City Council Agendas & Minutes
Regular MeetingFruit Heights, UT · March 1, 2022
Minutes
MINUTES
CITY COUNCIL MEETING
FRUIT HEIGHTS CITY
910 South Mountain Road
March 1, 2022
WELCOME: Mayor John Pohlman called the meeting to order at 7:00 pm.
PLEDGE & OPENING CEREMONY: The Pledge of Allegiance was led by a Council Member,
and the meeting was opened with a Council Member offering a word of prayer.
COUNCIL MEMBERS PRESENT: Council Members Diane Anderson, Gary Anderson, Eileen
Moss, George Ray, Florence Sadler and Mayor John Pohlman were all present.
CITY STAFF PRESENT: City Manager Brandon Green, City Engineer Brandon Jones, Public
Works Superintendent Darren Frandsen, Ted Perry, Hailee Ballingham and City Recording
Secretary Amy Gardiner were present.
VISITORS: Scott Justensen and Matt Lowe.
CITY COUNCIL TRAINING:
Council Member Florence Sadler shared information with the City Council from the first chapter
of the handbook by the Utah League of Cities and Towns. She explained that cities exist to
make our lives better by providing services, providing a sense of community, and providing local
control. She reminded the City Council that they have the challenge and responsibility to use
their powers to improve the lives of the citizens.
CONFLICT OF INTEREST: None.
PUBLIC COMMENTS: None.
SPECIAL PRESENTATIONS:
Presentation of the Storm Water Management Program and Plan (City Engineer Brandon
Jones)
City Engineer Brandon Jones presented The Annual Storm Water Training for City Council. He
also explained that a Storm Water Management Program Plan (SWMP) has been proposed for
consideration by the City Council, which is a “written plan that is used to describe the various
control measures and activities the Permittee will undertake to implement the storm water
management plan.” He said that the plan is required by the EPA and provides guidance and
measurable goals. He also said that the annual training is required for all who deal with storm
water issues in the City. A copy of the proposed plan had been distributed to City Council
members.
He reviewed the definitions of many words used in the proposed plan including: Minimum
Control Measure (MCM), Best Management Practices (BMPs), Permittee/MS4 and Waters of
the State – snowpack, reservoirs, streams, rivers, ponds, groundwater and the Great Salt Lake.
He focused his presentation on the six Minimum Control Measures (MCMs) and explained that
each MCM section contains tasks, goals, deadlines and action items. The six MCMs include:
1. Public Education and Outreach
2. Public Involvement and Participation
3. Illicit Discharge Detection and Elimination
4. Construction Site Storm Water Runoff Control
5. Long-Term Storm Water Management in New Development and Redevelopment
6. Pollution Prevention and Good Housekeeping
City Engineer Brandon Jones also highlighted Ted Perry who was in attendance and is
responsible for all the City’s storm water issues as well as keeping the City’s website page on
storm water up to date. He concluded by observing that the SWMP is a comprehensive plan
that covers all facets of the City’s storm water program. He also reminded the City Council that it
requires their involvement as well as the public works and the residents. Implementation
requires time and manpower, both initially and on-going.
City Engineer Brandon Jones addressed questions from the City Council about the proposed
plan and reminded them as they move forward and come across a need in the budget for storm
control measures – they will understand why.
PUBLIC HEARING:
Council Member Diane Anderson made a motion to move to a public hearing to discuss the
proposed Storm Water Management Plan. The motion was seconded by Council Member
Eileen Moss, and it was approved unanimously.
After commencement of the public hearing, there was no public comment about the proposed
plan.
Council Member Eileen Moss made a motion to close the public hearing. The motion was
seconded by Council Member Diane Anderson and it was approved unanimously.
CITY BUSINESS:
Review/Discuss/Approve/Deny Resolution 2022-01: A Resolution of the Fruit Heights City
Council Adopting Storm Water Management Plan.
Mayor John Pohlman thanked Ted Perry for the work that he does for the City. City Engineer
Brandon Jones explained that the State wanted to see the plan come before the City Council
and felt that a resolution was the best way to show that the City Council is on board with the
plan. Mayor John Pohlman also mentioned that two Public Hearings would be held six months
apart and City Manager Brandon Green said this is the first one.
Council Member Diane Anderson made a motion to approve the Resolution 2022-01 Adopting
the Storm Water Management Plan. The motion was seconded by Council Member George Ray
and it was approved by roll call. Council Members Diane Anderson, Gary Anderson, Eileen
Moss, George Ray and Florence Sadler unanimously approved the motion.
Review/Discuss/Approve/Deny the Annexation of 12.623 Acres into the Corporate Boundaries
of Fruit Heights City
City Manager Brandon Green explained the annexation process since City Planner Jeff Oyler
was unable to attend the meeting due to illness. He said that a notice of annexation was sent
out 30 days ago to residents and they had a period to respond. He explained to the City Council
that the City has followed the procedures for the annexation.
After brief discussion, Council Member Florence Sadler made a motion to approve the
Annexation of 12.623 Acres into the Corporate Boundaries of Fruit Heights City. The motion
was seconded by Council Member George Ray and it was approved three to one with all City
Council members approving except Eileen Moss voted against the motion and Gary Anderson
abstained from voting because he believed he did not receive the supporting documents in time
to review them adequately to be able vote on the motion.
REVIEW AND APPROVAL OF MINUTES FROM PREVIOUS MEETINGS:
City Council Meeting February 15, 2022
City Council members briefly discussed the draft minutes that previously had been provided to
them for the February 15, 2022 City Council Meeting.
After brief discussion, Council Member Gary Anderson made a motion to approve the minutes
for the February 15, 2022 City Council meeting. The motion was seconded by Council Member
Eileen Moss and it was approved unanimously.
INFORMATION ITEMS/UPCOMING EVENTS:
Mayor John Pohlman reviewed the upcoming events including:
March 15, 2022 – City Council Meeting
CITY COUNCIL & STAFF REPORTS:
Council Member Eileen Moss suggested some items to consider in the future when reviewing
items for the City Budget. First, she recommended adding cement pads by the bike trail to allow
for portable bathrooms. She also mentioned that donations from bikers could help with the cost
of the portable bathrooms. Second, she recommended finding a resident that is close to the bike
trail and see if they would be willing to leave their garbage can out for bikers to use in exchange
for a discount on their bill.
Council Member Florence Sadler mentioned that the new radios for the Citizens Corps Council
should be arriving soon and that the Utah Shake Out will take place next month.
City Manager Brandon Green confirmed he had turned in the City’s application to Get Healthy
Utah.
Council Member Gary Anderson made a motion to adjourn the meeting. Council Member
Florence Sadler seconded the motion. It was approved unanimously, and the meeting was
adjourned at 8:30 pm.
I HEREBY CERTIFY that the foregoing is a true, accurate and complete record of the Fruit
Heights City Council Meeting held March 1, 2022.
Not approved until signed.
/s/ Brandon Green
Brandon Green, City Recorder
Date approved by City Council: March 15, 2022
Agenda
FRUIT HEIGHTS CITY COUNCIL MEETING
March 1, 2022, Fruit Heights City Council Chambers
910 S Mountain Road Fruit Heights City, UT 84037
7:00 P.M. CITY COUNCIL MEETING
1. WELCOME: MAYOR JOHN POHLMAN
1.1. Pledge of Allegiance and Opening Ceremony (By Invitation)
1.2. Roll Call
1.3. City Council Training: Councilmember Florence Sadler
2. DECLARATION OF CONFLICT(S) OF INTEREST
3. PUBLIC COMMENTS – The public may address the mayor regarding issues that are not on the agenda. We
ask that you please limit your comments to 3 minutes.
No action may be taken on any item not on the agenda
4. SPECIAL PRESENTATION(S):
4.1. Youth City Council Report
4.2. Presentation of the Storm Water Management Program and Plan (City Engineer)
5. PUBLIC HEARING: Receive Public Comment on the Storm Water Management Plan.
6. CITY BUSINESS:
6.1. Review/Discuss/Approve/Deny the Storm Water Management Plan.
6.2. Review/Discuss/Approve/Deny the Annexation of 12.623 Acres into the Corporate Boundaries of Fruit
Heights City.
7. REVIEW AND APPROVAL OF MINUTES FROM PREVIOUS MEETING:
February 15, 2022, City Council Meeting
8. CONSENT CALENDAR:
9. INFORMATION ITEMS/UPCOMING EVENTS:
March 1, 2022, City Council Meeting
10. CITY COUNCIL REPORTS – This time is set aside to provide updates on City Oversite Assignments and
projects
Mayor’s Report
City Council Reports
City Engineer
City Planner
Public Works
City Manager
11. ELECTRONIC MEETING: By motion of the Fruit Heights City Council, Elected Officials and City Staff
can participate in regularly scheduled meetings via electronic media when approved by the mayor.
Fruit Heights City is now streaming City Council Meetings on its YouTube Channel. Please use the
link below to join us!
https://www.youtube.com/channel/UCaIqHYd0U5RCpaDo8rquABw
12. CLOSED MEETING: By motion of the Fruit Heights City Council, pursuant to Title 52, Chapter 4 of the
Utah Code, the City Council may vote to hold a closed meeting for any of the purposes identified in that
chapter.
13. ADJOURNMENT:
CERTIFICATE OF POSTING
I HEREBY CERTIFY that a copy of this agenda was posted on the City’s website, www.fruitheightscity.com, as
well as posted on the Utah State public notice website http://www.utah.gov/pmn/index.html, and was emailed to at
least one newspaper of general circulation within the jurisdiction of the public body.
R. Brandon Green
R. Brandon Green - City Recorder
In compliance with the Americans with Disabilities Act, individuals needing special accommodations during this
meeting should contact the City Manager, Brandon Green at (801)546-0861, at least 24 hours prior to the meeting.
Fruit Heights City West Point City Mayor
Mayor & City Council John Pohlman
910 S Mountain Road City Council
Fruit Heights, UT 84037 Diane Anderson, Mayor Pro Tem
801.546.0861 Gary Anderson
Eileen Moss
Florence Sadler
George Ray
FRUIT HEIGHTS CITY
NOTICE OF ANNEXATION PETITION
THIS IS NOTICE THAT AN ANNEXATION PETITION HAS BEEN FILED WITH
FRUIT HEIGHTS CITY.
YOU ARE RECEIVING THIS NOTICE AS THE RECORDED OWNER OF ONE OR MORE PARCEL(S) IN OR
WITHIN A ½ MILE RADIUS OF THE AREA PROPOSED FOR ANNEXATION.
The Fruit Heights City Council received notice of certification of the “Samuel G Raymond Inc. Annexation”
Petition (“Petition”) on October 12, 2021 and may grant the Petition and annex the area described in the Petition
unless, in accordance with UCA § 10-2-407(2)(a)(i), a written protest is filed with the Davis County Commission
and a copy of the protest delivered to the Fruit Heights City Recorder. SEE BELOW FOR INFORMATION ON
FILING A PROTEST.
THE AREA PROPOSED FOR ANNEXATION IN THE PETITION IS ATTACHED HERETO AND INCLUDED WITH
THIS NOTICE.
The area proposed for annexation into Fruit Heights City will also automatically be annexed into the Kaysville
City Fire Department and Davis County Sherriff’s Office to provide fire protection, paramedic, emergency
services, and law enforcement services.
PROTESTS
PROTESTS SHALL BE FILED IN ACCORDANCE WITH THE REQUIREMENTS IN
UCA § 10-2-407.
In accordance with UCA § 10-2-407(1), a protest to the Petition may be filed by:
a. The legislative body or governing board of an affected entity; or
b. An owner of rural real property (as defined in UCA § 17B-2a-1107 as an area zoned primarily for
manufacturing, commercial, or agricultural purposes and that does not include residential units with a
density greater than one unit per acre.)
DEADLINE TO FILE A PROTEST:
MARCH 1, 2022
PROTESTS MUST BE FILED WITH THE DAVIS COUNTY CLERK at:
Physical Location: Mailing Address:
Davis County Admin Building Davis County Clerk/Auditor
61 South Main Street P.O. Box 618
Farmington, UT 84025 Farmington, UT 84025
A copy of the protest shall on the same date the protest is filed with the Davis County Clerk be
delivered or mailed to the Fruit Heights City Recorder at:
Fruit Heights City Hall
910 S. Mountain Road
Fruit Heights, UT 84037
The complete Samuel G. Raymond Inc. Annexation Petition is available for inspection and copying at
the office of the Fruit Heights City Recorder,
online at www.fruitheightscity.com/402/Subdivision-Development
R. BRANDON GREEN, Fruit Heights City Recorder
Mailed & Posted this 1st day of February 2022
SAMUEL G. RAYMOND INC. ANNEXATION
LEGAL DESCRIPTION
FRUIT HEIGHTS CITY, UTAH
A PART OF THE SE QUARTER OF SECTION 36, TOWNSHIP 4 NORTH, RANGE 1 WEST, SALT LAKE BASE
AND MERIDIAN, U.S. SURVEY, DESCRIBED AS FOLLOWS:
BEGINNING AT A POINT ON THE EXISTING FRUIT HEIGHTS CITY BOUNDARY AND THE WESTERLY LINE
OF THE SAMUEL G. RAYMOND, INC. PROPERTY, WHICH POINT LIES N89"58'50"E ALONG THE SECTION
LINE
1175.38 FEET FROM THE SOUTH 1/4 CORNER OF SAID SECTION 36, THENCE ALONG SAID BOUNDARY
LINE N24 15'00"W 1436.99 FEET TO THE 1/16TH SECTION LINE; THENCE ALONG SAID 1 /16TH SECTION
LINE S89 50'05"E 715.94 FEET TO THE SW 1 /16TH
CORNER OF SECTION 36; THENCE soo·o3•03"w
1308.08 FEET ALONG THE 1 /16TH SECTION LINE TO THE SOUTH LINE OF SECTION 36; THENCE ALONG
SAID SECTION LINE S89"58'50"W 124.58 FEET TO THE POINT OF BEGINNING.
CONTAINING 549875 SQUARE FEET OR 12.623 ACRES
Reeve & Associates, Inc. - Solutions You Can Build On
Reeve & Associates, Inc. - Solutions You Can Build On Reeve & Associates, Inc. - Solutions You Can Build On
Reeve
& Associates, Inc.
Reeve & Associates, Inc. - Solutions You Can Build On
CONSULTING ENGINEERS
MEMORANDUM
TO: Fruit Heights City Mayor and Council
FROM: Brandon K. Jones, P.E.
Fruit Heights City Engineer
CC: Ted Parry – Fruit Heights City Storm Water Superintendent
Darren Frandsen – Fruit Heights City Public Works Director
RE: STORM WATER PRESENTATION
Date: March 1, 2022
______________________________________________________________________________
As of 2002 municipalities in Davis County became classified as Small MS4s (Municipal
Separate Storm Sewer Systems). As Small MS4s each city is required to comply with UPDES
(Utah Pollution Discharge Elimination System) General Permit requirements. On May 12, 2021,
the new General Permit became effective. The new permit, among other things, requires that
MS4s create a new Storm Water Management Plan (SWMP). This plan has been created, and a
general overview of the plan will be presented to the City Council.
Due to the many complexities of creating, implementing, and maintaining the SWMP and the
overall storm water program in compliance with the regulations, it was felt that it would be
beneficial to give a presentation on the program to the City Council. The purpose of the
presentation is to: 1) educate the City Council and the public about the general tenants of the
storm water program, 2) inform the City Council and the public on how Fruit Heights is striving
to meet the requirements of the permit, and 3) help the City Council understand the funding
needs to administer the program.
6080 Fashion Point Drive ● South Ogden, Utah 84403 ● (801) 476-9767 ● www.jonescivil.com
CONSULTING ENGINEERS
MEMORANDUM
TO: Fruit Heights City Mayor and Council
FROM: Brandon K. Jones, P.E.
Fruit Heights City Engineer
CC: Ted Parry – Fruit Heights City Storm Water Superintendent
Darren Frandsen – Fruit Heights City Public Works Director
RE: STORM WATER MANAGEMENT PLAN (SWMP) ADOPTION
Recommendation Memo
Date: March 1, 2022
______________________________________________________________________________
BACKGROUND
The city (via Ted Parry) submitted the new Storm Water Management Plan (SWMP) to the State
Division of Water Quality prior to its due date of November 8, 2021. One of the requirements of
the SWMP is certification from the city that the SWMP was prepared under their direction, by
qualified personnel, and that the information “to the best of their knowledge” is true, accurate,
and complete. For this purpose, on March 1, 2022, Jones & Associates will make a presentation
on the Storm Water Program to the entire City Council. The presentation will cover an overview
of the Storm Water Program including addressing all 6 Minimum Control Measures (MCM’s)
required in the SWMP. The purpose of the SWMP coming before the City Council is to
officially adopt the plan by resolution and authorize Darren (Public Works Director) to sign the
Certification (see Section 8).
SWMP SUMMARY
The SWMP is made up of 8 sections. The sections covering the MCM’s (sections 2 – 7) each
contain the following subsections, a) Fruit Heights’s Plan to Meet the Requirements of the
Permit, b) Areas of Focus, and c) Specific Goals with Methods of Evaluation.
1. Introduction. This section covers an overview of the purpose and general requirements of
the storm water permit and program. It lists the main point of contact, Ted Parry. It also
includes tables that address deadlines and inspection requirements.
2. MCM 1 – Public Education and Outreach on Stormwater Impacts. This section covers
how the city will help to educate the public about stormwater pollution and prevention.
Some of these efforts include the city’s involvement with the Davis County Stormwater
Coalition as well as training and educational information provide to the public through a
variety of means.
3. MCM 2 – Public Involvement / Participation. This section covers the public’s
involvement in stormwater pollution prevention. One of the city’s goals for this section is
to hold a public hearing at least twice a year to receive feedback from the public.
6080 Fashion Point Drive ● South Ogden, Utah 84403 ● (801) 476-9767 ● www.jonescivil.com
STORM WATER MANAGEMENT PLAN (SWMP) ADOPTION Page 2 of 2
Recommendation Memo
March 1, 2022
4. MCM 3 – Illicit Discharge Detection and Elimination. This section covers the city’s
program to prevent contamination of surface water and groundwater by monitoring,
tracking, and removing non-stormwater discharges into the stormwater drainage system.
One of the goals of this section is to develop a database of Standard Operating
Procedures (SOPs) for inspections, spills, illicit discharges, and connections. This will be
completed by this coming July 2022. The city will also inspect 33% of their stormwater
outfalls on an annual basis.
5. MCM 4 – Construction Site Stormwater Runoff Control. This section covers how the city
reviews plans, inspects construction sites and ensures that effective Best Management
Practices (BMP’s) are designed, in place and maintained by those responsible for the
construction activities (which includes the city themselves for all projects that disturb
more than an acre of ground).
6. MCM 5 – Long-Term Stormwater Management. This section covers how the city reviews
the design, implementation, and maintenance of permanent BMP’s. It also covers the
design and use Low Impact Development (LID) principles and practices.
7. MCM 6 – Pollution Prevention and Good Housekeeping for Municipal Operations. This
section covers stormwater pollution prevention for city owned and/or operated facilities.
One of the goals of this section is to create SOP’s for all facilities by July 2023.
8. Certification. This section contains the certification that must be part of the SWMP. It is
to be signed by the Public Work Director.
RECOMMENDATION
It is our recommendation that the SWMP be adopted as stated in the resolution and implemented
accordingly.
6080 Fashion Point Drive ● South Ogden, Utah 84403 ● (801) 476-9767 ● www.jonescivil.com
ANNUAL STORM WATER 2022
TRAINING FOR CITY COUNCIL
INTRODUCTION
What is the Storm Water Management
Program?
A Storm Water Management Program Plan
(SWMP) is a “written plan that is used to
describe the various control measures and
activities the Permittee will undertake to
implement the storm water management
plan.”
Why is it required?
Required by the EPA and the Utah Division of
Water Quality (federal, state)
Provides guidance and “measurable” goals
Why are we here?
Annual training is required for ALL who deal
with storm water related issues
INTRODUCTION
Click to add text
https://www.pca.state.mn.us/water/municipal-stormwater-ms4
SWMP DEFINITIONS
Minimum Control Measure (MCM)
“Control Measure” refers to any Best Management Practice or other
method used to prevent or reduce the discharge of pollutants to
Waters of the State.
Best Management Practices (BMPs)
Official Definition: “…schedules of activities, prohibitions of
practices, maintenance procedures, and other management practices
to prevent or reduce the pollution of Waters of the State. BMPs also
include treatment requirements, operating procedures, and practices
to control facility site runoff, spillage or leaks, sludge or waste
disposal, or drainage from raw material storage.”
Simply Put: BMPs are actions or items that prevent or reduce water
pollution.
Examples?
ordinances, standard operating procedures, street sweeping, silt fencing,
inlet protection
SWMP DEFINITIONS
Permittee/MS4 (Municipal Separate Storm Sewer System)
Fruit Heights
Waters of the State
Official Definition: “… all streams, lakes, ponds, marshes, water-
courses, waterways, wells, springs, irrigation systems, drainage
systems, and all other bodies or accumulations of water, surface and
underground, natural or artificial, public or private which are
contained within, flow through, or border upon this state or any
portion thereof, except bodies of water confined to and retained
within the limits of private property, and which do not develop into or
constitute a nuisance, or a public health hazard, or a menace to fish
and wildlife which shall not be considered to be ‘Waters of the State’
under this definition (‘UAC’ R317-1-1).”
Simply Put: just about any water conveyance or impoundment,
including groundwater
SWMP DEFINITIONS
Utah snowpack?
Waters of reservoirs
the State
streams
and rivers
ponds
groundwater
Great Salt Lake
https://www.melbournewater.com.au/community-and-education/about-our-water/natural-and-urban-water-cycle
SWMP CONTENTS
Six Minimum Control Measures (MCMs)
1. Public Education and Outreach
2. Public Involvement and Participation
3. Illicit Discharge Detection and Elimination
4. Construction Site Storm Water Runoff Control
5. Long-Term Storm Water Management in New Development and
Redevelopment (Post-Construction Storm Water Management)
6. Pollution Prevention and Good Housekeeping
Each MCM section contains tasks, goals, and deadlines
For each MCM, there are Action Items
MCM 1 – PUBLIC EDUCATION
Public Education and Outreach - General
Provide and participate in a variety of stormwater education and
outreach programs designed to build general awareness, reduce or
eliminate behaviors and practices that cause or contribute to
adverse stormwater impacts, and encourage the public to
participate in stewardship activities
Educate and reach a variety of audiences including residents,
institutions and commercial facilities, developers and contractors
(construction)
Davis County Storm Water Coalition provides some public outreach
and education
MCM 1 – PUBLIC EDUCATION
Public Education and Outreach - Examples
Develop program for installation of curb markers
Scout project
Community service
Earth Day activity
School or club project
MCM 1 – PUBLIC EDUCATION
Public Education and Outreach – Examples/Tasks
Add storm water info in utility bills or newsletter
Place storm water information on city’s website
SWMP
Hotline
http://www.lakesuperiorstreams.org/stormwater/brochures.html
Link to ordinance
MCM 1 – PUBLIC EDUCATION
Public Education and Outreach – Other Tasks
Have a Registered Storm Water Inspector (RSI) on staff
Develop and maintain Standard Operating Procedures (SOPs)
Training for employees annually
Document outreach materials and efforts
MCM 2 – PUBLIC INVOLVEMENT
Public Involvement and Participation - General
Implement a program that complies with applicable State and Local
public notice requirements
Conduct opportunities for public involvement and participation, a
minimum of two (2) times annually
advisory panels environmental activities
public hearings volunteer opportunities
watershed committees other similar activities
stewardship programs
Involve potentially affected stakeholder groups
commercial and industrial environmental groups
businesses homeowners’ associations
trade associations education organizations
MCM 2 – PUBLIC INVOLVEMENT
Public Involvement and Participation
Similar to Public Education MCM, but more aimed at the process
Post SWMP on website and/or at city hall (available for review)
Keep documentation
MCM 3 – ILLICIT DISCHARGE
Illicit Discharge Detection and Elimination - General
Revise, implement and enforce an Illicit Discharge and Elimination
(IDDE) program to systematically find and eliminate sources of non-
stormwater discharges from the MS4
Implement defined procedures to prevent illicit connections and
discharges
MCM 3 – ILLICIT DISCHARGE
Illicit Discharge
Official Definition: “… any discharge to a
municipal separate storm sewer that is not
composed entirely of storm water except
discharges pursuant to a UPDES Permit
(other than the UPDES Permit for
discharges from the municipal separate
storm sewer) and discharges resulting from
emergency firefighting activities.”
Simply Put: any discharge into the storm
drain system or Waters of the State that
isn’t purely storm water
MCM 3 – ILLICIT DISCHARGE
Non-storm water discharges:
Water line flushing Water from crawl space pumps
Landscape irrigation Footing drains
Diverted stream flows Lawn watering runoff
Rising ground waters Individual residential car washing
Uncontaminated ground water Flows from riparian habitats and
infiltration wetlands
Uncontaminated pumped ground Dechlorinated swimming pool
water discharges
Discharges from potable water Residual street wash water
sources Dechlorinated water reservoir
Foundation drains discharges
Air conditioning condensate Discharges or flows from
Irrigation water emergency fire fighting activity
Springs
MCM 3 – ILLICIT DISCHARGE
Illicit Discharge Detection and Elimination – Tasks
General Idea:
Avoid illicit discharges
Locate problem areas
Find the source, remove/correct illicit connection or discharge
Document actions taken
Inspect outfalls
Promote collection of household hazardous waste
Spring Cleanup
Fall Cleanup
Publicize hotline for reporting illicit discharges
Develop SOPs for avoiding, cleaning, tracking spills, responding to
public referrals of illicit discharges, etc.
Conduct IDDE annual training
Document, document, document
MCM 3 – ILLICIT DISCHARGE
Illicit discharge?
Yeah, that’s obvious…
MCM 3 – ILLICIT DISCHARGE
Dumping
Leaking liquids off of Discharging
dumpster loading dock contaminated
water
Maybe not
so obvious…
Grass
Grass clippings
clippings in dumped in
the gutter drainage
MCM 3 – ILLICIT DISCHARGE
Chlorinated
Leaking fuel
swimming
tank
pool water
Illicit
Connection
MCM 3 – ILLICIT DISCHARGE
Concrete cutting water
and concrete wash
outs – watch for small
projects like fences,
sidewalks, and
driveways
MCM 3 – ILLICIT DISCHARGE
MCM 3 – ILLICIT DISCHARGE
You are your City’s
eyes and ears.
MCM 4 – CONSTRUCTION SITES
Construction Site Storm Water Runof f Control - General
Revise, implement, and enforce a program to reduce pollutants in
any storm water runoff to the MS4 from:
construction sites with a land disturbance of greater than or equal to one
acre
sites less than one acre that are part of a larger common plan of
development
Public and private projects, including projects proposed by the
Permittee’s own departments and agencies, shall comply with these
requirements
MCM 4 – CONSTRUCTION SITES
Construction Site Storm Water Runof f Control - Tasks
Revise/enforce ordinances that require the use of erosion and
sediment control practices
Require Storm Water Pollution Prevention Plan (SWPPP)
All disturbances greater than 1 acre
Disturbances less than 1 acre but part of a Common Plan of Development
(i.e. individual building lots)
Disturbances in a sensitive area (e.g. floodplain, near wetland, steep
slope, highly erosive soils)
Inspections
City responsible for inspecting construction sites monthly
City responsible for enforcing SWPPP, ordinances, violations
MCM 4 – CONSTRUCTION SITES
More tasks…
Develop SOPs for enforcement of ordinances
Document and track all enforcement actions
Develop checklist for SWPPP review
Conduct pre-construction SWPPP meeting
Develop procedures for receiving input by public
Identify priority construction sites
Develop SOPs for construction site inspection
Inspect all phases of construction (pre-, during, and post-)
Perform monthly inspections of all construction sites
Perform bi-weekly inspections of high-priority sites
Perform necessary follow-up actions
MCM 4 – CONSTRUCTION SITES
Have hotline for reporting issues posted at the construction
site
MCM 4 – CONSTRUCTION SITES
Provide annual training
Registered Storm Water Inspectors, building inspectors
Anyone dealing with construction, building permits
Document reviews, inspections, enforcement
MCM 5 – LONG-TERM SW MGMT
Long-Term Storm Water Management in New Development and
Redevelopment - General
Revise, implement, and enforce a program to address post-
construction storm water runoff to the MS4 from private and public
new development and redevelopment construction sites.
These water quality considerations do not replace or substitute for
water quantity or flood management requirements for new
development or redevelopment sites.
The water quality controls may be incorporated into the design of
structures intended for flow control; or water quality control may be
achieved with separate control measures.
The program must apply to private and public development sites.
MCM 5 – LONG-TERM SW MGMT
Low Impact Development (LID)
Official Definition: “… an approach to land development (or re-
development) that works with nature to more closely mimic pre-
development hydrologic functions.”
Simply Put: structural and non-structural ways to minimize, slow,
and/or clean storm water flows
Examples: minimizing impervious areas, preserving natural features,
infiltration basins, rain barrels, permeable pavements
MCM 5 – LONG-TERM SW MGMT
Long-Term Storm Water Management for New Development
and Redevelopment - Tasks
Program must have requirements or standards to ensure that any
storm water controls or management practices for new development
and redevelopment will prevent or minimize impacts to water quality.
Non-Structural BMPs (i.e. procedural)
Planning (ordinance, SWMP, City Standards)
Site-based design
Develop and define a specific hydrologic method or methods for
calculating runoff volumes and flow rates
Require retention of 80 th percentile storm event (~0.5”) onsite
Require a process which requires the evaluation of a Low Impact
Development (LID) approach
Permittees must allow for use of a minimum of five (5) LID practices
Check feasibility
MCM 5 – LONG-TERM SW MGMT
Non-structural example – land planning
Allow cluster subdivisions - leave undisturbed or natural land
MCM 5 – LONG-TERM SW MGMT
Non-structural example - minimize impervious surfaces
Minimize driveway widths (curb cuts at street) by ordinance
Encourage gravel and/or permeable pavers (site-based design)
MCM 5 – LONG-TERM SW MGMT
City selected 5 LID practices (structural)
Bioretention Cell
Bioswale
Vegetated Strip
Infiltration Basin
Dry Well
Underground Infiltration Gallery
MCM 5 – LONG-TERM SW MGMT
Selected Structural Practices
Bioretention cells
Bioswales
Vegetated strips
Infiltration Basins
can be incorporated into detention pond, when designed properly
Dry Well
Underground Infiltration Gallery
Water flows
through vegetated strip
to bioswale
MCM 5 – LONG-TERM SW MGMT
Bioretention Cell
Grant Avenue at
23rd St. in Ogden
Curb cuts to
allow inflow
MCM 5 – LONG-TERM SW MGMT
Infiltration/
Detention
Basins
Avoid pollution
with pre-treatment
MCM 5 – LONG-TERM SW MGMT
Dry Well
MCM 5 – LONG-TERM SW MGMT
Underground
Infiltration
Gallery
MCM 5 – LONG-TERM SW MGMT
Other Tasks
Develop and adopt ordinances that require long-term
post-construction storm water controls including
regulatory and enforcement provisions
Maintain documentation of how the requirements will
protect water quality
Adopt and implement SOPs for site inspection and
enforcement
Require long-term storm water management
agreements for private LID BMPs; inspect during
installation, at completion, and every 5 years
MCM 5 – LONG-TERM SW MGMT
And more tasks…
Plan Review
Adopt and implement procedures for site plan review
Review plans to ensure they include long-term storm water management
measures
Inventory
Create and maintain an inventory of long-term BMPs (public and private)
Retention/detention basins, snouts, bioswales, etc.
Keep database up-to-date
Training
Provide training – suitability, installation, maintenance
Maintain documentation
MCM 6 – GOOD HOUSEKEEPING
Pollution Prevention / Good Housekeeping – General
Implement a program for Permittee-owned or operated facilities,
operations and structural storm water controls that includes SOPs,
pollution prevention BMPs, storm water pollution prevention plans or
similar type of documents, and a training component that have the
ultimate goal of preventing or reducing the runoff of pollutants to the
MS4 and waters of the state.
Public Works Shop
City Hall
City parks
City-owned detention/retention basins
MCM 6 – GOOD HOUSEKEEPING
Pollution Prevention / Good Housekeeping – General
All components of the program shall be included in the SWMP
document and must identify the department responsible for
performing each activity described in this section.
Develop and maintain an inventory of all such Permittee-owned or
operated facilities.
MCM 6 – GOOD HOUSEKEEPING
Pollution Prevention / Good Housekeeping - Tasks
Develop SWPPP for each “high-priority” permittee-owned or operated
facility (PW yard, etc.)
Perform weekly visual inspections
Perform quarterly comprehensive inspection of “high-priority”
facilities
Perform quarterly observation of storm water discharge from “high-
priority” facilities
Develop/update SOPs for other city-owned facilities (parks, roads,
buildings, etc.)
Obtain private maintenance contracts (privately owned facilities)
Follow permitting process for public construction projects (SWPPP,
NOI, NOT)
Provide training
Document, document, document
SUMMARY
SWMP is a
Requires involvement
comprehensive plan
from City Council to
that covers all facets
Public Works to the
of the City’s storm
public
water program
Implementation
requires time and
manpower, both initial
and on-going
SUMMARY
Questions? Discussion
Next Steps
RESOLUTION 2022-01
A RESOLUTION OF THE FRUIT HEIGHTS CITY COUNCIL ADOPTING
STORM WATER MANAGEMENT PLAN
WHEREAS, all Municipal Separate Storm Sewer Systems (MS4’s) are required to comply with Utah
Pollution Discharge Elimination System (UPDES) General Permit requirements; and
WHEREAS, Fruit Heights City is an MS4 under the UPDES General Permit; and
WHEREAS, the new General Permit became effective on May 12, 2021 requiring a new Storm Water
Management Plan (SWMP); and
WHEREAS, Public Works employee Ted Parry submitted the updated SWMP to the Division of Water
Quality prior to its due date of November 8, 2021; and
WHEREAS, the SWMP must be adopted by the city; and
WHEREAS, City Engineer Brandon Jones presented an overview of the plan requirements to the City
Council on March 1, 2022; and
WHEREAS, Council has reviewed the SWMP and supports adoption and implementation;
NOW THEREFORE BE IT RESOLVED by the Council of Fruit Heights City, Davis County,
State of Utah, as follows:
Section 1. Adoption: The Storm Water Management Plan (SWMP), dated November 2021, is hereby
adopted in full.
Section 2: Repealer Clause: All ordinances or resolutions or parts thereof, which are in conflict
herewith, are hereby repealed.
PASSED AND ADOPTED by the City Council of Fruit Heights, Davis County, on the 1st day
of March 2022.
Roll call vote is as follows:
Council Member Diane Anderson AYE
Council Member Eileen Moss AYE
Council Member Gary Anderson AYE
Council Member George Ray AYE
Council Member Florence Sadler AYE
Get email alerts for Fruit Heights