Planning Commission
Regular MeetingEugene, OR · February 13, 2006
Minutes
SUMMARY MINUTES
Regular Meeting
Eugene Planning Commission
Sloat Room -- The Atrium – 99 West 10th Avenue
February 13, 2006
11:30 a.m.
PRESENT: Mitzi Colbath, President; Rick Duncan, Vice President; Jon Belcher, Phillip
Carroll, Randy Hledik, Phillip Hudspeth, John Lawless, members; Steve
Nystrom, Kurt Yeiter, Planning and Development Department; Gary McNeel,
Peggy Keppler, Theresa Walch, Mark Schoening, Public Works Department;
Kathryn Brotherton, City Attorney; Terry Connolly, Charles Biggs, Zachary
Vishanoff, guests.
ABSENT: Mike Sullivan, ex officio.
PUBLIC COMMENT ON NON-AGENDA ITEMS
I. APPROVAL OF MINUTES -- November 28, 2005 and January 10, 2006
Mr. Duncan, seconded by Mr. Lawless, moved to approve the
minutes of November 28, 2005 as amended, and the minutes of
January 10, 2006. The motion passed unanimously, 7:0.
II. PLANNING COMMISSION DELIBERATION/ACTION: STORMWATER
DEVELOPMENT STANDARDS
Staff: Peggy Keppler, 682-2869
Mr. Belcher, seconded by Mr. Hledik, moved to recommend that
the City Council consider the proposal presented to the Planning
Commission, with the additional requirements that they take a
further look at parking lot size, and source control standards.
The motion passed unanimously, 7:0.
III. DISCUSSION: OPPORTUNITY SITING
Staff: Kurt Yeiter, 682-8379
IV. ITEMS FROM COMMISSION AND STAFF
A. Other Items from Staff
MINUTES -- Eugene Planning Commission February 13, 2006 Page 1
B. Other Items from Commission
MINUTES -- Eugene Planning Commission February 13, 2006 Page 2
MINUTES
Regular Meeting
Eugene Planning Commission
Sloat Room—The Atrium—99 West 10th Avenue
February 13, 2006
11:30 a.m.
PRESENT: Mitzi Colbath, President; Rick Duncan, Vice President; Jon Belcher, Phillip
Carroll, Randy Hledik, Phillip Hudspeth, John Lawless, members; Steve
Nystrom, Kurt Yeiter, Planning and Development Department; Gary McNeel,
Peggy Keppler, Theresa Walch, Mark Schoening, Public Works Department;
Kathryn Brotherton, City Attorney; Terry Connolly, Charles Biggs, Zachary
Vishanoff, guests.
ABSENT: Mike Sullivan, ex officio.
Ms. Colbath convened the meeting of the Eugene Planning Commission at 11:30 a.m.
PUBLIC COMMENT ON NON-AGENDA ITEMS
Zachary Vishanoff, Patterson Street, distributed a handout entitled UO Eyes Franklin—
Consultant’s proposal would mean big buildings. Mr. Vishanoff expressed his frustration with
the University of Oregon’s campus development proposal and lack of consideration for
sustainability.
I. APPROVAL OF MINUTES -- November 28, 2005 and January 10, 2006
November 28, 2005
Page 1, PRESENT: should read: Mitzi Colbath, President; Rick Duncan, Vice President; Jon
Belcher, Phillip Carroll, Randy Hledik, John Lawless, members; Mike Sullivan, ex officio; Susan
Muir, Steve Nystrom, Kurt Yeiter, Alan Lowe, Planning and Development Department;
Page 2, paragraph 5, should read: Mr. Lawless said that Councilor Bettman’s concern was that
the definition diverted from the initial definition. He said he had been more interested in
exploring going beyond that limited definition of opportunity siting and could be more in the
context of overall densification. He said he had hoped for more of a discussion of where other
infill could take place. He said he had been happy to see follow up discussion that provided
clarification that some infill would be accommodated in other ways. He said tax lot specific
opportunity siting still seemed as if it was moving away from the natural infill and absorption rate
that neighborhoods would have. He expressed his frustration that the issue was not being looked
at holistically.
Page 3, paragraph 3, sentence 3, should read: She said modeling was not the ultimate answer but
was the information to help determine how variables interacted with each other.
MINUTES -- Eugene Planning Commission February 13, 2006 Page 1
Page 4, paragraph 2, sentence 1, should read: Ms. Colbath added that there needed to be
alternative path language in the process.
Page 5, paragraph 8, should read: Ms. Colbath expressed a desire to have another joint meeting
before the end of April.
Page 5, paragraph 10, sentence 2, should read: She commented that if staff started in January it
would be difficult to get on a Council agenda by the end of April.
Page 6, paragraph 5, should read: There was general consensus to form an opportunity siting
subcommittee consisting of Commissioners Duncan, Hledik, Belcher, and Colbath.
Page 6, IV. ELECTION OF OFFICERS, insert the following between sentence 1 and sentence
2: Mr. Belcher called for a process discussion on election of officers before the next election.
Page 7, paragraph 1, sentence 1, should read: In response to a question from Mr. Duncan
regarding the City of Eugene’s reaction to the amendment that land use issues be postponed until
Ballot Measure 37 was resolved, Ms. Muir said the Council had taken action on Goal 5 which
superseded the earlier motion to not proceed on anything that could add value to a property.
January 10, 2006
No changes.
Mr. Duncan, seconded by Mr. Lawless, moved to approve the
minutes of November 28, 2005 as amended, and the minutes of
January 10, 2006. The motion passed unanimously, 7:0.
II. PLANNING COMMISSION DELIBERATION/ACTION: STORMWATER
DEVELOPMENT STANDARDS
Mr. Hledik stated for the record that although he had not attended the January 10, 2006 Planning
Commission Public Hearing on amendments to the Eugene Code, establishing stormwater
development standards, he had listened to the tapes, and reviewed the PowerPoint presentation.
Ms. Keppler offered a correction to the Agenda Item Summary (AIS) included in the agenda
packet for this discussion. The AIS stated that “Attached to this AIS as attachment A are staff’s
responses to all of the Planning Commission’s questions and the public testimony. All of the
written testimony submitted before the close of the record on January 10th is attached to this
AIS.” Ms. Keppler stated the documents had actually been included agenda packet for the
January 10, 2006 public hearing.
Ms. Keppler distributed the following handouts:
• Lone Oaks Paving.
• City of Eugene Stormwater Management Rite Aid Willamette Plaza Review.
• City of Eugene Stormwater Management Ray’s food Place Review.
• Lone Oaks Paving
MINUTES -- Eugene Planning Commission February 13, 2006 Page 2
Ms. Keppler described the use of pervious Portland cement concrete pavement on Lone Oak
Drive in 2005. She said the road was in a commercial area in the River Road/Santa Clara area.
She stated that pervious pavers had been used in the parking areas adjacent to the developable
sites, consisting of an assisted living complex and a commercial medical office. Ms. Keppler
stated that the porous pavement did not treat stormwater, but rather reduced the impervious area
that was needed to treat the stormwater. She added that it was necessary to apply subtreatment to
the road surface.
Mr. Duncan asked if parking stall areas with pervious pavers could be created in parking lots.
Ms. Keppler responded that although use of pervious pavers were not currently allowed for
streets, she was not aware of any situations in which they would not be allowed for parking lots.
Mr. Lawless asked why it would be desirable to use pervious pavers for an entire development to
remove an entire system from the treatment process.
Ms. Keppler replied that pollutants could be trapped under the pavers, and still not go into the
ground water below or into the City system, thus continuing to restrict pollutants from entering
the surface waters.
Ms. Colbath asserted it was difficult to strike a balance between the original stormwater standards
that required impervious surfaces and the new standards that allowed pervious surfaces.
Ms. Walch explained there was a difference between development standards that were designed
using a water quality design for more frequent, smaller storm events and the flood control system.
Mr. Lawless said the issue was about pollutants and how they were trapped and diverted, and how
they were infiltrated into the stormwater system, the rivers and streams, as well as the ground
water. He added that the pollutants were imbedded in the underlying surfaces and leaching into
the ground water.
Ms. Walch said staff acknowledged that there was a water quality impact to infiltration as there
was with other water quality facilities. The issue was to reduce the level of impact to the system
through infiltration. She added the stormwater program had complimentary elements such as the
education program that provided information about reducing pollutants at the source using best
management practices to compliment the development standards.
Mr. Duncan asked if federal requirements for putting less stormwater into the system are resulting
in putting more pollutants into the ground water system.
Ms. Keppler stated that two federal acts were pushing the water quality issue. The Clean Water
Act protected surface waters, while the Safe Drinking Water Act that protected subsurface waters.
With the pervious surface waters went down through the pavement and being trapped in the layer
between the impervious surface and the ground waters. The underground injection control (UIC)
system protects the safe drinking water which required separation between the impact and the
ground water elevation. Ensuring minimum separation, which was currently five feet for
impervious surfaces, was one requirement. If UIC was used, where there was a pipe
underground, a ten foot separation was required.
MINUTES -- Eugene Planning Commission February 13, 2006 Page 3
Ms. Walch said a decision to use the Portland Manual was made because it had been reviewed by
the State of Oregon Department of Environmental Quality (DEQ) for consistency with the Safe
Drinking Water Act regulations. All of the best management practices in the Portland Manual
had a designation that identified additional requirements through the UIC program. Ms. Walch
added that pervious pavement systems were not considered UIC systems.
Mr. Belcher asked what types of substances would be able to penetrate the pervious surfaces.
Ms. Walch replied there were still studies underway regarding the UIC in which the City of
Eugene was participating with other agencies to conduct ground water and dry well monitoring to
determine what substances came out of dry wells, and whether it met the drinking water quality
requirement.
Ms. Keppler stated that in addition to using best management practices, other maintenance
activities such as sweeping and periodic cleaning of the system were required. She added that the
goal was to make all of the elements work together to ensure that pollutants were not introduced
into the subsurface and forgotten about.
• City of Eugene Stormwater Management Rite Aid Willamette Plaza Review
Ms. Keppler stated that the Rite Aid site was a PUD redevelopment site. She said Phase I had
been approved before the new standards were adopted and was currently under construction.
Although no impervious area reduction was provided, the project did include an addition of trees
to the existing impervious parking area. Trees within the vegetated infiltration basis were not
included as impervious surface area reduction. Phase I was not in full compliance with
infiltration basis requirements, in that it did not meet the minimum requirements for plants per
square foot for large shrubs/small trees. However, the plan exceeded the shrub/large grass like
plants density requirement.
In response to a question from Ms. Colbath, Ms. Keppler said the Rite Aid Willamette Plaza
development preceded the implementation of the proposed standards.
Responding to Mr. Duncan, Ms. Keppler explained if a design was completed on the presumptive
method, the facility could be sized based upon actual soil types and infiltration rates, and possibly
been sized down, which would allow for use of the facility by multiple developments.
Mr. Hledik asked if a developer exceeded the requirements for a facility, could the parking lot be
reconfigured in the future without adding to its capacity, with credits generated by the first
project.
Ms. Keppler said it could be possible with an adjustment of the system development charges
(SDCs) or user fees. She added that another technique would be to do a subsurface structural
treatment through the vault system.
Mr. Schoening added that if the development was initially oversized, the developer would receive
an SDC credit, which would preclude the excess capacity being available in the future.
• City of Eugene Stormwater Management Ray’s food Place Review.
Ms. Keppler explained this was a new development site on River Road, that came in as a site
review with related land use applications, that included a subdivision on the east side and
MINUTES -- Eugene Planning Commission February 13, 2006 Page 4
partitions dividing commercial lots on the west side. She said the grocery store application
included some stormwater treatment facilities because the downstream system had capacity
issues. The plan built some storage in the swale in the south and east borders. She explained that
the proposed landscape could be used in both the swale and in the facilities separating parking
lanes. Based upon the SIM form, the facility was somewhat oversized for the system, which may
allow more impervious surface. Ms. Keppler said the developer did a good job with this project,
and was very close to being compliant with the proposed code.
Ms. Colbath said if it was standard for the parking square footage to exceed the building square
footage.
Mr. Nystrom explained that the ratio of parking to building size depended upon the use of the
building, adding that it was quite possible for the parking square footage to exceed the building
square footage.
In response to Mr. Hledik, Ms. Walch stated that Public Works had maps which illustrated all of
the stormwater outfalls into the river system. She added that there was currently no treatment of
the stormwater going into the river system throughout the City. However, there were some
capital projects, such as that at Royal Avenue and Greenhill Road, and generally in the West
Eugene Wetlands, to lay channels back and vegetate to improve water quality.
Ms. Keppler added there were few treatments at the outfall areas. Rather, measures had been
taken through other programs, such as the street sweeping program, and sedimentation manholes
in wetland areas.
Responding to Mr. Hledik, Mr. Schoening explained that SDCs were not segregated by water
quality versus quantity, but rather by an improvement fee versus a reimbursement fee. The SDCs
were used to fund capital improvements throughout the City, some to increase capacity, and some
to address water quality.
Mr. Duncan asked if passage of the ordinance would result in any dramatic change from current
City practices. He expressed concern that the proposed ordinance created any undue cost to
projects that would make the projects not feasible, particularly in the case of a large mixed use
project or a large employment center.
Ms. Walch responded that the proposed ordinance represented a significant change for new
developments. However, other jurisdictions in the state have already adopted similar changes,
and the local development community were aware of the need for the changes. She added that
Portland, where the standards had been in place for over five years, was seeing more creativity
from developers and designers for incorporating the green roofs, pervious surface techniques and
other techniques. Ms. Walch said there were some adjustments to the ordinance to ensure that it
did not create barriers that could not be overcome.
Mr. Duncan opined that the economics differed between Eugene and Portland, and asked if there
were cities similar in size to Eugene that had adopted new regulations.
Ms. Keppler said the City of Springfield had already adopted the new criteria. She added that the
development community had been including the new techniques in their design for five or six
years. This was due in part because other regulatory requirements to include water quality
treatment. By implementing the standards locally, DEQ would expect the City of Eugene, as a
phase one agency, to conduct reviews locally. This was a benefit to local developers.
MINUTES -- Eugene Planning Commission February 13, 2006 Page 5
Mr. Lawless asked if SDCs would be reduced dramatically as a result of the requirement for on-
site treatment by the private sector, and what would happen to the stormwater system with less
funding. He also asked what percentage of acreage was covered by private sector impervious
surface.
Mr. Schoening stated the capital improvements were funded both stormwater SDCs and utility
fees paid on monthly utility bills. He said the Lone Oak project, funded with SDCs, was used as
a beta site to demonstrate to the private sector that the City was imposing the same standards on
itself as it was requiring of private developers. When the ordinance was adopted, the cost of the
project would be covered through the project budget, regardless of whether the project was
publicly or privately funded.
In response to Mr. Lawless, Ms. Walch asserted that the Capital Improvement Plan (CIP)
included long term stormwater basin planning, such as neighborhood water quality facilities and
waterway restoration projects, that were identified to address existing water quality condition.
Ms. Keppler clarified that only a portion of SDCs and user fees were reduced through meeting or
exceeding the proposed requirements.
Mr. Hledik asked how closely the City of Eugene proposal paralleled that of the City of
Springfield.
Ms. Walch understood that the City of Springfield applied the new stormwater standards to new
industrial/commercial development regardless of impervious area, while they did not apply them
to minor subdivisions of three or fewer lots, or single family residences. She said this was
consistent with the City of Eugene’s proposal. She added that City of Springfield adopted the
Portland Manual with no changes.
Referring to page II-4, question 5, Is a person required to cover an oversized tank (such as a
refinery tank) as part of the source control requirements? Mr. Duncan asked for clarification of
the staff response. Ms. Keppler said it was necessary to verify adherence to the requirements, but
there was no need for a second adjustment review.
Mr. Nystrom added that if there was another discretionary application, the review could occur for
both simultaneously.
Ms. Brotherton said even if all of the state and federal standards were met, a blanket approval
may not cover all of the source control requirements. Thus, a minimal process would identify
those source controls that were not addressed by state and federal standards.
Mr. Duncan was concerned about placing unnecessary burdens on potential developments.
Mr. Nystrom added that may of these issues have been addressed through Goal 5, although there
may be some exceptions under Goal 5 that needed a discretionary process.
Ms. Colbath said the impetus appeared to be an effort to ensure that state and federal
requirements were being met.
In response to Mr. Lawless’ question about page II-7, question 12, Should the Goal 10 findings
include the information about oil control facilities adjustments since Goal 10 only applies to
MINUTES -- Eugene Planning Commission February 13, 2006 Page 6
residential housing?, Ms. Keppler affirmed that this applied only to apartment complexes of four
or more units, and did not apply to single family residences.
Mr. Lawless found this requirement onerous for a small development, a sentiment with which Mr.
Duncan concurred. Mr. Lawless added that he was concerned that this would be imposed on
infill types of development that the City was attempting to encourage.
Ms. Keppler agreed to find a solution to those concerns.
Mr. Nystrom said the standard was actually based on commercial rather than residential
development. He added that many infill projects would fit within the criteria.
Mr. Duncan asked how a development site would be classified that consisted of mixed use with
ground floor commercial with second floor residential.
Mr. Nystrom stated that mixed use was complicated to deal with, suggesting that residential
projects needed further study. He added that the DAC had focused on commercial, and would
willing to follow the Planning Commission lead on residential concerns.
In response to Mr. Hledik, Ms. Walch listed the DAC membership:
• 2 design engineers from the City of Eugene.
• 2 local design engineers.
• 1 representative from the neighborhood groups.
• 1 representative from the Home Builders Association of Lane County.
• 1 representative from the Eugene Area Chamber of Commerce.
• 1 representative from the Citizens for Public Accountability.
• 2 representatives from landscape architects.
• 1 representative from the DEQ.
• 1 UO professor.
Mr. Belcher asked for clarification on adjustment review language on pages II-23 and II-24.
Ms. Keppler said the purpose was to achieve a balance, rather than removing the requirements.
Mr. Belcher asked for clarification regarding page II-8, question 18, Rob Handy: Residents in the
River Road area are interested in drainage and asked that natural drainage options in the Santa
Clara/River Road area be a priority. Expressed some concern with the exemptions that were
built into the program and questioned whether the code language was strong enough. He
requested that the City consider using the 2,500 square feet currently being used by the City of
Gresham. Mr. Belcher asked if treatment available treatment options included bioswales or
drainage ditches.
Ms. Keppler replied that although the issue was not part of the ordinance, some of the standards
had been indirectly incorporated from the manual for the River Road/Santa Clara area. She added
that bioswales were considered acceptable forms of treatment.
Ms. Walch summarized the concerns expressed by the Planning Commissioners:
• Concern about pervious pavement.
• Clarification in the oil control section for application for commercial and industrial uses.
• Do no create an adjustment review process for something that would be exempted.
MINUTES -- Eugene Planning Commission February 13, 2006 Page 7
• Parking requirement adjustment for application to commercial but not residential.
Mr. Nystrom explained that the role of the Planning Commission in this legislative matter was to
make a recommendation to the City Council. He asked if the Commission was comfortable
moving forward, giving staff direction to address its concerns, or if it needed additional
information from staff. Based upon the Commission’s discussion, Mr. Nystrom suggested
directing staff to develop language for the parking requirement to address mid-size and larger
parking lots.
Mr. Carroll stated that he was more comfortable addressing general guidelines rather than talking
about specific numbers.
Ms. Colbath said it was important to capture businesses that had small parking lots, and high
volumes of drive through traffic.
Mr. Belcher, seconded by Mr. Hledik, moved to recommend that
the City Council consider the proposal presented to the Planning
Commission, with the additional requirements that they take a
further look at parking lot size, and source control standards.
The motion passed unanimously, 7:0.
III. DISCUSSION: OPPORTUNITY SITING
Mr. Nystrom acknowledged that the item was on the agenda as a place holder.
Referring to page 11, paragraph 3, of the draft minutes of the January 19, 2006 Planning
Commission meeting, Mr. Belcher said the first sentence did not accurately reflect his intent. He
said he assumed that the City of Eugene would create a list of contract planners from which
neighborhoods could select and work with on neighborhood projects.
Mr. Duncan reported that both of his City Council buddies were very supportive of the general
discussion that had taken place. Councilor Kelly said he would have discussions with both City
Manager Dennis Taylor and Mayor Kitty Piercy regarding scheduling a joint meeting with the
City Council on this item in April or May. Mr. Kelly asked if the process could be completed in
one year.
Mr. Duncan said he recently attended a presentation at the Eugene Area Chamber of Commerce
regarding commercial lands studies, where Jack Roberts commented that results were expected
no earlier than April 2006.
Mr. Belcher reported that he had talked with Councilor Taylor, but had not had an opportunity to
talk with Councilor Ortiz. Ms. Taylor seemed generally supportive, and raised questions of cost.
Mr. Hledik reported that Councilor Papé was generally supportive and urged the Commission to
keep pushing in the budget process and on the budget calendar. They discussed the importance of
balancing interests of various stake holders. Mr. Papé was very keen on the alternate path, and
considered it to be a good voluntary approach to the prescriptive process. He asked if the process
could be completed in a year.
MINUTES -- Eugene Planning Commission February 13, 2006 Page 8
Ms. Colbath said Planning Commission had requested staff to schedule the opportunity siting
discussion for March in preparation for a subsequent joint meeting with the City Council. She
said the subcommittee had met once with the Neighborhood Leaders’ Council (NLC), and was
planning to meet again prior to the Planning Commission discussion.
Mr. Belcher said the NLC was generally supportive of the Commission’s proposal, but they did
have questions regarding costs and neighborhood involvement.
Mr. Belcher stated that there several things about neighborhoods represented by Paul Conte, one
of which was true and one of which was not. One was there were very few if any parts of the
City that were not within neighborhood associations, the exception being most of the UO and
South Eugene High School, and any pieces of land recently annexed that had not formally been
included in a neighborhood association. Mr. Belcher expressed surprise that not every
neighborhood charter stated that people were members if they lived, owned property or had a
business in a neighborhood. He said the Commission would need to look into this matter.
Ms. Colbath said including businesses, property owners, and landlords in the neighborhood
charters was a recent trend.
Mr. Carroll reported that Councilor Solomon expressed concern that there was not enough
substance in the opportunity siting discussion to demonstrate to her the difference between
opportunity siting and a broad brush nodal concept. She was interested in an alternative path
development application approach.
MINUTES -- Eugene Planning Commission February 13, 2006 Page 9
IV. ITEMS FROM COMMISSION AND STAFF
A. Other Items from Staff
Mr. Nystrom reviewed the Commission schedule and said he would distributed a revised calendar
via email.
B. Other Items from Commission
Mr. Belcher provided an update on the Council buddies, noting that he was buddy for Councilors
Taylor and Ortiz. He added that Mr. Hudspeth was the buddy for Councilor Poling.
Mr. Lawless reported that he was a member of the technical advisory committee and steering
committee for the Walnut Node. He said the consultants had developed three alternatives that
were intended to put some big ideas in front of the larger group to generate discussions on some
of the concepts for nodal development. Mr. Lawless said group took a trip to Salem with
planning staff to meet with State of Oregon Department of Land Conservation and Development
staff to do a preview of how to examine and rearrange viable alternatives offered by neighbors,
business owners, the Oregon Department of Transportation and other stake holders.
Mr. Lawless said the following issues had been identified:
• ODOT had set aside the idea of an I-5 off ramp on Franklin Boulevard, but would
support the three jurisdictions if they chose to pursue the idea.
• Continued uncertainty with UO planning related to the arena, parking, east campus, and
other issues, that were outside of the Walnut Node planning area.
• Concern by members of the Fairmont neighborhood regarding traffic concerns.
In response to Ms. Colbath, Mr. Lawless said the UO had recognized the significance of the Joe
Romania site on Franklin Boulevard. Mr. Nystrom added that the Joe Romania site was not listed
as an historic site.
Mr. Duncan said the City Council would take action on the Parks, Recreation and Open Space
(PROS) Comprehensive Plan this evening. He said he had been asked by two City Councilors to
request a member of the Planning Commission attend the meeting. Mr. Duncan expressed
concern that the Council did not fully understand the Commission’s level of concern, particularly
regarding the lack of inclusion of proposed projects in the document, buildable lands issues, and
the needs assessment.
Mr. Belcher was concerned that the City Council would approve the project list by resolution
with no public process on the list.
Ms. Colbath said she regularly attended City Council meetings to be available to answer
Councilor’s questions on issues that had been addressed by the Planning Commission. She said
she had attended the City Council work session at which the PROS Comprehensive Plan was
discussed, at which staff had conveyed the Commission’s concerns. She said although the
Council had heard those concerns, she did not know if they understood the level of the
Commission’s concerns.
MINUTES -- Eugene Planning Commission February 13, 2006 Page 10
Mr. Belcher suggested that the Planning Commission may not always be sufficiently clear in its
issues or discussions with Council buddies, and it appeared to him that whatever the Planning
Commission was doing, it was not working with the Council. He asked if the Commission had
voted to change the draft, would staff have followed that direction.
Mr. Duncan asked if the Planning Commission made a recommendation, did not staff have the
responsibility of forwarding that recommendation to the City Council.
Mr. Nystrom said staff would have followed the Commission’s direction. He added staff was
regularly asked by the Council to forward its own recommendations, and stated that PROS staff
had iterated that it did differ with the Planning Commission on the project list. Mr. Nystrom said
PROS staff had the responsibility of balancing the opinions not only of the Planning Commission
but also the DAC and its three years of work on the project.
Ms. Colbath adjourned the Planning Commission meeting at 1:29 p.m.
(Recorded by Linda Henry)
m:\2006\planning and development department\planning division\planning commission\pc060213.doc
MINUTES -- Eugene Planning Commission February 13, 2006 Page 11
Agenda
AGENDA
EUGENE PLANNING COMMISSION
Atrium Building, Sloat Room, 99 West 10th Avenue, Eugene, OR 97401
Phone: (541) 682-5481 Web site: www.eugene-or.gov
The Eugene Planning Commission welcomes your interest in these agenda items. Feel free to come and go as you
please at any of the meetings. This meeting location is wheelchair-accessible. For the hearing impaired, FM
assistive-listening devices are available or an interpreter can be provided with 48 hours notice prior to the meeting.
Spanish-language interpretation will also be provided with 48 hours notice. To arrange for these services, contact the
receptionist at 682-5481. Telecommunications devices for deaf assistance are available at 682-5119.
MONDAY, FEBRUARY 13, 2006 – REGULAR MEETING
(11:30 a.m.)
11:30 a.m. PUBLIC COMMENT
The Planning Commission reserves 10 minutes at the beginning of this meeting for public
comment. The public may comment on any matter, except for items scheduled for public
hearing or public hearing items for which the record has already closed. Generally, the
time limit for public comment is three minutes; however, the Planning Commission reserves
the option to reduce the time allowed each speaker based on the number of people requesting to
speak.
11:40 a.m. I. APPROVAL OF MINUTES
Minutes of November 28, 2005 and January 10, 2006
11:50 a.m. II. PC DELIBERATION/ACTION: STORMWATER DEVELOPMENT STANDARDS
Staff: Peggy Keppler, 682-2869
12:40 p.m. III. DISCUSSION: OPPORTUNITY SITING
Staff: Kurt Yeiter, 682-8379
1:15 p.m. IV. ITEMS FROM COMMISSION AND STAFF
A. Other Items from Staff
B. Other Items from Commission
Commissioners: Jon Belcher, Phillip Carroll, Mitzi Colbath, President, Rick Duncan, Vice President,
Randy Hledik, Phillip Hudspeth, John Lawless
Ex officio member: Mike Sullivan, Division Manager, Community Development