Water & Wastewater Commission
Regular MeetingFitchburg, MA · November 4, 2020
Minutes
Water/Wastewater Commission
Meeting Minutes
November 4th, 2020
J.A. Provencial Building
1200 Rindge Rd, Fitchburg MA 01420
A meeting for the City of Fitchburg Water/Wastewater Commission was held on Wednesday November
4th, 2020 via Zoom and FATV.
The meeting commenced at 5:02 pm
Members present: Rick Healey, Chairman
Steven Bodurtha, Commission Member
George Seiner, Commission Member
Joshua Bedarian, Commission Member
Nicolas Bosonetto, Commissioner of Public Works
Others present: Jeff Murawski., Deputy Commissioner of Wastewater
Jennifer Lambert, Head Clerk Water Division
Nathan Glenny, FATV
Jennifer Lachmayr, Arcadis
Alex Misiaszek, Arcadis
Absentees: Michael Mclaughlin, Commission Member
Item #1
Approval of meeting minutes: Motion to approve minutes from September 9th, 2020 meeting was
granted by unanimous vote.
Item #2
Public Forum: None
Item #4
Water Division:
Scada Project update – Arcadis Engineers Jennifer Lachmayr and Alex Misiaszek presented the
Commission with an update on the Scada Project. Equipment is completely outdated. The MCP
(master control panel) along with the FCP (filter control panel) are between 17-20 yrs. old. We
Lots of equipment failure, chlorine alarms, pump alarms, equipment failure in general etc.…
which leads to personnel that are on call to be called in at time and a half there regular rate per
hour. This is a critical project that absolutely needs to be upgraded. At this point it is a mish
mash between the two plants. Our head treatment operator is having to buy spare parts off of
Ebay, or where ever we can get them to make our plants run. Everything needs to be swapped
over and reprogrammed. We need to be able to provide water to the City if our Regional
Treatment Facility in Westminster Ma fails. At this point, we cannot, if our Falulah treatment
facility fails we will not be able to provide the City with water, which is why this is so crucial.
Invitation to bid for this project will go out some time next month.
Loan-Scada/Falulah Transmission Main- We will be upgrading the 18”pipeline from Falulah
down to tanks to a 24”. We cannot operate plant to full capacity. Violations with discharge,
backs up into plant at times, and DEP says we need to upgrade. Looking for approval to borrow
4.5 mil. To have funding in place for both the Scada and Transmission Main. Motion to send
request to City Council to approve loan order was granted by unanimous vote.
Water Rate Revenues-Rate study will need to be done fairly soon. Water revenues have not
gone up too much. Covid of course plays a role in that. We have not increased the water rates in
a few years and they should be looked at again, as more Capital Improvements will need to be
done.
Meter upgrade project-Baystate Winsupply along with our staff have installed approx... 7100
meters so far. We are hoping to have less than 6000 meters to go by the end of the year. We
also will be rolling out the Water Smart Customer Portal to our residents with Novembers bills.
This will help our residents monitor their monthly consumption along with alerting them for
leaks.
Land protection projects-The 60 acre donation knows as the Dimmick Property in Hubbardston
Ma, has been finalized.
Item #3
Wastewater Division:
Status Updates – Sewer Ordinance (City Code Chapter 147) – Hearing on this petition was
presented to the Council of Legislative Affairs Committee on October 13th. Motion was
made by Councilor Zarella to approve petition 204-20 (changes to the city code). Motion
was seconded by Councilor Schultz. Review and approve the revised draft “Sewer Rules &
Regulations. PDF copy was sent to City Solicitor Pusateri for review. We have not heard back
from him as of yet.
SSU Project- 100% complete
CSS Project- Bid on August 17th. The City is contracting with J.A. Polito & Sons, Inc.
Preconstruction conference on October 9th went very well.
On Call Construction Work- the River Bank Stabilization Project along with the Elm Street
Sewer repair Project are both completed. Blue Diamond Equipment Contractor will be going
to Highview St. next for the Sewer Rehab/Replacement Project.
SSES, Phase 4 – Weston & Sampson are reviewing the City’s comments so we can submit to
EPA and Mass DEP.
Siphon Cleaning Design & Bid-Project-completed and under budget.
WMP, Consent Decree Submission #2- Weston & Sampson are preparing this for submission
by December 31, 2020 to EPA & Mass DEP.
Item #4
Other Business:
The Water/Wastewater Commission will next meet at 5:00 pm. on January 13, 2021 at the J.A.
Provencial Building, 1200 Rindge Rd. Fitchburg MA, 01420.
Meeting adjourned at 5:56 pm
Agenda
Water/Wastewater Commission
Meeting AGENDA
Wednesday – November 4th, 2020
5:00 p.m.
J. A. Provencial Building
1200 Rindge Rd.
Fitchburg, MA 01420
DUE TO THE RESTRICTIONS REGARDING COVID-19, THIS MEETING WILL TAKE
PLACE VIRTUALLY WITH THE ASSISTANCE OF FATV & ZOOM.
The public is invited to participate in the Zoom webinar of Oct 14, 2020 05:00 PM
Register in advance for the Public Comment/Hearing portion of the Agenda by going to:
https://us02web.zoom.us/webinar/register/WN_KfcEYJ3lRyCDipFu5lj6KQ
After registering, you will receive a confirmation email containing information about logging in to join
the webinar.
_____________________________________________________________________________________
1. Review minutes from September 9th, 2020 Commission Meeting.
2. Public Forum: None
3. Water Division
SCADA project update
Loan ($4 million) for SCADA upgrades and Falulah transmission main
Water rate revenues
Meter upgrade project – update
Land protection projects - update
4. Wastewater Division
Status Update Items:
o Sewer Ordinance, (City Code Chapter 147):
Council Legislative Affairs Committee Hearing on Petition 204-20 (‘Changes
to City Code, Ch. 147) was scheduled for Tuesday – October 13th.
JAM to provide briefing update on status of Petition 204-20.
o Review & Approve the Revised DRAFT “Sewer Rules & Regulations” (update of
previous DRAFT “Sewer Rules & Regulations” provided by Arcadis {consulting
engineer}), provided to the W/WW Commission at the Sept. 9th, 2020 Commission
Meeting.
Construction Project (Update):
o SSU Project (complete)
o CSS Project: “CSO 007, 011, 039, 048 Separation/Rehabilitation Project”. Bid on
Aug. 17th, 2020. City is executing construction contract with the Contractor, J.A.
Polito & Sons, Inc.
“Preconstruction Conference” held ‘virtually’, on Friday – Oct. 9th.
o “On-Call Construction Contract” Work (Contractor: Blue Diamond
Equipment): the “River Bank Stabilization Project” has been completed, and the
“Elm Street Sewer Repair Project” has been completed;
Blue Diamond will be going to Highview Street next, for the “Highview
Street Sewer Rehab./Replacement Project”.
SSES, Phase 4 – Interceptor Sewer Evaluation (Weston & Sampson): Update.
Siphon Cleaning Design & Bid, and Inspection Services Project (Weston &
Sampson): Update.
Wastewater Management Plan, Consent Decree Submission #2: Being prepared by
Weston & Sampson for submission to EPA & MassDEP by December 31, 2020.
5. Other Business
The Water/Wastewater Commission will next meet at 5:00 pm on Wednesday
December 9, 2020 at the J.A. Provencial Building, 1200 Rindge Rd. Fitchburg, MA
01420.
Adjourn