City Council
Regular MeetingElverson, PA · September 24, 2019
Minutes
MABE Meeting Minutes September 24, 2019
In Attendance: Absent: Others in Attendance:
Lori Sifford Dave Friedman, EEMA
Darrell Gibble Jack Stewart, Borough Council
Jose Colon
Steve Keech
Floyd Jennelle
Stephen Kalis, Fox Rothschild
Keith Showalter, Systems Design
Charlotte Gehman
Meeting called to order at 7:13p
Meeting Minutes
Motion by Darrell to approve Minutes of August 27, 2019 Board Meeting as presented. Second by Steve. Motion
approved.
Public Comment
None
Correspondence/Communication
Springfield Village Inquiry – Board looked at the area in question while on the plant tour. Charlotte will respond to
Springfield Village management company.
Darrel mentioned that the manhole between Stoltzfus Enterprises and the Werner property. Parging needs to be
replaced to eliminate the odors coming from the manhole. EEMA will plan to repair the manhole.
Operator’s Report
Plant is running well. One violation during the week when the sampler was not working.
EQ Tank Repairs – Dave will send an email to EEC and Hydraterra to let them know that the tank pumps have been
repaired and that Blower Panel start-up can be scheduled. There is a punch list of items to be completed to finalize the
project. Pump capacity has increased from 50 gpm to 95 gpm.
Chemical Feed Pumps have been replaced. Dave presented a quote for housing to protect the chemical feed pumps
from the weather. No action taken on quote.
Influent Pump Station – Repair was deferred to repair the EQ Tank Pumps. Dave feels the performance has degraded a
bit, which caused an alarm triggered by blow back. Motion by Darrell to approve the Controlex quote including
pumping and hauling the amount of $8,320.00. Second by Jose. Motion approved. Dave estimates this to be a one
job work once the parts are ordered.
HVAC – Well Water Plumbing Quote – No quote provided by EEMA. This project is still under consideration.
Influent Pump Station Repair and Spare Repair Quote – Dave feels that performance had degraded somewhat in
addition to the repairs that need to be made.
Decant Pump – Estimate for repair is $4,380.00. Currently working of one pump and Dave would like to get this
repaired.
Aeration Tank Painting Quote – Quotes still being considered.
Aeration Tank Improvements Quote – Quotes still being considered.
Blower #2 Repair – Blower unit needs to be replaced. Dave estimates $3,000. -3,500. But will get an estimate. EEMA can
do this work.
Engineer’s Report
Page 1 of 2
MABE Meeting Minutes September 24, 2019
Blower Panel Project – Previously discussed under Operations.
Blue Rock Project – Final plans have not been received yet. The Planning Module has been signed by MABE and
returned to the developer’s engineer. The Borough is waiting for a copy to be signed. Keith reviewed the suggested
improvements to the Corbett Pump station. Charlotte spoke to the homeowner whose property Corbett sits on and
they are agreeable to considering expanding the easement. Discussion of the suggested developer’s contribution to the
Corbett Pump Station. Keith says that some of the improvements will require permits, which are not costly, but more
time consuming. Discussion of the inspections process for the sewer connections. Keith recommends that SDE inspect
all sewer lines at installation even though these will not be dedicated. The building sewer can be inspected by Kraft
Codes. Keith will finalize the cost of the Corbett improvements and include those in his review letter.
Main St. Manholes – Keith is getting quotes for the 5 manhole improvements and will coordinate with Sewer Specialties.
PA Small Water and Sewer Grant - Review and discussion of the program. Keith estimates $2,500.00-3,000.00 in
engineering costs to prepare the application. Board members will let Charlotte know if they support applying.
Solicitor’s Report
Blue Rock HOA Review – Stephen is working in this and will distribute a draft prior to the October MABE meeting.
Bidding Requirements – Stephen reviewed the requirements for quotes and bids. Stephen encourages that file notes be
kept memorializing the bids or quotes received for various projects.
Old Business
Workshop Meeting Scheduled for October 22, 2019 7:00p
New Business
Borough Pipe/Swale Work- Scheduled for October 21 for the work to be completed on the north side of 23 to be
accessed through the MABE property.
Treasurer’s Report
Sign Checks - Motion by Floyd to approve the September payables as presented. Second by Darrell. Motion
approved.
Admin Update
Plumbing Inspections – Inspection list was modified to avoid construction on the west end of Rte. 23. Changed to
properties on east end of town.
Executive Session
Meeting Adjourned to executive session at 8:31p
Executive Session Adjourned at 8:41p
Meeting Adjourned 8:42p
Workshop Meeting Scheduled for Tuesday, October 22 at 7:00p. Next Regular Board Meeting is Scheduled for Tuesday,
October 29, 2019 at 7:00p.
Page 2 of 2