MPO Policy Committee
Regular MeetingFarmington, NM · February 26, 2015
Agenda
POLICY COMMITTEE
AGENDA
Farmington Metropolitan Planning Organization
February 26, 2016
1:30 p.m.
Council Chambers
Bloomfield City Hall
Bloomfield, New Mexico
AGENDA
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
POLICY COMMITTEE MEETING
February 26, 2015 1:30 PM
This meeting will be held in Council Chambers at Bloomfield City Hall, 915 North First Street,
Bloomfield, New Mexico.
ITEM PAGE
1. Call meeting to order
2. Approve the minutes from the January 22, 2016 Policy Committee meeting. 15
3. Consider approval of Amendment #10 to the FFY2014-2019 Transportation 1
Improvement Program (TIP) and the Self-Certification for Amendment #10.
4. Reports from NMDOT
a. District 5 (David Quintana)
b. Planning Division (Brian Degani)
5. Review draft chapters of the 2040 MTP Update: 6
• Chapter 7 – Complete Streets & Roadway Aesthetics
• Chapter 8 – Freight & Rail
• Chapter 10 – Public Health & Safety
• Chapter 12 – Transportation Strategies & Policies
• Chapter 15 – Performance Measures
6. Receive a report on Complete Streets 7
7. Information Items: 14
a. Joint Powers Agreement
b. Upcoming Meetings
c. Discussion Items from Joint Technical Committee & NMDOT Meeting
d. Other
8. Business From Chairman, Members, and Staff
9. Business from the Floor
10. Adjournment
ATTENTION PERSONS WITH DISABILITIES: If you are an individual with a disability who is in need of
a reader, amplifier, qualified sign language interpreter, or any other form of auxiliary aid or service to
attend or participate in the hearing or meeting, please contact the MPO Administrative Aide at the
Downtown Center, 100 W Broadway, Farmington, New Mexico or at 505-599-1466 at least one week
prior to the meeting or as soon as possible. Public documents, including the agenda and minutes, can be
provided in various accessible formats. Please contact the MPO Administrative Aide if a summary or
other type of accessible format is needed.
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
Agenda Item #3
Subject: FFY2014-2019 TIP Amendment #10
Prepared by: Duane Wakan, MPO Planner
Date: February 17, 2015
BACKGROUND
On January 25, 2015 the Farmington MPO advertised Amendment #10 to the
FFY2014-2019 Transportation Improvement Program (TIP).
The amendment adds one project to the TIP, amends two projects, and deletes
one project as described in the attached notice.
The Technical Committee is expected to recommend approval at their Special
Joint Meeting on February 26.
ADDED/DELETED TIP PROJECTS
$250,000 in CMAQ Flex funding in FY2019 is being removed from Phase I of the
East Piñon Hills Blvd Extension (CN F100100).
Adds Phase II of East Piñon Hills Blvd Extension (CN F100101) to the TIP and
receives $250,000 in CMAQ Flex in FY2017 moved over from Phase I.
Phase II of the East Arterial Route in Aztec (CN F100091) amends the scope of
the project to include language regarding a detached trail and underground
utilities.
County Road 7500 (CN F10040) is being removed from the TIP due to lack of
funds.
ANTICIPATED WORK
Seek approval of the amendment at the February 26, 2015 Policy Committee
meeting.
ATTACHMENTS
Public Notice describing the projects in Amendment #10.
MPO Self-Certification for TIP Amendment #10.
ACTION ITEM
It is recommended that the Policy Committee approve Amendment #10 to the
FFY2014-2019 TIP and the MPO Self-Certification for Amendment #10 to the
FFY2014-2019 TIP.
1
PUBLIC NOTICE
The Farmington MPO is advertising Amendment #10 to the FFY2014-2019
Transportation Improvement Program which adds one new project, amends two projects,
and deletes a project as follows:
This public comment period meets all of the applicable requirements of the federal
transportation bill MAP-21 and the federal transit requirements of Section 5307(c) (1-7).
Added/Amended Projects
Project Name: East Piñon Hills Blvd Extension (Phase I)
Control Number: F100100
Project Description: Full rebuild of the Intersection of Piñon Hills and
NM 516; Extension of Piñon Hills Blvd to
include earthwork, asphalt, street lighting,
drainage improvements and signalization
upgrades. Future Phases II & III are outside of
the current cycle.
Project Termini: NM 516 (E. Main to Hubbard)
Lead Agency: City of Farmington
Functional Classification: Principal Arterial (Other)
Funding Source TCSP, STP Small Urban, CMAQ Flex, Local
Match
Funding Action: Remove $250,000 CMAQ Flex funds
Fiscal Year FY2019
Total Project Cost Phase I: $3,700,000
New Project to TIP: East Piñon Hills Blvd Extension (Phase II)
Control Number: F100101
Project Description: Includes earthwork, asphalt, intersection
lighting, bridges over the Animas River and
oxbow, drainage improvements, environmental
mitigation.
Project Termini: Hubbard to CR 3000
Lead Agency: City of Farmington
Functional Classification: Principal Arterial (Other)
Funding Source CMAQ Flex, Local Funds
Funding Action: Add CMAQ Flex $213,600 Local Match
$36,400 moved over from CN F100100 (Phase
I)
Fiscal Year FY2017
Total Project Cost Phase $13,265,454
II:
2
Project Name: East Arterial Route Phase II
Control Number: F100091
Project Description Construct remaining road section from end of
Change: Phase I to NM 173 including a detached multi-
use pedestrian path. Utility work consisting of a
10-inch water line will be constructed for the
entire length of the project.
Project Termini: From Legion Road to NM 173
Lead Agency: City of Aztec
Functional Classification: Principal Arterial (Other)
Deleted Project
Project to delete from San Juan County Road 7500
TIP:
Control Number: F10040
Project Description: Maintenance and Resurfacing (road repair)
Project Termini: MP 7.2 to MP 0 (US 550)
Lead Agency: San Juan County
Functional Classification: Local
Funding Source STP FY 2008 Earmark
Funding Amount: $264,000 Federal $361,000 Local Funds
Fiscal Year FY2015
Total Project Cost: $625,000
As required by federal law and the Farmington MPO Public Participation Plan, the
FMPO is holding a 30-day Public Comment period and Public Hearing on Amendment
#9. The 30-day comment period is from January 25, 2015 to February 23, 2015. The
public may also make comments on the proposed amendments at the following meeting:
Public Hearing: During the Farmington MPO Technical Committee meeting at 10:00
a.m. on Thursday, February 12, 2015 in the Aztec City Commission Chambers, 201
West Chaco, Aztec, New Mexico 87410. Final approval on the proposed amendment will
be considered during the Farmington MPO Policy Committee meeting at Bloomfield City
Hall at 915 North First Street in Bloomfield, New Mexico on Thursday, February 26,
2015 at 1:30 p.m.
Written comments may be sent to the Farmington MPO at:
Fax: (505) 599-1299
Mail: Farmington MPO, 800 Municipal Drive, Farmington, New Mexico, 87401
Email: dwakan@fmtn.org
The public may view this Amendment at www.farmingtonmpo.org. For more
information contact Duane Wakan, MPO Planner, at (505) 599-1449.
3
MPO SELF-CERTIFICATION
Amendment #10 to the
FFY2014-2019 Transportation Improvement Program
The Farmington Metropolitan Planning Organization hereby certifies that the following
amendment is being conducted in accordance with all applicable requirements of 23
CFR 450.218 and 23 CFR 450.324 and the federal transit requirements of Section
5307(c) (1-7). The TIP Amendment was made available to the public via a notice in the
local newspaper and on the MPO website. A 30-day public comment period was held
from January 25, 2015 through February 23, 2015.
The following projects are part of Amendment #10:
Added/Amended/Deleted Projects
Project Name: East Piñon Hills Blvd Extension (Phase I)
Control Number: F100100
Project Description: Full rebuild of the Intersection of Piñon Hills and
NM 516; Extension of Piñon Hills Blvd to
include earthwork, asphalt, street lighting,
drainage improvements and signalization
upgrades. Future Phases II & III are outside of
the current cycle.
Project Termini: NM 516 (E. Main to Hubbard)
Lead Agency: City of Farmington
Functional Classification: Principal Arterial (Other)
Funding Source TCSP, STP Small Urban, CMAQ Flex, Local
Match
Funding Action: Remove $250,000 CMAQ Flex funds
Fiscal Year FY2019
Total Project Cost Phase I: $3,700,000
New Project to TIP: East Piñon Hills Blvd Extension (Phase II)
Control Number: F100101
Project Description: Includes earthwork, asphalt, intersection
lighting, bridges over the Animas River and
oxbow, drainage improvements, environmental
mitigation.
Project Termini: Hubbard to CR 3000
Lead Agency: City of Farmington
Functional Classification: Principal Arterial (Other)
Funding Source CMAQ Flex, Local Funds
Funding Action: Add CMAQ Flex $213,600 Local Match
$36,400 moved over from CN F100100 (Phase
I)
4
Fiscal Year FY2017
Total Project Cost Phase $13,265,454
II:
Project Name: East Arterial Route Phase II
Control Number: F100091
Project Description Construct remaining road section from end of
Change: Phase I to NM 173 including a detached multi-
use pedestrian path. Utility work consisting of a
10-inch water line will be constructed for the
entire length of the project.
Project Termini: From Legion Road to NM 173
Lead Agency: City of Aztec
Functional Classification: Principal Arterial (Other)
Project to delete from San Juan County Road 7500
TIP:
Control Number: F10040
Project Description: Maintenance and Resurfacing (road repair)
Project Termini: MP 7.2 to MP 0 (US 550)
Lead Agency: San Juan County
Functional Classification: Local
Funding Source STP FY 2008 Earmark
Funding Amount: $264,000 Federal $361,000 Local Funds
Fiscal Year FY2015
Total Project Cost: $625,000
_____________________________________
Sheri Sipe
FMPO Policy Committee Chair
__________________________________
Date
5
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
Agenda Item #5
Subject: 2040 Metropolitan Transportation Plan
Prepared by: Fran Fillerup, MPO Associate Planner
Date: February 18, 2015
BACKGROUND OR PREVIOUS WORK
Staff is drafting updates to the chapters of the Metropolitan Transportation Plan
(MTP), and adding new plan elements as needed.
This is the second set of five chapters to be presented.
The Technical Committee will review the chapters on February 26.
CURRENT WORK
The following chapter drafts are presented for review:
Chapter 7 – Complete Streets &Roadway Aesthetics – This chapter
addresses the work of the MPO’s Complete Streets Advisory Committee to date.
Chapter 8 – Freight & Rail – The freight function of the transportation network
and modes of travel not covered elsewhere are included here.
Chapter 10 – Public Health & Safety – This chapter highlights issues relating to
transportation safety and health impacts of transportation.
Chapter 12 – Transportation Strategies & Policies – Strategies and policies
included here are the relationship of land use and transportation, environmental
regulations, system preservation and Intelligent Transportation Systems.
Chapter 15 – Performance Measures – This chapter contains performance
measurement for the MPO area as required by MAP-21 legislation. Federal
measures must be addressed and are only partially developed as this time.
CHAPTERS
Copies of chapter drafts will be sent by e-mail.
DISCUSSION ITEM
Staff will review the status of these five draft chapters presented and seek input.
The Policy Committee does not have a meeting scheduled in March at which to
discuss the last five MTP chapter drafts. Adoption of NMDOT’s Statewide Long
Range Plan is moving back, and will likely occur in July. This provides time for
the Policy Committee to review the last five chapters in April and move planned
adoption of the MTP back. Moving back adoption also will help correlation with
pending Federal and State guidance on performance measures and financial
planning.
6
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
Agenda Item #6
Subject: Complete Streets
Prepared by: Duane Wakan, MPO Planner
Date: February 17, 2015
BACKGROUND or PREVIOUS WORK
Complete Streets is a means of designing a roadway so that it accommodates
all modes of travel, including driving, walking, biking, and transit.
Staff has worked with the Complete Streets Advisory Group (CSAG) to finalize
the land use context areas (LUCAs) and road typology (RTs) nomenclature and
descriptions.
The Advisory Group held its latest meeting on January 14.
CURRENT WORK
MPO Staff created preliminary cross-section street dimensions with input from
a sub-committee made up of local public works staff and engineers.
Minimum standards were created for travel lanes, bike lanes, sidewalks, buffer
zones, as well as other elements of the street.
Minimum standards apply differently depending on the land-use context area
and street typology.
The Advisory Group requested modifications to those dimensions.
A draft of the executive summary has been written.
ANTICIPATED WORK
Staff is currently drafting chapters for the Region’s proposed Complete Streets
Guidelines document. It is planned for final consideration and adoption by the
Policy Committee in August.
ATTACHMENTS
Sub Committee recommended dimensions, including CSAG recommended
modifications.
Draft Executive Summary.
INFORMATION ITEM
This is an informational presentation only.
7
Sub-committee Cross-section recommendations
Downtown/Urban Area (Minimum Standards)
Sidewalks Buffer Parking Door Bike Travel Center Detached Multi
Total ROW Zone Zone Curb Gutter Parking Zone Zone Zone Zone Zone Lane/Median Use Path
Lane 24 Feet N/A N/A N/A N/A N/A N/A N/A N/A 12' N/A N/A
Street 60 Feet 5' 5' N/A N/A 8.5' N/A 2' 6' 11' N/A 10'
Avenue 70 Feet 5' 3' 6" 1.5' N/A N/A N/A 6' 12' 14' N/A
Boulevard 100 Feet 5' 5' 6" 6" N/A N/A N/A 6' 11' 14' 10'
Parkway 120 Feet N/A 5' 6" 6" N/A N/A N/A 6' 11' 14' 10'
CSAG Cross-section recommended modifications
Downtown/Urban Area (Minimum Standards)
Sidewalks Buffer Angled Bike Travel Center Detached Multi
Total ROW Zone Zone Curb Gutter Parking Zone Parking Zone Door Zone Zone Zone Lane/Median Use Path
Lane 24 Feet N/A N/A N/A N/A N/A N/A N/A N/A 12' N/A N/A
Street 60 Feet 5' 3’ 6” 1.5’ 8.5' N/A N/A 6' 11' N/A N/A
Avenue 70 Feet 5’ 3’ 6” 1.5’ N/A N/A N/A 6' 11' 14’ N/A
(DT
Commercial) 80 Feet 10’ N/A 6” 1.5’ 8’ 19’ 2’ 6’ 11’ TBD N/A
Boulevard 100 Feet 5' 5' 6" 6" N/A N/A N/A 6' 11' 14' 10'
Parkway 120 Feet N/A 5' 6" 6" N/A N/A N/A 6' 11' 14' 10'
8
Sub-committee Cross-section recommendations
Industrial (Minimum Standards)
Angled Detached
Sidewalks Buffer Parking Parking Bike Travel Center Multi Use
Total ROW Zone Zone Curb Gutter Zone Zone Door Zone Zone Zone Lane/Median Path
Lane
Street
Avenue 70 Feet N/A 5' 6" 1.5' N/A N/A N/A N/A 12' 14' 10'
Boulevard 100 Feet N/A 5' 6" 1.5' N/A N/A N/A N/A 12' 14' 10'
Parkway 120 Feet N/A 5' 6" 1.5' N/A N/A N/A N/A 12' 14' 10'
CSAG Cross-section recommended modifications
• Recent visit to other community by CSAG members reveal the need for detached multi-use path
• Ensure adequate ROW for multi-use path for when future development occur and connections required
Industrial (Minimum Standards)
Angled Detached
Sidewalks Buffer Parking Parking Bike Travel Center Multi Use
Total ROW Zone Zone Curb Gutter Zone Zone Door Zone Zone Zone Lane/Median Path
Lane
Street
Avenue 70 Feet 10’Optional 5' 6" 1.5' N/A N/A N/A N/A 12' 14' 10'
Boulevard 100 Feet 10’Optional 5' 6" 1.5' N/A N/A N/A N/A 12' 14' 10'
Parkway 120 Feet 10’Optional 5' 6" 1.5' N/A N/A N/A N/A 12' 14' 10'
9
Sub-committee Cross-section recommendations
Commercial (Minimum Standards)
Angled
Sidewalks Buffer Parking Parking Bike Travel Center Detached
Total ROW Zone Zone Curb Gutter Zone Zone Door Zone Zone Zone Lane/Median Multi Use Path
Lane 24 Feet N/A N/A N/A N/A N/A N/A N/A N/A 24' N/A
Street 60 Feet 5' 5' 6" 1.5' 8.5' x 2 N/A N/A 6' x 2 11' x 2 N/A N/A
Avenue 70 Feet N/A 5' 6" 1.5' N/A N/A N/A N/A 12' 14' 10'
Boulevard 2
Lns 100 Feet 5' 5' 6" 1.5' N/A N/A N/A 6' 11' 16'
Boulevard 4
Lns 100 Feet N/A 10' 6" 1.5' N/A N/A N/A 11' 16' 10'
Parkway 2 Lns 120 Feet 10' 6" 1.5' N/A N/A N/A 6' 11' 16' 10’
Parkway 4 Lns 120 Feet 10' 6" 1.5' N/A N/A N/A 11' 16' 10'
CSAG Cross-section recommended modifications
Commercial (Minimum Standards)
Angled
Sidewalks Buffer Parking Parking Bike Travel Center Detached
Total ROW Zone Zone Curb Gutter Zone Zone Door Zone Zone Zone Lane/Median Multi Use Path
Lane 24 Feet N/A N/A N/A N/A N/A N/A N/A N/A 24' N/A
Street 60 Feet 5' 5' 6" 1.5' 8.5' x 2 N/A N/A 6' x 2 11' x 2 N/A N/A
Avenue 70 Feet 5’ 5' 6" 1.5' N/A N/A N/A N/A 12' 14' 10'
Boulevard 2
Lns 100 Feet 5' 5' 6" 1.5' N/A N/A N/A 6' 11' 16'
Boulevard 4
Lns 100 Feet 10’ option 10' 6" 1.5' N/A N/A N/A 11' 16' 10'
Parkway 2 Lns 120 Feet 10’ option 10' 6" 1.5' N/A N/A N/A 6' 11' 16' 10’
Parkway 4 Lns 120 Feet 10’ option 10' 6" 1.5' N/A N/A N/A 11' 16' 10'
10
Sub-committee Cross-section recommendations
Neighborhood (Minimum Standards)
Detached
Sidewalks Buffer Parking Parking Bike Travel Center Multi Use
Total ROW Zone Zone Curb Gutter Zone Zone Door Zone Zone Zone Lane/Median Path
Lane 24 Feet N/A N/A N/A N/A N/A N/A N/A N/A 24' N/A N/A
Street 60 Feet 5' 5' 6" 1.5' 8.5' N/A N/A 6' 11' N/A N/A
Avenue 70 Feet 5' 5' 6" 1.5' N/A N/A N/A 6' 12' 14' 10'
Boulevard
Parkway
CSAG Cross-section recommended modifications
Neighborhood (Minimum Standards)
Sidewalks Buffer Parking Parking Bike Travel Center Detached Multi
Total ROW Zone Zone Curb Gutter Zone Zone Door Zone Zone Zone Lane/Median Use Path
Lane 24 Feet N/A N/A N/A N/A N/A N/A N/A N/A 24' N/A 10’ Optional
Street 60 Feet 5' 5' 6" 1.5' 8.5' N/A N/A 6' 11' N/A 10’ Optional
5' option
Avenue 70 Feet for rural 5' 6" 1.5' N/A N/A N/A 6' 12' 14' 10'
Boulevard
Parkway
11
Sub-committee Cross-section recommendations
Rural (Minimum Standards)
Total Sidewalks Buffer Parking Parking Door Bike Travel Center Detached Multi Use
ROW Zone Zone Curb Gutter Zone Zone Zone Zone Zone Lane/Median Path
Lane 24 Feet N/A N/A N/A N/A N/A N/A N/A N/A 12' N/A N/A
Street 60 Feet 5' 5' N/A N/A 8.5' N/A 2' 6' 11' N/A 10'
Avenue
100
Boulevard Feet 5' 5' 6" 6" N/A N/A N/A 6' 11' 14' 10'
120
Parkway Feet N/A 5' 6" 6" N/A N/A N/A 6' 11' 14' 10'
CSAG Cross-section recommended modifications
Rural (Minimum Standards)
Total Sidewalks Buffer Parking Parking Door Bike Travel Center Detached Multi Use
ROW Zone Zone Curb Gutter Zone Zone Zone Zone Zone Lane/Median Path
Lane 24 Feet N/A N/A N/A N/A N/A N/A N/A N/A 12' N/A N/A
Street 60 Feet 5' optional 5' N/A N/A 8.5' N/A 2' 6' 11' N/A 10'
Avenue 5’ optional 10’
100
Boulevard Feet 5' optional 5' 6" 6" N/A N/A N/A 6' 11' 14' 10'
120
Parkway Feet N/A 5' 6" 6" N/A N/A N/A 6' 11' 14' 10'
12
Complete Streets Executive Summary
Our streets lay the foundation for how we interface with travel needs, physical
exercise, social exchanges and access to goods & services. They are meaningful for all
users of our transportation network whether by car, bus, bike or walking.
Over the last several decades, auto-centric transportation plans and designs have
confounded the mobility needs of our most vulnerable transportation users, i.e.,
children, seniors and the economically disadvantaged. It has also placed a costly burden
on cities and communities who endeavor to compete economically with ever-evolving
demographic shifts and market demands.
Context sensitive street designs will ensure that residents in the urbanized areas of
Farmington, Aztec, Bloomfield and San Juan County are provided balanced parameters
in regards to the layout and function of our streets. These guidelines will require leaders
and users of the manual to recognize and honor our regional visions, goals and policies,
and consider innovative approaches when designing and engineering streets.
With the understanding that entity-specific transportation needs are distinct, design
guidelines were created to provide flexibility in application. The menu of design options
found in this document derived from heavy regional involvement via a Complete Streets
Advisory Group (CSAG) led by MPO staff.
13
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
Agenda Item #7
Subject: Information Items
Prepared by: Fran Fillerup, MPO Associate Planner
Date: February 18, 2015
INFORMATION ITEMS
a. Joint Powers Agreement (JPA). The JPA expires in September and will
need to be reviewed by the Policy and Technical to consider updates and
revisions.
b. Upcoming Meetings:
- March 24 – Strategic Highway Safety Plan Summit
- March 25 – Quarterly MPO Meeting
- March 26 – TIP Training
c. Discussion Items from Joint Technical Committee & NMDOT Meeting.
d. Other.
14