Public Utility Commission
Regular MeetingFarmington, NM · December 11, 2013
Minutes
BOARD OF PUBLIC UTILITY COMMISSIONERS
The of the CITY OF FARMINGTON BOARD OF PUBLIC UTILITY
COMMISSIONERS was held Wednesday, December 11,2013 at 3
Room at City Hall, 800 Municipal Dr., Farmington, New Mexico,
ordinances of the Municipality.
1. GENERAL
1. Commission members present: Amanda Weese
lames Spence
leffParkes
Carol Cloer
Marty 10hnson
Bill
Larsen
Commission members absent: Vic Eicker
Bill Standley
Keith 10hns
Mayor and City Council:
Mayor Tommy Roberts
Water/Wastewater
CH2MHill OMI Monica Peterson
PUC Secretary Amy McKinley
Accounting Sheree Wilson
Administrative Services Director Andy Mason
Utility Business Operations Susan Nipper
Customer Service Nicki Parks
Electric Director Michael Sims
Electric Transmission & Distribution Rodney Romero
McNicol
Parks
2. Chairman called the meeting to order a present to ,-,vuuu,-,
business of the Commission.
3. Minutes of the November 13,2013 meeting were approved as published.
II. BUSINESS
1. Water/Wastewater Report:
Water/Wastewater Report
on the status of the design phase
"."'.....r......·1-t>I'i
Salcido reviewed the status the Meter Replacement project.
is reworking this project to purchase water meters only and is
working with CH2MHill-OMI for a cost to perform the water meter installation. Mr.
Salcido reviewed the ongoing water line installation and repairs throughout the city.
2. Water/Wastewater Operations Repo.rt,
Ms. Monica Peterson of CH2MHill-OMI presented the Water/\Vastewater Operations
Report for the month of November. Ms. Peterson reported that there were various
breaks due to the cold weather. Ms. Peterson reported that CH2MHill-OMI
on reducing
vVllllnercial customers to l;'uvVUH'l.",,'-'
- 1
Commissioner Hunter pomt .,,;
these businesses are being
Peterson stated no.
Commissioner Cloer asked what worst case scenario is and how long does the city
have before the City gets fined by the EPA. Ms. Peterson stated that City is
administrative order from the EPA and that on a monthly basis the department
a report to the EPA detailing the levels of salt discharged into the system.
Peterson stated that lUlder the administrative order, the department has been tasked
ways to efforts to reduce the salt discharge levels. Ms, Peterson
made and reports of these efforts have been reported to
recommenaatlons or comparisons of how
other communities are handling this issue. Ms. Peterson stated the salt discharge issue
is specific to the Colorado River and how much salt is being disbursed downstream to
Mexico, so a national study is not likely.
3. Electric Utility Dividend Policy Calculation:
At the request ofthe Commission, Ms. Nipper presented the Electric Utility Dividend
Policy calculation. Ms. Nipper stated the Dividend Policy Calculation was adopted by
the City Council through Resolution No. 2011-1392. Ms. Nipper stated this dividend
is a return on the investment in the Electric Utility.
Mayor Roberts commentea IS a component of
revenue flow into
Ms. Nipper stated the Electric Utility also pays a 5% franchise fee to the city. Ms.
Nipper stated this is also a part of Resolution No. 2011 Ms. Nipper
the utility also pays franchise fees to the other jurisdictions the utility serves.
Ms. Nipper presented the Electric Utility Report which details the year to date
financial information.
System Operations Report:
Komero reportea on the progress 01 the constructIon projects at the Municipal
Operations Mr. Romero stated that construction in the System Operations
Control Center has been completed. Mr. Romero new computer hardware has
arrived and the software engineers will be onsite of December 16,2013 to
program the system. Mr. Romero stated the goal is to have the new system
running at the end of that week. Mr. Romero presented photos of the ongoing
construction of the Transmission and Distribution office remodeling project.
Commissioner Hunter asked about the recent extended power outages. Mr. Romero
reported there were three power outages within a week's time involving the
Bloomfield substation. Mr. Romero stated one of these outages involved a private
individual using some heavy equipment and this equipment pulled down the power
line. Mr. Romero stated that due to some repair work by the utility coincidentally
down the line the private equipment operator was
~ . Komero stated another outage
discovered while crews were perform
other outage involved the Sullivan substatIOn. Mr. Komero stated the cause
of this outage was the result of a Pine tree that had grown and fully encased the
3 Phase line. Mr. Romero stated that while these tree/power line situations
occur the utility has been aggressive this year with its vegetation management
program.
Commissioner Hall asked if the heayy equipment operator will be held financially
liable for the damage that caused the outage. Mr. Sims stated yes.
Commissioner Hall asked if there will be an maintenance contract with the
new equipment provider and if the utility has personnel on staff with
with this equiDment. Mr. Romero stated
contract is
system.
-2
5. Director's Report:
Mr. Sims presented the Electric Report for the month of November was
City Manager. Mr. Sims
,311,699.
participates with other communities
New Mexico. Mr. Sims stated that as a part of this gas pre-pay
discount off the natural gas the utility buys.
Mr. Sims stated Nicki Parks, Customer Care Manager, is spearheading the creation of
an Electric Utility newsletter and will be bringing some newsletter options before the
Commission at the next meeting. Mr. Sims stated this action is at the request of the
City CounciL
Vice Chair Spence asked if the newsletter will include information from the other city
as of this time this newsletter would for
Mr. Sims reported that General Electric continues work on making the anti-icing
system they installed at the Bluffview plant work. Mr. Sims stated staff in Generation
has devised a temporary work-around to bring the Bluffview plant back online and the
plant is presently operating.
ADJOURl\!MENT
There being no further to come before the Commission, upon motion
seconded, meeting was
The meeting was adjourned at 4:39 p.m.
~14 ii/.,
~"~'C-L~
A'
1\ .
.
.
<~ Amanda Weese, Commission Chair
-3
Agenda
City of Fa rming ton
Wa ter/Wa stewa ter
……for the regular meeting of the Public Utility Commission of the City of Farmington,
Wednesday, December 11, 2013, at 3:00 pm in the Executive Conference Room at City Hall,
800 Municipal Dr., Farmington, New Mexico.
I. GENERAL
A. Roll Call
B. Convening of Meeting by Amanda Weese, Chair
C. Minutes of November 13, 2013 regular meeting submitted for approval
II. BUSINESS
A. Water/Wastewater Report – Jeff Smaka (5 min) ................................................. 2
B. Water/Wastewater Operations Report – Ron Rosen (5 min) ............................... 3
C. Electric Utility Dividend Policy Calculation – Sue Nipper (5 min) ....................... 4
D. System Operations Report – Rodney Romero (10 min) .......................................... 5
E. Director’s Report – Mike Sims (10 min) .................................................................... 6
III. ADJOURNMENT
The next regular meeting will be on January 8, 2014
The City of Farmington will make every effort to provide reasonable accommodations for people with disabilities who wish to attend a
public meeting. If you need to request that an accommodation be made, please notify the Electric Administration office (599-1160) at
least 24 hours prior to the meeting.
BOARD OF PUBLIC UTILITY COMMISSIONERS
The regular meeting of the CITY OF FARMINGTON BOARD OF PUBLIC UTILITY
COMMISSIONERS was held Wednesday, November 13, 2013 at 3:00 p.m., in the Executive Conference
Room at City Hall, 800 Municipal Dr., Farmington, New Mexico, in full conformity with the laws and
ordinances of the Municipality.
I. GENERAL
1. Commission members present: Amanda Weese
James Spence
Jeff Parkes
Keith Johns
Bill Standley
Carol Cloer
Marty Johnson
Bill Hall
Chris Hunter
Commission members absent: Vic Eicker
City personnel present:
Water/Wastewater Jeff Smaka
OMI/CH2MHIll Ron Rosen
PUC Secretary Amy McKinley
Accounting Sheree Wilson
Administrative Services Director Andy Mason
Utility Business Operations Susan Nipper
Electric Utility Director Michael Sims
Electric Transmission & Distribution Rodney Romero
Electric Generation Jim McNicol
Electric Engineering John Armenta
Legal Jay Burnham
Customer Service Nicki Parks
2. Chairman Weese called the meeting to order with a quorum present to conduct the
business of the Commission.
3. Commissioner Standley made a motion to approve the October 9, 2013 PUC
Commission meeting minutes which was seconded by Commissioner Cloer. The
motion passed unanimously.
II. BUSINESS
1. Quarterly Financial Report:
Mr. Mason detailed the quarterly financial report for the first quarter of Fiscal Year
2014. Mr. Mason stated the Electric Utility’s net income increased by $1 million from
FY13. Mr. Mason reported the operating revenue was about $2 million higher. Mr.
Mason stated electric sales were up $1.9 million; mainly due to $2.4 million increase
in the PCA and offset with lower sales to industrial customers of $570 thousand. Mr.
Mason reported surplus sales had a slight increase of $6 thousand. Mr. Mason stated
other revenues were up $77 thousand, with increases in auction proceeds and fiber
optic leasing. Mr. Mason stated operating expenses were $950 thousand more than last
year. Mr. Mason reported that purchase power increased $1.2 million. Mr. Mason
stated that natural gas costs decreased $767 thousand and coal costs had a small
increase of $43 thousand. Mr. Mason stated salary and benefits were $298 thousand
higher. Mr. Mason reported other expenses decreased by $41 thousand. Mr. Mason
reported non-operating revenues were up by $170 thousand and expenses also
increased by $166 thousand.
-1-
Mr. Mason reported the Water Utility’s operating revenues were $281 thousand less
than last year. Mr. Mason stated water sales were down $286 thousand. Mr. Mason
stated the renewal/replacement fees increased $7 thousand, while the water rights
acquisition fee had a slight decrease of nearly $2 thousand. Mr. Mason reported
operating expenses increased $87 thousand. Mr. Mason stated the OMI contract had
an increase of nearly $38 thousand. Mr. Mason reported salaries and benefits was
lower by $4 thousand. Mr. Mason reported other operating also had a decrease of $66
thousand. Mr. Mason stated depreciation expenses increased $119 thousand. Mr.
Mason reported non-operating revenues were lower by about $3 thousand. Mr. Mason
reported non-operating expenses were also lower, by $13 thousand. Mr. Mason stated
the net income for the Water Utility decreased by $358 thousand from the prior year.
Mr. Mason reported the Wastewater Utility’s net income was $150 thousand lower
than FY13. Mr. Mason stated operating revenues were higher by $48 thousand from
last year. Mr. Mason reported wastewater sales and renewal/replacement fees were
increased a combined $53 thousand and environmental taxes decreased almost $5
thousand. Mr. Mason reported operating expenses increased $202 thousand over
FY13. Mr. Mason reported the OMI contract increased $89 thousand and other
operating expenses increased $107 thousand. Mr. Mason reported salaries and benefits
along with depreciation had slight increases. Mr. Mason stated non-operating revenues
had a small increase of $1 thousand. Mr. Mason stated non-operating expenses
increased almost $2 thousand.
Mr. Mason reported that from September 2012 to September 2013, the cash balance
changes for the Electric, Water, and Wastewater funds were $(7,531,488), $1,758,211,
and $377,378 respectively. Mr. Mason reported for the 1st quarter of FY14, the cash
balance changes for the three utilities were $2,001,903, $1,787,600, and $(199,980).
Commissioner Hunter requested that a percentage column be added to the
spreadsheets to more easily view the financial increases/decreases between the fiscal
years. Mr. Mason stated he would work on inserting this information.
Vice Chair Spence observed that the Other Revenue dollars vary significantly from
fiscal year to fiscal year and asked why these dollars vary so dramatically from year to
year. Ms. Wilson stated the Other Revenue category encompasses a variety of things
such as auction revenues and fiber optic leasing dollars.
2. Water/Wastewater Report:
Mr. Smaka reported that HDR Engineering has submitted the design drawings for the
Waste Water Treatment Plant (WWTP) upgrades. Mr. Smaka stated staff is reviewing
the layout and design flow capacity of the proposed improvements. Mr. Smaka
reported on the construction of the Medium Rate Activated Sludge (MRAS) basin
detailed in the 2014 budget to provide redundancy at the WWTP and maintain
compliance with EPA permit. Mr. Smaka reported the NMED approved funding the
waste water treatment plant upgrade in the amount of $10,000,000 through the Clean
Water State Revolving Loan Fund (CWSRF) program.
Commissioner Parkes asked if the $10 million loan from NMED is the projected total
cost of the project. Mr. Smaka stated it is the total estimated cost of the project.
Mr. Smaka updated the Commission on the status of the Meter Replacement project.
Mr. Smaka reported Staff is reworking the project to purchase water meters only and
is working with OMI CH2MHill for a cost to do the water meter installation.
3. Water/Wastewater Operations Report:
Mr. Rosen, OMI CH2MHill, reported on the Water/Wastewater Operation activities
for October. Mr. Rosen stated staff is continuing to work with customers to encourage
reduction of the use of salt. Mr. Rosen stated that at the request of the EPA to
encourage voluntary compliance with EPA requirements, letters were sent out to the
various area car wash owners encouraging the reduction of the use of salt.
Commissioner Weese asked if any car wash owners had responded to the letters. Mr.
Rosen stated that some of the car wash representatives have contacted his office.
-2-
Commissioner Cloer asked if there has been any cost analysis performed that would
demonstrate how these EPA requirements will affect business owners financially. Mr.
Rosen stated there is information that demonstrates the cost savings by not having to
purchase so much salt.
Commissioner Larsen asked if there is no silver bullet that would solve the salt
problem. Mr. Rosen stated there are various ways to solve the salt problem, but the
cost is very high.
5. Director’s Report
Mr. Sims reported the new rate structure and associated tariffs went into effect on
November 1, 2013.
Mr. Sims stated the Bluffview Power Plant continues to be off line due to the inlet air
heater project. Mr. Sims stated this project has not been completed to the Utility’s
satisfaction and staff is working with the manufacturer to get the system to work as it
was designed to work. Mr. Sims stated staff is moving in several different directions,
potentially even away from the manufacturer, to get this unit up and running.
Mr. Sims stated the Animas Power Plant is on line and available for full load.
III. ADJOURNMENT
There being no further business to come before the Commission, upon motion duly made and
seconded, the meeting was adjourned.
The meeting was adjourned at 4:08 p.m.
Approved this 11th day of December, 2013.
Amanda Weese, Commission Chair
-3-
: Water &Wastewater
Title: Public Works Director
2013 PUC Meetin Date: 10 December 13
• Waste Water Treatment Plant. Phase III Design - HDR Engineering has submitted the design
drawings for the plant upgrades. Staff is reviewing the layout and design flow capacity of the
proposed improvements. Construction of Medium Rate Activated Sludge (MRAS) basin in 2014
budget to provide redundancy at the WWTP and maintain compliance with EPA permit. NMED
approved funding the waste water treatment plant upgrade in the amount of $10,000,000 through
the Clean Water State Revolving Loan Fund (CWSRF) program.
• 0& M Contract. The current 8 year Operation and Maintenance Contract with CH2MHILL OMI
expires on Dec 31, 2015.
• Utility Rates. Red Oak Consulting working on the rate study.
• On-Call Engineering Service Contract.
o 2P Waterline Project HDR has submitted 90% design drawings. City Council included
this project in the City's Infrastructure Capital Improvement Plan submitted to the state
estimated cost six million dollars.
o LaPlata Highway - Project design for water line replacement completed by City staff.
Awaiting permit approval; will be scheduled pending approval of NMDOT permit.
• Capital Project Review.
o Capital Improvement Project
• Meter Replacement - NMED: Drinking Water State Revolving Loan Fund
Program. Loan amount $5,959,000. The plans and specifications approved by
NMFA and NMED. Staff is reworking project to purchase water meters only and
we are working with CH2N1Hill-OIVlI for a cost to do water meter installation.
o Renewal and Replacement
rd
• 23 Street Project
rd th
• Phase 4 Santiago - 23 St to 25 St - Summer 2014
• Wildflower Parkway - 4P pump station - Working on acquiring property for pump
station. Budgeting for the construction of new pump station FY14.
th
• Municipal Drive Replace existing 24" steel waterline from 1C tank to 20 Street
with a 24" PVC waterline. - completed
• Knollcrest Dr Windsor to Kingsway - Replace existing 6" CI waterline with an
8"PVC waterline completed
• Holiday Dr Windsor to Kingsway - Replace existing 6" CI waterline with an
8"PVC waterline - completed
• Blake St - Main to Apache - Replace existing 6" CI waterline with an 8"PVC
waterline Spring 2014
th
• 20 St - Municipal to Sunset - Replace existing 24" and 16" steel waterline Street
with a 24" PVC and 16" PVC waterline. - Summer 2014
•
o Pressure Reducing Valve (PRV)
• PRV installation at Main Street and Gila Street - Construction 2013
• PRV installation at Main Street and Red Lobster - Construction 2013
•
o Sewer Main Extension
• Brehend Ave Apache St to Comanche St Replace existing 6" clay sewer line
with 8" PVC sewer line. - completed
• Lift Station 5 Improvements - RMCI of Albuquerque - Rehab of the existing lift
station which includes the mechanical, pumping equipment and electrical systems
of lift station 5. Notice to Proceed for July 22 - Phase 1 of the project is the
reconstruction of the wet well, replacement of the piping and mechanical system.
Phase 1 is 98% complete, Lift Station is back in operation:: Phase 2 - Electrical
submittals are being reviewed by HDR Engineering Inc. - Notice to Proceed will
be issued once submittals are ~n,.rn'''Qrt
• Lift Station 3 Improvements - HDR Engineering is designing the rehab of the
existing lift station which includes the mechanical, pumping equipment and
electrical systems. Design to be completed spring 2014. Construction summer
2014.
• Operational Review.
• Human Resource Issues. Job evaluations.
• Positions none
• Budget. - FY14
• COF Department Support. Survey support to acquire manhole data for future sewer collection
system model continues
• Annual Utility Contract. - Annual utilities contract awarded to TRC Construction by City Council
th
on August 6
• Federal Funding
o Water Projects - Meter Replacement Project
• City Council to approved final loan application to New Mexico Finance Authority
(NMFA) -loan documents completed in January 2013.
o Wastewater Projects - submitting for funding in 2014
• WWTP - MRAS Basin, Final Clarifier, Solids Handling Facility & UV Disinfection -
Estimated Cost $10,000,000 - NMED funding source is the Clean Water State
Revolving Loan Fund (CWSRF) Program - Project approved by NIVIED, on Nov 5
City Council approved permission to draft ordinance as required by NMED for
loan. Michael Groshek with Sherman and Howard is drafting ordinance for the
proposed project.
• Farmington Reach - Navajo Municipal Pipeline.
o Working with Bureau of Reclamation and Navajo Tribe for agreements to transfer title to
the City for the tank and pipeline project along with an Operation, Maintenance and
Replacement (OM&R) agreement as required by Federal law - March 2009.
• WWTP NPDES PERMIT - EPA. City has received the EPA final permit. New permit went into
effect on l\Jovember 1,2010, permit expires October 31,2015. - City staff and OMI are reviewing
the permit regarding Total Dissolved Solids (TDS) limits 400mg/1 requirement. On July 19, 2013
the City received an Administrative Order (AO) from EPA Region 6 which specifies the activities
the City is to accomplish along with due dates for each activity, these tasks and due dates
correspond to those proposed in the City's letter to EPA. After each task is completed as outlined
in the AO a written report for that completed task is due to EPA Region 6.
• Snowpack - Water Year 2013 - BOR reporting site down
• Animas River Basin - 118%
• San River basin - 118%
ATTACHMENTS
WATER FUND (602) -RENEWAL & REPLACEMENT
WASTEWATER FUND (603) - RENEWAL & REPLACEMENT
GRAPH WATER REVENUE FY 10 - FY14
-2.1
WATER
Renewal & Replacement
Water Fund - 602
FY10 FY11 ........ FY12 FY13 FY14 .... FY14
REVENUES Actual Actual Actual .......
Actual Y-T·D Budget
1 Renewal/Replacement Fee $1,733,666 $1,943,342 $2,018,436 $2,037,806 $710,021 $2,082,909
I 1 ~------------~- ------ ----- ------ -- -
STATE GRANT - $825,000
REVENUE TODATE ~$11,525,254
PROJECTED REVENUE FY07 • FY14 $13,608,163
... FY10 FY11 ......
FY12 FY13 FY14 ...
FY14
......................
Actual········ Actual Actual Y·T·D Budget
,..... Actuai
EXPENDITURES
1602-5543 RENEW AUREPLACEMENT
1651 .70-60 Construction $1,375,293 $1,518,581 $1,706,469 $2,278;859 $1,075.466
1 - -. _.. ---- - .. ---- - - -
Largo & Main PRV 'estimated $150,000
20th St· Red Lobster PRV estimated $150,000
Knollcrest Dr • Windsor to Kingsway estimated $200,000
Holiday Dr Windsor to KingsWay estimated $150,000
Troy King Piedras south to US 64 estimated $500,000.
20th St • Municipaito Sunset' estimated $7(0))00'
Behrend· Apache to Commanche estimated $80,000,
Coyote Drive· LaPlataHWytoend estimated $70,000'
Blake St • Main to Apache 'estimated $100,000
Foothills Dr • Hill & Dale to Main St estimated $700,000:
NCourtAv • Apache to Shiprock estimated $250;iioo
schwartz· Broadway to Animas estimated $95,000
Northwood .. estimated $100,000
'Polyli~~~Elrvice Replacement eStimated $100,000.
Fire Hydrant 1950 Replacement estimated $100,000:
$3,445,000,
PROJECTED EXPENDITURES FY07 • FY14 $13,215!~65
WATER RENEWAL & REPLACEMENT
$2,500.000
$2,000,000
rn
0:: $1,500,000
«
...I
...I
o $1,000,000
o
$500,000
$0
Actual Actual Actual Actual Y-T-D
FY10 FY11 FY12 FYB FY14
FISCAL YEAR
-2.2
WASTEWATER
Renewal & Replacement
Wastewater Fund - 603
.....
I····
FY10 FY11 FY12 : .....
FY13 FY14 ....... FY14
REVENUES Actual Actual .~
,~
Actual Actual Y-T-D
.-~
Budget
Charges for Utility Seruces
I I Renewal fReplacement Fee $1,229,258 $1,385,827 $1,436,494 $1,441,591 $492,124 $1,494,391
I I -- --
____w
---- .-.-- -- - -
/Y
REVENUE TODATE $7,476,563
PROJECTED REVENUE FY07 - FY14 . '$8,970,954
FY10 FY11 FY12 FY13 ..
FY14 FY14
Actual Actual Actual Actual Y~T-D Budget
I I
EXPENDITURES
603-5543 RENEWAL/REPLACEMENT
751_70-60 $501,814 $605,311 $1,257,531
$~
Construction $685,848
- - "" - -------- -
Subtotal Capital $592,933 $1,152,988 $501,814 $685,848 $605,311 $1,257,531
Projects FY07- FY13 $4,364,995
Lift Station #5 Rehab $915,000i
MRAS Basin $1,000,000:
Lift Station # 3 Rehab $~goA60'
Sewer Rehab $750,000
Scrubber Reha b $250,666;
"lVIanh()!E1Rehab $150.000~
"lVIllilllineRehab $300,000;
PROJECTED EXPENDITURES FY07 - FY14
cFY10
mFY11
Total Water Revenue Per Month
mFY12 FY10 - FY14
.FY 13
,.FY 14
2,000,000
1,800,000
1,,600,000
1,400,000
1,200,000
1,000,000
800,000
600,000
400,000
200,000
JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN
2013 •• 2014 ••
Actual Actual
JUL 1,1 1, 1,657,429
AUG 1, ,254 1,303,558 1,165,141 1,725,060 1,196,227 1,495,029
SEP 1,290,632 1,107,254 1,330,247 1,165,141 1,362,607 1,196,227 1,349,906
OCT 1,010,908 1,107,254 1,110,501 1,165,i41 1,338,557 1,196,227 1,123,250
NOV 735,252 1,107,254 886,031 1,165,141 936,091 1,196,227
DEC 1,067,568 791,478 1,107,254 810,541 1,165,141 839,767 1,196,227
JAN 1,067,568 760,713 {107,254·· 835,520 1,165,141 85(542 1,196,227
FEB 1,067,568 740,561 ···1,107,254 838,187 1,165,141 401,518 1,196,227
MAR 1,067,568 727,418 1,107,254 824,263 1,165,141 788,759 1,196,227
APR 1,067,568 889,702 .... 1,107,254 951,749 1,165,141. 958,767 1,196,227
MAY 1,067,568 1,099,110 1,107,254 1,116,639 1,165,141 1,194,193 1,196,227
JUN 1,067,568 1,521,671 1,107,254 1,425,556 1,165,141 1,520,186 1, 22rn7;;-_ _---1
TOTAL:
REVENUE PER CLASS/CUSTOMERS
FY 2010 FY 2011 FY 2012 FY 2013 FY 2014
Budget Actual Budget Actual Budget Actual Budget Actual Budget Actual
R 5,901,722 5,742,019 6,338,837 5,962,727 6,275,000 6,509,749 6,481,728 6,464,202 6,676,180 2,669,363
GS 3,400,119 2;923;899 3,294,004 3,081,024 3,458,704 3,441,527 3,447,238 3,107,129 3,550,655 1,543,157
CU 1,247,750 994,443 1,062,666 1,118,738 1,117,925 1,096,582 1,129,104 1,123,093 1,151,686 380,390
REC 212,000 205,146 227,751 217,349 210,000 264,281 225,000 264,196 250,000 120,650
FH 92,225 80,933 96,793 89,526 125,000 112,642 118,750 76,419 118,750 48,763
R&R 1,419,550 1,733,666 1,744,954 1,943,342 1,910,000 2,018,437 2,055,322 2,037,805 2,082,909 710,021
GRANTS
I 10,821,688 5,814,967 3,226,226 1,292,048 500,000 284,788 - 2,510
I
OTHER 537,453 630,069 1,740,218 1,720,237 1,018,114. 747,207 I 524,552 2,595,398 524,552 153,270
TOTAL: 23,632,507 18,125,142 17,731,449 15,424,991 14,614,743 14,475,213 13,981,694 15,670,752 14,354,7321 5,625,614
SCHEDULE OF CUSTOMERS
R Residential
GS General Service,
Single (commerical
CU Contract Users (bulk water users)
REC Recreational/Raw
WaterWater Users
(city facilities and
FH Fire Hydrants
R&R Renewal & Replacement
OTHER Miscellaneous
-2.4
Monthly Activity Report
November 2013
Prepared for
City of Farmington, Public Utility Commission
ADMINSTRATION OPERATIONS
Safety Training and Incidences as of 11-30-13
TAILGATE TOPICS NOV 2013 YTD
Total Safety Training Hours 111.7 1982.85
Incidences/accidents 0 4
Motor Vehicle Incidences/accidents 1 2
DELIVERABLES FOR DISTRIBUTION & COLLECTION SYSTEM
Deliverables as of 11-30-13
TASK TARGET YTD % COMPLETED
Pressure Regulator Inspection 57 39 68%
Valve Exercise 4895 4576 93%
Storm Drain Cleaning 678 900 133%
Dead End Main Flushing 492 492 100%
Sewer Main Cleaning 6" - 24" 307560 259737 84%
Sewer Main Cleaning 24" - UP 9800 10965 112%
Sewer Main Video Inspection 184800 149468 81%
Fire Hydrant Inspection 2565 2593 101%
Air Relief Valve Inspection 147 149 101%
Permaloggers 100 100 100%
Water breaks as of 11-30-13
NOV 2013 YEAR-TO-DATE
Main line breaks 8 Main line breaks 44
Service line breaks 7 Service line breaks *153
Total 15 Total 197
*YTD totals adjusted to reflect remaining October totals. Two additional water service lines
added for October 2013.
Estimated water loss for November => 93,530 (gallons)
New Meters and New Sewer Taps as of 11-30-13
NOV 2013 YEAR-TO-DATE
NEW METERS 1 94
SEWER TAP 2 76
WATER TREATMENT OPERATIONS
Farmington Lake Elevations – Monthly Average Comparison for 2012 to 2013
5638.00
2013
E 5636.00
l
5634.00
2012
e
v 5632.00
a
t 5630.00
i 5628.00
o
n 5626.00
5624.00
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov
2012 5630.95 5628.25 5628.85 5631.63 5634.98 5635.69 5633.96 5630.78 5628.70 5628.71 5633.28
2013 5634.68 5633.63 5634.58 5634.77 5635.02 5635.46 5634.28 5633.85 5634.88 5635.92 5635.96
Water Treatment Plants – Total Effluent to System Comparison for 2012 to 2013
700
600
500
Gallons (Millions)
400
2012
300
200
2013
100
0
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov
2012 242.566 234.059 269.349 375.305 510.642 598.929 578.981 557.870 451.947 364.366 253.024
2013 257.025 218.347 258.694 329.580 414.543 531.199 573.921 495.340 375.268 291.420 231.239
2012 2013
WASTEWATER TREATMENT OPERATIONS
FLOW
6.00
5.50
5.00
4.50
4.00
3.50
MGD
3.00
2.50
2.00
1.50
1.00
0.50
0.00
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
INF 5.38 5.28 5.19 5.52 5.53 5.69 5.69 5.62 0.00 5.22 5.12
EFF 4.82 4.73 4.68 5.01 4.97 5.18 5.31 5.42 5.46 4.89 4.64
LIMIT 6.67 6.67 6.67 6.67 6.67 6.67 6.67 6.67 6.67 6.67 6.67 6.67
Final Effluent Total Flow [MG] 120.55
Final Effluent Average Flow [MG] 4.64
Total Number Septic Trucks 432
Total Gallons Septic Trucks 453201
PRETREATMENT ACTIVITES
Completed 92% of the oil and sand separator inspections.
Completed Industrial Pretreatment Program annual inspections at Halliburton, Alsco, and San Juan
Regional Medical Center.
Drafted a letter to the food establishments on using best management practices for preventing
grease from entering the collection system. Also working with them on water softener settings.
Working with a laundry facility to permit them as an industrial user.
Working with Wal-Mart to be in compliance on the grease interceptor.
Acronyms and Abbreviations
CM Corrective Maintenance
CMMS Computerized Maintenance Management System
gpd Gallons per day
gpm Gallons per minute
hp Horsepower
mg millions of gallons
mg/L Milligrams per liter
mgd Million gallons per day
NMED New Mexico Environment Department
NPDES National Pollutant Discharge Elimination System
O&M Operation and Maintenance
OMI Operations Management International
OOS Out of Service
PdM Predictive Maintenance
PM Preventive Maintenance
ppm Parts per Million
PRV Pressure Reducing Valves
PRVs Pressure Reduced Valves
QA/QC Quality Assurance/Quality Control
SCADA Supervisory Control and Data Acquisition
SMP Standard Maintenance Plan
SOP Standard Operating Procedure
TTHMs Trihalomethanes
USEPA U.S. Environmental Protection Agency
WEP Work Execution Plan
WWTP Wastewater Treatment Plant
PUC – December 11, 2013
FEUS System Operations Report
System Control
Total EMS/SCADA Primary and Backup Control Center system replacement.
Last replacement 2009; issues with software support, obsolete hardware issues.
New system incorporates new system features;
• Automated failover between primary and backup centers.
• Quality assurance processes (test bed) to comply with NERC/CIP.
• System Operator simulator training tools.
• Automated real time electric system state estimator.
In service new UPS dual failover power distribution system for Primary and Backup Control Centers.
Transmission/Distribution
MOC west expansion project;
Transmission maintenance bay
Training room
Administrative areas
Vehicle parking canopy
Bloomfield 2302 outages;
Circuit on hot-line tag (non-reclosing)
-5-
November 2013 Monthly Electric Report
Administration
1. Initial discussions have begun for the development of a 5 year strategic plan for the electric utility with implementation
scheduled for the beginning of FY15.
Business Operations
1. NMMEAA board meetings – annual distribution to City was $1,311,699.14 in gas savings; discussed possible
restructuring of the prepayment arrangement.
2. Donna Drinen is retiring in December and Cloey Harrison has been promoted to the Engineering Support Supervisor
position.
Customer Care
1. Reviewed rate changes in system for accuracy.
2. Continued work on creating an Electric Utility newsletter.
3. Analyzing bank fees for credit card payments to minimize cost to utility; also meeting with bank regarding bill
processing issues.
4. Collections-173 evaluated, 87 of these collected on -86 accounts currently being worked.
5. 127 LIHEAP payments received.
Compliance – NERC/WECC, Environmental, Safety:
1. Operations and Planning Audit Nov 4-15, 3013: Concluded with no findings
2. Annual Compliance Certification for the Bluffview plant Title V Permit
3. Animas and Bluffview National Pollutant Discharge Elimination System (NPDES) project (Kiewit) work (plans for
NPDES permitted discharge to the rivers) completed.
Engineering:
1. Construction for widening State Highway 64 west of Bloomfield has begun.
2. Visual Inspection Contract has been awarded to MRB Technical Services based in Grants, NM for inspection of selected
transmission system lines. Work is scheduled to be complete by December 20.
3. Field work is complete for a distribution line river crossing south of Highway 371 near the confluence of the Animas and
San Juan Rivers.
Transmission and Distribution:
Construction/Maintenance:
1. New 3-phase underground to Path Home has been completed
2. 5500 feet of single phase line in the Largo Canyon area has been completed for Energen.
3. Middle Mesa line conversion is 45% complete. San Juan 2401 line rebuild is 50% complete
4. Maintenance crews replacing damage cross arms, insulators and anchors on Pine River circuit 4701.
5. Contract crews completed 69kv pole change out in Bloomfield area
6. Contract tree crews completed trimming work on all three phase and single phase distribution lines at Middle Mesa.
Relay/Meter:
1. Continuing rebuild work at Fruitland Substation.
2. Assisting in EMS/SCADA system replacement.
3. Starting on-site verifications of active accounts with no usage.
4. Continuing meter verifications on Lakeview substation circuits.
Generation:
1. APP and BV cooling tower capital projects completed.
2. On-going BV anti-icing system commissioning and GE re-design in progress. Retained independent engineering
services (Black & Veatch) and installed temporary electric heating system.
3. Issued approval for Canyon Hydro to move to fabrication stage of new Navajo runner manufacture/ installation contract.
4. On-going SJGS Global Settlement Group conference calls attended.
Fuel Sales & Purchases:
1. Bluffview total estimated gas sale – 305,600 mmbtu.
Control Center:
1. Beginning replacement of EMS/SCADA master station.
2. Completion of WECC/NERC audits and have implemented improvements.
System Outages:
1. Bloomfield circuit 2302 had three separate outages during the month. First outage was due to customer heavy equipment
with extended boom snagged line, Second outage line patrolled no obvious indication of fault, Third outage was due to
damaged phase conductor which failed during replacement of bad pole anchor. Total circuit outage time; 2 hours & 45
minutes, total customers were 1505.
Operating Statistics:
Animas Plant MWh: 14,937 Bluffview Plant MWh: 0 Navajo Plant MWh: 0 San Juan Plant MWh: 18,632
WAPA MWh: 9,057 Purchase MWh: 43,145 Average Purchase Price: $ 40.40 /MW Purchased Power cost: $ 1,743,222
Peak Demand MWh: 144 incr(decr): (7.69)% Monthly System Energy MWh: 87,161 incr(decr): (8.05)%