HPMPO Technical Coordinating Committee (TCC)
Regular MeetingHigh Point, NC · October 18, 2022
Agenda
HIGH POINT URBAN AREA MPO
TECHNICAL COORDINATING COMMITTEE (TCC)
Agenda for the October 18, 2022 TCC Meeting
2:00 PM – Third Floor Conference Room
High Point Municipal Building - City Hall
211 S. Hamilton Street, High Point
Action Items
1. Consideration of the September 20th TCC meeting minutes. (Greg Venable) Page 1
2. Recommendation to the TAC for the approval of amendments to the 2020-2029 MTIP.
(Andrew Edmonds) Page 7
Information Items
3. Safety Performance Measures FHWA Assessment and 2022 Targets (Andrew Edmonds)
Page 10
4. Consideration of the 2023 TCC Schedule (Greg Venable) Page 17
Agency Reports
5. NCDOT Division Reports
a. Division 7 (Stephen Robinson) Page 19
b. Division 8 (Bryan Kluchar) Page 25
c. Division 9 (Fred Haith)
6. NCDOT Transportation Planning Branch Report (Michael Abuya)
7. NCDOT Integrated Mobility Division Report (Alex Rottenberry)
8. FHWA Report (Suzette Morales)
9. Public Transportation Reports
a. High Point Transit System (Andrew Edmonds)
b. Davidson County Transportation (Richard Jones) Page 26
c. RCATS (Tawanna Williams)
d. PART (Mark Kirstner)
Next TCC Meeting
November 8, 2022
TCC
Meeting
Meeting Date 10/18/2022 Agenda Item No. 1
Action Requested Approve
Section Tab
Consideration of the September 20th TCC meeting minutes. (Greg Venable)
Information Summary Attachments Yes No
The complete meeting minutes are in your packet as Attachment 1.
TCC Vote: Motion Second
By:__________________ By:_______________________
Vote: For_______________________ Against________________________
1
Attachment 1
MINUTES
TECHNICAL COORDINATING COMMITTEE
September 20, 2022
TCC MEMBERS PRESENT: Stephen Robinson, Bryan Kluchar, Fred Haith, Michael
Abuya, Mark Kirstner, Greg Venable, Jason Miller, Heidi Galanti, Roger Jones, Chuck
George, Stevie Cox, Scott Leonard, Paul Blanchard, Kelly Garvin
TAC MEMBERS PRESENT: Suzette Morales
MPO Staff: John Hanes, Andrew Edmonds
OTHERS PRESENT: Phillip Craver, Richard Jones, Kathy Vollert, Alex Rotenberry,
Dawn Vallieres, Tawana Williams, Jeron Monroe
RECORDING STAFF: Microsoft Teams
Greg Venable called the meeting to order. Item #3 (Resolution supporting Archdale’s
Main Street Corridor study) was tabled until a future meeting.
ACTION ITEMS
Item 1: Consideration of the August 16th TCC meeting minutes.
Motion by: Stevie Cox
Seconded by: Jason Miller
Vote:
For: Unanimous
Against: None
Item 2: Recommendation to the TAC for amendments to the 2020-2029
MTIP.
John Hanes reported that there was one modification to the 2020-2029 MTIP; C-5700,
Oakdale Road sidewalk extension in Jamestown. Construction is being delayed from FY
22 to FY 24 to allow additional time for design.
Motion by: Stephen Robinson
Seconded by: Stevie Cox
Vote:
For: Unanimous
Against: None
2
Attachment 1
Item 3: Recommendation to the TAC for the approval of amendments to the
RAISE grant.
Andrew Edmonds reported that this is a request by the City of High Point to amend the
2020-2029 MTIP to include funding for the High Point RAISE project. It should be noted
that what is being presented is a revised funding table from what is shown in your packet.
After coordination with the STIP Management Office, the revised table shows PE and
ROW to be included in the parent STIP number with construction of the two components
of the project to be split as A and B. The STIP Management Office also assigned
$200,000 of previously allocated Spot Safety funds towards the project.
Motion by: Roger Jones
Seconded by: Heidi Galanti
Vote:
For: Unanimous
Against: None
Item 4: Recommendation to the TAC for the approval to the 2020 -2029
MTIP to incorporate FY22 Section 5307 Appropriations
Andrew Edmonds reported that this is a request by PART to amend the 2020-2029 MTIP
to incorporate revised 5307 funding amounts. Section 5307 funds are federal formula
funds available for transit capital and operating assistance. TAC approved a split-
allocation of FY22 5307 funds this past June, now PART is requesting an update to the
MTIP to align with the amount of funds applicable to PART for an upcoming FTA grant.
Motion by: Fred Haith
Seconded by: Heidi Galanti
Vote:
For: Unanimous
Against: None
Information Items
Item 5: Carbon Reduction Program call for project and development of
evaluation criteria.
3
Attachment 1
Andrew Edmonds reported that with the introduction of the Carbon Reduction Program
in the Bipartisan Infrastructure Law, additional funds have been made available to the
High Point MPO to assist in funding projects that reduce transportation emissions. For
FY22, High MPO will receive an allocation of $372,874. The federal share of CRP
projects is 80% and there is a minimum project cost of $100,000. MPO staff are opening
a call for eligible CRP projects until end of business Wednesday October 12, 2022.
Additionally, staff are in the process of developing an evaluation criteria to ensure
equitable distribution of funds in the event that project needs outweigh available funding.
This set of evaluation criteria is still under development, but it can be later utilized for
additional rounds of funding.
Agency Reports
Item 4: NCDOT Division Reports
Division 7
Stephen Robinson reported there was nothing to add from was in the report in the packet.
Stephen mentioned that Division 7 hosted a drop-in session the prior week for the new
draft STIP.
Division 8
Bryan Kluchar reported there are no changes from the report in the packet. Bryan
added that Division 8 will be hosting their drop-in session for the draft STIP this week.
He added that comments can be provided online until October 8th.
Division 9
Fred Haith reported that the Division 9’s public comment period for the draft STIP is
October 3rd to October 7th. Fred reported there is nothing to add to the report in the
packet.
Item 5: NCDOT Transportation Planning Branch Report
Michael Abuya has nothing to report.
Item 6: NCDOT Integrated Mobility Division Report
Alex Rottenberry shared information about the development of NCDOT’s Transportation
Disadvantage Index (TDI). This tool utilizes ACS data from the Census Bureau to look at
variables such as carless households, concentrations of persons with low income,
concentrations of mobility impairments, concentrations of youth, concentrations of
seniors, and concentrations of Black, Indigenous, and people of color. These variables in
of themselves don’t reflect anything but with higher concentrations of some of these
variables it may be an indicator that an area may have a Transportation Disadvantage.
4
Attachment 1
This will serve as a tool in the toolbox when thinking about the placement or impact of a
transportation project. Alex hopes to come back at a later date to demonstration the tool
but today he shared a recording and presentation of an introduction to the tool.
Phillip Craver asked for a point of information regarding a meeting at the Division 7
office to discuss P7.0 and discuss projects from the draft STIP on October 12th.
Phillip also advised that the P7.0 workgroup has meetings scheduled every month
until May 2023. After May, the P7.0 workgroup’s recommendation will go to the
Transportation Board. The Transportation Board is anticipated to adopt those
recommendation in Summer 2023.
Item 7: FHWA Report
Suzette Morales reported the Census Bureau has come up with new definitions for what’s
considered an urban area. This definition will be used with the 2020 Census to identify
the MPO and TMA boundaries. The Census Bureau has posted a Frequently Asked
Questions section on their website. This states the new definition should be anticipated by
the end of the year.
Item 8: Public Transportation Reports
High Point Transit System
Greg Venable reported that City of High Point Council passed an agreement with
Guilford County Schools to provide transportation to middle and high school students.
Davidson County Transportation
Richard Jones reported that Davidson County Transportation is still in the process of
becoming a direct recipient.
RCATS
Tawanna Williams had nothing to report.
PART
Mark Kirstner reported ridership at PART is fairly consistent with other agencies in that
they are holding steady at 60% of ridership pre-COVID. He believes the next six months
will be about identifying new markets. Mark also shared the Household Travel Survey.
This survey will be an invitation survey administered by consultants to sample
demographics in the area. Mark asked for help in spreading information about the survey
to ensure the public understands its safe and the importance of responding to the survey.
Mark also shared that there is a pilot survey available to help give feedback about the
Household Travel Survey. Mark also reported that the Growth Allocation and Scenario
project is continuing on. The team has done an unofficial run of the socioeconomic data
5
Attachment 1
given all of the work that’s done to date. The Travel Demand Model team will take that
data and conduct a comparison of the results. Mark shared a graphic of the scenario
model coverage in the Piedmont Crescent.
Item 9: Other Business
Stevie Cox reported Trinity City Council just approved moving forward with SME to
develop a Comprehensive Plan. Stevie stated that they were going to coordinate with
Thomasville and Archdale to analyze the regional transportation network issues and
growth allocation.
Heidi Galanti shared that High Point is also kicking off their Comprehensive Plan
process.
Item 10: Meeting Adjourned.
Motion by: Stevie Cox
Seconded: Stephen Robinson
Vote:
For: Unanimous
Against: None
6
TCC
Meeting
Meeting Date 10/18/2022 Agenda Item No. 2
Action Requested Recommendation
Section Tab
Recommendation to the TAC for approval of amendments to the 2020-2029 MTIP.
(Andrew Edmonds)
Information Summary Attachments Yes No
The proposed amendments to the 2020-2029 MTIP for the High Point MPO are included
in your packet. Staff is recommending approval of the MTIP amendments.
TCC Vote: Motion Second
By:__________________ By:_______________________
Vote: For_______________________ Against________________________
7
High Point
RESOLUTION
Archdale AMENDING THE 2020-2029 HIGH POINT METROPOLITAN
TRANSPORTATION IMPROVEMENT PROGRAM
WHEREAS, the Transportation Advisory Committee has reviewed the 2020-2029
Denton
Metropolitan Transportation Improvement Program and found an amendment is
necessary; and
Jamestown WHEREAS, the following amendments have been proposed:
HS-2007D I-74 AND US 29/70, I-74 AND US 29/70 (I-85 CONSTRUCTION FY 20223 - $500,000 (HSIP)
BUSINESS INTERCHANGE), UPGRADE SIGNALS, $500,000
Lexington PAVEMENT MARKINGS, AND SIGNAGE.
ADD SEGMENT “D” PER TRANSPORTATION
MOBILITY AND SAFETY DIVISION
Thomasville R-5787 VARIOUS, DIVISION 7 PROGRAM TO UPGRADE CONSTRUCTION FY 2022 - $200,000 (S)
INTERSECTIONS TO COMPLY WITH THE FY 2022 - $800,000 (TA)
AMERICANS WITH DISABILITIES ACT (ADA) FY 2023 - $200,000 (S)
USING TRANSPORATION ALTERNATIVES (TA) FY 2023 - $800,000 (TA)
FUNDS $2,000,000
Trinity
ADD FUNDING IN FY 23 NOT PREVIOUSLY
PROGRAMMED
R-5788 VARIOUS, DIVISION 8 PROGRAM TO UPGRADE CONSTRUCTION FY 2022 - $200,000 (S)
Wallburg INTERSECTIONS TO COMPLY WITH THE FY 2022 - $800,000 (TA)
AMERICANS WITH DISABILITIES ACT (ADA) FY 2023 - $200,000 (S)
USING TRANSPORATION ALTERNATIVES (TA) FY 2023 - $800,000 (TA)
FUNDS $2,000,000
ADD FUNDING IN FY 23 NOT PREVIOUSLY
Davidson
PROGRAMMED
County
R-5789 VARIOUS, DIVISION 9 PROGRAM TO UPGRADE CONSTRUCTION FY 2022 - $200,000 (S)
INTERSECTIONS TO COMPLY WITH THE FY 2022 - $800,000 (TA)
AMERICANS WITH DISABILITIES ACT (ADA) FY 2023 - $200,000 (S)
USING TRANSPORATION ALTERNATIVES (TA) FY 2023 - $800,000 (TA)
Forsyth FUNDS $2,000,000
County
ADD FUNDING IN FY 23 NOT PREVIOUSLY
PROGRAMMED
Guilford
County
NOW THEREFORE, be it resolved by the Transportation Advisory Committee for the
High Point Metropolitan Planning Organization that the 2020-2029 Metropolitan
Transportation Improvement Program be amended as listed above on this the 25th day of
Randolph
County October 2022.
A motion was made by TAC Member ______________and seconded by TAC
member _______________ and approved this the 25th day of October 2022.
_________________________
Martha Wolfe
Chair, Transportation Advisory Committee
8
Subscribed and sworn to me this the 25th day of October 2022.
______________________________________
Notary Public
My commission expires ______________________
9
TCC
Meeting
Meeting Date 10/18/2022 Agenda Item No. 3
Action Requested Information
Section Tab
Safety Performance Measures FHWA Assessment and 2023 Targets (Andrew Edmonds)
Information Summary Attachments Yes No
Federal regulations require MPOs and State DOTs to set targets for five safety
performance measure for highways. These performance measures are:
1. Number of fatalities
2. Rate of fatalities per 100 million vehicle miles traveled
3. Number of serious injuries
4. Rate of serious injuries per 100 million vehicle miles traveled
5. Number of combined non-motorized fatalities and non-motorized serious injuries
These targets serve as a continuous and systematic quantifier to analyze the performance
of the North Carolina Highway Safety Improvement Program. The ultimate goal is to
reduce the number of traffic crashes, injuries, and fatalities by reducing the potential for
and the severity in public roadways. The goal of the most recent 2019 Strategic Highway
Safety Plan is to reduce fatalities and serious injuries by 2035, moving towards zero by
2050.
Safety performance targets are established annually and are based on five-year rolling
averages of their respective data set. Per FHWA guidance, MPOs must establish safety
performance targets no later than February 27th of each year.
MPO staff are recommending approval of safety measure targets for 2023 that are
consistent with NCDOT targets. Information about the safety performance measures is
included in the meeting packet.
TCC Vote: Motion Second
By:__________________ By:_______________________
Vote: For_______________________ Against________________________
10
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
ROY COOPER J. ERIC BOYETTE
GOVERNOR SECRETARY
DATE: September 28, 2022
TO: Greg Venable
Transportation Planning Administrator, High Point Urban Area Metropolitan
Planning Organization
FROM: Brian Mayhew, PE, CPM
State Traffic Engineer
Transportation Mobility & Safety Division
SUBJECT: Safety Performance Measures – FHWA Assessment and 2023 Targets
Background
Effective April 14, 2016, the Federal Highway Administration (FHWA) established five highway safety
performance measures in accord with regulations set forth in the Federal MAP-21 and FAST Act
transportation funding bills. These performance measures are:
1. Number of fatalities;
2. Rate of fatalities per 100 million vehicle miles traveled;
3. Number of serious injuries;
4. Rate of serious injuries per 100 million vehicle miles traveled; and
5. Number of combined non-motorized fatalities and non-motorized serious injuries.
These targets are established annually, are based on 5 year rolling averages, and are for calendar years.
North Carolina state targets are set in agreement with our Strategic Highway Safety Plan (SHSP) goals.
The SHSP goals are developed through collaborative efforts of a diverse group of stakeholders including
state, regional, and local partners (including MPOs). The goal of the most recent (2019) SHSP is to
reduce fatalities and serious injuries by half by 2035, moving towards zero by 2050.
North Carolina Safety Performance Target Achievement Determination
Earlier this year, FHWA completed an assessment of target achievement for NCDOT’s calendar year (CY)
2020 safety targets, based on the 5-year averages for 2016-2020 for each measure. As per
23 CFR 490.211(c)(2), a State Department of Transportation (DOT) has met or made significant
progress towards meeting its safety performance targets when at least four of the safety
Mailing Address: Telephone: (919) 814-5000 Location:
NC DEPARTMENT OF TRANSPORTATION Fax: (919) 771-2745 750 N. GREENFIELD PARKWAY
TRANSPORTATION MOBILITY & SAFETY DIVISION Customer Service: 1-877-368-4968 GARNER, NC 27529
1561 MAIL SERVICE CENTER
RALEIGH, NC 27699-1561
Website: www.ncdot.gov
11
performance targets established under 23 CFR 490.209(a) have been met or the actual outcome
is better than the baseline performance. Based on FHWA’s review, North Carolina has not met or
made significant progress toward achieving its safety performance targets. As a result, NCDOT must
ensure that all HSIP safety funds are obligated, and must develop an HSIP Implementation Plan that
describes actions the State will take to meet or make significant progress toward achieving its targets.
Table 1 below provides a summary of the target achievement determination at the state level.
Table 1: North Carolina Safety Performance Target Achievement Determination Summary for CY 2020
5-year Rolling Averages
(Actual) Better than Met or Made
Performance Measures Target Actual Baseline Target Achieved?
Baseline? Significant Progress?
2016 - 2020 2016 - 2020 2014 - 2018
Fatalities
1,227.8 1,458.6 1,392.2 No No
(5 Year Average)
Fatality Rate
1.084 1.250 1.206 No No
(5 Year Average)
Serious Injuries
2,812.8 4,410.2 3,362.4 No No
(5 Year Average) No
Serious Injury Rate
2.462 3.776 2.884 No No
(5 Year Average)
Non-motorized Fatalities
and Serious Injuries 426.6 583.0 491.0 No No
(5 Year Average)
Table 2 below shows what this determination would look like if the state’s methodology for establishing
the CY 2020 goal was applied to crash data specific to High Point Urban Area MPO.
Table 2: High Point Urban Area MPO Safety Performance Target Achievement Determination Summary
for CY 2020
5-year Rolling Averages
(Actual) Better than Met or Made
Performance Measures Target Actual Baseline Target Achieved?
Baseline? Significant Progress?
2016 - 2020 2016 - 2020 2014 - 2018
Fatalities
37.6 44.4 44.2 No No
(5 Year Average)
Fatality Rate
1.174 1.348 1.358 No Yes
(5 Year Average)
Serious Injuries
109.7 132.6 126.0 No No
(5 Year Average) No
Serious Injury Rate
3.415 4.012 3.856 No No
(5 Year Average)
Non-motorized Fatalities
and Serious Injuries 12.8 18.4 15.6 No No
(5 Year Average)
12
2023 State Safety Performance Targets
2023 state safety performance targets were submitted to FHWA on August 31st, as required, with the
submission of the annual Highway Safety Improvement Program (HSIP) report. These targets reflect the
2019 SHSP goal to reduce fatalities and serious injuries by half by 2035, moving towards zero by 2050.
The calculated targets are shown in Table 3 below. More detailed information about each target can be
found at this link.
Table 3: North Carolina Calendar Year 2023 Safety Performance Targets
Performance
CY 2023
Measure
Number of
1,202.2
Fatalities
Rate of Fatalities 1.011
Number of Serious
3,423.0
Injuries
Rate of Serious
2.863
Injuries
Number of Non-
Motorized
468.2
Fatalities & Serious
Injuries
2023 High Point Urban Area MPO Safety Performance Targets
Table 4 below provides crash data specific to your MPO and shows what the safety performance targets
would look like if you applied the state’s methodology (reducing fatalities and serious injuries by half by
2035). More detailed information specific to your MPO can be found at this link.
Table 4: High Point Urban Area MPO Specific Safety Performance Targets
Non-motorized
Fatalities Fatality Rate Serious Injuries Serious Injury Rate Fatalities and
Year
(5 Year Average) (5 Year Average) (5 Year Average) (5 Year Average) Serious Injuries
(5 Year Average)
2008 - 2012 41.2 1.390 99.6 3.360 12.6
2009 - 2013 38.4 1.300 103.8 3.514 13.4
2010 - 2014 42.0 1.420 110.4 3.733 15.0
2011 - 2015 41.6 1.386 114.4 3.815 15.4
2012 - 2016 43.0 1.394 108.8 3.542 16.2
2013 - 2017 42.4 1.347 116.8 3.699 15.4
2014 - 2018 44.2 1.358 126.0 3.856 15.6
2015 - 2019 43.4 1.295 128.4 3.819 16.0
2016 - 2020 44.4 1.348 132.6 4.012 18.4
2017 - 2021 45.0 1.365 140.8 4.255 20.6
2023 Target* 37.6 1.114 112.4 3.323 14.9
13
Next Steps
MPOs are not directly assessed by FHWA on their progress towards meeting safety performance targets.
However, coordination and deliberate action will be needed to achieve the goals outlined in the NC
Strategic Highway Safety Plan and as communicated through the safety performance targets. We
encourage additional coordination between MPO’s and NCDOT Traffic Safety Unit in all areas of safety,
but specifically in data sharing, safety tools development, safety need identification and shared safety
project implementation. The Traffic Safety Unit is available to meet with your MPO for additional
discussion and partnership.
FHWA guidance allows each MPO to establish safety performance targets by either agreeing to plan and
program projects so that they contribute toward the accomplishments of the State DOT performance
targets or committing to quantifiable HSIP targets for their specific MPO area. If an MPO establishes its
own targets, it will need to do so in coordination with the State per FHWA guidelines. The Traffic Safety
Unit is available to facilitate this coordination. As a reminder, MPOs must establish safety performance
targets no later than February 27 of each year per FHWA guidance. Please transmit a signed adoption
resolution indicating the establishment of safety targets for your MPO or supporting the state’s targets
to Daryl Vreeland (dvreeland@ncdot.gov) in the Transportation Planning Division just as you have in
previous years. An adoption resolution template can be found at this link.
Finally, a new NCDOT Traffic Safety website has been established to communicate safety information to
the public. A few direct links that may be of specific interest to MPOs can be found below:
• Main NCDOT Traffic Safety Unit website: link
• Mapped safety data: link
o Here you can find a variety of spatial datasets related to traffic safety, including: fatal
and serious injury crashes, pedestrian and bicycle crashes, safety projects (completed,
funded, and those competing for funding), and several interactive map-based
dashboards that allows the user to select an area of interest for more specific crash
statistics.
• Safe Streets for All Grant (SS4A) Program: link
o Here you will find North Carolina specific information related to the SS4A grant
program. It is expected that the content of this site will expand over time.
Please contact me directly at (919) 814-5011 or bmayhew@ncdot.gov for further questions or
discussion.
BKM\bgm
cc: Jamal Alavi, PE, CPM
Daryl Vreeland, AICP
George Hoops, PE
Shawn Troy, PE
Brian Murphy, PE
14
High Point RESOLUTION
ENDORSEMENT OF TARGETS FOR SAFETY PERFORMANCE MEASURES
ESTABLISHED BY NCDOT
Archdale WHEREAS, the High Point Urban Area Metropolitan Planning Organization
(HPMPO) has been designated by the Governor of the State of North Carolina as the
Metropolitan Planning Organization (MPO) responsible, together with the State, for the
comprehensive, continuing, and cooperative transportation planning process for the MPO’s
Denton metropolitan planning area; and;
WHEREAS, the Highway Safety Improvement Program (HSIP) final rule (23 CFR
Part 490) requires States to set targets for five safety performance measures by August 31,
Jamestown and;
WHEREAS, the North Carolina Department of Transportation (NCDOT) has
established targets for five performance measures based on five year rolling averages for:
Lexington (1) Number of Fatalities, (2) Rate of Fatalities per 100 million Vehicle Miles Traveled
(VMT), (3) Number of Serious Injuries, (4) Rate of Serious Injuries per 100 million VMT,
and (5) Number of Non-Motorized (bicycle and pedestrian) Fatalities and Non-motorized
Serious Injuries, and;
Thomasville
WHEREAS, the NCDOT coordinated the establishment of safety targets with the
19 Metropolitan Planning Organizations (MPOs) in North Carolina continually through
outreach conducted by NCDOT’s Mobility and Safety Group and;
Trinity
WHEREAS, the NCDOT officially establishes and reports the safety targets in the
Highway Safety Improvement Program annual report by August 31, of each year and;
Wallburg
WHEREAS the MPO’s may establish safety targets by agreeing to plan and
program projects that contribute toward the accomplishment of the State’s targets for each
measure or establish its own target within 180 days of the State establishing and reporting
Davidson its safety targets in the HSIP annual report.
County
NOW THEREFORE, BE IT RESOLVED, that the High Point Urban Area
Metropolitan Planning Organization (HPMPO) Transportation Advisory Committee (TAC)
agrees that by approval of this resolution applicable references are hereby added to the
Forsyth
2045 MTP adopted August 27, 2020, and the 2020-2029 MTIP adopted January 28, 2020,
County
and that program projects that contribute toward the accomplishment of the State’s targets
as noted below for each of the aforementioned performance measures:
1. For the 2023 Highway Safety Improvement Plan (HSIP), the goal is to reduce total
Guilford
fatalities by 19.57 percent from 1,494.8 (2017-2021 average) to 1,202.2 (2019-
County
2023 average) by December 31, 2023.
2. For the 2023 Highway Safety Improvement Plan (HSIP), the goal is to reduce the
fatality rate by 20.95 percent from 1.279 (2017-2021 average) to 1.011 (2019-2023
Randolph average) by December 31, 2023.
County
15
3. For the 2023 Highway Safety Improvement Plan (HSIP), the goal is to reduce total
serious injuries by 30.19 percent from 4,903.4 (2017-2021 average) to 3,423.0
(2019-2023 average) by December 31, 2023.
4. For the 2023 Highway Safety Improvement Plan (HSIP), the goal is to reduce the
serious injury rate by 31.75 percent from 4.195 (2017-2021 average) to 2.863
(2019-2023 average) by December 31, 2023.
5. For the 2023 Highway Safety Improvement Plan (HSIP), the goal is to reduce the
total nonmotorized fatalities and serious injuries by 26.52 percent from 637.2
(2017-2021 average) to 468.2 (2019-2023 average) by December 31, 2023.
A motion was made by TAC Member ______________and seconded by TAC member
_______________ and approved this the 15th day of November 2023.
_________________________
Martha Wolfe
Chair, Transportation Advisory Committee
Subscribed and sworn to me this the 15th day of November 2023.
______________________________________
Notary Public
My commission expires ______________________
16
TCC
Meeting
Meeting Date 10/18/2021 Agenda Item No. 4
Action Requested Information
Section Tab
Consideration of the 2023 TCC Schedule. (Greg Venable)
Information Summary Attachments Yes No
The TCC will meet on the third Tuesday of each month with the exception of July (no
scheduled meeting), November (2nd Tuesday), and December (no scheduled meeting).
Meetings may be cancelled if there are no action items or information to discuss. A 2023
MPO calendar is included in your packet.
TCC Vote: Motion Second
By:__________________ By:_______________________
Vote: For_______________________ Against________________________
17
2023
DRAFT High Point Metropolitan Planning Organization Calendar
44927 44958
JANUARY Sunday FEBRUARY
S M T W T F S S M T W T F S
1 1 2 3 4 5 6 7 29 30 31 1 2 3 4
2 8 9 10 11 12 13 14 5 6 7 8 9 10 11
3 15 16 17 18 19 20 21 12 13 14 15 16 17 18
4 22 23 24 25 26 27 28 19 20 21 22 23 24 25
5 29 30 31 1 2 3 4 26 27 28 1 2 3 4
6 5 6 7 8 9 10 11 5 6 7 8 9 10 11
44986 45017
MARCH APRIL
S M T W T F S S M T W T F S
26 27 28 1 2 3 4 26 27 28 29 30 31 1
5 6 7 8 9 10 11 2 3 4 5 6 7 8
12 13 14 15 16 17 18 9 10 11 12 13 14 15
19 20 21 22 23 24 25 16 17 18 19 20 21 22
26 27 28 29 30 31 1 23 24 25 26 27 28 29
2 3 4 5 6 7 8 30 1 2 3 4 5 6
45047 45078
MAY JUNE
S M T W T F S S M T W T F S
1 30 1 2 3 4 5 6 28 29 30 31 1 2 3
2 7 8 9 10 11 12 13 4 5 6 7 8 9 10
3 14 15 16 17 18 19 20 11 12 13 14 15 16 17
4 21 22 23 24 25 26 27 18 19 20 21 22 23 24
5 28 29 30 31 1 2 3 25 26 27 28 29 30 1
6 4 5 6 7 8 9 10 2 3 4 5 6 7 8
45108 45139
JULY AUGUST
S M T W T F S S M T W T F S
25 26 27 28 29 30 1 30 31 1 2 3 4 5
2 3 4 5 6 7 8 6 7 8 9 10 11 12
9 10 11 12 13 14 15 13 14 15 16 17 18 19
16 17 18 19 20 21 22 20 21 22 23 24 25 26
23 24 25 26 27 28 29 27 28 29 30 31 1 2
30 31 1 2 3 4 5 3 4 5 6 7 8 9
45170 45200
SEPTEMBER OCTOBER
S M T W T F S S M T W T F S
1 27 28 29 30 31 1 2 1 2 3 4 5 6 7
2 3 4 5 6 7 8 9 8 9 10 11 12 13 14
3 10 11 12 13 14 15 16 15 16 17 18 19 20 21
4 17 18 19 20 21 22 23 22 23 24 25 26 27 28
5 24 25 26 27 28 29 30 29 30 31 1 2 3 4
6 1 2 3 4 5 6 7 5 6 7 8 9 10 11
45231 45261
NOVEMBER DECEMBER
S M T W T F S S M T W T F S
29 30 31 1 2 3 4 26 27 28 29 30 1 2
5 6 7 8 9 10 11 3 4 5 6 7 8 9
12 13 14 15 16 17 18 10 11 12 13 14 15 16
19 20 21 22 23 24 25 17 18 19 20 21 22 23
26 27 28 29 30 1 2 24 25 26 27 28 29 30
3 4 5 6 7 8 9 31 1 2 3 4 5 6
Agency Reporting Deadline
TCC Meetings - 3rd Tuesday at 2:00pm (unless otherwise noted)
TAC Meetings - 4th Tuesday at 10:00am (unless otherwise noted)
*No scheduled meetings for July and December *November TCC and TAC meetings moved up one week due to Thanksgiving
18
NCDOT DIV 7 PROJECTS LOCATED IN HPMPO - UNDER DEVELOPMENT
Estimated
Let/Start
TIP/WBS # Description Completion Cost Status Project Lead
Date
Date
EB-5519 Lydia greenway trail from Jamestown municipal building to Jul. 2019 11/30/22 $1,198,415 LAP, Under Construction, Contract Stephen Robinson
50035.3.1 York Leigh Road (Non-System) in Jamestown Administered by Town of Jamestown -
Punchlist Items Underway
SS-4907CN Install All-Way Stop with flasher and radius improvements Dec. 2019 8/31/22 $90,000 Construction completed Dawn McPherson
48759.1.2 on SR 1113 (Kivett Drive) at SR 1145 (Riverdale Drive) east Derek Dixon
48759.2.1 of High Point
48759.3.1
SS-4907CF Install traffic signal with pedestrian count down heads at the Mar. 2022 11/30/2022 $120,000 Signal plans not complete, MA w/City Dawn McPherson
48252.1.1 intersection of SR 1278 (University Parkway) and Davis of High Point executed. Poles arrived
48252.2.1 Avenue (non-system) in High Point. Traffic signal to be 8/23/2021. Construction underway
48252.3.1 supported by metal strain poles.
SS-6607AC Installation of 2 lines of trailing approach bridge guardrail at Jan. 2023 Jun. 2023 $33,000 Planning and design activities Bobby Norris
49824.1.1 Bridge #400196 on SR 1193 (Baker Road) over US 29-70 in underway
49824.2.1 High Point.
49824.3.1
SS-6007P Bridge #57 on SR 1113 (Kivett Drive) over Reddick's Creek - Jan. 2023 Jun. 2023 $36,000 Planning and design activities Bobby Norris
49423.1.1 Install bridge approach guardrail with MASH compliant end underway
49423.3.1 units
17BP.7.R.127 Replace Bridge #67 over Deep River in High Point on SR 1/19/23 FY 2025 $1,163,000 Planning and design activities Tim Powers
1523 (Deep River Road) underway
17BP.7.R.114 Replace Bridge #52 (S. Scientific Street) 1/20/23 FY2025 $1,045,000 Planning and design activities Tim Powers
underway
HS-2007D I-74 at I-74 and US 29-70 (I-85 Business) Interchange. 3/16/23 10/31/23 $500,000 Planning and design activities Dawn McPherson
49317.1.5 Upgrade traffic signals, signing, and pavement markings at underway
49317.2.5 intersections within the interchange.
49317.3.5
HS-2007E Installation of life-long pavement markings on NC 62 3/16/23 10/31/23 $715,000 Planning and design activities Dawn McPherson
49317.1.6 underway
49317.2.6
49317.3.6
19 1
Page HPMPO Oct. 2022
NCDOT DIV 7 PROJECTS LOCATED IN HPMPO - UNDER DEVELOPMENT
Estimated
Let/Start
TIP/WBS # Description Completion Cost Status Project Lead
Date
Date
C-5609L Six sidewalk projects in various locations in High Point MPO 3/31/23 FY2025 $1,860,100 Planning and design activities Stephen Robinson
underway
U-6018 Improve interchange at NC 62 and I-85 and realign 4/18/23 FY2026 $12,300,000 Planning and design activities Rob Weisz
47163.1.1 intersections along NC62 at SR 1154 (Kersey Valley Road) underway, ROW acquisition underway
47163.2.1 and SR 1162 (Weant Road) in Archdale
47163.3.1
U-4015A Widen SR 1556 (Gallimore Dairy Road) to multilanes from 5/16/23 FY2025 $11,500,000 Planning and design activities Brian Ketner
35013.1.4 NC 68 to Airpark East in Greensboro underway, coordinate with U-5974,
35013.2.4 ROW acquisition underway
35013.3.4
C-5609F Oakdale Pedestrian Improvements - Phase 3 - Construct 6/30/23 FY2025 $550,000 Planning and design activities Stephen Robinson
sidewalks between Chimney Court and Jamestown Oaks underway
Drive in Jamestown
EB-5873 Construct sidewalk on SR 1278 (S. College Drive) from SR 6/30/23 FY2025 $225,000 Planning and design activities Stephen Robinson
1300 (E. Green Drive) to SR 1113 (E. Kivett Drive) in High underway
Point
EB-5874 Construct sidewalk on NC 68 (Eastchester Drive) from 6/30/23 FY2025 $435,000 Planning and design activities Stephen Robinson
Johnson Street to SR 1278 (North College Road) in High underway
Point
EB-5889 Construct sidewalk with curb and gutter on SR 1486 (W. 9/20/23 FY 2025 $500,000 Planning and design activities Stephen Robinson
Main Street); SR 1539 (Penny Road) from existing sidewalk underway
on SR 1486 (W. Main Street) to park access on SR 1539
(Penny Road) in Jamestown
U-4758 Improvements to Johnson Street/Sandy Ridge Road from 12/19/23 FY2026 $45,700,000 Planning and Design activities Laura Sutton
40251.2.1 Skeet Club Road to I-40 underway, Public meeting 8/14/18 -
40251.3.1 ROW underway
C-5700 Extend Oakdale Road existing sidewalk from east of E. Main 2/29/24 FY2026 $170,000 Planning and design activities Stephen Robinson
Street to Chimney Court in Jamestown underway
P-5721 Construct extension Norfolk Southern Rail Siding in 6/18/24 FY2027 $4,070,000 Planning and design activities Brad Smythe
Jamestown underway
20 2
Page HPMPO Oct. 2022
NCDOT DIV 7 PROJECTS LOCATED IN HPMPO - UNDER DEVELOPMENT
Estimated
Let/Start
TIP/WBS # Description Completion Cost Status Project Lead
Date
Date
B-5723 Replace Bridge 54 over Richland Creek on SR 1158 11/19/24 FY2026 $3,237,000 Planning and design activities Rob Weisz
45679.1.1 (Jackson Lake Road) underway
45679.1.2
45679 2 1
EB-5922 Construct sidewalk on Eastchester Drive 7/30/25 FY2027 $125,000 Planning and design activities pending Stephen Robinson
EB-5989 Construct sidewalk on Cedrow Drive from west of I-74 to 9/25/26 FY2028 $1,200,000 Planning and design activities pending Stephen Robinson
East of I-74 in High Point
I-5712 Interchange improvements at I-40/US 421 and SR 1850 12/15/26 FY2029 $14,500,000 Planning and Design activities Laura Sutton
50126.1.FS1 (Sandy Ridge Road) in Greensboro. Sandy Ridge Road underway, Coordinate with U-4758 &
50126.2.1 widening to Cider Road U-6045
50126.3.1
U-5974 Upgrade NC 68 to Superstreet from SR 1523 (Hickswood 7/18/28 FY2030 $48,100,000 Planning and design activities Brian Ketner
45962.1.1 Road) to SR 1556 (Gallimore Dairy Road) in High Point underway, coordinate with U-4015A
45962.2.1
45962.3.1
EB-5999 Construct sidewalk on Johnson Street from Parris Avenue to 8/17/28 FY2030 $145,000 Planning and design activities pending Stephen Robinson
SR 1896 (E. Hartley Drive) in High Point
EB-6000 Construct sidewalk on SR 1536 (Penny Road) from City 8/18/28 FY2030 $1,500,000 Planning and design activities pending Stephen Robinson
Lake Park to Piedmont Environmental Center in High Point
U-6121 Widen SR 1541 (Wendover Avenue) from NC 68 11/21/28 FY 2031 $27,300,000 Planning and design activities Brian Ketner
48605.1.1 (Eastchester Drive) in High Point to SR 1541 (Guilford underway
48605.2.1 College Road) in Greensboro.
48605.3.1
EB-6010 Construct sidewalk on US 70 (W. Wendover Ave.) from NC 8/16/29 FY2032 $220,000 Planning and design activities pending Stephen Robinson
68 (Eastchester Drive) to Gibson Park Entrance in High
Point
21 3
Page HPMPO Oct. 2022
North Carolina Department of Transportation 10/7/2022
Active Projects Under Construction - Guilford Co.
Contract TIP Number Location Description Contractor Name Resident Contract Bid Availability Completion Work Start Estimated Progress Completion
Number Engineer Amount Date Date Date Completion Schedule Percent
Date Percent
C203256 U-3615B SR-1820 (SKEET CLUB RD) FROM EAST OF SR-1818 APAC - ATLANTIC INC Hayes, PE, $30,898,017.15 3/2/2015 3/29/2019 5/20/2015 11/30/2022 99.9 90.29
(JOHNSON ST) TO WEST OF NC-68 (EASTCHESTER DR) IN THOMPSON ARTHUR Meredith
HIGH POINT. DIVISION
C204071 U-5169 I-74/US-311 AND NC-68 (EASTCHESTER DR) BRANCH CIVIL INC Snell, PE, $22,481,354.65 7/30/2018 1/28/2021 9/14/2018 11/30/2022 100 91.7
INTERCHANGE IMPROVEMENTS. William H
C204096 U-2525C GREENSBORO EASTERN LOOP FROM US-29 NORTH OF ES WAGNER COMPANY Julian, Jason $120,471,182.82 4/30/2018 11/20/2022 5/7/2018 7/21/2023 92.93 79.52
GREENSBORO TO SR-2303 (LAWNDALE DR). LLC/SMITH-ROWE LL R
C204103 U-2412A SR-1486/SR-4121 (GREENSBORO/HIGH POINT RD) FROM BRANCH CIVIL INC Lorenz, PE, $55,963,119.69 7/30/2018 12/28/2021 9/12/2018 10/20/2023 90.2 89.13
US-311 BYPASS TO WEST OF SR-1480 (VICKREY CHAPEL Kris
RD).
C204150 U-5896 US-29/US-70/I-85 BUSINESS, SR 1009 (S. MAIN ST.) IN HIGH BOGGS CONTRACTING, Lorenz, PE, $25,325,396.73 3/28/2022 2/28/2025 4/23/2022 3/1/2025 18.4 9.63
POINT AND BRIDGE #147 OVER US-311 ON US-29/US-70/I- INC Kris
85 BUSINESS
C204371 U-2581BA US-70 (BURLINGTON RD) FROM WEST OF SR-3045 (MT APAC - ATLANTIC INC Snell, PE, $11,125,538.10 7/1/2020 4/30/2022 7/1/2020 11/1/2022 100 89.59
HOPE CHURCH RD) /SR-2819 (MCLEANSVILLE RD) TO THOMPSON ARTHUR William H
EAST OF SR-2826 (BIRCH CREEK RD) DIVISION
C204499 R-4707 INTERCHANGE OF US 29 AND SR 4771 (REEDY FORK APAC - ATLANTIC INC Hayes, PE, $46,382,713.04 6/2/2021 10/28/2024 6/7/2021 10/28/2024 28 28.81
PARKWAY) THOMPSON ARTHUR Meredith
DIVISION
C204626 RESURFACE 1 SECTION OF NC 87, 1 SECTION OF NC 49 FSC II LLC DBA FRED Lorenz, PE, $4,639,570.37 6/3/2021 11/1/2022 6/28/2021 11/1/2022 88.5 76.15
AND 21 SECTIONS OF SECONDARY ROADS SMITH COMPANY Kris
C204665 U-5754 US-29/US-70/US-220 (O'HENRY BLVD.) FROM I-40/I-85 BUS. BRANCH CIVIL INC Lorenz, PE, $5,144,885.00 3/15/2022 3/14/2023 4/25/2022 3/14/2023 93 46.68
TO SOUTH OF FLORIDA ST. IN GREENSBORO. Kris
C204700 RESURFACE 1 SECTION OF US-158 AND 49 SECTIONS OF VECELLIO & GROGAN INC. Hayes, PE, $5,303,911.30 4/25/2022 7/15/2023 6/30/2022 7/15/2023 15 48.74
SECONDARY ROADS DBA SHARPE BROTHERS Meredith
C204712 B-5717 REPLACE BRIDGES #109 AND #121 OVER SOUTH CONTI CIVIL LLC Cvijetic, PE, $8,270,442.00 10/15/2022 10/28/2025
BUFFALO CREEK ON SR 4240 (EAST GATE CITY BLVD.) IN Bojan
GREENSBORO.
Page 1 of 3
22
North Carolina Department of Transportation 10/7/2022
Active Projects Under Construction - Guilford Co.
Contract TIP Number Location Description Contractor Name Resident Contract Bid Availability Completion Work Start Estimated Progress Completion
Number Engineer Amount Date Date Date Completion Schedule Percent
Date Percent
DG00490 AST TREATMENT OF 26 SECONDARY ROADS IN CAROLINA ROAD Lorenz, PE, $832.311.02 4/1/2021 10/30/2021 4/8/2021 11/30/2022 100 97.46
GUILFORD COUNTY SOLUTIONS LLC Kris
DG00512 RESURFACE 43 VARIOUS STATE ROUTES VECELLIO & GROGAN INC. Hayes, PE, $2,562,749.29 7/1/2021 11/1/2022 7/1/2022 11/1/2022 86 95.41
DBA SHARPE BROTHERS Meredith
DG00513 REPLACE BRIDGE #235 OVER BIG ALAMANCE CREEK ON SMITH-ROWE, LLC Hayes, PE, $1,675,367.75 6/21/2021 10/25/2022
SR 1005 (ALAMANCE CHURCH ROAD) Meredith
DG00515 AST TREATMENT OF 34 SECONDARY ROADS IN WHITEHURST PAVING CO. Lorenz, PE, $749,755.28 7/1/2021 6/30/2021 4/25/2022 11/30/2022 100 86.05
GUILFORD COUNTY INC. Kris
DG00524 R-5787-G INSTALLATION OF ADA COMPLIANT CURB RAMPS AT ATLANTIC CONTRACTING Lorenz, PE, $717,704.25 6/1/2021 4/14/2023 7/26/2021 4/14/2023 94.4 88.14
R-5787-H VARIOUS ROUTES COMPANY, INC. Kris
DG00533 MILLING, RESURFACING AND PAVEMENT MARKINGS ON I- BLYTHE CONSTRUCTION Lorenz, PE, $2,989,292.45 7/8/2021 7/7/2022 9/20/2021 11/30/2022 100 94.63
85 BUS/US 29/US 70, NC 150 AND VARIOUS SECONDARY INC. Kris
ROADS
DG00545 REPLACE PIPE #40 ON SR 2930 (BETHEL CHURCH ROAD) BOGGS CONTRACTING, Cvijetic, PE, $346,396.50 6/16/2022 2/15/2023 7/6/2022 2/28/2023 100 89.14
IN GUILFORD COUNTY INC Bojan
DG00551 R-2413A(L) LANDSCAPE PLANTING ALONG I-73 FROM BRYAN BLVD. COUNTRY BOY Lorenz, PE, $593,953.15 12/20/2021 6/19/2023 3/21/2022 6/19/2023 85.2 85
TO US 220 LANDSCAPING INC. Kris
DG00552 R-2413C(L) LANDSCAPE PLANTING ALONG US 220 FROM I-840 TO NC GOLDSTAR PROJECT Lorenz, PE, $119,464.76 12/20/2021 6/19/2023 3/4/2022 6/19/2023 85.2 73
65 GROUP LLC Kris
DG00558 U-6019 INTERSECTION IMPROVEMENTS AT SR 2334 (AIR ATLANTIC CONTRACTING Hayes, PE, $1,082,298.10 7/11/2022 11/15/2022 8/29/2022
HARBOR ROAD) AT SR 2347 (LAKE BRANDT ROAD) COMPANY, INC. Meredith
DG00564 MILLING, RESURFACING AND PAVEMENT MARKINGS ON APAC - ATLANTIC INC Hayes, PE, $3,519,513.72 4/1/2022 6/30/2023 7/25/2022 6/30/2023 40.5 36.19
59 SECONDARY ROADS IN GUILFORD COUNTY THOMPSON ARTHUR Meredith
DIVISION
Page 2 of 3
23
North Carolina Department of Transportation 10/7/2022
Active Projects Under Construction - Guilford Co.
Contract TIP Number Location Description Contractor Name Resident Contract Bid Availability Completion Work Start Estimated Progress Completion
Number Engineer Amount Date Date Date Completion Schedule Percent
Date Percent
DG00570 REPLACE BRIDGE #85 OVER REEDY FORK ON SR 1858 RE BURNS & SONS CO. Hayes, PE, $1,052,260.20 7/7/2022 4/29/2023 8/1/2022 4/29/2023 10 12.76
(BEESON ROAD) INC. Meredith
DG00572 REPLACE BRIDGE #25 OVER POLE CAT CREEK ON SR RE BURNS & SONS CO. Lorenz, PE, $1,285,359.02
1105 (EAST STEEPLE CHASE ROAD) INC. Kris
DG00573 RESURFACE SR 2335 (TROSPER RD.) AND 25 ADDITIONAL APAC - ATLANTIC INC Hayes, PE, $2,009,092.07 6/1/2022 8/31/2023 7/6/2022 8/31/2023 19.6 25.3
SECONDARY ROADS THOMPSON ARTHUR Meredith
DIVISION
DG00575 R-2413C(L) LANDSCAPE PLANTINGS ON I-785 - FROM US 70 TO US 29 MOTS LANDSCAPING & Cvijetic, PE, $299,543.48 9/1/2022 4/30/2024
LAWNS LLC Bojan
DG00576 AST RETREATMENT ON 50 SECONDARY ROADS IN WAUGH ASPHALT INC. Lorenz, PE, $811,504.54 5/9/2022 6/30/2023
GUILFORD COUNTY Kris
Page 3 of 3
24
Randolph County - High Point MPO - Active Projects - Division 8--October 2022
Contract # or Completion
Route Description Let Date Contractor Project Admin. Project Cost Notes
WBS # or TIP # Date
HI-0002 C204703 I-85 Randolph Co. Pavement Rehab - from I-85/NC 109 in 4/19/2022 10/15/2023 Blythe Cary Fine $13,384,387 Project 32% complete
Thomasville to SR 1009 (South Main St) in Construction Inc. (336) 318-4020
Archdale
Randolph County - High Point MPO - Upcoming Projects - Planning & Design, R/W, or not started - Division 8- October 2022 Revised Draft STIP in RED
Contract # or Completion
Route Description Let Date Contractor Project Admin. Funds Needed Notes
WBS # or TIP # Date
U-3400 SR 1577 / SR 1004 Widening from SR 1567 (Robbins Country 11/18/2025 TBD TBD Jeff Stroder $38,626,000 Right of Way 1/2023 FY 2023
(Archdale Road) Rd) to US 311 (Main Street) in Archdale FY 2026 (910) 773-8034 Public Meeting held 2/27/18
U-5308 SR 1547 (Finch Farm Rd) Widening from south of SR 3106 Kennedy 6/17/2025 TBD TBD Greg Davis $35,462,000 Right of Way in progress
Rd to NC 62 FY 2025 (910) 773-8022 Public Meeting held 3/29/2018
2nd Public Meeting 11/29/18
U-5770 I-85 / SR 1993 Interchange Improvements - construct 4/15/2025 TBD TBD Jeff Stroder $19,193,000 Right of Way in progress
A= resurface (South Main Street) Diverging Diamond Interchange (DDI) and FY 2025 (910) 773-8034 Public Meeting 11/30/17
B= DDI RCI's Newsletter Mailed 6/8/18
U-5864 SR 1595 (Surrett Drive) 3-lane widening from I-85 to SR 1300 (W. 8/15/2028 TBD TBD Greg Davis $33,864,000 Right of Way 6/2024 FY 2026
Fairfield Rd. /Guilford Co.) in Trinity, FY 2029 (910) 773-8022 Public Meeting held 6/13/19
Archdale, and High Point
U-6191 NC 62 Modernize roadway between SR 3252 10/17/2028 TBD TBD Greg Davis $22,800,000 Right of Way 10/2026 FY 2027
(Surrett Dr) in Trinity to SR 1009 (N. Main FY 2029 (910) 773-8022
St) in Archdale
25
First Quarter Deviated Fixed Routes
RED
2023 2022 Difference
July 1,248 1,329 -81
Aug 1,791 1,293 498
Sept 1,659 1,311 348
Total 4,698 3,933 765
GREEN
2023 2022 Difference
July 2,011 1,370 641
Aug 2,421 1,401 1020
Sept 2,087 1,264 823
Total 6,519 4,035 2,484
BLUE
2023 2022 Difference
July 3,705 3,014 691
Aug 4,773 3,726 1047
Sept 4,498 2,604 1894
Total 12,976 9,344 3,632
ORANGE
2023 2022 Difference
July 2,268 1,523 745
Aug 2,322 1,692 630
Sept 2,178 1,697 481
Total 6,768 4,912 1,856
Thomasville Saturday
2023 2021 Difference
July 205 112 93
Aug 134 86 48
Sept 151 45 106
Total 490 243 247
1st QTR
2022 2021 Difference
RED 4,698 3,933 765
GREEN 6,519 4,035 2484
BLUE 12,976 9,344 3632
ORANGE 6,768 4,912 1856
T' ville Saturday 490 243 247
Total 31,451 22,467 8,984
FTA Direct Recipient Project– s ll wai ng on FTA review of our Civil Rights program.
GMV Syncroma cs contract approved and executed. Installa on expected to being in November 2022.
Community Transporta on Service Plan update in beginning stages.
26
Get email alerts for High Point
A daily email when new agendas and minutes are posted.