MPO Technical Committee
Regular MeetingFarmington, NM · December 18, 2014
Minutes
MINUTES
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
TECHNICAL COMMITTEE MEETING
December 18, 2014
Technical Members Present: Bill Watson, City of Aztec
Teresa Brevik, City of Bloomfield
Cynthia Lopez, City of Farmington
David Sypher, City of Farmington
Dave Keck, San Juan County
Technical Members Absent: None
Staff Present: Mary Holton, MPO Officer
Fran Fillerup, MPO Associate Planner
Duane Wakan, MPO Planner
June Markle, MPO Administrative Aide
Staff Absent: None
Also Present: Larry Hathaway, San Juan County
John Shepard, City of Farmington
1. CALL TO ORDER
Ms. Lopez called the meeting to order at 10:00 a.m. with a quorum present.
2. APPROVE THE MINUTES FROM THE NOVEMBER 20, 2014 TECHNICAL COMMITTEE
MEETING
Mr. Keck moved to approve the minutes from the November 20, 2014 Technical
Committee meeting. Mr. Sypher seconded the motion. The motion was passed
unanimously.
3. REPORTS FROM NMDOT
Neither David Quintana nor Brian Degani was able to attend the meeting. Mr. Wakan
received e-mailed updates from them just prior to the start of the meeting, but not in
time to be copied to the Technical Committee members prior to the meeting. Copies
will be sent to all the members following the meeting and will be included in the
meeting minutes.
Mr. Wakan reported from Mr. Degani’s e-mail update for the Planning Division:
• The Congestion Management Air Quality Flex Funds (CMAQ) are normally
distributed to entities in non-attainment or poor air quality areas. The Flex
Funds, however, can be administered throughout the state. This program will
now be administered by the Planning and Safety Division in coordination with
our NMDOT State Engineer and they will try to disperse the funds across the
state for supplemental projects. Ms. Holton commented that part of the
purpose for distributing the funds statewide was to help to reduce congestion
and she thought there were projects in this area that would qualify. Mr. Wakan
said more information would be presented by NMDOT in the near future.
• Administration of the HSIP program will be moving to the Planning Division of
NMDOT. Mr. Wakan reported that all funds for FY2015 and FY2016 have been
programmed. Another call for projects would be sent out next year for FY2017.
Mr. Sypher asked if the quarterly submittal of projects had been changed. It
was noted that with the Planning Division taking over administration of the
HSIP program, it is anticipated that there will be changes that could include a
move to a semi-annual process. Ms. Holton recommended that the entities
continue to submit projects as they have been until more details are
forthcoming from NMDOT.
• A Strategic Highway Safety Summit (SHSP) is scheduled for March 24 in
Albuquerque to have a public review of the draft SHSP strategies to be used in
guiding the HSIP. Mr. Wakan reported that Staff will plan to attend this
summit.
• MPOs are encouraged to continue to track TAP projects. Additionally, FFY2015
construction awarded projects must have all their certifications and PS&E
package completed by 7/15/15.
Show below is Mr. Degani’s complete update:
Congestion Management Air Quality Flex Funds or CMAQ Funds will be
administered by the Planning and Safety Division in coordination with our
NMDOT State Engineer. We will have more information in the near future.
Nothing new to report on the Freight Plan.
Highway Safety Improvement Program Will transition over to Planning. Again,
all of the FFY16 funds appear to be programmed and the next call for
applications will be spring/summer of 2015.
The Strategic Highway Safety Plan Safety Summit will be held March 24,
2015. The Summit's purpose is to have public review of the draft SHSP strategies
that will be used to guide the HSIP.
State Long Range Plan activities will resume in January 2015
FMPO and the governmental entities should continue tracking the FFY14/15 TAP
projects. FFY15 construction awarded projects must have all their certifications
and complete PS&E package complete by 7/15/15. FMPO Staff have developed
a 2014-2015 TAP Project Status Update sheet that needs to be updated on a
weekly basis due to the tight deadline. I provided an additional comment
included on this tracking sheet. A Project Agreement Start and End Date need to
be included for any federal aid awarded projects per 2 CFR 200 Uniform
Guidance beginning on Dec 26, 2014. More specifically, costs after Dec 26,
2014 can only be incurred within the Start and End Date, thus no additional costs
can be incurred or claimed for reimbursement after the Project End
Date. Project End Dates may be beyond the anticipated construction completion
date to account for project closeout, final audits and/or a delay in the project
beyond the control of the federally awarded recipient/subrecipient. This note
was provided on the FMPO 2014-2015 TAP Project Status Update sheet to the
FMPO Staff. More information will be provided per the MPO 2CFR 200 Uniform
Guidance webinars in the coming weeks and at the next FMPO PB and TC
meetings.
At this time, I am still reviewing the Transportation Improvement Program (TIP)
Template and will provide comments to FMPO Staff.
Lastly, I provided information to the FMPO Staff on the JPA/Bylaws needing to
be amended to allow state representation from NMDOT District 5 on both the
FMPO Policy and Technical Committees included with your agenda packets.
For the District 5 Project Update, Mr. David Quintana, provided the following:
Please use the same project update as last month. There have been no changes
since then. (NOTE: The last project update was received in October.)
Please advise the committee that District 5 is considering a more hands on role for
the T/LPA construction management. We are having internal discussions that we
take over all Independent Assurance Testing for the entities. This will be
determined over the next few months as project loads and manpower is assessed.
We may only do larger scale projects or all; that is TBD.
Please advise the technical committee to get hold of me if they are having
concerns with reimbursements. I will work with William Montoya to try and get
them processed more timely.
Mr. Keck reported on a new CFR by FHWA addressing prompt payments to entities.
NMDOT has seven days to respond if there is a problem with an entity’s reimbursement
request. Additionally, the entire reimbursement cannot be held up because of an issue
with one item. The remaining portion of the request must be reimbursed within 14
days following the seven-day comment period. Mr. Keck said he would forward this
information to the other Technical Committee members. Mr. Keck added that FHWA is
pushing prompt reimbursements because they believe it is important for the funds to
keep flowing and not get bogged down at the state DOT levels. They are concerned
that money is not getting back into the local economies and that there are smaller
entities that cannot afford to wait months for their reimbursement.
Mr. Sypher did not think NMDOT could feasibly respond this quickly and doing so would
depend on the penalty for failing to do so that might be imposed on them by FHWA.
Mr. Wakan said at the MPO Quarterly Meeting, the NMDOT Planning representative, Ms.
Jessica Griffin, said that they realized they have some internal issues with the
engineering group. She asked the entities to document all the problems, delays,
required re-certifications, and any other communication issues they are having with
NMDOT and she will take those up their chain of command.
Mr. Sypher asked if Ms. Griffin knew what she was asking to receive. He said he has an
enormous amount of e-mail exchanges with NMDOT on various projects and did not
have the staff to compile all the issues to send to her. Mr. Fillerup suggested that he
detail the issues on one project and state which issues existed on the other projects.
Mr. Wakan had sent a list of questions to Mr. Quintana on December 11 and asked him
to respond (see below). Mr. Quintana, however, has not responded to these questions.
• Please review the FMPOs TIP on all NMDOT led projects to make sure project
descriptions are sufficient and where we might consider changes, inform us
where you foresee red flags with any other regional entity led projects as
well.
Mr. Wakan had forwarded a copy of the 2014-2015 TAP Project Status Update list
(distributed to the Technical Committee members) to Mr. Quintana and asked him to
speak to any issues he might foresee with the projects listed.
• Please review the attached FFY2014-15 TAP projects and comment on any
status updates as we have a short window to complete PS&E on a couple of
projects.
• Please provide comments on the attached TIP template that I want to be
utilized by all the lead agency project managers. One area is incomplete
(TIP Modifications) but you can see where I am going with it
Mr. Wakan had sent the new TIP template to Mr. Quintana and asked for his comments
on having the lead agencies complete the template when there is a TIP amendment.
Mr. Wakan is seeking NMDOT input and comment on using the template in the future.
• Please provide us an update on US 64 public outreach meetings
• Please provide us an update on Pinon Hills Boulevard Extension Phase I status
(local agreements and Agreement Request Form)
• Please provide us an update on any other project in our region under
construction, etc.
Mr. Wakan had also asked for project status updates on the next phase of US 64 and
details on an upcoming public outreach meeting for the next phase, local agreements
on Phase I of the Pinon Hills Boulevard extension project, and any other projects in
the region that might be under consideration.
4. REPORT BY STAFF ON THE FFY2015-2016 WORK AUTHORIZATIONS
Subject: FFY2015-2016 Work Authorization Update
Prepared by: Duane Wakan, MPO Planner
Date: December 11, 2014
BACKGROUND or PREVIOUS WORK
The MPO prepared its FFY2014-2015 Budget based on initial funding estimates
from NMDOT for FHWA PL and FTA 5303.
Work Authorizations now provide official amounts for PL and 5303 funding.
CURRENT WORK
The MPO is receiving a base amount in federal PL funding of $192,211 +
$32,755 in local match for a total of $224,966.
There will be no carryover of federal PL funds from FY2014 to FFY2015.
A purchase order was issued to the FMPO in the amount of $168,724.50 for
FFY14 PL funds. This is 3/4 of the $224,966 total amount because the current
Memorandum of Agreement (MOA) only carries us through June 30, 2015.
Additional work authorizations and purchase orders will be issued for the
remaining 3 months (July 1 – Sept 30) of FFY15 once the new MOA is ready.
The FFY2015-16 UPWP estimated $231,742 in total PL funds for FY2015
including the local match, a difference of -$6,776
The MPO received federal FTA 5303 funding of $56,573 + local match of
$14,143 for a total of $70,716 that will cover transit activities from October 1,
2014 to September 30, 2015.
The FFY2015-16 UPWP estimated only $63,750 in total funds for FY2015
including the local match, a difference of +$6,966.
The MPO intends to use FTA 5303 funds to finance a feasibility study to
recommend an appropriate transit hub for Red Apple Transit services.
INFORMATION ITEM
This is an informational report only.
DISCUSSION: Mr. Wakan reported that the MPO received the PL and 5303 funding work
authorization award letters (see Pages 2 and 3 of the Agenda).
The PL work authorization showed a base amount of $192,211 plus a required local
match of $32,755 for a total of $224,966. Mr. Wakan said that there is no longer any
carryover of federal PL funds. The MPO needs to ensure they are spending down the
entire amount of each year’s awarded funding.
Mr. Wakan explained that only three-fourths of the PL funding was awarded because
the current Memorandum of Agreement (MOA) carries the MPO through June 30, 2015.
Additional work authorizations will be issued for the remaining three months (July 1 –
Sept 30) of FFY2015 once a new MOA is ready. Mr. Wakan also reported that NMDOT
will be changing the term MOA to Grant Agreement in the future. This change will be
proposed for the Joint Powers Agreement (JPA) and other MPO documents once it is
finalized by NMDOT.
Mr. Wakan reported that the work authorization for FTA 5303 funding was for $56,573
plus a required local match of $14,143 for a total of $70,716. This will cover transit
activities from October 1, 2014 to September 30, 2015. Mr. Wakan said that some of
the FTA funding is planned to be used for a feasibility study for a transit hub location
for the Red Apple Transit. Ms. Holton said this work will be in lieu of hiring the
summer interns to do survey work. The Red Apple Transit is actually purchasing
computer hardware and software that will do this ridership data collection instead of
the interns.
ACTION: The report was received.
5. REPORT BY STAFF ON THE 2040 METROPOLITAN TRANSPORTATION PLAN (MTP)
Subject: 2040 Metropolitan Transportation Plan (MTP)
Prepared by: Fran Fillerup, MPO Associate Planner
Date: December 11, 2014
BACKGROUND OR PREVIOUS WORK
The MPO’s consultant compiled input from public outreach efforts in August
and September 2014, and has provided recommendations for updating the MTP.
Staff has drafted several changes and additions to the goals and objectives set
forth in the MTP based upon the public comments and priorities identified
through the public outreach efforts and the recommendations of the
consultant.
As required by a review of the MPO from FHWA, a method of prioritizing
projects is being developed as part of the 2040 MTP.
CURRENT WORK
A review of the vision, mission, and draft goals and objectives will be
presented.
The goals are the accomplishments which the region hopes to achieve through
implementation of the plan. The objectives state more specific steps which
should be taken to pursue those goals.
The goals and objectives should be based in the vision, mission, and the results
of the data analysis and public input.
Staff has drafted criteria for the project prioritization methodology based on
the draft goals.
The methodology will prompt applicants for funding to address the various
criteria. The MPO needs to determine which criteria should be used, how they
should be weighted or scored (including quantitative scores or qualitative
findings), and how such a methodology should guide funding decisions.
DISCUSSION ITEM
Input on the vision, mission, goals, objectives and project prioritization
methodology criteria will be sought.
DISCUSSION: Mr. Fillerup referred to several handouts that showed the current Vision
and Mission Statements as well as the existing Goals & Objectives in the 2035 MTP. A
draft list for the project prioritization methodology for the 2040 MTP was on Page 5 of
the Agenda.
Vision Statement
“The Farmington Metropolitan Planning Organization vision is for a safe, efficient,
and reliable multi-modal transportation system that meets the needs of residents and
visitors in the region”.
Mission Statement
“Provide a forum to develop an effective transportation system to move people and
goods safely, economically, and efficiently while maintaining a high quality of life”.
Mr. Fillerup said that these were the current Vision and Mission Statements and Staff
was not proposing any changes. He encouraged the Technical Committee members to
recommend any changes they thought should be considered.
Mr. Fillerup explained that the goals represented the achievements desired by FMPO
through the transportation system. The objectives provide more specific steps that
would be taken to achieve the goals.
Mr. Fillerup referred to the Draft Development of Goals, Objectives, and Criteria for
the Project Prioritization Methodology – 2040 MTP on Pages 5- 8 of the Agenda (see
below). He noted that project prioritization methodology came out of the FHWA
review of the MPO and the planning process. FHWA thought that by developing a
project prioritization method, the MPO could more closely tie the goals to the projects
actually being proposed and built. Mr. Fillerup asked the Technical Committee to
review and comment on the goals, objectives, and criteria for the project
prioritization methodology to ensure they are in line with MPO and MTP goals. This
methodology was based on the existing goals and objectives, but updated to include
changes over the past five years due to changing priorities and public input.
Mr. Shepard noted that the goals were action-oriented. He asked if, when the criteria
were evaluated, would it be the verb “support” that was being evaluated and not the
economic vitality of the MPO region itself. Mr. Fillerup clarified that when the goal
was evaluated the MPO would evaluate how well it supported the economic vitality of
the MPO region and would not be assuming responsibility for the entire economic
vitality of the community. Mr. Wakan added that Staff is working to develop the
prioritization process now that will provide the methodology for accurately prioritizing
projects for inclusion in the TIP and ensuring they are in line with the MTP goals. Mr.
Fillerup reiterated that the MPO goal was to do their part to “support” the economic
vitality of the MPO region.
DRAFT DEVELOPMENT OF GOALS, OBJECTIVES & CRITERIA FOR THE PROJECT PRIORITIZATION
METHODOLOGY – 2040 MTP
Below are the draft Goals and Objectives of the 2040 MTP, and draft criteria for the Project Prioritization Methodology. The Criteria
would be used to evaluate projects proposed for funding to ensure that projects are pursuing the goals developed through the planning
process. The Criteria are based on the Goals, and the Objectives give guidance to the work which would help attain the Goals.
GOALS OBJECTIVES PROJECT PRIORITIZATION CRITERIA
A. Support the economic 1. Invest in and maintain transportation 1. How does the project or program
vitality of the MPO region infrastructure serving economic activity centers support economic vitality?
by investing strategically 2. Develop all modes of transportation system for 2. Does the project or program improve
in projects and programs efficient delivery of goods and services and quality of life within the community or
which create long-term, access to businesses, training and jobs region?
financially-sustainable 3. Enhance aesthetics and quality of life factors of 3. Does the project or program address
economic value the transportation system to attract visitors and workforce training or job access
new residents transportation needs?
4. Expand transit services hours and days of
operation to meet needs of residents in the
workforce and San Juan College students
seeking education and training
B. Foster regional 1. Incorporate locally-adopted plans in the MTP 1. Is the project or program based upon a
coordination on 2. Involve local planners in the transportation locally-adopted plan?
transportation projects planning process 2. Did the project or program have
and policies among all 3. Maintain collaborative relationships within the stakeholder input?
levels of government and region through ongoing public outreach to
stakeholder groups stakeholders and open public meetings
C. Develop transportation 1. Prioritize the completion of networks for 1. Does the project or program help
network connections and individual modes complete a transportation network?
associated facilities into a 2. Increase intermodal connections 2. Does the project or program include
cohesive intermodal intermodal connections?
system
D. Manage congestion by 1. Maximize use of current transportation system 1. Does the project or program improve the
prioritizing projects that 2. Minimize congestion and delay efficiency of the transportation system?
enhance the Quality of 3. Integrate Intelligent Transportation Systems 2. Does the project or program include
Service (QOS) of capacity- elements aimed at increasing system efficiency Intelligent Transportation Systems
efficient modes like into the regional infrastructure features?
carpooling, transit, biking,
and walking and reduce
overall person delay
E. Provide reasonable 1. Increased multi-modal accessibility by 1. Does the project or program improve
access for all of the completing networks for all modes access for groups which currently face
region’s residents, 2. Expand transit service hours and days of some obstacles to access within the
regardless of age, operation transportation system?
income, ability or location 3. Develop the Complete Streets Design Guidelines 2. Is the project or program consistent with
for implementation by local government entities the Complete Streets Design Guideline
and does it accommodate more than one
mode?
F. Minimize negative 1. Minimize air quality impacts 1. Will the project or program create any
environmental impacts 2. Minimize impacts to existing development new negative environmental impacts?
and enhance the 3. Develop strategies to educate the public about 2. Does the project or program help
environmental quality of how travel choices affect air quality address any negative environmental
the MPO region impacts?
G. Build, operate and 1. Maximize transportation system performance 1. Is the project or program financially
maintain the per project costs sustainable and how will it be
metropolitan 2. Include life cycle costing into proposals for all maintained?
transportation system in projects 2. Does the project or program improve the
a financially-sustainable, 3. Prioritize maintenance of the existing cost efficiency of the transportation
cost-efficient manner transportation system system?
3. Does the project or program improve
upon existing infrastructure?
H. Identify and implement 1. Improve multi-modal street design for high 1. Does the project or program incorporate
new technology for activity areas Intelligent Transportation Systems
balanced multi-modal 2. Implement Intelligent Transportation Systems elements?
transportation 2. What other technology is included in the
project or program and what are the
expected benefits?
I. Develop a transportation 1. Include local plans into MTP development 1. How does the project improve quality of
system that enhances 2. Address aesthetics of major thoroughfares life and aesthetics of the community and
quality of life and works within the region and gateways to the cities region?
in concert with cultural 3. Minimize access to adjacent developments 2. Does the project or program employ the
and environmental along key arterials to maximize capacity adopted Access Management Plan?
resources. consistent with access management principles
4. Include MPO review in local development
review
J. Integrate transportation 1. Encourage the local entities to integrate 1. What are the land use impacts of the
and land use planning to regional transportation policies into their project or program?
improve quality of life adopted local plans 2. How does the project or program relate
and to protect the natural 2. Emphasize connectivity and development of to adopted land use plans?
environment by using alternative travel routes as a means to avoid 3. Does the project or program improve
transportation widening of roadways connectivity of the transportation
investments to system?
proactively shape land
use patterns rather than
react to growth
K. Ensure safety for all 1. Improve system safety through improved levels 1. How does the project or program
modes of service and reduced congestion improve the safety of the transportation
2. Promote safety design practices for all modes system?
3. Minimize emergency vehicle response time 2. Are there negative safety impacts of the
project?
L. Coordinate with local 1. Implement Intelligent Transportation Systems 1. Does the project or program support
agencies on security (ITS) technologies for improving the safety and local and regional security needs?
planning and strategies security of transportation modes 2. Does the project or program address any
2. Coordinate transportation system design and natural disaster prevention needs?
operation with emergency response and
disaster mitigation efforts
M. Foster public private 1. Facilitate connections of all levels of 1. Does the project or program leverage
partnerships aimed at government, school districts, San Juan College, any public private partnerships?
reaching regional businesses, non-profit organizations and other 2. Is there a plan for the sustainability or
transportation goals interested stakeholders expiration of that partnership?
2. Support public private partnerships in
identifying needs, accessing data and technical
assistance as available
N. Provide a transportation 1. Promote access to healthcare services for all 1. What are the health impacts of the
system which promotes users, with focus on populations without the project?
healthy living ability to drive 2. Does the project support active
2. Maintain existing complete streets and expand transportation modes?
complete streets infrastructure to promote
active transportation modes
Mr. Sypher commented that he thought the proposed goals and objectives were a
substantial improvement over the exiting list of goals and objectives. He asked if the
Red Apple Transit provided a ridership report. He thought it important that with an
MPO objective to expand transit service and ongoing constraints on funding, that the
ridership data needed to support this objective.
Ms. Holton said the Red Apple Transit system is part of the City of Farmington and
informational reports are provided to City Council. Mr. Sypher said that with all the
competition for funding, he thought it was important that before a goal to expand
transit service hours is set, the Technical Committee should see a report that provides
justification for this expanded service. Mr. Wakan said that much of the justification
for the expanded service is coming from public input. He added that the data the MPO
is able to gather during the three months in the summer with the interns provides only
a small snapshot of the actual yearly ridership. The City of Farmington is planning to
purchase software that will provide a year-long, detailed look at ridership. Ms. Holton
commented that much of these changes are in response to requirements of the City of
Farmington by FTA.
Mr. Sypher reiterated his point that the MPO was setting a goal of expanding transit
service. Ms. Holton said that the work of the interns the last few years has been
utilized to expand the service. The data collected has assisted the city in changing
routes and schedules in order to attract more ridership. She added that over time
there has been improvement. Ms. Holton said that during the public participation
process, the community was aware of transit service and had opinions about the
service, but that most did not use the service. Mr. Wakan added that oftentimes the
comments are coming through the higher level stakeholders and the end users of the
Red Apple do not attend the public meetings to provide their input.
Mr. Sypher asked if this topic was of interest to the other Technical Committee
members. Mr. Keck commented that the Red Apple Transit has branched out to the
county areas a little over the past few years, but that ridership remains low. He
thought it was more of a “feel good” thing by offering transit in San Juan County.
Mr. Fillerup stated that at a recent meeting with NMDOT, Red Apple Transit can get
more money for buses, but getting more personnel is the issue. This lack of personnel
creates a problem for expansion. Ms. Lopez commented that she believed the transit
system was still in its infancy and was still developing. The Red Apple system was
started to fill a need in the community for people who do not have their own
transportation or who cannot drive themselves. Ms. Lopez said that the ridership data
was not the ultimate driver to support expansion of the services. She stated that it
was important to remember that this is a need of the community.
The Technical Committee members discussed:
• 30% of MTP survey respondents said the Red Apple Transit was a high priority;
30% also said it was a low priority; good to have available, but the service
could be better;
• Paratransit is more costly per ride, but also more flexible;
• More funds needed to hire drivers; one paratransit bus is booked every day;
new bus will be purchased;
• Operation is primarily between City of Farmington and FTA;
Mr. Fillerup asked if Mr. Sypher’s concern was in spending money on transit that would
not be available for other areas. Mr. Sypher said he thought it was more of a
philosophical concern. If there is a need for this goal to be included by the MPO then
he would approve of it, but he wanted the goal to be justified and thought that
accurate, detailed data would highlight the need for this.
Mr. Fillerup said that further discussion on this can be included when the MTP transit
chapter is presented and reviewed by the Technical Committee. Ms. Lopez added that
there had been a study completed by a consultant a few years ago and many of the
concerns Mr. Sypher voiced had already been vetted in that study. She recommended
the study could provide the background on the need for transit service.
Mr. Fillerup continued to review some of the proposed new goals for the MTP:
• Build, operate and maintain the transportation system in a financially
sustainable and cost-efficient manner;
• Enhance quality of life and work in conjunction with cultural and
environmental resources;
• Address public health
Ms. Holton asked when Staff was planning to have the final review of the MTP
chapters. Mr. Fillerup said that would occur in March. Ms. Holton said Staff would like
the Technical Committee members to think about and provide their ideas and input
over the next few months.
Mr. Fillerup asked the members to consider if the Project Prioritization Criteria were
scored qualitatively or quantitatively. This scoring method would be used in the future
when considering projects for inclusion in the TIP. Performance measures will be
included as a separate chapter in the MTP. Not all the goals and objectives will need
to be measured, but the MPO does need to decide which ones they want to measure.
Mr. Fillerup said the goals and objectives were being presented now because they will
inform and impact the other MPO actions.
ACTION: The report was received.
8. RECEIVE A TIP PROJECT STATUS REVIEW
Subject: Status of TIP Projects
Prepared by: Duane Wakan, MPO Planner
Date: December 10, 2014
BACKGROUND
The STIP Protocols, finalized in early 2014, indicate that each MPO shall develop
a process to monitor the progress and status of each project in the first two
years of the TIP.
MPO Staff recommends a monthly review of all FMPO TIP projects with the
Technical Committee.
Recent attention to inconsistencies in the TIP, STIP, the MPOs MTP and
Agreement Request Forms (ARFs) necessitate the need to review project details
on a regular basis for consistency.
Reviewing the status of projects is an opportunity to review project details,
programmed amounts, and any potential situations that may cause funding not
to be obligated by September 30th.
CURRENT WORK
MPO staff will seek updates on the three regional TAP projects for tracking
purposes (Local Agreement Status and Project Certifications).
MPO staff created project detail TIP PDF document that will improve the
communication between the MPO and lead agency project managers.
MPO is required provide these updates to NMDOT on a regular basis.
INFORMATION ITEM
This is an information item only.
DISCUSSION: Mr. Wakan reported that in an attempt to improve consistency between
the TIP, STIP, MTP, and local agreements and to, hopefully, alleviate project delays,
Staff developed a TIP template. Mr. Wakan said the template will help to improve the
detail accuracy of projects and the communication between the MPO and project
managers for the lead agencies.
Mr. Wakan reviewed the TIP template with the Technical Committee:
• PDF that is fillable and savable;
• Can be found on the MPO website;
• Project description – details need to be accurate and thorough;
• Mileposts/termini;
• All items in red are required fields;
Mr. Wakan said the project description area is where many of the discrepancies with
NMDOT and the entities are happening. The descriptions are too brief or vague or do
not match the local agreements which leads NMDOT coming back to the MPO and
requesting amendments. Mr. Watson commented that everything needs to be included
in the description. He noted that even though the City of Aztec is paying for the
utilities on the East Arterial, the project description must include this information or
that information cannot be included in the project advertisement for NMDOT’s portion
of the project. For instance, the utilities were not included in one of his project
descriptions and Mr. Watson had to advertise those separately.
Mr. Keck commented that NMDOT had changed the project description on a county
project when they put it into the STIP and then came back and required the county to
amend that project in the TIP. Mr. Sypher added that the differing versions of the
cooperative agreement for the Pinon Hills Boulevard project that has required the
agreement to be re-written numerous times is because NMDOT keeps changing the
description to include the bridge in the scope of Phase I of the project.
Mr. Wakan said that Staff is recommending that the completed TIP template be
reconfirmed and approved by the District 5 liaison or the STIP Coordinator.
Ms. Lopez suggested that the Project Description box on the template expand as it is
filled in. This allows the project manager to include all the necessary project details.
Mr. Wakan added that this should be sufficient since there also was a limited amount
of space in the TIP for this type of information. The Technical Committee members
made some recommendations for formatting this area of the template.
Funding Sources
Up to three possible sources
Identify funding source: federal, state or local funds
Match types: state, local, or other
Fiscal year
Federal funding categories – lots of choices (all that are identified in the TIP database
are noted in this section and any can be selected);
Mr. Wakan said that Staff is recommending that all the lead agencies begin using the
template for TIP amendments and modifications. If a project manager has questions,
they can e-mail the template to Mr. Quintana and ask for his assistance.
Mr. Sypher asked if Mr. Quintana had reviewed and commented on the template. Mr.
Wakan replied that Mr. Quintana had not yet reviewed the document. Mr. Sypher said
he thought the template looked really good, but thought that Mr. Quintana’s support
and buy-in was necessary. Mr. Wakan agreed that it was important to have NMDOT’s
support.
Mr. Sypher said that the City of Farmington has always had issues with submitted
documents to NMDOT and not hearing back from them. Ms. Holton added that with the
transfer to the Planning Division, additional delays may be created. Mr. Sypher thought
that without enough staff, the lack of communication would continue to be a problem
whether the Planning or Engineering department is processing the applications.
Mr. Wakan stated that Mr. Quintana is typically quick to respond to TIP amendments or
modifications, but the changes are never fully or accurately completed and requires
Staff to sort through numerous e-mails to get a change accurately completed. Mr.
Wakan hopes that the new TIP template will allow an amendment or modification to
be fully completed and one form can then be kept on file for reference.
The Technical Committee agreed that the template would be very beneficial and
agreed to start using the form. They want to have Mr. Quintana review the template
and offer his recommendations.
TAP Project Status Update
Mr. Wakan reviewed the handout for the FFY2014-2015 TAP Project Status Updates.
Vereda del Rio San Juan River Trail Phases II and III
Ms. Brevik reported that she had received the design certification today for Phase 2.
Agreement requests for construction on both phases have been submitted and she is
just waiting on the PS&E package. She noted that there had been a hiccup on one of
the deeds that had not been caught until now and that deed had to be re-executed.
Once this is completed, the rights of way for Phases II and III will be complete. Ms.
Brevik also added that NMDOT’s environmental coordinator, Rick Wessel, has been
very cooperative and responsive. All the other specifications – ITS, utilities, and
railroad – were completed in one day.
20th Street – Phase I
Mr. Sypher reported that the Archeology Certification section was left blank because it
was not applicable. He reported that there still is no local agreement even though the
Agreement Request Form was submitted on October 29. The City of Farmington had a
typo on the documents that showed the year as 2014 instead of 2015. NMDOT did not
get back to them on this typo for two months. Mr. Sypher is frustrated with the loss of
two months’ time and the lack of prompt feedback that would eliminate this type of
project delay.
Mr. Sypher said he anticipates nothing happening on Phase II until the design
completion in May 2015. Mr. Wakan reminded the members of the July 15, 2015
deadline for submittal of PS&E packages. Mr. Sypher said the problem continues to be
the lack of timely responses from NMDOT.
South Side River Road River Trail
Cory Styron is the project manager for this trail. Mr. Wakan reported that the only
outstanding item was the completion of the local agreement expected in March 2015.
Mr. Sypher reiterated that the Pinon Hills Boulevard project was once again delayed in
receiving the cooperative agreement. This issue has been going on for months to try
and get the language corrected to not include the bridge portion of the project.
Another three weeks have passed since the most recent problem.
Mr. Watson mentioned that Phase IB of the East Arterial was held up on materials.
There is also a language/scope change for Phase II of the project that may require a
simple TIP modification. Mr. Watson said that this change is to allow the City of Aztec
to bid the water/sewer lines with the roadway project and not have to bid them
separately.
ACTION: The report was received.
7. INFORMATION ITEMS
Subject: Information Items
Prepared by: Fran Fillerup, MPO Associate Planner
Date: December 11, 2014
INFORMATION ITEMS
a. NMDOT staff members to join Policy and Technical Committees. NMDOT
has requested to have a staff member serve on the MPO Policy and
Technical Committees. They currently may have an appointment as ex-
officio non-voting members. This change would require an amendment to
the MPO Joint Powers Agreement and Bylaws.
b. Statewide Long Range Plan. Staff participated in two meetings as part of
the NMDOT Statewide Multimodal Long Range Plan:
• Dec. 2 – Plenary Meeting of Statewide Working Groups, Albuquerque
• Dec. 10 – Meeting of the Northwest Regional Working Group, Milan
c. MPO Quarterly. Staff attended the MPO Quarterly on December 16 in Las
Cruces.
d. Completing Project Forms. NMDOT staff contacted the MPO in November
regarding consistent listing of termini in the STIP and the Agreement
Request Form for a particular intersection project. Using consistent
language on all forms will help avoid delays. This particular case was
resolved through a TIP Modification beginning at the MPO.
e. Complete Streets. The Complete Streets Advisory Group approved in draft
format the design guidelines for the Downtown/Urban Area.
f. Other
DISCUSSION: Mr. Fillerup reported that NMDOT has requested to have a staff member
as a voting member on the MPO Policy and Technical Committees. Ms. Holton said this
was something that had come out of the FHWA audit a few years ago. Staff thought it
was more important for local entities to be members of the MPO committees, but now
other MPOs have added NMDOT members to their boards. FMPO is the only MPO that
currently has no NMDOT voting members on their committees. Ms. Holton said this is
something that will be undertaken in January. She noted that this will be problematic
for the Policy Committee because the MPO bylaws currently require that these
members be elected officials. The Policy Committee members will have to agree to
this change before it could be implemented.
Ms. Holton stated that she thought there could be ongoing issues with reaching a
quorum if an NMDOT representative is named to the committees. She believed this will
be an issue, because they currently attend so few of the MPO meetings. Additionally,
there is no NMDOT staff that lives and/or work in the area, so how can they represent
this region. Ms. Brevik suggested considering Cassie Pescor who works for District 5
and lives in Bloomfield.
Mr. Sypher asked if they could be called into the meeting. Ms. Holton said this was left
up to the NMDOT representative on whether they call in or not. She added that if they
are a voting committee member, they need to attend the meeting in person to provide
active engagement. The members discussed the issue of the number of members
needed to meet a quorum if an NMDOT representative was added to the committee.
Ms. Lopez asked why would we want them as a voting member of the committees if
they are not invested in the community or possess an understanding of the region’s
concerns and issues. Ms. Brevik agreed that a voting member needed to reside in the
community.
The Technical Committee discussed:
• the need for a voting member to be invested in the community;
• all the other MPOs (4 total in state) have NMDOT representatives that live in
their communities;
• Mr. Quintana covers two MPOs (FMPO and Santa Fe);
• Write bylaws to indicate that NMDOT representative must live in MPO area;
• Write bylaws to spell out the required quorum and whether the NMDOT
representative would be counted as part of the needed quorum. Consider
keeping quorum at three of six members present, if at all possible;
• Could be asking that NMDOT hire another employee that could fill this position.
All the discussion items will be considered before any changes to the bylaws are
explored.
Two Statewide Long Range Plan meetings were held on December 2 and 10. Mr.
Fillerup attended these meetings and reported the meetings were to analyze
alternatives regarding funding levels, adding more policies on how NMDOT functions,
and how projects are prioritized (large projects only or all projects within the state).
Both Mr. Wakan and Mr. Fillerup attended the MPO Quarterly on December 16. Ms.
Griffin, the supervisor for the Planning Division specifically asked for entity comments
and documenting problems they were having with NMDOT. She asked that these
comments be provided to her by January 5 and she would take the comments to the
higher supervisory levels of the Engineering Division.
Mr. Fillerup reported that Mesilla Valley and El Paso MPOs did not report significant
issues with delays, but they also have NMDOT representatives who live right in their
communities. Mr. Wakan added that the NMDOT planning liaison for Mesilla Valley was
aware of issues and she has heard the concerns that FMPO and MRCOG had raised. She
said she would go to bat for all the MPOs statewide. The Albuquerque MPO (MRCOG)
has a lot of the same concerns as FMPO. There were no representatives at the
Quarterly from Santa Fe. Mr. Wakan clarified that the severity of the issues fluctuates
among the MPOs but clarified that all are having some type of problems and this is why
Ms. Griffin has offered to step in. NMDOT Planning has recognized the problems
between them and Engineering and that the problem does not rest with the MPOs.
Mr. Sypher asked if Ms. Griffin was going to take on the issue with or without
documentation and instances documented by the MPO. Mr. Wakan assured the
members that they had an advocate in NMDOT Planning. Ms. Griffin asked that when
the entities submit their documentation to make sure it is specific, detailed and not
open to interpretation. Mr. Wakan said he thought the investment of time to compile
the information would create the change at the upper levels.
Mr. Wakan reported that the Complete Streets Advisory Group met and approved a
draft of the urban/downtown design guidelines. Ms. Lopez said the City of
Farmington’s MRA Commission is working on a contract to hire Blue Zones (Dan
Burden’s new company) to do a Complete Streets evaluation, research, and design for
Main Street and how those changes will affect traffic on Broadway. The MRA
Commission received approval from City Council to spend the funds to hire Blue Zones.
Ms. Brevik said the City of Bloomfield’s landscape project along US 64 should begin in
March. They are trying to develop some private/public partnerships for the project.
Ms. Brevik said they have already received some interest from individuals and groups
wanting to adopt a median. Many showing interest are outside of Bloomfield yet are
interested in participating. Ms. Brevik added that the landscaping should have been
included when the project was initially designed and funded.
Ms. Holton said the upcoming meetings to discuss the next phase of the US 64 project
will be advertised to encourage public participation and comment.
8. BUSINESS FROM THE CHAIRMAN, MEMBERS AND STAFF
There was no additional business from the Chairman, Members and Staff.
9. BUSINESS FROM THE FLOOR
There was no business from the Floor.
Mr. Hathaway wished everyone a Merry Christmas. He also said that the election to
incorporate Kirtland is set for January 6 by mail-in ballot. There are 430 people
eligible to vote.
10. ADJOURNMENT
Mr. Watson moved to adjourn the meeting. Mr. Sypher seconded the motion. Ms. Lopez
adjourned the meeting at approximately 11:50 a.m.
__________________________ ________________________________
Cynthia Lopez, Chair June Markle, MPO Administrative Aide
Agenda
TECHNICAL COMMITTEE
AGENDA
Farmington Metropolitan Planning Organization
December 18, 2014
10:00 a.m.
Council Chambers
Bloomfield City Hall
915 North First Street
Bloomfield, New Mexico
AGENDA
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
TECHNICAL COMMITTEE MEETING
December 18, 2014 10:00 AM
This meeting will be held in the Council Chambers at Bloomfield City Hall, 915 North First
Street, Bloomfield, New Mexico.
ITEM PAGE
1. Call meeting to order
2. Approve the minutes from the November 20, 2014 Technical Committee 11
meeting.
3. Reports from NMDOT
a. District 5 (David Quintana)
b. Planning Division (Brian Degani)
4. Report by Staff on the FFY2015-2016 Work Authorizations 1
5. Report by Staff on the 2040 MTP Update 4
6. Receive a TIP Project Status Review 9
7. Information Items: 10
a. NMDOT Staff Join MPO Committees
b. Statewide Long Range Plan
c. MPO Quarterly
d. Completing Project Forms
e. Complete Streets
f. Other
8. Business From Chairman, Members, and Staff
9. Business from the Floor
10. Adjournment
ATTENTION PERSONS WITH DISABILITIES: If you are an individual with a disability who is in need of a
reader, amplifier, qualified sign language interpreter, or any other form of auxiliary aid or service to
attend or participate in the hearing or meeting, please contact the MPO Administrative Aide at the
Downtown Center, 100 W Broadway, Farmington, New Mexico or at 505-599-1466 at least one week
prior to the meeting or as soon as possible. Public documents, including the agenda and minutes, can
be provided in various accessible formats. Please contact the MPO Administrative Aide if a summary or
other type of accessible format is needed.
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
Agenda Item #4
Subject: FFY2015-2016 Work Authorization Update
Prepared by: Duane Wakan, MPO Planner
Date: December 11, 2014
BACKGROUND or PREVIOUS WORK
The MPO prepared its FFY2014-2015 Budget based on initial funding estimates
from NMDOT for FHWA PL and FTA 5303.
Work Authorizations now provide official amounts for PL and 5303 funding.
CURRENT WORK
The MPO is receiving a base amount in federal PL funding of $192,211 +
$32,755 in local match for a total of $224,966.
There will be no carryover of federal PL funds from FY2014 to FFY2015.
A purchase order was issued to the FMPO in the amount of $168,724.50 for
FFY14 PL funds. This is 3/4 of the $224,966 total amount because the current
Memorandum of Agreement (MOA) only carries us through June 30, 2015.
Additional work authorizations and purchase orders will be issued for the
remaining 3 months (July 1 – Sept 30) of FFY15 once the new MOA is ready.
The FFY2015-16 UPWP estimated $231,742 in total PL funds for FY2015
including the local match, a difference of -$6,776
The MPO received federal FTA 5303 funding of $56,573 + local match of
$14,143 for a total of $70,716 that will cover transit activities from October 1,
2014 to September 30, 2015.
The FFY2015-16 UPWP estimated only $63,750 in total funds for FY2015
including the local match, a difference of +$6,966.
The MPO intends to use FTA 5303 funds to finance a feasibility study to
recommend an appropriate transit hub for Red Apple Transit services.
ANTICIPATED WORK
MPO Staff will prepare an amendment to the UPWP to reflect these new
funding totals for recommended approval at the January 2015 Technical
Committee meeting.
ATTACHMENTS
The FFY2015-16 PL Work Authorization Letter
The FFY2015-16 FTA 5303 MPO Award Letter
INFORMATION ITEM
This is an informational report only.
1
2
3
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
Agenda Item #5
Subject: 2040 Metropolitan Transportation Plan (MTP)
Prepared by: Fran Fillerup, MPO Associate Planner
Date: December 11, 2014
BACKGROUND OR PREVIOUS WORK
The MPO’s consultant compiled input from public outreach efforts in August
and September 2014, and has provided recommendations for updating the MTP.
Staff has drafted several changes and additions to the goals and objectives set
forth in the MTP based upon the public comments and priorities identified
through the public outreach efforts and the recommendations of the
consultant.
As required by a review of the MPO from FHWA, a method of prioritizing
projects is being developed as part of the 2040 MTP.
CURRENT WORK
A review of the vision, mission, and draft goals and objectives will be
presented.
The goals are the accomplishments which the region hopes to achieve through
implementation of the plan. The objectives state more specific steps which
should be taken to pursue those goals.
The goals and objectives should be based in the vision, mission, and the results
of the data analysis and public input.
Staff has drafted criteria for the project prioritization methodology based on
the draft goals.
The methodology will prompt applicants for funding to address the various
criteria. The MPO needs to determine which criteria should be used, how they
should be weighted or scored (including quantitative scores or qualitative
findings), and how such a methodology should guide funding decisions.
ATTACHMENTS
Copies of the vision and mission as stated in the 2035 MTP are attached.
A table with the draft of goals, objectives and criteria for the project
prioritization methodology is attached.
DISCUSSION ITEM
Input on the vision, mission, goals, objectives and project prioritization
methodology criteria will be sought.
4
DRAFT DEVELOPMENT OF GOALS, OBJECTIVES & CRITERIA FOR THE PROJECT PRIORITIZATION
METHODOLOGY – 2040 MTP
Below are the draft Goals and Objectives of the 2040 MTP, and draft criteria for the Project Prioritization Methodology. The Criteria
would be used to evaluate projects proposed for funding to ensure that projects are pursuing the goals developed through the planning
process. The Criteria are based on the Goals, and the Objectives give guidance to the work which would help attain the Goals.
GOALS OBJECTIVES PROJECT PRIORITIZATION CRITERIA
A. Support the economic 1. Invest in and maintain transportation 1. How does the project or program
vitality of the MPO region infrastructure serving economic activity centers support economic vitality?
by investing strategically 2. Develop all modes of transportation system for 2. Does the project or program improve
in projects and programs efficient delivery of goods and services and quality of life within the community or
which create long-term, access to businesses, training and jobs region?
financially-sustainable 3. Enhance aesthetics and quality of life factors of 3. Does the project or program address
economic value the transportation system to attract visitors and workforce training or job access
new residents transportation needs?
4. Expand transit services hours and days of
operation to meet needs of residents in the
workforce and San Juan College students
seeking education and training
B. Foster regional 1. Incorporate locally-adopted plans in the MTP 1. Is the project or program based upon a
coordination on 2. Involve local planners in the transportation locally-adopted plan?
transportation projects planning process 2. Did the project or program have
and policies among all 3. Maintain collaborative relationships within the stakeholder input?
levels of government and region through ongoing public outreach to
stakeholder groups stakeholders and open public meetings
C. Develop transportation 1. Prioritize the completion of networks for 1. Does the project or program help
network connections and individual modes complete a transportation network?
associated facilities into a 2. Increase intermodal connections 2. Does the project or program include
cohesive intermodal intermodal connections?
system
D. Manage congestion by 1. Maximize use of current transportation system 1. Does the project or program improve the
prioritizing projects that 2. Minimize congestion and delay efficiency of the transportation system?
enhance the Quality of 3. Integrate Intelligent Transportation Systems 2. Does the project or program include
5
Service (QOS) of capacity- elements aimed at increasing system efficiency Intelligent Transportation Systems
efficient modes like into the regional infrastructure features?
carpooling, transit, biking,
and walking and reduce
overall person delay
E. Provide reasonable 1. Increased multi-modal accessibility by 1. Does the project or program improve
access for all of the completing networks for all modes access for groups which currently face
region’s residents, 2. Expand transit service hours and days of some obstacles to access within the
regardless of age, operation transportation system?
income, ability or location 3. Develop the Complete Streets Design Guidelines 2. Is the project or program consistent with
for implementation by local government entities the Complete Streets Design Guideline
and does it accommodate more than one
mode?
F. Minimize negative 1. Minimize air quality impacts 1. Will the project or program create any
environmental impacts 2. Minimize impacts to existing development new negative environmental impacts?
and enhance the 3. Develop strategies to educate the public about 2. Does the project or program help
environmental quality of how travel choices affect air quality address any negative environmental
the MPO region impacts?
G. Build, operate and 1. Maximize transportation system performance 1. Is the project or program financially
maintain the per project costs sustainable and how will it be
metropolitan 2. Include life cycle costing into proposals for all maintained?
transportation system in projects 2. Does the project or program improve the
a financially-sustainable, 3. Prioritize maintenance of the existing cost efficiency of the transportation
cost-efficient manner transportation system system?
3. Does the project or program improve
upon existing infrastructure?
H. Identify and implement 1. Improve multi-modal street design for high 1. Does the project or program incorporate
new technology for activity areas Intelligent Transportation Systems
balanced multi-modal 2. Implement Intelligent Transportation Systems elements?
transportation 2. What other technology is included in the
project or program and what are the
expected benefits?
I. Develop a transportation 1. Include local plans into MTP development 1. How does the project improve quality of
system that enhances 2. Address aesthetics of major thoroughfares life and aesthetics of the community and
6
quality of life and works within the region and gateways to the cities region?
in concert with cultural 3. Minimize access to adjacent developments 2. Does the project or program employ the
and environmental along key arterials to maximize capacity adopted Access Management Plan?
resources. consistent with access management principles
4. Include MPO review in local development
review
J. Integrate transportation 1. Encourage the local entities to integrate 1. What are the land use impacts of the
and land use planning to regional transportation policies into their project or program?
improve quality of life adopted local plans 2. How does the project or program relate
and to protect the natural 2. Emphasize connectivity and development of to adopted land use plans?
environment by using alternative travel routes as a means to avoid 3. Does the project or program improve
transportation widening of roadways connectivity of the transportation
investments to system?
proactively shape land
use patterns rather than
react to growth
K. Ensure safety for all 1. Improve system safety through improved levels 1. How does the project or program
modes of service and reduced congestion improve the safety of the transportation
2. Promote safety design practices for all modes system?
3. Minimize emergency vehicle response time 2. Are there negative safety impacts of the
project?
L. Coordinate with local 1. Implement Intelligent Transportation Systems 1. Does the project or program support
agencies on security (ITS) technologies for improving the safety and local and regional security needs?
planning and strategies security of transportation modes 2. Does the project or program address any
2. Coordinate transportation system design and natural disaster prevention needs?
operation with emergency response and
disaster mitigation efforts
M. Foster public private 1. Facilitate connections of all levels of 1. Does the project or program leverage
partnerships aimed at government, school districts, San Juan College, any public private partnerships?
reaching regional businesses, non-profit organizations and other 2. Is there a plan for the sustainability or
transportation goals interested stakeholders expiration of that partnership?
2. Support public private partnerships in
identifying needs, accessing data and technical
assistance as available
7
N. Provide a transportation 1. Promote access to healthcare services for all 1. What are the health impacts of the
system which promotes users, with focus on populations without the project?
healthy living ability to drive 2. Does the project support active
2. Maintain existing complete streets and expand transportation modes?
complete streets infrastructure to promote
active transportation modes
8
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
Agenda Item #6
Subject: Status of TIP Projects
Prepared by: Duane Wakan, MPO Planner
Date: December 10, 2014
BACKGROUND
The STIP Protocols, finalized in early 2014, indicate that each MPO shall develop
a process to monitor the progress and status of each project in the first two
years of the TIP.
MPO Staff recommends a monthly review of all FMPO TIP projects with the
Technical Committee.
Recent attention to inconsistencies in the TIP, STIP, the MPOs MTP and
Agreement Request Forms (ARFs) necessitate the need to review project details
on a regular basis for consistency.
Reviewing the status of projects is an opportunity to review project details,
programmed amounts, and any potential situations that may cause funding not
to be obligated by September 30th.
CURRENT WORK
MPO staff will seek updates on the three regional TAP projects for tracking
purposes (Local Agreement Status and Project Certifications).
MPO staff created project detail TIP PDF document that will improve the
communication between the MPO and lead agency project managers.
MPO is required provide these updates to NMDOT on a regular basis.
ATTACHMENTS
A PDF TIP Template recommended for project managers and district engineering
staff will be provided at the meeting.
A document updating the latest project certifications for FY2014-2015 TAP
projects will be reviewed at the meeting.
INFORMATION ITEM
This is an information item only.
9
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
Agenda Item #7
Subject: Information Items
Prepared by: Fran Fillerup, MPO Associate Planner
Date: December 11, 2014
INFORMATION ITEMS
a. NMDOT staff members to join Policy and Technical Committees. NMDOT
has requested to have a staff member serve on the MPO Policy and
Technical Committees. They currently may have an appointment as ex-
officio non-voting members. This change would require an amendment to
the MPO Joint Powers Agreement and Bylaws.
b. Statewide Long Range Plan. Staff participated in two meetings as part of
the NMDOT Statewide Multimodal Long Range Plan:
• Dec. 2 – Plenary Meeting of Statewide Working Groups, Albuquerque
• Dec. 10 – Meeting of the Northwest Regional Working Group, Milan
c. MPO Quarterly. Staff attended the MPO Quarterly on December 16 in Las
Cruces.
d. Completing Project Forms. NMDOT staff contacted the MPO in November
regarding consistent listing of termini in the STIP and the ARF for a
particular intersection project. Using consistent language on all forms will
help avoid delays. This particular case was resolved through a TIP
Modification beginning at the MPO.
e. Complete Streets. The Complete Streets Advisory Group approved in draft
format the design guidelines for the Downtown/Urban Area.
f. Other
10