Committee of the Whole
Regular MeetingGahanna, OH · October 9, 2012
Minutes
Office of the Clerk of Council
City of Gahanna 200 South Hamilton Road
Gahanna, Ohio 43230
Meeting Minutes
Committee of the Whole
Stephen A. Renner, Chair
Beryl D. Anderson
Karen J. Angelou
Ryan P. Jolley
Brian D. Larick
David L. Samuel
Brandon Wright
Tuesday, October 9, 2012 7:00 PM Council Committee Rooms
Present 7 - Stephen A. Renner, Brandon Wright, Beryl Anderson, Karen J. Angelou,
Ryan P. Jolley, Brian D. Larick, and David L. Samuel
Mayor Stinchcomb, Dottie Franey, Mike Andrako, Karl Wetherholt, Brian Hoyt, Troy
Euton, Jeff Spence, Ken Bell, Sue Wadley, Brandi Braun, Jennifer Teal, Jennifer
Price, Leah Evans, Tom Lefchik, Shane Ewald, Press.
Presentation by Scott Schmidt, Executive Dir. of Business & School
Improvement, GJSD:
Scott Schmidt, Executive Director of Business and School Improvement, GJSD, said
I am here to address the solar panels that we have proposed for several Gahanna
schools; there has been concern expressed with the solar panels proposed for
Middle School East as they will be on the ground and not the roof; we have decided
that we are going to withdraw the conditional use application for MSE, and will
continue with the other two as they are on the roof; we do have a ground array of
solar panels at Blacklick Elementary; we do own over 50 acres there; plan to do
Chapelfield and Goshen Lane Elementary in the summer of 2012, and those would
be on the roofs; will be able to purchase power; residents were caught off guard with
MSE panels; panels will be 12 to 15 inches off of the roof; win for district by reducing
energy cost. Schmidt introduced Jerry Corbin of Solar Planet; Schmidt said we did
work with Jefferson Township for the array at Blacklick.
After questions from Samuel, Schmidt said concerning run off we have worked with
Jefferson Township; the panels we are installing are smaller with breaks in between
them so there is not a large impervious surface created; looking at plant material to
plant below them to take care of some water shed. Samuel asked if grants are
involved and Corbin said yes. Samuel asked about other sources of funding and
Corbin said Charlie's Subs. Samuel asked what are they funding. Corbin said
everything; there is no cost, no risk to the schools; as an example of this project high
school was 1 megawatt which represents about a $5 million dollar investment on our
part; and some of it is being funded with treasury grants, some investment tax
credits, and some of it - our business plan evolves around depreciation as well and
that is how Charlie is getting back some of his investment; the federal treasury grant
went away in December of 2011, and before it went away we safe harbored
approximately $200 million worth of projects, so yes the Federal Treasury Grant is an
City of Gahanna Page 1
Committee of the Whole Meeting Minutes October 9, 2012
important part of our business plan. Samuel asked if the school system will have to
keep a lot of data for the grant and Corbin said no; the panels, the system and the
maintenance, everything that belongs to the solar belongs to us; we own it; all you
are providing is a place to put the panels and willing participants thinking outside the
box who want to be green and save on your energy bill. Samuel asked what do you
plan to do with the green credits. Corbin said renewable energy credits have a value
on the open market, and they have value because the major utility companies in Ohio
have a Renewable Energy Portfolio Standard that a certain percentage of their power
has to be renewable energy; they are not going to meet their mandates, and they are
not meeting their mandates; so as opposed to getting a fine for not meeting their
mandates they buy these renewable energy credits on the open market and they are
sold as a commodity; so every time you produce renewable energy you get one credit
and those credits have value depending on how far behind AEP is on their renewable
energy portfolio statement. Schmidt said those renewable energy credits were kind
of a sticking point with the Board of Education; we do not have the capital up front to
install the panels to get the energy credits and then we would have to hire someone
to manage all of those credits for us; while it seems like we are losing credits we
don't have the money in the bank to buy the solar panels in the first place.
Wright asked about the interactive solar lab. Corbin said there would be a smaller
panel hooked up to a computer for calculation purposes; students could do different
types of hypothesis as far as the angles of he panels, the direction of the panels;
calculating the amount of sunlight versus the amount of energy; is a science tool
accessible to students. Wright asked about the solar panels being produced
overseas. Corbin said solar panels cannot be produced in the US economically to
compete with panels produced overseas; there are not enough solar panels
produced in the US that are of the quality that would satisfy our appetite; if we had to
purchase panels made in the US that would be cost prohibitive; is work force driven;
the cost of the panels is only 10% of the project; we have done everything we can to
keep as much as we could in our backyard; Charlie is a Dublin guy and our offices
are right here on Claycraft and SME is in Gahanna; doing all we can to make this be
local. Wright asked about Charlie's Grilled Subs financing this project; is this a
subsidiary of a sub company that we are not talking about. Corbin said yes; our
owner, Solar Planet, is Charlie's Grilled Subs, and they have 400 to 600 sub shops all
around the world; he has a huge appetite for depreciation and also is very
philanthropic and wants to do projects that feel good; and how he got into the solar
business is that he spends a lot of his time on religious missions in third world
countries, in Mexico, Central America and Africa and he spends time in villages there
building solar projects to bring electricity to villages that have never had power; so
when he is doing that he is thinking if we can bring solar energy to third world
countries.
Anderson asked about the durability of the panels, and why these panels. Corbin
said we have our criteria and we search out panels that meet that; these panels have
a 25 year warranty; you will have a computer system and so will we and we will be
able to tell when something goes bad and will send someone out to fix it; there are no
moving parts; can withstand normal day to day wear, wind, hail; probably not
withstand a golf ball hitting it; we had a bad storm on June 29th and we had just
completed Centerburg and there are 4,500 panels there; only four were broken; have
them in very harsh climates.
Renner said Gahanna Jefferson schools is the stakeholder here; they are bringing
this to the City because it intersects with the Planning Commission; please ask
questions that are pertinent specifically to what is happening now.
Mayor said currently we do not have code on the books that deal with solar panels so
we are researching and studying code to bring to you in the future; also asked them
City of Gahanna Page 2
Committee of the Whole Meeting Minutes October 9, 2012
to be here to stop the rumor mill; ground base has been the problem; roof have not
heard any concerns.
Jolley asked when the land by Blacklick Elementary was purchased. Schmidt said
that the land that we are using at Blacklick Elementary is not part of the land that was
originally purchased. Jolley said so approximately 8 or 9 years and it has been
vacant and now we have an opportunity for investment; how many dollars does the
school district have to spend. Schmidt said zero dollars with the exception that it has
taken up some of my time and the board's time and Rick Owens our maintenance
supervisor some of his time; even permits in Jefferson Township, Solar Planet picked
up 100% of the cost; in full disclosure there are some roof repairs needed at the high
school and we would have had to do those anyway; will be a 30% discount rate and
our goal was to create 70% solar for our needs, but we cannot do panels everywhere
we wanted so system will not be as big; but it is 30% savings for every kilowatt we
are able to create. Jolley said so it is land we already owned; zero dollars up front
and a double digit percentage savings over life of the contract. Schmidt said yes.
Angelou said you almost answered my question as to does this fit all of the energy
needs of the building; you said 70% of the energy, so still have 30% be dealing with
AEP. Schmidt said we cannot create a system that creates more energy than what
we consume at that particular building; systems have to be at the meter location; we
cannot create our own power plant; still connected to the grid; when the power goes
outage for safety reasons the solar system shuts down as well; cannot produce more
energy than we consume; in the summer or on weekends and in the evenings when
we are creating more energy than we are using, our meters will put that energy back
on the grid and we will receive a credit from AEP. Angelou said the concerns
expressed to me were because of the ground arrays; wondered why not putting them
on the roof; would take away from the residential character. Schmidt said that is why
we are withdrawing the application for conditional use at MSE and are working on
contacting the neighbors; when the report came back that the roof was not feasible
for optimal size of a system we looked into other options; MSS, MSE, High Point,
Jefferson, and Lincoln Elementary all have limited roof possibilities at this time.
Angelou said I have a question about the AEP buying credits; how much do the
energy credits typically cost. Corbin said it is very volatile; in the last year renewable
energy credits have gone from high of $600 or as low as $140; every time there is
something on the news that Kasich is going to change the Renewable Energy
Portfolios they go up or down. Angelou said when you get these energy credits, that
is part of your business plan. Corbin said yes. Angelou said you get these and then
they are sold on the open market; you then get the money for that and that is how you
make your profit. Corbin said yes that is how we recoup our investment. Angelou
asked if Blacklick was finished. Schmidt said the solar arrays are installed, the
electrical work is not finished yet; hope to have it ready by the end of the month; will
be a chain link fence around it.
Larick thanked Schmidt and Corbin for being here. After question from Larick,
Schmidt said there are some other buildings where roof arrays would work, but there
is only 5 or 6 years life expectancy left for the roof, so it doesn't make sense to put
the panels on for 4 years and take them off and then have to put them back on; will
do Chapelfield and Goshen Lane roofs this summer before we put the solar panels
on; Royal Manor, Jefferson and MSE have roofs that have reached their life
expectancy. Larick asked about Lincoln and Schmidt said the roof and the age of the
building and the whole structure; lots of different levels to that roof.
Schmidt said we had multiple companies that we were looking at for the solar panels,
but the business plan and the comfort level we had with Solar Planet; a lot of the
other companies out there do not have the financing in place; you do all this work and
jump through hoops and then you have to find the financing; that is why Worthington
City of Gahanna Page 3
Committee of the Whole Meeting Minutes October 9, 2012
only did one school; they are willing to work with the City also.
PENDING LEGILSATION:
ORD-0191-2012 TO AMEND CHAPTER 559, NOISE CONTROL, OF THE CODIFIED
ORDINANCES OF THE CITY OF GAHANNA; AND TO DECLARE AN
EMERGENCY
Renner said we have received the latest changes with ORD-0191-2012. Mayor said
the Administration submitted our recommendations and we did not recommend
reducing the levels for daytime; after speaking with the PD and Ewald, we felt the
levels were fine; did get rid of the maximum peaks and penalty section; Council made
the decision to move to the earlier time,10:00 p.m. to 9:00 p.m.; that is where we are;
commercial is not changing. Jolley said we moved it from 10:00 p.m. to 9:00 p.m. to
facilitate folks, and particularly young people, students going to bed earlier; did we
include in here that we would be doing this at the slow speed. Ewald said no; it is
common practice that they have been using since the ordinance was enacted and
that same procedure should be followed; slow more closely approximates human
hearing; there has to be a consistent process used internally by the PD; when you
start codifying things we get to the point when the prosecutor tries enforcement of
these cases then that creates more variables that they have to go back; this
procedure would stand up in court; I worry about getting into too much detail because
of the police officers when they have to testify to citation.
Renner said the new ordinance will be on the agenda for Monday; what do we want
to do. Wright said I think that 70 is too high for mixed use; need to look at that.
Jolley said the 70 level is for the daytime in Olde Gahanna and Mixed Use until 9:00
p.m. and then they drop to 65; on the weekends go till midnight and then they drop to
65. Wright said I still think 70 is too high; I would like to have it amended to be less
than 70; also need to talk about the implementation. Mayor said the implementation
is the Administration's responsibility; important the code is written to the way Council
wants to see it. Wright said people have told him that the implementation is not
consistent. Jolley said the sound limit during the daytime is higher; limits in the day
are competing with more noise; traffic or other noise; all of the limits have been
higher in the day and that is the whole purpose to our discussion; was 70 to 10:00
and are now reducing to 9:00; doing more harm than good reducing during the
daytime; there is a purpose when do we reduce; the other thing is implementation is
the purview of the Administration; discuss with the PD making sure folks are using
the A weighting and the slow speed; cannot micromanage to the second what the PD
is doing; they are dealing with other issues; discretion left up to the PD; penalty
discretion left up to the prosecutor and the magistrate; this does not apply solely to
outdoor music at bars; this applies to everything within the city limits any kind of
construction you are doing; noise will be higher during the day; felt we had come to a
consensus on 65 decibels.
Larick said we have had many discussions on this and put forth a great deal of
energy around trying to do something that is good for the City and the citizens as well
as acceptable from a business standpoint; appreciate the effort put forth by Mr.
Lefchik and Mr. Thomas; want to make sure we are careful over legislation; at one
point in time; always have the ability to move forward if the need arises; I am okay
with the structure as we have it at this point.
Samuel said we have to be careful about micromanaging this when it is implemented;
our PD has a process where you can air your complaints and they will take care of it;
the PD has a process and we cannot micromanage.
City of Gahanna Page 4
Committee of the Whole Meeting Minutes October 9, 2012
Anderson said I too am in favor of 65; don't think just because other locales have
higher we have to; we can be a leader or a maverick with regard to certain things;
once the limits are set people know that is the rule; we do not have to follow suit; be
concerned about what is going on in the day; feel it should be 65db; needs of citizens
should be paramount with regard to noise levels; have a generation of people who
don't care about noise; in favor of 65 for Olde Gahanna as well as Mixed Use; is a
health issue.
Jolley said 70 or 75 is not uncommon; loud music late at night; daytime volume has
not been an issue; no complaints about noise in the day; technically on paper a
typical vocal conversation is 64 decibels; noise is part of our life; do not want to over
legislate this; have reduced the level and narrowed the time frame; I'm in favor of
proceeding with ORD-0191-2012 as it is. Wright said I am in favor of doing this in
one swoop and not revisiting it every year to tweak, then it is confusing for everyone;
70 is high. Anderson said Columbus is the only City that has 70.
Renner said are we ready to move forward with this; it was agreed to put
ORD-0191-2012 on the regular agenda and then if someone wants to make an
amendment they can.
ISSUES - From Director of Public Service:
Franklin Co. Public Health Contract:
Franey said Franklin County is asking for a 3% increase for 2013; has not had an
increase in the last several years; asking for legislation for the Mayor to enter into
contract. Question was asked if the City had a choice and Franey said this is a
service we have to have.
Recommendation: 1st Reading, no need to come back; 2nd reading, Consent.
.
Code Change/927.24, Illicit Discharge :
Franey said the EPA's NPDES Phase II program requires MS4s, which Gahanna is,
to create a program to detect and eliminate illicit discharges into the storm system;
Gahanna has always had code, but they are now requiring that it be more detailed
showing what we cannot do and authorization to force compliance; so we are asking
for legislation to adopt a revised code section 927.24 to comply; again the question
was asked do we have a choice.
Recommendation: 1st Reading, no need to come back; 2nd Reading, Consent.
ISSUE - From Director of Planning & Development:
CURC Property Transfer, 885 Claycraft Road:
Evans said the CURC did meet on September 27th and recommended that Council
accept their recommendation to release the Master Lease and City Lease to transfer
Lot 27 to Palinco, Inc.; also to authorize the Mayor to enter into General Warranty
Deed to transfer the property to the business; do have 3 more of these remaining.
City of Gahanna Page 5
Committee of the Whole Meeting Minutes October 9, 2012
Recommendation: 1st Reading, no need to come back; 2nd Reading, Consent.
ISSUE - From the City Attorney:
Code Change/303.99, General Traffic Code Penalties:
Ewald said while reviewing the noise ordinance we found that Unclassified
Misdemeanor was not listed in the general traffic code penalties; just need to add this
to the traffic code penalties.
Recommendation: 1st Reading, no need to come back; 2nd Reading, Consent.
ISSUE - From the Mayor:
5 Year Capital Needs Assessment:
Renner asked if there are any questions about projects in the Priority II. Larick said
the Buckles Tract Infrastructure Development; is there in the near term specifics or
relative specifics that have been outlined for what that is expected to be. Wetherholt
and Braun said that will depend on the prospective development that comes and
what kind of infrastructure will be needed there; hopefully that will be paid back by the
TIF. Braun said we have added the community gateway signage; we are proposing
to be added in here to fund the design next year; will be sent to you; what is being
passed out is the projects that are not in this assessment - either more than 5 years
out or the cost should be on our needs that are out there; they go in a tab that doesn't
exist now; put it in the back.
Priority III - Larick said the Headley Soccer Field Rebuild & Irrigation; the concept
here, does this result in fields equal to those in Dublin. Euton said this would create
fields that are equivalent; do have irrigation; working to improve the quality of our
sports; phasing over time; is some chunky dollars; complete full rebuild
accomplishing in a way that is not quite as expensive; significant increase to maintain
at a level people expect. Angelou said would the fields be available to be used as
practice fields as well as playing fields as the issue that came up with the soccer
association. Euton said it would increase the capacity of the fields allow more play
per week; still getting numbers from contractors and supplies irrigation delineate that
in more detail to make improvement.
Jolley said the South Stygler Road widening; think it is a should do; what is the
possibility of a grant and what is the likelihood, and is there any way to tie this into
being as a secondary conduit to the airport via Johnstown Road. Wetherholt said
the possibilities for the grant are normal for OPWC funding; does have a little bit of
an edge because when the airport came up with their NetJets expansion project, they
identified that segment right there having a critical nature so that gives it an extra
point or so; it competes with all the other projects always in competition in applying
for the grants in the district. Jolley said so is the process for that submitting the
application and seeing were we end up. Wetherholt said yes.
Wright said their is a traffic problem; driving today was terrible with traffic funneling in;
need to give the South Stygler Road widening project a higher priority. Angelou said
she definitely agrees.
Mayor said the GSA actually built and paid for the clubhouse facility that is out at
Headley; long standing relationship. Euton said GSA has already passed legislation
City of Gahanna Page 6
Committee of the Whole Meeting Minutes October 9, 2012
to allocate $50,000 for the irrigation system: have gone back to them to see if they
can make that $100,000.
Proprietary Funds - Larick asked Wetherholt if with the Farmwood Place Pilot project
there is a plan or intention or hope from the Administration if that does what it is
supposed to could that become a standard. Wetherholt said it is another tool; it could
become a standard tool for stormwater management; don't think it would totally
replace basins or other forms of open detention because at the higher level storms it
doesn't seem to do as much but it does for the lower; it also removes some of the
need for some of the higher volumes for the stormwater; also keep in mind that it is
not particular to cul de sacs; can be used in parking lots and at sag points in streets
and could work in conjunction with a basin. Larick said where I am going with this is
the point that this could be part of a more wholistic water process that is more
environmentally sound. Wetherholt said yes.
Angelou asked how many lift stations we have. Wetherholt said sanitary, I think it is
5; we just took 2 off line the beginning of this year. Angelou said are we looking into
those. Wetherholt said there is constantly a maintenance schedule; the only one that
has any kind of feasibility to take it off line is College Park and that would require
building the sewer that runs parallel to Price Rd; have kind of been working on that.
Angelou said that is the Price Road sewer construction. Wetherholt it is one phase
and then there would be another phase; it is very difficult to get in between the
houses to make it go over to the street to College Park; have to figure out a way to
get between those houses. Angelou said we have been getting a number of mobile
alerts about water main breaks; have gotten 3 lately; are their existing problems.
Franey said our number of breaks have not increased; we are using Code Red for
each one of the boil alerts that go out; it is assumed in 48 hours that the boil alert is
over unless you hear differently.
Jolley said to the Price Road sewer; about 22 parcels; what is the sewer hook up fee
that would be charged to each of these properties, is that something that they have to
do or would it be optional. Franey said any time we bring sewer in now they are
required to tie in; we are working on our second assessment with Council Office's
help we are getting good at setting up these assessments in order to help residents
spread it out over 20 years; we also only charge them the statutory $30 per foot plus
the capacity fees instead of a classic assessment where we could charge up to 98%
of the project. Jolley asked if this is something they will be required to do once we go
ahead with this project. Franey said yes. Renner said do you want to speak to what
drives those fees; think it is a good piece of information. Franey said a great deal of
the capacity fee goes to the City of Columbus; we have to forward that on to them;
other than that the capacity fees are used for ongoing maintenance; whatever you
believe is required to assist with the additional capacity that they bring on line; the
front footage would be to recoup some of the construction costs. Jolley asked what
average cost is to hook up. Franey said the capacity is around $5,000; front footage
at $30 can total up to $3,000. Renner said then you have to pay someone to connect
it. Franey said connection would about $2,500 to $2,800. Renner said how many
septic systems do we have in the City and what is the plan to get rid of them. Franey
said with the westside sewer we installed that knocked out one of the biggest and
worst areas. Andrako said one of the problems with that is if they are in the township
they could be within our general corporate boundary but they can't tie in unless they
annex and we cannot make them annex. Franey said 4 are in Gahanna that we are
getting ready to sewer on Johnstown Rd. Mayor said we can get that information to
you about all the unsewered areas.
Anderson asked about the Havens Corners Branch Sewers; estimated for 2015 cost
is $1,200,000; what would the longevity be. Andrako said we have not designed it
yet; very preliminary; storm reliever system; since we don't have flooding issues on a
City of Gahanna Page 7
Committee of the Whole Meeting Minutes October 9, 2012
yearly basis there. Franey said we take in about $1 million per year in the storm
water utility and we have to build up with funds to do a project; life of the storm sewer
is about 40 to 50 years.
Wright asked with this document is there something the Administration expects us to
adopt. Braun said nothing to be adopted right now this will be a working document
that continues to be updated based on our resident survey, Council feedback, the
Parks & Rec Master Plan; when we bring forth the appropriations this year we will
draw projects from this 5 year plan into the appropriations and continue to update
this; is an ongoing annual planning document. Mayor said the time when we are
doing the prioritization will actually be the appropriations; am interested to see how
you feel about this; looking for buy in on the document as well as the process.
Samuel said it is great document easy to show citizens. Jolley said the document is
fantastic; the only thing I would like to see is a spread sheet in the front that lists
everything together instead of being broken up into all the different sections; great
starting point. Larick said in some way, shape or form all of these are appropriate
projects going forward; challenge will be to identify how we can accomplish any small
portion of these. Wright said this is a good job; good basic jump start.
Donna L. Jernigan, MMC, Senior Deputy Clerk of Council, reporting.
City of Gahanna Page 8
Get email alerts for Gahanna
A daily email when new agendas and minutes are posted.