Muyni
← Back to High Point

HPMPO Technical Coordinating Committee (TCC)

Regular Meeting

High Point, NC · September 20, 2022

Agenda

Agenda

HIGH POINT URBAN AREA MPO TECHNICAL COORDINATING COMMITTEE (TCC) Agenda for the September 20, 2022 TCC Meeting 2:00 PM – Third Floor Conference Room High Point Municipal Building - City Hall 211 S. Hamilton Street, High Point Action Items 1. Consideration of the August 16th TCC meeting minutes. (Greg Venable) Page 1 2. Recommendation to the TAC for the approval of amendments to the 2020-2029 MTIP. (John Hanes) Page 5 3. Recommendation to the TAC for the approval of amendments to the RAISE grant. (Andrew Edmonds) Page 7 4. Recommendation to the TAC for the approval of amendments to the 2020-2029 MTIP to incorporate FY 22 Section 5307 Appropriations (Andrew Edmonds) Page 9 5. Recommendation to the TAC for approval of a resolution supporting the Archdale North Main Street Corridor Study (Andrew Edmonds) Page 14 Information Items 6. Carbon Reduction Program call for projects and development of evaluation criteria (Andrew Edmonds) Page 37 Agency Reports 7. NCDOT Division Reports a. Division 7 (Stephen Robinson) Page 39 b. Division 8 (Bryan Kluchar) Page 44 c. Division 9 (Fred Haith) 8. NCDOT Transportation Planning Branch Report (Michael Abuya) 9. NCDOT Integrated Mobility Division Report (Alex Rottenberry) 10. FHWA Report (Suzette Morales) 11. Public Transportation Reports a. High Point Transit System (Andrew Edmonds) b. Davidson County Transportation (Richard Jones) c. RCATS (Tawanna Williams) d. PART (Mark Kirstner) Page 45 Next TCC Meeting October 18, 2022 TCC Meeting Meeting Date 9/20/2022 Agenda Item No. 1 Action Requested Approve Section Tab Consideration of the August 16th TCC meeting minutes. (Greg Venable) Information Summary Attachments Yes No The complete meeting minutes are in your packet as Attachment 1. TCC Vote: Motion Second By:__________________ By:_______________________ Vote: For_______________________ Against________________________ 1 MINUTES TECHNICAL COORDINATING COMMITTEE August 16, 2022 TCC MEMBERS PRESENT: Stephen Robinson, Bryan Kluchar, Fred Haith, Michael Abuya, Mark Kirstner, Greg Venable, Jason Miller, Sushil Nepal, Chuck George, Stevie Cox TAC MEMBERS PRESENT: Suzette Morales MPO Staff: John Hanes, Andrew Edmonds, Gwen Ford OTHERS PRESENT: Kathy Vollert, Tamara Njegovan, Mike Horney, Matthew Burczyk, Tawana Williams, Zeb Holden, Phillip Craver, James Rottenberry, Andy Bailey, Jeron Monroe RECORDING STAFF: Microsoft Teams Greg Venable called the meeting to order. Sushil Nepal, the new planning and development director for the City of High Point was introduced. Item #3, an amendment to the RAISE grant, was pulled from the agenda. ACTION ITEMS Item 1: Consideration of the June 21st TCC meeting minutes. Motion by: Stevie Cox Seconded by: Jason Miller Vote: For: Unanimous Against: None Item 2: Recommendation to the TAC of amendments to the 2020-2029 MTIP. John Hanes reported that there was one additions to the 2020-2029 MTIP; P-5732 (Lexington Train Station track construction and improvements. There were also numerous modifications to statewide projects in the 2020-2029 MTIP including U-5770 (I-85/South Main Street in Archdale) with construction being programmed under U- 5770A and U-5770B. U-5770A and U-5770B (I-85/South Main Street in Archdale intersection improvements) added a new project break at the request of the division. The following projects also had STIP modifications, EB-5873, EB-5874, HO-0005, P-5731, and B-5731. Motion by: Fred Haith 2 Seconded by: Stephen Robinson Vote: For: Unanimous Against: None Information Items Item 3: STIP Format and P7.0 Schedule Update Greg gave an update on the STIP and P7.0 schedule. TAC and TCC members were emailed a spreadsheet from Van Argabright that updated the P7.0 schedule as well as project list and funding. Some addition revenue allocations were reflected in the most recent update. Stephen Robinson gave an overview of the updated funding for the projects and updated project spreadsheet. The project swap deadline is March 2023 with STIP approval by the NCDOT Board in May 2023. Agency Reports Item 4: NCDOT Division Reports Division 7 Stephen Robinson reported on HS-2007D (I-74 at US 29-70) planning and design activities are underway. HS-2007E (NC 62) life-long pavement markings are also in the planning and design activities phase. Division 8 Bryan Kluchar reported new revised draft STIP dates are in red and no changes to the project update. There will be roundabouts on Finch Farm Road at the interchange and to the south. Jeron Monroe added that a signalized intersection would likely be installed at the Finch Farm Road/NC 62 intersection. Division 9 Fred Haith reported that there was nothing to add from what was in the report in the packet. Item 5: NCDOT Transportation Planning Branch Report Michael Abuya reported that Alena Cook is now head of the NCDOT Transportation Planning Division. Item 6: FHWA Report 3 Suzette Morales reported on discretionary grants with upcoming deadlines. Grants discussed were Safe Streets for All (MPO and local governments), National Electric Vehicle Infrastructure (NEVI), and Bridge Formula Program (BFP), and Bridge Investment Program (BIP). Item 7: Public Transportation Reports High Point Transit System Andrew Edmonds had nothing to report. Davidson County Transportation Richard Jones was not in attendance. RCATS Tawanna Williams had nothing to report. PART Mark Kirstner discussed the Household Travel Survey which will be implemented in the fall. The tour based freight model should be available for the upcoming base year update. The scenario planning tool will be used next year to determine socio-economic data. NCDOT Itegrated Mobility Division Alex Rottenberry discussed the Integrated Mobility Division’s 2nd quarter webinar is available to view. The webinar and slides are available online. Item 8: Meeting Adjourned. Motion by: Stephen Robinson Seconded: Fred Haith Vote: For: Unanimous Against: None 4 TCC Meeting Meeting Date 9/20/2022 Agenda Item No. 2 Action Requested Recommendation Section Tab Recommendation to the TAC for approval of amendments to the 2020-2029 MTIP. (John Hanes) Information Summary Attachments Yes No The proposed amendments to the 2020-2029 MTIP for the High Point MPO are included in your packet. Staff is recommending approval of the MTIP amendments. TCC Vote: Motion Second By:__________________ By:_______________________ Vote: For_______________________ Against________________________ 5 High Point RESOLUTION Archdale AMENDING THE 2020-2029 HIGH POINT METROPOLITAN TRANSPORTATION IMPROVEMENT PROGRAM WHEREAS, the Transportation Advisory Committee has reviewed the 2020-2029 Denton Metropolitan Transportation Improvement Program and found an amendment is necessary; and Jamestown WHEREAS, the following amendments have been proposed: Lexington Thomasville Trinity NOW THEREFORE, be it resolved by the Transportation Advisory Committee for the High Point Metropolitan Planning Organization that the 2020-2029 Metropolitan Wallburg Transportation Improvement Program be amended as listed above on this the 27th day of September 2022. Davidson A motion was made by TAC Member ______________and seconded by TAC County member _______________ and approved this the 27th day of September 2022. _________________________ Forsyth Martha Wolfe, County Chair, Transportation Advisory Committee Guilford County Subscribed and sworn to me this the 27th day of September 2022. ______________________________________ Randolph Notary Public County My commission expires ______________________ 6 TCC Meeting Meeting Date 9/20/2022 Agenda Item No. 3 Action Requested Recommendation Section Tab Recommendation to the TAC for the approval of amendments to the 2020-2029 MTIP to incorporate High Point’s RAISE Grant (Andrew Edmonds) Information Summary Attachments Yes No This is a request by the City of High Point to amend the 2020-2029 MTIP to include funding for the RAISE project in High Point. Staff is recommending approval of the MTIP amendment. TCC Vote: Motion Second By:__________________ By:_______________________ Vote: For_______________________ Against________________________ 7 High Point RESOLUTION Archdale AMENDING THE 2020-2029 HIGH POINT METROPOLITAN TRANSPORTATION IMPROVEMENT PROGRAM WHEREAS, the Transportation Advisory Committee has reviewed the 2020-2029 Denton Metropolitan Transportation Improvement Program and found an amendment is necessary; and Jamestown WHEREAS, the following amendments have been proposed: BL-0071 – High Point – Sunset Drive to Harvell Park and Goldston Park – Lexington Construct pedestrian, bicycle, roadway, and streetscape improvements from Sunset Drive to Harvell Park and Goldston Park A – High Point – Sunset Drive to Harvell Park and Goldston Park Thomasville PE FY 2023 - $5,000,000 (DP) ROW FY 2023 - $2,000,000 (DP) BA – Southwest Heritage Greenway – Sunset Drive to Harvell Park and Trinity Goldston Park CON FY 2024 - $6,626,073 (DP) FY 2024 - $1,000,000 (L) BB – Elm Street – Sunset Drive to Commerce Avenue Wallburg CON FY 2024 - $6,175,180 (DP) FY 2024 - $1,500,000 (DP) FY 2024 - $6,187,836 (L) Davidson County NOW THEREFORE, be it resolved by the Transportation Advisory Committee for the High Point Metropolitan Planning Organization that the 2020-2029 Metropolitan Forsyth Transportation Improvement Program be amended as listed above on this the 27th day of County September 2022. A motion was made by TAC Member ______________and seconded by TAC Guilford member _______________ and approved this the 27th day of September 2022. County _________________________ Martha Wolfe, Chair, Transportation Advisory Committee Randolph County Subscribed and sworn to me this the 27th day of September 2022. ______________________________________ Notary Public My commission expires ______________________ 8 TCC Meeting Meeting Date 9/20/2022 Agenda Item No. 4 Action Requested Recommendation Section Tab Recommendation to the TAC for the approval of amendments to the 2020-2029 MTIP to incorporate FY 22 Section 5307 Appropriations (Andrew Edmonds) Information Summary Attachments Yes No This is a request by PART to amend the 2020-2029 MTIP to incorporate allocation amounts of Section 5307 GA funds. The FY2022 Federal Apportionments have been released by Congress, and the High Point MPO/NCDOT adopted an allocation of the FTA Section 5307 GA funds to the PART agency ($900,000). With the federal formula apportionment funds being updated on an annual basis, the amount of funds applicable to the PART agency are being updated to align the Federal Funding with the Metropolitan and State Transportation Improvement Program for an upcoming FTA grant. TCC Vote: Motion Second By:__________________ By:_______________________ Vote: For_______________________ Against________________________ 9 STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION ROY COOPER J. ERIC BOYETTE GOVERNOR SECRETARY July 12, 2022 Dr. Yvette G. Taylor Regional Administrator, Region IV Federal Transit Administration 230 Peachtree Street, NW, Suite 1400 Atlanta, Georgia 30303 Subject: NCDOT FFY2022 5307 SMALL URBANIZEZD AREA SPLIT LETTER Dear Dr. Taylor: Please accept North Carolina’s split letter for the FFY22 Section 5307 Governor’s Apportionment to the following Direct and transitioning Direct Recipients in the small urbanized areas described in the table below. This table identifies the maximum amount of Section 5307 funds available to each transit system to support operating, capital, and planning activities. (Pub. L. 117-103, Mar. 15, 2022). MPO / UZA Recipient FFY2022 Funding Amount Burlington, 372630 City of Burlington $1,722,564 NCDOT/(Transitioning) Alamance $845,031 NCDOT/(Transitioning) Orange $162,506 PART $520,019 Gastonia, 371900 City of Gastonia $2,957,028 Goldsboro, 373310 City of Goldsboro $1,062,497 Greenville, 373410 City of Greenville $2,425,699 High Point, 371920 City of High Point $2,884,618 NCDOT/(Transitioning) Guilford $100,000 NCDOT/(Transitioning) Davidson $300,000 PART $900,000 Jacksonville, 373440 City of Jacksonville $1,935,190 New Bern, 378400 Craven County $855,460 Rocky Mount, 373420 City of Rocky Mount $2,356,308 Totals $19,026,920 Mailing Address: Telephone: 919-707-4670 Location: NC DEPARTMENT OF TRANSPORTATION Fax: 919-733-1391 1 SOUTH WILMINGTON STREET INTEGRATED MOBILITY DIVISION Customer Service: 1-877-368-4968 RALEIGH, NC 27601 1550 MAIL SERVICE CENTER RALEIGH, NC 27699-1550 Website: ncdot.gov 10 North Carolina DOT, as Designated Recipient, authorizes the allocation of Section 5307 funds to the Direct and transitioning Direct Recipients, named herein. The undersigned agree to the Split Letter and the amounts allocated to each recipient. Each Direct Recipient is responsible for its application to the Federal Transit Administration to receive Section 5307 funds and assumes the responsibilities associated with any award for these funds. Please address any questions with Pamela M. DiGiovanni, pmdigiovanni@ncdot.gov Sincerely, Ryan Brumfield Director, Integrated Mobility Division cc: Pam DiGiovanni, NCDOT Jennifer Hibbert, NCDOT Myra Freeman, NCDOT Robert Buckley, FTA, Region IV Holly Liles, FTA, Region IV Page 2 of 2 11 High Point RESOLUTION Archdale AMENDING THE 2020-2029 HIGH POINT METROPOLITAN TRANSPORTATION IMPROVEMENT PROGRAM WHEREAS, the Transportation Advisory Committee has reviewed the 2020-2029 Denton Metropolitan Transportation Improvement Program and found an amendment is necessary; and Jamestown WHEREAS, the following amendments have been proposed: Lexington FY23 FY24 FY25 FY26 FY27 FY28 FY29 STIP # Transit Partner DESCRIPTION match FUND (000) (000) (000) (000) (000) (000) (000) Piedmont FUZ 5307 750 750 750 750 750 750 750 Thomasville TO- Authority for Operating 5134C Regional Assistance Transportation Local L 750 750 750 750 750 750 750 Trinity FY23 FY24 FY25 FY26 FY27 FY28 FY29 STIP # Transit Partner DESCRIPTION match FUND (000) (000) (000) (000) (000) (000) (000) Wallburg Routine Capital / Piedmont Preventative FUZ 5307 150 150 150 150 150 150 150 TG- Authority for Maintenance / 6173B Regional Passenger Davidson Transportation Amenities/ Mobility County 37 37 37 37 37 37 37 Management Local L Forsyth County NOW THEREFORE, be it resolved by the Transportation Advisory Committee for the High Point Metropolitan Planning Organization that the 2020-2029 Metropolitan Transportation Improvement Program be amended as listed above on this the 27th day of September 2022. Guilford County A motion was made by TAC Member ______________and seconded by TAC member _______________ and approved this the 27th day of September 2022. Randolph County _________________________ Martha Wolfe, Chair, Transportation Advisory Committee 12 Subscribed and sworn to me this the 27th day of September 2022. ______________________________________ Notary Public My commission expires ______________________ 13 TCC Meeting Meeting Date 9/20/2022 Agenda Item No. 5 Action Requested Recommendation Section Tab Recommendation to the TAC for approval of a resolution supporting the Archdale N Main Street Corridor Study (Andrew Edmonds) Information Summary Attachments Yes No The City of Archdale requested Special Studies funds to complete a study of North Main Street. The City of Archdale in conjunction with NCDOT and HPMPO hired Kimley Horn to complete a road diet concept study based on traffic forecasts, operations analysis, intersection improvements, and community input. A summary of the final report has been provided in your packet. City of Archdale staff are requesting a resolution of endorsement for the recommendations created from this study. A copy of the resolution has been provided in your packet as well. TCC Vote: Motion Second By:__________________ By:_______________________ Vote: For_______________________ Against________________________ 14 North Main Street Corridor Study Archdale, NC Summary Report 15 Acknowledgments Thank you to the continued support of the Mayor, City Council, and City staff to enhance the quality of life for Archdale’s residents. City Staff ♦ Zeb Holden, AICP, CZO – City Manager ♦ Jason Miller, PhD, AICP ­– Planning Director ♦ Matthew Wells – Planning Administrator ♦ Andrew Edmonds – High Point MPO ii 16 Contents Foundation.......................................................................................1 Introduction................................................................................................................................ 1 Guiding Principles................................................................................................................... 2 Study Area. ............................................................................................................................... 3 Existing Context....................................................................................................................... 4 Vision. ..............................................................................................7 Introduction................................................................................................................................7 Corridor Improvements......................................................................................................... 8 Pedestrian Improvements...................................................................................................10 Corridor Vision........................................................................................................................ 13 Action Plan . ................................................................................. 15 Introduction..............................................................................................................................15 Action Plan...............................................................................................................................16 Appendix....................................................................................... 17 iii 17 North Main Street today 18 Chapter 1 Foundation Introduction Every city has unique places that require special treatment. These special places may be retail corridors, historic districts, or beautiful neighborhoods that encourage a sense of place and community ownership. In the case of Archdale, there is a desire to transform and create a place that introduces these principles. To do so, the City and it’s residents have identified the transformation of North Main Street as a critical element in achieving the creation of a new downtown and the revitalization of North Main Street from a suburban highway strip commercial development pattern into an urban commercial district catalyzed by a transformative reallocation of space. The North Main Street Corridor Study explores the feasibility and recommendations needed for successfully reallocating space along the corridor to help the City achieve the goals set forth in Plan Archdale. The North Main Street Corridor Study builds on the strong foundation set in Plan Archdale by building on the plan’s goals, robust community engagement, and implementation framework. North Main Street Road Diet Concepts from Plan Archdale 1 19 Guiding Principles The North Main Street Corridor Study was guided by the four primary goals of Plan Archdale, as well as the principles outlined in the Main Street Mixed Use and City Center land use classifications. The re-purposing of space along North Main Street plays a critical role in the City’s ability to reach each of these goals and has the potential to serve as a catalyst project in realizing the character and principles of the future land use vision. Transforming North Main Street will play a critical role in the creation of a new Creating a More downtown and commercial center for the City. The reconfiguration of the Livable and Inclusive roadway will allow the community to feel reconnected and encourage residents Community to spend time connecting with each other and their City in a way that hasn’t been experienced before. North Main Street already serves as a commercial corridor for the City; however, intentionally refocusing it to be a community activity and social hub will invite Building a Strong, a variety of retail, dining, and entertainment opportunities to further diversify Diverse, and the City’s tax base and local employment opportunities. The public investment Resilient Economy in North Main Street could prove a critical component of business recruitment, reinvestment, and retention. Implementation of the principles housed within the Main Street Mixed Use and Managing Growth City Center land use typology, coupled with the reallocation of space on North in a Vibrant and Main Street can move the needle on influencing the form and function of the built Dynamic City environment in the City’s core. These items will help attract a range of housing options and improve economic development prospects along the corridor. The transformation of North Main Street has great potential in ensuring that the City can foster a strong sense of place and create a new focal point for the Fostering a Sense of community. The North Main Street Corridor Study sets the stage for the City to Place enhance the aesthetic quality of the corridor and enhance the user experience – whether in a car, on a bicycle, or on foot – and better position the corridor to receive investment. 2 20 Study Area The North Main Street Corridor Study focused evaluation on the segment between Archdale Road and Columbus Avenue. North Main Street’s intersection with Highway 62 (Trindale/Liberty Road) is at the heart of Archdale and is envisioned to serve as the City’s future downtown. The south end of the corridor ties into the interchange with I-85, which is slated to be reconfigured by NCDOT beginning in 2025. 3 21 Existing Context Today the North Main Street corridor can be characterized as a car focused “strip commercial” district, with large setbacks and parking fronting the street of the small format parcels. The road itself is characterized by wide lanes, overhead powerlines and large commercial signs that dominate the view. A lack of wayfinding, gateway features, or consistent landscaping standards leaves the corridor without a unique identity. The uncontrolled access at driveways and intersections create many conflict points throughout the corridor. Pedestrian facilities are inconsistent along the length of the corridor, making the road feel unwelcoming to all but those passing through in cars. North Main Street commercial development and sidewalk gaps North Main Street intermittent sidewalk Liberty/Trindale Road intersection North Main Street five-lane corridor cross-section 4 22 Safety Crash data from the last 5-years (from August 1, 2016 to July 31, 2021) was analyzed as a part of the North main Street Corridor Study. During the 5-year window a total of 163 crashes were reported, none of which were fatal. While no fatal crashes occurred during the analysis period, there were 53 non-fatal injury crashes, which is still lower than the critical crash rate. The table below outlines the crash rates along the corridor against those at the statewide level for other similar corridors. While the crash severity isn’t notable, a pattern of angle/left turn crashes at the intersection of North Main Street with Trindale/Liberty Road was noted. Crashes of this nature were most often attributed to southbound through vehicles running a red light. Within the 5-year analysis period, there was one pedestrian crash at the intersection of Baker Road. The vehicle was making a right turn and struck a pedestrian crossing the north leg of the intersection. The full safety analysis can be found in the Appendix. Traffic The North Main Street Corridor Study evaluated traffic operations for North Main Street between Archdale Road and Columbus Avenue. Analysis of the corridor explored the impacts of a road diet from the existing five- lane cross-section to an urban three-lane section with a center two-way left turn lane and intermittent medians. Traffic along the corridor was analyzed for the existing year (2021), interim year (2025), and design year (2045). Due to the declining historic traffic volumes along the corridor, two scenarios were explored – one which assumed a 0.5% growth rate, and one that assumed a 0.0% growth rate. Capacity analysis were performed in accordance with NCDOT Congestion Management Capacity Analysis Guidelines, and included the following intersections: ♦ North Main Street at Archdale Road ♦ North Main Street at Petty Street/Baker Road ♦ North Main Street at Trindale Road/Liberty Road ♦ North Main Street at White Drive ♦ North Main Street at Plummer Drive ♦ North Main Street at Misty Lane/Julian Avenue ♦ North Main Street at Columbus Avenue Under each analysis scenario, the study intersections are projected to operate at an acceptable level-of-service in the interim and future build conditions. Full traffic analysis can be found in the Appendix. 5 23 Art in Creekside Park 6 24 Chapter 2 Vision Introduction This chapter outlines the vision for a transformed North Main Street that builds on the robust community engagement conducted during the Plan Archdale Placemaking Workshops and a technical evaluation of existing and future traffic and crash history. The vision of the community combined with the quantitative analysis resulted in a series of recommendations that will catalyze the reimagining of North Main Street and creation of a new downtown. This transformation is primarily realized through the reallocation of space from cars to better prioritize safety, people, and foster the opportunity for a unique sense of place that Archdale residents are proud to call their own. The recommendations in this section focus on the reallocation of space, access management, and enhancing the pedestrian realm. Each element is critical to support the full vision of North Main Street as a bustling hub of activity that prioritizes pedestrian movement and showcases an attractive streetscape. 7 25 Corridor Improvements Road Diet Five-lane, undivided highways experience a variety of different crash types and safety concerns as volume and speeds are often high. North Main Street is a strong candidate for a road diet as the traffic volumes have been generally decreasing since the completion of I-74, which provides an alternative parallel route. Additionally, Archdale Road is slated to be widened to a multi-lane facility by NCDOT and will provide an additional parallel facility to the west. The North main Street Corridor Study recommends the reduction of the street cross-section from it’s existing five lane configuration to a variable two- to three-lane configuration with the provision of on-street parking. Traffic capacity analysis conducted as a part of the study demonstrates that the corridor operates at an acceptable level-of-service through the study year of 2045 with the reduced number of travel lanes. The key elements of the proposed road diet are better separation of movements and modes, simplified movements, and slower travel speeds. ♦ Separation. The proposed road diet provides a greater degree of separation for through traffic and turning vehicles through the intentionally located medians and turn lanes. The reallocation of space from cars to people, allows for a greater buffer between pedestrians and vehicular traffic, increasing safety and introducing the opportunity for an enhanced streetscape. ♦ Simplicity. The proposed road diet simplifies the movement of vehicles through the corridor and reduces the number of conflict points. The separation provided by the median locations channelizes turning vehicles and creates a more predictable travel pattern. The road diet also reduces the overall width of the roadway, creating shorter crossing distances and making it more intuitive for pedestrians. ♦ Slower. The narrowing of the roadway and reduction of travel lanes sets the stage for slower travel speeds. Removal of a travel lane in each direction removes the opportunity for high speed passing, and the introduction of street trees and other elements will provide natural traffic calming. Access Management Access management refers to the use of medians, turn restricts, driveway consolidation, and other traffic control techniques to restrict or control traffic access to certain locations. This typically results in smoother traffic operations and increased safety, particularly along busy corridors. Raised medians may be used to keep motorists from turning left across lanes of traffic or from blocking the flow of traffic while waiting to turn. Driveway consolidation is another popular tactic that minimizes driveway intrusions on a busy corridor, limiting the conflicts caused by motorists trying to turn. In each case, full access can be preserved to local businesses and destinations, but traffic patterns may be shifted from what is familiar to drivers. 8 26 On-Street Parking As the City Center begins to develop and the character and form described in Plan Archdale comes to fruition, a need for on-street parking may arise. On-street parking is preferred to large off-street surface lots as it supports higher efficiency and turnover rates, better use of valuable land along the corridor, and provides for natural traffic calming by causing friction and reducing through vehicle travel speeds. NORTH MAIN STREET TYPICAL CROSS-SECTION TODAY NORTH MAIN STREET TYPICAL CROSS-SECTION PROPOSED 9 27 Pedestrian Improvements Safe Pedestrian Crossings MARKED CROSSWALKS There are many different styles of crosswalk striping, with some more effective than others for certain applications. Ladder and continental striping patters are generally used where visibility to drivers is the fundamental concern. Decorative crosswalks with textured pavement or high visibility striping can also be used to draw attention to high traffic pedestrian areas. In addition to pavement markings, crosswalks may include signals or beacons, warning signs, raised platforms, curb bump-outs, and pedestrian countdown signals. All of these elements communicate to drivers that pedestrians may be present and a combination of elements can be applied to increase yielding behavior at intersections or midblock crossings where pedestrian visibility is a particular concern. Additionally, the presence of marked crosswalks guides pedestrians to cross at specific location, improving safety while encouraging predictable behavior. BULB-OUTS A bulb-out or curb extension is typically installed at an intersection or mid-block key pedestrian crossing point. Typically, the road is narrowed at the corner of an intersection by extending the sidewalk or pedestrian platform into the roadway. This makes pedestrians planning to cross more visible to motorists, reduces pedestrian crossing distance, and forces reduced vehicle turning speeds by decreasing the turning radius. Raised bulb-outs are often used on streets with on-street parking to clearly demarcate allowable parking areas and distinguish crossing locations for pedestrians. Aesthetic improvements like raised or decorative crosswalks and landscape planting can be used in combination with raised bulb-outs to provide a safe and highly-visible pedestrian area, distinct from any vehicle facilities that may be adjacent. Bulb-outs at the intersection of Trindale/Liberty Road and North Main Street are recommended as the concept of a city center is realized and pedestrian volumes increase. 10 28 DRIVEWAY MODIFICATIONS From the perspective of the sidewalk user, driveways can significantly impact the pedestrian realm experience. Ideally, the pedestrian through zone area of the sidewalk should remain straight across the driveway with no change in cross-slope. Driveways should not be excessively wide, as pedestrians are vulnerable each time they cross a driveway. Where possible, driveways should be consolidated, and curb radii should remain small to show entering and exiting vehicles. Driveway modifications can be provided as a part of the roadway construction, but may also be improved incrementally as properties along North Main Street redevelop. When possible, driveways may also be shifted to provide access on the side street rather than directly on North Main Street. LEADING PEDESTRIAN INTERVALS AND RIGHT TURN ON RED RESTRICTIONS Increasing pedestrian visibility is an essential design tactic that can vastly improve pedestrian safety and reduce pedestrian-vehicle conflict. At signalized intersections, a leading pedestrian interval allows pedestrians a 3-5 second head start prior to the light turning green for vehicles. Thus, before cars begin to cross or make turning movements, pedestrians are already in the crosswalk and are much more visible to drivers. Right turn on red (RTOR) may be restricted at intersections where high pedestrian traffic is expected, or where visibility is limited, as it reduces conflict between crossing pedestrians and turning cars. RTOR restrictions are generally low cost to implement and involve only the addition of new signage at an existing signalized intersection. When used in conjunction with a leading pedestrian interval, a right turn on red restriction allows for pedestrians to be visible and present in the crossing area during their appropriate signal phase and improves safety by reducing pedestrian-vehicle crossing conflicts. Right turn on red restrictions could have prevented the pedestrian crash that occurred at the intersection of North Main Street and Baker Road. 11 29 Enhanced Pedestrian Comfort and Public Realm PEDESTRIAN SCALE LIGHTING Pedestrian-scale street lighting provides safety, pedestrian comfort, and improved aesthetics to create a sense of place. Pedestrian lighting is crucial in ensuring pedestrians feel safe, meaning they will use the corridor frequently, contributing to the area’s overall economic vibrancy. Additionally, pedestrian lighting improves, facilitates, and encourages pedestrian traffic generally by facilitating a welcoming and safe-feeling corridor. Pedestrian lighting should be provided at regular intervals along the entire main street mixed use district, and should be chosen to support the overall urban design and aesthetic of the transformed North Main Street. SHADE In warm climates such as the City of Archdale, temperatures are a challenge to walkability. Providing shade along sidewalks creates a visually attractive environment that encourages walking and greatly increases comfort during summer months. Trees, landscaping, business awnings, or even public art installations can help provide shade along the length of a corridor as well as points of visual interest. The combination of these shade providers with seating and other amenities can create shelter from rain, intimate gathering spaces, and provide lasting environmental benefit. GREEN INFRASTRUCTURE Green infrastructure uses natural process to properly capture, store and filter stormwater. These elements are easily integrated into curbside landscaping elements, and help to improve the City’s stormwater management system overall, as well as provide vegetative greenery and improved aesthetics along North Main Street. Bioswales and stormwater trees provide landscaping opportunities along with functional capabilities to filter and manage excess water. The City can implement green infrastructure in the curb bump outs at intersections, and explore ways to integrate stormwater trees along the corridor. 12 30 Corridor Vision The North Main Street Corridor Study collected and analyzed data to determine potential corridor enhancements that would improve mobility, safety, and aesthetics in preparation for redevelopment and to serve as a catalyst for a new downvand main street mixed use district. It is important to note that a complete reconstruction of the corridor is not required to reach the goals outlined in Plan Archdale. Many of the strategies outlined in this chapter can be advanced incrementally as redevelopment occurs or opportunistically as funds become available. Improvements such as crosswalk striping, landscaping, and wayfinding are low-cost, near-term improvements that will have an immediate impact on the North Main Street experience. 13 31 14 32 Chapter 3 Action Plan Introduction The North Main Street Corridor Study process was structured in a way that took a step beyond the visionary outlook of Plan Archdale to move closer to implementation. The actions need a framework to spur investment that leads to change over time. The plan also needs to be flexible and allow staff and decision makers the ability to change course and capitalize on new opportunities as they arise. Ultimately, both public and private investment of time and dollars will be needed to achieve the desired vision for the corridor design, economic diversity, and mobility solutions. The action plan that follows sets the stage for the next steps for the City in transforming North Main Street, including pursuing funding sources to initiating preliminary engineering and design. Each step will identify the anticipated cost and offer insight into which partners need to lead or be involved in specific tasks. 15 33 Action Plan ACTION COST PARTICIPATION Amend the High Point MPO’s Metropolitan Lead: HPMPO Transportation Plan to include the North Main Street $ Support: City of Archdale project from Archdale Road to Columbus Avenue. Lead: HPMPO Submit the project to NCDOT for evaluation in the STI $ Support: City of Archdale process. Support: NCDOT Evaluate and consider applying for the North Carolina Rural Transformation Grant Fund for the Strategic $ Lead: City of Archdale Planning and Implementation of Local Projects category. Evaluate and consider applying for a RAISE Lead: City of Archdale Discretionary Grant. RAISE grants require the $$ Support: High Point MPO completion of a Benefit-Cost Analysis, which may require consultant support. Support: Consultant Move forward with securing local funds for design Lead: City of Archdale $$$ and permitting (est. $650,000) Support: High Point MPO As development/redevelopment occurs coordinate Lead: City of Archdale $ the consolidation and closure of driveways Support: NCDOT Consider amending the UDO to promote access from the secondary frontage instead of along North Main $ Lead: City of Archdale Street. Consider the advantages/disadvantages of moving the overhead utilities underground throughout the $$$ Lead: City of Archdale corridor to improve aesthetic and resiliency. Move forward with securing local funds to match construction costs should a grant application be $$$ Lead: City of Archdale successful (10-20% depending on funding source) Consider the creation of a Small Town Character Overlay District as a part of the UDO update to encourage development and redevelopment that $ Lead: City of Archdale reflect traditional character. Example UDO language can be found at https://www.apexnc.org/614/Small- Town-Character-Overlay-District 16 34 Appendix Archdale Corridor Study Report and Traffic Appendix Archdale N. Main Street Concept Design Archdale N. Main Street Opinion of Probable Cost 17 35 RESOLUTION High Point ENDORSING THE ARCHDALE NORTH MAIN CORRIDOR STUDY Archdale WHEREAS, High Point Planning Organization receives an allocation of Metropolitan Planning Funds (PL funds) provided from Federal Highway Trust Fund to carryout transportation planning activities; and, Denton WHEREAS, High Point Metropolitan Planning Organization develops or supports Special Studies projects that align with regional transportation needs and goals; and, WHEREAS, High Point Metropolitan Planning Organization serves as a funding Jamestown partner for local jurisdictions to develop or support special emphasis projects or studies; and, Lexington WHEREAS, The City of Archdale requested Special Studies funds to complete a study of a road diet concept of North Main Street based on traffic forecasts, operations analysis, intersection improvements, and community input; and, Thomasville WHEREAS, The City of Archdale in conjunction with the North Carolina Department of Transportation and the High Point Metropolitan Planning Organization hired Kimley Horn to complete the study of the North Main Corridor to Trinity inform transportation and land use decisions; NOW THEREFORE, BE IT RESOLVED, that the High Point Urban Area Metropolitan Planning Organization's Transportation Advisory Committee (TAC) Wallburg does hereby express its support of the North Main Street Corridor Study to serve as a guide and reference for transportation planning within the Archdale city limits and zoning jurisdictions. Davidson County A motion was made by TAC member ______________and seconded by TAC member _______________ and approved this the 27th day of September 2022. Forsyth _________________________ County Marth Wolfe Chair, Transportation Advisory Committee Guilford County Subscribed and sworn to me this the 27th day of September 2022. ______________________________________ Randolph Notary Public County My commission expires ______________________ 36 TCC Meeting Meeting Date 9/20/2022 Agenda Item No. 6 Action Requested Information Section Tab Carbon Reduction Program call for projects and development of evaluation criteria (Andrew Edmonds) Information Summary Attachments Yes No On November 15, 2021, President Biden signed the Bipartisan Infrastructure Law (BIL) into law. The BIL authorizes a new Carbon Reduction Program (CRP) to reduce transportation emissions. For Federal FY22, the High Point Urban Area MPO will receive the allocation of $372,874 in federal fund by way of CRP. The federal share for CRP funded projects is 80% and will require a 20% non-federal match for projects. High Point Urban Area MPO is a non-TMA area and must consult with NCDOT on which projects are selected to ensure eligibility. CRP funds can be used for a wide range of projects that reduce emissions. Eligible activities as identified in the statue are as follows: traffic management, truck stop electrification, public transportation, transportation alternatives, advanced transportation and congestion management technologies, intelligent transportation systems, development of a carbon reduction strategy, travel demand management, efforts to reduce the impacts of freight movement, deployment of alternative fuel vehicle, diesel engine retrofits, traffic flow improvements that do not involve construction of new capacity; and projects that reduce transportation emissions at port facilities. Other projects may be eligible with demonstration of emissions reductions. All projects selected must follow Title 23 requirements. More information about these funds and project selection will be provided at the meeting. TCC Vote: Motion Second By:__________________ By:_______________________ Vote: For_______________________ Against________________________ 37 TCC Meeting Meeting Date 9/20/2022 Agenda Item No. 7-11 Action Requested Information Section Tab MPO Reports Information Summary Attachments Yes No Agenda Item 7 Division Reports Agenda Item 8 NCDOT Transportation Planning Division Report Agenda Item 9 NCDOT Integrated Mobility Division Report Agenda Item 10 FHWA Report Agenda Item 11 Public Transportation Reports TCC Vote: Motion Second By:__________________ By:_______________________ Vote: For_______________________ Against________________________ 38 NCDOT DIV 7 PROJECTS LOCATED IN HPMPO - UNDER DEVELOPMENT Estimated TIP/WBS # Description Let/Start Date Completion Cost Status Project Lead Date EB-5519 Lydia greenway trail from Jamestown municipal building to Jul. 2019 10/31/22 $1,198,415 LAP, Under Construction, Contract Donnie Huffines 50035.3.1 York Leigh Road (Non-System) in Jamestown Administered by Town of Jamestown - Punchlist Items Underway SS-4907CN Install All-Way Stop with flasher and radius improvements on Dec. 2019 8/31/22 $90,000 Radius improvements completed, Dawn McPherson 48759.1.2 SR 1113 (Kivett Drive) at SR 1145 (Riverdale Drive) east of Traffic materials pending acquisition - Derek Dixon 48759.2.1 High Point Materials have been ordered - 48759.3.1 Construction underway - Pavement markings and sign installation expected by 9/30/22 SS-4907CF Install traffic signal with pedestrian count down heads at the Mar. 2022 11/30/22 $120,000 Signal plans not complete, MA w/City of Dawn McPherson 48252.1.1 intersection of SR 1278 (University Parkway) and Davis 9/30/22 High Point executed. Poles arrived 48252.2.1 Avenue (non-system) in High Point. Traffic signal to be 8/23/2021. Construction underway - 48252.3.1 supported by metal strain poles. Poles have been installed and pavement markings and final signs remain to be completed - Waiting on materials SS-6607AC Installation of 2 lines of trailing approach bridge guardrail at Jan. 2023 Jun. 2023 $33,000 Planning and design activities Bobby Norris 49824.1.1 Bridge #400196 on SR 1193 (Baker Road) over US 29-70 in Jul. 2022 Sep. 2022 underway 49824.2.1 High Point. 49824.3.1 SS-6007P Bridge #57 on SR 1113 (Kivett Drive) over Reddick's Creek - Jan. 2023 Jun. 2023 $36,000 Planning and design activities Bobby Norris 49423.1.1 Install bridge approach guardrail with MASH compliant end 9/1/22 12/31/22 underway 49423.3.1 units HS-2007D I-74 at I-74 and US 29-70 (I-85 Business) Interchange. 3/16/23 10/31/23 $500,000 Planning and design activities Dawn McPherson 49317.1.5 Upgrade traffic signals, signing, and pavement markings at underway 49317.2.5 intersections within the interchange. 49317.3.5 HS-2007E Installation of life-long pavement markings on NC 62 3/16/23 10/31/23 $715,000 Planning and design activities Dawn McPherson 49317.1.6 underway 49317.2.6 49317.3.6 39 Page 1 HPMPO Sep. 2022 NCDOT DIV 7 PROJECTS LOCATED IN HPMPO - UNDER DEVELOPMENT Estimated TIP/WBS # Description Let/Start Date Completion Cost Status Project Lead Date U-6018 Improve interchange at NC 62 and I-85 and realign 4/18/23 FY2026 $12,300,000 Planning and design activities Rob Weisz 47163.1.1 intersections along NC62 at SR 1154 (Kersey Valley Road) underway, ROW acquisition underway 47163.2.1 and SR 1162 (Weant Road) in Archdale 47163.3.1 U-4015A Widen SR 1556 (Gallimore Dairy Road) to multilanes from NC 5/16/23 FY2025 $11,500,000 Planning and design activities Brian Ketner 35013.1.4 68 to Airpark East in Greensboro underway, coordinate with U-5974, 35013.2.4 ROW acquisition underway 35013.3.4 U-4758 Improvements to Johnson Street/Sandy Ridge Road from 12/19/23 FY2026 $45,700,000 Planning and Design activities Laura Sutton 40251.2.1 Skeet Club Road to I-40 underway, Public meeting 8/14/18 - 40251.3.1 ROW underway B-5723 Replace Bridge 54 over Richland Creek on SR 1158 (Jackson 11/19/24 FY2026 $3,237,000 Planning and design activities Rob Weisz 45679.1.1 Lake Road) underway 45679.1.2 45679 2 1 I-5712 Interchange improvements at I-40/US 421 and SR 1850 12/15/26 FY2029 $14,500,000 Planning and Design activities Laura Sutton 50126.1.FS1 (Sandy Ridge Road) in Greensboro. Sandy Ridge Road underway, Coordinate with U-4758 & U- 50126.2.1 widening to Cider Road 6045 50126.3.1 U-5974 Upgrade NC 68 to Superstreet from SR 1523 (Hickswood 7/18/28 FY2030 $48,100,000 Planning and design activities Brian Ketner 45962.1.1 Road) to SR 1556 (Gallimore Dairy Road) in High Point underway, coordinate with U-4015A 45962.2.1 45962.3.1 U-6121 Widen SR 1541 (Wendover Avenue) from NC 68 (Eastchester 11/21/28 FY 2031 $27,300,000 Planning and design activities Brian Ketner 48605.1.1 Drive) in High Point to SR 1541 (Guilford College Road) in underway 48605.2.1 Greensboro. 48605.3.1 40 Page 2 HPMPO Sep. 2022 North Carolina Department of Transportation 9/8/2022 Active Projects Under Construction - Guilford Co. Contract TIP Number Location Description Contractor Name Resident Contract Bid Availability Completion Work Start Estimated Progress Completion Number Engineer Amount Date Date Date Completion Schedule Percent Date Percent C203256 U-3615B SR-1820 (SKEET CLUB RD) FROM EAST OF SR-1818 APAC - ATLANTIC INC Hayes, PE, $30,898,017.15 3/2/2015 3/29/2019 5/20/2015 9/30/2022 99.9 90.29 (JOHNSON ST) TO WEST OF NC-68 (EASTCHESTER DR) IN THOMPSON ARTHUR Meredith HIGH POINT. DIVISION C204071 U-5169 I-74/US-311 AND NC-68 (EASTCHESTER DR) BRANCH CIVIL INC Snell, PE, $22,481,354.65 7/30/2018 1/28/2021 9/14/2018 9/30/2022 100 91.7 INTERCHANGE IMPROVEMENTS. William H C204096 U-2525C GREENSBORO EASTERN LOOP FROM US-29 NORTH OF ES WAGNER COMPANY Julian, Jason $120,471,182.82 4/30/2018 11/20/2022 5/7/2018 7/21/2023 92.04 77.36 GREENSBORO TO SR-2303 (LAWNDALE DR). LLC/SMITH-ROWE LL R C204103 U-2412A SR-1486/SR-4121 (GREENSBORO/HIGH POINT RD) FROM BRANCH CIVIL INC Lorenz, PE, $55,963,119.69 7/30/2018 12/28/2021 9/12/2018 10/20/2023 93.6 88.15 US-311 BYPASS TO WEST OF SR-1480 (VICKREY CHAPEL Kris RD). C204150 U-5896 US-29/US-70/I-85 BUSINESS, SR 1009 (S. MAIN ST.) IN HIGH BOGGS CONTRACTING, Lorenz, PE, $25,325,396.73 3/28/2022 2/28/2025 4/23/2022 3/1/2025 15 8.45 POINT AND BRIDGE #147 OVER US-311 ON US-29/US-70/I- INC Kris 85 BUSINESS C204371 U-2581BA US-70 (BURLINGTON RD) FROM WEST OF SR-3045 (MT APAC - ATLANTIC INC Snell, PE, $11,125,538.10 7/1/2020 4/30/2022 7/1/2020 10/31/2022 100 89.1 HOPE CHURCH RD) /SR-2819 (MCLEANSVILLE RD) TO THOMPSON ARTHUR William H EAST OF SR-2826 (BIRCH CREEK RD) DIVISION C204499 R-4707 INTERCHANGE OF US 29 AND SR 4771 (REEDY FORK APAC - ATLANTIC INC Hayes, PE, $46,382,713.04 6/2/2021 10/28/2024 6/7/2021 10/28/2024 39 26.07 PARKWAY) THOMPSON ARTHUR Meredith DIVISION C204626 RESURFACE 1 SECTION OF NC 87, 1 SECTION OF NC 49 FSC II LLC DBA FRED Lorenz, PE, $4,639,570.37 6/3/2021 11/1/2022 6/28/2021 11/1/2022 82.5 58.04 AND 21 SECTIONS OF SECONDARY ROADS SMITH COMPANY Kris C204665 U-5754 US-29/US-70/US-220 (O'HENRY BLVD.) FROM I-40/I-85 BUS. BRANCH CIVIL INC Lorenz, PE, $5,144,885.00 3/15/2022 3/14/2023 4/25/2022 3/14/2023 71.7 28.77 TO SOUTH OF FLORIDA ST. IN GREENSBORO. Kris C204700 RESURFACE 1 SECTION OF US-158 AND 49 SECTIONS OF VECELLIO & GROGAN INC. Hayes, PE, $5,303,911.30 4/25/2022 7/15/2023 6/30/2022 9/30/2022 7 39.64 SECONDARY ROADS DBA SHARPE BROTHERS Meredith C204712 B-5717 REPLACE BRIDGES #109 AND #121 OVER SOUTH CONTI CIVIL LLC Cvijetic, PE, $8,270,442.00 10/15/2022 10/28/2025 BUFFALO CREEK ON SR 4240 (EAST GATE CITY BLVD.) IN Bojan GREENSBORO. Page 1 of 3 41 North Carolina Department of Transportation 9/8/2022 Active Projects Under Construction - Guilford Co. Contract TIP Number Location Description Contractor Name Resident Contract Bid Availability Completion Work Start Estimated Progress Completion Number Engineer Amount Date Date Date Completion Schedule Percent Date Percent DG00490 AST TREATMENT OF 26 SECONDARY ROADS IN CAROLINA ROAD Lorenz, PE, $832.311.02 4/1/2021 10/30/2021 4/8/2021 9/30/2022 100 97.46 GUILFORD COUNTY SOLUTIONS LLC Kris DG00512 RESURFACE 43 VARIOUS STATE ROUTES VECELLIO & GROGAN INC. Hayes, PE, $2,562,749.29 7/1/2021 11/1/2022 7/1/2022 11/1/2022 86 95.41 DBA SHARPE BROTHERS Meredith DG00513 REPLACE BRIDGE #235 OVER BIG ALAMANCE CREEK ON SMITH-ROWE, LLC Hayes, PE, $1,675,367.75 6/21/2021 10/25/2022 SR 1005 (ALAMANCE CHURCH ROAD) Meredith DG00515 AST TREATMENT OF 34 SECONDARY ROADS IN WHITEHURST PAVING CO. Lorenz, PE, $749,755.28 7/1/2021 6/30/2021 4/25/2022 9/30/2022 100 86.05 GUILFORD COUNTY INC. Kris DG00524 R-5787-G INSTALLATION OF ADA COMPLIANT CURB RAMPS AT ATLANTIC CONTRACTING Lorenz, PE, $717,704.25 6/1/2021 4/14/2023 7/26/2021 4/14/2023 94.4 88.14 R-5787-H VARIOUS ROUTES COMPANY, INC. Kris DG00533 MILLING, RESURFACING AND PAVEMENT MARKINGS ON I- BLYTHE CONSTRUCTION Lorenz, PE, $2,989,292.45 7/8/2021 7/7/2022 9/20/2021 9/30/2022 100 94.63 85 BUS/US 29/US 70, NC 150 AND VARIOUS SECONDARY INC. Kris ROADS DG00545 REPLACE PIPE #40 ON SR 2930 (BETHEL CHURCH ROAD) BOGGS CONTRACTING, Cvijetic, PE, $346,396.50 6/16/2022 2/15/2023 7/6/2022 2/24/2023 100 70.25 IN GUILFORD COUNTY INC Bojan DG00551 R-2413A(L) LANDSCAPE PLANTING ALONG I-73 FROM BRYAN BLVD. COUNTRY BOY Lorenz, PE, $593,953.15 12/20/2021 6/19/2023 3/21/2022 6/19/2023 91.8 84.85 TO US 220 LANDSCAPING INC. Kris DG00552 R-2413C(L) LANDSCAPE PLANTING ALONG US 220 FROM I-840 TO NC GOLDSTAR PROJECT Lorenz, PE, $119,464.76 12/20/2021 6/19/2023 3/4/2022 6/19/2023 96.7 72.76 65 GROUP LLC Kris DG00555 REPLACE PIPE #402221 ON SR 3426 (SHERATON PARK C2 CIVIL LLC Cvijetic, PE, $529,396.00 3/7/2022 12/1/2022 3/7/2022 9/30/2022 100 93.98 ROAD) IN GUILFORD COUNTY Bojan DG00558 U-6019 INTERSECTION IMPROVEMENTS AT SR 2334 (AIR ATLANTIC CONTRACTING Hayes, PE, $1,082,298.10 7/11/2022 11/15/2022 8/29/2022 HARBOR ROAD) AT SR 2347 (LAKE BRANDT ROAD) COMPANY, INC. Meredith Page 2 of 3 42 North Carolina Department of Transportation 9/8/2022 Active Projects Under Construction - Guilford Co. Contract TIP Number Location Description Contractor Name Resident Contract Bid Availability Completion Work Start Estimated Progress Completion Number Engineer Amount Date Date Date Completion Schedule Percent Date Percent DG00564 MILLING, RESURFACING AND PAVEMENT MARKINGS ON APAC - ATLANTIC INC Hayes, PE, $3,519,513.72 4/1/2022 6/30/2023 7/25/2022 6/30/2023 8 13.61 59 SECONDARY ROADS IN GUILFORD COUNTY THOMPSON ARTHUR Meredith DIVISION DG00570 REPLACE BRIDGE #85 OVER REEDY FORK ON SR 1858 RE BURNS & SONS CO. Hayes, PE, $1,052,260.20 7/7/2022 4/29/2023 8/1/2022 4/29/2023 10 12.76 (BEESON ROAD) INC. Meredith DG00572 REPLACE BRIDGE #25 OVER POLE CAT CREEK ON SR RE BURNS & SONS CO. Lorenz, PE, $1,285,359.02 1105 (EAST STEEPLE CHASE ROAD) INC. Kris DG00573 RESURFACE SR 2335 (TROSPER RD.) AND 25 ADDITIONAL APAC - ATLANTIC INC Hayes, PE, $2,009,092.07 6/1/2022 8/31/2023 7/6/2022 8/31/2023 19.6 25.3 SECONDARY ROADS THOMPSON ARTHUR Meredith DIVISION DG00576 AST RETREATMENT ON 50 SECONDARY ROADS IN WAUGH ASPHALT INC. Lorenz, PE, $811,504.54 5/9/2022 6/30/2023 GUILFORD COUNTY Kris Page 3 of 3 43 Randolph County - High Point MPO - Active Projects - Division 8--September 2022 Contract # or Completion Route Description Let Date Contractor Project Admin. Project Cost Notes WBS # or TIP # Date HI-0002 C204703 I-85 Randolph Co. Pavement Rehab - from I-85/NC 109 in 4/19/2022 10/15/2023 Blythe Cary Fine $13,384,387 Project 15% complete Thomasville to SR 1009 (South Main St) in Construction Inc. (336) 318-4020 Archdale Randolph County - High Point MPO - Upcoming Projects - Planning & Design, R/W, or not started - Division 8- September 2022 Revised Draft STIP in RED Contract # or Completion Route Description Let Date Contractor Project Admin. Funds Needed Notes WBS # or TIP # Date U-3400 SR 1577 / SR 1004 Widening from SR 1567 (Robbins Country 11/18/2025 TBD TBD Jeff Stroder $38,626,000 Right of Way 1/2023 FY 2023 (Archdale Road) Rd) to US 311 (Main Street) in Archdale FY 2026 (910) 773-8034 Public Meeting held 2/27/18 U-5308 SR 1547 (Finch Farm Rd) Widening from south of SR 3106 Kennedy 6/17/2025 TBD TBD Greg Davis $35,462,000 Right of Way in progress Rd to NC 62 FY 2025 (910) 773-8022 Public Meeting held 3/29/2018 2nd Public Meeting 11/29/18 U-5770 I-85 / SR 1993 Interchange Improvements - construct 4/15/2025 TBD TBD Jeff Stroder $19,193,000 Right of Way in progress A= resurface (South Main Street) Diverging Diamond Interchange (DDI) and FY 2025 (910) 773-8034 Public Meeting 11/30/17 B= DDI RCI's Newsletter Mailed 6/8/18 U-5864 SR 1595 (Surrett Drive) 3-lane widening from I-85 to SR 1300 (W. 8/15/2028 TBD TBD Greg Davis $33,864,000 Right of Way 6/2024 FY 2026 Fairfield Rd. /Guilford Co.) in Trinity, FY 2029 (910) 773-8022 Public Meeting held 6/13/19 Archdale, and High Point U-6191 NC 62 Modernize roadway between SR 3252 10/17/2028 TBD TBD Greg Davis $22,800,000 Right of Way 10/2026 FY 2027 (Surrett Dr) in Trinity to SR 1009 (N. Main FY 2029 (910) 773-8022 St) in Archdale 44 PARTiculars Piedmont Authority for Regional Transportation September 2022 PART Is Going To The Zoo! In a collaborative effort to gauge Randolph County residents’ transportation needs, the City of Asheboro, the Regional Coordinated Area Transportation Service (RCATS), and PART recently distributed a survey to gather data in the region. In addition, Randolph County, the YMCA’s Asheboro branch, Randolph County Community College, Christ United Outreach Center (CUOC), and the Asheboro Housing Authority partnered to help collect the information. The response was excellent, and we were able to provide reliable data for our planners to work with. As a result, we expanded our Randolph County Express Route 10 service effective 8/1/2022. Community interest drove PART’s expansion to include a stop at the North Carolina Zoo. Again, collaboration played a key role, and working with our North Carolina Zoo partners, PART landed a front door stop at the North American entrance. Messaging about the service expansion started going out to the public in mid-August utilizing a series of four ads, published as print and web-based, running for eight weeks, along with a series of four email campaigns through Triad City Beat, a local publication that focuses on the Triad (triad-city-beat.com). In addition, PART and several of our Randolph County partners ran email campaigns, put out posters, and ran web ads and social media blasts through various platforms. The messaging will continue through October and include an ad going into the city of Asheboro’s quarterly newsletter. PART also has a tab on the North Carolina Zoo website! nczoo.org/visit/part-bus. We want riders to know ... we are going to the North Carolina Zoo! Explore With Express. » EXPRESS ROUTE « 21 Route 21 NE Chimney Rock Express is another workhorse of a route. This service runs 6:15 am - 8:45 pm out of the Coble Transportation Center, getting riders to and from work and school. With stops at Harris Teeter NE Perishable warehouse, two GTCC Aviation centers, HAECO, Harris Teeter Distribution Center, and the CHIMNEY Industries of the Blind Distribution Center, this route makes the stops! An added bonus, this route connects ROCK with Greensboro Transit Authority’s (GTA) route 9 bus at our Swing Road stop. Connecting Communities, that’s what we do! M O N D AY - F R I D AY For more information, go to partnc.org/338/Route-21. 45 Triad Travel Counts. Our local Metropolitan Planning Organizations, known as MPOs, staffed by your neighbors and local residents, will launch a vital survey this fall called Triad Travel Counts. This research data is only gathered approximately every ten years, so the information is crucial to our region. PART is collaborating with the MPOs in our area to conduct the study. This is a rare opportunity for households to provide vital information that will help set transportation priorities for many years. The insights gained from this survey will help prioritize local transportation projects, improve mobility, and reduce congestion. Communication to the public about the study will include public relations campaigns, web, social media, email campaigns, and print. This survey will collect details about how residents get around the region, whether going to work, shopping, visiting family or friends, or finding entertainment. MPOs will use this data to understand how our transportation systems currently work for citizens and help us decide where things can be improved. If you are invited to participate in the survey, please take part and make sure you represent your neighborhood, town, and county! Save Money On Your Commute ... Join A PART Vanpool. A vanpool can be described as a blend of a traditional carpool and on-demand services, like taxis, Uber and Lyft. Compared to carpools and on-demand services, vanpools provide a more organized system and an easier way to connect with people on your route. Rather than a group of friends or coworkers sharing their private cars, designated drivers are assigned a vanpool vehicle to use for commuting purposes. The more riders that join in, the more money you save! Unlike on-demand services, you won’t have to request a new ride daily and wait to be matched with a new driver. Instead, riders set their pick-up and drop-off times that they can plan their schedules around. In addition, PART vanpoolers are charged a fixed monthly, all-inclusive fee that each rider pays directly to PART. This means you will never have to worry about collecting funds or coming up with gas and repair money. And surge pricing, which can peak during rush hours when you are likely doing your commute and is standard for most on-demand services, will be a thing of the past. Consider joining a PART Vanpool today. For more information, go to partnc.org/157/Vanpool. PARTnc.org 46

Get email alerts for High Point

A daily email when new agendas and minutes are posted.

Report an issue with this meeting