Groundwater Sustainability Agency
Regular MeetingGreenfield, CA · October 28, 2024
Agenda
Forebay Subbasin Implementation Committee Regular Meeting
Agenda
October 28, 2024
1:00 PM
Greenfield Council Chambers
599 El Camino Real
Greenfield, CA
Committee Members Bramers, Frahm, Lohr, McIntyre, Moss, Panziera, Rice, Smith, Wood
The meeting is conducted in a hybrid setting. Public participation is encouraged, members of the
public may attend in person, remotely through this link: https://us02web.zoom.us/j/89614518719
(passcode: 2020 if prompted) or by phone: (669) 900-6833. Meeting ID 896 1451 8719.
Participation in the Meeting
The public has opportunities to make comments throughout the meeting. To comment online, use
the raise hand option, by phone press *9. If experiencing technical difficulties online, consider
joining the meeting via phone. Written comments on agenda items may be emailed to
clerk@svbgsa.org prior to the meeting and will be included in the public record.
Remote public participation is for convenience only and not required by law. If the remote
connection offered via Zoom link or by phone fails for any reason, the meeting may be paused
while a fix is attempted, and the meeting may continue at the discretion of the Committee Chair.
1. Convene
1.1 Call to Order and Roll Call
1.2 Committee Member and Staff Introductions
1.3 Appointment of Committee Chair and Vice Chair
1.4 Appointment of Representative to Advisory Committee
1.5 Additions or Deletions to the Agenda
1.6 Public Comments
1
2. Presentations
2.1 Groundwater Quality Trend Network for Ag Order (Preservation, Inc.)
Presentation Preliminary Salinas Valley GQTM Network
3. Business
3.1 Minutes of the Committee July 2024 Regular Meeting
Recommendation: Approve minutes of the Forebay Subbasin Implementation Committee
July 22, 2024, meeting.
Minutes Forebay SBC 2024-07-22
3.2 Forebay Subbasin Implementation Committee 2025 Schedule.
Recommendation: Review Committee schedule for 2025 and discuss any necessary
changes.
- January 27, 2025
- April 28, 2025
- July 28, 2025
- October 27, 2025
4. Discussion
4.1 Request for Aquifer Properties Test Wells
Aquifer Test Wells Request
5. Informational
5.1 Well Registration and GEMS Expansion Update
6. Staff Reports
6.1 Update on Arroyo Seco Cone Management Area Domestic Water Quality Investigation
6.2 SMC TAC Update
Presentation SMCTAC Update
Summary SMCTAC 2024-08-20
6.3 Update on Salinas Valley Hydraulic Models (HEC-RAS)
6.4 Forebay Subbasin Work Plan FY 2024 Status Update June 2024
Work Plan Status FY 2024 Q4 Forebay
7. Committee Members' Reports
8. Future Items
- City of Soledad: Recycled Water Conveyance Project Updated
- WY2024 Annual Report Narrative on Progress Toward Implementation and Sustainability
Strategy.
- WY2024 Annual Report Narrative on Conditions
9. Adjourn
The next regular meeting of the Forebay Subbasin Implementation Committee is scheduled for
2
January 27 2025.
Accommodations under the Americans with Disability Act (ADA)
Pursuant to the ADA, any person in need of any type of special equipment, assistance or
accommodations in order to effectively participate at this meeting is asked to make a request to
clerk@svbgsa.org or 831-471-7512 no later than 5 p.m. two business days prior to the meeting.
Agenda Posting
The agenda was posted on October 25, 2024, at Greenfield City Hall at 599 El Camino Real,
Greenfield, CA.
In accordance with AB 2647, the agenda packet is available at the meeting location
3
Preliminary Salinas Valley
GQTM Network
Caveat: This workplan has not been approved by the Regional Board
and thus is subject to change
4
Study Area
• Study area:
• Phase 1 area
(spans Forebay
and Upper
Valley aquifers)
• Remainder of
Forebay aquifer
• 191 square
miles
5
Land Use
• Ag Order focuses on agricultural
areas only
• Truck crops and Vineyards
dominate study area
• Differences in crops do not
impact design of network
because cropping patterns
change
• Monitoring wells placed in
agricultural areas only
6
Water Levels
• Water levels have been stable
over the long term
• Fluctuations observed during
extended drought periods
7
Target Depth Zone
• Ag Order specifies GQTM network wells should target “first
encountered or shallow” groundwater
• Review of geology and hydrogeology indicates variability in the
occurrence and depth extents of the 180-foot and 400-foot aquifers
• Target depth for monitoring wells is 200 ft bgs
• Stable water levels
• Inclusion of SGMA wells in network
• Target shallow groundwater
8
Monitoring Area
• Ag Order requires the GQTM
Workplan must be designed to
“quantitatively evaluate
groundwater quality trends and
quantitatively assess the impacts
of agricultural discharges on
groundwater quality over time”
• Monitoring area covers all
agricultural areas
9
Candidate Wells
• Datasets analyzed:
• GSP wells
• OSCWR wells
• Preservation Inc wells
• Wells were required to have
construction information and
well depth had to be within
target depth zone
• 34 total candidate wells were
considered for selection
10
Network Wells
• 19 total wells selected
• Wells are spatially distributed
across monitoring area
• All wells subject to annual
monitoring frequency
• Well vetting will be conducted
by Preservation Inc.
• Constituents to be sampled are
dictated by Ag Order
11
l
Foebay Subbasin Implementation Committee Regular Meeting
Minutes
July 22, 2024, at 1:00 P.M.
Greenfield Council Chambers, 599 El Camino Real, Greenfield, CA.
1. CONVENE
1.1 Call to Order and Roll Call
Chair McIntyre called the meeting to order at 1:00 P.M.
Committee Members present:
J. Bramers, T. Frahm, S. McIntyre, M. Moss, A. Panziera, B. Rice, J. Smith,
P. Wood
Committee Members absent:
J. Lohr
J. Crank and K. Nunes participated as public members.
Staff:
M. Alvarez, E. Gardner, P. Harmon
Others: A. Ostovar. C. Weeks, V. Hermosilla
1.2 Additions or Deletions to the Agenda
None.
1.3 Public Comment
Public comment was received.
2. PRESENTATIONS
2.1 Forebay Aquifer Subbasin Hydrogeologic Conceptual Model Updates
E. Gardner introduced the item and V. Hermosilla provided a presentation of the Aquifer
Subbasin Hydrogeologic Conceptual Model (HCM) updates for the Forebay Subbasin,
including an overview of new data and information incorporated into the model. V.
Hermosilla and A. Ostovar answered questions from the Committee and the public.
3. BUSINESS
12
3.1 Minutes of the Committee April 2024, Regular Meeting
Chair McIntyre introduced the item. E. Gardner answered questions from the Committee
MOTION: Frahm/Smith to approve the April 22, 2024, regular meeting minutes with
the amendment on item 4.1 WY2023 Annual Report. By consensus, the
Committee agreed to have the reservoir release information be included
together with the precipitation to analyze water and groundwater
storage changes and trends.
AYES: Bramers, Frahm, McIntyre, Moss, Panziera, Rice, Smith, Wood
NOES: None
ABSTAIN: None
ABSENT: Crank, Lohr, Nunes
4. DISCUSSION
4.1 Review and Provide Input on Sustainability Strategy.
E. Gardner presented the item with the assistance of C. Weeks. E. Gardner informed the
Committee of the working plan process and progress for implementation in the Forebay
Subbasin. E. Gardner and C. Weeks answered questions from the Committee and
public.
5. INFORMATIONAL
5.1 Subbasin Implementation Committee Program and Application
E. Gardner informed the Committee members of the Subbasin Implementation
Committee Program that an application process is underway. Committee members
should reapply by August 20, 2024, if they would like to continue to another term. E.
Gardner answered questions from the Committee.
6. STAFF REPORTS
None.
7. COMMITTEE MEMBERS’ REPORTS
None.
8. FUTURE ITEMS
E. Gardner answered questions from the Committee regarding future agenda items.
13
9. ADJOURN
Chair McIntyre adjourned the meeting at 2:40 P.M.
APPROVED BY:
Steve McIntyre, Chair Date
ATTEST:
Merida Alvarez, Secretary Date
14
Wells for
aquifer test
• Screen interval depth
within 200-700 ft
• Could be monitored
for groundwater
levels
• Ideally, has a
sounding port and
tube (PVC pipe)
15
Sustainable Management Criteria
Technical Advisory Committee
Update
Forebay 10/28/24
16
Summary
• Convened April 10, 2024
• Special meeting August 20, 2024
• Next special meeting scheduled for November 20, 2024
Discussion Topics To Date:
• Administrative
• SMC TAC Role, Goals and Guiding Principles
• Forebay Aquifer and Upper Valley Aquifer Sustainable Management Criteria,
Current Conditions and Hydrogeologic Conceptual Models
• Data needs / Data sharing platform
• Action Levels (Starting with Groundwater Elevation)
17
Guiding Principles:
SGMA Implementation Forebay & Upper Valley
SMC TAC Description:
• Technical committee that reviews groundwater conditions and provides science-based advice on
management actions & projects to Subbasin Committees and Boards.
• Considers the Forebay Aquifer and Upper Valley Aquifer Subbasins independently.
• Develops Action Levels for when and what Projects and Management Actions should be activated
• Support the goals of the Forebay and Upper Valley GSPs.
• Consider conditions and water users throughout the Salinas River watershed but focus on actions
and benefits in the Forebay and Upper Valley Subbasins.
• Accept and consider input from all stakeholders.
• Base decisions on best available data and scientific principles.
• Strive to balance benefits, uncertainty and cost in our recommendations.
• Reach decisions by consensus to the extent possible, with opportunity for individual members to
include alternative opinions in our communications to the Subbasin Committees.
18
Decision Making Process:
SGMA Implementation Forebay & Upper Valley
How does the SMC TAC arrive at recommendations?
• Strive for consensus
• Remain efficient and effective
• If needed, document various differing perspectives to share with Subbasin Committees
19
Action Levels:
SGMA Implementation Forebay & Upper Valley
Short-Term Groundwater Elevation Action Levels: Excessive declines during
successive years without conservation releases.
• How are these defined? What occurs when action level is met?
Long-Term Groundwater Elevation Action Level: Excessive declines over many
years without conservation releases
• What data and analysis is needed to compare future annual conditions in the
context of long-term groundwater elevation trends?
Initial ideas summarized, but still under development. A recommended approach
will be presented to Subbasin Committee in the future.
20
Thank you!
Questions or Comments?
21
Guiding Principles:
SGMA Implementation Forebay & Upper Valley
SGMA Compliance:
• GSP and Annual Reports must demonstrate that groundwater management will not only
avoid undesirable results, but will enable the Subbasin to be at the measurable objectives by
2042
• Addresses long-term groundwater sustainability, under average hydrogeologic conditions,
with long, term and deliberate groundwater management.
Droughts and Climate Change:
• Required to manage so groundwater levels recover after droughts
• Anticipate climate change
• Plan for uncertainty with adaptive management
22
On August 20, 2024, the SMC TAC met to discuss setting Groundwater Elevation Action Levels for
the Forebay and Upper Valley Subbasins. Action Levels are intended to define the conditions that
indicate some groundwater management action should be taken in these subbasins; the type of
action taken may range from initiating planning efforts to implementing a planned action.
The TAC previously requested Montgomery & Associate (M&A) (1) develop options of potential
Action Levels to use as starting points and (2) prepare groundwater elevation, precipitation,
reservoir storage and releases, and streamflow data that could be used to inform the development
of Action Levels. This information was reviewed and discussed by the TAC at the August 20 meeting.
The TAC assigned members tasks to refine specific numbers and analyses associated with the
potential Action Levels.
The TAC developed initial approaches for Groundwater Elevation Action Levels, which are
summarized below. Different approaches were considered for short-term Groundwater Elevation
Action Levels (intended to address drought impacts) and long-term Groundwater Elevation Action
Levels (intended to identify chronic groundwater elevation decline). These approaches and the
numbers noted are in a preliminary stage of development and have not been fully developed or
tested. The TAC will return to further discuss these preliminary Action Levels, with the goal of
recommending these or other approaches and action levels to the subbasin implementation
committees.
Short-Term Groundwater Elevation Action Level (excessive declines during successive years
without conservation releases)
At the annual SMC-TAC meeting in April, evaluate whether any of the following are true:
• Combined Nacimiento and San Antonio reservoir storage is less than __________ AF. (Note
that the 200,000 AF trigger for D-TAC activation was for the prior October. Storage as of April
is more relevant. Could replace this with simply “If a D-TAC release schedule is being
implemented in the current year”), OR
• Groundwater elevations measured the previous fall (November/December) were lower than
a specified percentage of the way between the minimum thresholds and measurable
objectives in more than 25% [draft number, to be refined based on further analysis] of the
RMS wells in a subbasin. (Note: levels to be defined at a point between the minimum
threshold (MT) and measurable objective (MO), tentatively proposed at midway between the
two), OR
• Groundwater elevations measured the previous fall were lower than the action levels in a
cluster of RMS wells, defined as a specific number of neighboring RMS wells [that is yet to
be determined] for the Upper Valley and Forebay Subbasins,
Then take the following actions:
1. Check groundwater elevations in “alternative RMS wells” to confirm that similar
groundwater elevation trends are observed in those wells, too. If so, then
2. Recommend implementation of measures for the following year. (Note: this assumes that it
might take months to activate a management measure and that by the time the SMC-TAC
meeting occurs in April, growers will have already planted or committed to crops for the
23
current year. Also note that this meeting would be in the first year with D-TAC
recommendations for conservation release adjustments and that measures would be
implemented by the second year if the following winter also proves to be dry.)
Approach to Develop Long-Term Groundwater Elevation Action Level (over many years)
The TAC is in the process of developing Groundwater Elevation Action Levels that they can compare
annual conditions to at the annual SMC-TAC meeting in April. Steps they will take to evaluate long-
term groundwater elevation trends to develop a long-term Action Level include:
• Select an analysis period within the RMS wells’ groundwater elevation record that is:
o During a period of overall average hydrologic conditions based on cumulative
departure graphs of:
Annual precipitation
Annual Arroyo Seco discharge at the “near Soledad” gage
Combined Nacimiento and San Antonio reservoir storage
o Relatively recent but up to 30 years long. (Note: recent data better represent current
reservoir, cropping and irrigation conditions, whereas longer periods better
represent climatic variability.)
• Review the hydrograph for each RMS well and exclude abnormally low data points that
might heavily influence the regression calculation but not represent long-term trends.
• Calculate the long-term trend using linear regression and/or Mann-Kendall, and test the
slope for statistical significance.
• For each RMS well, manually evaluate whether water-level recovery following the most
recent drought is slower or less complete than for prior droughts.
• If >___% of RMS wells in a subbasin have negative slopes or slower/smaller post-drought
recovery, expand the analysis to alternative RMS wells to confirm that a similar pattern is
observed with the larger data set and also to see if there is geographic clustering of the
wells with negative slopes. (Note: definition of clustering TBD.)
• If >___% of RMS + alternative wells have negative slopes and/or decreased post-drought
recovery:
o Compile and review historical pumping data to see if it correlates with the water-
level declines.
o Compile and review historical crop data to see if changes in the types and acreages
of crops correlates with the water-level declines.
o Recommend to subbasin implementation committee that groundwater
management measures be taken. Include relevant considerations for the measure,
such as whether the measure should be local or subbasin-wide, depending on the
geographic distribution of declining water levels, and how the measure might reflect
the identified cause of the long-term declines or diminished post-drought recovery.
24
SVBGSA FY 2024 WORK PLAN STATUS
FOREBAY SUBBASIN
Q4 (As of 6/30/2024)
Not yet Scoping/
Activities Funding Tasks In progress Complete Comments
started Planning
DATA EXPANSION AND SGMA COMPLIANCE
MCWRA developing the "well library" starting
SGM R1 Desktop data collection x with the 180/400 and proceeding with all other
subbasins.
MCWRA and SVBGSA collaborating to develop
SGM R2 the best approach for a well registration program -
Program development x
(S)(M) incorporating this with GEMS. Anticipate a new
Develop Well Registration Program
ordinance to be adopted in September 2024.
MCWRA and SVBGSA developing outreach
SGM R2
Outreach activities and data solicitation x strategy and schedule to inform various interest
(S)(M)
groups and general public.
TBD Field verification of wells x
TBD Data management options evaluation x
MCWRA and SVBGSA collaborating to execute
new framework for GEMS expansion and
enhancement. Shared proposed approach with
SGM R1 MCWRA and SVBGSA Boards, and various
Development and adoption of regulatory
SGM R2 x stakeholder groups. Anticipate a new ordinance
framework in collaboration with MCWRA
(S)(M) to be adopted in September 2024, along with
MCWRA policy manual. Draft service agreement
Expand GW Extraction Monitoring and task order (SVBGSA to MCWRA) is being
finalized.
The feasibility study for using satellite data to
estimate net groundwater extraction began with a
kick-off meeting for interested grower
F T1 Feasibility study for extraction data collection x
participants in January 2024. Five growers
participated. Cal Poly collected and processed
data and are finalizing the report.
M&A developed technical specifications and
SGM R1 Well design, bid assist, CM, equip & monitor x
provided technical oversight for project.
Four monitoring wells were completed: three in
SGM R1 Well construction x the deep aquifers and one to monitor
interconnected surface water.
M&A developed technical specifications for the
Expand GW Level Monitoring Network SGM R2 monitoring wells in M, L, E, F, U (included in
Well design, bid assist, CM, equip & monitor x
(S)(M) bid documents) and will be providing technical
oversight for well drilling.
SGM R2
Well construction x
(S)(M)
Two existing well in the Langley subbasin have
F T1 Add existing wells to the monitoring network x
been added to the monitoring network.
Two tests completed and two more planned in
Test Aquifer Properties SGM R1 Fill aquifer properties data gap(s) in 180/400 x
2024.
The refined HCMs (incorporating AEM data) for
F T1
Eastside and Monterey SBs have been finished
F T2 Refine Hydrogeologic Conceptual Model
Modeling Preparation for 5-year updates x and presented. The refined HCMs for remaining
SGM R2 (HCM)
SBs will be completed and presented in July and
(S)(M)
August 2024.
GDE Working Group convened seven times to
provide CCWG and SVBGSA input. Additional
SGM R1 + subject matter experts were consulted for their
Develop methodology with CCWG x
Verify Groundwater Dependent Ecosystems G input on the methodology. Methodology was
(GDEs) presented at the June Advisory Committee
meeting.
Field reconnaissance to verify presence in Field reconnaissance is being planned for the
SGM R1 x
180/400 remaining portions of the 180/400.
Host and Manage Data Management SGM R1 Manage and update DMS concurrent with
x WY 2023 data was uploaded into DMS.
System (DMS) F T2 annual report preparation
Update new versions of model as they are
F T1 Conduct Groundwater model maintenance x
available and make adjustments as necessary.
No-cost contract extension between SVBGSA,
F T1 USGS model oversight x MCWRA and USGS executed to complete the
project deliverables by 12/31/24 at the latest.
F T1 USGS Tech Services Agreement x SVBGSA fiscal contribution
Maintain, Enhance and Update GW Models
Plan and implement GW model updates in Upon completion of the model updates, new
SGM R1 x
180/400 versions will be used to evaluate PMAs.
SGM R2 Recalibrate and update SVIHM in Monterey
x
(M) SB
SGM R2 Reviw/update completed model and prepare a
x
(S)(M) summary report
WY 2023 Annual Report process, narratives on
conditions and progress presented to all subbasin
F T1 Gather input from ICs x
implementation committees for their review and
input.
Prepare Annual Reports SGM R1 WY 2023 Annual Reports prepared and
Prepare, submit and present annual reports x
F T2 submitted to DWR on March 29, 2023.
Informed Board on the role of subbasin
Provide options and recommendation for AR
F T1 x implementation committees in the preparation of
process to Board of Directors
annual reports at November 2023 meeting.
RCA's and proposed strategies for addressing
Review Recommended Corrective Actions them were presented to the subbasin
F T1 (RCAs) and develop strategies for addressing x implementation committees for their review and
Prepare and Submit GSP 5-Year them input. Respective activities will be included in
Evaluations the Work Plans for FY 2025 and beyond.
Work under way to incorporate 180/400 RCAs
F T1 Implement RCA strategies x into the GSP 5-yr update that is due January
2025.
25
SVBGSA FY 2024 WORK PLAN STATUS
FOREBAY SUBBASIN
Q4 (As of 6/30/2024)
Not yet Scoping/
Activities Funding Tasks In progress Complete Comments
started Planning
Review well permits in compliance with EO N-7-
Review Well Permits (as needed) F T1 Review Well Permits (as needed) x
23
INTERESTED PARTIES COORDINATION AND OUTREACH
SGM R1
Host Advisory Committee meetings x Held 6 Advisory Committee meetings
F T1
Host Subbasin Implementation Committees Held 6 Monterey, 8 Eastside, 5 Langley, 4
F T1 meetings: Langley, Eastside, Forebay, Upper x Forebay and 4 Upper Valley Subbasin
Valley, Monterey Implementation Committee meetings
Host Subbasin Implementation Committee Held 7 180/400 Ft Aquifer Subbasin
SGM R1 x
Manage and Support Agency Meetings meetings: 180/400 Implementation Committee meetings
Convened GTAC to review and provide input on
Host Groundwater Technical Advisory
F T1 x Deep Aquifer Study and Seawater Intrusion
Committee meetings
Model
Coordinate meetings with partner agencies: Regularly met with partner agencies regularly for
F T1 MCWRA, M1W, MCWDGSA, ASGSA, x general coordination and on specific work
MCEHB streams.
SGM R1
Review 2020 DAC engagement strategy and Developing implementation plan in support of
SGM R2 x
develop implementation plan through 2027 SGM R2 grant scope.
(S)
SGM R2 Developing implementation plan in support of
Form AC DAC Working Group x
(S) SGM R2 grant scope.
Engage with Underrepresented and
SGM R2 Implement DAC Outreach and Engagement Coordinating with Castroville CSD, other
Disadvantaged Communities x
(S) (ongoing) community based organizations.
Activated Google Translate feature (13
SGM R2 Translation of SVBGSA website and key languages) on svbgsa.org. Provided Spanish
x
(S) information interpretation services at all Demand
Management workshops.
Information about the Dry Well Notification
F T1 Support Dry Well Notification Program x Program distributed to interested parties and
Enhance Partnerships with Domestic Well shared via social media channels.
Owners
Staff participates and contributes to the WAC and
Water Awareness Committee/ Conservation
F T1 x disseminates information about domestic water
Communication
conservation workshops and resources.
Work under way with RCDMC, RCDSC,
F T1 Engage and plan with partner agencies x PVWMA, SVBGSA and UCCE collaborating on
website development and content.
Develop and Support Website for Central
Coast Ag Water BMPs
Executed contract with TreeTop Web Design for
F T1 Work with website developer to create website x building the website. Draft website has been
created and partners are planning to add content.
PROJECTS AND MANAGEMENT ACTIONS
Executed agreement with FlowWest and initated
Assess GW Benefits of Salinas River Model the program impact to recharge and coordination meetings with RCDMC, MCWRA
F T2 x
Stream Mntce Programs conduct stakeholder outreach and M&A which continue as HEC-RAS model is
updated.
Using the DM basinwide workshops as a
Develop policy framework for 180/400 DM foundation, commense next phase of work
SGM R1 x
Program focused on 180/400 and Eastside SBs schedule
for Fall 2024.
SGM R1 Staff is working with special counsel to prepare a
Assess and Develop Demand Management
SGM R2 Conduct legal analysis x legal analysis. Draft anticipated to be be available
(DM)
(S) in Fall 2024.
F T2
SGM R1 Series of DM basinwide workshops conducted in
Conduct DM dialogue process x
SGM R2 Spring 2024.
(S)(M)
SGM R1 Make initial GTAC recommended model SWI model updates in response to GTAC
x
F T2 refinements comments completed September 2023.
Assess and Refine Seawater Intrusion
Model SGM R1 Model updates underway in coordination with
SGM R2 Update Salinas SWI Model based on new data x MCWD GSA and others, GTAC review of HCM
(M) updates done in June.
Completed. Subgrant amendment increased grant
SGM R1 Perform upgrade of dry scrubber at M1W x
funding for project.
MCWRA on subgrant amendment completed to
Fund CSIP Distribution System Upgrades
Plan and implement CSIP distribution system cover additional costs for work to date and
SGM R1 x
upgrades update work plan for work to be completed by
March 2025.
Support CSIP Regional Collaborative DWR FSS Utilize DWR Facilitation Support Services for Contract with DWR executed. Work has been
x
Intent G joint fact finding and consensus building postponed until late summer 2024.
To be explored with MCWRA and M1W
Scope CSIP Expansion, Initial Phase F T2 Blue Plan It x concurrent with CSIP Regional Collaborative
Intent.
Eastside SB IC confirmed strategy and PMAs that
F T2
they would like to move forward. Staff and M&A
SGM R2 Refine Sustainability Strategy for Eastside SB x
included specific tasks and activities in the FY
(S)
2025 and beyond work plan.
Langley SB IC confirmed strategy and PMAs that
Refine Sustainability Strategies F T2
they would like to move forward. Staff and M&A
SGM R2 Refine Sustainability Strategy for Langley SB x
included specific tasks and activities in the FY
(S)
2025 and beyond work plan.
Assist with Sustainability Strategy and PMA Sustainability strategy and PMAs under view and
F T1 x
Implementation discussion by subbasin committees.
26
SVBGSA FY 2024 WORK PLAN STATUS
FOREBAY SUBBASIN
Q4 (As of 6/30/2024)
Not yet Scoping/
Activities Funding Tasks In progress Complete Comments
started Planning
Board appointed SMC TAC committee members
F T2
Establish triggers for PMAs in Forebay SB (by in January 2024 and they convened in April
SGM R2 x
SMC TAC) 2024. Next meeting to discuss ideas for "action
(S)
Work with SMC TACs on PMAs in levels" scheduled for August 2024.
Forebay and Upper Valley Board appointed SMC TAC committee members
F T2
Establish triggers for PMAs in Upper Valley in January 2024 and they convened in April
SGM R2 x
SB (by SMC TAC) 2024. Next meeting to discuss ideas for "action
(S)
levels" scheduled for August 2024.
GTAC provided input for HCM that is
Develop hydrogelogic conceptual model
F T2 x incorporated into Deep Aquifer Study report
(HCM)
made public in May 2024.
GTAC provided input for water budget that is
F T2 Develop water budget x incorporated into Deep Aquifer Study report
made public in May 2024.
Conduct Deep Aquifer Study GTAC provided input for management guidance
F T2 Develop management guidance x that is incorporated into Deep Aquifer Study
report made public in May 2024.
Administrative draft of the study completed in
December 2023. Study completed in May 2024
F T2 Review by GTAC, finalize and present study x
and presented to the boards of funding partners in
Summer 2024.
Study released May 2024. Agencies' (County,
Assess Deep Aquifer Study Management Evaluate policy approaches and determine MCWDGSA, MCWRA, SVBGSA)Working
SGM R1 x
Options management options Group formed to develop a recommendation for
management actions.
SGM R1 Assessment of Project Constraints x Technical Memorandum under preparation
Modeling of ability to address SWI and GW
SGM R1 x Model scenarios under development.
elevations
Conduct ASR Feasibility Study
SGM R1 Initial WQ Analysis x Technical Memorandum under preparation
To be done by MCWRA following scenarios of
SGM R1 Distribution System Modeling x
existing system
SGM R1 Coordinate project management and meetings x Ongoing
Periodic updates presented at various committee
SGM R1 Prepare presentations to board and commitees x
meetings.
Initial seawater intrusion modeling completed.
SGM R1 Conduct effectiveness evaluation x Final modeling planned Summer 2024, pending
Conduct Seawater Extraction Barrier completion of SWI model updates.
Feasibility Study Three alternative project configurations under
SGM R1 Prepare alternatives analysis x development considering initial modeling
scenarios.
Facility siting under development concurrrent
SGM R1 Assess siting and implementation x
with alternatives.
SGM R1 Prepare final phase 1 feasibility study report x Administrative draft under preparation
SGM R1 Optional Tasks x To be determined
Supporting the implementation of the MLRP
Assess GW Benefits of Multi-Benefit Land grant. Agreement with UCD for recharge
MLRP G Conduct recharge suitability mapping x
Repurposing Program suitability mapping who is collecting community
input about local groundwater recharge goals.
Review of GSP projects and management actions
Prepare 180/400 PMA Summary Feasibility Prepare projects update report and feasibility
SGM R1 x underway, to be included in 5-year periodic
Report summary for 180/400
assessment due January 2025.
GENERAL ADMINISTRATIVE
F T1 Manage Board of Directors activities x Held 11 Board of Directors meetings
Organize and Conduct Agency Board and
Manage Executive Committee and Budget Held 4 Executive Committee and 7 Budget
Committee Activities F T1 x
Finance Committee activities Finance Committee meetings
Held 2 Coordination Committee (CC) and 4
Manage Interactions with ASGSA and Review and update coordination/framework Steering Committee (SC) meetings. Staff is
F T1 x
MCGSA agreements preparing amendments to the
coordination/framework agreements.
SGM R1 Manage SGM R1 Implementation Grant x Ongoing.
SGM R2 Manage SGM R2 SVBGSA Implementation Executed agreement with DWR for SGM R2
x
Provide Grant Administration (S) Grant SVBGSA grant.
SGM R2 Manage SGM R2 MCWDGSA Executed subgrant agreement with MCWDGSA
x
(M) Implementation Grant for SGM R2 grant.
Joint Advisory Committee and Board meeting to
provide input for scope held in October, survey
Develop scope of work. timeline and process
F T1 x conducted and shared with AC in December,
for Hansford Economic Consulting (HEC)
Board made a final decision in January 2024.
Agreement with HEC executed in March 2024.
Prepare Regulatory Fee Study Update Work by HEC to commence in April with
anticipated completion in Fall of 2024; potential
FT1 Conduct fee study update and prepare report x
recommendations from the study to be
implemented for FY 2026.
FT1 Conduct outreach for implementation x To be carried out after the study is made public.
F T1 Implement recommendations from study x Anticipated to occur in Spring 2025.
New budget and financial report format
Improve the format and process for financial
F T1 x developed in October. Bi-monthly financial
reports
Budget Preparation and Financial reports produced going forward.
Reporting
Board approved FY 2025 work plan approved in
F T1 Prepare work plan and annual budget x
March 2024 and FY 2025 budget in April 2024.
27
SVBGSA FY 2024 WORK PLAN STATUS
FOREBAY SUBBASIN
Q4 (As of 6/30/2024)
Not yet Scoping/
Activities Funding Tasks In progress Complete Comments
started Planning
Board approved 3 new policies and 1 revised
policy. Comprehensive Bylaws amendment
F T1 Review and update Agency policies x
underway, anticipated to be presented for Board
approval August 2024.
Administrative Oversight
F T1 Assess and improve administrative processes x Ongoing.
Ad-Hoc committee convened to assist Board in
Determine appropriate staffing support for
F T1 x evaluating the services provided by RGS. GM
administrative services
evaluation scheduled for August 2024.
Engage Board and staff in Agency vision and Prepared a Code of Conduct to be included in
F T1 x
values discussion Amended Bylaws.
Assess structure, goals and purpose of all Developed SBIC Membership Program and
F T1 x
Board Development committees opened recruitment for new term.
Conducted a Board governance training in June
F T1 Develop Board development strategy x 2024. Board resource library available on
svbgsa.org.
Developed a communications strategy that is
F T1 Develop Agency communications strategy x proposed to be implemented by Miller Maxfield
in FY 2025 and FY 2026.
Communications
Develop work plan to support the
F T1 x Developed in alignment with FY 2025 work plan.
communications strategy
F T1 Revamp and enhance Agency website x Ongoing.
LEGEND
SGM R1 SGM Round 1 Grant
G Other grant funding
DWR FSS DWR Facilitation Support Services funding
F T1 Fee: Tier 1
F T2 Fee: Tier 2
Light Gray Font Future Activity
Dark Gray Background Not Applicable to Subbasin
28