Muyni
← Back to High Point

HPMPO Technical Coordinating Committee (TCC)

Regular Meeting

High Point, NC · May 21, 2024

Agenda

Agenda

High Point MEMORANDUM Archdale TO: HPMPO TCC Members FROM: Andrew Edmonds, HPMPO Transportation Planning Administrator Denton RE: May HPMPO TCC Meeting Canceled – 5/21/2024 Jamestown Good morning, Lexington The HPMPO Technical Coordinating Committee meeting scheduled for May 21st has been canceled due to a lack of action items. The next TCC meeting is scheduled for Tuesday, June 18th at 2:00 PM. Thomasville Please take a look at the included attachment which compiles reports from many of our partner agencies. Trinity Warm Regards, Andrew Edmonds Wallburg Davidson ANDREW EDMONDS CITY OF HIGH POINT County TRANSPORTATION PLANNING ADMINISTRATOR P O Box 230 High Point, NC 27261 Forsyth 211 S Hamilton Street, High Point, NC 27261 County 336.883-3235 office 336.883-8568 fax andrew.edmonds@highpointnc.gov www.highpointnc.gov Guilford County Randolph County Meeting 5/21/2024 Date TECHNICAL Agenda COORDINATING Item No. 1-4 COMMITTEE Action (TCC) MEETING Information Requested AGENCY REPORTS Attachments Information Summary: Agenda Item 1: NCDOT Divisions 7, 8, 9 Reports Agenda Item 2: NCDOT Integrated Mobility Division Report Agenda Item 3: FHWA Report Agenda Item 4: Public Transportation Reports (PART) NCDOT DIV 7 PROJECTS LOCATED IN HPMPO - UNDER DEVELOPMENT Estimated TIP/WBS # Description Let/Start Date Completion Cost Status Project Lead Date C-5609L Six sidewalk projects in various locations in High Point MPO 7/11/24 FY2025 $1,860,100 ROW activities underway City of High Point/Stephen Robinson BL-0071A Southwest Heritage Greenway. Construct greenway on new 7/31/24 FY26 $7,826,000 Planning and design activities Stephen Robinson location connecting Harvell Park and Goldston Park. underway. BL-0071B Elm Street. Construct pedestrian, bicycle, roadway, and 7/31/24 FY26 $13,864,000 Planning and design activities Stephen Robinson streetscape inprovements from Sunset Drive to Commerce underway. Avenue HS-2007D I-74 at I-74 and US 29-70 (I-85 Business) Interchange. 8/15/24 12/31/24 $500,000 Funding has been approved; Dawn McPherson 49317.1.5 Upgrade traffic signals, signing, and pavement markings at preparation of contract documents 49317.2.5 intersections within the interchange. underway 49317.3.5 EB-5873 Construct sidewalk on SR 1278 (S. College Drive) from SR 9/26/24 FY2026 $225,000 Preliminary Engineering activities City of High 1300 (E. Green Drive) to SR 1113 (E. Kivett Drive) in High underway. Waiting for final plans from Point/Stephen Point City of HP. Robinson EB-5874 Construct sidewalk on NC 68 (Eastchester Drive) from 9/26/24 FY2026 $435,000 Preliminary Engineering activities City of High Johnson Street to SR 1278 (North College Road) in High underway. Waiting for final plans from Point/Stephen Point City of HP. Robinson C-5700 Extend Oakdale Road existing sidewalk from east of E. Main 9/26/24 FY2026 $170,000 Preliminary Engineering activities Town of Street to Chimney Court in Jamestown underway Jamestown/Stephen Robinson C-5609F Oakdale Pedestrian Improvements - Phase 3 - Construct 9/26/24 FY2026 $550,000 Preliminary Engineering activities Town of sidewalks between Chimney Court and Jamestown Oaks underway. Jamestown/Stephen Drive in Jamestown Robinson Page 1 HPMPO May 2024 NCDOT DIV 7 PROJECTS LOCATED IN HPMPO - UNDER DEVELOPMENT Estimated TIP/WBS # Description Let/Start Date Completion Cost Status Project Lead Date 17BP.7.R.114 Replace Bridge #52 (S. Scientific Street) 12/12/24 FY2025 $5,800,000 Planning and design activities Daniel Dagenhart underway - ROW acquisition completed U-4758 Improvements to Johnson Street/Sandy Ridge Road from 12/17/24 FY2027 $45,700,000 Planning and Design activities Bryan Key 40251.2.1 Skeet Club Road to I-40 underway, Public meeting 8/14/18 - 40251.3.1 ROW underway U-4015A Widen SR 1556 (Gallimore Dairy Road) to multilanes from 12/17/24 FY2026 $11,500,000 Planning and design activities Chris Smitherman 35013.1.4 NC 68 to Airpark East in Greensboro underway, coordinate with U-5974, 35013.2.4 ROW Certified 35013.3.4 U-6018 Improve interchange at NC 62 and I-85 and realign 6/17/25 FY2028 $14,200,000 Planning and design activities Brandon Green 47163.1.1 intersections along NC62 at SR 1154 (Kersey Valley Road) underway, ROW certified. Utilities 47163.2.1 and SR 1162 (Weant Road) in Archdale underway. 47163.3.1 EB-5922 Construct sidewalk on Eastchester Drive 7/30/25 FY2027 $125,000 Municipal Agreement required to begin City of High Preliminary Engineering work Point/Stephen Robinson EB-5889 Construct sidewalk with curb and gutter on SR 1486 (W. Main 9/25/25 FY 2027 $500,000 Municipal Agreement required to begin Town of Street); SR 1539 (Penny Road) from existing sidewalk on SR Preliminary Engineering work Jamestown/Stephen 1486 (W. Main Street) to park access on SR 1539 (Penny Robinson Road) in Jamestown 15BPR.113 Rehab on Bridge #875 on I-73 over I-85 and on Bridge #524 4/21/26 FY2028 $2,000,000 Planning and design activities Kristy Alford on NC 62 over I-85 underway P-5721 Construct extension Norfolk Southern Rail Siding in 6/18/26 FY2028 $4,070,000 Planning and design activities Brad Smythe Jamestown underway Page 2 HPMPO May 2024 NCDOT DIV 7 PROJECTS LOCATED IN HPMPO - UNDER DEVELOPMENT Estimated TIP/WBS # Description Let/Start Date Completion Cost Status Project Lead Date EB-5989 Construct sidewalk on Cedrow Drive from west of I-74 to East 3/25/27 FY2028 $3,140,000 Municipal Agreement required to begin City of High of I-74 in High Point Preliminary Engineering work Point/Stephen Robinson I-5712 Interchange improvements at I-40/US 421 and SR 1850 12/21/27 FY2030 $14,500,000 Planning and Design activities Bryan Key 50126.1.FS1 (Sandy Ridge Road) in Greensboro. Sandy Ridge Road underway, Coordinate with U-4758 & U- 50126.2.1 widening to Cider Road 6045 50126.3.1 U-5974 Upgrade NC 68 to Superstreet from SR 1523 (Hickswood 7/18/28 FY2030 $48,100,000 Planning and design activities Brandon Green 45962.1.1 Road) to SR 1556 (Gallimore Dairy Road) in High Point underway, coordinate with U-4015A 45962.2.1 45962.3.1 EB-6010 Construct sidewalk on US 70 (W. Wendover Ave.) from NC 8/16/29 FY2032 $220,000 Municipal Agreement required to begin City of High 68 (Eastchester Drive) to Gibson Park Entrance in High Point Preliminary Engineering work Point/Stephen Robinson EB-5999 Construct sidewalk on Johnson Street from Parris Avenue to 8/17/29 FY2031 $1,420,000 Planning and design activities pending City of High SR 1896 (E. Hartley Drive) in High Point Point/Stephen Robinson EB-6000 Construct sidewalk on SR 1536 (Penny Road) from City Lake 8/17/29 FY2031 $1,500,000 Planning and design activities pending City of High Park to Piedmont Environmental Center in High Point Point/Stephen Robinson U-6121 Widen SR 1541 (Wendover Avenue) from NC 68 11/19/30 FY 2033 $27,300,000 Planning and design activities pending Brandon Green 48605.1.1 (Eastchester Drive) in High Point to SR 1541 (Guilford 48605.2.1 College Road) in Greensboro. 48605.3.1 B-5723 Replace Bridge 54 over Richland Creek on SR 1158 11/21/30 FY2033 $3,237,000 Planning and design activities Trung Nguyen 45679.1.1 (Jackson Lake Road) underway Brandon Green 45679.1.2 45679.2.1 45679.3.1 BP7-R008 Replace Bridge #47 on SR 1113 (Kivett Drive) 9/16/32 FY2034 $1,000,000 Planning and Design activities Daniel Dagenhart underway Page 3 HPMPO May 2024 North Carolina Department of Transportation 5/1/2024 Active Projects Under Construction - Guilford Co. Contract TIP Number Location Description Contractor Name Resident Contract Bid Availability Completion Work Start Estimated Progress Completion Number Engineer Amount Date Date Date Completion Schedule Percent Date Percent C204071 U-5169 I-74/US-311 AND NC-68 (EASTCHESTER DR) BRANCH CIVIL INC Snell, PE, $22,481,354.65 7/30/2018 1/28/2021 9/14/2018 5/30/2024 100 94.41 INTERCHANGE IMPROVEMENTS. William H C204096 U-2525C GREENSBORO EASTERN LOOP FROM US-29 NORTH OF ES WAGNER COMPANY Julian, Jason $120,471,182.82 4/30/2018 11/20/2022 5/7/2018 6/30/2024 100 97.15 GREENSBORO TO SR-2303 (LAWNDALE DR). LLC/SMITH-ROWE LL R C204103 U-2412A SR-1486/SR-4121 (GREENSBORO/HIGH POINT RD) FROM BRANCH CIVIL INC Lorenz, PE, $55,963,119.69 7/30/2018 12/28/2021 9/12/2018 5/30/2024 100 95.81 US-311 BYPASS TO WEST OF SR-1480 (VICKREY CHAPEL Kris RD). C204150 U-5896 US-29/US-70/I-85 BUSINESS, SR 1009 (S. MAIN ST.) IN HIGH BOGGS CONTRACTING, Lorenz, PE, $25,325,396.73 3/28/2022 2/28/2025 4/23/2022 3/23/2025 83.6 41.13 POINT AND BRIDGE #147 OVER US-311 ON US-29/US-70/I- INC Kris 85 BUSINESS C204499 R-4707 INTERCHANGE OF US 29 AND SR 4771 (REEDY FORK APAC - ATLANTIC INC Hayes, PE, $46,382,713.04 6/2/2021 10/28/2024 6/7/2021 10/28/2024 93.1 64.69 PARKWAY) THOMPSON ARTHUR Meredith DIVISION C204665 U-5754 US-29/US-70/US-220 (O'HENRY BLVD.) FROM I-40/I-85 BUS. BRANCH CIVIL INC Lorenz, PE, $5,144,885.00 3/15/2022 3/14/2023 4/25/2022 6/30/2024 100 83 TO SOUTH OF FLORIDA ST. IN GREENSBORO. Kris C204712 B-5717 REPLACE BRIDGES #109 AND #121 OVER SOUTH CONTI CIVIL LLC Cvijetic, PE, $8,270,442.00 10/15/2022 10/28/2025 11/29/2022 10/28/2025 64.9 63.84 BUFFALO CREEK ON SR 4240 (EAST GATE CITY BLVD.) IN Bojan GREENSBORO C204771 R-5725 NC 68 AT SR 2129 (FOLGLEMAN RD) TO NC 150 IN OAK YATES CONSTRUCTION Hayes, PE, $10,497,020.93 3/15/2024 3/14/2026 3/15/2024 3/14/2026 0 0.58 RIDGE CO., INC Meredith C204781 HE-0005 PIEDMONT TRIAD INTERNATIONAL AIRPORT - ROADWAY APAC - ATLANTIC INC Snell, PE, $8,991,271.36 9/15/2022 12/30/2024 10/5/2022 12/30/2024 81.5 79.35 CONNECTIONS IN RELATION TO BOOM SUPERSONIC THOMPSON ARTHUR William H DIVISION C204813 BP7-R006 REPLACE BRIDGE #400225 OVER US 29/70 ON SR 1115 ZACHRY CONSTRUCTION Lorenz, PE, $8,420,829.53 5/31/2023 4/13/2026 7/18/2023 4/13/2026 52.3 27.15 (REHOBETH CHURCH ROAD) IN GREENSBORO CORPORATION Kris C204928 1 SECTION OF NC 62 AND 39 SECTIONS OF SECONDARY VECELLIO & GROGAN INC Lorenz, PE, $5,794,919.46 5/1/2024 11/1/2025 4/25/2024 ROADS. DBA SHARPE BROTHERS Kris Page 1 of 3 North Carolina Department of Transportation 5/1/2024 Active Projects Under Construction - Guilford Co. Contract TIP Number Location Description Contractor Name Resident Contract Bid Availability Completion Work Start Estimated Progress Completion Number Engineer Amount Date Date Date Completion Schedule Percent Date Percent DG00513 REPLACE BRIDGE #235 OVER BIG ALAMANCE CREEK ON SMITH-ROWE, LLC Hayes, PE, $1,675,367.75 6/21/2021 10/25/2022 6/12/2023 6/30/2024 100 67.11 SR 1005 (ALAMANCE CHURCH ROAD) Meredith DG00558 U-6019 INTERSECTION IMPROVEMENTS AT SR 2334 (AIR ATLANTIC CONTRACTING Hayes, PE, $1,082,298.10 7/11/2022 11/15/2022 4/11/2023 6/30/2024 100 76.18 HARBOR ROAD) AT SR 2347 (LAKE BRANDT ROAD) COMPANY, INC. Meredith DG00572 REPLACE BRIDGE #25 OVER POLE CAT CREEK ON SR RE BURNS & SONS CO. Lorenz, PE, $1,285,359.02 7/7/2022 7/1/2023 3/14/2023 4/19/2024 100 100 1105 (EAST STEEPLE CHASE ROAD) INC. Kris DG00575 R-2413C(L) LANDSCAPE PLANTINGS ON I-785 - FROM US 70 TO US 29 MOTS LANDSCAPING & Cvijetic, PE, $299,543.48 9/1/2022 4/30/2024 10/18/2022 5/31/2024 100 96.33 LAWNS LLC Bojan DG00592 RESURFACING OF US 70 FROM SR 2848 (FLEMINGFIELD APAC - ATLANTIC INC Hayes, PE, $2,215,729.61 3/15/2023 6/30/2024 5/25/2023 4/23/2024 100 100 ROAD) TO SR 2851 (PENRY ROAD) AND SECTIONS OF NC THOMPSON ARTHUR Meredith 61 DIVISION DG00598 FIFTEEN SECONDARY ROADS VECELLIO & GROGAN INC Hayes, PE, $2,664,511.33 10/6/2023 4/7/2025 11/6/2023 4/7/2025 5 18.96 DBA SHARPE BROTHERS Meredith DG00599 REPLACE BRIDGE #584 OVER BIG ALAMANCE CREEK ON RE BURNS & SONS CO. Hayes, PE, $1,166,713.00 3/27/2023 3/20/2024 3/27/2023 4/9/2024 100 100 SR 3412 (TABERNACLE CHURCH ROAD) INC. Meredith DG00600 REPLACE BRIDGE #78 OVER WEST FORK DEEP RIVER ON EASTERN STRUCTURES Lorenz, PE, $1,931,675.63 5/1/2023 4/24/2024 5/3/2023 6/30/2024 34.75 34.87 SR 1523/1538 (DEEP RIVER ROAD) LLC Kris DG00601 REPLACE PIPE #402104 ON SR 3097 (INGOLD ROAD) HUNTING CREEK Cvijetic, PE, $1,088,888.88 6/5/2023 5/29/2024 6/5/2023 5/31/2024 100 98.78 CONSTRUCTION INC. Bojan DG00606 TWENTY TWO SECONDARY ROADS IN GUILFORD WHITEHURST PAVING CO Hayes, PE, $759,956.76 4/3/2024 10/3/2025 7/8/2024 COUNTY AND ONE SECONDARY ROAD IN ROCKINGHAM INC Meredith COUNTY DG00610 RESURFACING OF 57 VARIOUS SECONDARY ROADS BLYTHE CONSTRUCTION, Lorenz, PE, $4,122,630.60 4/3/2023 6/30/2024 7/22/2023 4/19/2024 100 100 INC. Kris Page 2 of 3 North Carolina Department of Transportation 5/1/2024 Active Projects Under Construction - Guilford Co. Contract TIP Number Location Description Contractor Name Resident Contract Bid Availability Completion Work Start Estimated Progress Completion Number Engineer Amount Date Date Date Completion Schedule Percent Date Percent DG00611 REPLACE BRIDGE #402 OVE RIDDICKS CREEK ON SR HUNTING CREEK Lorenz, PE, $608,888.88 8/21/2023 11/22/2023 8/21/2023 6/30/2024 100 89.68 1376 (MECKLENBURG ROAD) CONSTRUCTION INC. Kris Page 3 of 3 Randolph County - High Point MPO - Upcoming Projects - Planning & Design, R/W, or not started - Division 8--May 2024 Contract # or Completion Route Description Let Date Contractor Project Admin. Funds Needed Notes WBS # or TIP # Date HI-0004 I-74 Pavement Rehab on I-74 from SR 1928 2/20/2029 TBD TBD Michael Ricketts $8,140,000 (Cedar Square Road) to I-73/US 220. (910) 773-8033 U-3400 SR 1577 / SR 1004 Widening from SR 1567 (Robbins Country 7/18/2028 TBD TBD Jeff Stroder $54,582,000 Right of Way in progress (Archdale Road) Rd) to US 311 (Main Street) in Archdale (910) 773-8034 U-5308 SR 1547 (Finch Farm Rd) Widening from south of SR 3106 Kennedy 1/19/2027 TBD TBD Greg Davis $35,462,000 Right of Way in progress Rd to NC 62 (910) 773-8022 U-5770B I-85 / SR 1993 Interchange Improvements - construct 1/1/2027 TBD TBD Jeff Stroder $19,193,000 Right of Way in progress (South Main Street) Diverging Diamond Interchange (DDI) and (910) 773-8034 RCI's U-5864 SR 1595 (Surrett Drive) 3-lane widening from I-85 to SR 1300 (W. 8/21/2028 TBD TBD Greg Davis $33,864,000 Right of Way 11/2025 Fairfield Rd. /Guilford Co.) in Trinity, (910) 773-8022 Archdale, and High Point U-6191 NC 62 Modernize roadway between SR 3252 4/16/2030 TBD TBD Greg Davis $22,800,000 Right of Way 11/2027 (Surrett Dr) in Trinity to SR 1009 (N. Main (910) 773-8022 St) in Archdale High Point MPO NCDOT Division 9 Transportation Update May 2024 T.I.P. No. Description Let Date Completion Date Status Construction Cost Contractor Project Administrator Comments PROJECTS UNDER CONSTRUCTION 2023CPT.09…1091 Availability date is May 31, 2023. J.T Russell is expected to begin Milling, resurfacing, and shoulder reconstruction on 2 Eric Goldston 2023CPT.09.02.20291 April 18, 2023 November 15, 2024 0% Complete $6,185,165 J. T. Russell and Sons work in April 2024. The project is expected to be completed by section of US-64 and 5 sections of secondary roads. (704) 630-3220 (C204871) November 2024. 2024CPT.09.11.20292.3 Asphalt Surface Treatment, 45 Sections in Davidson Eric Goldston April 1, 2024 October 22, 2024 0% Complete $681,495 Waugh Asphalt, Inc. Work to begin in April 2024. (DI00333) County (704) 630-3220 2024CPT.09…10291 Milling, resurfacing, and shoulder reconstruction on 1 Availability date is March 15, 2024. J.T Russell is expected to Eric Goldston 2024CPT.09.02.20291 section of NC 109, 2 sections of NC 8, and 11 November 21, 2023 September 26, 2025 0% Complete $7,681,070 J. T. Russell and Sons begin work in spring of 2025. The project is expected to be (704) 630-3220 (C204906) sections of secondary roads. completed by September 2025. 9.102919.1; 9.103419.1; Polyurea pavement markings on various primary Oglesby Construction, Eric Goldston 9.108019.1 June 3, 2024 TBA 0% Complete $1,627,542 routes in Davidson, Forsyth, and Rowan County Inc. (704) 630-3220 (DI00344) Extend Left Turn Lane and Construct Right Turn Lane Economic Development project. Aerial utility relocations are at Proposed New Access and RR Crossing Jeremy Keaton HE-0008 April 28, 2023 Fall 2024 70% Complete $800,000 State Forces complete, grading & paving for turn lane in progress. Awaiting rail Improvements US 64 from SR 2112 (Decker Road) to (336) 747-7800 crossing improvements by CSX. Rail Crossing 836515Y Safety improvements to US 64 between SR 2782 JT Russell has built the westbound and eastbound U-turn bulbs (Bowers Rd) and SR 2012 (Heath Church Rd) in Kelly Seitz and are currently constructing the new left turn lanes, for I-85 and HS-2009B July 26, 2023 November 22, 2024 53% Complete $2,186,164 J. T. Russell and Sons Lexington. Install four Reduced Conflict Intersections (704) 630-3200 New Bowers Rd. Construction is scheduled to be completed by (RCI). June 30, 2024. This project will be performing pavement rehabilitation and bridge preservation on a 9.332-mile stretch of I-85 from US-52 to North Pavement Rehabilitation on I-85 from US 29/52/70/I- of US-64. Blythe has paved the northbound lanes at night with I-5950 Kelly Seitz 85 Bus to N of SR 2205 (Old US 64) and from NC 109 October 31, 2022 November 15, 2024 37% Complete $24,763,704 Blythe Construction, Inc single and double lane closures, from NC 47 up to US 64. 45897.3.1 (704) 630-3200 to Randolph County Line (Includes I-5951) Subcontractors are grading and repairing drainage structures, bridge slopes, along with deck repairs on structures. Crews plan to begin paving again at night around May 5, 2024. Multiple Freeway and Expressway Ramp Pavement 49321.3.11 Hickory Sealing and Kelly Seitz Preconstruction meeting completed 3/27/2024. Anticipated start Markings in Davidson, Davie, Forsyth, Rowan, and April 8, 2024 August 30, 2024 0% Complete $431,240 (DI00341) Striping, Inc. (704) 630-3200 mid- April 2024. Stokes County Gumtree Road was closed at the bridge location on May 22, 2023. The bridge deck and approch slabs have been poured. Barrier wall was poured on 3/28/24. Fencing on the bridge is B-5765 Replace Bridge #115 on SR 1711 (Gumtree Rd) over March 15, 2023 thru 805 days after start Kemp Sigmon Larry Shaver currently under construction and two bar metal rail is scheduled to 45721.3.1 87% Complete $4,591,917 WSSB RR July 31, 2023 date Construction Co Inc. (336) 867-6230 be installed on 4-27-24. The final grading and asphalt paving will (C204385) then be compled. The contractor is ahead of schedule and anticipates the bridge replacement to be completed and Gumtree Road reopened by late-Summer 2024. Median crossovers have been constructed for placing northbound US 29/70 on the existing southbound bridge.The traffic switch to southbound bridge and demolition of the northbound bridge is B-5783 Replace Bridge #164 and Bridge #168 on US 29/70/I- Larry Shaver August 15, 2023 May 14, 2027 10% Complete $5,777,000 Smith-Rowe scheduled to begin late April 2024. Traffic will then flow through 45738.3.1 85 Bus over NSRR (336) 867-6230 the project with one lane of US 29/70 in each direction. Allowing for work to begin on the new northbound bridge soon after demolition. Traffic continues to flow through the project with one lane of US 29/70 in each direction. Construction continues on the new northbound bridge and is nearing completion. Both directions of US 29/70 traffic are scheduled to be placed on the northbound R-5737 Convert at grade intersection to Interchange on US Larry Shaver bridge during Spring 2024. For the remainder of 2024, the onsite 50195.3.1 January 10, 2022 February 28, 2026 60% Complete $25,893,075 Smith-Rowe 29/70/I-85 Bus at SR 1798 (Old Greensboro Rd) (336) 867-6230 detour will be removed and construction will focus on the (C204399) completion of the southbound bridge and the portion of Old Greensboro Road between US 29/70 and the Davidson-Davie Community College main entrance. Anticipated project completion is Summer 2025. Project schedules reflect the 2024-2033 STIP Page 1 of 3 High Point MPO NCDOT Division 9 Transportation Update May 2024 T.I.P. No. Description Let Date Completion Date Status Construction Cost Contractor Project Administrator Comments PROJECTS UNDER DEVELOPMENT B-5785 Replace Bridge #121 and Bridge #122 on US 29/70/I- ROW Acquisition Al Blanton (Acting) February 15, 2028 TBA $4,000,000 TBA Raleigh Let - Design is underway. 45740.3.1 85 Bus over Leonard Creek April 30, 2025 (336) 747-7800 B-5787 ROW Acquisition Al Blanton (Acting) Replace Bridge #29 on NC 49 over NC 109 August 17, 2027 TBA $6,600,000 TBA Raleigh Let. -Design is underway. 45741.3.1 Mar. 31, 2025 (336) 747-7800 BP9-R001 Replace Bridge #469 on SR 2183 (Fisher Ferry Rd) ROW Acquisition Al Blanton (Acting) BP9.R001.3 February 26, 2025 TBA $1,300,000 TBA Division Let - Project is on schedule. over North Hamby's Creek in Davidson County in progress (336) 747-7800 formerly 17BP.9.R.16) BP9-R006 Replace Bridge #246 on SR 2351 (Flat Swamp Rd) ROW Acquisition Al Blanton (Acting) BP9.R006.3 February 25, 2026 TBA $900,000 TBA Division Let - Project is on schedule. over Lick Creek in Davidson County Complete (336) 747-7800 (formerly 17BP.9.R.92) Norfolk Southern Railroad, Kimberly Clark in Planning/Design in Ben Dawes P-5722 December 30, 2026 TBA $2,038,000 TBA Non - DOT Let (Rail) - Lexington. Construct Lead Progress (919) 707-4116 East 5th Avenue construct a grade separation of the Planning/Design in Ben Dawes P-5731 July 15, 2025 TBA $25,000,000 TBA Raleigh Let - PE work and public involvement has started. rail line and East 7th Avenue. Progress (919) 707-4116 Lexington Train Station. Construct track Planning/Design in Ben Dawes P-5732 improvements and multimodal passenger rail and bus September 15, 2024 TBA $15,700,000 TBA Raleigh Let - PE work and public involvement has started. Progress (919) 707-4116 station in the Lexington depot district. BR-0015 Replace Bridges #67 & 68 on US 29/US 70 (I-85 ROW Acquisition April Jennifer Hernandez June 17, 2025 TBA $17,200,000 TBA PMU Managed. PE in progress. 67015.3.1 Business) over SR 1192 17, 2024 (919) 707-6048 Planning/Design in Matt Jones HS-2009K NC 109 at Canaan Church Road – turn lanes September 25, 2024 TBA $800,000 TBA Project being reviewed for possible CRP funding. Progress (336) 747-7800 Project Gemini. Construct access road north of SR HE-0014 ROW Acquisition in Jeremy Keaton 1254 (Brown Street) and improvements to SR 1104 June 28, 2024 TBA $9,000,000 TBA Economic Development Project for Siemens Mobility. 50795 progress (336) 747-7800 (Old Linwood Road) in Lexington. Pavement Rehabilitation – I-285 from I-40 in Forsyth Planning/Design in Jeremy Keaton Division Design Raleigh Let (DDRL) - Revised & reduced project HI-0005 September 20, 2025 TBA $30,147,000 TBA County to SR 3010 (Old US 52) in Davidson County Progress (336) 747-7800 limits. Pavement design requested. NC 109, Ray Lanning Road to Wallburg Road. ROW Acquisition Jeremy Keaton Design to begin upon funding approval. ROW date updated to HL-0061 April 30, 2027 TBA $1,684,000 TBA Construct turn Lane and Traffic Signal. February 28, 2025 (336) 747-7800 accommodate funding delay. Raleigh Let - Approved to move forward with PE. 25% plans in B-5773 Replace Bridge #25 on SR 3346 (S. Main St) over ROW Acquisition Ryan Newcomb progress. Let date revised based on reprogramming of bridge April 17, 2029 TBA $3,250,000 TBA 45729.3.1 WSSB RR in Lexington (Combine let with BR-0015) Jan. 15, 2027 (336) 747-7800 replacement projects in the Bridge Maintenance Improvement Program. Raleigh Let - PE work has started. 25% plans complete. Utility coordination has started. No right-of-way impacts expected. B-5777 Ryan Newcomb Replace Bridge #58 on NC 109 over US 64 June 17, 2025 TBA No ROW Required $7,300,000 TBA Hydro approved. Bridge preliminary general drawings complete. 45733.3.1 (336) 747-7800 Combined Field Inspection held March 12, 2024. RW plans under review and should be released by the end of April. Project schedules reflect the 2024-2033 STIP Page 2 of 3 High Point MPO NCDOT Division 9 Transportation Update May 2024 T.I.P. No. Description Let Date Completion Date Status Construction Cost Contractor Project Administrator Comments PROJECTS UNDER DEVELOPMENT Raleigh Let - Coordinate with B-5785. Division is currently working on a feasibility study for this bridge replacement and how this will work with the overall interchange. PE work has started. B-5779 Replace Bridge #118 on US 29NB/64EB/70EB over ROW Acquisition Ryan Newcomb Functional alternatives complete. Preferred alternative selected. April 17, 2029 TBA $4,061,000 TBA 45735.3.1 SR 3346 (N Main St) in Lexington October 15, 2027 (336) 747-7800 Proceeding to final design. Working with firm to accelerate design to potentially let earlier in FY25. RW and Let dates revised based on approved FY24-33 STIP. 25% plans complete. Proceeding with environmental document. Raleigh Let - PE work has started. Local officials meeting held in April 2023. Public outreach planned for Fall 2023. Let date revised based on reprogramming of bridge replacement projects BR-0016 Replace Bridge #150 over SR 2123 (Kanoy Rd) WB ROW Acquisition Ryan Newcomb January 20, 2028 TBA $5,175,000 TBA in the Bridge Maintenance Improvement Program. Public Meeting 67016.3.1 on I-85 Bus in Thomasville Jan. 19, 2025 (336) 747-7800 held November 8, 2023. Hydro design in progress. Updated construction estimate was higher than programmed. Coordinating with Structures Management Unit on how to proceed. Raleigh Let - PE work has started. Railroad coordination has BR-0140 Replace Bridges #87 and #89 0n US 29/70/I-85 Bus ROW Acquisition Sept. Ryan Newcomb September 16, 2025 TBA $16,200,000 TBA started. Geotechnical field work is in progress. 25% plans 67140.3.1 over WSSB Railroad 23, 2024 (336) 747-7800 complete. Hydro design in progress. Widen NC 109 to multilanes from NC 47 in Denton to Funded for Preliminary Funded for Preliminary Funded for Preliminary Funded for Preliminary Ryan Newcomb DDRL - The PE work for this project has been suspended. R-4734A TBA US 64 Engineering Only Engineering Only Engineering Only Engineering Only (336) 747-7800 Express design update in progress to revise project estimate. Widen NC 109 to multilanes from US 64 to Liberty Funded for Preliminary Funded for Preliminary Funded for Preliminary Funded for Preliminary Ryan Newcomb DDRL - The PE work for this project has been suspended. R-4734B $63,200,000 Drive in Thomasville Engineering Only Engineering Only Engineering Only Engineering Only (336) 747-7800 Express design update in progress to revise project estimate. U-5757 Widen NC 8 (Winston Rd) to multi-lanes from 9th St ROW Acquisition/Utility Ryan Newcomb Division Design Raleigh Let (DDRL) - *Letting will likely be *September 17, 2024 TBA $14,400,000 TBA 54035.3.1 to SR 1408 (Biesecker Rd) in Lexington Relocation in progress (336) 747-7800 delayed due to ROW issue. Project schedules reflect the 2024-2033 STIP Page 3 of 3 NCDOT Integrated Mobility Division (IMD) Programs In 2023, the NCDOT IMD developed a pilot project, NCDOT Interim Design Safety Pilot Project, that evaluated the process for deploying low-cost, interim design safety countermeasures on state owned and maintained roadways. These FHWA Proven Safety Countermeasures emphasized the safety of pedestrians and bicyclists through risk and exposure reduction at intersections. This innovative approach to more rapidly deploy safety countermeasures was funded by the FHWA’s State Transportation Innovation Council (STIC) Incentive program. Foundational to the approach of this project were the goals of the Technology and Innovation Deployment Program (TIDP) that emphasized innovative practices, improvements to safety, quick construction/ deployment, new tools and techniques, and improvements to mobility. The term “interim design” was used throughout the life of the project to communicate that the deployment of the safety countermeasures is a step toward a more permanent solution. https://connect.ncdot.gov/projects/BikePed/Documents/interim-design-safety-pilot-program.pdf NCDOT’s Integrated Mobility Division (IMD) is holding its next quarterly Multimodal Updates Webinar on Thursday, May 23rd at 10am. These meetings are designed to inform some of our partners on planning, policy and programming initiatives that our Division is currently leading. We are still working on the agenda for this webinar; however, below are some items that may be discussed: • Transportation Demand Management (TDM) Grant Program • Multimodal Planning Grant Program • Zero Emission Vehicle (ZEV) transition plans • Locally Coordinated Plan (Enhanced Mobility of Seniors & Individuals with Disabilities - Section 5310) • Bicycle Helmet Initiative – Awards • Bike and Roll to School Day – May 8 • Safe Routes to School Program • Intercity Bus Program • Great Trails State – equity/trail connections survey • Great Trails State – GTS network amendment process • State Bike Routes • Freeway, Arterial, Street and Tactical (FAST) transit study – May 3rd kick-off • Mobility Hubs • Paved Trails/Sidewalk Feasibility Study Program • Pedestrian and Bicycle Infrastructure Network (PBIN) Updates • CASSI (Connected Autonomous Shuttle Supporting Innovation) • RFI - Automated bus technologies • North Carolina Non-Motorized Volume Data Program (NC NMVDP) Meeting information is below. ________________________________________________________________________________ Microsoft Teams Need help? Join the meeting now Meeting ID: 214 534 910 86 Passcode: qoiXrw Dial-in by phone +1 984-204-1487,,91584466# United States, Raleigh Find a local number Phone conference ID: 915 844 66# Join on a video conferencing device Tenant key: ncgov@m.webex.com Video ID: 119 855 688 7 More info For organizers: Meeting options | Reset dial-in PIN ________________________________________________________________________________ FHWA Updates – May 2024 FHWA Announces $830 Million in Awards for PROTECT Discretionary Grant Program On April 11, 2024, the Federal Highway Administration (FHWA) announced approximately $830 million in awards from the Promoting Resilient Operations for Transformative, Efficient, and Cost-Saving Transportation (PROTECT) Discretionary Grant Program. The PROTECT Discretionary Grant Program is funding 80 projects nationwide that will help States and local communities strengthen surface transportation systems and make them more resilient to natural hazards, including climate change, extreme weather events, flooding, sea-level rise, heat waves, and other disasters. More information is available here. FHWA Announces $148 Million in Awards for Reduction of Truck Emissions at Port Facilities On April 24, 2024, FHWA announced $148 million in awards from the Reduction of Truck Emissions at Port Facilities (RTEPF) Grant Program. The RTEPF Grant Program is awarding grants to 11 States and Puerto Rico to improve air quality and reduce pollution for truck drivers, port workers, and families that live in communities surrounding ports. More information is available here. U.S. DOT Announces $23.6 Million in Awards for Thriving Communities Program On April 15, 2024, the U.S. Department of Transportation (DOT) announced $23.6 million in awards from the Thriving Communities Program (TCP). The TCP is awarding grants to three national and six regional Thriving Communities Capacity Builders to support 112 communities in accessing Federal funding and resources. More information is available here. FTA Announces $17.6 Million in Awards for Transit-Oriented Development Planning On April 2, 2024, the Federal Transit Administration (FTA) announced $17.6 million in awards from the Pilot Program for Transit-Oriented Development (TOD) Planning. The Pilot Program for TOD Planning is funding 20 projects in 16 States to help plan for transportation projects that connect communities and improve access to transit and affordable housing. More information is available here. FTA Announces $316 in Available Funding to Improve and Expand Ferry Services On April 17, 2024, FTA announced the availability of $316 million in funding to support and modernize passenger ferry service in communities across the country. The Passenger Ferry Grant Program is providing $51 million in funding to buy, replace, or modernize passenger ferries, terminals, and related equipment. The Electric or Low-Emitting Ferry Pilot Program is providing $49 million in funding to buy ferry vessels that reduce emissions by using alternative fuels or on-board energy storage systems. The Ferry Service for Rural Communities Program is providing $216 million in funding to initiate or expand ferry services in rural areas, including capital, planning, and operating costs. The application deadline for all three programs is June 17, 2024. More information is available here. U.S. DOE Announces $54 Million in Available Funding for Communities Taking Charge Accelerator On April 16, 2024, the U.S. Department of Energy’s (DOE’s) Joint Office of Energy and Transportation with the U.S. DOT announced the availability of $54 million in funding through the Communities Taking Charge Accelerator. This program will make strategic investments at the local level that address key barriers to expanding access to electrified mobility options for individuals without home charging, accelerate the transition to electrified fleets, and mature the implementation of managed charging systems to mitigate impacts and optimize usage of the electrical grid. The application deadline is July 16, 2024. More information is available here. FHWA Announces $3 Million in Available Funding for Roadside Pollinator Program On April 8, 2024, FHWA announced the availability of $3 million in funding through the Pollinator- Friendly Practices on Roadsides and Highway Rights-of-Way Program (Roadside Pollinator Program). The goals of the Roadside Pollinator Program are to fund the implementation, improvement, or further development of the applicants’ Pollinator Friendly Practices Plan on routes eligible for Federal-aid. The application deadline is June 18, 2024. More information is available here. FHWA Accepting First Applications for Transportation Access Pilot Program On April 16, 2024, FHWA announced the first application period for the Transportation Access Pilot Program. This first round seeks to identify transportation agencies that are currently working on, or are soon planning to start, transportation accessibility analysis studies. Letters of interest are due by June 7, 2024 to be considered for the first round of the pilot program. More information is available here. Application Deadlines Approaching for Other U.S. DOT Discretionary Grant Opportunities Please be aware of the approaching application deadlines for the following discretionary grant opportunities from the U.S. DOT: • May 1 – Prioritization Process Pilot Program (PPPP), • May 6 – National Infrastructure Project Assistance (Mega) Program, • May 6 – Infrastructure for Rebuilding America (INFRA) Program, • May 6 – Rural Surface Transportation Grant (Rural) Program, • May 10 – Innovative Finance and Asset Concession Grant Program, • May 16 – Safe Streets and Roads for All (SS4A): Planning and Demonstration Grants, • May 16 – SS4A: Implementation Grants, • May 27 – Strategic Innovation for Revenue Collection (SIRC) Program, • June 10 – Low-Carbon Transportation Materials (LCTM) Grants Program, • June 17 – Active Transportation Infrastructure Investment Program (ATIIP), and • August 29 – SS4A: Planning and Demonstration Grants. FHWA Announces 2024 Environmental Excellence Award Winners On April 30, 2024, FHWA announced the 2024 Environmental Excellence Award (EEA) recipients. The biennial EEA program recognizes outstanding transportation projects, processes, and partners that used FHWA funding sources to go above and beyond compliance to achieve environmental excellence. The winning projects and programs exemplify FHWA’s priorities of safety, economic strength and global competitiveness, equity, climate and sustainability, transformation, and organizational excellence. More information is available here. • North Carolina Department of Transportation Flood Inundation Mapping for Transportation Resiliency and Climate Adaptation (North Carolina) FTA Announces Updates to the Final Rule and National Plan for Public Transportation Safety On April 9, 2024, FTA announced the availability of updates to the final rule for Public Transportation Agency Safety Plans (PTASPs) [89 FR 25694] and the National Public Transportation Safety Plan [89 FR 25316]. The final rule updates 49 CFR 673 to includes provisions for safety committees, safety performance targets, safety risk reduction programs, training for transit workers, and a safety management system process that addresses infectious diseases. The updated National Public Transportation Safety Plan includes safety performance measures for all agencies subject to the PTASP regulations, and safety risk reduction performance measures for Section 5307 recipients that serve an urbanized area with a population of 200,000 or more. Additional information is available here and here. Comment Deadlines Approaching for U.S. DOT Federal Register Notices Please be aware of the approaching comments deadlines for the following Federal Register notices from the U.S. DOT: • May 13 – Buy America Requirements for Manufactured Products, • May 13 – Request for Information on the Use of Manufactured Products in Highway Projects, • May 20 – PROTECT Discretionary Program Metrics, and • June 11 – Request for Information on Goals, Criteria, Thresholds, and Measurable Data Sources for Designating the National Multimodal Freight Network (NMFN). U.S. DOT Resources on Asset Management, GHG Emissions, EV Charging, and Carbon Reduction The U.S. DOT recently published the following resources: • Asset Management Integration Case Studies: o Atlanta Region, o Southeast Michigan Council of Governments, o Washington State DOT, o Washoe County Regional Transportation Commission, o West Virginia DOT, • Asset Management Peer Exchange Summaries: o Integrating Highway Asset Management into Planning and Programming, o Integrating Transit Asset Management into Planning and Programming, • How Are Greenhouse Gas (GHG) Emissions Different From Criteria Pollutant Emissions?, • Public Electric Vehicle (EV) Charging Infrastructure Playbook, and • State Carbon Reduction Strategies. NCHRP Research on Coordination, Mobility Inclusion, and Cooperative Automation Data The National Cooperative Highway Research Program (NCHRP) recently published the following research: • Practices for Statewide and Metropolitan Planning Organization (MPO) Coordination, • Transformational Technologies and Mobility Inclusion Playbook, and • Using Cooperative Automated Transportation Data for Freeway Operational Strategies. Webinars on Equity, EVs, Safety, Asset Management, Climate Change, and Bicycle/Pedestrian Data Here is the registration information for some upcoming webinars and virtual meetings: • May 3 – U.S. DOT Advisory Committee on Transportation Equity, • May 10 – Rural EV Infrastructure Virtual Peer Exchange, • May 15 – Operating Intersections for Pedestrian Safety, • May 22 – Equitable Data Analysis, • May 29 – Don’t Let Financial Uncertainty Derail Your Transportation Asset Management Plan, • May 30 – Climate Adaptation and Resilience in Transportation, • June 11 – Bicycle and Pedestrian Count Data Gathering and Reporting, • June 18 – Climate Change Research and Technology, and • September 4 – Roadway Safety for People Experiencing Homelessness. PARTiculars Piedmont Authority for Regional Transportation May 2024 Transportation Models That Work For Communities Investment decisions related to transportation infrastructure are made through a complex series of steps involving leaders and transportation planners at federal, state, and local levels, with participation from civic involvement. Each year, Congress appropriates funding, establishes funding programs, and provides procedural guidance. The budget is passed down to each state’s Transportation Department, which distributes the funds to MPOs. Reaching the regional MPOs allows each community to use this funding to address their community’s unique needs. One tool used to evaluate the need for future investments in roads, highways, rail, aviation, and public transportation is a travel demand model. PART is responsible for leading the development and maintenance of our region’s travel demand model. The Piedmont Triad Regional Modeling Program (PTRM) has been in place since February 2003 and began with the development of a regional travel demand model. Today it includes a four-step travel demand model, a tour-based freight model, a growth allocation model, and a transit ridership projection model. PART’s team is updating the model in preparation for the 2025 Metropolitan Transportation Plans by the region’s four MPOs. This revision of the travel demand model will include several first: · A more detailed freight movement analysis using the tour-based freight model; · Scenario planning and the allocation of future population and employment growth across each MPO using CommunityViz, a powerful analysis tool used for urban planning, land use planning, geodesign, transportation planning, and resource management applications; · Household travel data from the Triad Travel Counts’ state-wide survey and; · The inclusion of future public transportation projects, along with the projected growth of transit ridership These enhancements to the PTRM represent PART’s continued commitment to ensuring that our transportation infrastructure meets the community’s future needs and provides the highest level of transportation planning for the benefit of our MPOs and the NCDOT. Image Source: From “Inside the black box: Making transportation models work for livable communities,” 1996. In the public domain. Earth Day 2024 PART was proud to sponsor the Piedmont Environmental Alliance’s Earth Day Celebration for another year. Once again, we partnered with our friends at Winston-Salem Transit Authority and tabled with Forsyth County Office of Environmental Assistance and Protection. Over 8,500 people attended this year’s event. We understand the significance of this global event and are committed to supporting initiatives that promote environmental awareness and sustainability. Bringing Back the Buddy Ride! As part of a regional initiative with universities and colleges, lead my PART’s Transportation Demand Management and Marketing Departments, PART is offering a ride incentive for Join us for a students—a revamped PART program originally dubbed “Buddy Rides.” Our goal is to encourage and promote the use of public transportation among college students. Buddy Rides will offer a unique opportunity for participating students to experience the convenience, affordability, and environmental benefits of public transportation. By riding with PART representatives, students will gain valuable insights into navigating the bus system, discovering the best routes, and optimizing travel time. We kick off our first Buddy Ride in August 2024 with three participating colleges. We will take advantage of our new Transit To Trails initiative and visit Purgatory Trail directly outside of the North Carolina Zoo. Students and our PART representatives will take Greensboro Transit Authority into the Galyon Depot and ride PART’s Route 10 Randolph County Express directly into the North Carolina Zoo. From there, we will hike Purgatory Trail, a public trail that is part of the Uwharrie Mountain Range and is accessed RideTheTriad.org without paid entrance into the Zoo. Students will be given the opportunity to stay after the hike and visit the Zoo, a true We want to take you for a FREE ride! We are planning community treasure. local ‘field trips’ to areas of interest and giving away As an added bonus, Buddy Rides will also cater to the SWAG! Scan the QR code to get your college or educational needs of college students. Our University & university’s schedule ... and sign up! College Work Groups have been instrumental in guiding PART to plan student-centric messages and offerings. Our program A Regional University & College Transportation Initiative will be crafted to teach students how to plan their trips, pay for their rides, and utilize multiple transportation systems to Regional Park & Ride Lots get around our region. Our goal is to create a more sustainable future while fostering a sense of community among students ... PTI Airport Connector one Buddy Ride at a time. Adding Voices To The Conversation The City of Greensboro is Explore the Draft Plan asking residents’ opinions about a proposed expansion The Draft Plan focuses most of of its Public Transportation its resources on high-ridership services and provides more Service, Greensboro Transit coverage than the Ridership Concept. Agency (GTA). As part of This network assumes that GoBORO, the City’s long- more long-term funding would be available to support the range transit planning process, increase in service. planners are asking residents to review a Draft Bus Network This network also introduces demand- response zones. These zones are marked in tan. In this type of service, passengers will and take an on-line survey. The have to request a pickup with an average wait time of about 30 minutes. deadline to participate is June 30. Take the on-line survey at: Key Stats www.surveymonkey.com/r/ 6,500 more jobs would be accessible CHRBRWM in 45 minutes for the average person, Access to jobs in 45 minutes compared to the Existing Network. That’s a 100% increase. 30 percent of residents will be close to frequent service (service coming Learn more about the GoBORO People near every 15 minutes or better). 15-minute or better transit 43 percent of jobs will be close to service frequent service (service coming every planning process and view the 15 minutes or better). Draft Plan at: People near any 59 percent of residents and 61 percent of jobs will be close to any transit service, compared to 52 percent www.greensboro-nc.gov/ transit service of residents and 64 percent of jobs in the Existing Network. GoBORO. facebook.com/partnc linkedin.com/company/partnc @partnc youtube.com/partnc

Get email alerts for High Point

A daily email when new agendas and minutes are posted.

Report an issue with this meeting