Committee of the Whole
Regular MeetingGahanna, OH · September 24, 2012
Minutes
Office of the Clerk of Council
City of Gahanna 200 South Hamilton Road
Gahanna, Ohio 43230
Meeting Minutes
Committee of the Whole
Stephen A. Renner, Chair
Beryl D. Anderson
Karen J. Angelou
Ryan P. Jolley
Brian D. Larick
David L. Samuel
Brandon Wright
Monday, September 24, 2012 7:00 PM Council Committee Rooms
Present 7 - Stephen A. Renner, Brandon Wright, Beryl Anderson, Karen J. Angelou,
Ryan P. Jolley, Brian D. Larick, and David L. Samuel
Additional Attendees:
Mayor Stinchcomb, Brandi Braun, Dottie Franey, Mike Andrako, Karl Wetherholt,
Chief Murphy, Lt. Williams, General Williams, Jennifer Teal, Joann Bury, Tony
Collins, Troy Euton, Anthony Jones, Isobel Sherwood, Brian Hoyt; Press.
ISSUE - From Previous Committee Night:
Noise
Renner called the meeting for Monday, September 24, 2012 to order; said the noise
issue discussion continues from a previous committee.
Mayor said the administration and Ewald met with Chief Murphy and Lt. Williams; we
talked about Council's comments and concerns as well as enforcement; Ewald
recommended changes and the Council Office Staff wrote them into the Code which
you have before you; the main 2 changes are we are removing the maximum peak
sound requirement and we removed the restriction of one citation per day; the penalty
section has changed; if there is a subsequent offense within 12 months of the first
offense it is changed to an unclassified misdemeanor with up to a $1000 fine or 500
hours of community service; this forced a change in a second piece of Code dealing
with penalties; any questions.
Angelou said can you explain maximum peak being taken out. Lt. Williams said the
maximum peak is usually attributed to an outside source; all locations have a
roadway nearby; the maximum peak is typically a vehicle with loud exhaust; when we
can't attribute it to the noise source, we can't prosecute on it; by removing it we can
focus on the 2 minute average; the previous Code change determining where we
take the reading has helped; that removes outside noise sources; we can now
attribute the noise reading we get to the noise source.
Jolley said I agree with removing the maximum peak; my questions are why are we
not changing the times from 10 PM to 9 PM from Sunday through Thursday; the folks
disturbed are people going to work or school and who need sleep; this was a
compromise we came up with where we would allow louder thresholds on the
weekend in exchange for lower ones through the week; believe 9 PM cutoff would be
appropriate.
City of Gahanna Page 1
Committee of the Whole Meeting Minutes September 24, 2012
Lt. Williams said this was discussed at length; don't go strictly by it; a band may be in
the middle of a set so there is some leeway always; the more changes we make the
more difficult it is for us but does not prevent enforcing; field officers would have to
have charts with them; with the changes already in place it is working well; we have
issued a couple of citations and plan to go to court on one; it is end of season so we
would like some time to see if the changes we have made provided remedy. Mayor
said we took into consideration that we have establishments that do have
entertainment on Wednesday and Thursday nights which is something for you to
consider; we could possibly have problems from them; it is Council's decision, but we
felt that changing the times and the db levels was a lot at once; as I stated 2 weeks
ago, we feel we should make some conservative changes now and we can always
revisit it. Jolley said the only change I would make is everything that says 10 PM
would go to 9 PM; agree we have bands through the week, but for folks trying to
sleep, particularly students, we should not be adding to that burden; trade off is
continue to have the economic activity but be sensitive to folks who need to wind
down; agree with removing peak and believe that is warranted; my other question is
why do we have an 11 PM cutoff time for Olde Gahanna through the week. Lt.
Williams said that has been in place for a long time; with the outdoor stage right
behind what used to be Buck Mulligans, there was the anticipation of activity at a
higher level; only residences near there were the condos and the Creek makes a nice
buffer; plus there are a number of City events down there. Jolley said we are adding
an exemption for City Events. Mayor said we did not recommend that.
Wright said I did not realize Olde Gahanna had a different time throughout the week;
I think we should look at that and make sure Olde Gahanna is included with the rest
of it; I do not see a problem with the Sunday through Thursday end time of 9 PM; I
would also like to see exemptions put in for the City and School events.
Anderson said I would speak in favor of the 9 PM cutoff time; bands can tone down;
children need 10 hours of sleep; it is a balance, but after hearing the testimony and
reading the correspondence, even though we respect our businesses, I would
support our residents; I would be in favor of 10 PM for Olde Gahanna. Mayor said if
you would look at the current ordinance, section 559.04, special provisions, A3
exemptions, there is already an exemption for permitted events; not just the City as
we live by our rules. Angelou said do we get a permit when we have an event. Mayor
said sometimes. Angelou said we may have to start doing that always.
Samuel said I am in favor of 9 PM for Sunday through Thursday; our number one
goal is the health and welfare of our citizens; the sleep issue is important.
Renner said can we clarify the area included as Olde Gahanna. Braun said it is a
mixed use area that includes Creekside; we left the noise level higher because we
were trying to create an atmosphere of an entertainment district; people who live
there understand the mixed use environment and anticipated it would be lively.
Sherwood displayed the area on a map.
Larick said I am fine with 9 PM; for the exemption, is there concern over requiring a
permit. Angelou said I think requiring a permit is a good thing. Jolley said now
schools would need one every week for their football game. Mayor said I would be
concerned about that. Jolley said there are not a lot of City and School events, even
though it may not be a big deal, I think it is sensible to exempt our own events that
are known to the community. Larick said so is there consensus that we do not require
a permit. Jolley said I think we could have both. Anderson said the permit would not
have to be one at time; could be for multiple events. Angelou said I think that will
cause confusion; do you need a permit or not; I do not think City or School events
should be required to have a permit. Mayor said the City Attorney is not here tonight; I
think we would have to change 559.04 so there is not conflicting language. Angelou
said should only have to get a permit if it is a private event. Mayor said we could
make these changes and give it first reading next week; I am concerned about the
language and would like to get the City Attorney to review it and he is not back until
Monday. Sherwood said I can make the changes, have the administration look at it
and send it to Ewald; it may have to have changes after first reading; so first reading
City of Gahanna Page 2
Committee of the Whole Meeting Minutes September 24, 2012
and back to committee; Sherwood said I need one clarification; Ewald had sent
language on the exemption for the City that never got incorporated; my concern
about this is saying Gahanna City Schools because we have private schools with the
same activities. Mayor said he talked about adding this; I think we need to replace.
Sherwood said I will change that to local; I will submit the changes and put it on for
first reading for next Monday.
Jolley said he believed we could add it to Code 559.04 as a new section A4.
Wright said I still think the cutoff time for Olde Gahanna should be 9 PM; should be
same as the rest of the City; incorporated in this district is Coaches which is one of
the problems. Renner said he thought that is what we are going to do. Jolley said I
think it should be 9 PM; I know we are trying to promote the area to young
professionals who want outdoor entertainment; but the trade off is Sunday through
Thursday it is earlier; Friday and Saturday it is later; there are a lot of homes right
there. Angelou said music doesn't have stop, just turned down.
Wright said I have another issue; there are such differences in measurements; police
reports differ greatly from what residents email us; what is the reason for that
discrepancy. Lt. Williams said they were using "fast waiting" measurements as
opposed to "slow waiting"; that increases peak readings; over time that increases
your average; I have done readings with both A and C settings and there is a
consistent difference; if you look at jurisdictions that use the C readings they are 10
to 15 db higher typically; it is the way the meter is being set up. Angelou said so if you
are working with 2 different gauges they are not going to be exactly the same. Lt.
Williams said the meters would have to be set up exactly the same; Kneeland
brought in some very expensive equipment and our meters were exactly on par with
it.
Anderson said so we are going to make the change to 9 PM even for Olde Gahanna.
Larick said yes. Anderson said for block parties, a permit is needed only if the street
will be blocked off. Mayor said correct. Anderson said they may not know that; I just
want to make sure that gets out there. Mayor said remember most of our calls are
about loud neighbors.
Jolley said about measurement speed, is there a consistency among other
jurisdictions about using fast versus slow; I have asked Ewald to purchase the ASTM
Guide for Measuring Outdoor Sound, another document we can reference; the
question is what standards do we want to use. Lt. Williams said most jurisdictions
use the slow setting because it replicates the human ear; that is what we have
adopted. Jolley said that makes sense.
Recommendation; 1st Reading, Back to Committee.
ISSUE - From Director of Parks & Recreation:
Supp. App. - Parks Maintenance, Creekside
Collins said I put the requested funds and amounts in my report; we would like to
establish a cost accountable method for the maintenance and management of the
Creekside Park and Plaza area; with a number of projects coming, we would like to
track those expenses; we talked to Teal and she helped us find the best method; we
have put the funds into the Creekside account that already exists; timing is right since
there is now a revenue source to match up to expenses; happy to answer questions;
general request for labor and supplies for daily maintenance.
Larick said is this for the remainder of 2012. Collins said correct; big thing for us here
is going from a function based management system to a zone based management
system; we would like this part time person to become the day to day coordinator with
Strathmore as well as our person to handle the day to day labor there.
Angelou said how were ongoing maintenance issues like water dripping handled
before the foreclosure and then after that because the park was our City
City of Gahanna Page 3
Committee of the Whole Meeting Minutes September 24, 2012
responsibility. Collins said it has always been accounted for in Parks Management;
we accounted for what was needed in our Parks requests; the challenge to that,
combined with everything we manage, means we are not able to get a true
accounting of that center; it has so many more specialty maintenance requirements;
this will be a better tool; we have always maintained it; the only difference is the zone
based approach. Angelou said she agrees with that; need a view of everything done
at Creekside; was there ongoing maintenance. Collins said absolutely; we have had
staff down there 7 days a week working on custodial and maintenance projects since
day one in 1999; it has always just been shown under Parks costs in the Parks
General Budget.
Samuel asked do you have a dedicated staff down there. Collins said if you go down
there you will see the same faces; like one of our best staff members is usually down
there, but he is pulled off once or twice a week to work on specific projects where he
would be needed; like in the Spring which is a huge time for us so he was pulled off
to paint the pool; never had one person where that was their sole job whereas the
past 6 months we have had staff dedicated to Headley/Hannah. Samuel said do you
do a weekly walk through where someone goes through and looks for problems.
Collins said because of the nature and type of site and the traffic it gets, we do have
more staff there than any other Park we operate; someone is there every day.
Samuel asked does that include the trails to the golf course. Collins said yes; the
whole area.
Larick said this is a supplemental for 2012; what is the expectation for 2013. Collins
said we are working with Teal to include it the appropriations for 2013 and revise our
request for 2013; we will make this a year round amount; I just reached out to Euton
and the Parks superintendent to look at a full year of supplies, contracts and those
types of things.
Angelou said what kind of winter plans and preparations need to be made for things
like shoveling. Collins said it is pretty intense because we have 24 residents there
now; we do a lot of snow removal, winterization of the pumps and water lines, putting
up Holiday Lights and making it a destination; we were one of the top 3 in Ohio for
that lighting; we have focused on 6:30 AM to 10:30 PM; we have a specific plan; it
deals with the garage and walkways; challenging site because it is all hard surface;
use brine or salt but we have to be careful not to damage; a lot of labor. Angelou said
was damage done from using the wrong substances. Collins said that is a matter of
interpretation; our staff has worked closely with experts to determine what the best
material is; we have been told that our materials may have caused some damage; we
believe it could be that inferior materials were used; it is a lot of work in the winter; we
are hoping to work with the developer to create a winter maintenance plan.
Wright said if we go with the zone based plan, can we expect to see in 2013 that a lot
of maintenance issues will be addressed. Collins said some of the things you referred
to in email are construction related and are repair rather than maintenance; this is
just so we can do routine items on our punch list like remove cob webs and graffiti;
we previously did not have the staff so this is an attempt to have a dedicated person
with the punch list all the time; and to improve our communication with Strathmore
since we as management can't be there every day; this is a higher level person to
communicate with the residents and developer.
Mayor said a few years ago when the economy hit bottom, Parks took the biggest
cuts; we are thin; the Slavin study was done last week, and she was very concerned;
this is an attempt to try to get the level back to where we need to be. Collins said we
are seeing a new energy and excitement at Creekside; we did have to scale back
and just survive; now that we received some revenue from the property transfer, it
deserves a higher level of attention; we need to give it that for the tenants and
businesses there; that is why we are switching gears and the revenue source makes
it possible.
Anderson said I think this is a good idea; share that there is a wealth of civic and
community organizations that are looking for ways to be of service; I always tell them
to call you or the Mayor. Collins said we do use volunteers in scouting and from
City of Gahanna Page 4
Committee of the Whole Meeting Minutes September 24, 2012
corporations on a routine basis; that still requires an exceptional amount of staff time;
every group needs tools, coordination, a job to do, clean up; we have a goal to create
friends organizations to have them take care of their own front entry ways and local
parks. Anderson said my goal was to let you know they are there. Angelou said this is
not just residents but businesses as well; this is good idea; Creekside is the
destination in Gahanna; hope the new owner will bring in the types of businesses that
will attract tourists.
Recommendation; 1st Reading, no need to come back; 2nd Reading, Consent
Agenda.
ISSUE - From Council Office:
Appointment - Community Reinvestment Area Housing Council
Sherwood said on Friday I sent a report that provided the history of that board;
Council has 2 appointments to that board and 1 term is up this year and that is Tom
Weber; asked Larick did he contact Weber. Larick said he did not. Sherwood said I
will contact him tomorrow if you are interested in reappointing him; Maurice Jones'
term is not up until next year. Samuel said any connection between this term and
Weber as City Attorney. Sherwood said no; if Weber agrees, we will do a Motion
Resolution on consent agenda.
Recommendation; Motion Resolution, Consent Agenda.
ISSUE - From Mayor's Office:
5 Year Capital Needs Assessment
Renner said what I plan to do is go tab by tab; last April the Administration provided a
Community Reinvestment Plan; that included a list of projects and funds; does this
binder on 5 Year Capital Needs replace that, or do we have 2 places to look. Braun
said the goal is 1; the Community Reinvestment Plan was more short term where this
will cover 5 years. Mayor said the 2013 projects even if funded by last year's CIP are
in here, correct. Braun said if we have already appropriated money for something it is
not in this; this is new stuff. Teal said there are overlaps; many projects that require
operating capital were included; they are in the first section as ongoing annual
requirements; you see the 2013 captured in the binder; from my standpoint I do not
want multiple lists so it will all be consolidated. Larick said for discussion it is this
book and nothing else. Teal said we can designate which items are in here and were
also in Community Reinvestment. Mayor said some are noted already; great idea to
have it all in the book.
Angelou said I asked for an addendum of projects. Braun said we are working on
that.
Jolley said there is 60 million in projects in here; what is the focus; what are we trying
to get out of this conversation; funding is supposed to be down the road. Braun said
we did the rankings as a group without talking about money; so my goal is to answer
Council's questions on the projects, the priority rankings; at the end of this we may be
making changes like moving an item up in priority; need to build consensus as a City
on what is in here so we can take it to the public and turn it into the actual Capital
Improvement Plan (CIP) that drives funding. Mayor said this is a list by priority; we do
City of Gahanna Page 5
Committee of the Whole Meeting Minutes September 24, 2012
not currently have the money to make all this happen; this is engaging you and the
community to determine revenue sources or determine what we can live without; not
going to get done tonight; we are doing the survey and will continue to gather
information to determine what will be in the CIP and then look at what it costs and
how we fund it.
Samuel asked how did you come up with costs and did you consider inflation. Braun
said costs were determined different ways depending on the scope and intensity of
the project; we used similar models and historical data; the project also determined
whether inflation was included; routine items like operating capital included increases.
Angelou said this is a wish list for when the money would become available. Braun
said it is a planning document; at appropriations we would look at the CIP and build
some of them into the appropriations; then we would update the CIP and it would
continue to cycle. Angelou said this passes for only 1 year even though it is a 5 year
plan. Mayor said yes. Angelou said wouldn't it be helpful to wait on the survey. Mayor
said we need to start the dialogue; the survey will be back in a few weeks; hope is
they will all come together for appropriations. Braun said the process is just as
important; new concept doing a 5 year CIP; new definitions; this all needs to be
talked through to set the foundation.
Wright said since it is a planning document, need to make sure departments
understand we are not gunning for them; this is what we think and we need to be free
to change and understand the priorities to pass this. Mayor said it is not something
we need to pass. Angelou said I think we need to adopt this as a resolution.
Larick said it is a good step forward in looking into the future of where we need to be;
my focus is always on the financials; is it a net addition or where are the resources if
it is permanent; as we get into appropriations this all ties together and becomes one
process; we need to understand perpetuity; an example is the asphalt overlay; there
is a million dollars that has been identified as the ongoing number; looking at detail
there is 121 miles of road; based on historical costs for doing 3.23 miles per year,
that is 35 years to cycle through all the roads that have an expected life of 25 years;
roughly means in year 25 you have roads that are 25 years old and can't be funded
for another 10 years; from an operational and perpetuity standpoint, this looks like the
million one should be a million six for that line item in order to keep roads on a 25
year cycle. Renner said this is an example; you have identified this for many of the
items we are talking about tonight. Larick said yes and I don't need this answered
tonight; the sustainability piece is critical especially for the operational pieces; needs
to be reflected as allowing us to maintain without falling behind.
Angelou said plus there are always new technologies; what you are trying to get to is
this perfect replacement schedule, but there will always be variables. Jolley said
Larick is trying to get at sustainability; how do we see on paper that this is
sustainable. Mayor said sustainability is a big part of what we did; we picked 5 years
for a reason; as you get further out the outlook gets foggier; the planning horizon is
somewhat limited and this is realistic; if it is carried out, we will continue this process
and it will always look at 5 years out.
Renner said the first tab is operating capital; crucial tab because it is a fundamental
shift in the way the budget has been handled; not going page by page; are there
questions.
Samuel said for the golf cart replacement program; are you purchasing gas or
electric, what are the prices; what is the most efficient way to operate golf carts.
Euton said have not done those comparisons; this is looking a place holder in order
to provide replacements; we were paying about $20,000 to lease; in 2010 we
City of Gahanna Page 6
Committee of the Whole Meeting Minutes September 24, 2012
purchased them; they last about 8 to 10 years; think we are better off owning; down
the road when we are ready to purchase we will make the necessary analysis.
Renner said I like the chart with the amount separated out and showing on the
second line the general fund portion; speak to the funding differences. Braun said
some things are grants; the streets fund for example has revenue coming in from
different sources like the gas tax.
Jolley said the Police radio replacement program; it is $144 per radio each year for
maintenance; for 120 radios that is $17,000; that is 25% of the outlay; are we getting
value out of that maintenance program. Chief Murphy said absolutely; purchased in
2009 and have had 2 in for maintenance; soon will have to start rotating these
because of the abuse they receive; we don't have the transmitter or computer; that is
on somebody else so yes we are getting our bang for the buck. Jolley said so this is
not just maintenance that fixes them; it is maintaining the entire MARCS system.
Wright said we passed additional radio maintenance in Parks Committee; is that
accounted for here. Chief Murphy said he would have to check with Lt. Spence for an
answer.
Mayor said many people worked on this; we will take notes and write back to you on
those responses we are checking.
Renner said on streets replacement, knowing how expensive the specialty equipment
is, are these dollars for a specific vehicle. Franey said we have tried to spread out the
expensive equipment over the years; large plows are one per year; specifically for
2013 it is big dollar items; a plow and possible bucket truck; will have to fit in with the
equipment replacement program; hope would be they would be funded through the
Streets fund; it is possible the General fund will have to support it.
Anderson said for street lights, $20,000 is appropriated; is that used every year; is
any of it carried over; where did that amount come from. Franey said that amount
was made up years ago; pretty much what we thought would cover the project; if it is
not used it goes back into the General fund; it is available if we get a request.
Anderson said does one cost this. Franey said if power is there, $20,000 will do 3; if
we run power it covers 1.
Mayor said the street light answer was written today; goal is not to light every
intersection; some people don't want them; if we get a request then we use the
money for that. Anderson said how do you prioritize if you get multiple requests.
Franey said we set up a program; get together with Police; determine who needs the
lights the most; anticipated a flood of requests; never been that many and we have
always had enough to cover requests.
Renner said next Tab; Priority 1 Capital Projects.
Angelou said the Carpenter Road/Shepard Street signal upgrade, couldn't that have
been covered under the Safe Routes to Schools Program. Andrako said we did
receive funding for Jefferson Elementary School from the program; they do a walk
audit and make their recommendations based on it; they did not find this one; it is
right in front of the school and there is no pedestrian signal; the signal does not meet
qualifications to be a "warranted" signal so we would have to take it down or not get
funding for it; they would not provide the funding through this federal program; happy
leaving it the way it is. Angelou asked does being an "unwarranted" signal create
legal difficulties. Andrako said no; that is a guideline for the City; we are not libel; left
in flash mode most of day; operates during school times and provides some utility;
does need pedestrian lights.
Samuel said can you tell us about the Creekside Park repairs; what is destructive
City of Gahanna Page 7
Committee of the Whole Meeting Minutes September 24, 2012
testing. Collins said there is a long list of items that we would like to begin repairing;
steps, lighting, materials issues; we have a punch list to work on in priority order;
difficult to move forward on certain ones without knowing what it takes to fix it
correctly; some cases need to take things apart to see what needs to be done; do our
best to minimize the impact on the park; once completed we will create a plan to go
forward; working closely with Service to get started this year.
Angelou said the Morse Road Columbus project is shown just as an enhancement;
reason it is not more. Wetherholt said it falls into the guidelines for an enhancement;
there is an existing roadway there and this project changes it from 2 lanes to 3.
Angelou said I think it is more than an enhancement because of the traffic there; will
there be a bottleneck. Wetherholt said this project goes from the roundabout with 3
lanes up to Trellis/Underwood Farms signal; the original project did not go that far;
we have been trying to get Columbus for the last 8 years to pay attention to this
section of road; their response is it is TIF funding on their development area; their tax
increase to make the TIF work has not yielded enough money to do that; has yielded
enough to do a portion; Gahanna is adding a small amount of money and continuing
to the intersection. Angelou said the area between Hamilton Road and that goes from
4 lanes down to 2 then would go out to 3; I asked before what would it take to
continue it. Wetherholt said it was a lot of money. Andrako said this has a Phase 1
and 2; that would be in Phase 2; it was millions of dollars. Wetherholt said it has no
date because they can't predict the growth of the TIF. Angelou said I am concerned
about the growth and the bottleneck. Wetherholt said we have to pay for it or wait for
Columbus. Jolley said I agree with Angelou; are there any cost savings to be realized
in ramping up and down to do this as one project instead of two. Wetherholt said
probably; more than nothing and less than 10%. Jolley said what if we would only
widen the Gahanna side of the road. Wetherholt said it would be the same; over a
million dollars no matter who does it. Angelou said what about the culvert. Wetherholt
said the culvert is on the section we are looking at in the current project.
Larick said in this section there are a couple of items on pools; also in the next
section; prudent to do an assessment of the pools for an overall plan of what we want
to do with the pools. Collins said the next step is a feasibility study; looks at what we
have, what the demands and costs and potential revenues are; we wanted to get the
Parks Master Plan done and have that step us into a feasibility study. Larick said
what is the likelihood of getting that done before we have to put money into the
Gahanna Swim Club. Collins said don't know; staff will use everything they have to
preserve the Swim Club this winter; don't know what will happen over winter; nice to
have the study in place by Spring; don't know if that pool will operate next Spring;
reality is a feasibly study and a plan for a new pool will take time and the earliest is
2014.
Samuel said isn't the Swim Club the most used. Collins said absolutely; membership
numbers include both pools and is at 4500. Samuel said why is it a priority 2 rather
than a 1; the front pool and facilities are a disgrace. Collins said I agree with you, but
the health safety and welfare of the City would not be affected if the pool closed; that
is why it is a 2; there was additional discussion on the newer pool located there and
the issues associated with if it could safely remain open. Angelou said the money
shown here then is for an aquatic center. Collins said yes for an aquatic complex; the
building, rest rooms and whatever pool winds up being recommended; the number
used is an average based on what nearby communities have recently spent. Jolley
said to clarify, it would take closing the pool down for an entire season in order to
rebuild the front pool. Collins said we don't know that; we have not sat down and
looked at a plan; Westerville did almost the same thing and it took 11 months but
they have done very well the last 2 seasons.
Angelou said the Mill Race Bridge has erosion due to high water; would concrete as
City of Gahanna Page 8
Committee of the Whole Meeting Minutes September 24, 2012
proposed originally been a solution for this. Collins said depends on how it would
have been designed if the concrete went up the banks or not; we have talked about
cleaning it out and adding concrete as a base; when you put a park in the middle of
moving water, it is always going to need this; the erosion is going to happen and we
will have to continually plan for it; it is an investment that has paid off. Euton said the
natural habitat is more economical and more sustainable than a concrete channel
would be; the concrete would not last forever either; this bridge is a different class
from what is there today.
Renner said next is priority 2 capital projects.
Angelou said would these proposed lights into Academy Park be better than what is
there already. Collins said absolutely; we have been working to become more
neighbor friendly; like installing additional parking or screening so the impact of the
park is not so severe; has paid off; current lights were donated and cause a lot of
light pollution; new lighting designed to be more efficient and give us better control;
have timer controls and can we can track costs to pass on to users.
Jolley said would like to discuss signage in general; coming off 670; do we have any
plans to make a statement to that main entrance to Gahanna. Jones said we have
had plans in the past with Bird Houk now OHM to have Citywide gateway entry
features which we have seen happen on Hamilton Road; scaled back because of the
number of community entryways we have; this request is for the OCT district
because we can identify a funding stream for this site; it is a priority for my
department as we can identify funding streams; like coming in Johnstown Road when
you reach Gahanna where Niagara will be located we want to make sure people
know that. Jolley said would like us to keep in mind what it looks like when you come
into town; would like to keep it uniform and professional. Mayor said we have
beautiful plans on the shelf; trying to implement them comes down to funding;
welcome to come in and look at them.
Larick said there are several items in here that refer to the Capital Improvement
Fund; is that money that has already been put in place; general question but for items
Buckles Tract infrastructure improvement, Carpenter Road culvert replacement,
Central Park infrastructure, Detroit Street rebuild, and fiber optic expansion Phase 2.
Franey said many are on the CIP. Teal said if they are on the CIP and the transfer of
funds already took place, that is where those would be reflected; hope what ever we
fund year to year, if it is accounted for in Capital improvements we would move the
money into that fund so we can get a grasp on what those costs are; looking at the
concept of General Government activities versus proprietary activities.
Angelou said I have a question back in Priority 1; the Hamilton Road central which is
Carpenter Road to US 62; it is the largest project in the book; $180,000 for the
design; then it is $520,000 and it will be done in 2016; are the plans done for this.
Wetherholt said ODOT has plans in phase 1 design; we are within months of having
a more detailed estimate where you can see the impact on individual properties; start
to develop right of way purchases; starting to look like plans we can look at and
understand. Angelou said back in 1996 we as a City said it should remain residential
area; felt 4 lanes would not do that; do we have any say on this. Wetherholt said we
have had our say and have told them what it is going to be; we spent 10 years on the
questions; had public involvement meetings and studies; the county engineer is
participating in this with us; he was roasted for not studying the 3 lane option; most of
the complaints involving residents was about what was going to happen on the west
side of Hamilton Road; that property was bought by Stonehenge Company; they
planed to turn it into multifamily; residents said ok since it is not commercial; did not
want big box stores; made the proposed roadway acceptable; additionally about 1/3
of the area was purchased by the City of Gahanna; now is park property with a
City of Gahanna Page 9
Committee of the Whole Meeting Minutes September 24, 2012
retention basin; the area will probably stay single or multifamily residential; medians
don't work here because it is not a long stretch of road; only work if it is no left turn;
we can accommodate that with roundabouts on either end; so everyone liked the 5
lanes then best and we received federal funding so this is what we are going with.
Jolley said don't we still have roundabouts in the design. Wetherholt said yes we do;
at Clark State there would have been back up over the bridge; so that would have
had to be replaced; the roundabout has a higher through put, less congestion, less
delay, than signalizing the intersection; for moving the traffic the roundabout works
better; the one at the Northeast School has several purposes; enables them to exit
their buses in all directions, and controls the ingress and egress for the west side
when it is developed; it is also a traffic calming device. Jolley said what about
Carpenter Road. Wetherholt said there are special provisions for it to come out; there
will be a wider lane for them to pull out into the roundabout; it is incorporated as best
it can be. Angelou asked the size of the roundabouts. Andrako said this is a double
lane roundabout.
Renner said we have had good dialogue; can stop for tonight and we will pick up the
discussion at the next committee meeting.
Wright said we need a cut off time for emails. Mayor said no later than Wednesday,
October 3 so we can respond; Braun will be the contact point.
Recommendation: Return to Committee of the Whole on October 9.
Meeting Adjourned.
Della Brandenberger, Reporting
City of Gahanna Page 10