HPMPO Technical Coordinating Committee (TCC)
Regular MeetingHigh Point, NC · May 17, 2016
Agenda
HIGH POINT URBAN AREA MPO
TECHNICAL COORDINATING
COMMITTEE (TCC)
Agenda for the May 17, 2016 TCC Meeting
2:00 PM
***Third Floor Conference Room***
High Point Municipal Building - City Hall
211 S. Hamilton Street, High Point
Action Items
1. Consideration of the April 19th TCC meeting minutes. (Mark McDonald) Page 1
2. Recommendation to the TAC for approval of amendments to the 2016-2025 MTIP.
(Greg Venable) Page 5
3. Recommendation of SPOT 4.0 HPMPO Prioritization Process and Preliminary Point
Assignment (Greg Venable) Page 7
Information Items
MPO Reports
4. NCDOT Division Reports
Division 7 (Mike Mills / Ed Lewis)
Division 8 (Brandon Jones / Darius Sturdivant) Page 13
Division 9 (Pat Ivey / Diane Hampton) Page 14
5. Triad Air Awareness Report (Lorelei Elkins)
6. NCDOT Transportation Planning Branch Report (Keith Dixon)
7. Hitran Report (Angela Wynes)
8. PART Report (Scott Rhine) Page 17
TCC
Meeting
Meeting Date 5/17/2016 Agenda Item No. 1
Action Requested Approve
Section Tab
Consideration of the April 19th TCC meeting minutes. (Mark McDonald)
Information Summary Attachments Yes No
The complete meeting minutes are in your packet as Attachment 1.
TCC Vote: Motion Second
By:__________________ By:_______________________
Vote: For_______________________ Against________________________
1
MINUTES
TECHNICAL COORDINATING COMMITTEE
April 19, 2016
TCC MEMBERS PRESENT: Chuck George, Bryan Fulbright, Darius Sturdivant, Jen
Britt, Diane Hampton, Ed Lewis, Chuck Smith, Mark McDonald, Lee Burnette, John
Olinger, Heidi Galanti, Jay Dale, Jason Miller, Wayne Davis, and Mark Kirstner
TAC MEMBERS PRESENT: Joe Geigle (FHWA)
OTHERS PRESENT: Greg Blakeney (NCDOT _ PDEA), Emaly Simone (Baker
Engineering), Ken Gilland (Baker Engineering), Jeffrey Teague (NCDOT Roadway
Design), Tony Houser (NCDOT Roadway), Jay McInnis (NCDOT PDEA), John Hanes
(High Point)
RECORDING SECRETARY: Marianne Janiszewski, City of High Point
Mark McDonald called the meeting to order.
ACTION ITEMS
Item 1: Consideration of the March 15, 2016 TCC Meeting Minutes.
The minutes were approved.
Motion by: Chuck George
Seconded by: Bryan Fulbright
Vote:
For: Unanimous
Against: None
Item 2: Recommendation to the TAC for approval of Amendments to the
2016-2025 MTIP.
John reviewed the various STIP modifications and additions.
Motion by: Bryan Fulbright
Seconded by: Chuck George
Vote:
For: Unanimous
Against: None
2
Information Items
Item 3: SPOT 4.0
John reviewed the SPOT process. Staff received the SPOT scores from the State a few
weeks ago and they have been distributed out to local libraries for public review and
comment on the methodology that was used and the score rankings. John reviewed the
top five ranked highway projects, the top three bike and pedestrian projects and the top
two rail projects. The TAC vote counts for 40%, congestion 20%, safety 20%
accessibility 10% and freight 10% for a total of 100%. There is a total of 1600 points for
regional projects and 1600 points for division projects. The next step is to meet with the
Division Offices to discuss how to maximize the regional points with the division points.
MPO Reports
Item 5: NCDOT Division Reports
Division 7
Ed Lewis reported that the design and bid document preparation for the ped
improvements on N. Main and Lexington Ave. are in progress and the signal plans have
been approved. They were hoping to have a public workshop on the I-74/US 311 and NC
68 interchange early in 2016 but they are waiting on a noise wall study.
Division 8
Darius Sturdivant reported that the Prospect St. Bridge Project is 40% complete and is
scheduled to be completed in March of 2017. The safety project at the intersection of NC
62 and Finch Farm Rd. was completed as of April 1, 2016. Darius has confirmed with
SPOT and Programming that if the traffic study comes back and shows that a 4 lane is
not needed then it will be constructed as a 3 lane. The interchange at I-85 and S. Main St.
in Archdale is in the current STIP and the feasibility study is complete but has been
shelved until Right of Way cost is received.
Division 9
Diane Hampton reported that replacement bridge over Business 85 in Lexington is just
now getting underway. The bridge will stay open during construction.
Item 5: Triad Air Awareness
No one was present.
Item 6: NCDOT Transportation Planning Branch
Wayne Davis was late and did not give a report.
Item 7: Hi tran
No one was present. Mark stated that Angela is making good progress with the purchase
of our next fleet of busses. Delivery is expected at the end of this year or first part of
next year. Information has also been submitted for some additional grant funding for
3
some improvements to the transportation terminal and a building at the Hi tran facility to
accommodate the para transit operations.
Item 8: PART
Mark Kirstner reported that the Triad Commute Challenge was very successful.
Discussion
Item 9:
Ken Gilland and Emaly Simone from Baker Engineering gave a presentation on project
U-5864 – Surrett Drive Widening Project.
There was no other business. The meeting was adjourned.
4
TCC
Meeting
Meeting Date 5/17/2016 Agenda Item No. 2
Action Requested Recommendation
Section Tab
Consideration of amendments to the 2016-2025 MTIP. (Greg Venable)
Information Summary Attachments Yes No
The proposed amendments to the 2016-2025 MTIP for the High Point MPO are included
in you packet. Staff is requesting a recommendation to the TAC for approval of the
amendments to the 2016-2025 MTIP.
TCC Vote: Motion Second
By:__________________ By:_______________________
Vote: For_______________________ Against________________________
5
HIGH POINT URBAN AREA METROPOLITAN PLANNING ORGANIZATION ITEM N
(HANDOUT)
REVISIONS TO THE 2016-2025 STIP
HIGHWAY PROGRAM
STIP MODIFICATIONS
DIVISION 9
I-5793 I-85, EAST OF US 64 TO NC 109 IN THOMASVILLE. CONSTRUCTION FY 2018 - $5,693,000 (NHPIM)
DAVIDSON PAVEMENT REHABILITATION. FY 2019 - $5,693,000 (NHPIM)
PROJ.CATEGORY MODIFY DESCRIPTION TO EXTEND NORTHERN $11,386,000
STATEWIDE PROJECT LIMIT BASED ON LATEST INTERSTATE
MAINTENANCE PRIORITIZATION.
These items are for informational purposes only and subject to future NC Board of Transportation approval.
It is anticipated that these items will be considered for NC Board of Transportation approval in 30 days.
* INDICATES FEDERAL AMENDMENT
Thursday, May 05, 2016 6 1
TCC
Meeting
Meeting Date 5/17/2016 Agenda Item No. 3
Action Requested Recommendation
Section Tab
SPOT 4.0 HPMPO Prioritization Process and Preliminary Point Assignment
(Greg Venable)
Information Summary Attachments Yes No
The public had at least thirty (30) days to review and comment on the SPOT 4.0 HPMPO
prioritization process and preliminary point assignment as voted on by TAC members.
Staff is requesting recommendation to the TAC for final approval of the process and
point assignments.
TCC Vote: Motion Second
By:__________________ By:_______________________
Vote: For_______________________ Against________________________
7
SPOT 4.0 HPMPO PRIORITY LIST OF PROJECTS AND DRAFT PRELIMINARY POINTS ASSIGNMENT
ESTIMATED A HPMPO NCDOT HPMPO NCDOT HPMPO
MAP PROJECT TOTAL PROJECT HIGHWAY TOTAL REGIONAL REGIONAL DIVISION DIVISION
# SPOT ID CATEGORY TIP # ROUTE NAME FROM TO PROJECT DESCRIPTION COST TAC RANK SCORE SCORE POINTS SCORE POINTS
North of SR 1756 North of Widen to Multi-Lanes with Bypass of
H8 H090138-CA Regional Impact R-2568C NC 109 in Davidson County (Old Greensboro Road) Motsinger Road Wallburg, Part on New Location $83,900,000 1 71.71 28.13 96 21.29 96
Eastchester Dr (NC 68) in
H7 H150362 Regional Impact High Point Hickswood Rd Gallimore Dairy Rd Upgrade existing NC-68 to superstreet $32,708,000 2 69.41 51.24 100 37.64
Reconstruct the Existing Obsolete
interchange of I-85 Business and
I-85 Bus Interchange in High Main Street. Bridge Is Structurally
H17 H090602 Regional Impact Point S. Main Street in High Point Deficient. $10,912,000 3 67.63 38.49 100 28.15 100
Widen roadway to accommodate a
two lane median divided facility with
E. Lexington Ave. in High bike lanes and sidewalks on both
H2 H150360 Division Needs Point Montlieu Ave. Main St. sides $25,923,000 4 67.02 N/A 26.47 100
SR 2123 I-85 Business/ Widen to Multi-Lanes, Part on New
H32 H090528-C Regional Impact U-5311C NC 109 in Thomasville (Main Street) US 29/US 70 Location $27,346,000 5 62.54 23.82 100 18.39 100
Improve interchange area including
realignments of Weant Road and
H18 H090607-C Regional Impact NC 62 in Archdale Weant Road Kersey Valley Road Kersey Valley Road $11,394,000 6 62.30 35.39 100 26.80 100
I-85 Widen to Multi-Lanes. Sidewalks
H9 H090294 Regional Impact R-4734 NC 109 in Davidson County in Thomasville NC 47 in Denton within Denton town Limits. $133,435,000 7 59.49 35.07 100 26.77 100
Statewide
H25 H090061-CA Mobility R-2220CA US 64 in Davidson County NC 109 Randolph County Line Widen to Multi-Lanes. $30,436,000 8 58.69 33.74 100 25.50 100
NC 62 in Trinity and Rockford Drive Widen NC 62 to a Multi-Lane Divided
H12 H090607-A Regional Impact Archdale west of Archdale East Fairfield Drive Facility with Sidewalks on Both Sides. $40,399,000 9 56.29 28.51 100 22.29 100
Widen interstate from 4 Lanes to Six
Statewide I-40 in Forsyth and Guilford I-40 Business/ Lanes Between US 311 and I-40
H33 H090605-A Mobility Counties US 311 US 421 Bus./US 421. $138,771,000 10 55.88 38.00 26.87
Westside Bypass in I-85 Business/ SR 2212 Construct Multi-Lanes on New
H20 H090341 Regional Impact U-2545 Lexington US 29/52/70 (Fairview Road) Location $60,759,000 11 53.84 20.69 100 15.70 100
Statewide
H10 H090061-B Mobility R-2220B US 64 in Davidson County East of I-85 in Lexington NC 109 Widen to Multi-Lanes. $51,492,000 12 53.41 37.71 100 28.26 100
NC 62 SR 2123 Widen to Multi-Lanes, Part on New
H30 H090528-B Regional Impact U-5311B NC 109 in Thomasville (Cloninger Drive) (Main Street) Location $24,995,000 13 50.41 23.69 100 18.32
SR 2067 NC 62 Widen to Multi-Lanes, Part on New
H19 H090528-A Regional Impact U-5311A NC 109 in Thomasville (Lambeth Road) (Cloninger Drive) Location $19,550,000 14 49.12 23.60 100 18.28
Widen NC 62 to a Multi-Lane Divided
H13 H090607-B Regional Impact NC 62 in Archdale East Fairfield Drive I-74 Facility with Sidewalks on Both Sides. $30,030,000 15 48.13 24.72 100 18.77
Widen roadway to accommodate a
two lane median divided facility with
Montlieu Avenue in High bike lanes and sidewalks on both
H15 H141847 Division Needs U-5855 Point Interstate 74 University Parkway sides $13,958,000 16 47.34 N/A 26.09
8
Convert Macy Grove Road Grade
Statewide I-40 Interchange in Guilford Separation to Interchange to Relieve I-
H26 H090605-B Mobility County Macy Grove Road 40/NC 66 interchange $12,740,000 17 44.90 40.18 100 27.87
SR 1493 (Frye Bridge Rd
SR 1493 Frye Bridge/ /Welcomearcadia Rd) to US 64. Widen
H1 H090970-A Regional Impact NC 150 in Davidson County Welcome Arcadia Road US 64 to Multi-Lanes. Add to Stip. $121,481,000 18 43.15 32.91 60 25.96
Surrett Drive
(SR 1595/1216) in High Eden Terrace to Market Center Drive.
H22 H090406 Division Needs U-3432 Point Eden Terrace Market Center Drive Widen to Multi-Lanes. $14,076,000 19 42.18 N/A 10.80
US 601 South of Mocksville to US 52
in Lexington. Widen to Multi-Lanes
and Upgrade interchange at US 52.
US 52 Section B: US 64 from Davie County
H29 H090241-B Regional Impact R-3602B US 64 in Davidson County Davie County Line in Lexington Line to US 52 in Lexington. $58,975,000 20 41.88 34.91 44 26.04
Turner St./Liberty St. NC 62 (Cloniger Street) to SR 2123
(SR 2165/2055) in NC 62 SR 2123 (National Highway).
H31 H090469 Division Needs U-4420 Thomasville (Cloniger Street) (National Highway) Widen to Multi-Lanes. $37,362,000 21 39.81 N/A 21.00
NC 8 (Cotton Grove Road) SR 2412 SR 1115 Widen to Multi-Lanes, Part on New
H4 H090078-BA Regional Impact in Davidson County (Rothrock Road) (Wrenn Road) Location $37,039,000 22 38.07 29.08 23.01
High Point City Limits Widen the existing road way to a
W. Lexington Avenue in just east of three lane facility with bike lanes and
H5 H150302 Division Needs High Point Kensington Drive Pinewood Lane sidewalks on both sides. $9,612,000 23 36.60 N/A 17.39
Skeet Club Road
(SR 1003/1820) in High East of SR 1818
H24 H090431-A Division Needs U-3615A Point US 311/N Main St. (Johnson Street) Widen to Multi-Lanes $24,094,000 24 35.13 N/A 21.09
East Fairfield Road (NC 610) NC 62
H36 H090407 Regional Impact U-3433 in High Point S. Main Street (High Point) (Liberty Street) Widen to Multi-Lanes. $28,408,000 25 33.57 33.03 25.66
Construct Multi-Lane facility with
Piedmont Parkway SR 1850 sidewalks and bike lanes, part on new
H35 H090609 Division Needs Extension in High Point NC 68 (Sandy Ridge Road) location $41,267,000 26 29.26 N/A 13.60
High Point Airport
Connector in Guilford NC 66 /N Main St./ Johnson Street / Construct Multi-Lane Facility,
H27 H090604 Regional Impact County High Point Road Sandy Ridge Road part on new location (FS-0707B) $54,324,000 27 26.38 14.45 11.19
NC 24/27 in Troy to NC 47 in Denton.
Widen Existing Two-Lane Cross
Section; Improve Shoulders; Add Turn
Lanes at Traffic Generators; Improve
Signalization. Provide Bicycle
H21 H090740 Regional Impact NC 109 in Davidson County NC 24/27 NC 47 Accomodation $22,573,000 28 24.44 28.72 21.68
Widen existing Triangle Lake Rd. to
Triangle Lake Rd. in High three lane curb and gutter facility
H6 H150361 Division Needs Point Hickory Chapel Rd. Central Ave. with sidewalk on both sides. $11,618,000 29 22.69 N/A 13.20
SR 2504 SR 2412 Widen to Multi-Lanes, Part on New
H3 H090078-AB Regional Impact NC 8 in Davidson County (Hunt Road) (Rothrock Road) Location $69,592,000 30 20.05 14.00 11.27
Kivett Drive in Guilford I-85 Business/ Widen Kivett Drive Between I-85
H14 H090610 Division Needs County I-85 US 29/US 70 Business and I-85 $32,078,000 31 18.19 N/A 13.84
Re-Construct interchange at
intersection of I-85 Business/US
H34 H111157 Regional Impact I-85 Bus in Lexington US 64 29/70 & US 64 East of Lexington $34,410,000 32 16.56 14.96 7.83
I-85 Interchange in Guilford New interchange of I-85 and Kivett
H23 H090608 Division Needs County Kivett Drive Drive $6,386,000 33 14.20 N/A 7.08
9
ESTIMATED A HPMPO NCDOT HPMPO NCDOT HPMPO
MAP PROJECT TOTAL PROJECT BIKE & PED TOTAL REGIONAL REGIONAL DIVISION DIVISION
# SPOT ID CATEGORY TIP # ROUTE NAME FROM TO PROJECT DESCRIPTION COST TAC RANK SCORE SCORE POINTS SCORE POINTS
Eastchester Drive in High
BP3 B150310 Division Needs Point Johnson Street Hartley Drive Construct a 5-foot concrete sidewalk $142,200 1 77.28 100
University Parkway in High
BP7 B150369 Division Needs Point East Green Drive Dr ML King Jr Drive Construct a 5-foot concrete sidewalk $128,600 2 74.60 100
West Wendover Avenue in
BP6 B150370 Division Needs High Point NC-68 Eastchester Drive Gibson Park Entrance Construct a 5-foot concrete sidewalk $212,440 3 70.79
Construct a 5-foot concrete sidewalk
BP1 B151047 Division Needs Oakdale Road in Jamestown Chimney Court Jamestown Oaks on the east side of Oakdale Road $216,000 4 66.45
Johnson Street in High
BP5 B150374 Division Needs Point Parris Avenue Hartley Drive Construct a 5-foot concrete sidewalk $142,000 5 66.20
Construct a 5-foot concrete sidewalk
and concrete curb and gutter on the
Main Street / Existing Sidewalk north side of Main Street and the east
BP2 B150901 Division Needs Penny Road in Jamestown on Main Street Park Access on Penny Road side of Penny Road. $500,000 6 58.84
Eastchester Drive in High
BP4 B150365 Division Needs Point Centennial Street Lassiter Drive Construct a 5-foot concrete sidewalk $125,120 7 58.62
ESTIMATED A HPMPO NCDOT HPMPO NCDOT HPMPO
MAP PROJECT TOTAL PROJECT RAIL TAC TOTAL REGIONAL REGIONAL DIVISION DIVISION
# SPOT ID CATEGORY TIP # ROUTE NAME FROM TO PROJECT DESCRIPTION COST RANK SCORE SCORE POINTS SCORE POINTS
Yadkin Valley Station in Construct a new passenger station in
R3 R150375 Division Needs Lexington Lexington and passenger platforms $30,000,000 1 78.36 23.10 100
East 7th Avenue in Construct a grade separation of the
R1 R150903 Division Needs Lexington rail line and E. 7th Avenue $5,000,000 2 76.04 26.40 100
Provide a grade separation between
the existing rail line and Turner Street
Turner Street/Liberty Street / Liberty Street at the existing at grade
R4 R150855 Division Needs in Thomasville rail crossing $34,500,000 3 67.24 23.10
Jamestown siding extension to allow
Statewide Norfolk Southern Main in the local train to clear the mainline
R5 R140003 Mobility Jamestown during switching operations. 4 64.17 48.06 35.83
Kimberly Clark lead in Lexington,
Davidson County. Allows the local
train to clear the mainline track
during switching operations,
Statewide Norfolk Southern Main in increasing network fluidity for freight
R2 R140010 Mobility Lexington & passenger traffic. $2,000,000 5 58.76 46.35 34.97
10
ESTIMATED T NCDOT HPMPO NCDOT HPMPO
MAP PROJECT TOTAL PROJECT A AVIATION REGIONAL REGIONAL DIVISION DIVISION
# SPOT ID CATEGORY TIP # ROUTE NAME FROM TO PROJECT DESCRIPTION COST TAC RANK SCORE POINTS SCORE POINTS
Upgrade and strengthen the existing
runway due to excessive cracking on
the airfield and an increase of the
number of requests for large private
aircraft for landings. The PCI in 2014
was 74; however the airport has
contractors making regular trips for
Davidson County Airport crack sealing. In 2016 the pavement
Runway Rehabilitation and will be 17 years old and in need of
A1 A151104 Division Needs Strengthening rehab. $3,616,000 1 36.90 100
ESTIMATED T TRANSIT NCDOT HPMPO NCDOT HPMPO
MAP PROJECT TOTAL PROJECT A PROJECT REGIONAL REGIONAL DIVISION DIVISION
# SPOT ID CATEGORY TIP # ROUTE NAME FROM TO PROJECT DESCRIPTION COST RANK SCORE POINTS SCORE POINTS
Upgrade approximately 3,000 square
feet of an existing 6,000 square foot
building. The renovations will allow
the para-transit division of the transit
system to be in its own facility
complete with offices for the
supervisor and the para-transit
services coordinator. The facility will
also include space to allow for in-
person interviews and functional
Para Transit Facility 716- assessments for ADA para-transit
T1 T150904 718 W. Kivett Drive eligibility. $300,000 1 51.12 100 37.30
11
TCC
Meeting
Meeting Date 5/17/2016 Agenda Item No. 4-8
Action Requested Information
Section Tab
MPO Reports
Information Summary Attachments Yes No
Agenda Item 4
Division Reports
Agenda Item 5
Triad Air Awareness
Agenda Item 6
Transportation Planning Branch Report
Agenda Item 7
Hitran
Agenda Item 8
PART Report
TCC Vote: Motion Second
By:__________________ By:_______________________
Vote: For_______________________ Against________________________
12
DIVISION 8 - ACTIVE PROJECTS (HIGH POINT MPO)
TIP/WBS/ Completion
Description Let Date Status Cost Contractor Comments
Contract # Date
Asphalt Surface Treatment: SR 1916, SR 2039, SR 1697, 53% Riley Paving
DH00172 6/9/15 Spring 2016 $867,269 Work started 9/18/15
SR 1685 and SR 1536 Complete INC
APAC-
Atlantic, INC.
Resurfacing SR 1567, SR 1545, SR 1597, SR 1794, SR 86%
DH00175 7/30/15 6/24/16 $1,398,521 Thompson Work started 10/7/15
1850 and SR 1864 Complete
Arthur
Division
Asphalt Surface Treatment on 30 sections of primary and
17% Whitehurst
DH00178 secondary roads: SR 3261 Pineview Avenue from SR 1627 9/8/15 6/24/16 $844,950 Work started 3/21/16
Complete Paving
Old Thomasville Rd to End of Maintenance
Country Boy
SR 1603 School Rd - Replace Bridge #84 over Muddy
DH00191 2/23/16 4/3/17 No Report $728,888 Landscaping Work started 4/15/16
Creek.
INC
SR 1619 Prospect Street - Replace Bridge #136 over US 43% Lee
B-5114 6/16/15 3/15/17 $4,714,965 Work started 8/7/15
29/70/I-85 Business. Complete Construction
I-73 Pavement Rehabilitation from US 311 to 0.6 mi North
APAC-
of SR 1938 Hockett Dairy Road; 7.7 miles - Combined with I-
Atlantic, INC.
5737: I-73 from 1.3 miles north of SR 1504 Spero Road to
I-5763 1/19/16 10/28/16 4% Complete $ 6,298,145 Thompson Work started 4/18/16
US 311, 2.2 miles) and Combined with W-5601AJ: I-
Arthur
73/74/US 220 from south of SR 2269 Vision Drive to south
Division
of SR 1712 Pineview Road.
DIVISION 8 - UPCOMING PROJECTS (HIGH POINT MPO)
TIP/WBS/
Description Let Date Comments Cost
Contract #
I-85 South of SR 1009 to North of SR 1912 Lunar Drive in
Archdale. Pavement Rehabilitation. Scope of work should Project let date delayed from Mar 2016 to
$7,000,000
I-5738 include milling and filling of deteriorating asphalt paved Jun-16 June 2016. Project combined with I-5821
Total Contract Amt $16,900,000
shouders, rehabilitation of ramps and rehabilitation of and I-5789.
concrete aprons around drainage structures.
SR 1944 Branson Davis Rd from US 311 to SR 2017 Summer
8CR.207611.xx Randolph 2016 Summer Resurfacing TBD
Walker Mill Rd. 2016
ROW is being acquired; Utilities to be
SR 1911 Ashland Street (Archdale) - Replace Bridge #416 relocated; Power is authorized to move;
17BP.8.R.76 Jun-18 TBD
over Dale Creek. Relocation of water lines to be
determined.
13 High_Point_Urban_Area_MPO Div 8 Project Report May 2016
High Point Urban Area MPO
Piedmont Triad RPO
NCDOT Transportation Update
Tuesday, May 17, 2016
Completion Construction Project
T.I.P. No. Description Let Date Status Contractor Comments
Date Cost Administrator
Centrally Managed Projects under Construction
May 1, 2019 Contractor began work on project on April 4, 2016. Road to
B-3159 Replace Bridge #27 on US 52/NC 8 over US 29/64/70/I-85 (perm. vegetation J.T. Russell & Sons, Dale Swicegood, PE
Oct. 20, 2015 4.4% Complete $10,164,621 remain open during construction, with periodic lane closures
38331.3.FR1 Bus. Loop in Lexington established Inc. (336)249-6255
October 28, 2019) on NC 8 and nighttime stoppages on I-85 Bus.
2016CPT.09.18.
Contract Resurfacing of Primary routes including (1)
10291.1 Availability J.T. Russell & Sons, Dale Swicegood, PE
section of US 64, (2) sections of NC 8, and (8) sections of April 19, 2016 May 19, 2017 $2,847,876 Centrally let contract
2016CPT.09.19. June 6, 2016 Inc. (336)249-6255
20291.1 Secondary routes for 18.729 miles in Davidson Co.
Division Managed Projects under Construction
Contract Landscaping on I-85 from (SR 1224) Hardgrave Contractor completed supplemental seeding and fertilizer
I-2304AC/AD (L) Staniel Key Todd Hiatt
Rd in Davidson Co. to (SR2120) Long Ferry Rd in Rowan Sept. 23, 2015 May 6, 2018 45% Complete $1,281,336 topdressing.Contractor is planting containerized grasses
34156.3.12 Landscaping (336)896-2380
Co. throughout project.
Pavement Rehabilitation of 5.17 miles of I-85 from the
Contractor plans to start work in June, 2016. Will be all
I-5740 ramps N. of Old Hwy 64 to the concrete pavement south of Availability date Blythe Construction, Chris Corriher, PE
Feb. 24, 2016 August 31, 2016 $1,069,294 nighttime work. Preconstruction meeting scheduled for May
52021.3.1 SR 2010 (E. Holly Grove Rd), which includes milling, April 4, 2016 Inc. (704)630-3200
25, 2016.
paving, and pavement markings.
Grading, drainage, widening, paving, and pavement
U-4742NC
markings on SR 1508 (Hickory Tree Rd) and SR 1601 Contractor began work on April 25, 2016. Clearing, grubbing,
39746.3.24 Work start date Thunder Contracting, Wright Archer, III, PE
(Mendenhall Rd) in Davidson Co. Install left turn lane on Feb. 24, 2016 Sept. 30, 2016 $366,513 and grading work will continue over the next few days with
SS-4909AH April 25, 2016 Inc (336)747-7900
SR 1508 (Hickory Tree Rd) near SR 1601 (Mendenhall shoulder widening to begin before mid-May.
43399.3.1
Rd).
Replace Bridge #361 on SR 1837 (Bud Sink Rd) over June 3, 2016
BD-5109L
Leonard Creek in Davidson County. Includes Grading, (perm. vegetation 74.4% Complete Dale Swicegood, PE Work began Feb. 16, 2016, using an off-site detour. Work on
45355.2.12 Dec. 9, 2015 $378,498 TCB Builders, LLC
Drainage, Widening, Structure, Paving, and Pavement established (10% ahead of schedule) (336)249-6255 replacing the bridge has begun
17BP.9.R.63 Dec. 31, 2016)
Markings.
June 23, 2016
Replace Bridge #40 on SR 1298 / I-85 Service Rd (Grimes (perm. vegetation 95% Complete Dale Swicegood, PE Work began December 7, 2015. Road is closed with off-site
17BP.9.R.3 October 28, 2015 $830,623 Smith-Rowe LLC
Blvd) over Swearing Creek in Davidson County. established (20% ahead of schedule) (336)249-6255 detour.
Dec. 9, 2016)
Design Build Project - Bridge #424 (E Center St) work began
on December 7, 2015 and projected will be completed by
Replace (4) bridges in Davidson Co., (1) in Forsyth Co., Crowder Construction Jeremy Guy, PE
17BP.9.R.34 April, 2012 Oct. 20, 2016 97.1% Complete $12,585,775 August 23, 2016. Contractor has completed work on drill
(3) in Rowan Co., and (1) in Stokes Co. Co. (336)747-7950
shafts. Contractor is working on constructing end-bents, which
will follow by MSE Wall.
Permitting and design in Express Design Build Contract - Br. #258 over Swearing
DESIGN BUILD - Replace two (2) Bridges in Davidson Co.,
progress Dale Swicegood, PE Creek on SR 1272, and Br. #410 over Leonard Creek on SR
17BP.9.R.61 one (1) Bridge in Davie Co., three (3) Bridges in Rowan May 19, 2015 June 30, 2019 $10,642,621 Smith-Rowe, LLC
(Anticipate construction work to (336)249-6255 1844 in Davidson; (1) bridge in Davie; (2) bridges in Rowan;
Co., and four (4) Bridges in Stokes Co. begin Fall, 2016) and (4) bridges in Stokes Co.
Permitting and design in Express Design Build Contract - Br. #86 over First Potts
Mountain Creek
DESIGN BUILD - Replace three (3) Bridges in Davidson progress Dale Swicegood, PE Creek on SR 1158, Br. #95 over Leonard Creek on SR 1838,
17BP.9.R.62 May 19, 2015 Sept. 1, 2018 $4,740,000 Contractors/SEPI
Co. and seven (7) Bridges in Rowan Co. with Culverts (Anticipate construction work to (336)249-6255 and Br. #471 over Unnamed Creek on SR 2416 in Davidson
begin Fall, 2016)
Engineering
Co. and (7) bridges in Rowan Co.
Milling and resurfacing of 3.8 miles of US 64 from RR
2016CPT.09.01. Work scheduled to J.T. Russell & Sons, Dale Swicegood, PE Division Let contract. Continuation of previous resurfacing
crossing near Decker Rd. to the end of concrete island Aug. 12, 2015 May 20, 2016 $1,035,588
10291.1 begin early May, 2016 Inc. (336)249-6255 map. Work scheduled to begin early May, 2016.
near Linda Pl., just W. of I-85.
2017CPT.09.11. Asphalt Surface Treatment (AST) of 69.33 miles of Availability date Asphalt Maintenance Chris Corriher, PE
March 23, 2016 Oct. 14, 2016 $1,782,681 Work scheduled to begin May 9, 2016.
20292.1 Secondary routes in Davidson Co. April 25, 2016 Solutions, Inc (704)630-3200
Contract Resurfacing of 2 sections of NC 8, 1 section of
9CR.10291.160, May 25, 2016 J.T. Russell & Sons, Dale Swicegood, PE
US 64, 1 section of NC 68 and 8 sections of Secondary May 19, 2015 85% Complete $3,755,440 Work began August 3, 2015. Work resumed March 15, 2016.
9CR.20291.160 (revised) Inc. (336)249-6255
routes (20.54 miles) in Davidson County.
Davidson County Asphalt Surface Treatment (AST) Preconstruction meeting held Aug. 19, 2015. Work began
Blythe Construction, Chris Corriher, PE
9SP.20295.4 Retreatment (58.79 miles) of various Secondary routes in June 10, 2015 May 25, 2016 77.9% Complete $1,455,996 Sept. 22, 2015. Seasonal limitations in force currently, plan to
Inc. (704)630-3200
Davidson Co. start back in late March, weather permitting.
14
Completion Construction Project
T.I.P. No. Description Let Date Status Contractor Comments
Date Cost Administrator
Centrally Managed Projects under Development
Replace Bridge #271 on SR 2501 (S. Main St. Ext./ Lick ROW Acquisition Dale Swicegood, PE Coordinating with ALCOA to begin construction. Utility
17BP.9.R.10 Nov. 23, 2016 TBD $1,000,000 TBD
Creek Ch. Rd) over Lick Creek in Davidson County. in progress. (336)249-6255 relocation in progress
Replace Bridge #221 on SR 2324 (Harris Rd) over Lick Dale Swicegood, PE Plan Preparation 75% Complete; Let date is funding
17BP.9.R.15 TBD TBD $525,000 TBD
Creek in Davidson County. (336)249-6255 dependent
Replace Bridge #459 on SR 2160 (Smith Rd) over an Dale Swicegood, PE
17BP.9.R.33 Nov. 23, 2016 TBD $250,000 TBD Letting date delayed due to funding and other priorities.
unnamed creek in Davidson County. (336)249-6255
Bridge Preservation project - At this time, project will not be
Bridge Preservation – Bridge #31 on NC 8 and Bridge #82 Matt Jones, PE
41665.6A TBD TBD TBD $1,600,000 TBD pursued as designed. Looking at other avenues to replace or
on NC 47 in Davidson County (336)747-7800
rehab these bridges along with Bridge #55.
B-5165 Replace Bridge #46 on SR 1485 (Hampton Rd) over ROW Acquisition Dale Swicegood, PE
June 20, 2017 TBD $1,800,000 TBD *Schedule based on Approved 2016-2025 STIP
42341.3.1 Muddy Creek June 17, 2016 (336)249-6255
B-5765 Replace Bridge #115 on SR 1711 (Gumtree Rd) over ROW Acquisition Dale Swicegood, PE
Nov. 17, 2020 TBD $1,700,000 TBD *Schedule based on Approved 2016-2025 STIP
45721.3.1 WSSB RR Nov. 16, 2018 (336)249-6255
B-5773 Replace Bridge #25 on SR 3346 (S. Main St) over WSSB ROW Acquisition Dale Swicegood, PE
Dec. 17, 2024 TBD $3,250,000 TBD *Schedule based on Approved 2016-2025 STIP
45729.3.1 RR in Lexington July 15, 2022 (336)249-6255
B-5774 Replace Bridge #99 on SR 1810 (Clodfelter Rd) over ROW Acquisition Dale Swicegood, PE *Schedule based on Approved 2016-2025 STIP - Project
Feb. 26, 2020 TBD $1,200,000 TBD
45730.3.1 Brushy Creek March 31, 2019 (336)249-6255 accelerated due to additional revenue (HB 97)
B-5776 Replace Bridge #100 on SR 1810 (Clodfelter Rd) over ROW Acquisition Dale Swicegood, PE *Schedule based on Approved 2016-2025 STIP - Project
Feb. 26, 2020 TBD $1,800,000 TBD
45732.3.1 Abbott's Creek March 31, 2019 (336)249-6255 accelerated due to additional revenue (HB 97)
B-5777 ROW Acquisition Dale Swicegood, PE
Replace Bridge #58 on NC 109 over US 64 Feb. 15, 2022 TBD $1,850,000 TBD *Schedule based on Approved 2016-2025 STIP
45733.3.1 Feb. 19, 2021 (336)249-6255
B-5779 Replace Bridge #118 on US 29NB/64EB/70EB/I-85 Bus ROW Acquisition Dale Swicegood, PE *Schedule based on Approved 2016-2025 STIP -
April 15, 2025 TBD $4,061,000 TBD
45735.3.1 NB over SR 3346 (N Main St) in Lexington April 19, 2024 (336)249-6255 Coordinate with B-5785
B-5780 ROW Acquisition Dale Swicegood, PE
Replace Bridge #17 on NC 47 over Swearing Creek Dec. 14, 2016 TBD $1,400,000 TBD Structure and Geotech design in progress
45736.3.1 Acquisition in progress (336)249-6255
ROW Acquisition
B-5783 Replace Bridge #164 and Bridge #168 on US 29/70/I-85 Dale Swicegood, PE
April 15, 2025 TBD Acquisition $5,778,000 TBD *Schedule based on Approved 2016-2025 STIP
45738.3.1 Bus over NSRR (336)249-6255
April 19, 2024
B-5785 Replace Bridge #121 and Bridge #122 on US 29/70/I-85 ROW Acquisition Dale Swicegood, PE *Schedule based on Approved 2016-2025 STIP -
Feb. 18, 2025 TBD $4,000,000 TBD
45740.3.1 Bus over Leonard Creek Feb. 16, 2024 (336)249-6255 Coordinate with B-5779
B-5787 ROW Acquisition Dale Swicegood, PE
Replace Bridge #29 on NC 49 over NC 109 Sept. 19, 2023 TBD $2,000,000 TBD *Schedule based on Approved 2016-2025 STIP
45741.3.1 Sept. 16, 2022 (336)249-6255
I-5793 Pavement Rehabilitation of I-85 from SR 2025 (Squire Planning and Design in Chris Corriher, PE
Jan. 16, 2018 TBD $6,386,000 TBD DDRL - *Schedule based on Approved 2016-2025 STIP
53032.3.1 Bowers Rd) to 0.3 mi N. of NC 109 in Thomasville Progress (704)630-3200
I-40/US 311 at NC 109 (Thomasville Rd)/Clemmonsville
Rd in Winston-Salem. Convert Half Split Diamond
I-5880 ROW Acquisition Jeremy Guy, PE
Interchange at NC 109 to Full Split Diamond Interchange, Aug. 17, 2021 TBD $2,875,000 TBD *Schedule subject to Approved 2016-2025 STIP
53080.3.FR1 Nov. 11, 2019 (336)747-7950
and remove Half Split Diamond Interchange and
Connector Roads at Clemmonsville Rd.
15
Completion Construction Project
T.I.P. No. Description Let Date Status Contractor Comments
Date Cost Administrator
Centrally Managed Projects Under Development
R-5737 Convert at grade intersection to Interchange on US 29/70/I- ROW Acquisition Dale Swicegood, PE
March 16, 2021 TBD $15,000,000 TBD *Schedule based on Approved 2016-2025 STIP
50195.3.1 85 Bus at SR 1798 (Old Greensboro Rd) March 15, 2019 (336)249-6255
U-5757 Widen NC 8 (Winston Rd) to multi-lanes from 9th St to SR Planning and Design in Dale Swicegood, PE
June 26, 2019 TBD $1,254,000 TBD *Schedule based on Approved 2016-2025 STIP
54035.3.1 1408 (Biesecker Rd) in Lexington Progress (336)249-6255
U-5786 Widen SR 1508 (Hickory Tree Rd) from US 52/NC ROW Acquisition Dale Swicegood, PE
Feb. 21, 2023 TBD $13,794,000 TBD *Schedule based on Approved 2016-2025 STIP
44358.3.1 8/Future I-285 to NC 150 Feb. 22, 2021 (336)249-6255
U-5902B Widen NC 150 to multilanes from SR 1493 (Frye Bridge ROW & Utilities Dale Swicegood, PE *Schedule based on Approved 2016-2025 STIP - New
TBD TBD $33,150,000 TBD
44725.3.2 Rd) to Forsyth County Line TBD (336)249-6255 project programmed due to additional revenue (HB 97)
Division Managed Projects under Development
Bridge Painting on Bridges #136, 150 in Davidson;#'s
Matt Jones, PE No work is being done on this project at this time. No funding
17BP.9.P.3 29,32,85,86 in Davie; #'s 53,54,55,78,115,185,297,322 in TBD TBD $5,000,000 TBD
(336)747-7800 available for this project at this time.
Forsyth; and #94 in Rowan County.
Safety Improvements to median crossovers, etc., on I-85
W-5601CF ROW Acquisition Chris Corriher, PE Division Let. Public meeting held Jan. 14, 2016 at Davidson
Business from SR1797 (Evans Rd) to SR 1963 (Moose Jan. 25, 2017 TBD $600,000 TBD
50138.3.85 June 24, 2016 (704)630-3200 County Community College.
Lodge Rd) in Davidson Co.
Locally Administered Projects Under Development
Extend Sidewalks on SR 3346 (S Main St) and provide
C-5216 Planning/Design/ Right Chris Corriher, PE *Schedule based on Approved 2016-2025 STIP - Non-
wide paved shoulders on Anna Lewis Dr and Emergency Sept. 30, 2016 TBD $601,000 TBD
46261.3.1 of Way in progress (704)630-3200 DOT let (City of Lexington)
Dr. in Lexington
Provide wide paved shoulders and construct sidewalks on
C-5217 Planning/Design/ Right Chris Corriher, PE *Schedule based on Approved 2016-2025 STIP -
Cornelia St and Hillside Dr, bike and pedestrian Sept. 30, 2016 TBD $190,000 TBD
46262.3.1 of Way in progress (704)630-3200 Non-DOT let (City of Lexington)
improvements on Mize and Biesecker Rds.
Completed Projects
April 6, 2016
B-4741 Replace Bridge #38 on SR 1493 (Frye Bridge Rd) over (Perm. vegetation 100% Complete Dale Swicegood, PE Construction is 100% complete. Awaiting permanent
Dec. 16, 2014 $2,333,794 Dane Construction, Inc.
38514.3.FD1 Muddy Creek in Davidson County established (30% ahead of schedule) (336)249-6255 vegetation establishment for final acceptance
Dec. 12, 2016)
June 15, 2016 Only work on punchlist items remains. Minimal to no vehicular
C-4901A (Perm. vegetation 99% Complete Blythe Construction, Dale Swicegood, PE
NCRR/NS Mainline Bowers to Lake Railroad Roadbed June, 2013 $15,738,016 traffic impact. Awaiting permanent vegetation establishment
44001.3.STR01T4A established (7% ahead of schedule) Inc. (336)249-6255
Oct. 28, 2016) for final acceptance.
Pavement Rehabilitation, Bridge Preservation, and April 4, 2016
R-4750 Upgrade to Interstate Standards - US 29/52/70/I-85 Bus. (Perm. vegetation J. T. Russell & Sons, Chris Corriher, PE DDRL Project - waiting final punchlist items. Awaiting
September, 2013 99% Complete $7,571,155
39889.3.FS1 From I-85 to south of SR 1147 (Salisbury Rd) and Bridges established Inc. (704)630-3200 permanent vegetation establishment for final acceptance.
#43 & #225 over Swearing Creek on US 29/52/70. June 4, 2016)
16
Piedmont Authority for Regional Transportation Updates
for the Burlington-Graham MPO TCC/TAC
May 2016
PART Express Updates
Mr. James Wilds was the Operator of the Month for
March. He's been an operator for PART since
January of 2014.
The Alamance Regional Medical Center Park &
Ride Lot in Burlington is on pace for a Spring 2016
opening.
On Board Passenger Survey
PART Express On Board Survey will be
conducted during the next month. Be aware that
Shown Above: PART Express Ridership was 40,118 for March contract staff will be on board PART vehicles and
at Transportation Centers to conduct survey of
2016 with a projection of 475,608 for FY 2016.
passengers.
To learn more about PART’s programs and projects, please
visit www.partnc.org
Welcome New Board Member
James Butler, City Council Member for the City of Burlington Regional Advertising Contract
was sworn into the PART Board at the meeting held on April
13th. Mr. Butler was sworn in to the City Council in December A solicitation was conducted, and representatives of
of 2013. Born in Burlington and actively involved in the PART, High Point Transit, GTA and WSTA conducted
community for over 25 years, Mr. Butler plans to focus on evaluations of the submitted project proposals. The
issues related to city growth, quality of life, and fiscal firm selected was Streetlevel Media, LLC.
responsibility.
Stay Connected with PART on Social Media!
Page 1 of 2
17
Page 2 of 2
Commuter Dash 5K Run/Walk Regional Call Center Activities for
March
On April 16th the Sixth Annual Commuter Dash 5K was
held at Triad Park in Kernersville. Close to 200 people
participated in this great event, the weather was perfect Presented Calls: 7,375
and the crowd had lots of fun. Visit www.PARTnc.org to Answered Calls: 6,998
see results and photos. Avg. % of Calls Answered: 95.7%
Speed of Answer: 0:00:07
Avg. Call Duration: 0:00:53
Welcome Sabrina Glenn Vanpool Activities
# of Vans Leased: 55
# of Riders: 523
# of New Vans this report: 4
Join us in welcoming Mrs. Sabrina Glenn to the PART
Organization. Sabrina has worked in the field of
Transportation Demand Management for over 16 years.
Her experience includes working with local, regional, and
private sector organizations to address mobility issues in
Minnesota, Atlanta, and Florida. She has served in a
variety of capacities that support the development,
implementation, marketing, and promotion of programs
and services that support the use of alternatives to
driving alone. Her responsibilities at PART include the
oversight of the Commuter Resources department May is National Bike to Work Month
including the Call Center, Vanpool Program, and
Business Development and Outreach Efforts. If the average person biked once every 2 weeks instead
of driving, we could prevent 1 billion gallons of gasoline
We are happy to have her on the PART team! from entering the atmosphere every year.
Ride your bike to the PART Bus and board for Free on
May 20th!
18