Public Art Committee
Regular MeetingHappy Valley, OR · November 17, 2025
Agenda
AGENDA
Public Art Committee Special Meeting
Monday, November 17, 2025 at 6:00 PM
Happy Valley City Hall in the Rebstock Room
16000 SE Misty Drive, Happy Valley, OR 97086
Page
1. Call to Order
1.1 Roll Call
2. Communications
3. Information and Action Topic(s)
3.1 King Road Roundabout Debrief 3 - 12
King Road Roundabout Project Debrief.pdf
2024 RFQ Debrief.pdf
3.2 Tree Lighting Volunteer Planning 13 - 22
Tree-Lighting Crafts.pptx
4. Future Business
4.1 2026 Planning 23
5. Adjournment
Motion to Adjourn
Virtual Link:
Meeting Zoom URL: https://happyvalleyor.zoom.us/j/85754786136
Meeting Zoom Dial-in: +1 253 215 8782 US (Tacoma)
Webinar ID: 857 5478 6136
Virtual Attendees: If you would like to provide general comments or public testimony, please fill
out this form at https://docs.happyvalleyor.gov/Forms/SpeakerRegistration no later than 12:00
PM on the meeting date.
Page 1 of 23
The meeting location is accessible to people with disabilities. To request an accommodation,
please contact Ivy Markesino, the Human Resources Director at (503) 886-8426 or
hrinfo@happyvalleyor.gov at least 48 hours before the meeting. You may also call City Hall at
(503) 783-3800 or email cityrecorderinfo@happyvalleyor.gov.
Page 2 of 23
AGENDA STATEMENT
Title
King Road Roundabout Art Debrief
Presenter(s)
Kevin McGrane, Policy Analyst
Explanation
In October, the City of Happy Valley installed a new piece of specially-commissioned art
in the roundabout in the intersection of SE King Road and SE 129th Ave. This was the
second individual public art commission by the City of Happy Valley, and the City Staff
will present a review of the process, what went right, what went wrong, and where it
deviated from plan.
This will be an opportunity for committee members to discuss what lessons to take
away from this project for the next time the City of Happy Valley is involved in
commissioning or otherwise acquiring public art pieces.
Financial Impact
None
Page 3 of 23
Memorandum
DATE: November 12, 2025
TO: Happy Valley Public Art Committee
FROM: Kevin McGrane, Policy Analyst
SUBJECT: King Road Roundabout Installation Debrief
Project Overview
The King Road Roundabout Project was the first time the City of Happy Valley
commissioned roundabout art and it was the first time the City went through the
process of bidding an art commission as part of a City-owned development. The other
roundabout art pieces in Happy Valley were funded by developers, who maintained
control and oversight of the selection and installation processes.
In 2024, the City of Happy Valley made a nationwide request for qualifications and
received 262 responses. Although the original plan was to pass all responses to the
Public Art Committee to decide, the number of responses led city staff to identify 30
candidates for Public Art Committee consideration. These applications listed past work
and resumes. The Art Committee selected 3 candidates from the top 30 to request
specific plans from.
In 2025, the Public Art Committee evaluated 4 submissions and selected Confluence by
Douwe Blumberg. The proposal included a suggestion to substitute a raised cement pad
to elevate and protect the piece. Discussions with the artist identified October 2025 as
the target date for installation.
Project Proposal
A roundabout art commission was proposed to the City Council on October 19, 2021, to
be commissioned by the City. There was preliminary examination into budgeting based
on other art proposals in the Pacific Northwest, and a budget based on average project
costs of regional projects.
1
Page 4 of 23
Budgeting
The initial budgeting was informed by a survey of roundabout art projects in Oregon,
California, Idaho and Washington. The total project was budgeted at $175,000, the total
project cost was $176,954.
Planned
Step Budget Final Budget
RFQ Process $ 5,500.00 $ 2,750.00
Finalist Stipends (Assume $1,500 x 5) $ 7,500.00 $ 4,500.00
Art Commission (Not to Exceed) $ 120,000.00 $120,000.00
Minor Plan Review (Planning Dept) $ 1,754.00 $ -
Display Pad + Landscaping $ 29,000.00 $ 46,065.00 *
Sculpture Installation Services $ 750.00 $ 3,639.00
Subtotal $ 164,504.00 $176,954.00
Contingency $ 10,496.00 $ -
Total $ 175,000.00 $176,954.00
*Value based on July quote.
The largest component cost was the fabrication and delivery of the art itself at
$120,000. This was determined before the project was initiated and was a parameter for
the design and selection.
The budget excess is entirely due to the installation of the cement pedestal. This was not
imagined in the initial designs, but it was a recommendation of the artist incorporated
in the pitch, and an initial quote in March was equivalent to the cost of the initial
vision’s landscaping estimate, around $20,000. By summer, when the timeline was
refined and we went out for quotes for October work, the final price was $46,000. City
staff elected to maintain the plan and maintain the timeline rather than alter the scope
of work with a limited timeline for good construction weather.
The project was under budget in all sections of the application and selection process,
including the decision to only select three finalists, and generally lower fees for the
project announcement and responses.
The other area that went over budget was the installation work itself. Proposed budget
only accounted for $750 installation services, which is around the mobilization fee for
local crane services. Total installation day contracting for welding, crane services, and
traffic control totaled $3,639.
Announcement
Happy Valley staff hosted the call for artists on the Call for Entry website (“CaFÉ”). Staff
published the announcement through CaFÉ, Clackamas County Arts Alliance, staff
2
Page 5 of 23
emails to cultural and art groups, city media channels (e.g. Happy Valley News and
social media), and art schools. These are similar channels to the ones the City uses for
local art selections. Of 262 applicants, 213 (82%) heard of the Call through CaFÉ
directly, and 224 (85%) said they prefer to hear about announcements through CaFÉ.
Selection
This area had the largest deviations from the planned process.
As planned, qualifications would be evaluated by the Public Art Committee, 5 finalists
would be selected and paid to create proposals for the installation. Proposals would first
be reviewed by City planning and engineering staff to identify hazards or issues, then be
held in a public open house to inform the Public Art Committee selection immediately
afterward, which would provide a recommendation for Council’s ultimate decision.
In reality, the number of qualifications received from the call resulted in staff
recommending a short list of 30 applicants for consideration by the Public Art
Committee. The Committee selected 3 finalists who were paid to produce proposals. The
proposals were reviewed by staff to identify hazards or issues, and an abbreviated list
was provided to a public meeting for the Art Committee to make a decision. The
disconnect between planning and execution on this step was partly due to staff turnover
and the timeliness of a selection, and was informed by generally low turnout in local
open houses.
Community Members did ask about taking more of a role in selection, and the open
house plan could be a good opportunity to engage with residents and build local interest
and trust with this kind of project.
Installation Planning
After selection of the artist, three online meetings were hosted with the artist, Happy
Valley Public Works and Engineering staff, and one meeting was held with the welder.
The first meeting outlined timelines and other considerations, including specifications
for the raised cement pad and traffic control logistics. The second meeting identified a
specific target date, manning, steps in the installation process, and considerations for
contracting welding and crane services. The third meeting introduced the welder and
talked through specific details in the installation plan.
3
Page 6 of 23
Welding and crane services were provided by Suri
Iron, who the city has an existing art installation
contract with. The project work space in the
roundabout had strict space requirements to avoid
shutting down traffic in front of the fire station,
which limited the size and types of cranes that
could access the space for several hours of
maneuvering and welding pieces. The artist
mocked up steps of the installation in his studio in
Kentucky and relayed photographs and
demonstrations. As the concrete pad was
constructed, city staff relayed measurements and
images.
On the installation day, the actual process went
very quickly, without safety issues or delays. Traffic
was stopped briefly while moving materials into the
roundabout, and while maneuvering the crane into
position, but traffic flow was mostly maintained. The artist, welder and city staff all said
they were very happy with the efficiency of the project.
Challenges
• Institutional Inexperience. This project was Happy Valley’s second new art
commission, and it was largely a new process for staff and committees.
• Committee Capacity. This project had a higher budget than the other Happy
Valley art commission, the Veterans Memorial Eagle, and was proposed as a
request for qualifications, rather than request for proposals. Consequently, this
project had 4.5 times the number of applications to process, which could not
reasonably be evaluated by all committee members.
• Physical Constraints. Installation was physically limited because it took place
in an active roadway and principal access point to emergency services and
schools.
• Coordination. This was part of larger roadwork projects along King Road,
which affected sequencing with other ongoing projects.
• Distance. The nation-wide call for artists resulted in selection of an artist based
in Kentucky, which limited the ability to visit the site or consult local contractors,
and which put additional pressure on a rigid timeline and precise steps in the
project installation.
4
Page 7 of 23
Successes
• Mission Accomplished. The piece was installed on time, as envisioned and
approved by the art committee with no safety issues.
• Efficiency. City staff, the artist, and the welder all commented on how smoothly
the installation went. In meetings, the artist expressed concerns that there might
be two days maneuvering pieces, and the artist cautioned that his staff took
several hours on the trial positioning, but through rehearsals, briefing and
diligent preparation, the process went quickly and safely.
Shortfalls
• Exceeded projected budget. This is primarily due to the cost of the cement
pedestal. To mitigate in the future, Calls to Artists should establish a firm shared
reality of what the surroundings will be, so new construction does not add cost
variance.
• Last Minute Paperwork. Permitting requirements were identified shortly
before the project delivery date. This was remedied by staff and the artist quickly,
but it added confusion and crunch time. There was a similar point of confusion
over insurance documentation during the Veterans Memorial installation in
2024. To correct in any future art installations, the Public Art staff liaison should
provide artists with a packet of required paperwork at the same time as the
contract, including subcontractor requirements, and set milestones to monitor
them as a project progresses.
Lessons Learned
• CaFÉ website recruitment was highly effective.
• Service contracts should be identified and established early
• Community outreach should be planned into the sequencing of art selection.
Public noticing through the Happy Valley Newsletter requires the better part of a
month for drafting, printing, and dissemination, so might need to incorporate
social media, public posters, or community events.
• Establishing the external conditions of the installation before requesting
proposals might reduce cost overages.
• All proposals were exactly at the allotted budget announced in the request for
qualifications. Emphasizing cost as a decision factor in art selection may motivate
lower bids.
• Early planning and coordination made the installation process operate smoothly.
5
Page 8 of 23
KING ROAD ROUNDABOUT
RFQ ENGAGEMENT & EQUITY DEBRIEF
ENGAGEMENT IMPACT
How did you hear about this Call to Artists? (Check all that apply)
250
213
200
150
100
50 42
13 17
3 4 1 1
0
CAFÉ City media Clackamas City Staff School Social Media Word of Other
channels Arts Alliance Email Mouth
How do you prefer to hear about Calls to Artists? (Check all that apply)
250
224
200
146
150
100
49 43
50 30
19 15
12
4
0
CAFÉ City Staff Community Print Media School Social Media Texting Word of Other
Email Groups Mouth
Page 9 of 23
APPLICANT POOL
Geographic Distribution: USA
Most Common Places Count % Applicant Pool
California 40 15.27%
Oregon 40 15.27%
Washington 23 8.78%
New York 21 8.02%
Florida 18 6.87%
Colorado 15 5.73%
Applicant Type
15%
85%
0% 10% 20% 30% 40% 50% 60% 70% 80% 90%
Team Individual
Page 10 of 23
Demographic Response Rates (Opt-In Percentage)
Demographic Participation 79%
Gender 76%
Race 75%
Disability 73%
LGBTQIA2+ 66%
Race Occurrence
180
156
160
140
120
100
80 66
60
40
18 19
20 13 9 12
3
0
American Indian, Alaska Native Asian
Black or African American Opt-Out
Hispanic or Latino Native Hawaiian and Other Pacific Islander
Race Not Listed White
Race Distribution
25%
53%
22%
White Alone Race Other than White Alone Opt-Out
Page 11 of 23
Gender Occurrence
160
144
140
120
100
80 70
62
60
40
20 11
1
0
Female Gender Not Listed Male Non-Binary Opt-Out
LGBTQIA2+ Community Disability Community
27%
34%
53%
8% 64%
13%
No Yes Opt-Out No Yes Opt-Out
Page 12 of 23
AGENDA STATEMENT
Title
Tree Lighting Volunteer Planning
Presenter(s)
Kevin McGrane, Policy Analyst
Explanation
Every year, the City of Happy Valley hosts a Tree-Lighting Event in front of City Hall.
The Public Art Committee has an opportunity to lead crafts events in the Council
Chambers during the event on December 7, 2025.
This item is to stand in for a discussion of craft ideas and a check-in about other
volunteer considerations by the Public Art Committee.
Financial Impact
None
Page 13 of 23
Tree-Lighting Crafts
Happy Valley Public Art Committee
December 7, 2025
Page 14 of 23
Lessons Learned
• Lessons Learned:
• Art Should be Self-Contained.
• Portable (small, durable, not sticky)
• Pre-Make Examples.
• Consider the time investment per participant.
• Others?
Page 15 of 23
Option 1: Ornaments
Page 16 of 23
Option 1: Ornaments
Been used in the past, on-theme for a tree-lighting ceremony. Coloring / blank slate
Page 17 of 23
ornaments leave some room for creative freedom but may tend toward directionless
– premade templates or steps may be required. Other considerations?
Option 2: Bookmarks
Page 18 of 23
Option 2: Bookmarks
Have been used in the past. Not thematic, but could have a thematic prompt.
Page 19 of 23
Variable complexity / investment. May want a template or coloring portion for
younger participants. Other considerations?
Option 3: Holiday Cards
Page 20 of 23
Option 3: Holiday Cards
Thematic and seasonal, highly flexible. Could provide
a template or coloring portion. Can incorporate most
mediums. Would be nice to get good cardstock and
Page 21 of 23
appropriately sized envelopes. Other considerations?
Other Suggestions?
Other Discussion?
Page 22 of 23
AGENDA STATEMENT
Title
2026 Planning
Presenter(s)
Kevin McGrane, Policy Analyst
Explanation
This item is a prompt for a discussion of interests in Happy Valley Public Art Planning
for 2026.
The Public Art Committee has been involved in planning and public outreach about
designs and art opportunities focused on the Happy Valley Community Center project,
but based on November’s bond vote, the committee has an opportunity to approach
new projects and priorities.
Staff have collected some of the interests that were discussed during Public Art
Committee meetings this year, and will present those for consideration, as well as
welcoming other suggestions and discussions for projects to investigate in the
upcoming year.