HPMPO Technical Coordinating Committee (TCC)
Regular MeetingHigh Point, NC · November 9, 2021
Agenda
HIGH POINT URBAN AREA MPO
TECHNICAL COORDINATING COMMITTEE (TCC)
Agenda for the November 9, 2021 TCC Meeting
2:00 PM – Online Meeting
Microsoft Teams
+1 336-803-7698 | 146 200 383#
Action Items
1. Consideration of the October 19th TCC meeting minutes. (Mark McDonald) Page 1
2. Consideration of the 2022 TCC Schedule. (Greg Venable) Page 5
3. Recommendation to the TAC of amendments to the 2020-2029 MTIP. (John Hanes)
Page 7
Information Items
4. Town of Kernersville Comprehensive Transportation Plan (CTP) Amendment Request
(Greg Venable) Page 10
5. Safety Performance Measures – FHWA Assessment and 2022 Targets. (John Hanes)
Page 13
6. DRAFT 2022-2023 Unified Planning Work Program (UPWP). (Greg Venable) Page 21
7. 2023 CMAQ Funding Call for Projects. (John Hanes) Page 22
Agency Reports
8. NCDOT Division Reports
Division 7 (Stephen Robinson) Page 24
Division 8 (Bryan Kluchar) Page 29
Division 9 (Fred Haith)
9. NCDOT Transportation Planning Branch Report (Michael Abuya)
10. FHWA Report (Suzette Morales)
11. Public Transportation Reports
High Point Transit System (Andrew Edmonds)
Davidson County Transportation (Richard Jones)
RCATS (Tawanna Williams)
PART (Mark Kirstner)
Next TCC Meeting
January 18, 2022
TCC
Meeting
Meeting Date 11/9/2021 Agenda Item No. 1
Action Requested Approve
Section Tab
Consideration of the October 19th TCC meeting minutes. (Mark McDonald)
Information Summary Attachments Yes No
The complete meeting minutes are in your packet as Attachment 1.
TCC Vote: Motion Second
By:__________________ By:_______________________
Vote: For_______________________ Against________________________
1
MINUTES
TECHNICAL COORDINATING COMMITTEE
October 19, 2021
TCC MEMBERS PRESENT: Greg Venable, Mark McDonald, Michael Abuya, Pat
Ivey, Roger Jones, Chuck George, Kyle Laird, Bryan Kluchar, Fred Haith, Stephen
Robinson
TAC MEMBERS PRESENT: Suzette Morales (non-voting)
MPO Staff: Gwen Ford, John Hanes
OTHERS PRESENT: Phillip Craver, Kathryn Vollert, Tamara Njegovan
RECORDING STAFF: Microsoft Teams
Mark McDonald called the meeting to order.
ACTION ITEMS
Item 1: Consideration of the August 17th TCC meeting minutes. (Mark
McDonald)
Motion by: Stephen Robinson
Seconded by: Bryan Kluchar
Vote:
For: Unanimous
Against: None
Item 2: Recommendation to the TAC of amendments to the 2020-2029 MTIP.
John Hanes reported for September amendments HO-0009 STIP addictions are North
Carolina Department of Environment and Natural resources, North Carolina air
awareness outreach program to provide education and produce daily air quality forecast.
Project added at the request of the Transportation Planning Branch.
U-5308 STIP Modifications are Finch Farm Road and Kennedy Road to I-85 in Trinity.
Widen to multilanes to allow additional time for planning and design delay construction
from FY 23 to FY 25
October Amendments AV-5900 STIP Modifications in Davidson County airport upgrade
Taxiway and Apron. Cost increase exceeding $2 million and 25% thresholds.
HI-0002-I-85 in Thomasville which is pavement rehabilitation to revise western terminus
to reflect current project delivery scope.
2
I-5950-I-85, I-285 to North of 64 in Davidson County pavement rehabilitation to revise
eastern terminus to reflect current project delivery scope.
U-3400 Archdale Road from Springwood Lane in Archdale widen to multilanes. Cost
increase exceeding $2 million and 25% thresholds.
U-5757 NC 8 Winston Road in Lexington widen to multilanes. Cost increase exceeding
$2 million and 25% thresholds.
Motion by: Roger Jones
Seconded by: Fred Haith
Vote:
For: Unanimous
Against: None
Information Items
3. P6.0 workgroup update.
Greg Venable reported STIP Program Update in the worst-case scenario if no action is
taken, with respective to the funding issues we are in currently. Only a few divisions that
will have funds available for P7.0 submittals. More realistically most would not have any
until P9.0. Greg went over the budget and has a link to the virtual meeting that will be
sent out to get all the information.
Agency Reports
Item 4: NCDOT Division Reports
Division 7
Stephen Robinson had no updates.
Division 8
Bryan Kluchar reported SR 1557 Morris Road bridge is 23% complete. All other projects
are in planning & design, ROW, or not started.
Division 9
Fred Haith had no updates.
3
Item 5: NCDOT Transportation Planning Branch Report
Michael Abuya had no updates.
Item 6: FHWA Report
Suzette Morales reported we are still waiting on census updates. For FHWA we are
working under a Fast Act extension and it goes to the end of the month. We will keep
waiting for the infrastructure bill and if it takes longer; we would expect a longer
extension for the Fast Act
Item 7: Public Transportation Reports
High Point Transit System
No one present.
Davidson County Transportation
No one present.
RCATS
No one present.
PART
Kyle Laird reported we are still working on building our numbers back up as COVID is
being handled. We do have Saturday route changes that effects route 3 going into High
Point that started October 9th. We are continuing to rise up in ridership slowly and with
the holidays coming up that will deep down as well.
WALKtober is an annual health promotion event that aims to encourage people to start
waling more during the month of October. It encourages spending more time outdoors as
a pedestrian, increasing overall health through physical activity, social interaction, and
valuable time in the fresh air of fall.
Item 13: Other Business
Greg Venable added for the TAC meeting next week. It will be in person TAC staff only
and everyone else will be virtual.
4
TCC
Meeting
Meeting Date 11/9/2021 Agenda Item No. 2
Action Requested Approve
Section Tab
Consideration of the 2022 TCC Schedule. (Greg Venable)
Information Summary Attachments Yes No
The TCC will meet on the third Tuesday of each month with the exception of July (no
scheduled meeting), November (2nd Tuesday), and December (no scheduled meeting).
Meetings may be cancelled if there are no action items or information to discuss. A 2022
MPO calendar is included in your packet.
TCC Vote: Motion Second
By:__________________ By:_______________________
Vote: For_______________________ Against________________________
5
2022
DRAFT High Point Metropolitan Planning Organization Calendar
44562 44593
JANUARY Sunday FEBRUARY
S M T W T F S S M T W T F S
1 26 27 28 29 30 31 1 30 31 1 2 3 4 5
2 2 3 4 5 6 7 8 6 7 8 9 10 11 12
3 9 10 11 12 13 14 15 13 14 15 16 17 18 19
4 16 17 18 19 20 21 22 20 21 22 23 24 25 26
5 23 24 25 26 27 28 29 27 28 1 2 3 4 5
6 30 31 1 2 3 4 5 6 7 8 9 10 11 12
44621 44652
MARCH APRIL
S M T W T F S S M T W T F S
27 28 1 2 3 4 5 27 28 29 30 31 1 2
6 7 8 9 10 11 12 3 4 5 6 7 8 9
13 14 15 16 17 18 19 10 11 12 13 14 15 16
20 21 22 23 24 25 26 17 18 19 20 21 22 23
27 28 29 30 31 1 2 24 25 26 27 28 29 30
3 4 5 6 7 8 9 1 2 3 4 5 6 7
44682 44713
MAY JUNE
S M T W T F S S M T W T F S
1 1 2 3 4 5 6 7 29 30 31 1 2 3 4
2 8 9 10 11 12 13 14 5 6 7 8 9 10 11
3 15 16 17 18 19 20 21 12 13 14 15 16 17 18
4 22 23 24 25 26 27 28 19 20 21 22 23 24 25
5 29 30 31 1 2 3 4 26 27 28 29 30 1 2
6 5 6 7 8 9 10 11 3 4 5 6 7 8 9
44743 44774
JULY AUGUST
S M T W T F S S M T W T F S
26 27 28 29 30 1 2 31 1 2 3 4 5 6
3 4 5 6 7 8 9 7 8 9 10 11 12 13
10 11 12 13 14 15 16 14 15 16 17 18 19 20
17 18 19 20 21 22 23 21 22 23 24 25 26 27
24 25 26 27 28 29 30 28 29 30 31 1 2 3
31 1 2 3 4 5 6 4 5 6 7 8 9 10
44805 44835
SEPTEMBER OCTOBER
S M T W T F S S M T W T F S
1 28 29 30 31 1 2 3 25 26 27 28 29 30 1
2 4 5 6 7 8 9 10 2 3 4 5 6 7 8
3 11 12 13 14 15 16 17 9 10 11 12 13 14 15
4 18 19 20 21 22 23 24 16 17 18 19 20 21 22
5 25 26 27 28 29 30 1 23 24 25 26 27 28 29
6 2 3 4 5 6 7 8 30 31 1 2 3 4 5
44866 44896
NOVEMBER DECEMBER
S M T W T F S S M T W T F S
30 31 1 2 3 4 5 27 28 29 30 1 2 3
6 7 8 9 10 11 12 4 5 6 7 8 9 10
13 14 15 16 17 18 19 11 12 13 14 15 16 17
20 21 22 23 24 25 26 18 19 20 21 22 23 24
27 28 29 30 1 2 3 25 26 27 28 29 30 31
4 5 6 7 8 9 10 1 2 3 4 5 6 7
Agency Reporting Deadline
TCC Meetings - 3rd Tuesday at 2:00pm (unless otherwise noted)
TAC Meetings - 4th Tuesday at 10:00am (unless otherwise noted)
*No scheduled meetings for July and December *November TCC and TAC meetings moved up one week due to Thanksgiving
6
TCC
Meeting
Meeting Date 11/9/2021 Agenda Item No. 3
Action Requested Recommendation
Section Tab
Recommendation to the TAC for approval of amendments to the 2020-2029 MTIP. (John
Hanes)
Information Summary Attachments Yes No
The proposed amendments to the 2020-2029 MTIP for the High Point MPO are included
in you packet. Staff is recommending approval of the MTIP amendments.
TCC Vote: Motion Second
By:__________________ By:_______________________
Vote: For_______________________ Against________________________
7
High Point
RESOLUTION
Archdale AMENDING THE 2020-2029 HIGH POINT METROPOLITAN
TRANSPORTATION IMPROVEMENT PROGRAM
WHEREAS, the Transportation Advisory Committee has reviewed the 2020-2029
Denton
Metropolitan Transportation Improvement Program and found an amendment is
necessary; and
Jamestown WHEREAS, the following amendments have been proposed:
Lexington
Thomasville
Trinity
Wallburg
Davidson
County
Forsyth
County
Guilford
County
Randolph
County
8
High Point
Archdale
NOW THEREFORE, be it resolved by the Transportation Advisory Committee for the
High Point Metropolitan Planning Organization that the 2020-2029 Metropolitan
Transportation Improvement Program be amended as listed above on this the 16th day of
Denton
November 2021.
A motion was made by TAC Member ______________and seconded by TAC
Jamestown member _______________ and approved this the 16th day of November 2021.
_________________________
Lexington
Neal Grimes
Chairman, Transportation Advisory Committee
Thomasville
Subscribed and sworn to me this the 16th day of November 2021.
Trinity ______________________________________
Notary Public
Wallburg My commission expires ______________________
Davidson
County
Forsyth
County
Guilford
County
Randolph
County
9
TCC
Meeting
Meeting Date 11/9/2021 Agenda Item No. 4
Action Requested Information
Section Tab
Town of Kernersville Comprehensive Transportation Plan (CTP) Amendment Request.
(Greg Venable)
Information Summary Attachments Yes No
Attached is a request from the Town of Kernersville to amendment the HPMPO CTP.
Kernersville is currently working on a business park development that is in HPMPO and
WSMPO. It will create an opportunity for a Minor Thoroughfare to connect Macy Grove
Road and the US 421/Macy Grove Road interchange to Bunker Hill Road.
If HPMPO CTP is amended, the Town will then request WSMPO to amend their CTP. If
adopted on both CTPs, the Town will pursue a Federal Functional Classification.
TCC Vote: Motion Second
By:__________________ By:_______________________
Vote: For_______________________ Against________________________
10
Community Development Department
Development - Planning - Engineering - Economics
Transportation - GIS – Zoning - Building Permits - Watershed TOWN OF KERNERSVILLE
Code Enforcement – Inspections
Memo
To: Greg Venable, Transportation Administrator
From: Jeff Hatling, AICP
Community Development Director
Date: September 22, 2021
Re: Comprehensive Transportation Plan (CTP) Amendment Request
This memo is written to request the
addition of a Minor Thoroughfare to the
High Point Urban Area Metropolitan
Planning Organization (HPMPO)
Comprehensive Transportation Plan (CTP).
Kernersville is currently working on a
business park development that is in
HPMPO and WSMPO (see maps to the
right). It will create an opportunity for a
Minor Thoroughfare to connect Macy
Grove Road and the US 421/Macy Grove
Road interchange to Bunker Hill Road.
If HPMPO CTP is amended, the Town will
then request WSMPO to amend their CTP.
If adopted on both CTPs, the Town will
pursue a Federal Functional Classification.
Let me know if you have any questions.
1|Page
11
12
TCC
Meeting
Meeting Date 11/9/2021 Agenda Item No. 5
Action Requested Information
Section Tab
Safety Performance Measures – FHWA Assessment and 2022 Targets. (John
Hanes) Information Summary Attachments Yes
No
NCDOT is recommending to MPOs approve safety performance measure targets for
2022 that are consistent with NCDOT targets. Information about the safety performance
measures is included in the meeting packet.
TCC Vote: Motion Second
By:__________________ By:_______________________
Vote: For_______________________ Against________________________
13
DATE: October 12, 2021
TO: Greg Venable
Transportation Planning Administrator, High Point Urban Area Metropolitan
Planning Organization
FROM: Brian Mayhew, PE, CPM
State Traffic Safety Engineer
Transportation Mobility & Safety Division
SUBJECT: Safety Performance Measures – FHWA Assessment and 2022 Targets
Background
Effective April 14, 2016, the Federal Highway Administration (FHWA) established five highway safety
performance measures in accord with regulations set forth in the Federal MAP-21 and FAST Act
transportation funding bills. These performance measures are:
1. Number of fatalities;
2. Rate of fatalities per 100 million vehicle miles traveled;
3. Number of serious injuries;
4. Rate of serious injuries per 100 million vehicle miles traveled; and
5. Number of combined non-motorized fatalities and non-motorized serious injuries.
These targets are established annually, are based on 5 year rolling averages, and are for calendar years.
North Carolina state targets are set in agreement with our Strategic Highway Safety Plan (SHSP)
(https://spatial.vhb.com/ncdotshsp/) goals. The SHSP goals are developed through collaborative efforts
of a diverse group of stakeholders including state, regional, and local partners (including MPOs). The
goal of the most recent (2019) SHSP is to reduce fatalities and serious injuries by half by 2035, moving
towards zero by 2050.
North Carolina Safety Performance Target Achievement Determination
In early 2021, FHWA completed an assessment of target achievement for NCDOT’s calendar year (CY)
2019 safety targets, based on the 5-year averages for 2015-2019 for each measure. As per
23 CFR 490.211(c)(2), a State Department of Transportation (DOT) has met or made significant
14
progress towards meeting its safety performance targets when at least four of the safety
performance targets established under 23 CFR 490.209(a) have been met or the actual outcome
is better than the baseline performance. Based on FHWA’s review, North Carolina has not met or
made significant progress toward achieving its safety performance targets. As a result, NCDOT must
ensure that all HSIP safety funds are obligated, and must develop an HSIP Implementation Plan that
describes actions the State will take to meet or make significant progress toward achieving its targets.
Table 1 below provides a summary of the target achievement determination at the state level. Note
that these CY 2019 targets were based off the goal outlined in the 2014 SHSP to reduce fatalities and
serious injuries by half by 2030.
Table 1: North Carolina Safety Performance Target Achievement Determination Summary for CY 2019
5-year Rolling Averages
(Actual) Better than Met or Made
Performance Measures Target Actual Baseline Target Achieved?
Baseline? Significant Progress?
2015 - 2019 2015 - 2019 2013 - 2017
Fatalities
1,214.7 1,410.0 1,363.0 No No
(5 Year Average)
Fatality Rate
1.097 1.192 1.214 No Yes
(5 Year Average)
Serious Injuries
2,490.6 4,078.4 2,860.8 No No
(5 Year Average) No
Serious Injury Rate
2.228 3.422 2.522 No No
(5 Year Average)
Non-motorized Fatalities
and Serious Injuries 403.7 515.6 436.2 No No
(5 Year Average)
Table 2 below shows what this determination would look like if the state’s methodology for establishing
the CY 2019 goal (reducing fatalities and serious injuries by half by 2030) was applied to crash data
specific to High Point Urban Area MPO.
Table 2: High Point Urban Area MPO Safety Performance Target Achievement Determination Summary
for CY 2019
5-year Rolling Averages
(Actual) Better than Met or Made
Performance Measures Target Actual Baseline Target Achieved?
Baseline? Significant Progress?
2015 - 2019 2015 - 2019 2013 - 2017
Fatalities
37.1 43.2 42.4 No No
(5 Year Average)
Fatality Rate
1.190 1.289 1.347 No Yes
(5 Year Average)
Serious Injuries
104.3 128.2 116.6 No No
(5 Year Average) No
Serious Injury Rate
3.338 3.813 3.693 No No
(5 Year Average)
Non-motorized Fatalities
and Serious Injuries 13.1 15.6 15.2 No No
(5 Year Average)
15
2022 State Safety Performance Targets
2022 state safety performance targets were submitted to FHWA on August 31st, as required, with the
submission of the annual Highway Safety Improvement Program (HSIP) report. These targets reflect the
2019 SHSP goal to reduce fatalities and serious injuries by half by 2035, moving towards zero by 2050.
The calculated targets are shown in Table 3 below. More detailed information about each target can be
found at the following link:
https://connect.ncdot.gov/resources/safety/Documents/Crash%20Data%20and%20Information/NC%20
Performance%20Measures%20(Final%20HSIP%20CY%202022%20Targets).pdf
Table 3: North Carolina Calendar Year 2022 Safety Performance Targets
Performance
CY 2022
Measure
Number of
1,254.9
Fatalities
Rate of Fatalities 1.057
Number of Serious
3,537.6
Injuries
Rate of Serious
2.962
Injuries
Number of Non-
Motorized
486.0
Fatalities & Serious
Injuries
2022 High Point Urban Area MPO Safety Performance Targets
Table 4 below provides crash data specific to your MPO and shows what the safety performance targets
would look like if you applied the state’s methodology (reducing fatalities and serious injuries by half by
2035). More detailed information specific to your MPO can be found at the following link:
https://connect.ncdot.gov/resources/safety/Documents/Crash%20Data%20and%20Information/NC_Per
formanceMeasuresData_2022Targets_HighPointUrbanAreaMPO.pdf
16
Table 4: High Point Urban Area MPO Specific Safety Performance Targets
Non-motorized
Fatalities Fatality Rate Serious Injuries Serious Injury Rate Fatalities and
Year
(5 Year Average) (5 Year Average) (5 Year Average) (5 Year Average) Serious Injuries
(5 Year Average)
2008 - 2012 41.2 1.390 99.6 3.360 12.6
2009 - 2013 38.4 1.300 103.8 3.514 13.4
2010 - 2014 42.0 1.420 110.4 3.733 15.0
2011 - 2015 41.6 1.386 114.4 3.815 15.4
2012 - 2016 43.0 1.394 108.8 3.542 16.2
2013 - 2017 42.4 1.347 116.6 3.693 15.2
2014 - 2018 44.2 1.358 125.8 3.850 15.4
2015 - 2019 43.2 1.289 128.2 3.813 15.6
2016 - 2020 44.2 1.342 132.4 4.006 18.0
2022 Target 38.8 1.153 116.1 3.437 14.9
Next Steps
MPOs are not directly assessed by FHWA on their progress towards meeting safety performance targets.
However, coordination and deliberate action will be needed to achieve the goals outlined in the NC
Strategic Highway Safety Plan and as communicated through the safety performance targets. We
encourage additional coordination between MPO’s and NCDOT Traffic Safety Unit in all areas of safety,
but specifically in data sharing, safety tools development, safety need identification and shared safety
project implementation. The Traffic Safety Unit is available to meet with your MPO for additional
discussion and partnership.
FHWA guidance allows each MPO to establish safety performance targets by either agreeing to plan and
program projects so that they contribute toward the accomplishments of the State DOT performance
targets or committing to quantifiable HSIP targets for their specific MPO area. If an MPO establishes its
own targets, it will need to do so in coordination with the State per FHWA guidelines. The Traffic Safety
Unit is available to facilitate this coordination. As a reminder, MPOs must establish safety performance
targets no later than February 27 of each year per FHWA guidance. Please transmit a signed adoption
resolution indicating the establishment of safety targets for your MPO or supporting the state’s targets
to Daryl Vreeland (dvreeland@ncdot.gov) in the Transportation Planning Unit just as you have in
previous years. Daryl can also provide a template of the adoption resolution if helpful. An adoption
resolution template can be found at the link below:
https://connect.ncdot.gov/resources/safety/Documents/Crash%20Data%20and%20Information/MPO%
20Safety%20Target%20Adoption%20Template%20-
%202022CY_FromTransportationPlanningDivision.docx
Finally, a new website (link below) has been established to communicate safety information of specific
interest to planning organizations. It is expected that the content on this website will expand over time.
https://www.ncdot.gov/initiatives-policies/safety/traffic-safety/Pages/Planning-Organization-
Resources.aspx
Please contact me directly at (919) 814-5011 or bmayhew@ncdot.gov for further questions or
discussion.
BKM\bgm
17
cc: Jamal Alavi, PE, CPM
J. Kevin Lacy, PE, CPM
George Hoops, PE
18
High Point RESOLUTION
ENDORSEMENT OF TARGETS FOR SAFETY PERFORMANCE MEASURES
ESTABLISHED BY NCDOT
Archdale
WHEREAS, the High Point Urban Area Metropolitan Planning Organization
(HPMPO) has been designated by the Governor of the State of North Carolina as the
Metropolitan Planning Organization (MPO) responsible, together with the State, for the
Denton comprehensive, continuing, and cooperative transportation planning process for the MPO’s
metropolitan planning area; and;
WHEREAS, the Highway Safety Improvement Program (HSIP) final rule (23 CFR
Jamestown Part 490) requires States to set targets for five safety performance measures by August 31,
and;
WHEREAS, the North Carolina Department of Transportation (NCDOT) has
Lexington established targets for five performance measures based on five year rolling averages for:
(1) Number of Fatalities, (2) Rate of Fatalities per 100 million Vehicle Miles Traveled
(VMT), (3) Number of Serious Injuries, (4) Rate of Serious Injuries per 100 million VMT,
and (5) Number of Non-Motorized (bicycle and pedestrian) Fatalities and Non-motorized
Thomasville
Serious Injuries, and;
WHEREAS, the NCDOT coordinated the establishment of safety targets with the
19 Metropolitan Planning Organizations (MPOs) in North Carolina continually through
Trinity outreach conducted by NCDOT’s Mobility and Safety Group and;
WHEREAS, the NCDOT officially establishes and reports the safety targets in the
Wallburg Highway Safety Improvement Program annual report by August 31, of each year and;
WHEREAS the MPO’s may establish safety targets by agreeing to plan and
program projects that contribute toward the accomplishment of the State’s targets for each
Davidson measure or establish its own target within 180 days of the State establishing and reporting
County its safety targets in the HSIP annual report.
NOW THEREFORE, BE IT RESOLVED, that the High Point Urban Area
Metropolitan Planning Organization (HPMPO) Transportation Advisory Committee (TAC)
Forsyth
agrees that by approval of this resolution applicable references are hereby added to the
County
2045 MTP adopted August 27, 2020, and the 2020-2029 MTIP adopted January 28, 2020,
and that program projects that contribute toward the accomplishment of the State’s targets
as noted below for each of the aforementioned performance measures:
Guilford
• Reduce total fatalities by 12.17 percent from 1,428.8 (2016-2020 average) to
County
1,254.9 (2018-2022 average) by December 31, 2022.
• Reduce the fatality rate by 13.78 percent from 1.226 (2016-2020 average) to
1.057 (2018-2022 average) by December 31, 2022.
Randolph • Reduce total serious injuries by 19.79 percent from 4,410.2 (2016-2020
County average) to 3,537.6 (2018-2022 average) by December 31, 2022.
19
• Reduce the serious injury rate by 21.68 percent from 3.782 (2016-2020
average) to 2.962 (2018-2022 average) by December 31, 2022.
• Reduce the total nonmotorized fatalities and serious injuries by 17.93 percent
from 592.2 (2016-2020 average) to 486.0 (2018-2022 average) by December
31, 2022.
A motion was made by TAC Member ______________and seconded by TAC member
_______________ and approved this the 25th day of January 2022.
_________________________
Neal Grimes, Chairman
Transportation Advisory Committee
Subscribed and sworn to me this the 25th day of January 2022.
______________________________________
Notary Public
My commission expires ______________________
20
TCC
Meeting
Meeting Date 11/9/2021 Agenda Item No. 6
Action Requested Information
Section Tab
2022-2023 Unified Planning Work Program (UPWP) Draft. (Greg Venable)
Information Summary Attachments Yes No
The UPWP is the MPO’s annual budget and work plan. It lists the planning tasks that staff
expects to perform and the work products that we expect to produce during the fiscal year.
Our fiscal year runs from July 1st through June 30th of next year. The work program consists
of three major divisions: surveillance of change, long-range planning, and administration.
Each major division includes several line items under which the MPO can perform work.
Each line item includes explanatory text describing the customary work items for the line
item, the rationale for performing the work, how much money we plan to spend on the line
item and the work products that the MPO expects to produce during the upcoming year. The
UPWP also includes a series of tables showing the sources of the funds used, the amount of
federal funds used, the amount of the local match, and total expenditures for each line item
from each funding source. The DRAFT 2022-2023 UPWP will be sent in a separate email.
TCC Vote: Motion Second
By:__________________ By:_______________________
Vote: For_______________________ Against________________________
21
TCC
Meeting
Meeting Date 11/9/2021 Agenda Item No. 7
Action Requested Information
Section Tab
2023 CMAQ funding call for projects. (John Hanes)
Information Summary Attachments Yes No
Congestion Mitigation & Air Quality (CMAQ) is a Federal program that funds
transportation projects and programs in air quality nonattainment and maintenance areas
to help achieve and maintain national standards for air quality pollutants.
Funding is apportioned to North Carolina based on the population in non-attainment and
maintenance areas of the state and the severity of air quality problem.
Subregional CMAQ funds are locally-administered and awarded at the MPO/RPO level
to projects within eligible counties. The local project sponsor is responsible for providing
the required match and meeting federal funding requirements. This category accounts for
60% of the total North Carolina CMAQ apportionment.
NCDOT announced the release of federal CMAQ funding for the High Point Urban Area
MPO for Fiscal Year 2023. NCDOT has allocated $1,191,275 to the HPMPO. Projects
submitted for consideration must be a minimum of $100,000 and each project requires a
20% local match. All projects are locally administered which means that the jurisdiction
is responsible for all planning, design, engineering, and project oversight that ensures
federal requirements are met.
The project submittal window ended November 1. At the November TCC and TAC
meetings proposed projects will be reviewed. Action will be taken on these projects at
the January TCC and TAC meetings. One project, City of High Point - signal timing for
selected signals, as been submitted.
TCC Vote: Motion Second
By:__________________ By:_______________________
Vote: For_______________________ Against________________________
22
TCC
Meeting
Meeting Date 11/9/2021 Agenda Item No. 8-11
Action Requested Information
Section Tab
MPO Reports
Information Summary Attachments Yes No
Agenda Item 8
Division Reports
Agenda Item 9
NCDOT Transportation Planning Division Report
Agenda Item 10
FHWA Report
Agenda Item 11
Public Transportation Reports
TCC Vote: Motion Second
By:__________________ By:_______________________
Vote: For_______________________ Against________________________
23
NCDOT DIV 7 PROJECTS LOCATED IN HPMPO - UNDER DEVELOPMENT
Estimated
TIP/WBS # Description Let/Start Date Completion Cost Status Project Lead
Date
EB-5519 Lydia greenway trail from Jamestown municipal building to Jul. 2019 Nov. 2021 $1,198,415 LAP, Under Construction, Contract Donnie Huffines
50035.3.1 York Leigh Road (Non-System) in Jamestown Administered by Town of Jamestown
SS-4907CN Install All-Way Stop with flasher and radius improvements on Dec. 2019 Jun. 2022 $90,000 Radius improvements completed, Dawn McPherson
48759.1.2 SR 1113 (Kivett Drive) at SR 1145 (Riverdale Drive) east of Traffic materials pending acquisition - Derek Dixon
48759.2.1 High Point Materials have been ordered - Plans
48759.3.1 completed, construction pending -
Waiting on Rings to arrive, Approval in
Raleigh delayed shipping from vendor
SS-6007P Bridge #57 on SR 1113 (Kivett Drive) over Reddick's Creek - 12/1/21 12/31/21 $36,000 Planning and design activities Bobby Norris
49423.1.1 Install bridge approach guardrail with MASH compliant end underway
49423.3.1 units
SS-6607AC Installation of 2 lines of trailing approach bridge guardrail at Jun. 2022 Aug. 2022 $33,000 Planning and design activities Bobby Norris
49824.1.1 Bridge #400196 on SR 1193 (Baker Road) over US 29-70 in underway
49824.2.1 High Point.
49824.3.1
SS-4907CF Install traffic signal with pedestrian count down heads at the Mar. 2022 Jun. 2022 $120,000 Signal plans not complete, MA w/City Dawn McPherson
48252.1.1 intersection of SR 1278 (University Parkway) and Davis of High Point executed. Poles arrived
48252.2.1 Avenue (non-system) in High Point. Traffic signal to be 8/23/2021. Contractor is waiting on
48252.3.1 supported by metal strain poles. foundation design to order steel for
foundation.
B-5353 Replace Bridge 147 over SR 1009 (South Main Street) on US 2/15/22 FY2024 $3,450,000 Combined let with U-5896, ROW Laura Sutton
46067.1.1 29/70 and I-85 Business in High Point acquisition underway -80% Complete
46067.2.1
46067.3.1
U-5896 Reconstruct interchange at US 29 / US 70 / Business 85 and 2/15/22 FY2024 $12,400,000 Combined let with B-5353, ROW Laura Sutton
44674.1.1 SR 1009(South Main Street) in High Point acquisition underway - 80% Complete
44674.2.1
44674.3.1
24
Page 1 HPMPO Nov. 2021
NCDOT DIV 7 PROJECTS LOCATED IN HPMPO - UNDER DEVELOPMENT
Estimated
TIP/WBS # Description Let/Start Date Completion Cost Status Project Lead
Date
U-6018 Improve interchange at NC 62 and I-85 and realign 4/19/2023 FY2026 $12,300,000 Planning and design activities Rob Weisz
47163.1.1 intersections along NC62 at SR 1154 (Kersey Valley Road) 12/20/2022 FY2025 underway, ROW acquisition underway
47163.2.1 and SR 1162 (Weant Road) in Archdale
47163.3.1
U-4015A Widen SR 1556 (Gallimore Dairy Road) to multilanes from NC 5/16/23 FY2025 $6,600,000 Planning and design activities Brian Ketner
35013.1.4 68 to Airpark East in Greensboro underway, coordinate with U-5974
35013.2.4
35013.3.4
B-5723 Replace Bridge 54 over Richland Creek on SR 1158 (Jackson 11/19/2024 FY2026 $3,237,000 Planning and design activities Kevin Fischer
45679.1.1 Lake Road) 11/21/2023 FY2025 underway
45679.1.2
U-4758 Improvements to Johnson Street/Sandy Ridge Road from 12/19/23 FY2026 $45,700,000 Planning and Design activities Laura Sutton
40251.2.1 Skeet Club Road to I-40 underway, Public meeting 8/14/18
40251.3.1
I-5712 Interchange improvements at I-40/US 421 and SR 1850 12/15/26 FY2029 $14,500,000 Planning and Design activities Laura Sutton
50126.1.FS1 (Sandy Ridge Road) in Greensboro. Sandy Ridge Road underway, Coordinate with U-4758 & U-
50126.2.1 widening to Cider Road 6045
50126.3.1
U-5974 Upgrade NC 68 to Superstreet from SR 1523 (Hickswood 7/18/28 FY2030 $48,100,000 Planning and design activities Brian Ketner
45962.1.1 Road) to SR 1556 (Gallimore Dairy Road) in High Point underway, coordinate with U-4015A
45962.2.1
45962.3.1
U-6121 Widen SR 1541 (Wendover Avenue) from NC 68 11/21/28 FY 2031 $27,300,000 Planbning and design activities Brian Ketner
48605.1.1 (Eastchester Drive) in High Point to SR 1541 (Guilford underway
48605.2.1 College Road) in Greensboro.
48605.3.1
25
Page 2 HPMPO Nov. 2021
North Carolina Department of Transportation 10/25/2021
Active Projects Under Construction - Guilford Co.
Contract TIP Location Description Contractor Name Resident Contract Bid Availability Completion Work Start Estimated Progress Completion
Number Number Engineer Amount Date Date Date Completion Schedule Percent
Date Percent
C203256 U-3615B SR-1820 (SKEET CLUB RD) FROM EAST OF SR-1818 APAC - ATLANTIC INC Hayes, PE, $30,898,017.15 3/2/2015 3/29/2019 5/20/2015 12/31/2021 99.6 99.6
(JOHNSON ST) TO WEST OF NC-68 (EASTCHESTER DR) IN THOMPSON ARTHUR Meredith
HIGH POINT. DIVISION
C203433 I-5110 FUTURE I-73 FROM EXISTING SR-2085 (JOSEPH M BRYAN FLATIRON Smith, Brian $176,550,000.00 5/7/2014 4/25/2017 5/7/2014 6/30/2021 100 99.94
I-5110A BLVD) / AIRPORT PKWY INTERCHANGE TO SOUTH OF US- CONSTRUCTORS INC - V
R-2413A 220 NEAR HAW RIVER. BLYTHE DEVELOPMENT
CO JOINT VENT
C204045 I-5852B PAVEMENT REHAB. ON I-73 FROM 0.7 MILES SOUTH OF I- TRIANGLE GRADING & Snell, PE, $5,464,750.19 8/28/2017 9/15/2018 10/7/2017 12/1/2021 100 90.34
40 TO 0.73 MILES SOUTH OF SR-2085 (JOSEPH M. BRYAN PAVING INC William H
BLVD.) IN GREENSBORO.
C204071 U-5169 I-74/US-311 AND NC-68 (EASTCHESTER DR) INTERCHANGE BRANCH CIVIL INC Snell, PE, $22,481,354.65 7/30/2018 1/28/2021 9/14/2018 12/31/2021 100 82.1
IMPROVEMENTS. William H
C204096 U-2525C GREENSBORO EASTERN LOOP FROM US-29 NORTH OF ES WAGNER COMPANY Julian, Jason $120,471,182.82 4/30/2018 11/20/2022 5/7/2018 7/14/2023 75.28 72.86
GREENSBORO TO SR-2303 (LAWNDALE DR). LLC/SMITH-ROWE LL R
C204100 B-5351 REPLACE BRIDGE #237 AND #242 OVER DEEP RIVER ON SMITH-ROWE, LLC Snell, PE, $8,026,687.83 7/30/2018 3/14/2021 8/1/2018 6/15/2021 100 97.15
US-29/US-70/I-85 BUS IN HIGH POINT. William H
C204103 U-2412A SR-1486/SR-4121 (GREENSBORO/HIGH POINT RD) FROM BRANCH CIVIL INC Lorenz, PE, $55,963,119.69 7/30/2018 12/28/2021 9/12/2018 9/13/2022 86.8 79.6
US-311 BYPASS TO WEST OF SR-1480 (VICKREY CHAPEL Kris
RD).
C204174 I-5852A PAVEMENT REHAB. ON I-73/US-421 FROM I-85 TO I-40 IN DIAMOND SURFACE INC Snell, PE, $13,393,320.88 3/15/2019 10/15/2020 3/18/2019 2/16/2021 100 92.42
GREENSBORO. William H
C204371 U-2581BA US-70 (BURLINGTON RD) FROM WEST OF SR-3045 (MT APAC - ATLANTIC INC Snell, PE, $11,125,538.10 7/1/2020 4/30/2022 7/1/2020 4/30/2022 87.1 71.78
HOPE CHURCH RD) /SR-2819 (MCLEANSVILLE RD) TO EAST THOMPSON ARTHUR William H
OF SR-2826 (BIRCH CREEK RD) DIVISION
C204465 RESURFACE 1 SECTION OF US 29 AND 21 SECTIONS OF BLYTHE CONSTRUCTION, Lorenz, PE, $3,884,488.85 4/1/2021 7/1/2022 7/9/2021 7/1/2022 16.4 91
RAMPS AND LOOPS FOR US 29 INC Kris
C204499 R-4707 INTERCHANGE OF US 29 AND SR 4771 (REEDY FORK APAC - ATLANTIC INC Hayes, PE, $46,382,713.04 6/2/2021 10/28/2024 6/7/2021 10/28/2024 7.5 6.65
PARKWAY) THOMPSON ARTHUR Meredith
DIVISION
26
Page 1 of 3
North Carolina Department of Transportation 10/25/2021
Active Projects Under Construction - Guilford Co.
Contract TIP Location Description Contractor Name Resident Contract Bid Availability Completion Work Start Estimated Progress Completion
Number Number Engineer Amount Date Date Date Completion Schedule Percent
Date Percent
C204626 RESURFACE 1 SECTION OF NC 87, 1 SECTION OF NC 49 FSC II LLC DBA FRED Lorenz, PE, $4,639,570.37 6/3/2021 11/1/2022 6/28/2021 11/1/2022 23.5 15.23
AND 21 SECTIONS OF SECONDARY ROADS SMITH COMPANY Kris
DG00462 REHAB. BRIDGES 264, 288, 260, 543 IN GUILFORD COUNTY ELITE INDUSTRIAL Snell, PE, $967,383.15 8/1/2019 1/1/2020 9/13/2021 2/14/2022 23.8 16.57
AND BRIDGE 031 IN ORANGE COUNTY PAINTING INC William H
DG00480 U-2412B(L) LANDSCAPE PLANTING ALONG GATE CITY BLVD FROM SR MOTS LANDSCAPING & Hayes, PE, $175,647.50 9/1/2019 12/31/2021 9/9/2019 12/31/2021 100 100
4121 (EAST MAIN ST) TO SR 1546 (GUILFORD COLLEGE LAWNS LLC Meredith
ROAD)
DG00490 AST TREATMENT OF 26 SECONDARY ROADS IN GUILFORD CAROLINA ROAD Lorenz, PE, $832.311.02 4/1/2021 10/30/2021 4/8/2021 11/30/2021 100 97.46
COUNTY SOLUTIONS LLC Kris
DG00493 REPLACE PIPE #2134 ON SR 2835 (MCKNIGHT MILL ROAD) HUNTING CREEK Snell, PE, $374,444.44 7/8/2021 9/9/2021 7/8/2021 11/9/2021 82.5 99.69
APPROX. 0.1 MILE SOUTH OF INTERSECTION WITH SR CONSTRUCTION INC William H
2732 (HINES CHAPEL ROAD)
DG00499 RESURFACE A SECTION OF 1 PRIMARY AND 33 SR'S IN SHARPE BROTHERS A Hayes, PE, $1,878,711.88 4/1/2021 6/30/2022 3/15/2021 10/31/2021 100 99.52
GUILFORD COUNTY AND ONE SECTION OF SR IN DIVISION OF VECELLIO & Meredith
ROCKINGHAM GROGAN INC.
DG00500 WIDENING 2 SECONDARY ROADS AND MILLING AND BLYTHE CONSTRUCTION Hayes, PE, $1,367,596.39 4/1/2021 11/1/2021 5/17/2021 11/29/2021 62 55.59
RESURFACING 4 SECONDARY ROADS Meredith
DG00505 WIDENING AND RESURFACING A PORTION OF US 70 AND SHARPE BROTHERS A Snell, PE, $2,711,163.82 7/1/2021 11/1/2021 4/15/2021 11/30/2021 29.5 93.75
RESURFACING 48 SECONDARY ROADS DIVISION OF VECELLIO & William H
GROGAN INC.
DG00512 RESURFACE 43 VARIOUS STATE ROUTES SHARPE BROTHERS A Hayes, PE, $2,562,749.29 7/1/2021 11/1/2022 7/1/2022
DIVISION OF VECELLIO & Meredith
GROGAN INC.
DG00513 REPLACE BRIDGE #235 OVER BIG ALAMANCE CREEK ON SMITH-ROWE, LLC Hayes, PE, $1,675,367.75 6/21/2021 10/25/2022
SR 1005 (ALAMANCE CHURCH ROAD) Meredith
DG00515 AST TREATMENT OF 34 SECONDARY ROADS IN GUILFORD WHITEHURST PAVING CO. Lorenz, PE, $749,755.28 7/1/2021 6/30/2021
COUNTY INC. Kris
27
Page 2 of 3
North Carolina Department of Transportation 10/25/2021
Active Projects Under Construction - Guilford Co.
Contract TIP Location Description Contractor Name Resident Contract Bid Availability Completion Work Start Estimated Progress Completion
Number Number Engineer Amount Date Date Date Completion Schedule Percent
Date Percent
DG00524 R-5787-G INSTALLATION OF ADA COMPLIANT CURB RAMPS AT ATLANTIC CONTRACTING Lorenz, PE, $717,704.25 6/1/2021 4/14/2023 7/26/2021 4/14/2023 18.9 30.82
R-5787-H VARIOUS ROUTES COMPANY, INC. Kris
DG00525 REPLACE BRIDGE #40 ON SR 2735 (SOCKWELL ROAD) HUNTING CREEK Howell, Bobby $284,444.44 6/28/2021 9/26/2021 7/19/2021 11/30/2021 81 99.81
CONSTRUCTION INC J
DG00526 RESURFACE US 421 AT NORTHBOUND AND SOUTHBOUND SHARPE BROTHERS A Snell, PE, $971,172.66 7/1/2021 11/19/2021 9/1/2021 11/19/2021 38 63.81
I-85 RAMPS DIVISION OF VECELLIO & William H
GROGAN INC.
DG00527 HS-2007C INSTALLATION OF THERMOPLASTIC PAVEMENT MARKING TMI SERVICES INC. Cvijetic, PE, $1,358,289.72 8/16/2021 11/19/2021
LINES ON VARIOUS SECONDARY ROUTES Bojan
DG00531 RESURFACE SR 1001 (CHURCH STREET) - 3 SECTIONS, SR SHARPE BROTHERS A Hayes, PE, $2,780,006.94 7/8/2021 7/7/2022 8/12/2021 7/7/2022 50 54.34
2714 (RED CEDAR ROAD) AND SR 2748 (SPRINGWOOD DIVISION OF VECELLIO & Meredith
CHURCH ROAD) GROGAN INC.
DG00533 MILLING, RESURFACING AND PAVEMENT MARKINGS ON I- BLYTHE CONSTRUCTION Lorenz, PE, $2,989,292.45 7/8/2021 7/7/2022 9/20/2021 7/7/2022 22 22.13
85 BUS/US 29/US 70, NC 150 AND VARIOUS SECONDARY INC. Kris
ROADS
28
Page 3 of 3
Randolph County - High Point MPO - Active Projects - Division 8--November 2021
Contract # or Completion
Route Description Let Date Contractor Project Admin. Project Cost Notes
WBS # or TIP # Date
DH00327 Various Upgrade Intersections to comply with 7/13/2021 4/30/2022 Eastern Cary Fine $247,107 Project just starting
R-5788GA, GB Americans with Disabilities Act (ADA) Earthscapes (336) 318-4020
using TA Funds
17BP.8.R.136 SR 1557 (Morris Rd) Replace Bridge No. 54 over unnamed 3/23/2021 7/20/2022 APAC Cary Fine $910,339 Project 31% complete
DH00325 incident tributary of the Uwharrie River (336) 318-4020 Open to Traffic end of Jan 2022
612628
Randolph County - High Point MPO - Upcoming Projects - Planning & Design, R/W, or not started - Division 8--November 2021
Contract # or Completion STIP Project
Route Description Let Date Contractor Project Admin. Notes
WBS # or TIP # Date Cost
U-3400 SR 1577 / SR 1004 Widening from SR 1567 (Robbins Country 8/19/2025 TBD TBD Jeff Stroder $38,626,000 Right of Way 1/2023
(Archdale Road) Rd) to US 311 (Main Street) in Archdale (910) 773-8034 Public Meeting held 2/27/18
U-5308 SR 1547 (Finch Farm Rd) Widening from south of SR 3106 Kennedy 6/17/2025 TBD TBD Jeffrey Teague $39,808,000 Right of Way 9/2019
Rd to I-85 in Trinity Extend northern (910) 773-8025 Public Meeting held 3/29/2018
limit to NC 62 2nd Public Meeting 11/29/18
U-5770 I-85 / SR 1993 Interchange Improvements 1/21/2025 TBD TBD Jeff Stroder $30,150,000 Right of Way 12/2021
(South Main Street) Frontage Road Alternative Selected (910) 773-8034 Public Meeting 11/30/17
Newsletter Mailed 6/8/18
U-5864 SR 1595 (Surrett Drive) 3-lane widening from I-85 to SR 1300 (W. 8/15/2028 TBD TBD Greg Davis $55,063,000 Right of Way 6/2024
Fairfield Rd. /Guilford Co.) in Trinity, (910) 773-8022 Public Meeting held 6/13/19
Archdale, and High Point
U-6191 NC 62 Modernize roadway between SR 3252 10/17/2028 TBD TBD Greg Davis $15,500,000 Right of Way 10/2026
(Surrett Dr) in Trinity to SR 1009 (N. Main (910) 773-8022
St) in Archdale
HI-0002 I-85 Randolph Co. Pavement Rehab - from I-85/NC 109 in 4/19/2022 TBD TBD Cary Fine $14,700,000
Thomasville to SR 1009 (South Main St) in (336) 318-4020
Archdale
29