HPMPO Technical Coordinating Committee (TCC)
Regular MeetingHigh Point, NC · January 18, 2022
Agenda
HIGH POINT URBAN AREA MPO
TECHNICAL COORDINATING COMMITTEE (TCC)
Agenda for the January 18, 2022 TCC Meeting
2:00 PM – Online Meeting
Microsoft Teams
+1 336-803-7698 | 547 882 603#
Action Items
1. Consideration of the November 9th TCC meeting minutes. (Mark McDonald) Page 1
2. Recommendation to the TAC for approval the 2022 Safety Performance Targets
established by NCDOT. (Greg Venable) Page 7
3. Recommendation to the TAC for amendments to the 2020-2029 MTIP.
(John Hanes) Page 10
4. Recommendation to the TAC for approval to release the FY2022-2023 Unified Planning
Work Program (UPWP) for a minimum 30-day public review period. (Greg Venable)
Page 12
5. Recommendation to the TAC for approval of resolution of support for 2023 CMAQ
Funding Call for Projects. (John Hanes) Page 15
Information Items
6. P 6.0 Update. (Greg Venable) Page 17
7. RAISE Grant Update. (Andrew Edmonds) Page 18
8. Clean Cities Coalition Presentation. (Jesse Day) Page 19
Agency Reports
9. NCDOT Division Reports
Division 7 (Stephen Robinson) Page 23
Division 8 (Bryan Kluchar) Page 28
Division 9 (Fred Haith)
10. NCDOT Transportation Planning Branch Report (Michael Abuya)
11. FHWA Report (Suzette Morales)
12. Public Transportation Reports
High Point Transit System (Andrew Edmonds)
Davidson County Transportation (Richard Jones) Page 29
RCATS (Tawanna Williams)
PART (Mark Kirstner) Page 30
Next TCC Meeting
February 15, 2022
TCC
Meeting
Meeting Date 1/18/2022 Agenda Item No. 1
Action Requested Approve
Section Tab
Consideration of the November 9th TCC meeting minutes. (Mark McDonald)
Information Summary Attachments Yes No
The complete meeting minutes are in your packet as Attachment 1.
TCC Vote: Motion Second
By:__________________ By:_______________________
Vote: For_______________________ Against________________________
1
MINUTES
TECHNICAL COORDINATING COMMITTEE
November 9, 2021
TCC MEMBERS PRESENT: Greg Venable, Mark McDonald, Chuck George, Fred
Haith, Mark Kirstner, Stephen Robinson, Scott Leonard, Jason Miller, Michael Abuya,
Anne Hawryluk, Heidi Galanti
TAC MEMBERS PRESENT: Suzette Morales (non-voting)
MPO Staff: Gwen Ford, John Hanes, Tabatha J’Arrante, Andrew Edmonds
OTHERS PRESENT: Phillip Craver, RJ Monroe, Tamara, Njegovan, Tawanna
Williams, Kathryn Vollert, Jesse Day, Jeff Hatling, Paul Blanchard, Mike Horney,
Brandon Oliver
RECORDING STAFF: Microsoft Teams
Mark McDonald called the meeting to order.
ACTION ITEMS
Item 1: Consideration of the October 19th TCC meeting minutes. (Mark
McDonald)
Motion by: Chuck George
Seconded by: Bryan Kluchar
Vote:
For: Unanimous
Against: None
Item 2: Consideration of the 2022 TCC Schedule.
Greg Venable reported TCC will continue to meet on the third Tuesday of each month
with exception of July and December. In November TCC meets a week earlier to avoid
conflicts with the Thanksgiving holiday.
Motion by: Greg Venable
Seconded by: Stephen Robinson
Vote:
For: Unanimous
Against: None
Item 3: Recommendation to the TAC of amendments to the 2020-2029 MTIP.
2
John Hanes reported we have 4 STIP modifications and STIP deletion.
EB-5873 South College Drive in High Point being modified to allow additional time for
planning and design, which delays construction from FY 21 to FY 22.
HS-2009C US 64 in Davidson County add project segment B at the request of the
Transportation Mobility and Safety Divisions.
HS-2009C US 29/70 in Davidson County adding project segment C at the request of the
Transportation Mobility and Safety Division.
U-3400 Archdale Road project is being modified to allow additional time for planning
and design, delay ROW from FY 22 to FY 23.
The STIP deletion is B-5723 at Jackson Lake Road. This project is being deleted at the
request of the Structures Management Unit, project to be funded under the state bridge
program.
Motion by: Chuck George
Seconded by: Michael Abuya
Vote:
For: Unanimous
Against: None
Information Items
4. Town of Kernersville Comprehensive Transportation Plan (CTP)
Amendment Request.
Greg Venable reported attached is a request from the Town of Kernersville to amendment
the HPMPO CTP. Kernersville is currently working on a business park development that
is in HPMPO and WSMPO. It will create an opportunity for a Minor Thoroughfare to
connect Macy Grove Road and the US 421/Macy Grove Road interchange to Bunker Hill
Road. If HPMPO CTP is amended, the Town will then request WSMPO to amend their
CTP. If adopted on both CTPs, the Town will pursue a Federal Functional Classification.
5. Safety Performance Measures – FHWA Assessment and 2022
Targets.
John Hanes reported these targets are established annually, are based on 5 year rolling
averages, and are for calendar years. We have been adopting the NCDOT safety
measures. Table 1-shows the 5-year running average of North Carolina safety
3
performance targets, which none have been achieved except the fatality rate which is
better than baseline. Table 2-shows High Point MPO’s safety target measurements over
the last 5 years. Along with North Carolina we have been improving the fatality rate, but
none of the targets have been achieved. Table 3 shows 2022 safety performance targets
for number of fatalities, rate of fatalities, number of serious injuries, rate of serious
injuries, and number of non-motorized fatalities & serious injuries that NCDOT looks to
achieve. Table 4 is the running 5-year averages for High Point MPO starting in 2008 to
2020 including the 2022 safety target rates in the five categories. We are allowed to adopt
the states or create our own. However, we are again going to adopt the states safety
targets. These need to be approved and sent to the state by the end of January.
6. Draft 2022-2023 Unified Planning Work Program (UPWP).
The UPWP is the MPO’s annual budget and work plan. It lists the planning tasks that
staff expects to perform and the work products that we expect to produce during the fiscal
year. Our fiscal year runs from July 1st through June 30th of next year. The work
program consists of three major divisions: surveillance of change, long-range planning,
and administration. Each major division includes several line items under which the MPO
can perform work. Each line item includes explanatory text describing the customary
work items for the line item, the rationale for performing the work, how much money we
plan to spend on the line item and the work products that the MPO expects to produce
during the upcoming year. The UPWP also includes a series of tables showing the
sources of the funds used, the amount of federal funds used, the amount of the local
match, and total expenditures for each line item from each funding source. The DRAFT
2022-2023 UPWP will be sent in a separate email.
7. 2023 CMAQ Funding Call for Projects.
John Hanes reported the project submittal window ended November 1. One project, City
of High Point – signal timing $600,000 project for selected signals has been submitted.
Action will be taken in January at the TCC & TAC meetings.
Agency Reports
Item 8: NCDOT Division Reports
Division 7
Stephen Robinson reported the Kersey Valley Road at NC 62 project let date has been
pushed out from December of 2022 to April of 2023. The bridge over Richland Creek on
Jackson Lake Road has been pushed from 2023 to a start date to November 2024.
Division 8
Bryan Kluchar reported project U-3400 let date is November 2025 and not August 2025.
4
Division 9
Fred Haith had no updates.
Item 9: NCDOT Transportation Planning Branch Report
Michael Abuya had no updates.
Item 10: FHWA Report
Suzette Morales introduced a new member (Brandon Oliver) to their team. Brandon
reported he will be working with the North Carolina Division Office as Community
Planner.
Item 11: Public Transportation Reports
High Point Transit System
Andrew Edmonds had no updates.
Davidson County Transportation
No one present.
RCATS
Tawanna Williams reported RCATS is very busy and short staffed.
PART
Mark Kirstner reported we have been on the streets with the household survey, which is
an input of the Travel Demand Model. We have received two proposals and we will be
going through the selection process this month. Hopefully this project can kick off in
January 2022. We will do a pilot project in the Spring and the full survey in the Fall.
While this is not an input to the model; it will provide a lot of information and data about
household trave throughout our whole region.
From a transit standpoint we also have an RFP out for real time passenger information
system, which a number of systems are participating, and the responses are due back on
Friday. Hopefully given some of our transit systems an opportunity to implement some
new technology in the region over the next year to year and half. We also have a freight
study that is ongoing. We have developed a tour-based freight model and that model
needs some local driver survey data. We started in 2019 trying to collect this data but
have not been successful in getting the number of surveys we needed. Then the pandemic
hit, and we have been back at it and have had a few small successes.
5
We have spent around $500,000 to get to this point. If you know anyone who drives a
truck, please let us give them a call for a 3-day survey where they can earn $100. It is an
app on your phone where you will turn it on in the morning and it tracks their movements
throughout the day and in the evening, they answer a few questions. This is a critical
piece for us and the state planning as well. As for timing we need to get this wrapped up
by the end of the year. There is some post processing of all the data and this contract will
end on June 30, 2022. We have the contractor coming to the region in early December;
because we do have a few companies that have agreed to participate. The contractor will
go to the facility and show them how to set up the app.
Item 12: Other Business
Greg Venable added for the TAC meeting next week. It will be in person TAC staff only
and everyone else will be virtual.
6
TCC
Meeting
Meeting Date 1/18/2022 Agenda Item No. 2
Action Requested Recommendation
Section Tab
Safety Performance Measures – FHWA Assessment and 2022 Targets (Greg Venable)
Information Summary Attachments Yes No
NCDOT is recommending to MPOs approve safety performance measure targets for
2022 that are consistent with NCDOT targets. A resolution for the 2022 safety
performance targets is included in the meeting packet.
TCC Vote: Motion Second
By:__________________ By:_______________________
Vote: For_______________________ Against________________________
7
High Point RESOLUTION
ENDORSEMENT OF TARGETS FOR SAFETY PERFORMANCE MEASURES
ESTABLISHED BY NCDOT
Archdale
WHEREAS, the High Point Urban Area Metropolitan Planning Organization
(HPMPO) has been designated by the Governor of the State of North Carolina as the
Metropolitan Planning Organization (MPO) responsible, together with the State, for the
Denton comprehensive, continuing, and cooperative transportation planning process for the MPO’s
metropolitan planning area; and;
WHEREAS, the Highway Safety Improvement Program (HSIP) final rule (23 CFR
Jamestown Part 490) requires States to set targets for five safety performance measures by August 31,
and;
WHEREAS, the North Carolina Department of Transportation (NCDOT) has
Lexington established targets for five performance measures based on five year rolling averages for:
(1) Number of Fatalities, (2) Rate of Fatalities per 100 million Vehicle Miles Traveled
(VMT), (3) Number of Serious Injuries, (4) Rate of Serious Injuries per 100 million VMT,
and (5) Number of Non-Motorized (bicycle and pedestrian) Fatalities and Non-motorized
Thomasville
Serious Injuries, and;
WHEREAS, the NCDOT coordinated the establishment of safety targets with the
19 Metropolitan Planning Organizations (MPOs) in North Carolina continually through
Trinity outreach conducted by NCDOT’s Mobility and Safety Group and;
WHEREAS, the NCDOT officially establishes and reports the safety targets in the
Wallburg Highway Safety Improvement Program annual report by August 31, of each year and;
WHEREAS the MPO’s may establish safety targets by agreeing to plan and
program projects that contribute toward the accomplishment of the State’s targets for each
Davidson measure or establish its own target within 180 days of the State establishing and reporting
County its safety targets in the HSIP annual report.
NOW THEREFORE, BE IT RESOLVED, that the High Point Urban Area
Metropolitan Planning Organization (HPMPO) Transportation Advisory Committee (TAC)
Forsyth
agrees that by approval of this resolution applicable references are hereby added to the
County
2045 MTP adopted August 27, 2020, and the 2020-2029 MTIP adopted January 28, 2020,
and that program projects that contribute toward the accomplishment of the State’s targets
as noted below for each of the aforementioned performance measures:
Guilford
• Reduce total fatalities by 12.17 percent from 1,428.8 (2016-2020 average) to
County
1,254.9 (2018-2022 average) by December 31, 2022.
• Reduce the fatality rate by 13.78 percent from 1.226 (2016-2020 average) to
1.057 (2018-2022 average) by December 31, 2022.
Randolph • Reduce total serious injuries by 19.79 percent from 4,410.2 (2016-2020
County average) to 3,537.6 (2018-2022 average) by December 31, 2022.
8
• Reduce the serious injury rate by 21.68 percent from 3.782 (2016-2020
average) to 2.962 (2018-2022 average) by December 31, 2022.
• Reduce the total nonmotorized fatalities and serious injuries by 17.93 percent
from 592.2 (2016-2020 average) to 486.0 (2018-2022 average) by December
31, 2022.
A motion was made by TAC Member ______________and seconded by TAC member
_______________ and approved this the 25th day of January 2022.
_________________________
, Chair
Transportation Advisory Committee
Subscribed and sworn to me this the 25th day of January 2022.
______________________________________
Notary Public
My commission expires ______________________
9
TCC
Meeting
Meeting Date 1/18/2022 Agenda Item No. 3
Action Requested Recommendation
Section Tab
Recommendation to the TAC for approval of amendments to the 2020-2029 MTIP. (John
Hanes)
Information Summary Attachments Yes No
The proposed amendments to the 2020-2029 MTIP for the High Point MPO are included
in you packet. Staff is recommending approval of the MTIP amendments.
TCC Vote: Motion Second
By:__________________ By:_______________________
Vote: For_______________________ Against________________________
10
High Point
RESOLUTION
Archdale AMENDING THE 2020-2029 HIGH POINT METROPOLITAN
TRANSPORTATION IMPROVEMENT PROGRAM
WHEREAS, the Transportation Advisory Committee has reviewed the 2020-2029
Denton
Metropolitan Transportation Improvement Program and found an amendment is
necessary; and
Jamestown WHEREAS, the following amendments have been proposed:
Lexington
Thomasville
Trinity
Wallburg
Davidson NOW THEREFORE, be it resolved by the Transportation Advisory Committee for the
County High Point Metropolitan Planning Organization that the 2020-2029 Metropolitan
Transportation Improvement Program be amended as listed above on this the 25th day of
January 2022.
Forsyth
County A motion was made by TAC Member ______________and seconded by TAC
member _______________ and approved this the 25th day of January 2022.
_________________________
Guilford
County ________________
Chair, Transportation Advisory Committee
Randolph
County
Subscribed and sworn to me this the 25th day of January 2022.
______________________________________
Notary Public
My commission expires ______________________
11
TCC
Meeting
Meeting Date 1/18/2022 Agenda Item No. 4
Action Requested Recommendation
Section Tab
Recommendation for approval of the 2022-2023 Unified Planning Work Program
(UPWP). (Greg Venable)
Information Summary Attachments Yes No
The UPWP is the MPO’s annual budget and work plan. It lists the planning tasks that staff
expects to perform and the work products that we expect to produce during the fiscal year.
Our fiscal year runs from July 1st through June 30th of next year. The work program consists
of three major divisions: surveillance of change, long-range planning, and administration.
Each major division includes several line items under which the MPO can perform work.
Each line item includes explanatory text describing the customary work items for the line
item, the rationale for performing the work, how much money we plan to spend on the line
item and the work products that the MPO expects to produce during the upcoming year. The
UPWP also includes a series of tables showing the sources of the funds used, the amount of
federal funds used, the amount of the local match, and total expenditures for each line item
from each funding source.
Our allocation from NCDOT for FY2022-2023 is $329,733 in Federal PL Funds. Our local
match for the MPO will be $83,950.
As required by our Public Participation Policy (PPP) the UPWP must go through a minimum
30-day public review and comment period. We request a recommendation to the TAC to
release the FY2022-2023 UPWP for public review and comment beginning February 1,
2022 and ending on March 4, 2022.
TCC Vote: Motion Second
By:__________________ By:_______________________
Vote: For_______________________ Against________________________
12
The High Point Metropolitan Planning Organization (MPO) is soliciting comments on the
Draft 2022-2023 High Point MPO Unified Planning Work Program (UPWP). The
UPWP outlines the work schedule, projects, and financing of MPO staff for the fiscal
year.
The public will have at least thirty (30) days to review and comment on the UPWP. The
public review period will begin on Tuesday February 1, 2022 and end on Friday March 4,
2022.
Copies of the UPWP will be available for public review in the following locations
beginning February 1, 2022:
• The High Point Public Library
• Archdale Public Library
• Jamestown Public Library
• Davidson County Libraries
(Lexington, Thomasville, Denton, North Davidson, West Davidson)
• High Point Department of Transportation
• Archdale Planning Department
• Denton Town Hall
• Jamestown Town Hall
• Lexington City Hall
• Thomasville Engineering Department
• Trinity City Hall
• Wallburg Town Hall
• Davidson County Planning Department
• Guilford County Planning Department
• Randolph County Planning Department
• The website of the MPO will post the draft UPWP for public review at
https://www.highpointnc.gov/HPMPO
Please submit all written comments to:
Greg Venable
High Point Urban Area Metropolitan Planning Organization
PO Box 230
High Point, NC 27261
336-883-3310
Fax: 336-883-8568
Email: greg.venable@highpointnc.gov
Written comments must be received by March 4, 2022
13
High Point
Archdale RESOLUTION APPROVING THE FY 2022-2023 PLANNING
WORK PROGRAM FOR THE HIGH POINT URBANIZED AREA
METROPOLITAN PLANNING ORGANIZATION
Denton
WHEREAS, a comprehensive and continuing transportation planning program
Jamestown
must be carried out cooperatively in order to ensure that funds for transportation
projects are effectively allocated to the High Point Urban Area; and
WHEREAS, the MPO has adopted a 25-year Metropolitan Transportation Plan to
Lexington
the Year 2045 that is fiscally constrained and meets federal requirements for
metropolitan transportation planning; and
Thomasville WHEREAS, the City of High Point has been designated as the recipient of Federal
Transit Administration Metropolitan Planning Program (Section 5303) funds; and
Trinity WHEREAS, members of the High Point Urban Area Transportation Advisory
Committee agree that the Planning Work Program will effectively advance the
transportation planning process for FY 2022-2023
Wallburg
NOW, THEREFORE, BE IT RESOLVED that the Transportation Advisory
Committee hereby endorses the FY 2022-2023 Planning Work Program for the
High Point Urban Area.
Davidson
County
A motion was made by TAC member _______________________ and seconded by
TAC member __________________________ for the adoption of the above
resolution, and upon being put to a vote was duly adopted on this the 22nd day of
Forsyth
County
March 2022.
_______________________
XXXXXXX
Guilford
County Chair, Transportation Advisory Committee
*******************************************************************
Randolph
County
Subscribed and sworn to me this 22nd day of March 2022.
_______________________________Notary Public
My commission expires ______________
14
TCC
Meeting
Meeting Date 1/18/2022 Agenda Item No. 5
Action Requested Recommendation
Section Tab
Recommendation to the TAC for approval of a resolution of support for City of High
Point CMAQ funded traffic signal system improvement projects. (John Hanes)
Information Summary Attachments Yes No
Attached is a copy of a resolution of support for CMAQ funded traffic signal system
projects in High Point.
TCC Vote: Motion Second
By:__________________ By:_______________________
Vote: For_______________________ Against________________________
15
High Point
Archdale
RESOLUTION ENDORSING THE CONGESTION MITIGATION AIR QUAILTY
(CMAQ) PROJECT FOR THE CITY OF HIGH POINT
Denton
WHEREAS, the Infrastructure Investment and Jobs Act (IIJA) (Public Law 117-58,
November 15, 2021) continues the Congestion Mitigation and Air Quality Improvement
Jamestown Program (CMAQ) (23 U.S.C. § 149); and
WHEREAS, CMAQ is a Federal program that funds transportation projects
and programs in air quality nonattainment and maintenance areas to help achieve and
Lexington maintain national standards for pollutants; and
WHEREAS, the North Carolina Department of Transportation (NCDOT)
administers the CMAQ program on behalf of non-attainment and maintenance areas
Thomasville
within North Carolina; and
WHEREAS, the High Point Metropolitan Planning Organization (HPMPO)
Trinity has administered a CMAQ project selection process among local area jurisdictions in air
quality non-attainment and maintenance counties; and
WHEREAS, the resulting candidate project meets the requirements of CMAQ
Wallburg and the guidelines established by NCDOT to administer the program; and
WHEREAS, upon approval of the candidate project for CMAQ funding by the
NCDOT, the H P M P O will amend its Long-Range Transportation Plan and
Davidson
County
Metropolitan Transportation Improvement Program to include this project.
NOW THEREFORE, be it resolved that the High Point Urban Area
Transportation Advisory Committee fully endorses the proposed CMAQ project by the
Forsyth City of High Point.
County
A motion was made by TAC Member ________________________and seconded by TAC
Member _______________________ and approved this the 25th day of January, 2022.
Guilford
County
_________________________
,TAC Chair
Randolph
County
Transportation Advisory Committee
Subscribed and sworn to me this the 25th day of January, 2022.
______________________________________
Notary Public
My commission expires ______________________
16
TCC
Meeting
Meeting Date 1/18/2022 Agenda Item No. 6
Action Requested Information
Section Tab
P6.0 Update (Greg Venable)
Information Summary Attachments Yes No
Update on the P 6.0 Process.
TCC Vote: Motion Second
By:__________________ By:_______________________
Vote: For_______________________ Against________________________
17
TCC
Meeting
Meeting Date 1/18/2022 Agenda Item No. 7
Action Requested Information
Section Tab
RAISE Grant Update (Andrew Edmonds)
Information Summary Attachments Yes No
Update on the RAISE Grant application that was submitted in Partnership by the City of
High Point, Southwest Renewal Foundation, High Point Urban Area Metropolitan
Planning Organization, and the Piedmont Triad Regional Council.
TCC Vote: Motion Second
By:__________________ By:_______________________
Vote: For_______________________ Against________________________
18
TCC
Meeting
Meeting Date 1/18/2022 Agenda Item No. 8
Action Requested Information
Section Tab
Clean Cities Coalition (Jesse Day)
Information Summary Attachments Yes No
Information is included in the meeting packet concerning the NC Clean Energy
Technology Center’s Clean Cities Coalition.
TCC Vote: Motion Second
By:__________________ By:_______________________
Vote: For_______________________ Against________________________
19
Advancing Clean Energy for a Sustainable Economy
NC Clean Energy Technology Center is Exploring Creating a Clean
Cities Coalition for Unrepresented Regions of North Carolina
What are Clean Cities Coalitions?
The Clean Cities Coalitions were originally created
by the U.S. Department of Energy in order to reduce
reliance on petroleum products and improve air
quality. Clean Cities coalitions do this by convening
partnerships of public and private stakeholders
to share information and resources regarding
alternative fuels and advanced vehicle technologies
that reduce fuel use and related air pollution.
Why is there a need for a fourth Clean Cities Coalition in North Carolina?
Large swaths of North Carolina are currently unrepresented by Clean Cities Coalitions.
These areas have less access to the support services offered by Clean Cities Coalitions.
North Carolina (NC) has three Clean Cities Coalitions, represented by three Regional
Councils of Governments, representing 44% of NC’s population, around the Asheville,
Charlotte, and Raleigh-Durham metro areas. The North Carolina Clean Energy
Technology Center (NCCETC) is seeking partners to form an additional Clean Cities
Coalition to provide alternative fuel initiatives to rural and underserved communities in
the Eastern, Northeastern, and Central regions and will reach an additional 45% of North
Carolina’s population.
Background on the NC Clean Energy Technology Center
The NC Clean Energy Technology Center is located on North Carolina State University’s
(NCSU) campus in the College of Engineering, and is one of two land-grant universities
in North Carolina. NCSU’s Cooperative Extension offices operate in all 100 counties
in North Carolina, providing resources and training to the public on topics such as
agriculture and natural resource management. NCCETC’s mission is to advance a
sustainable energy economy by educating, demonstrating, and providing support for clean
energy technologies, practices, and policies. NCCETC has over 30 years of experience
in forming partnerships and providing technical assistance with industries, academia,
governments, profit, and nonprofit organizations. NCCETC already manages education and
outreach activities related to clean transportation, such as the annual Sustainable Fleet
Technology Conference & Expo, alternative fuel vehicle demonstrations and ride and drives,
and online webinars on topics related to sustainable fleet management.
20
North Carolina State University | College of Engineering | 919-515-3480 | www.nccleantech.ncsu.edu
How can my organization be involved?
By joining our coalition as a stakeholder, you will be supporting the clean fleets, alternative
fuels, and sustainable transportation across North Carolina. As a fleet, you have access
to resources that will provide guidance on ways that you can improve the efficiency and
sustainability of your vehicles. As a manufacturer or trade organization, you will have
access to a network of partners and organizations that are expanding their infrastructure
and fleets. Our staff can also provide assistance by providing advice on available
technologies and available grant funds that can be applied for to help offset the costs of
installing new technologies. There will be quarterly stakeholder meetings that you can
attend in person or virtually to learn more about these technologies and network with others
in your region who are also working to improve the sustainability of their vehicle fleets.
Eastern and Central Clean Fuels Coalition Coverage Areas
K R
G L
Q
M P
O
REGION G REGION O
Alamance, Caswell, Davidson, Guilford, Brunswick, Columbus, New Hanover and
Montgomery, Randolph, Rockingham, Pender
Davie, Forsyth, Stokes, Surry and Yadkin
REGION P
REGION K Carteret, Craven, Duplin, Greene, Jones,
Franklin, Granville, Person, Vance and Lenoir, Onslow, Pamlico and Wayne
Warren
REGION Q
REGION L Beaufort, Bertie, Hertford, Martin and Pitt
Edgecombe, Halifax, Nash, Northampton
and Wilson
REGION R
REGION M Camden, Chowan, Currituck, Dare, Gates,
Cumberland, Harnett and Sampson Hyde, Pasquotank, Perquimans, Tyrrell
and Washington
21
North Carolina State University | College of Engineering | 919-515-3480 | www.nccleantech.ncsu.edu
TCC
Meeting
Meeting Date 1/18/2022 Agenda Item No. 9-12
Action Requested Information
Section Tab
MPO Reports
Information Summary Attachments Yes No
Agenda Item 9
Division Reports
Agenda Item 10
NCDOT Transportation Planning Division Report
Agenda Item 11
FHWA Report
Agenda Item 12
Public Transportation Reports
TCC Vote: Motion Second
By:__________________ By:_______________________
Vote: For_______________________ Against________________________
22
NCDOT DIV 7 PROJECTS LOCATED IN HPMPO - UNDER DEVELOPMENT
Estimated
TIP/WBS # Description Let/Start Date Completion Cost Status Project Lead
Date
EB-5519 Lydia greenway trail from Jamestown municipal building to Jul. 2019 2/28/2022 $1,198,415 LAP, Under Construction, Contract Donnie Huffines
50035.3.1 York Leigh Road (Non-System) in Jamestown 12/31/2021 Administered by Town of Jamestown
SS-4907CN Install All-Way Stop with flasher and radius improvements on Dec. 2019 Jun. 2022 $90,000 Radius improvements completed, Dawn McPherson
48759.1.2 SR 1113 (Kivett Drive) at SR 1145 (Riverdale Drive) east of Traffic materials pending acquisition - Derek Dixon
48759.2.1 High Point Materials have been ordered - Plans
48759.3.1 completed, construction underway
SS-6007P Bridge #57 on SR 1113 (Kivett Drive) over Reddick's Creek - 1/1/22 3/1/22 $36,000 Planning and design activities Bobby Norris
49423.1.1 Install bridge approach guardrail with MASH compliant end underway
49423.3.1 units
SS-6607AC Installation of 2 lines of trailing approach bridge guardrail at Jun. 2022 Aug. 2022 $33,000 Planning and design activities Bobby Norris
49824.1.1 Bridge #400196 on SR 1193 (Baker Road) over US 29-70 in underway
49824.2.1 High Point.
49824.3.1
SS-4907CF Install traffic signal with pedestrian count down heads at the Mar. 2022 Jun. 2022 $120,000 Signal plans not complete, MA w/City of Dawn McPherson
48252.1.1 intersection of SR 1278 (University Parkway) and Davis High Point executed. Poles arrived
48252.2.1 Avenue (non-system) in High Point. Traffic signal to be 8/23/2021. Planning and design
48252.3.1 supported by metal strain poles. activities underway
B-5353 Replace Bridge 147 over SR 1009 (South Main Street) on US 2/15/22 FY2024 $3,450,000 Combined let with U-5896, ROW Laura Sutton
46067.1.1 29/70 and I-85 Business in High Point Complete
46067.2.1
46067.3.1
U-5896 Reconstruct interchange at US 29 / US 70 / Business 85 and 2/15/22 FY2024 $12,400,000 Combined let with B-5353, ROW Laura Sutton
44674.1.1 SR 1009(South Main Street) in High Point Complete
44674.2.1
44674.3.1
23
Page 1 HPMPO Jan. 2022
NCDOT DIV 7 PROJECTS LOCATED IN HPMPO - UNDER DEVELOPMENT
Estimated
TIP/WBS # Description Let/Start Date Completion Cost Status Project Lead
Date
U-6018 Improve interchange at NC 62 and I-85 and realign 4/18/23 FY2026 $12,300,000 Planning and design activities Rob Weisz
47163.1.1 intersections along NC62 at SR 1154 (Kersey Valley Road) underway, ROW acquisition underway
47163.2.1 and SR 1162 (Weant Road) in Archdale
47163.3.1
U-4015A Widen SR 1556 (Gallimore Dairy Road) to multilanes from NC 5/16/23 FY2025 $6,600,000 Planning and design activities Brian Ketner
35013.1.4 68 to Airpark East in Greensboro underway, coordinate with U-5974
35013.2.4
35013.3.4
B-5723 Replace Bridge 54 over Richland Creek on SR 1158 (Jackson 11/19/24 FY2026 $3,237,000 Planning and design activities Kevin Fischer
45679.1.1 Lake Road) underway
45679.1.2
45679 2 1
U-4758 Improvements to Johnson Street/Sandy Ridge Road from 12/19/23 FY2026 $45,700,000 Planning and Design activities Laura Sutton
40251.2.1 Skeet Club Road to I-40 underway, Public meeting 8/14/18 -
40251.3.1 Preliminary ROW underway
I-5712 Interchange improvements at I-40/US 421 and SR 1850 12/15/26 FY2029 $14,500,000 Planning and Design activities Laura Sutton
50126.1.FS1 (Sandy Ridge Road) in Greensboro. Sandy Ridge Road underway, Coordinate with U-4758 & U-
50126.2.1 widening to Cider Road 6045
50126.3.1
U-5974 Upgrade NC 68 to Superstreet from SR 1523 (Hickswood 7/18/28 FY2030 $48,100,000 Planning and design activities Brian Ketner
45962.1.1 Road) to SR 1556 (Gallimore Dairy Road) in High Point underway, coordinate with U-4015A
45962.2.1
45962.3.1
U-6121 Widen SR 1541 (Wendover Avenue) from NC 68 (Eastchester 11/21/28 FY 2031 $27,300,000 Planning and design activities Brian Ketner
48605.1.1 Drive) in High Point to SR 1541 (Guilford College Road) in underway
48605.2.1 Greensboro.
48605.3.1
24
Page 2 HPMPO Jan. 2022
North Carolina Department of Transportation 1/3/2022
Active Projects Under Construction - Guilford Co.
Contract TIP Location Description Contractor Name Resident Contract Bid Availability Completion Work Start Estimated Progress Completion
Number Number Engineer Amount Date Date Date Completion Schedule Percent
Date Percent
C203256 U-3615B SR-1820 (SKEET CLUB RD) FROM EAST OF SR-1818 APAC - ATLANTIC INC Hayes, PE, $30,898,017.15 3/2/2015 3/29/2019 5/20/2015 1/31/2022 99.7 99.7
(JOHNSON ST) TO WEST OF NC-68 (EASTCHESTER DR) IN THOMPSON ARTHUR Meredith
HIGH POINT. DIVISION
C203433 I-5110 FUTURE I-73 FROM EXISTING SR-2085 (JOSEPH M BRYAN FLATIRON Smith, Brian $176,550,000.00 5/7/2014 4/25/2017 5/7/2014 1/31/2022 100 99.5
I-5110A BLVD) / AIRPORT PKWY INTERCHANGE TO SOUTH OF US- CONSTRUCTORS INC - V
R-2413A 220 NEAR HAW RIVER. BLYTHE DEVELOPMENT
CO JOINT VENT
C204071 U-5169 I-74/US-311 AND NC-68 (EASTCHESTER DR) BRANCH CIVIL INC Snell, PE, $22,481,354.65 7/30/2018 1/28/2021 9/14/2018 1/31/2022 100 92.27
INTERCHANGE IMPROVEMENTS. William H
C204096 U-2525C GREENSBORO EASTERN LOOP FROM US-29 NORTH OF ES WAGNER COMPANY Julian, Jason $120,471,182.82 4/30/2018 11/20/2022 5/7/2018 7/14/2023 78.82 78.43
GREENSBORO TO SR-2303 (LAWNDALE DR). LLC/SMITH-ROWE LL R
C204100 B-5351 REPLACE BRIDGE #237 AND #242 OVER DEEP RIVER ON SMITH-ROWE, LLC Snell, PE, $8,026,687.83 7/30/2018 3/14/2021 8/1/2018 1/31/2022 100 98.05
US-29/US-70/I-85 BUS IN HIGH POINT. William H
C204103 U-2412A SR-1486/SR-4121 (GREENSBORO/HIGH POINT RD) FROM BRANCH CIVIL INC Lorenz, PE, $55,963,119.69 7/30/2018 12/28/2021 9/12/2018 10/20/2023 88.7 84.52
US-311 BYPASS TO WEST OF SR-1480 (VICKREY CHAPEL Kris
RD).
C204371 U-2581BA US-70 (BURLINGTON RD) FROM WEST OF SR-3045 (MT APAC - ATLANTIC INC Snell, PE, $11,125,538.10 7/1/2020 4/30/2022 7/1/2020 4/30/2022 96.9 77.8
HOPE CHURCH RD) /SR-2819 (MCLEANSVILLE RD) TO THOMPSON ARTHUR William H
EAST OF SR-2826 (BIRCH CREEK RD) DIVISION
C204465 RESURFACE 1 SECTION OF US 29 AND 21 SECTIONS OF BLYTHE CONSTRUCTION, Lorenz, PE, $3,884,488.85 4/1/2021 7/1/2022 7/9/2021 1/31/2022 100 99.98
RAMPS AND LOOPS FOR US 29 INC Kris
C204499 R-4707 INTERCHANGE OF US 29 AND SR 4771 (REEDY FORK APAC - ATLANTIC INC Hayes, PE, $46,382,713.04 6/2/2021 10/28/2024 6/7/2021 10/28/2024 16 9.87
PARKWAY) THOMPSON ARTHUR Meredith
DIVISION
C204626 RESURFACE 1 SECTION OF NC 87, 1 SECTION OF NC 49 FSC II LLC DBA FRED Lorenz, PE, $4,639,570.37 6/3/2021 11/1/2022 6/28/2021 11/1/2022 23.5 15.23
AND 21 SECTIONS OF SECONDARY ROADS SMITH COMPANY Kris
DG00462 REHAB. BRIDGES 264, 288, 260, 543 IN GUILFORD ELITE INDUSTRIAL Snell, PE, $967,383.15 8/1/2019 1/1/2020 9/13/2021 2/14/2022 100 67.49
COUNTY AND BRIDGE 031 IN ORANGE COUNTY PAINTING INC William H
Page 1 of 3
25
North Carolina Department of Transportation 1/3/2022
Active Projects Under Construction - Guilford Co.
Contract TIP Location Description Contractor Name Resident Contract Bid Availability Completion Work Start Estimated Progress Completion
Number Number Engineer Amount Date Date Date Completion Schedule Percent
Date Percent
DG00480 U-2412B(L) LANDSCAPE PLANTING ALONG GATE CITY BLVD FROM MOTS LANDSCAPING & Hayes, PE, $175,647.50 9/1/2019 12/31/2021 9/9/2019 12/31/2021 100 100
SR 4121 (EAST MAIN ST) TO SR 1546 (GUILFORD LAWNS LLC Meredith
COLLEGE ROAD)
DG00490 AST TREATMENT OF 26 SECONDARY ROADS IN CAROLINA ROAD Lorenz, PE, $832.311.02 4/1/2021 10/30/2021 4/8/2021 1/31/2022 100 97.46
GUILFORD COUNTY SOLUTIONS LLC Kris
DG00493 REPLACE PIPE #2134 ON SR 2835 (MCKNIGHT MILL ROAD) HUNTING CREEK Snell, PE, $374,444.44 7/8/2021 9/9/2021 7/8/2021 1/31/2022 82.5 99.69
APPROX. 0.1 MILE SOUTH OF INTERSECTION WITH SR CONSTRUCTION INC William H
2732 (HINES CHAPEL ROAD)
DG00500 WIDENING 2 SECONDARY ROADS AND MILLING AND BLYTHE CONSTRUCTION Hayes, PE, $1,367,596.39 4/1/2021 11/1/2021 5/17/2021 1/31/2022 72 68.06
RESURFACING 4 SECONDARY ROADS Meredith
DG00505 WIDENING AND RESURFACING A PORTION OF US 70 AND SHARPE BROTHERS A Snell, PE, $2,711,163.82 7/1/2021 11/1/2021 4/15/2021 1/31/2022 29.5 93.75
RESURFACING 48 SECONDARY ROADS DIVISION OF VECELLIO & William H
GROGAN INC.
DG00512 RESURFACE 43 VARIOUS STATE ROUTES SHARPE BROTHERS A Hayes, PE, $2,562,749.29 7/1/2021 11/1/2022 7/1/2022 11/1/2022 4.38 5.37
DIVISION OF VECELLIO & Meredith
GROGAN INC.
DG00513 REPLACE BRIDGE #235 OVER BIG ALAMANCE CREEK ON SMITH-ROWE, LLC Hayes, PE, $1,675,367.75 6/21/2021 10/25/2022
SR 1005 (ALAMANCE CHURCH ROAD) Meredith
DG00515 AST TREATMENT OF 34 SECONDARY ROADS IN WHITEHURST PAVING CO. Lorenz, PE, $749,755.28 7/1/2021 6/30/2021
GUILFORD COUNTY INC. Kris
DG00524 R-5787-G INSTALLATION OF ADA COMPLIANT CURB RAMPS AT ATLANTIC CONTRACTING Lorenz, PE, $717,704.25 6/1/2021 4/14/2023 7/26/2021 4/14/2023 18.9 30.82
R-5787-H VARIOUS ROUTES COMPANY, INC. Kris
DG00527 HS-2007C INSTALLATION OF THERMOPLASTIC PAVEMENT MARKING TMI SERVICES INC. Cvijetic, PE, $1,358,289.72 8/16/2021 11/19/2021
LINES ON VARIOUS SECONDARY ROUTES Bojan
DG00531 RESURFACE SR 1001 (CHURCH STREET) - 3 SECTIONS, SHARPE BROTHERS A Hayes, PE, $2,780,006.94 7/8/2021 7/7/2022 8/12/2021 7/7/2022 60 95.29
SR 2714 (RED CEDAR ROAD) AND SR 2748 (SPRINGWOOD DIVISION OF VECELLIO & Meredith
CHURCH ROAD) GROGAN INC.
Page 2 of 3
26
North Carolina Department of Transportation 1/3/2022
Active Projects Under Construction - Guilford Co.
Contract TIP Location Description Contractor Name Resident Contract Bid Availability Completion Work Start Estimated Progress Completion
Number Number Engineer Amount Date Date Date Completion Schedule Percent
Date Percent
DG00533 MILLING, RESURFACING AND PAVEMENT MARKINGS ON I- BLYTHE CONSTRUCTION Lorenz, PE, $2,989,292.45 7/8/2021 7/7/2022 9/20/2021 7/7/2022 62.7 63.2
85 BUS/US 29/US 70, NC 150 AND VARIOUS SECONDARY INC. Kris
ROADS
Page 3 of 3
27
Randolph County - High Point MPO - Active Projects - Division 8--January 2022
Contract # or Completion
Route Description Let Date Contractor Project Admin. Project Cost Notes
WBS # or TIP # Date
DH00327 Various Upgrade Intersections to comply with 7/13/2021 4/30/2022 Eastern Cary Fine $247,107 Project underway
R-5788GA, GB Americans with Disabilities Act (ADA) Earthscapes (336) 318-4020
using TA Funds
17BP.8.R.136 SR 1557 (Morris Rd) Replace Bridge No. 54 over unnamed 3/23/2021 7/20/2022 APAC Cary Fine $910,339 Project 68% complete
DH00325 tributary of the Uwharrie River (336) 318-4020 Open to Traffic end of Jan 2022
incident 612628
Randolph County - High Point MPO - Upcoming Projects - Planning & Design, R/W, or not started - Division 8--January 2022
Contract # or Completion STIP Project
Route Description Let Date Contractor Project Admin. Notes
WBS # or TIP # Date Cost
U-3400 SR 1577 / SR 1004 Widening from SR 1567 (Robbins Country 11/18/2025 TBD TBD Jeff Stroder $38,626,000 Right of Way 1/2023
(Archdale Road) Rd) to US 311 (Main Street) in Archdale (910) 773-8034 Public Meeting held 2/27/18
U-5308 SR 1547 (Finch Farm Rd) Widening from south of SR 3106 Kennedy 6/17/2025 TBD TBD Jeffrey Teague $39,808,000 Right of Way in progress
Rd to I-85 in Trinity Extend northern (910) 773-8025 Public Meeting held 3/29/2018
limit to NC 62 2nd Public Meeting 11/29/18
U-5770 I-85 / SR 1993 Interchange Improvements 4/15/2025 TBD TBD Jeff Stroder $30,150,000 Right of Way 4/2022
(South Main Street) Frontage Road Alternative Selected (910) 773-8034 Public Meeting 11/30/17
Newsletter Mailed 6/8/18
U-5864 SR 1595 (Surrett Drive) 3-lane widening from I-85 to SR 1300 (W. 8/15/2028 TBD TBD Greg Davis $55,063,000 Right of Way 6/2024
Fairfield Rd. /Guilford Co.) in Trinity, (910) 773-8022 Public Meeting held 6/13/19
Archdale, and High Point
U-6191 NC 62 Modernize roadway between SR 3252 10/17/2028 TBD TBD Greg Davis $15,500,000 Right of Way 10/2026
(Surrett Dr) in Trinity to SR 1009 (N. Main (910) 773-8022
St) in Archdale
HI-0002 I-85 Randolph Co. Pavement Rehab - from I-85/NC 109 in 4/19/2022 TBD TBD Michael Ricketts $14,700,000
Thomasville to SR 1009 (South Main St) in (910) 773-8033
Archdale
28
First Quarter Deviated Fixed Routes
RED
2022 2021 Difference
October 1,217 400 817
November 1,153 287 866
December 1,240 317 923
Total 3,610 1,004 2,606
GREEN
2022 2021 Difference
October 1,337 389 948
November 1,357 323 1034
December 1,338 350 988
Total 4,032 1,062 2,970
BLUE
2022 2021 Difference
October 2,929 477 2452
November 2,769 373 2396
December 3,021 452 2569
Total 8,719 1,302 7,417
ORANGE
2022 2021 Difference
October 1,750 435 1315
November 1,557 383 1174
December 1,386 447 939
Total 4,693 1,265 3,428
Thomasville Saturday
2022 2021 Difference
October 109 54 55
November 81 44 37
December 100 44 56
Total 290 142 148
2nd Quarter
2022 2021 Difference
RED 3,610 1,004 2606
GREEN 4,032 1,062 2970
BLUE 8,719 1,302 7417
ORANGE 4,693 1,265 3428
Thomasville Saturday 290 142 148
Total 21,344 4,775 16,569
QTR Difference 346.99%
29
PARTiculars
Piedmont Authority for Regional Transportation January 2022
We Make It Our Business to Connect Communities
Every day people in the Triad need to get to work, make appointments and access the many opportunities that each
city individually and uniquely offers our citizens.
PART not only helps keep our communities connected, but we also play an important role in keeping ‘a sense of
adventure’ going! Each of the cities in our 10-county network have wonderful and special features to enjoy. PART can
make connecting easy and affordable.
As part of our new Explore with Express series, each month we will focus on different PART routes and share
something interesting and fun about the communities these routes connect! This month’s focus will be on our Route 1
Winston-Salem Express. The historic and beautiful City of Winston-Salem features many wonderful areas to explore
that can be taken advantage of by using the PART system. Visitors can participate in Winston-Salem’s Cityside Treks,
a fun way to stroll the city utilizing the urban park trails and greenway system. PART’s Route 1 makes getting to the
downtown area easy for visitors interested in walking or biking adventures throughout the city.
Our buses are climate controlled, bike friendly, handicap accessible, have high back reclining seats and high ceilings.
So … sit back and enjoy the ride as you get out and enjoy what our neighboring communities have to offer.
Go to visitwinstonsalem.com to find your next adventure and utilize PART’s Trip Planner at partnc.org/tripplanner, to
make it an easy to get to adventure.
visitwinstonsalem.com
On The Go … With Umo
As we travel into 2022, PART’s TouchPass is not only changing the name,
but adding new and exciting features, starting with the mobile app. We
encourage you to download the new Umo Mobility App today. There are
so many new features we don’t want you to miss out! To get the new App
visit the Apple Store or Google Play Store. The Umo Mobility App will keep
PART riders moving efficiently by offering multi-modal journey planning,
contactless payments and real-time travel information.
Umo is a simple and easy way for our customers to ride. There are two
options, download the app on a smartphone, load funds directly through
the app to your account and scan your QR code to pay when boarding.
Or purchase a Umo Smartcard, load funds to the card and scan your card
when boarding. If you use the Umo app, you will also be able to load passes
and Umo cash for Greensboro Transit Agency (GTA) and High Point
Transit System (HPTS).
Visit partnc.org/umo, contact our PART Call Center at 336-883-7278 or
email umo@partnc.org for more information. Be sure to fully register your
30
Umo account and … we will load a free ride. The TouchPass system will soon be gone … so make the switch TODAY!
Sharing Has Never Been So Easy
PART participates in a unique statewide
rideshare system, known as Share the Ride
NC (STRNC). This is a web-based tool
that helps people quickly and securely
find others to “share the ride” anywhere in
North Carolina. Participants can utilize this
innovative tool for daily commuting, single
trips to local businesses, a ride to the airport,
or to visit friends and family out of town.
Whether you are offering to drive, or need a
ride, sharing miles and expenses is a win for
everyone.
No Need to Ride Alone! Share the Ride NC is simple to use. An
With current concerns about our individual and collective impact interested participant simply creates an
on the environment, coupled with the fact that everyone likes to account. We recommend you plan-ahead by
save money, community members often search for readily available, setting up your profile before you need to
sustainable and relaxing transportation alternatives. That is where connect. Once you are registered, you can
Vanpooling with PART can help. check for matches. If a match doesn’t come
up right away … you may find the perfect
The PART Vanpool Program provides eligible groups of five or
match the next time you check in. The more
more commuters with a 7 or 15 passenger van to use to commute
participants in the pool, the more options
to and from work. A month-to-month lease includes the vehicle,
with similar schedules and destinations
insurance, maintenance and gas.
become available to match.
At-A-Glance: Your address and personal information
will never be shared with others. Participants
• Most economical for groups traveling 15+ miles one way to
sign-up by using their email address, create a
work.
trip profile and then receive a list of potential
• Monthly fares are based on the average daily round-trip miles trip partners. It is up to you to choose
the van travels each day. who to contact. You will communicate
• Monthly cost is divided among the riders. The more riders, the with your matches directly through your
lower the cost! STRNC profile. There are no obligations or
requirements, only opportunities to share the
• At least two members of the group need to qualify to be the
ride, save money, and reduce your carbon
primary driver and back-up driver.
footprint.
• Most vans meet at a central location like a Park & Ride lot.
Not only are there personal benefits to participating in PART’s
Vanpool Program, but there are also positive environmental impacts
associated with this form of ride sharing, such as reducing our
carbon footprint and less traffic congestion.
For more information about our Vanpool Program go to partnc.
org/vanpool.
The average walk to and from most bus stops is less
than 25 minutes
Using mixed modes of transportation, like biking,
reduces the walk to an average of 8 minutes
source: U.S. National Household Travel Survey
31