MPO Policy Committee
Regular MeetingFarmington, NM · November 15, 2018
Agenda
Aztec ¤ Bloomfield ¤ Kirtland ¤ Farmington ¤ San Juan County ¤ NEW MEXICO
MPO POLICY COMMITTEE
AGENDA
November 15, 2018
1:30 p.m.
Commission Chambers
San Juan County’s Administrative Building
100 South Oliver
Aztec, New Mexico
AGENDA
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
POLICY COMMITTEE MEETING
November 15, 2018 1:30 PM
This regular meeting will be held in Commission Chambers at San Juan County’s
Administrative Building, 100 South Oliver, Aztec, Bloomfield, New Mexico.
ITEM PAGE
1. Call meeting to order
2. Approve the minutes from the September 27, 2018 Technical Committee 36-46
Meeting.
3. Review and consider approval of proposed Policy Committee (PC) Resolution 1-8
2018-5 regarding adopting FMPO Targets for Performance Measures (PM 2
Targets) (Pavement and Bridge Condition):
a. Review proposed PC Resolution 2018-5
b. Hold a public hearing on proposed PC Resolution 2018-5
c. Consider approval of proposed PC Resolution 2018-5 (PM2 Targets)
Action Item
Presented by: Jeff Kiely
4. Review and consider approval of proposed Policy Committee (PC) Resolution 9-20
2018-6 regarding adopting the state’s targets for Performance Measures (PM 3
Targets) (System Performance) as the FMPO targets:
a. Review proposed PC Resolution 2018-6
b. Hold a public hearing on proposed PC Resolution 2018-6
c. Consider approval of proposed PC Resolution 2018-6 (PM 3 Targets)
Action Item
Presented by: Jeff Kiely
5. Review, discuss, and consider approval of proposed Policy Committee 21-26
Resolution 2018-4 regarding the 2019 Policy Committee Meeting Schedule.
Action Item
Presented by: Jeff Kiely
6. Reports from NMDOT
a. Update from District 5 (Anthony Lujan / Lawrence Lopez)
b. Update from the Planning Bureau (Joseph Moriarty)
7. Receive a report on the National Highway Performance Management Measures 27-32
(PM 1) for Highway Safety Improvement Program for FFY2019
Presented by: Jeff Kiely
8. Committee Member Discussion Item(s) 33
No additional items were presented for inclusion on the agenda.
9. Information Items 34
a. Report on FFY2020 Plus CMAQ Non-Mandatory Program - Next steps.
b. Report on FFY2020-21 Transportation Alternatives Program (TAP) &
Recreation Trails Program (RTP) – Next steps.
c. Update on the Search for an FMPO Officer
d. Update on the Bicycle/Pedestrian Plan Update
Presented by: Jeff Kiely
10. Business from Chairman, Members, and Staff
11. Public Comment on Any Issues Not on the Agenda
12. Adjournment
The public body may only take action on an item if it is
listed for action on the publicly noticed agenda.
ATTENTION PERSONS WITH DISABILITIES: If you are an individual with a disability who is in
need of a reader, amplifier, qualified sign language interpreter, or any other form of auxiliary aid
or service to attend or participate in the hearing or meeting, please contact the MPO
Administrative Assistant at the Downtown Center, 100 W Broadway, Farmington, New Mexico or
at 505-599-1466 at least one week prior to the meeting or as soon as possible. Public
documents, including the agenda and minutes, can be provided in various accessible formats.
Please contact the MPO Administrative Assistant if a summary or other type of accessible format
is needed.
FARMINGTON METROPOLITAN PLANNING ORGRANIZATION
Agenda Item #3
Subject: National Performance Management Measures
for Assessing Pavement Condition and Bridge
Condition (PM 2)
Prepared by: MPO Staff
Date: November 15, 2018
BACKGROUND
23 CFR §490 Subpart C – National Performance Management Measures for
Assessing Pavement Condition and 23 CFR §490 Subpart D – National
Performance Management measures for Assessing Bridge Condition (see
attached).
The FHWA requires that MPOs establish four-year targets for six (6) performance
measures. Those six performance measures to be considered are:
1) Percentage of interstate pavements on the NHS in good condition;
2) Percentage of interstate pavements on the NHS in poor condition;
3) Percentage of non-interstate pavements on the NHS in good condition;
4) Percentage of non-interstate pavements on the NHS in poor condition;
5) Percentage of bridges on the NHS in good condition; and
6) Percentage of bridges on the NHS in poor condition.
MPOs may: Agree to support State target OR establish their own targets. The
FMPO needed to develop some of its own targets for PM 2 (see attached). After a
work session with NMDOT staff and careful review of NMDOT’s statistics,
Technical Committee recommends:
o BRIDGES on National Highway System (NHS) – Adopt a different target for FMPO:
10% target for Bridges in Good condition [vs. the State at 36.0% (2019) and 30.0%
(2021)]
2.5% target for Bridges in Poor condition [vs. State at 3.3% (2019) and 2.5%
(2021)]
o PAVEMENT on Non-Interstate/NHS – Adopt a slightly different target for FMPO:
set 34.2% target for Pavement in Good condition [vs. the State at 35.6% (2019)
and 34.2% (2021)]
set 12.0% target for Pavement in Poor condition [vs. State at 9.0% (2019) and
12.0% (2021)]
Reporting is for a four-year period although revisions to the targets can be made
after two years.
Staff recommends approval of the FMPO proposed targets; the Technical
Committee recommended their approval on November 7.
CURRENT ISSUES
FMPO Policy Committee action is due no later than November 20, 2018
1
ATTACHMENTS
Proposed Policy Committee Resolution 2018-5 regarding PM 2 Targets and the
proposed FMPO four-year (2021) Performance Management (PM 2) Targets for
the FMPO.
NMDOT’s PM 2 Targets Memo dated 5/18/18.
ACTION ITEM
Hold a public hearing on the proposed Policy Committee Resolution 2018-5 (PM 2
Performance Measure Targets).
Consider approval of the proposed Policy Committee Resolution 2018-5 (PM 2
Performance Measure Targets).
APPLICABLE CITATIONS
Requirement for MPOs to establish performance targets for Federal-aid highway
measures and public transportation established by USDOT.
23 USC 134(h)(2)
49 USC 5303(h)(2)
49 USC 5304(d)(2)
Requirements to include discussion in the metropolitan and statewide improvement
program as to how the planned program will achieve State/MPO targets:
23 USC 134(j)(2)(D)
23 USC 135(g)(4)
49 USC 5303(j)(2)(D)
49 USC 5304(g)(4)
2
3
4
5
Tom Church
Cabinet Secretary
G e n e r a l O f f i c e P. O. B o x 1 1 4 9 S a n t a F e, N M 8 7 5 0 4 – 1 1 4 9
23 CFR 490 Sub Part C and D Target Setting
National Highway System Pavements and Bridges
This document outlines the NMDOT procedures for establishing performance targets for New Mexico,
as required by 23 CFR 490, Subpart C - National Performance Management Measures for Assessing
Pavement Condition and Subpart D – National Performance Management Measures for Assessing
Bridge Condition. The State DOT is required to establish targets, regardless of ownership, for the full
extent of the Interstate and non-Interstate NHS for pavements and for Bridges on the NHS. By May 21,
2018, 2- and 4-year targets must be established and report targets by October 1, 2018, in the Baseline
Performance Period Report. The following are the six (6) Performance Measures:
1. Percentage of Interstate pavements on the NHS in Good Condition
2. Percentage of Interstate pavements on the NHS in Poor Condition
3. Percentage of non-Interstate pavements on the NHS in Good Condition
4. Percentage of non-Interstate pavements on the NHS in Poor Condition
5. Percentage of bridges on the NHS in Good condition
6. Percentage of bridges on the NHS in Poor Condition
The NMDOT used a coordinated effort with the Metropolitan Planning Organizations (MPOs) and other
stakeholders to set the targets. The bulleted sections below provide an explanation of events leading to
the development of the performance measures and this document:
1. In 2013, NMDOT began collecting the pavement condition data for all NMDOT maintained
roadways, non-DOT maintained NHS and HPMS sample segments based on the four condition
metrics (IRI, rutting, faulting and cracking) and three inventory data elements (through lanes,
surface type, and structure type) included in 23 CFR 490.309. Pavement condition data is
collected based on one-tenth mile. 23 CFR 490.313 requires DOTs to be in compliance with the
reporting cycle beginning January 1, 2019 for the Interstate.
2. Numerous internal meetings took place with representatives from the Districts and Pavement
Management and Design Bureau staff to review and analyze pavement condition data and
performance trends. NMDOT maintains the pavement condition data in a Pavement
Management System database (PMS db) on the Agile Assets platform. The PMS db is used to
predict future performance based on criteria identified for various funding scenarios. It can also
forecast funding required to attain a desired condition.
3. Funding allocations for Interstate, non-Interstate NHS and non-NHS pavements, NHS and non-
NHS Bridges were determined based on reviewing historical information based on obligated
amounts for federally funded projects contained in the Statewide Transportation Improvement
Program (STIP) database. In addition, historical funding amounts for pavements and bridges
was obtained from data in the Maintenance Management System and Contract Maintenance
Databases.
4. In preparation for developing the Transportation Asset Management Plan (the TAMP), a
Financial Planning and Investment Analysis Workshop was held on June 15, 2015 to review the
process for developing Transportation Asset Management (TAM) eligible revenue forecasts and
reviewing bridge and pavement performance at funding levels in order to develop allocation
recommendations for baseline revenues.
6
5. On February 27, 2018, FHWA presented the Asset Management Workshop on Life Cycle
Planning, Risk Management and Financial Plans to support the implementation of Asset
Management Plans. Representatives from the Mesilla Valley MPO, Mid-Region MPO and
Santa Fe MPO participated in the workshop with NMDOT staff. There was a representative
from five of the six NMDOT Districts in attendance.
6. On March 15, 2018, the New Mexico Transportation Commission was briefed on the Initial
TAMP and proposed Federal 2 and 4 year targets.
7. On March 16, 2018, the NMDOT TAM Technical Working Committee met to review the final
draft of the initial TAMP and to review the performance targets proposed for inclusion in the
document.
8. On March 28, 2018, the NMDOT provided a presentation on all Performance Measures to the
MPO’s attending the quarterly MPO meeting. NMDOT collected Pavement Condition data was
presented by MPO area for the Interstate and non-Interstate NHS pavements within each MPO
boundary in order to show how pavements are performing within each MPO area. In addition,
10-year pavement condition projections were presented.
9. Documentation on the Pavement and Bridge condition performance measures was presented to
NMDOT Executive Staff on May 16, 2018, in preparation for transmitting the 2- and 4-year
performance targets for the six measures listed above to FHWA-NM Division.
Predicting future condition of pavements and bridges is dependent on funding. The period determined
for predicting future condition is ten years. In order to prepare predictions of future conditions, funding
allocations needed to be established. The funding allocations for Interstate, non-Interstate NHS and
non-NHS pavements and NHS and non-NHS bridges were based on a review of information contained
in historical STIP’s and MMS data. A combination of federal and state funding is used to determine the
total amount of funding available for TAM activities. In addition to STIP and MMS financial information,
a review of NMDOT historical budget, state road fund revenue projections and future debt service
payments were reviewed to determine the TAM-eligible revenues. This analysis also included review of
pavement and bridge allocations.
In setting the 2- and 4-year performance targets for the pavement measures, NMDOT analyzed
historical pavement condition data based on the FHWA measures to prepare a trend analysis. The
PMS db is used to predict future condition; however, it is unable to predict future condition based on the
FHWA metrics. As a result, the PMS db uses a Pavement Condition Rating (PCR) to determine
condition. The PMS db was configured based on a multi-year collaborative effort to develop the
decision trees that combine the various pavement distresses collected for each tenth mile section to
determine an Overall Condition Index (OCI) for each 2-mile managed segment. The PCR is 80 percent
OCI and 20 percent smoothness index, which is IRI and rutting metric converted to a 100 scale.
The annual funding allocation below is entered into the PMS db in order to predict an annual PCR for
each system. The PCR is then mapped to the Federal Good, Fair and Poor to predict a future
pavement condition each year for the ten-year analysis period.
The annual funding allocations used in the PMS to predict future pavement condition are:
1. Interstate Pavements, $62 million/year
2. Non-Interstate NHS Pavements, $68 million/year
3. Non-NHS Pavements, $50 million/year
NMDOT maintains bridge condition data in a Bridge Management System (BrM); however, BMS does
not have the capability of predicting future condition. NMDOT uses a spreadsheet based tool to predict
7
performance of each bridge given predicted deterioration. The model components include measures,
deterioration, treatments and prioritization. The model uses the National Bridge Inventory (NBI) data
weighted by deck area. A Markov modeling approach, similar to Pontis models is used but applied to
the NBI data. The approach predicts a percent chance a rating will drop to the next value in a year.
NCHRP Report 713 was used to determine median years to reach ratings of 3, 4 and 5. NMDOT
Bridge Management evaluated the spreadsheet tool for predicting future condition prior to adopting for
use. The annual funding allocations used in the spreadsheet tool to predict future condition are:
1. NHS Bridges, $40 million/year
2. Non-NHS Bridges, $20 million/year
The future condition is based on data collected during calendar year 2016 and predicting condition for
calendar years 2016 through 2026. The 2-year target is based on the condition data collected during
calendar year 2019 and the 4-year target is based on data collected in calendar year 2021. The first
Mid Performance Period Progress Report is due to FHWA on October 1, 2020 which will be based on
pavement and bridge condition data collected during calendar year 2019.
The table below indicates NMDOT performance measure targets.
Performance Measure 2 Year (2019) 4 Year (2021)
Percentage of bridges on the NHS in Good condition 36.0% 30.0%
Percentage of bridges on the NHS in Poor condition 3.3% 2.5%
Percentage of Interstate pavements on the NHS in Good condition 57.3% 59.1%
Percentage of Interstate pavements on the NHS in Poor condition 4.5% 5.0%
Percentage of Non-Interstate pavements on the NHS in Good
35.6% 34.2%
condition
Percentage of Non-Interstate pavements on the NHS in Poor
9.0% 12.0%
condition
8
FARMINGTON METROPOLITAN PLANNING ORGRANIZATION
Agenda Item #4
Subject: FFY2019 Targets for System
Performance/Freight/CMAQ (PM 3)
Prepared by: MPO Staff
Date: November 15, 2018
BACKGROUND
23 CFR §490 – 2019 Targets for System Performance/Freight/CMAQ (PM 3)
(see attached).
The FHWA requires that MPOs establish PM 3 Measures as follows: 1) Two
measures to assess system performance: a. Percentage of person-miles
traveled on the interstate system that are reliable; b. Percentage of person-
miles traveled on the non-interstate National Highway System (NHS) that are
reliable; 2) One measure to assess freight movement: a. Truck Travel Trime
Reliability (TTTR) index; 3) Three measures to assess the CMAQ Program: a.
Annual hours of peak-hour excessive delay per capita – NM is not required to
set a target for this measure; b. Percent on non-single occupancy vehicle
(SOV) travel – NM is not required to set a target for this measure; c. On-road
mobile source emissions reductions – NM is in non-attainment for Particulate
Matter (PM) 10 in one area covered by the El Paso Metropolitan Planning
Organization (EPMPO).
MPOs may agree to support State target OR establish their own targets. The
FMPO proposes to adopt the NMDOT targets for PM 3.
Staff recommends adopting the NMDOT targets; the Technical Committee
recommended their approval on November 7.
CURRENT ISSUES
FMPO Policy Committee action is due no later than November 20, 2018
ATTACHMENTS
NMDOT’s Performance Measure (PM) Target Report for PM 3 for FFY2019
Proposed Policy Committee Resolution 2018-6 regarding PM 3 Targets.
ACTION ITEM
Hold a public hearing on the proposed Policy Committee Resolution 2018-6
regarding the PM 3 Performance Measure Targets.
Consider approval of the proposed Policy Committee Resolution 2018-6
regarding PM 3 Performance Measure Targets.
APPLICABLE CITATIONS
Requirement for MPOs to establish performance targets for Federal-aid highway
measures and public transportation established by USDOT.
9
23 USC 134(h)(2)
49 USC 5303(h)(2)
49 USC 5304(d)(2)
Requirements to include discussion in the metropolitan and statewide improvement
program as to how the planned program will achieve State/MPO targets:
23 USC 134(j)(2)(D)
23 USC 135(g)(4)
49 USC 5303(j)(2)(D)
49 USC 5304(g)(4)
10
11
12
13
14
15
16
17
18
19
20
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
Agenda Item #5
Subject: 2019 Annual Meeting Schedule
Prepared by: MPO Staff
Date: November 15, 2018
BACKGROUND
Each year the Policy Committee approves a resolution ensuring compliance
with the open meetings act and establishes its meeting schedule for the
coming year.
NMDOTs STIP Procedures Manual outlines an annual calendar for TIP
Amendments which may impact the meeting schedule on a quarterly basis.
This schedule has been considered in developing this proposal.
CURRENT WORK
Staff is presenting, herein, a proposed meeting schedule for discussion with
the Policy Committee.
It is suggested that the Policy Committee hold eight (8) regular meetings
during 2019. The additional meeting in June is needed to consider a scheduled
amendment to the UPWP.
Meetings are recommended for January, February, April, May, June, August,
September, and November.
The Committee’s Meetings can continue to be held on the fourth Thursday at
1:30 pm, unless otherwise indicated, on a rotating basis among the entities.
Staff compared the Policy Committee schedule with the Technical Committee
schedule, as well as with the RTPO, NMDOT, and other possible competing
schedules, and has concluded that the proposed Policy Committee schedule
remains the most efficient and workable.
ACTION ITEM
Staff recommends that the Policy Committee approve the 2019 meeting
calendar by adoption of Policy Committee Resolution 2018-4.
21
* PROPOSED *
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
2019 Regular Meeting Schedule
POLICY COMMITTEE
All meetings will be held at 1:30 p.m. at the locations listed below.
MPO will seek final approval to TIP Amendments in the months highlighted below.
Date Location and City
January 24, 2019 Commission Chambers San Juan County
San Juan County Administrative Bldg.
100 S. Oliver
February 28, 2019 Council Chambers Farmington
Farmington City Hall
800 Municipal Drive
April 25, 2019 Council Chambers Kirtland
Kirtland Town Hall
47 Road 6500
May 23, 2019 Council Chambers Bloomfield
Bloomfield City Hall
915 N. First Street
June 27, 2019 Commission Chambers Aztec
Aztec City Hall
201 W. Chaco Street
August 22, 2019 Commission Chambers San Juan County
San Juan County Administrative Bldg.
100 S. Oliver
September 26, Council Chambers Farmington
2019 Farmington City Hall
800 Municipal Drive
November 21, Council Chambers Kirtland
2019 (3rd Kirtland Town Hall
Thursday) 47 Road 6500
22
23
24
25
26
FARMINGTON METROPOLITAN PLANNING ORGRANIZATION
Agenda Item #7
Subject: National Performance Management Measures
for Highway Safety Improvement Program (PM
1)
Prepared by: MPO Staff
Date: November 15, 2018
BACKGROUND
23 CFR §490 Subpart B – National Performance Management Measures for
Highway Safety Improvement Program (see attached).
The FHWA requires that MPOs establish targets for five (5) safety
performance measures for all public roads in the MPO planning area within
180 days after the State establishes each target.
The five Performance Measures to be considered are: 1) Number of Fatalities,
2) Number of Serious Injuries, 3) Fatalities per 100 Million VMT (Vehicle Miles
Traveled), 4) Serious Injuries per 100 Million VMT (Vehicle Miles Traveled)
and, 5) Number of Non-Motorized Fatalities and Non-Motorized Serious
Injuries.
The first three targets are common measures and must be identical to the
targets established for the Highway Safety Plan (HSP).
MPOs may: Agree to support State target OR establish specific numeric
targets for a safety performance measure (number or rate).
Reporting is done on an annual basis, leaving the choice to adopt State
standards vs. establish MPO specific targets up to the MPO Policy Committee
each year..
CURRENT ISSUES & RECOMMENDATIONS
This item will be presented to the Technical Committee for consideration in
December and then brought back to the Policy Committee in January for their
considered adoption.
Staff recommends that the state standards be adopted again for FFY2019.
FMPO Policy Committee action is due no later than February 27, 2019.
ATTACHMENTS
NMDOT’s Performance Measure (PM) Target Report – PM 1 for Federal Fiscal
Year 2019 – REVISED.
INFORMATION ITEM
This item will be considered and action sought by the Policy Committee in
January 2019.
APPLICABLE CITATIONS
Requirement for MPOs to establish performance targets for Federal-aid highway
measures and public transportation established by USDOT.
23 USC 134(h)(2)
27
49 USC 5303(h)(2)
49 USC 5304(d)(2)
Requirements to include discussion in the metropolitan and statewide improvement
program as to how the planned program will achieve State/MPO targets:
23 USC 134(j)(2)(D)
23 USC 135(g)(4)
49 USC 5303(j)(2)(D)
49 USC 5304(g)(4)
28
Performance Measure (PM) Target Report – PM 1
Federal Fiscal Year 2019 - REVISED
This document outlines the Federal Fiscal Year (FFY) 2019 Targets for Safety (PM 1) for New Mexico, as required by
the 23 CFR 490, Final Rule on the Highway Safety Improvement Program (HSIP) published March 15, 2016
(effective April 14, 2017). The New Mexico Department of Transportation (NMDOT) Statewide Planning Bureau
(SPB) is responsible for coordinating the setting of PM 1 targets.
Overview of PM 1 Measures
The state is required to set annual targets for five performance measures:
1. Number of Total Fatalities
2. Number of Serious Injuries
3. Fatalities per 100 million vehicle miles travelled (VMT)
4. Serious Injuries per 100 million VMT
5. Number of Non-motorized Fatalities and Serious Injuries
The first three are common measures and must be identical to the targets established for the Highway
Safety Plan (HSP).
Coordination with Metropolitan Planning Organizations (MPOs)
The NMDOT undertook a coordinated effort with the Metropolitan Planning Organizations (MPOs), the HSP team
and other stakeholders to set the targets.
1. Numerous internal meetings took place in winter of 2018 between the NMDOT S t a t e w i d e Planning
Bureau (SPB) and Traffic Safety Division to review and analyze crash data and trends. NMDOT contracts with
the University of New Mexico (UNM) to maintain the state’s crash database.
2. On March 29, 2018, NMDOT staff discussed the PM 1 measures with the MPOs at the Joint Meeting with the
MPOs and Regional Transportation Planning Organizations (RTPOs).
3. On May 2 2 , 2018, the NMDOT Safety Division held a meeting to discuss and adopt the targets required
in the HSP. NMDOT Planning Bureau staff and MPO representatives attended.
4. On June 5, 2018, SPB staff presented the final targets to the MPOs at the MPO Quarterly meeting in
Farmington. The MPOs agreed to adopt the state targets by resolution prior to the February 27, 2019 deadline.
5. On June 18, 2018, SPB staff emailed a draft of this report, outlining the adopted state PM1 targets, to the
MPOs for review and comments by July 9, 2018. SPB received no comments from the MPOs on this report or
the NMDOT PM 1 targets.
6. The MPOs have until February 27, 2019 to adopt the NMDOT PM 1 targets or set their own quantifiable
targets.
Data Methodologies and Assumptions
In setting the FFY2019 safety performance targets, NMDOT and stakeholders did not rely solely on the data
projections, but used the data in combination with their discussions regarding other relevant factors and their
assessment of the potential safety impacts of various strategies and projects. NMDOT worked with UNM to
determine methodologies and assumptions required to set the targets. These are as follows:
• NMDOT uses Excel to plot a linear best fit line based on 5-years of actual data to project for future
years.
• Vehicle Miles Travelled (VMT) - the Annual VMT estimate for 2017 assumes a 2.1% increase over the 2016
VMT. The calculation is 278.09 * 1.021 = 283.93 annual 100 Million VMT for 2017, where:
29
o 278.09 is the 2016 annual VMT in units of 100M VMT.
o 1.021 is the preliminary 2.1% increase in VMT recommended by NMDOT from 2016 to 2017.
• Crash Data - 2016 is finalized, 2017 is preliminary.
NMDOT PM 1 Targets
1) Number of Total Fatalities
480
402.0
366.0
386.0 379.0 382.0 389.1
347.0 342.0
360
366.0 361.0 349.0 350.0 358.0 352.0 352.6 355.2 369.4 370.0
311.0 298.0
240
120 Total Fatalities
5-Yr Moving Average
0
2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019
FARS FARS FARS FARS FARS FARS FARS FARS FARS Prelim. Projected
NMDOT Target Statement: Limit the increase in total fatalities to 6.4 percent from 352.6 in 2016 to 375 by
December 31, 2019 (FARS; 5-year averages).
NMDOT Justification: Five-year average fatalities fell by 7 percent between 2011 and 2015, but then rose in 2016
to their highest level in ten years. 2017 preliminary data and 2018 and 2019 projected data indicate fatalities
remaining high. Although the 5- year trend line indicates a 5 percent increase in overall fatalities from 2016 to
2019, given the projected increases in pedestrian, speeding and alcohol-impaired fatalities, the State has
determined a 6.4 percent increase in overall fatalities to be an achievable target in 2019.
30
2) Number of Serious Injuries
2,400
1,818.8
1,693.6
1,800 1,563.6
1,940.0 1,899.0 1,922.0 1,445.0
1,333.8
1,709.0 1,624.0 1,220.1 1,149.9
1,074.2
1,200
1,314.0 1,249.0 1,329.0
1,153.0
1,055.7
Suspected Serious Injuries (Class A) 963.0
870.3
600
5-Yr Moving Average
0
2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019
State State State State State State State State State Projected
NMDOT Target Statement: Decrease the number of serious injuries by 17.5 percent from 1,333.8 in 2016 to 1,100.0
by December 31, 2019.
NMDOT Justification: Five-year average serious injuries are projected to fall by 14.7 percent between 2016 and 2018,
and the State anticipates a continued reduction in serious injuries in 2019. The State has determined a 17.5 percent
reduction in these injuries from 2016 to 2019 is achievable.
3) Fatalities per 100M VMT
2.0
1.520 1.446
1.430 1.361
1.5 1.330 1.335 1.344 1.318
1.390 1.390 1.380 1.360 1.392 1.386 1.343 1.325 1.314 1.306
1.0 1.240
1.090
0.5 Fatalities per 100M VMT
5-Yr Moving Average
0.0
2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019
FARS FARS FARS FARS FARS FARS FARS FARS FARS Prelim. Projected
NMDOT Target Statement: Decrease the fatality rate from 1.343 in 2016 to 1.318 by December 31, 2019.
NMDOT Justification: Although five-year average fatalities are expected to increase in 2019 from 2016, with VMT
expected to continue rising, the State determines that the projected 2019 five-year fatality rate is an achievable
target.
31
4) Serious Injuries per 100 VMT
9.0
7.062
6.637
6.160
7.382 7.300 7.605 5.597
6.0 6.663 6.353 5.082
4.550 4.185
3.825
5.238 4.928
4.844
3.0 4.146
3.718
Suspected Serious Injuries per 100M VMT 3.218
2.745
5-Yr Moving Average
0.0
2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019
State State State State State State State State State Projected
NMDOT Target Statement: Decrease the rate of serious injuries from 5.082 in 2016 to 3.825 by December 31, 2019.
NMDOT Justification: Five-year average serious injury rates are projected to continue falling, and the State has
determined the 2019 five-year average projection to be an achievable target.
5) Number of Non-motorized Fatalities and Serious Injuries
320
242.6
240 217.0 220.6 231.6
198.0 191.0
175.0
161.8 220.6
160 187.6 200.3 211.6
175.0 180.8
161.0 159.0 157.0 157.0 161.8 169.2
80 Non-Motorized Fatalities and Serious Injuries (Pedestrians and Pedalcyclists)
5-Yr Moving Average
0
2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019
State State State State State State State State State Projected
NMDOT Target Statement: Limit the increase in non-motorized fatalities and non-motorized serious injuries
to 220.6 by December 31, 2019.
NMDOT Justification: Five-year average non-motorized fatalities and serious injuries are projected to rise over the
next four years, and the State has determined the 2019 five-year average projection to be an achievable target.
32
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
Agenda Item #8
Subject: Committee Member Discussion Items
Date: November 15, 2018
DISCUSSION ITEMS
There were no additional discussion items provided by Policy Committee members for
inclusion in the Agenda.
33
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
Agenda Item #9
Subject: Information Items
Prepared by: MPO Staff
Date: November 15, 2018
INFORMATION ITEMS
a. Report on FFY2020 PLUS CMAQ Non-Mandatory Program - Next Steps
PFFs for two projects were discussed at a CMAQ Feasibility Review Meeting held at
the MPO Office on October 18. San Juan County’s Diesel Replacement project was
deemed feasible. The next steps for this project are:
- Monday, December 3, 2018 (by 5:00 p.m.) is the deadline for the completed
application form and required materials (including Resolution of Sponsorship)
as one PDF to MPO Staff;
- Thursday, December 27, 2018 is the deadline for the FMPO Staff to submit the
completed CMAQ project applications to NMDOT.
b. Report on FFY2020-21 Transportation Alternatives Program (TAP) & Recreation
Trails Program (RTP). Five TAP and RTP projects provided their project
application forms and required materials (including the Resolution of Sponsorship)
to MPO Staff by the October 26, 2018 deadline:
City of Farmington
Foothills Drive Enhancement Phase II
Foothills Drive Pedestrian and Traffic Calming Improvements
San Juan County
Kirtland Schools Path Extension
Glade Run Recreation Area (GRRA) Extension
Farmington Municipal School District
Safe Routes to Schools Program
These projects will be submitted to the NMDOT TAP/RTP Coordinator by the
November 30, 2018 (5:00 p.m.) deadline.
c. MPO Officer. Applications from four potential candidates for the position of MPO
Officer are being reviewed with interviews scheduled soon.
d. Bicycle/Pedestrian Plan Update. The consultant provided several draft chapters of
the Bicycle/Pedestrian Plan Update on October 26 for initial review by the
Technical Committee and Staff. Additionally, the consultant briefed the Technical
Committee on November 7th and made arrangements with members and NMDOT
staff to finalize their input into the Plan.
34
The minutes from the
September 27, 2018
Policy Committee meeting
are on the following pages
35
MINUTES
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
POLICY COMMITTEE MEETING
September 27, 2018
Policy Members Present: Sherri Sipe, City of Aztec
Nate Duckett, City of Farmington
Sean Sharer, City of Farmington
Larry Hathaway (Alt), San Juan County
Policy Members Absent: Curtis Lynch, City of Bloomfield
Anthony Lujan, Deputy Secretary, NMDOT
Staff Present: Mary Holton, AICP, MPO Officer
June Markle, MPO Administrative Assistant
Staff Absent: None
Others Present: Rebecca Maes, STIP Manager, NMDOT
Mike Stark, San Juan County
David Quintana, NMDOT
Nancy Lauro, Russell Planning & Engineering
Jeff Kiely, Director, Northwest New Mexico
Council of Governments
1. CALL TO ORDER
Chair Duckett called the meeting to order at 1:40 p.m.
2. APPROVE THE MINUTES FROM THE AUGUST 23, 2018 POLICY COMMITTEE
MEETING
Mr. Hathaway moved to approve the minutes from the August 23, 2018 Policy
Committee meeting. Councilor Sharer seconded the motion. The motion to approve the
minutes was approved unanimously.
3. ANNUAL ELECTION OF OFFICERS
Subject: Annual Election of Officers
Date: September 27, 2018
36
BACKGROUND
As outlined in the MPO Committee Bylaws, the annual Election of Officers
occurs in September to allow newly elected members to become familiar with
Policy Committee proceedings.
Each September, the Policy Committee selects the Chair and Vice-Chair from
their membership who will serve until the following annual election.
The Chair presides over the meetings and is responsible for the other duties
which are outlined in the Committee Bylaws and Operating Procedures
document.
The Vice-Chair presides over the meetings in the absence of the Chair.
Mayor Duckett has been serving as the current Policy Committee Chair, while
Commissioner Sipe has been serving as the current Vice-Chair.
ELECTION
Elections are to take place to select a Policy Committee Chair and Vice-Chair
until September 2019.
RECOMMENDATION
It is recommended that the Policy Committee accept nominations and vote to
elect the Chair and Vice-Chair.
DISCUSSION: Ms. Holton explained that the annual election of officers is outlined in the
Committee Bylaws & Operation Procedures document. The September election allows
newly elected members to become familiar with Policy Committee proceedings prior to
the election. The Policy Committee selects a Chair and Vice Chair from their
membership who will serve until the following annual election.
Mayor Duckett nominated Sean Sharer as Chair or Vice Chair. Councilor Sharer said he
would accept the Chair nomination. Councilor Sharer nominated Commissioner Sipe as
Vice Chair. There were no other nominations or discussion.
ACTION: The Policy Committee voted unanimously to elect Councilor Sharer as Chair of
the Policy Committee and Commissioner Sipe as the Vice Chair.
4. REVIEW AND APPROVE THE PROPOSED FFY2019 FMPO BUDGET FOR NON-
REIMBURSALE EXPENDITURES
Subject: Review and Approve the Proposed FFY2019
FMPO Budget for Non-Reimbursable
Expenditures
Date: September 27, 2018
37
BACKGROUND
As outlined in the MPO JPA effective October 1, 2018, “any expenditure
deemed non-reimbursable by NMDOT shall require the advance approval of
the Policy Committee and shall be subject to the funding formula contained in
Paragraph A” (Section 5.B, page 9).
Non-reimbursable expenditures include those that are deemed ineligible by
NMDOT to be reimbursed by the Planning PL and FTA 5303 federal grants.
These expenditures include refreshments for meetings, bottled water for the
MPO, and similar purchases.
In previous years, the MPO has budgeted a total of $1,500 for these
expenditures a year. The expenditures are typically expended as needed by
MPO employees via the fiscal agent, and then the fiscal agent has been
reimbursed with payments from the member entities on a quarterly basis. This
amount is recommended for FFY2019.
MPO Staff will need to propose a maximum amount to the Policy Committee
on an annual basis before the start of each FFY.
Applying the JPA’s new reimbursement formula: Aztec would pay $105;
Bloomfield would pay $120; Farmington would pay $720; Kirtland would pay
$15; and the County would pay $540. Of course, these reimbursement
payments would be spread over four quarters.
Recent such expenditures have been absorbed by the City of Farmington’s
Community Development Department.
RECOMMENDATION
It is recommended that the Policy Committee review and consider the proposal
to approve up to $1,500 for the MPO’s FFY2019 to ensure sufficient funding
for these expenditures is available to the MPO during FFY2019 (October 1,
2018 – September 30, 2019).
DISCUSSION: Ms. Holton stated that this recommendation was different than how the
non-reimbursable expenses were treated in the past. Previously, expenses that were not
reimbursable (i.e.: meeting refreshments, snacks, water, etc.) under the PL or FTA
grants, were paid for entirely by the fiscal agent. In past years, the MPO Division within
the Community Development Department of the City of Farmington would earmark about
$1,500 for the year to cover these types of expenses.
With the new JPA, a provision was added that any reimbursement deemed non-
reimbursable by NMDOT would require the advance approval of the Policy Committee
and would be subject to the local match funding formula. This action item is being
presented prior to the start of the new federal fiscal year to allow the MPO to have funds
available for these types of purchases. Expenses would be invoiced to each of the
entities based on the reimbursement formula shown in the JPA:
Annual Maximum
Aztec 7% $105
Bloomfield 8% $120
Farmington 48% $720
Kirtland 1% $15
San Juan County 36% $540
38
These expenses would be reimbursed as they occurred and the dollar amounts shown
above would not be exceeded in the federal fiscal year of October through September.
For the past year, the Community Development Department has been covering these
expenditures for the MPO. The reimbursement formula has not been applied previously
as the fiscal agent used to pay all these costs.
Mayor Duckett thought it was a good policy to spread the costs out among each of the
entities. Ms. Holton said this was being brought to the Policy Committee for
consideration so that the approval would be in place beginning October 1. The first
invoice these charges could show up would be the quarterly billing for the first quarter of
FFY19 (January 2019).
ACTION: Commissioner Sipe moved to recommend the approval of up to $1,500 for the
MPO’s FFY2019 budget to ensure sufficient funding for non-reimbursable expenditures
is available to the MPO during FFY2019 (October 1, 2018 – September 30, 2019).
Councilor Sharer seconded the motion. The motion was passed unanimously.
5. CALL FOR PROJECTS: FFY2020 PLUS CMAQ NON-MANDATORY PROGRAM
Subject: Call for Projects: FFY2020 Plus CMAQ Non-
Mandatory Program
Prepared by: Mary Holton, AICP
Date: September 27, 2018
BACKGROUND
Beginning with the federal Intermodal Surface Transportation Efficiency Act
(ISTEA) of 1991 through the most recent law, Fixing America’s Surface
Transportation Act or “FAST Act,” signed on December 4, 2015, the NMDOT
receives federal funds to administer a variety of programs, including the CMAQ
program. The CMAQ program provides a flexible funding source to the State and
T/LPAs for transportation projects and programs that help meet the requirements of
the Clean Air Act. Mandatory CMAQ funding is made available to areas that do not
meet the National Ambient Air Quality Standards for ozone, carbon monoxide, or
particulate matter (for nonattainment areas) and for former nonattainment areas
that are now in compliance (maintenance areas).
Currently, El Paso Metropolitan Planning Organization (EPMPO) is the only
recipient of mandatory CMAQ funds for a portion of southern Dona Ana County that
is in non-attainment. Non-mandatory CMAQ funding is administered by NMDOT
and is available statewide for projects and programs that improve air quality and
reduce congestion.
NMDOT administers CMAQ on behalf of the FHWA. Pursuant to the FAST Act,
transportation projects that fall into one of the following three broad categories are
eligible for CMAQ funding:
1. Projects that reduce the number of vehicle trips and/or vehicle miles traveled
(VMT);
39
2. Projects that reduce emissions related to traffic congestion; and/or
3. Projects that reduce the per mile rate of vehicle emissions through improved
vehicle and fuel technologies.
All T/LPAs receiving federal aid highway program funding must fulfill specific
requirements to successfully complete their project. T/LPAs wishing to pursue
CMAQ funding must consult the T/LPA Handbook prior to applying for funds in
order to fully understand the requirements. A current copy of the T/LPA Handbook
can be found at:
http://dot.state.nm.us/content/dam/nmdot/Local_Government_Agreement_Unit/TLG
A_HANDBOO K.pdf
APPLICATION PROCESS
Eligible Tribal/Local Public Agencies (T/LPAs) submitting a grant application under
this program must first complete and submit electronically a Project Feasibility
Form (PFF) to the Farmington MPO prior to submitting a CMAQ Application.
Following receipt of the PFF, the MPO will set up a meeting with the Agency and
NMDOT representatives to determine the project eligibility and feasibility to meet
the funding deadlines. If the project meets these criteria, then the Agency may
submit a CMAQ Application Package to the MPO.
The deadline to submit a PFF electronically to MPO Staff is Wednesday, October
3, 2018 at 5:00 pm (PFF’s can be submitted at any time before this deadline).
Project applications must fully follow the directions contained in the New Mexico
DOT’s Congestion Mitigation and Air Quality Improvement (CMAQ) Non-Mandatory
Program Guide.
APPLICATON SCHEDULE SUMMARY
Wednesday August 15, 2018 – Release of Call for Projects
Wednesday October 3, 2018 – Deadline to Submit Project Feasibility Form
Electronically to FMPO Staff (5:00PM)
Monday October 15 - Friday October 19, 2018 (Tentative) – Feasibility Review of
submitted PFFs with LPAs, FMPO, & NMDOT staff – Meeting(s) will be set up and
scheduled by the FMPO. Additional forms to be provided once PFFs are approved
by District 5.
Monday December 3, 2018 – Deadline for Local Public Agencies to Submit CMAQ
Application Form & required materials (including Resolution of Sponsorship)
Electronically to FMPO Staff (5:00PM)
Thursday December 27, 2018 – Deadline for the Farmington MPO to Submit
Completed CMAQ Project Applications to the NMDOT CMAQ Program Coordinator
(5:00PM)
CURRENT WORK
The Call for Projects was released on August 15, 2018.
INFORMATION ITEM
This is an information item only.
40
DISCUSSION: Ms. Holton explained that this Agenda item was informational only and
had been shared by e-mail several times prior.
This Congestion, Mitigation, and Air Quality (CMAQ) program provides a flexible funding
source to the State and T/LPAs for transportation projects and programs that help meet
the requirements of the Clean Air Act. Mandatory CMAQ funding is made available to
areas that do not meet the National Ambient Air Quality Standards for ozone, carbon
monoxide, or particulate matter (for nonattainment areas) and for former nonattainment
areas that are now in compliance (maintenance areas).
Currently, non-mandatory CMAQ funding is available statewide for projects and
programs that improve air quality and reduce congestion. Ms. Holton asked that the
Policy Committee members to speak with their Technical Committee members and
encourage them to look into this funding opportunity for local CMAQ projects. The
deadline for submittal of the Project Feasibility Forms (PFF) is October 3. The FMPO will
ensure that the PFFs are collected and forwarded to the NMDOT review committee. It is
hoped that the feasibility review meeting can be held the week of October 15.
6. REPORTS FROM NMDOT
District 5 – Rebecca Maes
Rebecca Maes introduced David Quintana who has returned to NMDOT’s District 5 in an
engineering capacity.
Ms. Maes had no additional updates since the August meeting.
Planning Liaison – Joseph Moriarty
Mr. Moriarty was not able to attend.
7. COMMITTEE MEMBER DISCUSSION ITEMS
Subject: Committee Member Discussion Items
Date: September 27, 2018
DISCUSSION ITEMS
Policy Committee members presented no additional discussion items for addition to the
Agenda.
8. INFORMATION ITEMS
Subject: Information Items
Prepared by: Mary L Holton, AICP
Date: September 27, 2018
41
INFORMATION ITEMS
e. Review & provide input on the proposed CY2019 MPO Policy Committee
Meeting Schedule – See attached. The resolution adopting the schedule will be on
your November agenda.
f. Update on the FMPO Bike/Ped Plan. From the Consultant, Nancy Lauro, Russell
Engineering: The Update to the Bicycle and Pedestrian Plan is nearing completion.
Three public events have been completed including the San Juan County Fair multi-
day event. Holding the public events at well attended community activities generated
lots of comments and awareness of the plan. The people we spoke with were almost
universally in support of safer infrastructure for non-motorized transportation. Many
individuals that reported that they don’t currently walk or bike but thought that they
might if safer infrastructure was available. Even the anti-bicycle drivers (there were
only a few!) thought that separated infrastructure would be helpful to prevent
conflicts. Most people mentioned education of drivers and bicyclists as a priority.
Drafts of the plan chapters should be out for review soon. The draft project priorities
were sent to committee members on 9/19, once we have them finalized we will get
cost estimates completed.
g. MRA Plan Update for the City of Farmington – The City’s consultants for this
project – Liza Miller and Ben Savoca with Architectural Research Consultants, Inc.
presented the attached presentation to the MPO Tech Committee on September 12.
h. Report on FFY2020-21 Transportation Alternatives Program (TAP) &
Recreation Trails Program (RTP) – FMPO PFF Submittals, Next steps
The following projects were deemed feasible at the PFF Meetings on August 14:
City of Aztec
Aztec’s Downtown Road Diet
City of Farmington
Foothills Drive Enhancement Phase II
Foothills Drive Pedestrian and Traffic Calming Improvements
San Juan County
Kirtland Schools Path Extension
Glade Run Recreation Area (GRRA) Extension
Farmington Municipal School District
Safe Routes to Schools Program
The next steps for these projects are:
Friday October 26, 2018 – Deadline for Agencies to Submit TAP/RTP Project
Application Electronically to MPO Staff (5:00PM) – Including the completed
application form & required materials (including Resolution of Sponsorship)
as one (1) PDF file
42
Friday November 30, 2018 – Deadline for the Farmington MPO to Submit
TAP/RTP Project Applications to the NMDOT TAP/RTP Coordinator
(5:00PM)
i. Performance Measures (PM 2) Presentation by Tammy Haas at the MPO on
September 13.
As the Committee is aware, NMDOT recommends that the FMPO consider setting
our own targets, as opposed to what the NMDOT has set for the state, so that the
MPO’s targets will be relevant, realistic and attainable. Tammy Haas, Director of
Asset Management & Planning Division for NMDOT worked closely with other
NMDOT staff and their consultants to establish the State Targets for PM 2. She
presented to members of the Tech Committee and staff (including Jeff Kiely)
regarding the FMPO’s need to develop some of its own targets. The PM 2 targets
report adopted the state is attached. The following indicates the targets the MPO
must consider and Tammy’s recommendations that were provided at the meeting:
4 Year (2021) Targets Required/NMDOT
Performance Measure
Recommendations
Percentage of NHS bridges classified as in good
condition – Recommendation: Do not adopt the
state’s target of 30.0%/Adopt the MPO’s current
status of 10.0%.
PM 2 - Bridge
Percentage of NHS bridges classified as in poor
condition – Recommendation: Adopt the state’s
target of 2.5% as the MPO’s current status stands
at 0%.
Not Applicable as FMPO MPA has no
Interstate: Percentage of pavement on the
Interstate System in good condition
Percentage of pavement on the non-Interstate
NHS in good condition – Recommendation: Adopt
the state’s target of 34.2% as the MPO’s projection
for 2021 is 41%.
PM 2 - Pavement
Not-Applicable as FMPO MPA has no
Interstate: Percentage of pavement on the
Interstate System in poor condition
Percentage of pavement on the non-Interstate
NHS in poor condition – Recommendation: Adopt
the state’s target of 12.0% as the MPO’s projection
for 2021 is 10%.
Note: Direction for the above targets will be placed on the Tech Committee’s Agenda in
October. Both Committees will consider the resolution adopting the MPO’s targets in
November.
43
Performance CFR FHWA/ Final Rule Final Rule Effective Target- State DOT MPO Target-
Area FTA Publication Date Setting Target-Setting Setting Deadline
Date Frequency Deadline
PM2 - 23 CFR FHWA January 18, May 20, 2017 Every four May 20, 2018 November 20,
Pavement & 490 2017 years 2018
Bridge Perf.
Measures
j. MPO’s Transition Status between the City of Farmington and NWNMCOG. The
transition has started.
k. Status of Updates to the MPO’s Title VI Plan & Public Participation Plan.
NMDOT has recommended that the MPO’s Title VI Plan be updated with the MPO’s
Coordinator’s name and the MPO’s new structure after October 1. NMDOT has also
advised that the revisions to the Public Participation Plan to include FAST Act
provisions, the MPO’s new structure, and to consider NMDOT’s revised PPP can be
delayed until early CY2019 so that its update will be appropriately timed prior to staff
starting on the update to the MTP.
l. Upcoming MPO Quarterly in Santa Fe on October 2-3. Jeff Kiely will attend the
Quarterly to represent the MPO.
m. Your Next Meeting – November 15, 2018 at San Juan County.
DISCUSSION: Ms. Holton referred to Page 33 of the Agenda which showed the
proposed 2019 Policy Committee meeting schedule. She asked the Policy Committee to
review the dates for any conflicts and stated that it would be brought back for final review
and considered adoption in November.
Ms. Holton introduced Nancy Lauro, the consultant with Russell Planning & Engineering
who has been working on the FMPO Bike/Ped Plan Update. Ms. Lauro said some of the
chapter drafts are close to being ready for review, but she is really trying to get
comments from the entities on their project lists that were developed with historical
information and recent public outreach efforts. She has meetings scheduled with the City
of Bloomfield and San Juan County to discuss their lists, but wants input from the other
entities. Ms. Lauro said this input from the entities is critical before doing any cost
estimates and needs to be incorporated into the plan along with her analysis, the public
input and the information from the previous plan. She said the draft document is due in
October and encouraged all comments be sent to her.
The City of Farmington’s MRA Plan Update consultant presented to the Technical
Committee on September 12. Their presentation is part of the Agenda on Pages 34-51.
The next steps for the TAP/RTP projects that were deemed feasible are shown on Page
31 of the Agenda.
Ms. Tammy Haas, Division Director for the Asset Management & Planning Division of
NMDOT, gave a presented on Performance Measure (PM) 2. She worked closely with
other NMDOT staff and their consultants to establish the states PM 2 targets. She
presented to members of the Technical Committee and staff regarding the FMPO’s need
44
to develop some of its own targets. The following indicates the targets the MPO must
consider and reflect Ms. Haas’ recommendations provided during the meeting:
Performance Measure 4 Year (2021) Targets Required/NMDOT Recommendations
Percentage of NHS bridges classified as in good
condition – Recommendation: Do not adopt the state’s
target of 30.0%/Adopt the MPO’s current status of
PM 2 - Bridge 10.0%.
Percentage of NHS bridges classified as in poor
condition – Recommendation: Adopt the state’s target
of 2.5% as the MPO’s current status stands at 0%.
Not Applicable as FMPO MPA has no Interstate:
Percentage of pavement on the Interstate System in
good condition
Percentage of pavement on the non-Interstate NHS in
good condition – Recommendation: Adopt the state’s
target of 34.2% as the MPO’s projection for 2021 is
41%.
PM 2 - Pavement
Not-Applicable as FMPO MPA has no Interstate:
Percentage of pavement on the Interstate System in
poor condition
Percentage of pavement on the non-Interstate NHS in
poor condition – Recommendation: Adopt the state’s
target of 12.0% as the MPO’s projection for 2021 is
10%.
The direction for the above targets will be placed on the Technical Committee’s agenda
in October and both FMPO committees will consider the resolution adopting the MPO’s
targets in November.
Ms. Holton reported that the transition of the FMPO between the City of Farmington and
the NWNMCOG has started. Jeff Kiely provided a copy of the transitional organizational
chart to the Policy Committee. He noted that FMPO staff will be hired and paid by the
NWNMCOG, but they will perform work identified by the FMPO committees and
NMDOT. In the event of employee issues, the Policy Committee has recourse through
the COG as they would through the City of Farmington previously.
Mr. Kiely reported that the position of MPO Officer was broadly advertised for a month
with no applicants. The print media was very expensive and will not be used again, but
the posting will continue to October 17 and will be advertised with APA and national and
statewide networks. There were a couple of people who expressed interest in the
position, but they did not officially apply. Interviews will take place following the close of
the application period and Mr. Kiely asked if a member of the Policy Committee would be
interested in participating in those interviews. Mayor Duckett asked that Mr. Kiely provide
updates on when those interviews might take place and the Policy Committee will see
who among them is available to assist with the selection.
Ms. Holton said some minor changes to the Title VI (Tom Swenk must actually be
named as the Title VI Coordinator for the City of Farmington) along with the
organizational changes can be done after October 1. The Public Participation Plan
(PPP) needs to also be updated to include provisions from the FAST Act, changes to the
45
MPO structure, and include the state’s new PPP which is under consideration. Shannon
Glendenning stated that it would be okay to wait until January 2019 to update the PPP.
This will allow the PPP to be updated prior to beginning the MTP update planned for
September 2019.
Mr. Kiely will be attending the MPO Quarterly in Santa Fe on October 2 and 3 to
represent the FMPO.
The next Policy Committee meeting is on November 15, 2018.
Mr. Kiely said the NWNMCOG Board is having a Board Meeting on November 14 at the
MPO Office. He invited all Policy Committee members to stop by near the end of the
afternoon for a short reception and provide an opportunity for the COG Board to meet
leaders from the local entities.
9. BUSINESS FROM THE CHAIRMAN, MEMBERS AND STAFF
There was no business from the Chairman, Members and Staff.
10. PUBLIC COMMENT ON ANY ISSUES NOT ON THE AGENDA
There was no public comment on any issues not on the agenda
11. ADJOURNMENT
Councilor Sharer moved to adjourn the meeting. Commissioner Sipe seconded the
motion. The motion was approved unanimously. Mayor Duckett adjourned the meeting
at 2:10 p.m.
_________________________ ___________________________
Nate Duckett, Policy Committee Chair June Markle, Administrative Assistant
46