HPMPO Technical Coordinating Committee (TCC)
Regular MeetingHigh Point, NC · April 19, 2016
Agenda
HIGH POINT URBAN AREA MPO
TECHNICAL COORDINATING
COMMETTEE (TCC)
Agenda for the April 19, 2016 TCC Meeting
2:00 PM
*** Jamestown Town Hall***
Jamestown Town Hall
LOCATION CHANGE
301 E. Main Street
Action Items
1. Consideration of the March 15th TCC meeting minutes. (Mark McDonald) Page 1
2. Recommendation to the TAC approval of amendments to the 2016-2025 MTIP.
(Greg Venable) Page 5
Information Items
3. SPOT 4.0 update (Greg Venable) Page 10
MPO Reports
4. NCDOT Division Reports
Division 7 (Mike Mills / Ed Lewis) Page 12
Division 8 (Brandon Jones / Darius Sturdivant) Page 17
Division 9 (Pat Ivey / Diane Hampton) Page 18
5. Triad Air Awareness Report (Lorelei Elkins)
6. NCDOT Transportation Planning Branch Report (Wayne Davis)
7. Hitran Report (Angela Wynes)
8. PART Report (Scott Rhine) Page 21
* At the conclusion of the TCC meeting we will discuss project U-5864 - Surrett Drive
widening project
TCC
Meeting
Meeting Date 4/19/2016 Agenda Item No. 1
Action Requested Approve
Section Tab
Consideration of the March 15th TCC meeting minutes. (Mark McDonald)
Information Summary Attachments Yes No
The complete meeting minutes are in your packet as Attachment 1.
TCC Vote: Motion Second
By:__________________ By:_______________________
Vote: For_______________________ Against________________________
1
MINUTES
TECHNICAL COORDINATING COMMITTEE
March 15, 2016
TCC MEMBERS PRESENT: Greg Venable, Guy Cornman, Chuck George, Bryan
Fulbright, Carrie Spencer, Darius Sturdivant, Jen Britt, Roger Jones, Diane Hampton, Ed
Lewis, Marc Allred, Angela Wynes, Chuck Smith, Mark McDonald, and Mark Kirstner
TAC MEMBERS PRESENT: Joe Geigle (FHWA)
OTHERS PRESENT: Kelly Larkins (Piedmont Triad RPO), Anna Leonard (Piedmont
Triad Regional Council, John Hanes (High Point), Vicki Embry (High Point)
RECORDING SECRETARY: Marianne Janiszewski, City of High Point
Mark McDonald called the meeting to order.
ACTION ITEMS
Item 1: Consideration of the February 16, 2016 TCC Meeting Minutes.
The minutes were approved.
Motion by: Guy Cornman
Seconded by: Bryan Fulbright
Vote:
For: Unanimous
Against: None
Item 2: Recommendation to the TAC for approval of the Self Certification
process.
Every year, prior to adoption of the Unified Planning Work Program, the MPO is
required to certify its planning process and its compliance with various federal
regulations including the Clean Air Act, the Civil Rights Act, the Americans with
Disabilities Act, and the federal transportation authorizing legislation. The certification
states that the MPO is in compliance with all federal requirements and is carrying out its
planning process in the appropriate manner. The resolution is a necessary prerequisite for
adoption of the UPWP.
Motion by: Mark Kirstner
Seconded by: Guy Cornman
Vote:
2
For: Unanimous
Against: None
Item 3: Recommendation to the TAC for approval of the 2016-2017 Unified
Planning Work Program.
The UPWP is the MPO’s annual budget and work plan. It lists the planning tasks that staff
expects to perform and the work products that we expect to produce during the fiscal year.
Our fiscal year runs from July 1st through June 30th of next year. The work program consists
of three major divisions: surveillance of change, long-range planning, and administration.
Each major division includes several line items under which the MPO can perform work.
Each line item includes explanatory text describing the customary work items for the line
item, the rationale for performing the work, how much money we plan to spend on the line
item and the work products that the MPO expects to produce during the upcoming year. The
UPWP also includes a series of tables showing the sources of the funds used, the amount of
federal funds used, the amount of the local match, and total expenditures for each line item
from each funding source. The public had at least thirty (30) days to review and comment
on the UPWP. No public comments were received. Greg stated that a change was made
to the funding amounts. As a result of a carryover from this fiscal year to next fiscal year
some additional funding was added to the planning study. The MPO originally budgeted
$280,000 for special studies and $70,000 local match for a total of $350,000. We had
$200,000 in there originally but we are carrying over $150,000 that we had programmed
for this fiscal year. Jamestown will possibly be using some of those funds. The MPO is
also going to be conducting a bike plan. Greg stated that if there are any additional
studies that the jurisdictions would like done they can be looked at.
Motion by: Bryan Fulbright
Seconded by: Guy Cornman
Vote:
For: Unanimous
Against: None
Information Items
Item 4: SPOT 4.0
Greg stated that the MPO’s prioritization process was approved.
MPO Reports
Item 5: NCDOT Division Reports
Division 7
Ed Lewis reported that the projects in Division 7 are moving along.
3
Division 8
Darius Sturdivant reported that there are several resurfacing projects that are scheduled to
start in April. The Prospect St. bridge replacement project over Business 85 is 36%
complete. The SPOT safety project to update the traffic signal at NC 62 and Finch Farm
Rd. is expected to be completed by the middle of April. The Archdale Rd. widening
project has been segmented in the segments A & B. The Randolph County (segment A)
portion from Robbins Country Rd to the Guilford County line is funded. The remaining
segment (segment B) from the Randolph County line to Main St. is unfunded. There has
been discussion about down scoping the project to a 3 lane project.
Division 9
Diane Hampton reported that the US 52/I-85 Business project is expected to be
completed by the end of March. The bid opening for the turn lane at Hickory Tree Rd.
and Mendenhall Rd. has taken place and they are awaiting documents for award. There
was a public meeting in January on the Business 85 crossover between Thomasville and
Lexington. Some suggestions for modifications were received and are being reviewed.
Item 5: Triad Air Awareness
No one was present.
Item 6: NCDOT Transportation Planning Branch
No one was present.
Item 7: Hitran
Angela had nothing to report.
Item 8: PART
Mark Kirstner reported information on the Commuter Dash which is a transportation
demand management program and project that takes place yearly to raise awareness
about the different forms of transportation. The 5K race will take place in Triad Park this
year. PART’s service on route 4 was recently modified through some funds from the
Burlington/Graham MPO. This route was originally set up to provide medical trips from
the Triad area to Chapel Hill and Duke. Due to the modifications and the addition of a
connection with Triangle Transit in Mebane ridership has gone from 300 a month to over
1200 a month. The UNC hospital in Chapel Hill offers their employees free transit. Now
that High Point has a UNC owned hospital Mark would like Angela and the MPO staff to
look into whether this is something that can be provided to the other UNC branches.
Discussion
Greg stated that there will be a two of presentations at the TAC meeting on March 22.
DOT voting will take place after the TAC meeting is adjourned. The TAC meeting will
start at 9:00 am instead of 10:00 to give the TAC members time to vote.
There was no other business. The meeting was adjourned.
4
TCC
Meeting
Meeting Date 4/19/2016 Agenda Item No. 2
Action Requested Recommendation
Section Tab
Consideration of amendments to the 2016-2025 MTIP. (Greg Venable)
Information Summary Attachments Yes No
The proposed amendments to the 2016-2025 MTIP for the High Point MPO are included
in you packet. Staff is requesting a recommendation to the TAC for approval of the
amendments to the 2016-2025 MTIP.
TCC Vote: Motion Second
By:__________________ By:_______________________
Vote: For_______________________ Against________________________
5
HIGH POINT URBAN AREA METROPOLITAN PLANNING ORGANIZATION ITEM N
(HANDOUT)
REVISIONS TO THE 2016-2025 STIP
HIGHWAY PROGRAM
STIP MODIFICATIONS
DIVISION 7
* P-2918 PIEDMONT CORRIDOR, TRAIN 74 / 75 OPERATIONS OPERATIONS FY 2016 - $3,750,000 (CMAQ)
RANDOLPH BETWEEN CHARLOTTE AND RALEIGH, EQUIPMENT FY 2017 - $4,091,000 (CMAQ)
MECKLENBURG AND CAPITAL YARD MAINTENANCE FACILITY. $7,841,000
DURHAM ADD OPERATIONS IN FY 17 NOT PREVIOUSLY
CABARRUS PROGRAMMED, AT REQUEST OF TRANSPORTATION
ALAMANCE PLANNING BRANCH.
ORANGE
WAKE
ROWAN
DAVIDSON
GUILFORD
PROJ.CATEGORY
EXEMPT
These items are for informational purposes only and subject to future NC Board of Transportation approval.
It is anticipated that these items will be considered for NC Board of Transportation approval in 30 days.
* INDICATES FEDERAL AMENDMENT
Thursday, April 07, 2016 6 1
HIGH POINT URBAN AREA METROPOLITAN PLANNING ORGANIZATION ITEM N
(HANDOUT)
REVISIONS TO THE 2016-2025 STIP
HIGHWAY PROGRAM
STIP ADDITIONS
STATEWIDE
* Z-5700 VARIOUS, HIGHWAY-RAIL GRADE CROSSING SAFETY
STATEWIDE IMPROVEMENTS.
NEW PROJECT PROGRAMMED AT REQUEST OF RAIL
DIVISION - STI CATEGORY PROGRAMMIING SHOWN
BELOW.
* Z-5700DIV VARIOUS, HIGHWAY-RAIL GRADE CROSSING SAFETY RIGHT-OF-WAY FY 2017 - $150,000 (RR)
STATEWIDE IMPROVEMENTS. FY 2018 - $150,000 (RR)
PROJ.CATEGORY NEW PROJECT PROGRAMMED AT REQUEST OF RAIL FY 2019 - $150,000 (RR)
DIVISION DIVISION - DIVISION NEEDS CATEGORY. CONSTRUCTION FY 2017 - $900,000 (RR)
FY 2018 - $900,000 (RR)
FY 2019 - $900,000 (RR)
$3,150,000
* Z-5700REG VARIOUS, HIGHWAY-RAIL GRADE CROSSING SAFETY RIGHT-OF-WAY FY 2017 - $150,000 (RR)
STATEWIDE IMPROVEMENTS. FY 2018 - $150,000 (RR)
PROJ.CATEGORY NEW PROJECT PROGRAMMED AT REQUEST OF RAIL FY 2019 - $150,000 (RR)
REGIONAL DIVISION - REGIONAL IMPACT CATEGORY. CONSTRUCTION FY 2017 - $900,000 (RR)
FY 2018 - $900,000 (RR)
FY 2019 - $900,000 (RR)
$3,150,000
* Z-5700SW VARIOUS, HIGHWAY-RAIL GRADE CROSSING SAFETY RIGHT-OF-WAY FY 2017 - $200,000 (RR)
STATEWIDE IMPROVEMENTS. FY 2018 - $200,000 (RR)
PROJ.CATEGORY NEW PROJECT PROGRAMMED AT REQUEST OF RAIL FY 2019 - $200,000 (RR)
STATEWIDE DIVISION - STATEWIDE STRATEGIC MOBILITY CONSTRUCTION FY 2017 - $1,200,000 (RR)
CATEGORY. FY 2018 - $1,200,000 (RR)
FY 2019 - $1,200,000 (RR)
$4,200,000
* Z-5800 VARIOUS, HIGHWAY-RAIL GRADE CROSSING SAFETY
STATEWIDE IMPROVEMENTS.
NEW PROJECT PROGRAMMED AT REQUEST OF RAIL
DIVISION - STI CATEGORY PROGRAMMIING SHOWN
BELOW.
These items are for informational purposes only and subject to future NC Board of Transportation approval.
It is anticipated that these items will be considered for NC Board of Transportation approval in 30 days.
* INDICATES FEDERAL AMENDMENT
Thursday, April 07, 2016 7 2
HIGH POINT URBAN AREA METROPOLITAN PLANNING ORGANIZATION ITEM N
(HANDOUT)
REVISIONS TO THE 2016-2025 STIP
HIGHWAY PROGRAM
STIP ADDITIONS
STATEWIDE
* Z-5800DIV VARIOUS, HIGHWAY-RAIL GRADE CROSSING SAFETY RIGHT-OF-WAY FY 2019 - $150,000 (RR)
STATEWIDE IMPROVEMENTS. FY 2020 - $150,000 (RR)
PROJ.CATEGORY NEW PROJECT PROGRAMMED AT REQUEST OF RAIL FY 2021 - $150,000 (RR)
DIVISION DIVISION - DIVISION NEEDS CATEGORY. CONSTRUCTION FY 2019 - $900,000 (RR)
FY 2020 - $900,000 (RR)
FY 2021 - $900,000 (RR)
$3,150,000
* Z-5800REG VARIOUS, HIGHWAY-RAIL GRADE CROSSING SAFETY RIGHT-OF-WAY FY 2019 - $150,000 (RR)
STATEWIDE IMPROVEMENTS. FY 2020 - $150,000 (RR)
PROJ.CATEGORY NEW PROJECT PROGRAMMED AT REQUEST OF RAIL FY 2021 - $150,000 (RR)
REGIONAL DIVISION - REGIONAL IMPACT CATEGORY. CONSTRUCTION FY 2019 - $900,000 (RR)
FY 2020 - $900,000 (RR)
FY 2021 - $900,000 (RR)
$3,150,000
* Z-5800SW VARIOUS, HIGHWAY-RAIL GRADE CROSSING SAFETY RIGHT-OF-WAY FY 2019 - $200,000 (RR)
STATEWIDE IMPROVEMENTS. FY 2020 - $200,000 (RR)
PROJ.CATEGORY NEW PROJECT PROGRAMMED AT REQUEST OF RAIL FY 2021 - $200,000 (RR)
STATEWIDE DIVISION - STATEWIDE STRATEGIC MOBILITY CONSTRUCTION FY 2019 - $1,200,000 (RR)
CATEGORY. FY 2020 - $1,200,000 (RR)
FY 2021 - $1,200,000 (RR)
$4,200,000
STIP MODIFICATIONS
STATEWIDE
* C-5571 NORTH CAROLINA RAILROAD, NCDOT PIEDMONT AND IMPLEMENTATION FY 2016 - $818,000 (CMAQ)
STATEWIDE CAROLINIAN PASSENGER RAIL SERVICES. PUBLIC FY 2017 - $819,000 (CMAQ)
PROJ.CATEGORY OUTREACH AND AWARENESS PROGRAM. $1,637,000
EXEMPT ADD IMPLEMENTATION IN FY 17 NOT PREVIOUSLY
PROGRAMMED, AT REQUEST OF TRANSPORTATION
PLANNING BRANCH.
* Z-5400DIV VARIOUS, HIGHWAY-RAIL GRADE CROSSING SAFETY RIGHT-OF-WAY FY 2016 - $150,000 (RR)
STATEWIDE IMPROVEMENTS. FY 2017 - $150,000 (RR)
PROJ.CATEGORY ADD RIGHT OF WAY AND CONSTRUCTION IN FY 17 CONSTRUCTION FY 2016 - $900,000 (RR)
DIVISION NOT PREVIOUSLY PROGRAMMED, AT REQUEST OF FY 2017 - $900,000 (RR)
RAIL DIVISION. $2,100,000
These items are for informational purposes only and subject to future NC Board of Transportation approval.
It is anticipated that these items will be considered for NC Board of Transportation approval in 30 days.
* INDICATES FEDERAL AMENDMENT
Thursday, April 07, 2016 8 3
HIGH POINT URBAN AREA METROPOLITAN PLANNING ORGANIZATION ITEM N
(HANDOUT)
REVISIONS TO THE 2016-2025 STIP
HIGHWAY PROGRAM
STIP MODIFICATIONS
STATEWIDE
* Z-5400REG VARIOUS, HIGHWAY-RAIL GRADE CROSSING SAFETY RIGHT-OF-WAY FY 2016 - $150,000 (RR)
STATEWIDE IMPROVEMENTS. FY 2017 - $150,000 (RR)
PROJ.CATEGORY ADD RIGHT OF WAY AND CONSTRUCTION IN FY 17 CONSTRUCTION FY 2016 - $900,000 (RR)
REGIONAL NOT PREVIOUSLY PROGRAMMED, AT REQUEST OF FY 2017 - $900,000 (RR)
RAIL DIVISION. $2,100,000
* Z-5400SW VARIOUS, HIGHWAY-RAIL GRADE CROSSING SAFETY RIGHT-OF-WAY FY 2016 - $200,000 (RR)
STATEWIDE IMPROVEMENTS. FY 2017 - $200,000 (RR)
PROJ.CATEGORY ADD RIGHT OF WAY AND CONSTRUCTION IN FY 17 CONSTRUCTION FY 2016 - $1,200,000 (RR)
STATEWIDE NOT PREVIOUSLY PROGRAMMED, AT REQUEST OF FY 2017 - $1,200,000 (RR)
RAIL DIVISION. $2,800,000
These items are for informational purposes only and subject to future NC Board of Transportation approval.
It is anticipated that these items will be considered for NC Board of Transportation approval in 30 days.
* INDICATES FEDERAL AMENDMENT
Thursday, April 07, 2016 9 4
TCC
Meeting
Meeting Date 4/19/2016 Agenda Item No. 3
Action Requested Information
Section Tab
SPOT 4.0 Update (Greg Venable)
Information Summary Attachments Yes No
TCC Vote: Motion Second
By:__________________ By:_______________________
Vote: For_______________________ Against________________________
10
TCC
Meeting
Meeting Date 4/19/2016 Agenda Item No. 4-8
Action Requested Information
Section Tab
MPO Reports
Information Summary Attachments Yes No
Agenda Item 4
Division Reports
Agenda Item 5
Triad Air Awareness
Agenda Item 6
Transportation Planning Branch Report
Agenda Item 7
Hitran
Agenda Item 8
PART Report
TCC Vote: Motion Second
By:__________________ By:_______________________
Vote: For_______________________ Against________________________
11
NCDOT DIV 7 PROJECTS LOCATED IN HPMPO
TIP/WBS # Description Let Date Completion Date Status Cost Comments
Design and bid
document
Install pedestrian improvements on SR 1009 (N. Main Street) at
preparation in Small Construction.
43250 Lexington Avenue (WCR, pedestrian signal heads, traffic Spring 2016 Summer 2016 $140,000
progress by City, M.A. w/ City,
islands)
Signal plans
approved
I-5767
Pavement Rehabilitation: I-74/US-311 from 0.7 miles East of I-
53010.3.1/ Construction NHPP - Interstate
40 to the Guilford /Forsyth County Line to SR1300 (E. Green 2/16/16 Summer 2017 $20,600,000
I-5736 underway Maintenance
Drive)
52018.3.1
I-5821
Design and bid
50464.3.1
package
I-5789 Pavement Rehabilitation: I-85 from 0.4 miles South of I-85 NHPP - Interstate
6/21/16 Summer 2017 submittal to $9,900,000
53029.3.1 Business to South of SR 1009 (S. Main St.) in Archdale Maintenance
Raleigh-85%
I-5738
Complete
52020.3.1
Design and bid
I-5734
package
52010.3.1 Pavement Rehabilitation: I-40 from 1.1 miles East of SR 1556 NHPP - Interstate
5/17/16 Summer 2017 submitted to $9,664,000
I-5762 Gallimore Dairy Rd to Forsyth County Line Maintenance
Raleigh - 100%
53005.3.1
complete
Planning and
I-5712 Design activities STIP, P3.0,
Interchange improvements at I-40/US 421 and SR 1850 (Sandy
50126.2.1 1/19/21 FY 2023 underway, R/W $7,800,000 Coordinate w/
Ridge Road)
50126.3.1 plans complete U-4758
1/18/19
Planning and
U-4758 Design activities
Improvements to Johnson Street/Sandy Ridge Road from Skeet STIP, Coordinate w/
40251.2.1 7/16/19 FY2022 underway, R/W $18,300,000
Club Road to I-40 I-5712
40251.3.1 plans complete
7/21/2017
12
NCDOT DIV 7 PROJECTS LOCATED IN HPMPO
TIP/WBS # Description Let Date Completion Date Status Cost Comments
R/W plans being
U-2412A
SR 1486 (Greensboro Road) / SR 4121 (High Point Road), revised - April
34802.2.2 STIP, Programmed
Widening (part on new location) from SR 4228 (Vickrey Chapel FY 2019 FY 2022 2017 completion, $51,900,000
34802.2.6 due to HB97
Road) to I-74/US 311 Bypass R/W Acquisition -
34802.3.3
10% complete
Central Design in
progress, Public
U-5169
I-74/US 311 and NC 68 (Eastchester Drive) interchange workshop early
45220.2.1 6/19/18 FY 2020 $15,775,000 STIP
improvements 2016, R/W
45220.3.1
plans complete
6/17/16
Contract System
17BP.7.R.22 Bridge #895 on SR 1486 (Lexington Ave.) over Bouldin Branch 3/17/16 Summer 2016 awarded, $577,000 Preservation, M.A.
Available 4/11/16 executed
B-5358
R/W plans
46072.1.1 STP funds, LAP,
Replace Bridge #428 on Model Farm Rd over Richland Creek 9/30/16 Summer 2017 complete; R/W $1,050,000
46072.2.FD1 City match
certified
46072.3.FD1
13
Page 1 of 3
04/09/2016
North Carolina Department of Transportation
Active Projects Under Construction - Guilford Co.
Contract TIP Location Description Contractor Name Resident Engineer Contract Bid Availability Work Start Completion Progress Completion
Number Number Amount Date Date Date Schedule Percent
C200800 R-2309AB US-220 FROM SR-2182 (HORSEPEN CREEK TETRA TECH Lorenz, PE, Kris $96,195,464.51 04/02/2012 05/09/2012 Percent
12/27/2016 83.40 57.37
RD) TO EXISTING NC-68 & US-220 CONSTRUCTION INC
INTERSECTION.
C200800 R-2413C US-220 FROM SR-2182 (HORSEPEN CREEK TETRA TECH Lorenz, PE, Kris $96,195,464.51 04/02/2012 05/09/2012 12/27/2016 83.40 57.37
RD) TO EXISTING NC-68 & US-220 CONSTRUCTION INC
INTERSECTION.
C202648 R-2611 SR-1008 (W MARKET ST) FROM SR-2007 JIMMY R. LYNCH & SONS, Smith, Brian V $17,475,472.75 09/26/2011 09/26/2011 11/01/2014 100.00 97.66
(BUNKER HILL RD) AT COLFAX TO NC-68 INC.
IN GREENSBORO.
C202881 U-2412B SR-4228 (VICKERY CHAPEL RD) TO APAC - ATLANTIC, INC. Ingram, PE, J. Paul $40,094,959.99 10/01/2012 10/05/2012 05/13/2016 99.80 87.96
SR-1424 (HILLTOP RD); GREENS- BORO THOMPSON ARTHUR
WESTERN LOOP INTERCHANGE AT HIGH DIVISION
POINT RD.
C202881 U-2524AE SR-4228 (VICKERY CHAPEL RD) TO APAC - ATLANTIC, INC. Ingram, PE, J. Paul $40,094,959.99 10/01/2012 10/05/2012 05/13/2016 99.80 87.96
SR-1424 (HILLTOP RD); GREENS- BORO THOMPSON ARTHUR
WESTERN LOOP INTERCHANGE AT HIGH DIVISION
POINT RD.
C202923 REPLACEMENT OF 1 BRIDGE IN CASWELL SMITH-ROWE, LLC Ingram, PE, J. Paul $7,292,875.26 04/02/2012 05/01/2012 11/01/2015 100.00 99.34
COUNTY, 3 IN GUILFORD COUNTY, 2 IN
ORANGE COUNTY, & 6 IN ROCKINGHAM
COUNTY.
C203197 U-2524C GREENSBORO-WESTERN LOOP FROM VECELLIO & GROGAN INC Smith, Brian V $122,804,388.50 10/28/2013 10/30/2013 03/14/2018 62.80 43.88
SOUTH OF SR-2137 (OLD OAK RIDGE RD)
TO NORTH OF US-220 (BATTLEGROUND
AVE).
C203237 BRIDGE #217, 259 & 274 ON US-220 AND ASTRON GENERAL Lorenz, PE, Kris $1,274,112.00 06/01/2013 06/14/2013 09/28/2013 100.00 82.31
#1, 136 & 470 ON SR-2254 (WENDOVER CONTRACTING COMPANY
AVE). INC
C203256 U-3615B SR-1820 (SKEET CLUB RD) FROM EAST OF APAC - ATLANTIC, INC. Ingram, PE, J. Paul $30,898,017.15 03/02/2015 05/20/2015 03/29/2019 13.80 5.79
SR-1818 (JOHNSON ST) TO WEST OF THOMPSON ARTHUR
NC-68 (EASTCHESTER DR) IN HIGH POINT. DIVISION
C203290 U-2524BC GREENSBORO W LOOP FROM I-73/I-840 FLATIRON Smith, Brian V $4,955,491.02 07/27/2015 09/08/2015 03/01/2017 38.90 42.65
TO SR-2085 (JOSEPH BRYAN BLVD) CONSTRUCTORS, INC.
INTERCHANGE. BLYTHE DEVELOPMENT
CO JOINT VENT
C203399 U-2525B GREENSBORO EASTERN LOOP FROM FLATIRON Smith, Brian V $111,683,421.13 07/28/2014 08/08/2014 12/28/2018 46.80 54.58
NORTH OF US-70 TO US-29 NORTH OF CONSTRUCTORS, INC.
GREENSBORO. BLYTHE DEVELOPMENT
CO JOINT VENT
C203412 R-2612B US-421 AT SR-3418 (NEELLEY RD) SOUTH BRANCH HIGHWAYS, INC. Lorenz, PE, Kris $13,528,497.85 07/28/2014 08/07/2014 12/28/2016 93.10 67.34
OF GREENSBORO.
C203415 W-5114 NC-68 FROM SOUTH OF SR-2111 (E YATES CONSTRUCTION Ingram, PE, J. Paul $1,819,807.14 06/30/2014 07/01/2014 05/14/2015 99.50 86.80
HARRELL RD) TO SR-4831 (BARTONSHIRE CO., INC.
DR).
C203433 I-5110 FUTURE I-73 FROM EXISTING SR-2085 FLATIRON Smith, Brian V $176,550,000.00 05/07/2014 05/07/2014 04/25/2017 49.84 50.57
(JOSEPH M BRYAN BLVD) / AIRPORT CONSTRUCTORS, INC.
PKWY INTERCHANGE TO SOUTH OF BLYTHE DEVELOPMENT
US-220 NEAR HAW RIVER. CO JOINT VENT
14
Page 2 of 3
04/09/2016
North Carolina Department of Transportation
Active Projects Under Construction - Guilford Co.
Contract TIP Location Description Contractor Name Resident Engineer Contract Bid Availability Work Start Completion Progress Completion
Number Number Amount Date Date Date Schedule Percent
C203433 I-5110A FUTURE I-73 FROM EXISTING SR-2085 FLATIRON Smith, Brian V $176,550,000.00 05/07/2014 05/07/2014 Percent
04/25/2017 49.84 50.57
(JOSEPH M BRYAN BLVD) / AIRPORT CONSTRUCTORS, INC.
PKWY INTERCHANGE TO SOUTH OF BLYTHE DEVELOPMENT
US-220 NEAR HAW RIVER. CO JOINT VENT
C203433 R-2413A FUTURE I-73 FROM EXISTING SR-2085 FLATIRON Smith, Brian V $176,550,000.00 05/07/2014 05/07/2014 04/25/2017 49.84 50.57
(JOSEPH M BRYAN BLVD) / AIRPORT CONSTRUCTORS, INC.
PKWY INTERCHANGE TO SOUTH OF BLYTHE DEVELOPMENT
US-220 NEAR HAW RIVER. CO JOINT VENT
C203489 P-5204 SR-2819 (MCLEANSVILLE RD) GRADE TRIANGLE GRADING & Ingram, PE, J. Paul $7,078,936.15 10/27/2014 10/29/2014 02/28/2017 43.90 47.20
SEPARATION OVER NS/NCRR RAILROAD PAVING INC
FROM SR-2826 TO NORTH OF SR-2746.
C203518 B-5119 BRIDGES #349 & #291 OVER US-29/70/220 APAC - ATLANTIC, INC. Julian, Jason R $5,973,735.98 03/02/2015 03/16/2015 02/28/2018 32.00 32.29
ON I-40/85. THOMPSON ARTHUR
DIVISION
C203625 B-4959 BRIDGE #193 OVER BUFFALO CREEK ON R.E. BURNS & SONS CO., Smith, Brian V $957,388.91 03/01/2016 12/07/2015 03/06/2017 0 74.70
SR-2719 (HIGH ROCK RD). INC.
C203627 C-5558 CITY OF HIGH POINT. MB HAYNES Lorenz, PE, Kris $7,099,452.53 11/30/2015 02/15/2019
CORPORATION DBA
HAYNES ELECTRIC UTILITY
C203640 REPLACEMENT OF 4 BRIDGES IN HAYMES BROTHERS, INC. Lorenz, PE, Kris $3,124,500.00 06/01/2015 09/02/2015 11/01/2017 8.00 9.95
GUILFORD COUNTY AND 3 BRIDGES IN
ORANGE COUNTY.
C203641 REPLACEMENT OF 5 BRIDGES IN R.E. BURNS & SONS CO., Kirkman, PE, $5,940,323.00 06/01/2015 06/01/2015 11/01/2018 8.50 23.70
GUILFORD COUNTY AND 5 BRIDGES IN INC. Christopher D
ORANGE COUNTY.
C203715 NC-150 FROM NC-68 TO US-220, AND 20 BLYTHE CONSTRUCTION, Ingram, PE, J. Paul $2,068,055.18 04/15/2016 11/18/2016
SECTIONS OF SECONDARY ROADS. INC.
C203779 I-74/US-311 FROM I-40 IN FORSYTH SHARPE BROTHERS A DIV Ingram, PE, J. Paul $14,950,678.73 04/04/2016 10/29/2017
COUNTY TO BUSINESS I-85 IN HIGH OF VECELLIO & GROGAN,
POINT. INC.
C203779 I-5736 I-74/US-311 FROM I-40 IN FORSYTH SHARPE BROTHERS A DIV Ingram, PE, J. Paul $14,950,678.73 04/04/2016 10/29/2017
COUNTY TO BUSINESS I-85 IN HIGH OF VECELLIO & GROGAN,
POINT. INC.
DG00090 U-2524AB I-73 FROM I-85 TO WENDOVER AVENUE LINEBERRY, INC. Ingram, PE, J. Paul $204,060.50 02/15/2012 02/07/2012 12/15/2014 0 100.00
DG00218 RESURFACE 5.041 MILES OF US 220 APAC - ATLANTIC, INC. Lorenz, PE, Kris $1,376,734.85 04/27/2015 07/09/2015 11/20/2015 100.00 100.00
(WENDOVER AVE.) THOMPSON ARTHUR
DIVISION
DG00220 BD-5107AB REPLACE BRIDGE #145 ON SR 1340 SMITH-ROWE, LLC Smith, Brian V $347,976.83 03/04/2015 03/04/2015 02/01/2016 99.90 100.00
(HOPKINS ROAD) OVER CANDY CREEK
DG00226 ER-2973 US 421 AND WOODY MILL ROAD MOTS LANDSCAPING & Ingram, PE, J. Paul $81,384.00 02/21/2015 03/09/2015 05/15/2017 100.00 100.00
LAWNS LLC
DG00226 R-2612A(L) US 421 AND WOODY MILL ROAD MOTS LANDSCAPING & Ingram, PE, J. Paul $81,384.00 02/21/2015 03/09/2015 05/15/2017 100.00 100.00
LAWNS LLC
DG00231 REPLACE BRIDGE #238 ON SR 1005 SMITH-ROWE, LLC Kirkman, PE, $1,396,792.10 06/25/2015 06/25/2015 06/15/2017 27.33 16.70
(ALAMANCE CHURCH ROAD) OVER LITTLE Christopher D
ALAMANCE CREEK
15
Page 3 of 3
04/09/2016
North Carolina Department of Transportation
Active Projects Under Construction - Guilford Co.
Contract TIP Location Description Contractor Name Resident Engineer Contract Bid Availability Work Start Completion Progress Completion
Number Number Amount Date Date Date Schedule Percent
DG00235 ER-2973 SR 2085 (BRYAN BLVD) AND I-73 IN STANIEL KEY Ingram, PE, J. Paul $187,000.80 04/09/2015 05/04/2015 Percent
10/30/2016 0 36.48
GUILFORD COUNTY AND US 220 IN LANDSCAPING
ROCKINGHAM COUNTY
DG00238 SS-4907AV US 29/70/220 BETWEEN SR 3000 TRAFFIC CONTROL Lorenz, PE, Kris $56,000.00 06/21/2015 03/23/2016 06/20/2016
(MCCONNELL ROAD) AND EAST SIDE SAFETY SERVICES, INC.
DRIVE (NON-SYSTEM)
DG00245 ER-2973 VARIOUS INTERCHANGES ALONG I-40 STANIEL KEY Ingram, PE, J. Paul $282,985.15 06/08/2015 07/23/2015 04/30/2018 97.00 91.10
LANDSCAPING
DG00247 BD-5107Z REPLACE BRIDGE #245 ON SR 3088 DANE CONSTRUCTION, Smith, Brian V $397,647.00 07/06/2015 07/06/2015 04/19/2016 97.30 100.00
(THACKER DAIRY ROAD) OVER BEAVER INC.
CREEK
DG00253 INTERSECTION OF SR 3330 (SOUTHEAST P & S GRADING LLC Lorenz, PE, Kris $585,254.50 07/06/2015 07/10/2015 03/25/2016 99.99 100.00
SCHOOL ROAD) AND SR 3389 (WOODY
MILL ROAD)
DG00256 B-5736 REPLACE BRIDGE #38 ON NC 61 OVER KEYSTONE CONTRACTING Lorenz, PE, Kris $704,800.00 08/03/2015 09/04/2015 05/06/2016 99.99 95.85
BEAVER CREEK CO INC
DG00260 NC 22 FROM THE RANDOLPH COUNTY SHARPE BROTHERS A DIV Lorenz, PE, Kris $1,265,131.67 04/15/2016 11/15/2016
LINE TO NC 62 TO JOINT NORTH OF SR OF VECELLIO & GROGAN,
1486 (LEXINGTON AVENUE) INC.
DG00261 A PORTION OF SR 1001, SR 1008, SR 3163 APAC - ATLANTIC, INC. Ingram, PE, J. Paul $1,423,221.44 04/15/2016 11/15/2016
AND SR 2851 THOMPSON ARTHUR
DIVISION
DG00262 REPLACE BRIDGE NUMBER 338 ON SR SMITH-ROWE, LLC Lorenz, PE, Kris $562,359.38 02/01/2016 02/01/2016 03/01/2017 21.40 42.34
1859 (BOYLSTON ROAD) OVER WEST
FORK OF DEEP RIVER (TRIBUTARY 1)
DG00265 39 SECONDARY ROADS IN GUILFORD WHITEHURST PAVING CO Julian, Jason R $782,184.98 04/15/2016 08/31/2016
COUNTY AND ONE SECONDARY ROAD IN INC
ROCKINGHAM COUNTY
DG00274 ER-2971G NC 100 FROM STEELE ST. TO BETHEL ST. HOLLINS CONSTRUCTION Ingram, PE, J. Paul $122,953.50 04/01/2016 12/01/2016
AND NC 62 AT BARTLETT YANCEY HIGH SERVICES INC
SCHOOL
DG00275 CONVERT TWO-WAY STOP TO P & S GRADING LLC Ingram, PE, J. Paul $44,050.00 04/01/2016 12/31/2016
FOUR-WAT STOP AT THE INTERSECTION
OF NC 150 AND SR 2702
(OSCEOLA-OSSIPPEE ROAD)
16
DIVISION 8 - ACTIVE PROJECTS (HIGH POINT MPO)
TIP/WBS/ Completion
Description Let Date Status Cost Contractor Comments
Contract # Date
APAC-
Atlantic, INC.
Resurfacing SR 1567, SR 1545, SR 1597, SR 1794, SR 39%
DH00175 7/30/15 6/24/16 $1,398,521 Thompson
1850 and SR 1864 Complete
Arthur
Division
Replace culverts #97 and # 31 on US 311 Business.
Culvert #97 over Sycamore Creek south of SR 1930 Project Country Boy
DH00171 6/9/15 5/11/16 $707,777 Work began 7/7/15
Bronzie Lawson Road and culvert #31 over Bob's Branch Complete Landscaping
north of SR 1527 Marlboro Church Road.
Asphalt Surface Treatment: SR 1916, SR 2039, SR 1697, 53% Riley Paving
DH00172 6/9/15 Spring 2016 $867,269 Work began 9/18/15
SR 1685 and SR 1536 Complete INC
SR 1619 Prospect Street - Replace Bridge #136 over US 40% Lee
B-5114 6/16/15 3/15/17 $4,714,965 Work began 8/7/15
29/70/I-85 Business. Complete Construction
I-73 Pavement Rehabilitation from US 311 to 0.6 mi North
APAC-
of SR 1938 Hockett Dairy Road; 7.7 miles - Combined with I-
Atlantic, INC.
5737: I-73 from 1.3 miles north of SR 1504 Spero Road to Availability Funding approved Jan 2016
I-5763 1/19/16 10/28/16 $ 6,298,145 Thompson
US 311, 2.2 miles) and Combined with W-5601AJ: I- Date 3/21/16 Start - Spring 2016
Arthur
73/74/US 220 from south of SR 2269 Vision Drive to south
Division
of SR 1712 Pineview Road.
DIVISION 8 - SPOT SAFETY PROJECTS (HIGH POINT MPO)
Project Description Board Approval Date Cost Status
NC 62 at SR 1547 Finch Farm Rd - Upgrade the traffic signal to Flashing
Yellow Arrow (FYA) and restripe northbound Finch Farm Rd to include 9/3/2015 $75,000 Project Complete 4/1/2016
exclusive left, thru and right turn lanes.
DIVISION 8 - UPCOMING PROJECTS (HIGH POINT MPO)
TIP/WBS/
Description Let Date Comments Cost
Contract #
Contract awarded - 2/29/16
SR 1603 School Rd - Replace Bridge #84 over Muddy
17BP.8.R.79 Feb-16 Availability Date - 4/4/2016 $728,888
Creek.
Completion Date - August 2016
I-85 South of SR 1009 to North of SR 1912 Lunar Drive in
Archdale. Pavement Rehabilitation. Scope of work should
include milling and filling of deteriorating asphalt paved Project let date delayed from Mar 2016 to
I-5738 Apr-16 $7,000,000
shouders, rehabilitation of ramps and rehabilitation of Apr 2016
concrete aprons around drainage structures. Project
combined with I-5821 and I-5789.
SR 1944 Branson Davis Rd from US 311 to SR 2017 Summer
8CR.207611.xx Randolph 2016 Summer Resurfacing TBD
Walker Mill Rd. 2016
ROW is being acquired; Utilities to be
SR 1911 Ashland Street (Archdale) - Replace Bridge #416 relocated; Power is authorized to move;
17BP.8.R.76 Jun-18 TBD
over Dale Creek. Relocation of water lines to be
determined.
DIVISION 8 - (FY 2016-25) STIP PROJECT UPDATES (HIGH POINT MPO)
Segment A
Confirm with SPOT and Programming to
R/W and
SR 1577/ SR 1004 Archdale Rd Segment A: from SR 1567 Utilities revise cross section from 4 lane median
Robbins Country Rd to Guilford Co Line, widen to FY 2020 divided w/ sidewalks and bike lanes to 3
U-3400 $24,950,000
multilanes. Segment B: From the Randolph Co Line to SR Construction lanes with wide outside lanes and
1993 Main Street. FY 2022 sidewalks as supported by HPMPO and
Segment B
Unfunded
City of Archdale.
R/W and Feasibility Study document is complete
Utilities but shelved until Right of Way cost is
Interchange improvement at I-85 and SR 1993 South Main
U-5770 FY 2020 $2,975,000
Street in Archdale. Const received. Right of Way is currently
FY 2022 working on the cost estimate.
17 High_Point_Urban_Area_MPO Div 8 Project Report April 2016
High Point Urban Area MPO
NCDOT Transportation Update
(Davidson County)
Tuesday, April 19, 2016
Construction
T.I.P. No. Description Let Date Completion Date Status Contractor Comments
Cost
Centrally Managed Projects under Construction
May 1, 2019 Utility relocation work is ongoing; Contractor scheduled to begin
B-3159 Replace Bridge #27 on US 52/NC 8 over US 29/64/70/I-85 Availability date
Oct. 20, 2015 (perm. vegetation established $10,164,621 J.T. Russell & Sons, Inc. work on project on April 11, 2016. Road to remain open during
38331.3.FR1 Bus. Loop in Lexington October 28, 2019) April 1, 2016
construction.
April 6, 2016 Work start date April 6, 2015. Only final pavement markings
B-4741 Replace Bridge #38 on SR 1493 (Frye Bridge Rd) over (Perm. vegetation 99% Complete
Dec. 16, 2014 $2,333,794 Dane Construction, Inc. remain. Anticiapte final construction date to be April 6, 2016
38514.3.FD1 Muddy Creek in Davidson County established (30% ahead of schedule)
Dec. 12, 2016) (2.5 months ahead of schedule)
June 15, 2016
C-4901A (Perm. vegetation 99% Complete Only work on punchlist items remains. Minimal to no impact to
NCRR/NS Mainline Bowers to Lake Railroad Roadbed June, 2013 $15,738,016 Blythe Construction, Inc.
44001.3.STR01T4A established (7% ahead of schedule) vehicular traffic.
Oct. 28, 2016)
2017.CPT.09.01. Contract Resurfacing of 18.729 miles, including (1)section
10291.1 Availability date
of US 64, (2) sections of NC 8, and (8) sections of April 19, 2016 May 19, 2017 $3,100,000 TBD State funded. Currently advertised for let April 19, 2016
2017.CPT.09.01. June 6, 2016
20291.1 Secondary routes in Davidson County
Division Managed Projects under Construction
Contractor began work on Nov. 3, 2015. Currently planting trees and
I-2304AC/AD (L) Contract Landscaping on I-85 from (SR 1224) Hardgrave Rd in
Sept. 23, 2015 May 6, 2018 30% Complete $1,281,336 Staniel Key Landscaping shrubs, and mulching plant beds. Selective clearing and landscape
34156.3.12 Davidson Co. to (SR2120) Long Ferry Rd in Rowan Co.
grading are complete.
Pavement Rehabilitation of 5.17 miles of I-85 from the ramps N.
I-5740 of Old Hwy 64 to the concrete pavement south of SR 2010 (E. Availability date Contractor plans to start work in June, 2016. Will be all nighttime
Feb. 24, 2016 August 31, 2016 $1,069,294 Blythe Construction, Inc.
52021.3.1 Holly Grove Rd), which includes milling, paving, and pavement April 4, 2016 work.
markings.
Pavement Rehabilitation, Bridge Preservation, and Upgrade to March 15, 2016 DDRL Project - Contractor should have all pavement markings and
R-4750 Interstate Standards - US 29/52/70/I-85 Bus. From I-85 to south (Perm. vegetation 99.6% Complete
September, 2013 $7,571,155 J. T. Russell & Sons, Inc. rumble strips complete by April 14, 2016. Final inspection scheduled
39889.3.FS1 of SR 1147 (Salisbury Rd) and Bridges #43 & #225 over established (schedule has been revised)
for that day.
Swearing Creek on US 29/52/70. June 4, 2016)
Grading, drainage, widening, paving, and pavement markings on
U-4742NC Availability date
SR 1508 (Hickory Tree Rd) and SR 1601 (Mendenhall Rd) in Feb. 24, 2016 September 30, 2016 $660,000 TBD Bids have been opened, awaiting documents for award
39746.3.24 Davidson Co.
April 4, 2016
BD-5109L Replace Bridge #361 on SR 1837 (Bud Sink Rd) over Leonard June 3, 2016
(perm. vegetation Work began Feb. 16, 2016, using an off-site detour. Work on
45355.2.12 Creek in Davidson County. Includes Grading, Drainage, Dec. 9, 2015 20% Complete $378,498 TCB Builders, LLC
established replacing the bridge has begun
17BP.9.R.63 Widening, Structure, Paving, and Pavement Markings.
Dec. 31, 2016)
June 23, 2016
Replace Bridge #40 on SR 1298 / I-85 Service Rd (Grimes Blvd) (perm. vegetation 60% Complete
17.BP.9.R.3 October 28, 2015 $830,623 Smith-Rowe LLC Work began December 7, 2015. Road is closed with off-site detour.
over Swearing Creek in Davidson County. established (on schedule)
Dec. 9, 2016)
Design Build Project - Bridge #424 (E Center St) work began on
Replace (4) bridges in Davidson Co., (1) in Forsyth Co., (3) in December 7, 2015 and projected will be completed by August 23,
17BP.9.R.34 April, 2012 Oct. 20, 2016 97.1% Complete $12,585,775 Crowder Construction Co.
Rowan Co., and (1) in Stokes Co. 2016. Contractor has completed work on drill shafts. Contractor is
working on constructing end-bents, which will follow by MSE Wall.
Permitting and design work Express Design Build Contract - Br. #258 over Swearing Creek
DESIGN BUILD - Replace two (2) Bridges in Davidson Co., one
begun on SR 1272, and Br. #410 over Leonard Creek on SR 1844 in
17BP.9.R.61 (1) Bridge in Davie Co., three (3) Bridges in Rowan Co., and four May 19, 2015 June 30, 2019 $10,642,621 Smith-Rowe, LLC
(Anticipate construction work to Davidson; (1) bridge in Davie; (2) bridges in Rowan; and (4) bridges
(4) Bridges in Stokes Co. begin Summer, 2016) in Stokes Co.
Permitting and design work Mountain Creek Express Design Build Contract - Br. #86 over First Potts Creek on
DESIGN BUILD - Replace three (3) Bridges in Davidson Co. begun SR 1158, Br. #95 over Leonard Creek on SR 1838, and Br. #471
17BP.9.R.62 May 19, 2015 September 1, 2018 $4,740,000 Contractors/SEPI
and seven (7) Bridges in Rowan Co. with Culverts (Anticipate construction work to over Unnamed Creek on SR 2416 in Davidson Co. and (7) bridges
begin Spring, 2016) Engineering in Rowan Co.
Milling and resurfacing of 3.8 miles of US 64 from RR crossing
2016CPT.09.01. Work scheduled to begin Division Let contract. Continuation of previous resurfacing map.
near Decker Rd. to the end of concrete island near Linda Pl., Aug. 12, 2015 May 20, 2016 $1,035,588 J.T. Russel & Sons, Inc.
10291.1 mid-April, 2016 Work scheduled to begin mid-April, 2016.
just W. of I-85.
2017CPT.09.11. Asphalt Surface Treatment (AST) of 69.33 miles of Secondary Availability date Asphalt Maintenance
March 23, 2016 Oct. 14, 2016 $1,782,681
20292.1 routes in Davidson Co. April 25, 2016 Solutions, Inc
Contract Resurfacing of 2 sections of NC 8, 1 section of US 64,
9CR.10291.160, May 25, 2016 Work began August 3, 2015. Work scheduled to resume in after
1 section of NC 68 and 8 sections of Secondary routes (20.54 May 19, 2015 50% Complete $3,755,440 J.T. Russell & Sons, Inc.
9CR.20291.160 (revised) March 15, 2016.
miles) in Davidson County.
Preconstruction meeting held Aug. 19, 2015. Work began Sept. 22,
Davidson County Asphalt Surface Treatment (AST) Retreatment
9SP.20295.4 June 10, 2015 May 25, 2016 75% Complete $1,455,996 Blythe Construction, Inc. 2015. Seasonal limitations in force currently, plan to start back in
(58.79 miles) of various Secondary routes in Davidson Co.
late March, weather permitting.
18
Construction
T.I.P. No. Description Let Date Completion Date Status Contractor Comments
Cost
Centrally Managed Projects under Development
Bridge Preservation project - Plans are currently being
Bridge Preservation – Bridge #31 on NC 8, Bridges #55 & revised. Bridge #55 will be dropped from this contract and
41665.6A TBD TBD $1,600,000 TBD
82 on NC 47 in Davidson County completed under another project at a later date. Finalizing
structure plans.
B-5165 Replace Bridge #46 on SR 1485 (Hampton Rd) over Muddy ROW
June, 2017 TBD $1,800,000 TBD *Schedule based on Approved 2016-2025 STIP
42341.3.1 Creek FY 2016
B-5765 Replace Bridge #115 on SR 1711 (Gumtree Rd) over ROW
FY 2021 TBD $1,700,000 TBD *Schedule based on Approved 2016-2025 STIP
45721.3.1 WSSB RR FY 2019
B-5773 Replace Bridge #25 on SR 3346 (S. Main St) over WSSB ROW
FY 2025 TBD $3,250,000 TBD *Schedule based on Approved 2016-2025 STIP
45729.3.1 RR in Lexington FY 2023
B-5774 Replace Bridge #99 on SR 1810 (Clodfelter Rd) over ROW *Schedule based on Approved 2016-2025 STIP - Project
Feb., 2020 TBD $1,200,000 TBD
45730.3.1 Brushy Creek March, 2019 accelerated due to additional revenue (HB 97)
B-5776 Replace Bridge #100 on SR 1810 (Clodfelter Rd) over ROW *Schedule based on Approved 2016-2025 STIP - Project
Feb., 2020 TBD $1,800,000 TBD
45732.3.1 Abbott's Creek March, 2019 accelerated due to additional revenue (HB 97)
B-5777 ROW
Replace Bridge #58 on NC 109 over US 64 FY 2022 TBD $1,850,000 TBD *Schedule based on Approved 2016-2025 STIP
45733.3.1 FY 2021
B-5779 Replace Bridge #118 on US 29NB/64EB/70EB/I-85 Bus NB ROW *Schedule based on Approved 2016-2025 STIP - Coordinate
FY 2025 TBD $4,061,000 TBD
45735.3.1 over SR 3346 (N Main St) in Lexington FY 2024 with B-5785
B-5780 ROW Acquisition in
Replace Bridge #17 on NC 47 over Swearing Creek Dec., 2016 TBD $1,400,000 TBD Structure and Geotech design in progress
45736.3.1 progress
B-5783 Replace Bridge #164 and Bridge #168 on US 29/70/I-85 ROW
FY 2025 TBD $5,778,000 TBD *Schedule based on Approved 2016-2025 STIP
45738.3.1 Bus over NSRR FY 2024
B-5785 Replace Bridge #121 and Bridge #122 on US 29/70/I-85 ROW *Schedule based on Approved 2016-2025 STIP - Coordinate
FY 2025 TBD $4,000,000 TBD
45740.3.1 Bus over Leonard Creek FY 2024 with B-5779
B-5787 ROW
Replace Bridge #29 on NC 49 over NC 109 FY 2024 TBD $2,000,000 TBD *Schedule based on Approved 2016-2025 STIP
45741.3.1 FY 2023
Extend Sidewalks on SR 3346 (S Main St) and provide wide
C-5216 Planning/Design/ Right
paved shoulders on Anna Lewis Dr and Emergency Dr. in FY 2016 TBD $601,000 TBD *Schedule based on Approved 2016-2025 STIP
46261.3.1 of Way in progress
Lexington
Provide wide paved shoulders and construct sidewalks on
C-5217 Planning/Design/ Right
Cornelia St and Hillsdie Dr. Bike and Pedestrian FY 2016 TBD $190,000 TBD *Schedule based on Approved 2016-2025 STIP
46262.3.1 of Way in progress
Improvements on Mize and Biesecker Rds.
I-5793 Pavement Rehabilitation of I-85 from SR 2025 (Squire Planning and Design in
FY 2018 TBD $6,386,000 TBD *Schedule based on Approved 2016-2025 STIP
53032.3.1 Bowers Rd) to 0.3 mi N. of NC 109 in Thomasville Progress
I-40/US 311 at NC 109 (Thomasville Rd)/Clemmonsville Rd
in Winston-Salem. Convert Half Split Diamond Interchange
I-5880 ROW
at NC 109 to Full Split Diamond Interchange, and remove FY 2021 TBD $2,875,000 TBD Schedule subject to Approved 2016-2025 STIP
53080.3.FR1 FY 2020
Half Split Diamond Interchange and Connector Roads at
Clemmonsville Rd.
19
Construction
T.I.P. No. Description Let Date Completion Date Status Contractor Comments
Cost
Centrally Managed Projects Under Development
R-5737 Convert at grade intersection to Interchange on US 29/70/I- ROW
FY 2021 TBD $15,000,000 TBD *Schedule based on Approved 2016-2025 STIP
50195.3.1 85 Bus at SR 1798 (Old Greensboro Rd) FY 2019
Construct Two-lanes with paved shoulders on new location
U-2545 ROW
(4.2 miles) from US 29/52/70/I-85 Bus to SR 2212 (Fairview FY TBD $39,200,000 TBD Planning and Environmental Study only
34830.3.1 FY
Rd) in Lexington
U-5757 Widen NC 8 (Winston Rd) to multi-lanes from 9th St to SR Planning and Design in
FY 2019 TBD $1,254,000 TBD *Schedule based on Approved 2016-2025 STIP
54035.3.1 1408 (Biesecker Rd) in Lexington Progress
U-5786 Widen SR 1508 (Hickory Tree Rd) from US 52/NC 8/Future ROW
FY 2023 TBD $13,794,000 TBD *Schedule based on Approved 2016-2025 STIP
44358.3.1 I-285 to NC 150 FY 2021
U-5902B Widen NC 150 to multilanes from SR 1493 (Frye Bridge ROW & Utilities *Schedule based on Approved 2016-2025 STIP - New
Post Year TBD $33,150,000 TBD
44725.3.2 Rd) to Forsyth County Line FY 2024 project programmed due to additional revenue (HB 97)
Safety Improvements to median crossovers, etc., on I-85
W-5601CF ROW Division Let. Public meeting held Jan. 14, 2016 at Davidson
Business from SR1797 (Evans Rd) to SR 1963 (Moose January , 2017 TBD $600,000 TBD
50138.3.85 June 2016 County Community College.
Lodge Rd) in Davidson Co.
Bridge Painting on Bridges #136, 150 in Davidson;#'s
Funding issues. There will be plan revisions and a new letting
17BP.9.P.3 29,32,85,86 in Davie; #'s 53,54,55,78,115,185,297,322 in TBD TBD $5,000,000 TBD
date - to be determined.
Forsyth; and #94 in Rowan County.
Replace Bridge #271 on SR 2501 (S. Main St. Ext./ Lick ROW Acquisition Coordinating with ALCOA to begin construction. Utility
17.BP.9.R.10 Nov., 2016 TBD $1,000,000 TBD
Creek Ch. Rd) over Lick Creek in Davidson County. in progress. relocation in progress
Replace Bridge #221 on SR 2324 (Harris Rd) over Lick
17.BP.9.R.15 TBD TBD $525,000 TBD Plan Preparation 75% Complete; Let date is funding dependent
Creek in Davidson County.
Replace Bridge #459 on SR 2160 (Smith Rd) over an
17BP.9.R.33 Nov., 2016 TBD $250,000 TBD Letting date delayed due to funding and other priorities.
unnamed creek in Davidson County.
Replace Bridge #63 on SR 1481 (Welcome-Arcadia Rd) This project will not be pursued at this time. Will be deleted
17BP.9.R.57 TBD TBD $443,000 TBD
over Reedy Creek in Davidson County. from program due to funding rules and bridge condition.
20
Piedmont Authority for Regional Transportation Updates
for the High Point MPO TCC/TAC
April 2016
PART Express Updates
NEW Discounted Fare for Veterans: In appreciation
of the men and women who have served in our
nation’s armed forces, PART is honored to offer
veterans a new discounted fare beginning 3/28/16.
The new Veterans fare will be accepted on all PART
Express bus and shuttle routes.
Shown Above: PART Express Ridership was 35,577 for
February 2016 with a projection of 473,952 for FY 2016.
Transportation Center Construction
Progress
Keep up with construction updates by visiting our Flickr page Now Serving the Kernersville Hospital & VA Health
search for @PARTNC. Care Center in Kernersville: Effective 3/28/16 the
Kernersville Shuttles 17 & 18 will be adjusted to
serve the new VA Health Care Center in Kernersville.
View the new schedule at www.partnc.org.
To learn more about PART’s programs and projects, please
visit www.partnc.org
Stay Connected with PART on Social Media!
Page 1 of 2
21
Page 2 of 2
Commuter Dash 5K Run/Walk PART Vanpool Program Wins Safety
Award
Join PART for the Commuter Dash 5K Run/Walk being
held on April 16th at Triad Park in Kernersville. Family For the second consecutive year, PART has received
friendly with live music, vendors and food. Guest Lancer Insurance's Safety Award for safe driving. Thank
speaker will be Dawn Morgan, Town of Kernersville you to all of our dedicated Vanpool drivers and riders!
Mayor. Registration is FREE!
www.TriadCommuteChallenge.com
Find PART at these Upcoming Events!
• ACC Open House - 4/6/2016
• Senior Health Fair Mt Airy - 4/8/2016
• Greensboro Earth Day Fair - 4/9/2016
• Town of Kernersville Earth Day - 4/12/2016
• DCCC Community Resource Fair - 4/14/2016
• TCC Commuter Dash 5K - 4/16/2016
• Healthy Active Adults Day - 4/18/2016
• Elon University College Coffee - 4/19/2016
• UNC Chapel Hill Parking Mtg. – 4/20/2016
• ACC Culture Day/Spring Fling - 4/20/2016
• HPU Earth Day - 4/20/2016
• Eastern Alamance HS Earth Day – 4/22/2016
• 2016 Piedmont Earth Day Fair - 4/23/2016
• High Point Spring Fling - 5/2/2016
• Triad Innovation Showcase – 5/5/2016
• GSO Open Streets - 5/6/2016
• State of Davidson County – 5/6/2016
• Walk & Roll WS - 5/7/2016
• South University - 5/16/2016-5/17/2016
22