HPMPO Transportation Advisory Committee (TAC)
Regular MeetingHigh Point, NC · November 25, 2014
Minutes
Attachment 1
MINUTES
TRANSPORTATION ADVISORY COMMITTEE
November 25, 2014
TAC MEMBERS PRESENT:
Jim Myers –Lexington
Neal Grimes – Thomasville
Larry Warlick – Archdale
Becky Smothers – High Point
Clyde Lynn Reese – Wallburg
Steve Shell – Davidson County
Cheryl McQueary – NCDOT Board
TCC MEMBERS PRESENT: Greg Venable, Guy Cornman, Hemal Shah, Mark
McDonald, Bryan Fulbright, Ed Lewis, Diane Hampton, Chuck George, Jeff Loflin,
Heidi Galanti, Roger Jones, Jesse Day, Zeb Holden, Scott Rhine, Angela Wynes, and Jay
Dale.
OTHERS PRESENT: Robert Morgan (High Point)
RECORDING SECRETARY: Marianne Janiszewski, City of High Point
Item 1: Reading of the Ethics Statement.
Becky Smothers read the Ethics Awareness and Conflict of Interest Reminder. No one
had any conflicts.
Item 2: Public Comment Period
Becky opened up the public comment period. No one spoke. Becky closed the public
comment period.
ACTION ITEMS
Item 3: Consideration of the October 24, 2014 TAC meeting minutes.
There was no change to the minutes.
Motion by: Cheryl McQuery
Seconded: Larry Warlick
Vote:
For: Unanimous
Against: None
1
Attachment 1
Item 4: Consideration of the amendments to the High Point MPO
Metropolitan Transportation Improvement Program (MTIP).
Greg stated that the amendments are included in the TAC packet. There has been a delay
in construction on project B-3159 from FY15 to FY16 to allow additional time for ROW
and Utilities.
Motion by: Jim Myers
Seconded: Cheryl McQueary
Vote:
For: Unanimous
Against: None
Item 5: Consideration of a resolution of endorsement for the City of High
Point’s application for a pedestrian planning grant from NCDOT.
The City of High Point is submitting an application to NCDOT for a pedestrian planning
grant. As part of the application process the City is requesting a resolution of
endorsement from the MPO. The North Carolina Department of Transportation has
established a Bicycle and Pedestrian Planning Grant Fund which provides funding to
develop master plans which promote bicycle and pedestrian modes of travel, increase
community benefits of pedestrian and bicycle transportation, and encourage
citizen participation in these modes of travel. The City of High Point recognizes the
many benefits that pedestrian facilities such as sidewalks and trails bring to the town’s
citizens. The City of High Point is a member jurisdiction of the High Point
Metropolitan Planning Organization and is required by Title 23 of the US Code to include
pedestrian and bicycle facilities planning in its Long Range Transportation Plan.
Motion by: Cheryl McQueary
Seconded: Larry Warlick
Vote:
For: Unanimous
Against: None
Item 6: Consideration of an amendment and Conformity Determination
Report to the Winston-Salem MPO 2012-2018 Metropolitan
Transportation Improvement Program (MTIP and the 2035 Long
Range Transportation Plan.
2
Attachment 1
The Winston-Salem MPO is amending their FY 2012-2018 Winston-Salem Metropolitan
Transportation Improvement Program (MTIP), 2035 Long Range Transportation Plan
(LRTP), and Conformity Determination Report. The amendment that requires HPMPO
TAC action is TIP project U-2827B – US 421/Business 40 Pavement Rehabilitation
project to reflect the preferred alternative selection of Cherry/Marshall for the final
interchange configuration. This particular amendment requires a Transportation
Conformity Determination. Because the High Point MPO includes a portion of Forsyth
County, the High Point MPO must also approve the amendment and associated Air
Quality Conformity Determination. The amendment has been out for the required 30 day
public review and comment period. Becky suggested a joint board meeting to discuss
this amendment.
Motion by: Neal Grimes
Seconded: Jim Myers
Vote:
For: Unanimous
Against: None
Item 7: Approval of Chairman and Co-Chairman nominations.
Neal Grimes was voted in as Chairman and Keith Volz was voted in as Vice-Chairman of
the High Point MPO.
Motion by: Larry Warlick
Seconded: Jim Myers
Vote:
For: Unanimous
Against: None
Item 8: Approval of the TAC meeting schedule for 2015.
Motion by: Larry Warlick
The TAC meetings will take place on the 4th Tuesday of every month. Greg went over
the dates. There will be no meeting in July, the November meeting was moved to the 3rd
week in November and no meeting in December.
Seconded: Jim Myers
Vote:
For: Unanimous
3
Attachment 1
Against: None
AGENCY REPORTS
Item 9: Division Engineers Report
Division 7
Mike Mills reported that the traffic signal revisions are 25% complete with an estimated
completion date is December, 2014. The High Point Rd. project is currently under
construction. It is 48% complete which is a little ahead of schedule. There will be a
major traffic shift prior to Thanksgiving. ROW acquisition is 96% complete on the Skeet
Club Rd. project. The let date is scheduled for January, 2015. The design change
narrowing Skeet Club Rd. at Johnson St. down to a three lane section is complete. The
Groomtown Rd. project ROW acquisition is 66% complete. It is scheduled to be let in
December, 2014 with an anticipated completion date of October, 2015. The High Point
Signal System design is in progress. The I-74/US 311 and NC 68 interchange is pending
STI. The draft TIP will be presented to the board in December. This project went down
from a regionally funded project to a Division funded project. The hope is to make it into
the five year plan. Cheryl McQueary stated that if this project does not score high
enough to make it into the five year plan there are two things that can be done. The first
is to see if it can be included as part of the Bond Package and the second is if alternate
funding from other sources comes forward. The installation of pedestrian improvements
on N. Main St. at Lexington Ave. has been on the books for several years. Council has
voted not to proceed with the road diet. There are funds still available to do the
streetscape project. A supplemental agreement changing the dates has to be done. The
bridge project on Baker Rd. should be completed at the end of this year. The Design
Build bridge projects are expected to be finished at the end of 2015. The design is in
progress on both future bridge projects.
Division 8
Jeff Loflin reported that the resurfacing on I-85 SB lane is was completed in May and the
resurfacing of the NB lane is in progress. The Prospect St. Bridge over Business 85 will
be let June 2015. They are also replacing culverts on Old US 311 just south of Archdale.
Division 9
Diane Hampton reported that the rail projects are moving along. The C-4901A project is
70% complete and is anticipated to be finished in June of 2016. The grade separation on
Turner Rd. is 92% complete. The road is scheduled to reopen on or before December 15,
2014 with a completion date of April, 2015. The Business 85 project is about 50%
complete. They are currently working on shoulder drains and are expected to be
completed in June, 2015. There are several bridge and resurfacing projects in the works.
The Happy Hill Rd. project, Yadkin College Rd project, the super elevation project on
NC 150, and the ultra-thin bonded wearing course on I-85 are completed. The question
of what post year means on the NC 109 project was asked and Diane explained that due
to the STI process it will not be known until December if this project will be funded. If it
is not funded this year then it will be put on the list to be looked at in two years. Cheryl
4
Attachment 1
McQueary stated that there is a limit on the amount of funding a corridor can receive.
She suggested that if the project can be broken down into parts it may get a better result
in the scoring process.
Item 10: Triad Air Awareness.
No one was present.
Item 13: NCDOT Transportation Planning Branch Report.
Hemal reported that she is currently working on the HPMPO Comprehensive
Transportation Plan Roadway Inventory and it is scheduled to be completed at the end of
December.
Item 14: Hi tran Report
Angela Wynes reported that the Short Range Transportation Plan is progressing. The
sounding board and steering committee have met several times to discuss needs, wants,
money, etc. The consulting team is preparing the first draft taking in comments from
meetings as well as input from operators and staff. Angela is expecting to have
something to present at the next meeting in January, 2015.
Item 15: PART Report
Scott Rhine reported that the PART information page is in the TAC packet. Scott added
that PART has some existing contract work underway. There will be more information
coming to the MPO’s relating to the Metropolitan Transportation Planning Process and
Air Quality Conformity kick off. All four MPO’s are currently going through the LRTP
process which is tied in with the regional model. PART has just started the process and
expects it to be in place by October or November of 2015. Guy Cornman thanked Scott
for his partnership with the construction of a transit parking lot.
Item 16: Other Business
Scott Rhine thanked Becky for her service as Chair of the MPO. Greg presented her with
a plaque recognizing her for her leadership and dedication.
There was no other business. The meeting was adjourned.
5
Get email alerts for High Point
A daily email when new agendas and minutes are posted.