Muyni
← Back to High Point

HPMPO Technical Coordinating Committee (TCC)

Regular Meeting

High Point, NC · May 17, 2016

AgendaMinutes

Agenda

HIGH POINT URBAN AREA MPO TECHNICAL COORDINATING COMMITTEE (TCC) Agenda for the May 17, 2016 TCC Meeting 2:00 PM ***Third Floor Conference Room*** High Point Municipal Building - City Hall 211 S. Hamilton Street, High Point Action Items 1. Consideration of the April 19th TCC meeting minutes. (Mark McDonald) Page 1 2. Recommendation to the TAC for approval of amendments to the 2016-2025 MTIP. (Greg Venable) Page 5 3. Recommendation of SPOT 4.0 HPMPO Prioritization Process and Preliminary Point Assignment (Greg Venable) Page 7 Information Items MPO Reports 4. NCDOT Division Reports Division 7 (Mike Mills / Ed Lewis) Division 8 (Brandon Jones / Darius Sturdivant) Page 13 Division 9 (Pat Ivey / Diane Hampton) Page 14 5. Triad Air Awareness Report (Lorelei Elkins) 6. NCDOT Transportation Planning Branch Report (Keith Dixon) 7. Hitran Report (Angela Wynes) 8. PART Report (Scott Rhine) Page 17 TCC Meeting Meeting Date 5/17/2016 Agenda Item No. 1 Action Requested Approve Section Tab Consideration of the April 19th TCC meeting minutes. (Mark McDonald) Information Summary Attachments Yes No The complete meeting minutes are in your packet as Attachment 1. TCC Vote: Motion Second By:__________________ By:_______________________ Vote: For_______________________ Against________________________ 1 MINUTES TECHNICAL COORDINATING COMMITTEE April 19, 2016 TCC MEMBERS PRESENT: Chuck George, Bryan Fulbright, Darius Sturdivant, Jen Britt, Diane Hampton, Ed Lewis, Chuck Smith, Mark McDonald, Lee Burnette, John Olinger, Heidi Galanti, Jay Dale, Jason Miller, Wayne Davis, and Mark Kirstner TAC MEMBERS PRESENT: Joe Geigle (FHWA) OTHERS PRESENT: Greg Blakeney (NCDOT _ PDEA), Emaly Simone (Baker Engineering), Ken Gilland (Baker Engineering), Jeffrey Teague (NCDOT Roadway Design), Tony Houser (NCDOT Roadway), Jay McInnis (NCDOT PDEA), John Hanes (High Point) RECORDING SECRETARY: Marianne Janiszewski, City of High Point Mark McDonald called the meeting to order. ACTION ITEMS Item 1: Consideration of the March 15, 2016 TCC Meeting Minutes. The minutes were approved. Motion by: Chuck George Seconded by: Bryan Fulbright Vote: For: Unanimous Against: None Item 2: Recommendation to the TAC for approval of Amendments to the 2016-2025 MTIP. John reviewed the various STIP modifications and additions. Motion by: Bryan Fulbright Seconded by: Chuck George Vote: For: Unanimous Against: None 2 Information Items Item 3: SPOT 4.0 John reviewed the SPOT process. Staff received the SPOT scores from the State a few weeks ago and they have been distributed out to local libraries for public review and comment on the methodology that was used and the score rankings. John reviewed the top five ranked highway projects, the top three bike and pedestrian projects and the top two rail projects. The TAC vote counts for 40%, congestion 20%, safety 20% accessibility 10% and freight 10% for a total of 100%. There is a total of 1600 points for regional projects and 1600 points for division projects. The next step is to meet with the Division Offices to discuss how to maximize the regional points with the division points. MPO Reports Item 5: NCDOT Division Reports Division 7 Ed Lewis reported that the design and bid document preparation for the ped improvements on N. Main and Lexington Ave. are in progress and the signal plans have been approved. They were hoping to have a public workshop on the I-74/US 311 and NC 68 interchange early in 2016 but they are waiting on a noise wall study. Division 8 Darius Sturdivant reported that the Prospect St. Bridge Project is 40% complete and is scheduled to be completed in March of 2017. The safety project at the intersection of NC 62 and Finch Farm Rd. was completed as of April 1, 2016. Darius has confirmed with SPOT and Programming that if the traffic study comes back and shows that a 4 lane is not needed then it will be constructed as a 3 lane. The interchange at I-85 and S. Main St. in Archdale is in the current STIP and the feasibility study is complete but has been shelved until Right of Way cost is received. Division 9 Diane Hampton reported that replacement bridge over Business 85 in Lexington is just now getting underway. The bridge will stay open during construction. Item 5: Triad Air Awareness No one was present. Item 6: NCDOT Transportation Planning Branch Wayne Davis was late and did not give a report. Item 7: Hi tran No one was present. Mark stated that Angela is making good progress with the purchase of our next fleet of busses. Delivery is expected at the end of this year or first part of next year. Information has also been submitted for some additional grant funding for 3 some improvements to the transportation terminal and a building at the Hi tran facility to accommodate the para transit operations. Item 8: PART Mark Kirstner reported that the Triad Commute Challenge was very successful. Discussion Item 9: Ken Gilland and Emaly Simone from Baker Engineering gave a presentation on project U-5864 – Surrett Drive Widening Project. There was no other business. The meeting was adjourned. 4 TCC Meeting Meeting Date 5/17/2016 Agenda Item No. 2 Action Requested Recommendation Section Tab Consideration of amendments to the 2016-2025 MTIP. (Greg Venable) Information Summary Attachments Yes No The proposed amendments to the 2016-2025 MTIP for the High Point MPO are included in you packet. Staff is requesting a recommendation to the TAC for approval of the amendments to the 2016-2025 MTIP. TCC Vote: Motion Second By:__________________ By:_______________________ Vote: For_______________________ Against________________________ 5 HIGH POINT URBAN AREA METROPOLITAN PLANNING ORGANIZATION ITEM N (HANDOUT) REVISIONS TO THE 2016-2025 STIP HIGHWAY PROGRAM STIP MODIFICATIONS DIVISION 9 I-5793 I-85, EAST OF US 64 TO NC 109 IN THOMASVILLE. CONSTRUCTION FY 2018 - $5,693,000 (NHPIM) DAVIDSON PAVEMENT REHABILITATION. FY 2019 - $5,693,000 (NHPIM) PROJ.CATEGORY MODIFY DESCRIPTION TO EXTEND NORTHERN $11,386,000 STATEWIDE PROJECT LIMIT BASED ON LATEST INTERSTATE MAINTENANCE PRIORITIZATION. These items are for informational purposes only and subject to future NC Board of Transportation approval. It is anticipated that these items will be considered for NC Board of Transportation approval in 30 days. * INDICATES FEDERAL AMENDMENT Thursday, May 05, 2016 6 1 TCC Meeting Meeting Date 5/17/2016 Agenda Item No. 3 Action Requested Recommendation Section Tab SPOT 4.0 HPMPO Prioritization Process and Preliminary Point Assignment (Greg Venable) Information Summary Attachments Yes No The public had at least thirty (30) days to review and comment on the SPOT 4.0 HPMPO prioritization process and preliminary point assignment as voted on by TAC members. Staff is requesting recommendation to the TAC for final approval of the process and point assignments. TCC Vote: Motion Second By:__________________ By:_______________________ Vote: For_______________________ Against________________________ 7 SPOT 4.0 HPMPO PRIORITY LIST OF PROJECTS AND DRAFT PRELIMINARY POINTS ASSIGNMENT ESTIMATED A HPMPO NCDOT HPMPO NCDOT HPMPO MAP PROJECT TOTAL PROJECT HIGHWAY TOTAL REGIONAL REGIONAL DIVISION DIVISION # SPOT ID CATEGORY TIP # ROUTE NAME FROM TO PROJECT DESCRIPTION COST TAC RANK SCORE SCORE POINTS SCORE POINTS North of SR 1756 North of Widen to Multi-Lanes with Bypass of H8 H090138-CA Regional Impact R-2568C NC 109 in Davidson County (Old Greensboro Road) Motsinger Road Wallburg, Part on New Location $83,900,000 1 71.71 28.13 96 21.29 96 Eastchester Dr (NC 68) in H7 H150362 Regional Impact High Point Hickswood Rd Gallimore Dairy Rd Upgrade existing NC-68 to superstreet $32,708,000 2 69.41 51.24 100 37.64 Reconstruct the Existing Obsolete interchange of I-85 Business and I-85 Bus Interchange in High Main Street. Bridge Is Structurally H17 H090602 Regional Impact Point S. Main Street in High Point Deficient. $10,912,000 3 67.63 38.49 100 28.15 100 Widen roadway to accommodate a two lane median divided facility with E. Lexington Ave. in High bike lanes and sidewalks on both H2 H150360 Division Needs Point Montlieu Ave. Main St. sides $25,923,000 4 67.02 N/A 26.47 100 SR 2123 I-85 Business/ Widen to Multi-Lanes, Part on New H32 H090528-C Regional Impact U-5311C NC 109 in Thomasville (Main Street) US 29/US 70 Location $27,346,000 5 62.54 23.82 100 18.39 100 Improve interchange area including realignments of Weant Road and H18 H090607-C Regional Impact NC 62 in Archdale Weant Road Kersey Valley Road Kersey Valley Road $11,394,000 6 62.30 35.39 100 26.80 100 I-85 Widen to Multi-Lanes. Sidewalks H9 H090294 Regional Impact R-4734 NC 109 in Davidson County in Thomasville NC 47 in Denton within Denton town Limits. $133,435,000 7 59.49 35.07 100 26.77 100 Statewide H25 H090061-CA Mobility R-2220CA US 64 in Davidson County NC 109 Randolph County Line Widen to Multi-Lanes. $30,436,000 8 58.69 33.74 100 25.50 100 NC 62 in Trinity and Rockford Drive Widen NC 62 to a Multi-Lane Divided H12 H090607-A Regional Impact Archdale west of Archdale East Fairfield Drive Facility with Sidewalks on Both Sides. $40,399,000 9 56.29 28.51 100 22.29 100 Widen interstate from 4 Lanes to Six Statewide I-40 in Forsyth and Guilford I-40 Business/ Lanes Between US 311 and I-40 H33 H090605-A Mobility Counties US 311 US 421 Bus./US 421. $138,771,000 10 55.88 38.00 26.87 Westside Bypass in I-85 Business/ SR 2212 Construct Multi-Lanes on New H20 H090341 Regional Impact U-2545 Lexington US 29/52/70 (Fairview Road) Location $60,759,000 11 53.84 20.69 100 15.70 100 Statewide H10 H090061-B Mobility R-2220B US 64 in Davidson County East of I-85 in Lexington NC 109 Widen to Multi-Lanes. $51,492,000 12 53.41 37.71 100 28.26 100 NC 62 SR 2123 Widen to Multi-Lanes, Part on New H30 H090528-B Regional Impact U-5311B NC 109 in Thomasville (Cloninger Drive) (Main Street) Location $24,995,000 13 50.41 23.69 100 18.32 SR 2067 NC 62 Widen to Multi-Lanes, Part on New H19 H090528-A Regional Impact U-5311A NC 109 in Thomasville (Lambeth Road) (Cloninger Drive) Location $19,550,000 14 49.12 23.60 100 18.28 Widen NC 62 to a Multi-Lane Divided H13 H090607-B Regional Impact NC 62 in Archdale East Fairfield Drive I-74 Facility with Sidewalks on Both Sides. $30,030,000 15 48.13 24.72 100 18.77 Widen roadway to accommodate a two lane median divided facility with Montlieu Avenue in High bike lanes and sidewalks on both H15 H141847 Division Needs U-5855 Point Interstate 74 University Parkway sides $13,958,000 16 47.34 N/A 26.09 8 Convert Macy Grove Road Grade Statewide I-40 Interchange in Guilford Separation to Interchange to Relieve I- H26 H090605-B Mobility County Macy Grove Road 40/NC 66 interchange $12,740,000 17 44.90 40.18 100 27.87 SR 1493 (Frye Bridge Rd SR 1493 Frye Bridge/ /Welcomearcadia Rd) to US 64. Widen H1 H090970-A Regional Impact NC 150 in Davidson County Welcome Arcadia Road US 64 to Multi-Lanes. Add to Stip. $121,481,000 18 43.15 32.91 60 25.96 Surrett Drive (SR 1595/1216) in High Eden Terrace to Market Center Drive. H22 H090406 Division Needs U-3432 Point Eden Terrace Market Center Drive Widen to Multi-Lanes. $14,076,000 19 42.18 N/A 10.80 US 601 South of Mocksville to US 52 in Lexington. Widen to Multi-Lanes and Upgrade interchange at US 52. US 52 Section B: US 64 from Davie County H29 H090241-B Regional Impact R-3602B US 64 in Davidson County Davie County Line in Lexington Line to US 52 in Lexington. $58,975,000 20 41.88 34.91 44 26.04 Turner St./Liberty St. NC 62 (Cloniger Street) to SR 2123 (SR 2165/2055) in NC 62 SR 2123 (National Highway). H31 H090469 Division Needs U-4420 Thomasville (Cloniger Street) (National Highway) Widen to Multi-Lanes. $37,362,000 21 39.81 N/A 21.00 NC 8 (Cotton Grove Road) SR 2412 SR 1115 Widen to Multi-Lanes, Part on New H4 H090078-BA Regional Impact in Davidson County (Rothrock Road) (Wrenn Road) Location $37,039,000 22 38.07 29.08 23.01 High Point City Limits Widen the existing road way to a W. Lexington Avenue in just east of three lane facility with bike lanes and H5 H150302 Division Needs High Point Kensington Drive Pinewood Lane sidewalks on both sides. $9,612,000 23 36.60 N/A 17.39 Skeet Club Road (SR 1003/1820) in High East of SR 1818 H24 H090431-A Division Needs U-3615A Point US 311/N Main St. (Johnson Street) Widen to Multi-Lanes $24,094,000 24 35.13 N/A 21.09 East Fairfield Road (NC 610) NC 62 H36 H090407 Regional Impact U-3433 in High Point S. Main Street (High Point) (Liberty Street) Widen to Multi-Lanes. $28,408,000 25 33.57 33.03 25.66 Construct Multi-Lane facility with Piedmont Parkway SR 1850 sidewalks and bike lanes, part on new H35 H090609 Division Needs Extension in High Point NC 68 (Sandy Ridge Road) location $41,267,000 26 29.26 N/A 13.60 High Point Airport Connector in Guilford NC 66 /N Main St./ Johnson Street / Construct Multi-Lane Facility, H27 H090604 Regional Impact County High Point Road Sandy Ridge Road part on new location (FS-0707B) $54,324,000 27 26.38 14.45 11.19 NC 24/27 in Troy to NC 47 in Denton. Widen Existing Two-Lane Cross Section; Improve Shoulders; Add Turn Lanes at Traffic Generators; Improve Signalization. Provide Bicycle H21 H090740 Regional Impact NC 109 in Davidson County NC 24/27 NC 47 Accomodation $22,573,000 28 24.44 28.72 21.68 Widen existing Triangle Lake Rd. to Triangle Lake Rd. in High three lane curb and gutter facility H6 H150361 Division Needs Point Hickory Chapel Rd. Central Ave. with sidewalk on both sides. $11,618,000 29 22.69 N/A 13.20 SR 2504 SR 2412 Widen to Multi-Lanes, Part on New H3 H090078-AB Regional Impact NC 8 in Davidson County (Hunt Road) (Rothrock Road) Location $69,592,000 30 20.05 14.00 11.27 Kivett Drive in Guilford I-85 Business/ Widen Kivett Drive Between I-85 H14 H090610 Division Needs County I-85 US 29/US 70 Business and I-85 $32,078,000 31 18.19 N/A 13.84 Re-Construct interchange at intersection of I-85 Business/US H34 H111157 Regional Impact I-85 Bus in Lexington US 64 29/70 & US 64 East of Lexington $34,410,000 32 16.56 14.96 7.83 I-85 Interchange in Guilford New interchange of I-85 and Kivett H23 H090608 Division Needs County Kivett Drive Drive $6,386,000 33 14.20 N/A 7.08 9 ESTIMATED A HPMPO NCDOT HPMPO NCDOT HPMPO MAP PROJECT TOTAL PROJECT BIKE & PED TOTAL REGIONAL REGIONAL DIVISION DIVISION # SPOT ID CATEGORY TIP # ROUTE NAME FROM TO PROJECT DESCRIPTION COST TAC RANK SCORE SCORE POINTS SCORE POINTS Eastchester Drive in High BP3 B150310 Division Needs Point Johnson Street Hartley Drive Construct a 5-foot concrete sidewalk $142,200 1 77.28 100 University Parkway in High BP7 B150369 Division Needs Point East Green Drive Dr ML King Jr Drive Construct a 5-foot concrete sidewalk $128,600 2 74.60 100 West Wendover Avenue in BP6 B150370 Division Needs High Point NC-68 Eastchester Drive Gibson Park Entrance Construct a 5-foot concrete sidewalk $212,440 3 70.79 Construct a 5-foot concrete sidewalk BP1 B151047 Division Needs Oakdale Road in Jamestown Chimney Court Jamestown Oaks on the east side of Oakdale Road $216,000 4 66.45 Johnson Street in High BP5 B150374 Division Needs Point Parris Avenue Hartley Drive Construct a 5-foot concrete sidewalk $142,000 5 66.20 Construct a 5-foot concrete sidewalk and concrete curb and gutter on the Main Street / Existing Sidewalk north side of Main Street and the east BP2 B150901 Division Needs Penny Road in Jamestown on Main Street Park Access on Penny Road side of Penny Road. $500,000 6 58.84 Eastchester Drive in High BP4 B150365 Division Needs Point Centennial Street Lassiter Drive Construct a 5-foot concrete sidewalk $125,120 7 58.62 ESTIMATED A HPMPO NCDOT HPMPO NCDOT HPMPO MAP PROJECT TOTAL PROJECT RAIL TAC TOTAL REGIONAL REGIONAL DIVISION DIVISION # SPOT ID CATEGORY TIP # ROUTE NAME FROM TO PROJECT DESCRIPTION COST RANK SCORE SCORE POINTS SCORE POINTS Yadkin Valley Station in Construct a new passenger station in R3 R150375 Division Needs Lexington Lexington and passenger platforms $30,000,000 1 78.36 23.10 100 East 7th Avenue in Construct a grade separation of the R1 R150903 Division Needs Lexington rail line and E. 7th Avenue $5,000,000 2 76.04 26.40 100 Provide a grade separation between the existing rail line and Turner Street Turner Street/Liberty Street / Liberty Street at the existing at grade R4 R150855 Division Needs in Thomasville rail crossing $34,500,000 3 67.24 23.10 Jamestown siding extension to allow Statewide Norfolk Southern Main in the local train to clear the mainline R5 R140003 Mobility Jamestown during switching operations. 4 64.17 48.06 35.83 Kimberly Clark lead in Lexington, Davidson County. Allows the local train to clear the mainline track during switching operations, Statewide Norfolk Southern Main in increasing network fluidity for freight R2 R140010 Mobility Lexington & passenger traffic. $2,000,000 5 58.76 46.35 34.97 10 ESTIMATED T NCDOT HPMPO NCDOT HPMPO MAP PROJECT TOTAL PROJECT A AVIATION REGIONAL REGIONAL DIVISION DIVISION # SPOT ID CATEGORY TIP # ROUTE NAME FROM TO PROJECT DESCRIPTION COST TAC RANK SCORE POINTS SCORE POINTS Upgrade and strengthen the existing runway due to excessive cracking on the airfield and an increase of the number of requests for large private aircraft for landings. The PCI in 2014 was 74; however the airport has contractors making regular trips for Davidson County Airport crack sealing. In 2016 the pavement Runway Rehabilitation and will be 17 years old and in need of A1 A151104 Division Needs Strengthening rehab. $3,616,000 1 36.90 100 ESTIMATED T TRANSIT NCDOT HPMPO NCDOT HPMPO MAP PROJECT TOTAL PROJECT A PROJECT REGIONAL REGIONAL DIVISION DIVISION # SPOT ID CATEGORY TIP # ROUTE NAME FROM TO PROJECT DESCRIPTION COST RANK SCORE POINTS SCORE POINTS Upgrade approximately 3,000 square feet of an existing 6,000 square foot building. The renovations will allow the para-transit division of the transit system to be in its own facility complete with offices for the supervisor and the para-transit services coordinator. The facility will also include space to allow for in- person interviews and functional Para Transit Facility 716- assessments for ADA para-transit T1 T150904 718 W. Kivett Drive eligibility. $300,000 1 51.12 100 37.30 11 TCC Meeting Meeting Date 5/17/2016 Agenda Item No. 4-8 Action Requested Information Section Tab MPO Reports Information Summary Attachments Yes No Agenda Item 4 Division Reports Agenda Item 5 Triad Air Awareness Agenda Item 6 Transportation Planning Branch Report Agenda Item 7 Hitran Agenda Item 8 PART Report TCC Vote: Motion Second By:__________________ By:_______________________ Vote: For_______________________ Against________________________ 12 DIVISION 8 - ACTIVE PROJECTS (HIGH POINT MPO) TIP/WBS/ Completion Description Let Date Status Cost Contractor Comments Contract # Date Asphalt Surface Treatment: SR 1916, SR 2039, SR 1697, 53% Riley Paving DH00172 6/9/15 Spring 2016 $867,269 Work started 9/18/15 SR 1685 and SR 1536 Complete INC APAC- Atlantic, INC. Resurfacing SR 1567, SR 1545, SR 1597, SR 1794, SR 86% DH00175 7/30/15 6/24/16 $1,398,521 Thompson Work started 10/7/15 1850 and SR 1864 Complete Arthur Division Asphalt Surface Treatment on 30 sections of primary and 17% Whitehurst DH00178 secondary roads: SR 3261 Pineview Avenue from SR 1627 9/8/15 6/24/16 $844,950 Work started 3/21/16 Complete Paving Old Thomasville Rd to End of Maintenance Country Boy SR 1603 School Rd - Replace Bridge #84 over Muddy DH00191 2/23/16 4/3/17 No Report $728,888 Landscaping Work started 4/15/16 Creek. INC SR 1619 Prospect Street - Replace Bridge #136 over US 43% Lee B-5114 6/16/15 3/15/17 $4,714,965 Work started 8/7/15 29/70/I-85 Business. Complete Construction I-73 Pavement Rehabilitation from US 311 to 0.6 mi North APAC- of SR 1938 Hockett Dairy Road; 7.7 miles - Combined with I- Atlantic, INC. 5737: I-73 from 1.3 miles north of SR 1504 Spero Road to I-5763 1/19/16 10/28/16 4% Complete $ 6,298,145 Thompson Work started 4/18/16 US 311, 2.2 miles) and Combined with W-5601AJ: I- Arthur 73/74/US 220 from south of SR 2269 Vision Drive to south Division of SR 1712 Pineview Road. DIVISION 8 - UPCOMING PROJECTS (HIGH POINT MPO) TIP/WBS/ Description Let Date Comments Cost Contract # I-85 South of SR 1009 to North of SR 1912 Lunar Drive in Archdale. Pavement Rehabilitation. Scope of work should Project let date delayed from Mar 2016 to $7,000,000 I-5738 include milling and filling of deteriorating asphalt paved Jun-16 June 2016. Project combined with I-5821 Total Contract Amt $16,900,000 shouders, rehabilitation of ramps and rehabilitation of and I-5789. concrete aprons around drainage structures. SR 1944 Branson Davis Rd from US 311 to SR 2017 Summer 8CR.207611.xx Randolph 2016 Summer Resurfacing TBD Walker Mill Rd. 2016 ROW is being acquired; Utilities to be SR 1911 Ashland Street (Archdale) - Replace Bridge #416 relocated; Power is authorized to move; 17BP.8.R.76 Jun-18 TBD over Dale Creek. Relocation of water lines to be determined. 13 High_Point_Urban_Area_MPO Div 8 Project Report May 2016 High Point Urban Area MPO Piedmont Triad RPO NCDOT Transportation Update Tuesday, May 17, 2016 Completion Construction Project T.I.P. No. Description Let Date Status Contractor Comments Date Cost Administrator Centrally Managed Projects under Construction May 1, 2019 Contractor began work on project on April 4, 2016. Road to B-3159 Replace Bridge #27 on US 52/NC 8 over US 29/64/70/I-85 (perm. vegetation J.T. Russell & Sons, Dale Swicegood, PE Oct. 20, 2015 4.4% Complete $10,164,621 remain open during construction, with periodic lane closures 38331.3.FR1 Bus. Loop in Lexington established Inc. (336)249-6255 October 28, 2019) on NC 8 and nighttime stoppages on I-85 Bus. 2016CPT.09.18. Contract Resurfacing of Primary routes including (1) 10291.1 Availability J.T. Russell & Sons, Dale Swicegood, PE section of US 64, (2) sections of NC 8, and (8) sections of April 19, 2016 May 19, 2017 $2,847,876 Centrally let contract 2016CPT.09.19. June 6, 2016 Inc. (336)249-6255 20291.1 Secondary routes for 18.729 miles in Davidson Co. Division Managed Projects under Construction Contract Landscaping on I-85 from (SR 1224) Hardgrave Contractor completed supplemental seeding and fertilizer I-2304AC/AD (L) Staniel Key Todd Hiatt Rd in Davidson Co. to (SR2120) Long Ferry Rd in Rowan Sept. 23, 2015 May 6, 2018 45% Complete $1,281,336 topdressing.Contractor is planting containerized grasses 34156.3.12 Landscaping (336)896-2380 Co. throughout project. Pavement Rehabilitation of 5.17 miles of I-85 from the Contractor plans to start work in June, 2016. Will be all I-5740 ramps N. of Old Hwy 64 to the concrete pavement south of Availability date Blythe Construction, Chris Corriher, PE Feb. 24, 2016 August 31, 2016 $1,069,294 nighttime work. Preconstruction meeting scheduled for May 52021.3.1 SR 2010 (E. Holly Grove Rd), which includes milling, April 4, 2016 Inc. (704)630-3200 25, 2016. paving, and pavement markings. Grading, drainage, widening, paving, and pavement U-4742NC markings on SR 1508 (Hickory Tree Rd) and SR 1601 Contractor began work on April 25, 2016. Clearing, grubbing, 39746.3.24 Work start date Thunder Contracting, Wright Archer, III, PE (Mendenhall Rd) in Davidson Co. Install left turn lane on Feb. 24, 2016 Sept. 30, 2016 $366,513 and grading work will continue over the next few days with SS-4909AH April 25, 2016 Inc (336)747-7900 SR 1508 (Hickory Tree Rd) near SR 1601 (Mendenhall shoulder widening to begin before mid-May. 43399.3.1 Rd). Replace Bridge #361 on SR 1837 (Bud Sink Rd) over June 3, 2016 BD-5109L Leonard Creek in Davidson County. Includes Grading, (perm. vegetation 74.4% Complete Dale Swicegood, PE Work began Feb. 16, 2016, using an off-site detour. Work on 45355.2.12 Dec. 9, 2015 $378,498 TCB Builders, LLC Drainage, Widening, Structure, Paving, and Pavement established (10% ahead of schedule) (336)249-6255 replacing the bridge has begun 17BP.9.R.63 Dec. 31, 2016) Markings. June 23, 2016 Replace Bridge #40 on SR 1298 / I-85 Service Rd (Grimes (perm. vegetation 95% Complete Dale Swicegood, PE Work began December 7, 2015. Road is closed with off-site 17BP.9.R.3 October 28, 2015 $830,623 Smith-Rowe LLC Blvd) over Swearing Creek in Davidson County. established (20% ahead of schedule) (336)249-6255 detour. Dec. 9, 2016) Design Build Project - Bridge #424 (E Center St) work began on December 7, 2015 and projected will be completed by Replace (4) bridges in Davidson Co., (1) in Forsyth Co., Crowder Construction Jeremy Guy, PE 17BP.9.R.34 April, 2012 Oct. 20, 2016 97.1% Complete $12,585,775 August 23, 2016. Contractor has completed work on drill (3) in Rowan Co., and (1) in Stokes Co. Co. (336)747-7950 shafts. Contractor is working on constructing end-bents, which will follow by MSE Wall. Permitting and design in Express Design Build Contract - Br. #258 over Swearing DESIGN BUILD - Replace two (2) Bridges in Davidson Co., progress Dale Swicegood, PE Creek on SR 1272, and Br. #410 over Leonard Creek on SR 17BP.9.R.61 one (1) Bridge in Davie Co., three (3) Bridges in Rowan May 19, 2015 June 30, 2019 $10,642,621 Smith-Rowe, LLC (Anticipate construction work to (336)249-6255 1844 in Davidson; (1) bridge in Davie; (2) bridges in Rowan; Co., and four (4) Bridges in Stokes Co. begin Fall, 2016) and (4) bridges in Stokes Co. Permitting and design in Express Design Build Contract - Br. #86 over First Potts Mountain Creek DESIGN BUILD - Replace three (3) Bridges in Davidson progress Dale Swicegood, PE Creek on SR 1158, Br. #95 over Leonard Creek on SR 1838, 17BP.9.R.62 May 19, 2015 Sept. 1, 2018 $4,740,000 Contractors/SEPI Co. and seven (7) Bridges in Rowan Co. with Culverts (Anticipate construction work to (336)249-6255 and Br. #471 over Unnamed Creek on SR 2416 in Davidson begin Fall, 2016) Engineering Co. and (7) bridges in Rowan Co. Milling and resurfacing of 3.8 miles of US 64 from RR 2016CPT.09.01. Work scheduled to J.T. Russell & Sons, Dale Swicegood, PE Division Let contract. Continuation of previous resurfacing crossing near Decker Rd. to the end of concrete island Aug. 12, 2015 May 20, 2016 $1,035,588 10291.1 begin early May, 2016 Inc. (336)249-6255 map. Work scheduled to begin early May, 2016. near Linda Pl., just W. of I-85. 2017CPT.09.11. Asphalt Surface Treatment (AST) of 69.33 miles of Availability date Asphalt Maintenance Chris Corriher, PE March 23, 2016 Oct. 14, 2016 $1,782,681 Work scheduled to begin May 9, 2016. 20292.1 Secondary routes in Davidson Co. April 25, 2016 Solutions, Inc (704)630-3200 Contract Resurfacing of 2 sections of NC 8, 1 section of 9CR.10291.160, May 25, 2016 J.T. Russell & Sons, Dale Swicegood, PE US 64, 1 section of NC 68 and 8 sections of Secondary May 19, 2015 85% Complete $3,755,440 Work began August 3, 2015. Work resumed March 15, 2016. 9CR.20291.160 (revised) Inc. (336)249-6255 routes (20.54 miles) in Davidson County. Davidson County Asphalt Surface Treatment (AST) Preconstruction meeting held Aug. 19, 2015. Work began Blythe Construction, Chris Corriher, PE 9SP.20295.4 Retreatment (58.79 miles) of various Secondary routes in June 10, 2015 May 25, 2016 77.9% Complete $1,455,996 Sept. 22, 2015. Seasonal limitations in force currently, plan to Inc. (704)630-3200 Davidson Co. start back in late March, weather permitting. 14 Completion Construction Project T.I.P. No. Description Let Date Status Contractor Comments Date Cost Administrator Centrally Managed Projects under Development Replace Bridge #271 on SR 2501 (S. Main St. Ext./ Lick ROW Acquisition Dale Swicegood, PE Coordinating with ALCOA to begin construction. Utility 17BP.9.R.10 Nov. 23, 2016 TBD $1,000,000 TBD Creek Ch. Rd) over Lick Creek in Davidson County. in progress. (336)249-6255 relocation in progress Replace Bridge #221 on SR 2324 (Harris Rd) over Lick Dale Swicegood, PE Plan Preparation 75% Complete; Let date is funding 17BP.9.R.15 TBD TBD $525,000 TBD Creek in Davidson County. (336)249-6255 dependent Replace Bridge #459 on SR 2160 (Smith Rd) over an Dale Swicegood, PE 17BP.9.R.33 Nov. 23, 2016 TBD $250,000 TBD Letting date delayed due to funding and other priorities. unnamed creek in Davidson County. (336)249-6255 Bridge Preservation project - At this time, project will not be Bridge Preservation – Bridge #31 on NC 8 and Bridge #82 Matt Jones, PE 41665.6A TBD TBD TBD $1,600,000 TBD pursued as designed. Looking at other avenues to replace or on NC 47 in Davidson County (336)747-7800 rehab these bridges along with Bridge #55. B-5165 Replace Bridge #46 on SR 1485 (Hampton Rd) over ROW Acquisition Dale Swicegood, PE June 20, 2017 TBD $1,800,000 TBD *Schedule based on Approved 2016-2025 STIP 42341.3.1 Muddy Creek June 17, 2016 (336)249-6255 B-5765 Replace Bridge #115 on SR 1711 (Gumtree Rd) over ROW Acquisition Dale Swicegood, PE Nov. 17, 2020 TBD $1,700,000 TBD *Schedule based on Approved 2016-2025 STIP 45721.3.1 WSSB RR Nov. 16, 2018 (336)249-6255 B-5773 Replace Bridge #25 on SR 3346 (S. Main St) over WSSB ROW Acquisition Dale Swicegood, PE Dec. 17, 2024 TBD $3,250,000 TBD *Schedule based on Approved 2016-2025 STIP 45729.3.1 RR in Lexington July 15, 2022 (336)249-6255 B-5774 Replace Bridge #99 on SR 1810 (Clodfelter Rd) over ROW Acquisition Dale Swicegood, PE *Schedule based on Approved 2016-2025 STIP - Project Feb. 26, 2020 TBD $1,200,000 TBD 45730.3.1 Brushy Creek March 31, 2019 (336)249-6255 accelerated due to additional revenue (HB 97) B-5776 Replace Bridge #100 on SR 1810 (Clodfelter Rd) over ROW Acquisition Dale Swicegood, PE *Schedule based on Approved 2016-2025 STIP - Project Feb. 26, 2020 TBD $1,800,000 TBD 45732.3.1 Abbott's Creek March 31, 2019 (336)249-6255 accelerated due to additional revenue (HB 97) B-5777 ROW Acquisition Dale Swicegood, PE Replace Bridge #58 on NC 109 over US 64 Feb. 15, 2022 TBD $1,850,000 TBD *Schedule based on Approved 2016-2025 STIP 45733.3.1 Feb. 19, 2021 (336)249-6255 B-5779 Replace Bridge #118 on US 29NB/64EB/70EB/I-85 Bus ROW Acquisition Dale Swicegood, PE *Schedule based on Approved 2016-2025 STIP - April 15, 2025 TBD $4,061,000 TBD 45735.3.1 NB over SR 3346 (N Main St) in Lexington April 19, 2024 (336)249-6255 Coordinate with B-5785 B-5780 ROW Acquisition Dale Swicegood, PE Replace Bridge #17 on NC 47 over Swearing Creek Dec. 14, 2016 TBD $1,400,000 TBD Structure and Geotech design in progress 45736.3.1 Acquisition in progress (336)249-6255 ROW Acquisition B-5783 Replace Bridge #164 and Bridge #168 on US 29/70/I-85 Dale Swicegood, PE April 15, 2025 TBD Acquisition $5,778,000 TBD *Schedule based on Approved 2016-2025 STIP 45738.3.1 Bus over NSRR (336)249-6255 April 19, 2024 B-5785 Replace Bridge #121 and Bridge #122 on US 29/70/I-85 ROW Acquisition Dale Swicegood, PE *Schedule based on Approved 2016-2025 STIP - Feb. 18, 2025 TBD $4,000,000 TBD 45740.3.1 Bus over Leonard Creek Feb. 16, 2024 (336)249-6255 Coordinate with B-5779 B-5787 ROW Acquisition Dale Swicegood, PE Replace Bridge #29 on NC 49 over NC 109 Sept. 19, 2023 TBD $2,000,000 TBD *Schedule based on Approved 2016-2025 STIP 45741.3.1 Sept. 16, 2022 (336)249-6255 I-5793 Pavement Rehabilitation of I-85 from SR 2025 (Squire Planning and Design in Chris Corriher, PE Jan. 16, 2018 TBD $6,386,000 TBD DDRL - *Schedule based on Approved 2016-2025 STIP 53032.3.1 Bowers Rd) to 0.3 mi N. of NC 109 in Thomasville Progress (704)630-3200 I-40/US 311 at NC 109 (Thomasville Rd)/Clemmonsville Rd in Winston-Salem. Convert Half Split Diamond I-5880 ROW Acquisition Jeremy Guy, PE Interchange at NC 109 to Full Split Diamond Interchange, Aug. 17, 2021 TBD $2,875,000 TBD *Schedule subject to Approved 2016-2025 STIP 53080.3.FR1 Nov. 11, 2019 (336)747-7950 and remove Half Split Diamond Interchange and Connector Roads at Clemmonsville Rd. 15 Completion Construction Project T.I.P. No. Description Let Date Status Contractor Comments Date Cost Administrator Centrally Managed Projects Under Development R-5737 Convert at grade intersection to Interchange on US 29/70/I- ROW Acquisition Dale Swicegood, PE March 16, 2021 TBD $15,000,000 TBD *Schedule based on Approved 2016-2025 STIP 50195.3.1 85 Bus at SR 1798 (Old Greensboro Rd) March 15, 2019 (336)249-6255 U-5757 Widen NC 8 (Winston Rd) to multi-lanes from 9th St to SR Planning and Design in Dale Swicegood, PE June 26, 2019 TBD $1,254,000 TBD *Schedule based on Approved 2016-2025 STIP 54035.3.1 1408 (Biesecker Rd) in Lexington Progress (336)249-6255 U-5786 Widen SR 1508 (Hickory Tree Rd) from US 52/NC ROW Acquisition Dale Swicegood, PE Feb. 21, 2023 TBD $13,794,000 TBD *Schedule based on Approved 2016-2025 STIP 44358.3.1 8/Future I-285 to NC 150 Feb. 22, 2021 (336)249-6255 U-5902B Widen NC 150 to multilanes from SR 1493 (Frye Bridge ROW & Utilities Dale Swicegood, PE *Schedule based on Approved 2016-2025 STIP - New TBD TBD $33,150,000 TBD 44725.3.2 Rd) to Forsyth County Line TBD (336)249-6255 project programmed due to additional revenue (HB 97) Division Managed Projects under Development Bridge Painting on Bridges #136, 150 in Davidson;#'s Matt Jones, PE No work is being done on this project at this time. No funding 17BP.9.P.3 29,32,85,86 in Davie; #'s 53,54,55,78,115,185,297,322 in TBD TBD $5,000,000 TBD (336)747-7800 available for this project at this time. Forsyth; and #94 in Rowan County. Safety Improvements to median crossovers, etc., on I-85 W-5601CF ROW Acquisition Chris Corriher, PE Division Let. Public meeting held Jan. 14, 2016 at Davidson Business from SR1797 (Evans Rd) to SR 1963 (Moose Jan. 25, 2017 TBD $600,000 TBD 50138.3.85 June 24, 2016 (704)630-3200 County Community College. Lodge Rd) in Davidson Co. Locally Administered Projects Under Development Extend Sidewalks on SR 3346 (S Main St) and provide C-5216 Planning/Design/ Right Chris Corriher, PE *Schedule based on Approved 2016-2025 STIP - Non- wide paved shoulders on Anna Lewis Dr and Emergency Sept. 30, 2016 TBD $601,000 TBD 46261.3.1 of Way in progress (704)630-3200 DOT let (City of Lexington) Dr. in Lexington Provide wide paved shoulders and construct sidewalks on C-5217 Planning/Design/ Right Chris Corriher, PE *Schedule based on Approved 2016-2025 STIP - Cornelia St and Hillside Dr, bike and pedestrian Sept. 30, 2016 TBD $190,000 TBD 46262.3.1 of Way in progress (704)630-3200 Non-DOT let (City of Lexington) improvements on Mize and Biesecker Rds. Completed Projects April 6, 2016 B-4741 Replace Bridge #38 on SR 1493 (Frye Bridge Rd) over (Perm. vegetation 100% Complete Dale Swicegood, PE Construction is 100% complete. Awaiting permanent Dec. 16, 2014 $2,333,794 Dane Construction, Inc. 38514.3.FD1 Muddy Creek in Davidson County established (30% ahead of schedule) (336)249-6255 vegetation establishment for final acceptance Dec. 12, 2016) June 15, 2016 Only work on punchlist items remains. Minimal to no vehicular C-4901A (Perm. vegetation 99% Complete Blythe Construction, Dale Swicegood, PE NCRR/NS Mainline Bowers to Lake Railroad Roadbed June, 2013 $15,738,016 traffic impact. Awaiting permanent vegetation establishment 44001.3.STR01T4A established (7% ahead of schedule) Inc. (336)249-6255 Oct. 28, 2016) for final acceptance. Pavement Rehabilitation, Bridge Preservation, and April 4, 2016 R-4750 Upgrade to Interstate Standards - US 29/52/70/I-85 Bus. (Perm. vegetation J. T. Russell & Sons, Chris Corriher, PE DDRL Project - waiting final punchlist items. Awaiting September, 2013 99% Complete $7,571,155 39889.3.FS1 From I-85 to south of SR 1147 (Salisbury Rd) and Bridges established Inc. (704)630-3200 permanent vegetation establishment for final acceptance. #43 & #225 over Swearing Creek on US 29/52/70. June 4, 2016) 16 Piedmont Authority for Regional Transportation Updates for the Burlington-Graham MPO TCC/TAC May 2016 PART Express Updates Mr. James Wilds was the Operator of the Month for March. He's been an operator for PART since January of 2014. The Alamance Regional Medical Center Park & Ride Lot in Burlington is on pace for a Spring 2016 opening. On Board Passenger Survey PART Express On Board Survey will be conducted during the next month. Be aware that Shown Above: PART Express Ridership was 40,118 for March contract staff will be on board PART vehicles and at Transportation Centers to conduct survey of 2016 with a projection of 475,608 for FY 2016. passengers. To learn more about PART’s programs and projects, please visit www.partnc.org Welcome New Board Member James Butler, City Council Member for the City of Burlington Regional Advertising Contract was sworn into the PART Board at the meeting held on April 13th. Mr. Butler was sworn in to the City Council in December A solicitation was conducted, and representatives of of 2013. Born in Burlington and actively involved in the PART, High Point Transit, GTA and WSTA conducted community for over 25 years, Mr. Butler plans to focus on evaluations of the submitted project proposals. The issues related to city growth, quality of life, and fiscal firm selected was Streetlevel Media, LLC. responsibility. Stay Connected with PART on Social Media! Page 1 of 2 17 Page 2 of 2 Commuter Dash 5K Run/Walk Regional Call Center Activities for March On April 16th the Sixth Annual Commuter Dash 5K was held at Triad Park in Kernersville. Close to 200 people participated in this great event, the weather was perfect Presented Calls: 7,375 and the crowd had lots of fun. Visit www.PARTnc.org to Answered Calls: 6,998 see results and photos. Avg. % of Calls Answered: 95.7% Speed of Answer: 0:00:07 Avg. Call Duration: 0:00:53 Welcome Sabrina Glenn Vanpool Activities # of Vans Leased: 55 # of Riders: 523 # of New Vans this report: 4 Join us in welcoming Mrs. Sabrina Glenn to the PART Organization. Sabrina has worked in the field of Transportation Demand Management for over 16 years. Her experience includes working with local, regional, and private sector organizations to address mobility issues in Minnesota, Atlanta, and Florida. She has served in a variety of capacities that support the development, implementation, marketing, and promotion of programs and services that support the use of alternatives to driving alone. Her responsibilities at PART include the oversight of the Commuter Resources department May is National Bike to Work Month including the Call Center, Vanpool Program, and Business Development and Outreach Efforts. If the average person biked once every 2 weeks instead of driving, we could prevent 1 billion gallons of gasoline We are happy to have her on the PART team! from entering the atmosphere every year. Ride your bike to the PART Bus and board for Free on May 20th! 18

Get email alerts for High Point

A daily email when new agendas and minutes are posted.

Report an issue with this meeting