Muyni
← Back to High Point

HPMPO Technical Coordinating Committee (TCC)

Regular Meeting

High Point, NC · October 18, 2022

Agenda

Agenda

HIGH POINT URBAN AREA MPO TECHNICAL COORDINATING COMMITTEE (TCC) Agenda for the October 18, 2022 TCC Meeting 2:00 PM – Third Floor Conference Room High Point Municipal Building - City Hall 211 S. Hamilton Street, High Point Action Items 1. Consideration of the September 20th TCC meeting minutes. (Greg Venable) Page 1 2. Recommendation to the TAC for the approval of amendments to the 2020-2029 MTIP. (Andrew Edmonds) Page 7 Information Items 3. Safety Performance Measures FHWA Assessment and 2022 Targets (Andrew Edmonds) Page 10 4. Consideration of the 2023 TCC Schedule (Greg Venable) Page 17 Agency Reports 5. NCDOT Division Reports a. Division 7 (Stephen Robinson) Page 19 b. Division 8 (Bryan Kluchar) Page 25 c. Division 9 (Fred Haith) 6. NCDOT Transportation Planning Branch Report (Michael Abuya) 7. NCDOT Integrated Mobility Division Report (Alex Rottenberry) 8. FHWA Report (Suzette Morales) 9. Public Transportation Reports a. High Point Transit System (Andrew Edmonds) b. Davidson County Transportation (Richard Jones) Page 26 c. RCATS (Tawanna Williams) d. PART (Mark Kirstner) Next TCC Meeting November 8, 2022 TCC Meeting Meeting Date 10/18/2022 Agenda Item No. 1 Action Requested Approve Section Tab Consideration of the September 20th TCC meeting minutes. (Greg Venable) Information Summary Attachments Yes No The complete meeting minutes are in your packet as Attachment 1. TCC Vote: Motion Second By:__________________ By:_______________________ Vote: For_______________________ Against________________________ 1 Attachment 1 MINUTES TECHNICAL COORDINATING COMMITTEE September 20, 2022 TCC MEMBERS PRESENT: Stephen Robinson, Bryan Kluchar, Fred Haith, Michael Abuya, Mark Kirstner, Greg Venable, Jason Miller, Heidi Galanti, Roger Jones, Chuck George, Stevie Cox, Scott Leonard, Paul Blanchard, Kelly Garvin TAC MEMBERS PRESENT: Suzette Morales MPO Staff: John Hanes, Andrew Edmonds OTHERS PRESENT: Phillip Craver, Richard Jones, Kathy Vollert, Alex Rotenberry, Dawn Vallieres, Tawana Williams, Jeron Monroe RECORDING STAFF: Microsoft Teams Greg Venable called the meeting to order. Item #3 (Resolution supporting Archdale’s Main Street Corridor study) was tabled until a future meeting. ACTION ITEMS Item 1: Consideration of the August 16th TCC meeting minutes. Motion by: Stevie Cox Seconded by: Jason Miller Vote: For: Unanimous Against: None Item 2: Recommendation to the TAC for amendments to the 2020-2029 MTIP. John Hanes reported that there was one modification to the 2020-2029 MTIP; C-5700, Oakdale Road sidewalk extension in Jamestown. Construction is being delayed from FY 22 to FY 24 to allow additional time for design. Motion by: Stephen Robinson Seconded by: Stevie Cox Vote: For: Unanimous Against: None 2 Attachment 1 Item 3: Recommendation to the TAC for the approval of amendments to the RAISE grant. Andrew Edmonds reported that this is a request by the City of High Point to amend the 2020-2029 MTIP to include funding for the High Point RAISE project. It should be noted that what is being presented is a revised funding table from what is shown in your packet. After coordination with the STIP Management Office, the revised table shows PE and ROW to be included in the parent STIP number with construction of the two components of the project to be split as A and B. The STIP Management Office also assigned $200,000 of previously allocated Spot Safety funds towards the project. Motion by: Roger Jones Seconded by: Heidi Galanti Vote: For: Unanimous Against: None Item 4: Recommendation to the TAC for the approval to the 2020 -2029 MTIP to incorporate FY22 Section 5307 Appropriations Andrew Edmonds reported that this is a request by PART to amend the 2020-2029 MTIP to incorporate revised 5307 funding amounts. Section 5307 funds are federal formula funds available for transit capital and operating assistance. TAC approved a split- allocation of FY22 5307 funds this past June, now PART is requesting an update to the MTIP to align with the amount of funds applicable to PART for an upcoming FTA grant. Motion by: Fred Haith Seconded by: Heidi Galanti Vote: For: Unanimous Against: None Information Items Item 5: Carbon Reduction Program call for project and development of evaluation criteria. 3 Attachment 1 Andrew Edmonds reported that with the introduction of the Carbon Reduction Program in the Bipartisan Infrastructure Law, additional funds have been made available to the High Point MPO to assist in funding projects that reduce transportation emissions. For FY22, High MPO will receive an allocation of $372,874. The federal share of CRP projects is 80% and there is a minimum project cost of $100,000. MPO staff are opening a call for eligible CRP projects until end of business Wednesday October 12, 2022. Additionally, staff are in the process of developing an evaluation criteria to ensure equitable distribution of funds in the event that project needs outweigh available funding. This set of evaluation criteria is still under development, but it can be later utilized for additional rounds of funding. Agency Reports Item 4: NCDOT Division Reports Division 7 Stephen Robinson reported there was nothing to add from was in the report in the packet. Stephen mentioned that Division 7 hosted a drop-in session the prior week for the new draft STIP. Division 8 Bryan Kluchar reported there are no changes from the report in the packet. Bryan added that Division 8 will be hosting their drop-in session for the draft STIP this week. He added that comments can be provided online until October 8th. Division 9 Fred Haith reported that the Division 9’s public comment period for the draft STIP is October 3rd to October 7th. Fred reported there is nothing to add to the report in the packet. Item 5: NCDOT Transportation Planning Branch Report Michael Abuya has nothing to report. Item 6: NCDOT Integrated Mobility Division Report Alex Rottenberry shared information about the development of NCDOT’s Transportation Disadvantage Index (TDI). This tool utilizes ACS data from the Census Bureau to look at variables such as carless households, concentrations of persons with low income, concentrations of mobility impairments, concentrations of youth, concentrations of seniors, and concentrations of Black, Indigenous, and people of color. These variables in of themselves don’t reflect anything but with higher concentrations of some of these variables it may be an indicator that an area may have a Transportation Disadvantage. 4 Attachment 1 This will serve as a tool in the toolbox when thinking about the placement or impact of a transportation project. Alex hopes to come back at a later date to demonstration the tool but today he shared a recording and presentation of an introduction to the tool. Phillip Craver asked for a point of information regarding a meeting at the Division 7 office to discuss P7.0 and discuss projects from the draft STIP on October 12th. Phillip also advised that the P7.0 workgroup has meetings scheduled every month until May 2023. After May, the P7.0 workgroup’s recommendation will go to the Transportation Board. The Transportation Board is anticipated to adopt those recommendation in Summer 2023. Item 7: FHWA Report Suzette Morales reported the Census Bureau has come up with new definitions for what’s considered an urban area. This definition will be used with the 2020 Census to identify the MPO and TMA boundaries. The Census Bureau has posted a Frequently Asked Questions section on their website. This states the new definition should be anticipated by the end of the year. Item 8: Public Transportation Reports High Point Transit System Greg Venable reported that City of High Point Council passed an agreement with Guilford County Schools to provide transportation to middle and high school students. Davidson County Transportation Richard Jones reported that Davidson County Transportation is still in the process of becoming a direct recipient. RCATS Tawanna Williams had nothing to report. PART Mark Kirstner reported ridership at PART is fairly consistent with other agencies in that they are holding steady at 60% of ridership pre-COVID. He believes the next six months will be about identifying new markets. Mark also shared the Household Travel Survey. This survey will be an invitation survey administered by consultants to sample demographics in the area. Mark asked for help in spreading information about the survey to ensure the public understands its safe and the importance of responding to the survey. Mark also shared that there is a pilot survey available to help give feedback about the Household Travel Survey. Mark also reported that the Growth Allocation and Scenario project is continuing on. The team has done an unofficial run of the socioeconomic data 5 Attachment 1 given all of the work that’s done to date. The Travel Demand Model team will take that data and conduct a comparison of the results. Mark shared a graphic of the scenario model coverage in the Piedmont Crescent. Item 9: Other Business Stevie Cox reported Trinity City Council just approved moving forward with SME to develop a Comprehensive Plan. Stevie stated that they were going to coordinate with Thomasville and Archdale to analyze the regional transportation network issues and growth allocation. Heidi Galanti shared that High Point is also kicking off their Comprehensive Plan process. Item 10: Meeting Adjourned. Motion by: Stevie Cox Seconded: Stephen Robinson Vote: For: Unanimous Against: None 6 TCC Meeting Meeting Date 10/18/2022 Agenda Item No. 2 Action Requested Recommendation Section Tab Recommendation to the TAC for approval of amendments to the 2020-2029 MTIP. (Andrew Edmonds) Information Summary Attachments Yes No The proposed amendments to the 2020-2029 MTIP for the High Point MPO are included in your packet. Staff is recommending approval of the MTIP amendments. TCC Vote: Motion Second By:__________________ By:_______________________ Vote: For_______________________ Against________________________ 7 High Point RESOLUTION Archdale AMENDING THE 2020-2029 HIGH POINT METROPOLITAN TRANSPORTATION IMPROVEMENT PROGRAM WHEREAS, the Transportation Advisory Committee has reviewed the 2020-2029 Denton Metropolitan Transportation Improvement Program and found an amendment is necessary; and Jamestown WHEREAS, the following amendments have been proposed: HS-2007D I-74 AND US 29/70, I-74 AND US 29/70 (I-85 CONSTRUCTION FY 20223 - $500,000 (HSIP) BUSINESS INTERCHANGE), UPGRADE SIGNALS, $500,000 Lexington PAVEMENT MARKINGS, AND SIGNAGE. ADD SEGMENT “D” PER TRANSPORTATION MOBILITY AND SAFETY DIVISION Thomasville R-5787 VARIOUS, DIVISION 7 PROGRAM TO UPGRADE CONSTRUCTION FY 2022 - $200,000 (S) INTERSECTIONS TO COMPLY WITH THE FY 2022 - $800,000 (TA) AMERICANS WITH DISABILITIES ACT (ADA) FY 2023 - $200,000 (S) USING TRANSPORATION ALTERNATIVES (TA) FY 2023 - $800,000 (TA) FUNDS $2,000,000 Trinity ADD FUNDING IN FY 23 NOT PREVIOUSLY PROGRAMMED R-5788 VARIOUS, DIVISION 8 PROGRAM TO UPGRADE CONSTRUCTION FY 2022 - $200,000 (S) Wallburg INTERSECTIONS TO COMPLY WITH THE FY 2022 - $800,000 (TA) AMERICANS WITH DISABILITIES ACT (ADA) FY 2023 - $200,000 (S) USING TRANSPORATION ALTERNATIVES (TA) FY 2023 - $800,000 (TA) FUNDS $2,000,000 ADD FUNDING IN FY 23 NOT PREVIOUSLY Davidson PROGRAMMED County R-5789 VARIOUS, DIVISION 9 PROGRAM TO UPGRADE CONSTRUCTION FY 2022 - $200,000 (S) INTERSECTIONS TO COMPLY WITH THE FY 2022 - $800,000 (TA) AMERICANS WITH DISABILITIES ACT (ADA) FY 2023 - $200,000 (S) USING TRANSPORATION ALTERNATIVES (TA) FY 2023 - $800,000 (TA) Forsyth FUNDS $2,000,000 County ADD FUNDING IN FY 23 NOT PREVIOUSLY PROGRAMMED Guilford County NOW THEREFORE, be it resolved by the Transportation Advisory Committee for the High Point Metropolitan Planning Organization that the 2020-2029 Metropolitan Transportation Improvement Program be amended as listed above on this the 25th day of Randolph County October 2022. A motion was made by TAC Member ______________and seconded by TAC member _______________ and approved this the 25th day of October 2022. _________________________ Martha Wolfe Chair, Transportation Advisory Committee 8 Subscribed and sworn to me this the 25th day of October 2022. ______________________________________ Notary Public My commission expires ______________________ 9 TCC Meeting Meeting Date 10/18/2022 Agenda Item No. 3 Action Requested Information Section Tab Safety Performance Measures FHWA Assessment and 2023 Targets (Andrew Edmonds) Information Summary Attachments Yes No Federal regulations require MPOs and State DOTs to set targets for five safety performance measure for highways. These performance measures are: 1. Number of fatalities 2. Rate of fatalities per 100 million vehicle miles traveled 3. Number of serious injuries 4. Rate of serious injuries per 100 million vehicle miles traveled 5. Number of combined non-motorized fatalities and non-motorized serious injuries These targets serve as a continuous and systematic quantifier to analyze the performance of the North Carolina Highway Safety Improvement Program. The ultimate goal is to reduce the number of traffic crashes, injuries, and fatalities by reducing the potential for and the severity in public roadways. The goal of the most recent 2019 Strategic Highway Safety Plan is to reduce fatalities and serious injuries by 2035, moving towards zero by 2050. Safety performance targets are established annually and are based on five-year rolling averages of their respective data set. Per FHWA guidance, MPOs must establish safety performance targets no later than February 27th of each year. MPO staff are recommending approval of safety measure targets for 2023 that are consistent with NCDOT targets. Information about the safety performance measures is included in the meeting packet. TCC Vote: Motion Second By:__________________ By:_______________________ Vote: For_______________________ Against________________________ 10 STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION ROY COOPER J. ERIC BOYETTE GOVERNOR SECRETARY DATE: September 28, 2022 TO: Greg Venable Transportation Planning Administrator, High Point Urban Area Metropolitan Planning Organization FROM: Brian Mayhew, PE, CPM State Traffic Engineer Transportation Mobility & Safety Division SUBJECT: Safety Performance Measures – FHWA Assessment and 2023 Targets Background Effective April 14, 2016, the Federal Highway Administration (FHWA) established five highway safety performance measures in accord with regulations set forth in the Federal MAP-21 and FAST Act transportation funding bills. These performance measures are: 1. Number of fatalities; 2. Rate of fatalities per 100 million vehicle miles traveled; 3. Number of serious injuries; 4. Rate of serious injuries per 100 million vehicle miles traveled; and 5. Number of combined non-motorized fatalities and non-motorized serious injuries. These targets are established annually, are based on 5 year rolling averages, and are for calendar years. North Carolina state targets are set in agreement with our Strategic Highway Safety Plan (SHSP) goals. The SHSP goals are developed through collaborative efforts of a diverse group of stakeholders including state, regional, and local partners (including MPOs). The goal of the most recent (2019) SHSP is to reduce fatalities and serious injuries by half by 2035, moving towards zero by 2050. North Carolina Safety Performance Target Achievement Determination Earlier this year, FHWA completed an assessment of target achievement for NCDOT’s calendar year (CY) 2020 safety targets, based on the 5-year averages for 2016-2020 for each measure. As per 23 CFR 490.211(c)(2), a State Department of Transportation (DOT) has met or made significant progress towards meeting its safety performance targets when at least four of the safety Mailing Address: Telephone: (919) 814-5000 Location: NC DEPARTMENT OF TRANSPORTATION Fax: (919) 771-2745 750 N. GREENFIELD PARKWAY TRANSPORTATION MOBILITY & SAFETY DIVISION Customer Service: 1-877-368-4968 GARNER, NC 27529 1561 MAIL SERVICE CENTER RALEIGH, NC 27699-1561 Website: www.ncdot.gov 11 performance targets established under 23 CFR 490.209(a) have been met or the actual outcome is better than the baseline performance. Based on FHWA’s review, North Carolina has not met or made significant progress toward achieving its safety performance targets. As a result, NCDOT must ensure that all HSIP safety funds are obligated, and must develop an HSIP Implementation Plan that describes actions the State will take to meet or make significant progress toward achieving its targets. Table 1 below provides a summary of the target achievement determination at the state level. Table 1: North Carolina Safety Performance Target Achievement Determination Summary for CY 2020 5-year Rolling Averages (Actual) Better than Met or Made Performance Measures Target Actual Baseline Target Achieved? Baseline? Significant Progress? 2016 - 2020 2016 - 2020 2014 - 2018 Fatalities 1,227.8 1,458.6 1,392.2 No No (5 Year Average) Fatality Rate 1.084 1.250 1.206 No No (5 Year Average) Serious Injuries 2,812.8 4,410.2 3,362.4 No No (5 Year Average) No Serious Injury Rate 2.462 3.776 2.884 No No (5 Year Average) Non-motorized Fatalities and Serious Injuries 426.6 583.0 491.0 No No (5 Year Average) Table 2 below shows what this determination would look like if the state’s methodology for establishing the CY 2020 goal was applied to crash data specific to High Point Urban Area MPO. Table 2: High Point Urban Area MPO Safety Performance Target Achievement Determination Summary for CY 2020 5-year Rolling Averages (Actual) Better than Met or Made Performance Measures Target Actual Baseline Target Achieved? Baseline? Significant Progress? 2016 - 2020 2016 - 2020 2014 - 2018 Fatalities 37.6 44.4 44.2 No No (5 Year Average) Fatality Rate 1.174 1.348 1.358 No Yes (5 Year Average) Serious Injuries 109.7 132.6 126.0 No No (5 Year Average) No Serious Injury Rate 3.415 4.012 3.856 No No (5 Year Average) Non-motorized Fatalities and Serious Injuries 12.8 18.4 15.6 No No (5 Year Average) 12 2023 State Safety Performance Targets 2023 state safety performance targets were submitted to FHWA on August 31st, as required, with the submission of the annual Highway Safety Improvement Program (HSIP) report. These targets reflect the 2019 SHSP goal to reduce fatalities and serious injuries by half by 2035, moving towards zero by 2050. The calculated targets are shown in Table 3 below. More detailed information about each target can be found at this link. Table 3: North Carolina Calendar Year 2023 Safety Performance Targets Performance CY 2023 Measure Number of 1,202.2 Fatalities Rate of Fatalities 1.011 Number of Serious 3,423.0 Injuries Rate of Serious 2.863 Injuries Number of Non- Motorized 468.2 Fatalities & Serious Injuries 2023 High Point Urban Area MPO Safety Performance Targets Table 4 below provides crash data specific to your MPO and shows what the safety performance targets would look like if you applied the state’s methodology (reducing fatalities and serious injuries by half by 2035). More detailed information specific to your MPO can be found at this link. Table 4: High Point Urban Area MPO Specific Safety Performance Targets Non-motorized Fatalities Fatality Rate Serious Injuries Serious Injury Rate Fatalities and Year (5 Year Average) (5 Year Average) (5 Year Average) (5 Year Average) Serious Injuries (5 Year Average) 2008 - 2012 41.2 1.390 99.6 3.360 12.6 2009 - 2013 38.4 1.300 103.8 3.514 13.4 2010 - 2014 42.0 1.420 110.4 3.733 15.0 2011 - 2015 41.6 1.386 114.4 3.815 15.4 2012 - 2016 43.0 1.394 108.8 3.542 16.2 2013 - 2017 42.4 1.347 116.8 3.699 15.4 2014 - 2018 44.2 1.358 126.0 3.856 15.6 2015 - 2019 43.4 1.295 128.4 3.819 16.0 2016 - 2020 44.4 1.348 132.6 4.012 18.4 2017 - 2021 45.0 1.365 140.8 4.255 20.6 2023 Target* 37.6 1.114 112.4 3.323 14.9 13 Next Steps MPOs are not directly assessed by FHWA on their progress towards meeting safety performance targets. However, coordination and deliberate action will be needed to achieve the goals outlined in the NC Strategic Highway Safety Plan and as communicated through the safety performance targets. We encourage additional coordination between MPO’s and NCDOT Traffic Safety Unit in all areas of safety, but specifically in data sharing, safety tools development, safety need identification and shared safety project implementation. The Traffic Safety Unit is available to meet with your MPO for additional discussion and partnership. FHWA guidance allows each MPO to establish safety performance targets by either agreeing to plan and program projects so that they contribute toward the accomplishments of the State DOT performance targets or committing to quantifiable HSIP targets for their specific MPO area. If an MPO establishes its own targets, it will need to do so in coordination with the State per FHWA guidelines. The Traffic Safety Unit is available to facilitate this coordination. As a reminder, MPOs must establish safety performance targets no later than February 27 of each year per FHWA guidance. Please transmit a signed adoption resolution indicating the establishment of safety targets for your MPO or supporting the state’s targets to Daryl Vreeland (dvreeland@ncdot.gov) in the Transportation Planning Division just as you have in previous years. An adoption resolution template can be found at this link. Finally, a new NCDOT Traffic Safety website has been established to communicate safety information to the public. A few direct links that may be of specific interest to MPOs can be found below: • Main NCDOT Traffic Safety Unit website: link • Mapped safety data: link o Here you can find a variety of spatial datasets related to traffic safety, including: fatal and serious injury crashes, pedestrian and bicycle crashes, safety projects (completed, funded, and those competing for funding), and several interactive map-based dashboards that allows the user to select an area of interest for more specific crash statistics. • Safe Streets for All Grant (SS4A) Program: link o Here you will find North Carolina specific information related to the SS4A grant program. It is expected that the content of this site will expand over time. Please contact me directly at (919) 814-5011 or bmayhew@ncdot.gov for further questions or discussion. BKM\bgm cc: Jamal Alavi, PE, CPM Daryl Vreeland, AICP George Hoops, PE Shawn Troy, PE Brian Murphy, PE 14 High Point RESOLUTION ENDORSEMENT OF TARGETS FOR SAFETY PERFORMANCE MEASURES ESTABLISHED BY NCDOT Archdale WHEREAS, the High Point Urban Area Metropolitan Planning Organization (HPMPO) has been designated by the Governor of the State of North Carolina as the Metropolitan Planning Organization (MPO) responsible, together with the State, for the comprehensive, continuing, and cooperative transportation planning process for the MPO’s Denton metropolitan planning area; and; WHEREAS, the Highway Safety Improvement Program (HSIP) final rule (23 CFR Part 490) requires States to set targets for five safety performance measures by August 31, Jamestown and; WHEREAS, the North Carolina Department of Transportation (NCDOT) has established targets for five performance measures based on five year rolling averages for: Lexington (1) Number of Fatalities, (2) Rate of Fatalities per 100 million Vehicle Miles Traveled (VMT), (3) Number of Serious Injuries, (4) Rate of Serious Injuries per 100 million VMT, and (5) Number of Non-Motorized (bicycle and pedestrian) Fatalities and Non-motorized Serious Injuries, and; Thomasville WHEREAS, the NCDOT coordinated the establishment of safety targets with the 19 Metropolitan Planning Organizations (MPOs) in North Carolina continually through outreach conducted by NCDOT’s Mobility and Safety Group and; Trinity WHEREAS, the NCDOT officially establishes and reports the safety targets in the Highway Safety Improvement Program annual report by August 31, of each year and; Wallburg WHEREAS the MPO’s may establish safety targets by agreeing to plan and program projects that contribute toward the accomplishment of the State’s targets for each measure or establish its own target within 180 days of the State establishing and reporting Davidson its safety targets in the HSIP annual report. County NOW THEREFORE, BE IT RESOLVED, that the High Point Urban Area Metropolitan Planning Organization (HPMPO) Transportation Advisory Committee (TAC) agrees that by approval of this resolution applicable references are hereby added to the Forsyth 2045 MTP adopted August 27, 2020, and the 2020-2029 MTIP adopted January 28, 2020, County and that program projects that contribute toward the accomplishment of the State’s targets as noted below for each of the aforementioned performance measures: 1. For the 2023 Highway Safety Improvement Plan (HSIP), the goal is to reduce total Guilford fatalities by 19.57 percent from 1,494.8 (2017-2021 average) to 1,202.2 (2019- County 2023 average) by December 31, 2023. 2. For the 2023 Highway Safety Improvement Plan (HSIP), the goal is to reduce the fatality rate by 20.95 percent from 1.279 (2017-2021 average) to 1.011 (2019-2023 Randolph average) by December 31, 2023. County 15 3. For the 2023 Highway Safety Improvement Plan (HSIP), the goal is to reduce total serious injuries by 30.19 percent from 4,903.4 (2017-2021 average) to 3,423.0 (2019-2023 average) by December 31, 2023. 4. For the 2023 Highway Safety Improvement Plan (HSIP), the goal is to reduce the serious injury rate by 31.75 percent from 4.195 (2017-2021 average) to 2.863 (2019-2023 average) by December 31, 2023. 5. For the 2023 Highway Safety Improvement Plan (HSIP), the goal is to reduce the total nonmotorized fatalities and serious injuries by 26.52 percent from 637.2 (2017-2021 average) to 468.2 (2019-2023 average) by December 31, 2023. A motion was made by TAC Member ______________and seconded by TAC member _______________ and approved this the 15th day of November 2023. _________________________ Martha Wolfe Chair, Transportation Advisory Committee Subscribed and sworn to me this the 15th day of November 2023. ______________________________________ Notary Public My commission expires ______________________ 16 TCC Meeting Meeting Date 10/18/2021 Agenda Item No. 4 Action Requested Information Section Tab Consideration of the 2023 TCC Schedule. (Greg Venable) Information Summary Attachments Yes No The TCC will meet on the third Tuesday of each month with the exception of July (no scheduled meeting), November (2nd Tuesday), and December (no scheduled meeting). Meetings may be cancelled if there are no action items or information to discuss. A 2023 MPO calendar is included in your packet. TCC Vote: Motion Second By:__________________ By:_______________________ Vote: For_______________________ Against________________________ 17 2023 DRAFT High Point Metropolitan Planning Organization Calendar 44927 44958 JANUARY Sunday FEBRUARY S M T W T F S S M T W T F S 1 1 2 3 4 5 6 7 29 30 31 1 2 3 4 2 8 9 10 11 12 13 14 5 6 7 8 9 10 11 3 15 16 17 18 19 20 21 12 13 14 15 16 17 18 4 22 23 24 25 26 27 28 19 20 21 22 23 24 25 5 29 30 31 1 2 3 4 26 27 28 1 2 3 4 6 5 6 7 8 9 10 11 5 6 7 8 9 10 11 44986 45017 MARCH APRIL S M T W T F S S M T W T F S 26 27 28 1 2 3 4 26 27 28 29 30 31 1 5 6 7 8 9 10 11 2 3 4 5 6 7 8 12 13 14 15 16 17 18 9 10 11 12 13 14 15 19 20 21 22 23 24 25 16 17 18 19 20 21 22 26 27 28 29 30 31 1 23 24 25 26 27 28 29 2 3 4 5 6 7 8 30 1 2 3 4 5 6 45047 45078 MAY JUNE S M T W T F S S M T W T F S 1 30 1 2 3 4 5 6 28 29 30 31 1 2 3 2 7 8 9 10 11 12 13 4 5 6 7 8 9 10 3 14 15 16 17 18 19 20 11 12 13 14 15 16 17 4 21 22 23 24 25 26 27 18 19 20 21 22 23 24 5 28 29 30 31 1 2 3 25 26 27 28 29 30 1 6 4 5 6 7 8 9 10 2 3 4 5 6 7 8 45108 45139 JULY AUGUST S M T W T F S S M T W T F S 25 26 27 28 29 30 1 30 31 1 2 3 4 5 2 3 4 5 6 7 8 6 7 8 9 10 11 12 9 10 11 12 13 14 15 13 14 15 16 17 18 19 16 17 18 19 20 21 22 20 21 22 23 24 25 26 23 24 25 26 27 28 29 27 28 29 30 31 1 2 30 31 1 2 3 4 5 3 4 5 6 7 8 9 45170 45200 SEPTEMBER OCTOBER S M T W T F S S M T W T F S 1 27 28 29 30 31 1 2 1 2 3 4 5 6 7 2 3 4 5 6 7 8 9 8 9 10 11 12 13 14 3 10 11 12 13 14 15 16 15 16 17 18 19 20 21 4 17 18 19 20 21 22 23 22 23 24 25 26 27 28 5 24 25 26 27 28 29 30 29 30 31 1 2 3 4 6 1 2 3 4 5 6 7 5 6 7 8 9 10 11 45231 45261 NOVEMBER DECEMBER S M T W T F S S M T W T F S 29 30 31 1 2 3 4 26 27 28 29 30 1 2 5 6 7 8 9 10 11 3 4 5 6 7 8 9 12 13 14 15 16 17 18 10 11 12 13 14 15 16 19 20 21 22 23 24 25 17 18 19 20 21 22 23 26 27 28 29 30 1 2 24 25 26 27 28 29 30 3 4 5 6 7 8 9 31 1 2 3 4 5 6 Agency Reporting Deadline TCC Meetings - 3rd Tuesday at 2:00pm (unless otherwise noted) TAC Meetings - 4th Tuesday at 10:00am (unless otherwise noted) *No scheduled meetings for July and December *November TCC and TAC meetings moved up one week due to Thanksgiving 18 NCDOT DIV 7 PROJECTS LOCATED IN HPMPO - UNDER DEVELOPMENT Estimated Let/Start TIP/WBS # Description Completion Cost Status Project Lead Date Date EB-5519 Lydia greenway trail from Jamestown municipal building to Jul. 2019 11/30/22 $1,198,415 LAP, Under Construction, Contract Stephen Robinson 50035.3.1 York Leigh Road (Non-System) in Jamestown Administered by Town of Jamestown - Punchlist Items Underway SS-4907CN Install All-Way Stop with flasher and radius improvements Dec. 2019 8/31/22 $90,000 Construction completed Dawn McPherson 48759.1.2 on SR 1113 (Kivett Drive) at SR 1145 (Riverdale Drive) east Derek Dixon 48759.2.1 of High Point 48759.3.1 SS-4907CF Install traffic signal with pedestrian count down heads at the Mar. 2022 11/30/2022 $120,000 Signal plans not complete, MA w/City Dawn McPherson 48252.1.1 intersection of SR 1278 (University Parkway) and Davis of High Point executed. Poles arrived 48252.2.1 Avenue (non-system) in High Point. Traffic signal to be 8/23/2021. Construction underway 48252.3.1 supported by metal strain poles. SS-6607AC Installation of 2 lines of trailing approach bridge guardrail at Jan. 2023 Jun. 2023 $33,000 Planning and design activities Bobby Norris 49824.1.1 Bridge #400196 on SR 1193 (Baker Road) over US 29-70 in underway 49824.2.1 High Point. 49824.3.1 SS-6007P Bridge #57 on SR 1113 (Kivett Drive) over Reddick's Creek - Jan. 2023 Jun. 2023 $36,000 Planning and design activities Bobby Norris 49423.1.1 Install bridge approach guardrail with MASH compliant end underway 49423.3.1 units 17BP.7.R.127 Replace Bridge #67 over Deep River in High Point on SR 1/19/23 FY 2025 $1,163,000 Planning and design activities Tim Powers 1523 (Deep River Road) underway 17BP.7.R.114 Replace Bridge #52 (S. Scientific Street) 1/20/23 FY2025 $1,045,000 Planning and design activities Tim Powers underway HS-2007D I-74 at I-74 and US 29-70 (I-85 Business) Interchange. 3/16/23 10/31/23 $500,000 Planning and design activities Dawn McPherson 49317.1.5 Upgrade traffic signals, signing, and pavement markings at underway 49317.2.5 intersections within the interchange. 49317.3.5 HS-2007E Installation of life-long pavement markings on NC 62 3/16/23 10/31/23 $715,000 Planning and design activities Dawn McPherson 49317.1.6 underway 49317.2.6 49317.3.6 19 1 Page HPMPO Oct. 2022 NCDOT DIV 7 PROJECTS LOCATED IN HPMPO - UNDER DEVELOPMENT Estimated Let/Start TIP/WBS # Description Completion Cost Status Project Lead Date Date C-5609L Six sidewalk projects in various locations in High Point MPO 3/31/23 FY2025 $1,860,100 Planning and design activities Stephen Robinson underway U-6018 Improve interchange at NC 62 and I-85 and realign 4/18/23 FY2026 $12,300,000 Planning and design activities Rob Weisz 47163.1.1 intersections along NC62 at SR 1154 (Kersey Valley Road) underway, ROW acquisition underway 47163.2.1 and SR 1162 (Weant Road) in Archdale 47163.3.1 U-4015A Widen SR 1556 (Gallimore Dairy Road) to multilanes from 5/16/23 FY2025 $11,500,000 Planning and design activities Brian Ketner 35013.1.4 NC 68 to Airpark East in Greensboro underway, coordinate with U-5974, 35013.2.4 ROW acquisition underway 35013.3.4 C-5609F Oakdale Pedestrian Improvements - Phase 3 - Construct 6/30/23 FY2025 $550,000 Planning and design activities Stephen Robinson sidewalks between Chimney Court and Jamestown Oaks underway Drive in Jamestown EB-5873 Construct sidewalk on SR 1278 (S. College Drive) from SR 6/30/23 FY2025 $225,000 Planning and design activities Stephen Robinson 1300 (E. Green Drive) to SR 1113 (E. Kivett Drive) in High underway Point EB-5874 Construct sidewalk on NC 68 (Eastchester Drive) from 6/30/23 FY2025 $435,000 Planning and design activities Stephen Robinson Johnson Street to SR 1278 (North College Road) in High underway Point EB-5889 Construct sidewalk with curb and gutter on SR 1486 (W. 9/20/23 FY 2025 $500,000 Planning and design activities Stephen Robinson Main Street); SR 1539 (Penny Road) from existing sidewalk underway on SR 1486 (W. Main Street) to park access on SR 1539 (Penny Road) in Jamestown U-4758 Improvements to Johnson Street/Sandy Ridge Road from 12/19/23 FY2026 $45,700,000 Planning and Design activities Laura Sutton 40251.2.1 Skeet Club Road to I-40 underway, Public meeting 8/14/18 - 40251.3.1 ROW underway C-5700 Extend Oakdale Road existing sidewalk from east of E. Main 2/29/24 FY2026 $170,000 Planning and design activities Stephen Robinson Street to Chimney Court in Jamestown underway P-5721 Construct extension Norfolk Southern Rail Siding in 6/18/24 FY2027 $4,070,000 Planning and design activities Brad Smythe Jamestown underway 20 2 Page HPMPO Oct. 2022 NCDOT DIV 7 PROJECTS LOCATED IN HPMPO - UNDER DEVELOPMENT Estimated Let/Start TIP/WBS # Description Completion Cost Status Project Lead Date Date B-5723 Replace Bridge 54 over Richland Creek on SR 1158 11/19/24 FY2026 $3,237,000 Planning and design activities Rob Weisz 45679.1.1 (Jackson Lake Road) underway 45679.1.2 45679 2 1 EB-5922 Construct sidewalk on Eastchester Drive 7/30/25 FY2027 $125,000 Planning and design activities pending Stephen Robinson EB-5989 Construct sidewalk on Cedrow Drive from west of I-74 to 9/25/26 FY2028 $1,200,000 Planning and design activities pending Stephen Robinson East of I-74 in High Point I-5712 Interchange improvements at I-40/US 421 and SR 1850 12/15/26 FY2029 $14,500,000 Planning and Design activities Laura Sutton 50126.1.FS1 (Sandy Ridge Road) in Greensboro. Sandy Ridge Road underway, Coordinate with U-4758 & 50126.2.1 widening to Cider Road U-6045 50126.3.1 U-5974 Upgrade NC 68 to Superstreet from SR 1523 (Hickswood 7/18/28 FY2030 $48,100,000 Planning and design activities Brian Ketner 45962.1.1 Road) to SR 1556 (Gallimore Dairy Road) in High Point underway, coordinate with U-4015A 45962.2.1 45962.3.1 EB-5999 Construct sidewalk on Johnson Street from Parris Avenue to 8/17/28 FY2030 $145,000 Planning and design activities pending Stephen Robinson SR 1896 (E. Hartley Drive) in High Point EB-6000 Construct sidewalk on SR 1536 (Penny Road) from City 8/18/28 FY2030 $1,500,000 Planning and design activities pending Stephen Robinson Lake Park to Piedmont Environmental Center in High Point U-6121 Widen SR 1541 (Wendover Avenue) from NC 68 11/21/28 FY 2031 $27,300,000 Planning and design activities Brian Ketner 48605.1.1 (Eastchester Drive) in High Point to SR 1541 (Guilford underway 48605.2.1 College Road) in Greensboro. 48605.3.1 EB-6010 Construct sidewalk on US 70 (W. Wendover Ave.) from NC 8/16/29 FY2032 $220,000 Planning and design activities pending Stephen Robinson 68 (Eastchester Drive) to Gibson Park Entrance in High Point 21 3 Page HPMPO Oct. 2022 North Carolina Department of Transportation 10/7/2022 Active Projects Under Construction - Guilford Co. Contract TIP Number Location Description Contractor Name Resident Contract Bid Availability Completion Work Start Estimated Progress Completion Number Engineer Amount Date Date Date Completion Schedule Percent Date Percent C203256 U-3615B SR-1820 (SKEET CLUB RD) FROM EAST OF SR-1818 APAC - ATLANTIC INC Hayes, PE, $30,898,017.15 3/2/2015 3/29/2019 5/20/2015 11/30/2022 99.9 90.29 (JOHNSON ST) TO WEST OF NC-68 (EASTCHESTER DR) IN THOMPSON ARTHUR Meredith HIGH POINT. DIVISION C204071 U-5169 I-74/US-311 AND NC-68 (EASTCHESTER DR) BRANCH CIVIL INC Snell, PE, $22,481,354.65 7/30/2018 1/28/2021 9/14/2018 11/30/2022 100 91.7 INTERCHANGE IMPROVEMENTS. William H C204096 U-2525C GREENSBORO EASTERN LOOP FROM US-29 NORTH OF ES WAGNER COMPANY Julian, Jason $120,471,182.82 4/30/2018 11/20/2022 5/7/2018 7/21/2023 92.93 79.52 GREENSBORO TO SR-2303 (LAWNDALE DR). LLC/SMITH-ROWE LL R C204103 U-2412A SR-1486/SR-4121 (GREENSBORO/HIGH POINT RD) FROM BRANCH CIVIL INC Lorenz, PE, $55,963,119.69 7/30/2018 12/28/2021 9/12/2018 10/20/2023 90.2 89.13 US-311 BYPASS TO WEST OF SR-1480 (VICKREY CHAPEL Kris RD). C204150 U-5896 US-29/US-70/I-85 BUSINESS, SR 1009 (S. MAIN ST.) IN HIGH BOGGS CONTRACTING, Lorenz, PE, $25,325,396.73 3/28/2022 2/28/2025 4/23/2022 3/1/2025 18.4 9.63 POINT AND BRIDGE #147 OVER US-311 ON US-29/US-70/I- INC Kris 85 BUSINESS C204371 U-2581BA US-70 (BURLINGTON RD) FROM WEST OF SR-3045 (MT APAC - ATLANTIC INC Snell, PE, $11,125,538.10 7/1/2020 4/30/2022 7/1/2020 11/1/2022 100 89.59 HOPE CHURCH RD) /SR-2819 (MCLEANSVILLE RD) TO THOMPSON ARTHUR William H EAST OF SR-2826 (BIRCH CREEK RD) DIVISION C204499 R-4707 INTERCHANGE OF US 29 AND SR 4771 (REEDY FORK APAC - ATLANTIC INC Hayes, PE, $46,382,713.04 6/2/2021 10/28/2024 6/7/2021 10/28/2024 28 28.81 PARKWAY) THOMPSON ARTHUR Meredith DIVISION C204626 RESURFACE 1 SECTION OF NC 87, 1 SECTION OF NC 49 FSC II LLC DBA FRED Lorenz, PE, $4,639,570.37 6/3/2021 11/1/2022 6/28/2021 11/1/2022 88.5 76.15 AND 21 SECTIONS OF SECONDARY ROADS SMITH COMPANY Kris C204665 U-5754 US-29/US-70/US-220 (O'HENRY BLVD.) FROM I-40/I-85 BUS. BRANCH CIVIL INC Lorenz, PE, $5,144,885.00 3/15/2022 3/14/2023 4/25/2022 3/14/2023 93 46.68 TO SOUTH OF FLORIDA ST. IN GREENSBORO. Kris C204700 RESURFACE 1 SECTION OF US-158 AND 49 SECTIONS OF VECELLIO & GROGAN INC. Hayes, PE, $5,303,911.30 4/25/2022 7/15/2023 6/30/2022 7/15/2023 15 48.74 SECONDARY ROADS DBA SHARPE BROTHERS Meredith C204712 B-5717 REPLACE BRIDGES #109 AND #121 OVER SOUTH CONTI CIVIL LLC Cvijetic, PE, $8,270,442.00 10/15/2022 10/28/2025 BUFFALO CREEK ON SR 4240 (EAST GATE CITY BLVD.) IN Bojan GREENSBORO. Page 1 of 3 22 North Carolina Department of Transportation 10/7/2022 Active Projects Under Construction - Guilford Co. Contract TIP Number Location Description Contractor Name Resident Contract Bid Availability Completion Work Start Estimated Progress Completion Number Engineer Amount Date Date Date Completion Schedule Percent Date Percent DG00490 AST TREATMENT OF 26 SECONDARY ROADS IN CAROLINA ROAD Lorenz, PE, $832.311.02 4/1/2021 10/30/2021 4/8/2021 11/30/2022 100 97.46 GUILFORD COUNTY SOLUTIONS LLC Kris DG00512 RESURFACE 43 VARIOUS STATE ROUTES VECELLIO & GROGAN INC. Hayes, PE, $2,562,749.29 7/1/2021 11/1/2022 7/1/2022 11/1/2022 86 95.41 DBA SHARPE BROTHERS Meredith DG00513 REPLACE BRIDGE #235 OVER BIG ALAMANCE CREEK ON SMITH-ROWE, LLC Hayes, PE, $1,675,367.75 6/21/2021 10/25/2022 SR 1005 (ALAMANCE CHURCH ROAD) Meredith DG00515 AST TREATMENT OF 34 SECONDARY ROADS IN WHITEHURST PAVING CO. Lorenz, PE, $749,755.28 7/1/2021 6/30/2021 4/25/2022 11/30/2022 100 86.05 GUILFORD COUNTY INC. Kris DG00524 R-5787-G INSTALLATION OF ADA COMPLIANT CURB RAMPS AT ATLANTIC CONTRACTING Lorenz, PE, $717,704.25 6/1/2021 4/14/2023 7/26/2021 4/14/2023 94.4 88.14 R-5787-H VARIOUS ROUTES COMPANY, INC. Kris DG00533 MILLING, RESURFACING AND PAVEMENT MARKINGS ON I- BLYTHE CONSTRUCTION Lorenz, PE, $2,989,292.45 7/8/2021 7/7/2022 9/20/2021 11/30/2022 100 94.63 85 BUS/US 29/US 70, NC 150 AND VARIOUS SECONDARY INC. Kris ROADS DG00545 REPLACE PIPE #40 ON SR 2930 (BETHEL CHURCH ROAD) BOGGS CONTRACTING, Cvijetic, PE, $346,396.50 6/16/2022 2/15/2023 7/6/2022 2/28/2023 100 89.14 IN GUILFORD COUNTY INC Bojan DG00551 R-2413A(L) LANDSCAPE PLANTING ALONG I-73 FROM BRYAN BLVD. COUNTRY BOY Lorenz, PE, $593,953.15 12/20/2021 6/19/2023 3/21/2022 6/19/2023 85.2 85 TO US 220 LANDSCAPING INC. Kris DG00552 R-2413C(L) LANDSCAPE PLANTING ALONG US 220 FROM I-840 TO NC GOLDSTAR PROJECT Lorenz, PE, $119,464.76 12/20/2021 6/19/2023 3/4/2022 6/19/2023 85.2 73 65 GROUP LLC Kris DG00558 U-6019 INTERSECTION IMPROVEMENTS AT SR 2334 (AIR ATLANTIC CONTRACTING Hayes, PE, $1,082,298.10 7/11/2022 11/15/2022 8/29/2022 HARBOR ROAD) AT SR 2347 (LAKE BRANDT ROAD) COMPANY, INC. Meredith DG00564 MILLING, RESURFACING AND PAVEMENT MARKINGS ON APAC - ATLANTIC INC Hayes, PE, $3,519,513.72 4/1/2022 6/30/2023 7/25/2022 6/30/2023 40.5 36.19 59 SECONDARY ROADS IN GUILFORD COUNTY THOMPSON ARTHUR Meredith DIVISION Page 2 of 3 23 North Carolina Department of Transportation 10/7/2022 Active Projects Under Construction - Guilford Co. Contract TIP Number Location Description Contractor Name Resident Contract Bid Availability Completion Work Start Estimated Progress Completion Number Engineer Amount Date Date Date Completion Schedule Percent Date Percent DG00570 REPLACE BRIDGE #85 OVER REEDY FORK ON SR 1858 RE BURNS & SONS CO. Hayes, PE, $1,052,260.20 7/7/2022 4/29/2023 8/1/2022 4/29/2023 10 12.76 (BEESON ROAD) INC. Meredith DG00572 REPLACE BRIDGE #25 OVER POLE CAT CREEK ON SR RE BURNS & SONS CO. Lorenz, PE, $1,285,359.02 1105 (EAST STEEPLE CHASE ROAD) INC. Kris DG00573 RESURFACE SR 2335 (TROSPER RD.) AND 25 ADDITIONAL APAC - ATLANTIC INC Hayes, PE, $2,009,092.07 6/1/2022 8/31/2023 7/6/2022 8/31/2023 19.6 25.3 SECONDARY ROADS THOMPSON ARTHUR Meredith DIVISION DG00575 R-2413C(L) LANDSCAPE PLANTINGS ON I-785 - FROM US 70 TO US 29 MOTS LANDSCAPING & Cvijetic, PE, $299,543.48 9/1/2022 4/30/2024 LAWNS LLC Bojan DG00576 AST RETREATMENT ON 50 SECONDARY ROADS IN WAUGH ASPHALT INC. Lorenz, PE, $811,504.54 5/9/2022 6/30/2023 GUILFORD COUNTY Kris Page 3 of 3 24 Randolph County - High Point MPO - Active Projects - Division 8--October 2022 Contract # or Completion Route Description Let Date Contractor Project Admin. Project Cost Notes WBS # or TIP # Date HI-0002 C204703 I-85 Randolph Co. Pavement Rehab - from I-85/NC 109 in 4/19/2022 10/15/2023 Blythe Cary Fine $13,384,387 Project 32% complete Thomasville to SR 1009 (South Main St) in Construction Inc. (336) 318-4020 Archdale Randolph County - High Point MPO - Upcoming Projects - Planning & Design, R/W, or not started - Division 8- October 2022 Revised Draft STIP in RED Contract # or Completion Route Description Let Date Contractor Project Admin. Funds Needed Notes WBS # or TIP # Date U-3400 SR 1577 / SR 1004 Widening from SR 1567 (Robbins Country 11/18/2025 TBD TBD Jeff Stroder $38,626,000 Right of Way 1/2023 FY 2023 (Archdale Road) Rd) to US 311 (Main Street) in Archdale FY 2026 (910) 773-8034 Public Meeting held 2/27/18 U-5308 SR 1547 (Finch Farm Rd) Widening from south of SR 3106 Kennedy 6/17/2025 TBD TBD Greg Davis $35,462,000 Right of Way in progress Rd to NC 62 FY 2025 (910) 773-8022 Public Meeting held 3/29/2018 2nd Public Meeting 11/29/18 U-5770 I-85 / SR 1993 Interchange Improvements - construct 4/15/2025 TBD TBD Jeff Stroder $19,193,000 Right of Way in progress A= resurface (South Main Street) Diverging Diamond Interchange (DDI) and FY 2025 (910) 773-8034 Public Meeting 11/30/17 B= DDI RCI's Newsletter Mailed 6/8/18 U-5864 SR 1595 (Surrett Drive) 3-lane widening from I-85 to SR 1300 (W. 8/15/2028 TBD TBD Greg Davis $33,864,000 Right of Way 6/2024 FY 2026 Fairfield Rd. /Guilford Co.) in Trinity, FY 2029 (910) 773-8022 Public Meeting held 6/13/19 Archdale, and High Point U-6191 NC 62 Modernize roadway between SR 3252 10/17/2028 TBD TBD Greg Davis $22,800,000 Right of Way 10/2026 FY 2027 (Surrett Dr) in Trinity to SR 1009 (N. Main FY 2029 (910) 773-8022 St) in Archdale 25 First Quarter Deviated Fixed Routes RED 2023 2022 Difference July 1,248 1,329 -81 Aug 1,791 1,293 498 Sept 1,659 1,311 348 Total 4,698 3,933 765 GREEN 2023 2022 Difference July 2,011 1,370 641 Aug 2,421 1,401 1020 Sept 2,087 1,264 823 Total 6,519 4,035 2,484 BLUE 2023 2022 Difference July 3,705 3,014 691 Aug 4,773 3,726 1047 Sept 4,498 2,604 1894 Total 12,976 9,344 3,632 ORANGE 2023 2022 Difference July 2,268 1,523 745 Aug 2,322 1,692 630 Sept 2,178 1,697 481 Total 6,768 4,912 1,856 Thomasville Saturday 2023 2021 Difference July 205 112 93 Aug 134 86 48 Sept 151 45 106 Total 490 243 247 1st QTR 2022 2021 Difference RED 4,698 3,933 765 GREEN 6,519 4,035 2484 BLUE 12,976 9,344 3632 ORANGE 6,768 4,912 1856 T' ville Saturday 490 243 247 Total 31,451 22,467 8,984  FTA Direct Recipient Project– s ll wai ng on FTA review of our Civil Rights program.  GMV Syncroma cs contract approved and executed. Installa on expected to being in November 2022.  Community Transporta on Service Plan update in beginning stages. 26

Get email alerts for High Point

A daily email when new agendas and minutes are posted.

Report an issue with this meeting