Regular MeetingEugene, OR · October 31, 2011
Agenda
AGENDA
EUGENE PLANNING COMMISSION
McNutt Room, City Hall
Phone: 541‐682‐5481 777 Peal Street
www.eugene‐or.gov/pc Eugene, OR 97401
The Eugene Planning Commission welcomes your interest in these agenda items. Feel free to come and go as
you please at any of the meetings. This meeting location is wheelchair‐accessible. For the hearing impaired,
FM assistive‐listening devices are available or an interpreter can be provided with 48 hours notice prior to the
meeting. Spanish‐language interpretation will also be provided with 48 hours notice. To arrange for these
services, contact the receptionist at 541‐682‐5481. Telecommunications devices for deaf assistance are
available at 541‐682‐5119.
MONDAY, OCTOBER 31, 2011 – REGULAR MEETING (11:30 a.m. to 1:30 p.m.)
11:30 a.m. I. PUBLIC COMMENT
The Planning Commission reserves 10 minutes at the beginning of this meeting for
public comment. The public may comment on any matter, except for items
scheduled for public hearing or public hearing items for which the record has
already closed. Generally, the time limit for public comment is three minutes;
however, the Planning Commission reserves the option to reduce the time allowed
each speaker based on the number of people requesting to speak.
11:40 a.m. II. ENVISION EUGENE: SINGLE‐FAMILY HOUSING LAND NEED
Staff: Heather O’Donnell, 541‐682‐5451
Alissa Hansen, 541‐682‐5508
1:00 p.m. III. CLUTAC JOINT SUBCOMMITTEE: DISCUSSION OF UPCOMING WORK
Planning Commissioner Mills
1:15 P.M. IV. ITEMS FROM COMMISSION AND STAFF
A. Other Items from Staff
B. Other Items from Commission
Commissioners: Steven Baker; Jonathan Belcher; Rick Duncan; Randy Hledik, Vice Chair;
Jeffery Mills, Chair; William Randall
PC AIS OCTOBER 31, 2011 - Page 2
AGENDA ITEM SUMMARY
October 31, 2011
To: Eugene Planning Commission
From: Heather O’Donnell and Alissa Hansen, City of Eugene Planning Division
Subject: Envision Eugene Update: Single‐Family Land Need
ACTION REQUESTED
This work session provides the Planning Commission with an update and opportunity to provide
feedback on analysis regarding the future single‐family housing land need.
BRIEFING STATEMENT
This is part of an ongoing conversation about Eugene’s 20‐year land need for all land types, including:
• Public and semi‐public land
• Single‐family housing
• Multi‐family housing
• Commercial
• Industrial
There are several components that make up how we determine our future land need for single family
homes. These components are identified below along with the status of each component.
COMPONENT COMPONENT DETAIL STATUS1
Housing Demand • Projected number of Units for 20 yrs • 14,951 units
• Single‐family/Multi‐family mix • Staff Recommendation:
55 SF/ 45 MF
• Single‐family Units needed • 8,223 units
Existing Capacity • Vacant land • 4,299 units
• Partially vacant land • 1,886‐2,643 units
• Redevelopment • 589 units
New Capacity through • Alley access lots • 60 units
Efficiency Strategies • Secondary dwelling units • 100 units
• Re‐designations • TBD
Remaining land need • Approximate UGB expansion • TBD
This work session will focus on the four highlighted components which have been the subject of
recent work: partially vacant land, redevelopment, re‐designations, and remaining land need.
1 Numbers cited here will be refined over the next couple of months.
1
PC AIS OCTOBER 31, 2011 - Page 3
Partially Vacant Lands
State statute requires that we identify partially vacant lands within the urban growth boundary
(UGB) and attribute future development to those lands. Partially vacant lands are those that have
some level of development, but also have a vacant portion of the property with potential for
additional development without demolishing the existing structure. In general, it was found that
Low Density Residential partially vacant lands are those that are one acre in size or larger. Lots
smaller than one acre in size are addressed under the “Redevelopment” category below. Staff
worked closely with the Technical Resource Group (TRG) and a sub‐committee of the TRG that was
dedicated to this task. The resulting analysis goes beyond what is required by the state and
provides a thoughtful and reasonable approach to predicting future development activity on these
lands. The attached white paper provides a summary overview of the analysis that has determined
how many single‐family homes can be accommodated on lands identified as partially vacant. A
map will be displayed at the work session that shows the location and approximate capacity of
these lands.
Redevelopment
Redevelopable lands are those that are less than one acre in size and have some level of
development that may or may not be removed to add new housing. It is not feasible to identify
specific properties that will redevelop over the next 20 years because the factors that go in to the
decision to redevelop are highly unpredictable. The City also has limited data to help understand
the historic redevelopment rate for single‐family homes. However, by reviewing the amount of
new dwellings on Low Density Residential lots less than one acre in size that have occurred
historically, a reasonable prediction of the future amount of new dwellings can be made. The TRG
and its sub‐committee worked closely with staff to develop the methodology and analysis:
Category Total Lots2 Total Lot Acres Historic Amount of Assumed Dwelling
New Dwellings Units Produced in
Created on Lots 20 years
Under 1 ac
Tax lots under 1 44,920 9,687 231 in 8 years 589
acre
Re‐designation of Parcels to Low‐Density Residential
Staff provided Planning Commission with an update on property re‐designations at the September
20, 2011 work session. At that time, staff had identified and sent letters to a group of landowners
to explore their interest in changing their property’s current land use designation from Medium
Density Residential (MDR) to Low Density Residential (LDR). This may make development of single‐
family homes more feasible on certain properties, thus helping to address our need for additional
land for single‐family home development.
Direction from the Planning Commission indicated that there is no interest in pursuing re‐
designation of properties if the property owner is not willing. After conversations with many
2 “Total Lots” includes all ECLA developed tax lots that have all or a portion of the tax lot designated LDR. This is the total base for consideration.
2
PC AIS OCTOBER 31, 2011 - Page 4
property owners in the study areas, and staff analysis of future land use patterns, a preliminary
recommendation has been generated to solicit feedback and provide initial numbers for the
purpose of calculating the future single‐family housing need. This recommendation may be revised
in the future to reflect additional property owner feedback and further analysis regarding the
impact of re‐designating MDR property to LDR on the multi‐family housing need. A map of the
preliminary recommendation of proposed properties for re‐designation will be displayed at the
work session.
Remaining Land Need
There are a number of considerations before one can confidently translate units needed into
acreage. Expansion areas must be identified and an analysis of the capacity of those lands must be
made. This capacity analysis is underway and preliminary results will be shared at the work session.
It should also be noted that there are public land uses that often take place on land designated for
single‐family homes. These public uses were discussed at the October 24, 2011 work session and
include approximately 170 acres of additional land need for purposes such as parks and
infrastructure. Some employment such as neighborhood commercial or home occupations also often
take place on land designated for single‐family homes. These uses will be discussed as part of the
work session on commercial lands in November.
In the event of a UGB expansion, the state has specific steps that must be followed to identify areas
for expansion. Property owners who live outside the current UGB and have a Lane County land use
designation that makes them a priority for consideration have been notified of this process. In
addition to a letter sent on October 5, 2011 (see attached), two drop‐in information sessions have
been held, and a phone line has been established to answer questions from property owners.
Attached is a map of the properties that received these letters.
NEXT STEPS
On November 9, 2011, staff will discuss the public land need and the single‐family housing land need
with the City Council. Feedback from the Planning Commission on these topics will be forwarded to
the City Council. A Public Hearing on public land need and single‐family housing land need will take
place on November 21, 2011. Council will not be asked to make any decisions before the end of the
calendar year or before adequate opportunity for public comments is provided.
FOR MORE INFORMATION
Heather O’Donnell, 541‐682‐5488 or heather.m.odonnell@ci.eugene.or.us
Alissa Hansen, 541‐682‐5508 or alissa.h.hansen@ci.eugene.or.us
ATTACHMENTS
A. Low Density Residential Partially Vacant Lands Summary
B. Letter sent to Property Owners in Expansion Study Area including map of area
3
PC AIS OCTOBER 31, 2011 - Page 5
PC AIS OCTOBER 31, 2011 - Page 6
Low Density Residential Partially Vacant Lands Summary
Enclosed is a table summarizing the results of the committee work and staff analysis of partially vacant lands with a plan designation of LDR. All lots
identified as partially vacant will be assigned capacity as part of the revised Buildable Lands Inventory (BLI). It is important to note that the language
utilized in this document is meant to be broadly descriptive and does not represent legal or findings-level language. Some of the key assumptions of
this analysis are as follows:
The analysis is much more detailed than the safe harbor provisions for partially vacant lands and represents a methodology that the
committee members felt was more thorough and reasoned than the safe harbor assumptions would have been. (see end of document for
list of methodologies/variables that were considered but discarded)
All lots that were in a non-residential use (church, neighborhood commercial, etc.) were excluded from the analysis.
All lots under 1 acre in size will not be identified as partially vacant lands, nor will they be included on a list or map of partially vacant lands.
While some of these lots are assumed to have additional capacity, this capacity will be assigned to the entire pool of lots and will be based
on recent trends for similar lots. These trends suggest that 589 dwelling units will be produced on these lands in the next 20 years.
All lots over 1 acre in size were examined individually. All lots are assumed to have some partially vacant capacity, dependent on their
location and their size, with the following exceptions:
o Developed with or owned by a non-residential use
o Needs to be reclassified from “developed” to “vacant” land
Densities were applied using the densities identified during the ECLA process with the following exception:
o The one exception to the ECLA densities applies to lots over 1 acre and above 5% slope. It is assumed that most of these lots will
develop as part of a Planned Unit Development (PUD). Recent data shows that densities achieved in PUD’s are slightly lower than
those achieved outside of PUD’s, so this lower density will be applied to these lots. Staff is still reviewing relevant data to confirm
that 1 acre is the appropriate cutoff point.
Lots with wastewater constraints are in areas that are not currently served by wastewater utilities. There are two options for how these lots
will be treated at the conclusion of Envision Eugene:
o The City believes that these areas can be served during the planning period and will document this in relevant plans if it is not
already adequately documented. The lots will be categorized as partially vacant and will be assigned capacity.
o The City does not believe that these areas can be served during the planning period. The lots will not be assigned partially vacant
capacity. Further work would be needed to determine what additional actions may be necessary to address these areas.
Eugene Planning Commission -10/31/11 1
PC AIS OCTOBER 31, 2011 - Page 7
Lots with transportation constraints are in areas that due to ODOT regulations may have limited or no ability to have additional capacity.
There are two options for how these lots will be treated at the conclusion of Envision Eugene:
o ODOT (and the City as necessary) believe that these areas can be served with adequate transportation infrastructure during the
planning period that will support additional capacity on these lots. The lots will be categorized as partially vacant and will be
assigned capacity.
o ODOT (and the City as necessary) does not believe that these areas can be served with adequate transportation infrastructure
during the planning period that will support additional capacity on these lots. This may impact the partially vacant capacity of these
lots, with the potential result that no capacity would be assigned. Further work would be needed to determine what additional
actions may be necessary to address these areas.
There are no lots currently categorized at this time as stormwater constrained. This category of lots is representative of the fact that lots
may become stormwater constrained within the next five years as a result of new state and/or city regulations. At that time, the capacity of
some lots that are currently categorized as partially vacant could be reduced in part or entirely.
Methodologies or Variables that were Considered but Discarded
The following represent ideas that were considered as part of the process in pursuit of a way to categorize similar lots that may have potentially had
similar capacity characteristics. While informative, each of these methodologies was discarded for various reasons including that the number of
similar lots was too small, data was incomplete or not sufficient or that the lots did not differ from a larger pool of lots in a significant way.
Improvement value (high or low)
Land to improvement value ratio
Lots lacking an address point
Lot frontage (eligibility for subdivision/partition)
Proximity to developable (vacant) land
Surrounding development pattern
Lots larger than 5 acres
Eugene Planning Commission -10/31/11 2
PC AIS OCTOBER 31, 2011 - Page 8
Summary of LDR Lots Considered for Categorization as Partially Vacant
Category Partially Partially Deduction for Buildable Density of Infill Dwelling Units
Vacant Lots² Vacant Acres Existing Acreage Lots Created⁴ Produced⁵
Development
(amount per lot)³
Tax Lots > or = 1 acre:
Lots > 900’ elevation (SHS)⁶ 33 57 NA NA 1.0 33
Lots straddling 900’ elevation (SHS)⁶ 4 12 NA NA varies varies
Lots < 5% slope (500’) 158 360 0.33 308 4.1-4.4 1,263-1,355
Lots > 5% slope (500’) 151 327 0.5 251 2.35-2.55 590-640
Lots with wastewater constraints 35 122 0.5 105 2.9-4.1 304-430
(Willow Creek area)⁷
Lots with transportation constraints⁸ 24 50 0.33 42 4.1-4.4 172-185
Lots with stormwater constraints Unknown Unknown NA NA NA NA
Total 2,362-2,643
Total (without wastewater and transportation constrained lots) 1,886-2,028
Notes:
¹“Total Lots” includes all ECLA developed tax lots that have all or a portion of the tax lot designated LDR. This is the total base for consideration.
²“Partially Vacant Lots” are partially vacant tax lots that are >= 1 acre. Tax lots determined not to be partially vacant include those that are:
o Completely residentially developed;
o Developed with or owned by a non-residential use; or
o Needs to be reclassified from “developed” to “vacant” land
³ Deduction for existing development accounts for existing houses or structures on the lot. This acreage, as well as any committed/protected acreage
or acreage under a different plan designation, is removed from the total lot acreage. Only the remaining acreage on the lot is assigned density.
⁴ Range in density is due to different densities based on lot size. Buildable areas from 1-5 acres would receive the smaller density, while areas larger
than 5 acres would receive the larger density. This accounts for the greater net to gross deduction for larger lots, as documented in ECLA. Densities
are based on documented densities from the 2001-2008 period, as established during ECLA. Staff will analyze data from development during the
2009-2010 period to determine if the density data should be updated. As such, minor changes to this density data may result.
⁵ All numbers are approximate for purposes of creating a preliminary estimate of dwelling units. Estimates are based on aggregate acreage. Ranges
are not a result of uncertainty in assumptions but rather that different densities will be applied to individual lots based on their buildable area size
Eugene Planning Commission -10/31/11 3
PC AIS OCTOBER 31, 2011 - Page 9
(1-5 acres or 5+ acres). Final values will be based on a lot by lot assignment of capacity, which is not expected to produce results substantially
different from the number of dwelling units shown above.
⁶ The South Hills Study (SHS) limits development above 900’ and is addressed in the Eugene Code.
⁷ Lots with wastewater constraints are primarily over 5% slope, thus the use of 0.5 ac deduction. The final capacity assignment on these lots (and all
lots) would be done on a lot-specific basis, thus the deduction for existing development could be 0.33 for lots that have less than 5% slope.
⁸ Lots with transportation constraints are all in areas with below 5% slope.
Eugene Planning Commission -10/31/11 4
PC AIS OCTOBER 31, 2011 - Page 10
October 5, 2011
Dear Property Owner,
Envision Eugene is the City of Eugene’s long‐range planning effort to determine how the city will
accommodate population growth over the next 20 years. The goals of Envision Eugene are to:
1) Determine how much land will be needed for residential, commercial and industrial uses, as
required by state law, and
2) Describe how we want to use our existing and new land as we grow, to shape what our
community will look like and feel like in the future.
Oregon law and community values require that the city grow as efficiently as possible. That means using
land inside the current urban growth boundary to the greate st extent possible, before looking to expand
the city’s urban growth boundary. Technical analysis is unde rway to determine how many jobs and
homes we can fit inside the existing urban growth boundary while still maintaining the high quality of
life we currently experience in our community. Although our analysis is not complete, it is possible that
Eugene may need to add additional land to its urban growth boundary for single‐family homes.
To help protect farm and forest land, state law has specific requirements about where a city can expand
its urban growth boundary. The first or highest priority type of land the city must consider for expansion
is land that is planned for residential, commercial, or industrial uses or currently has those uses on it, or is
completely surrounded by those uses. The identification of first priority lands is based on the planning
designation assigned to each property by Lane County. Once this first priority land is identified, the city
must check to see if it meets the city’s land need (i.e. does it provide suitable or appropriate land for
single‐family residential housing). A map of first priority areas around Eugene is on the back of this letter.
It is important for you to know that your property is located in a first priority area. The City is required
to consider all of these lands first if the urban growth boundary is expanded. This does not mean that
the urban growth boundary will expand, or that your property would be included if an expansion is
necessary. It does mean that your property is included in the current study area. There may be obvious
reasons why your property is not suitable to include for residential land. Over the next few months, the
City will be determining if expansion is necessary for
single‐family residential housing and if so, where it would
occur.
For More Information
If you have questions or would like additional information
Visit our website: www.envisioneugene.org
about Envision Eugene, there are several ways to get in
Click on “Expansion Analysis” on left side
touch with us (see the information provided in the grey
box at right). Attend a Drop‐In Info Session:
Tuesday October 18
Thank you for your time. The planning team and I look Drop in between 12pm and 2pm
forward to discussing our community’s future with you. or between 4pm and 6pm
99 W. 10th Avenue (10th & Olive)
Send an email:
Lisa Gardner envisioneugene@ci.eugene.or.us
Planning Director
Call our property owner phone message line:
City of Eugene Planning Division 541‐682‐5686
First Priority Land Surrounding Eugene
MEADOWVIEW RD
RIVE
R RD
HWY 99N
PRAIRIE RD
E PEARL ST
GREEN HILL RD
BEACON DR
AWBREY LN
SCENIC DR
LYNNBROOK DR I5 NB
E ENID RD
IRVINGTON DR
AIRPORT RD WILKES DR
AIRPORT RD BLACKFOOT AVE MC
K
PRAIRIE
EN
ZIE
VIE
W
DR
CLEAR LAKE RD RD IRVING RD HUNSAKER LN COUNTY FARM RD
AYRES R
D
WB BELTLINE RD LAKEVIEW
DR
RIVER AVE
BODENHAMER RD WB DELTA ONRP
GILHAM RD
CRESCENT AVE
I5 SB
RIVER
EB BELTLI
NC
COBURG RD
Y
CUBIT
CH
SB D
HOWARD AVE
N PARK AVE
L AR AD Y
INTERNATIONAL WA
FIR BUTTE RD
BARGER DR D
ELTA
NE RD
RD R
LEGACY ST
ST EY S
HW
N TERRY ST
HORN LN MINDA DR BELTLINE RD
TANEY ST
T
N
GATEWAY ST
BE OR
ECHO HOLLOW RD
I5
TH TH CAL YOUNG RD
EL WE BAILEY LN
NB D
GREEN HILL RD
OAKWAY RD
D R ST
ROYAL AVE EX
PR
ES ELTA HARLOW RD
ELMIRA RD SW
HW Y
ROOSEVELT BLVD AY
Y
BELTLINE RD
HW EB I105 I105 EB I105
WB I105
W 1ST AVE WB Q ST
99 MARTIN LUTHER KING JR BLVD
N W 2ND AVE MENLO LP
BAILEY HILL RD
CENTE
W 6TH AVE E 4TH AVE NNIAL
RAINBOW DR
E BLVD BLVD
ASPEN ST
ED CON W 7TH PL W 7TH AVEE 7TH AVE
POLK ST
S BERTELSEN RD
W 11TH AVE
N Y ST
OAK PATCH RD
HIGH ST
W D ST
W 13TH AVE
S A ST
CITY VIEW ST
SB
SENECA RD OAK ST
W 18TH AVE I5
PATTERSON ST
E 19TH AVE RP
AUGUSTA ST
ON
LINCOLN ST
E K RD S 2N
CHAMBERS ST
WILLO
W CRE BRITT
A W 24TH AVE
HAWKINS
DS
HILYARD ST
RD
WILLAMETTE ST
OW
T
CR
LN
W 28TH AVE
HARRIS ST AGATE ST
SPR
WA IN G
R
CREST D BLV
DR R
ON D
D E 30TH AV
E I5 SB
BRAE BURN M AZ
E 40TH AVE
E 46 VE
TH A RD A
V E E 43
RD ST
GIMPL HILL
DONALD
MCBETH RD
DILLARD RD
S WILLAMETTE ST
LORANE HWY
RD
OL
LO
W
FO
XH
´
DIL
L AR
DR
D
Study Areas Caution:
This map is based on imprecise
Eugene Urban Growth Boundary source data, subject to change, and
for general reference only.
10/5/11
Get email alerts for Eugene
A daily email when new agendas and minutes are posted.