Attachment 1 MINUTES TRANSPORTATION ADVISORY COMMITTEE February 23, 2016 TAC MEMBERS PRESENT: Jim Myers –Lexington Neal Grimes – Thomasville Keith Volz – Jamestown Bill Bencini – High Point Larry Ward – Denton Clyde Lynn Reece - Wallburg Larry Warlick – Archdale Steve Shell – Davidson County TCC MEMBERS PRESENT: Greg Venable, Guy Cornman, Bryan Fulbright, Ed Lewis, Chuck Smith, Mark McDonald, Jason Miller, Mark Kirstner, John Gray, Kelly Larkins, Jen Britt, Diane Hampton, Marty Tillman, and Carrie Spencer. OTHERS PRESENT: John Hanes (Transportation Planning), Gwen Ford (COHP), Randy McCaslin (COHP), L.G. Cashion (Davidson County Airport), Karel Ban Der Linden (Davidson County Airport), Lee Gill (Citizen, Wallburg), and Eddie MacEldowney (Citizen) RECORDING SECRETARY: Marianne Janiszewski, City of High Point Item 1: Reading of the Ethics Statement. Neal Grimes read the Ethics Awareness and Conflict of Interest Reminder. No one had any conflicts. Item 2: Public Comment Period Neal opened up the public comment period. Lee Gill, 580 Oaklawn Rd., spoke in opposition to the NC 109 project. H provided several maps and diagrams to support his position. Neal closed the public comment period. ACTION ITEMS Item 3: Consideration of the January 26, 2016 TAC meeting minutes. There were no corrections to the minutes. Motion by: Jim Myers 1 Attachment 1 Seconded: Bill Bencini Vote: For: Unanimous Against: None Item 4: Consideration to amendments to the 2016-2025 Metropolitan Transportation Improvement Program. There are four STIP additions and one STIP modification that are being recommended for TAC approval. PART has some projects that he would like to include in the amendment to the TAC. There are two projects on the list for replacement buses that are using funding from NCDOT not the MPO. The first projects funding originated from FTA section 5339 funding which will be transferred into the 5307 program for FTA grant purposes. Funding for the second project will go directly through NCDOT which will go through partner direct. These grant funds need to be recorded in the local TIP. There are also two projects on the list that are being funded through CMAQ funds which came through the HP MPO “Call for Projects” and have already been approved by HP MPO. The first project is to implement a new Palladium circulator in North High Point beginning in 2017. The funds will be an 80/20 split. The second project is for a replacement bus. Hi tran is also requesting replacement busses. Motion by: Larry Warlick Seconded: Jim Myers Vote: For: Unanimous Against: None INFORMATION ITEMS Item 5: SPOT 4.0 Update. Greg reported that NCDOT has to approve all prioritization processes throughout the State. Greg handed out a draft version that will be submitted to NCDOT. It spells out how we are going to vote and rank projects and the criteria that will be used. This year highway, bicycle and ped, rail, aviation and transit projects will be included. The ranking criteria that we will use is spelled out individually for these projects and modes. The data that is determined at the State level is taken to rank these projects. We have 36 highway projects and whatever project is ranked number 1 will be given 100 points which will count as 40%. This will be added to the 60% from part one of the ranking process which 2 Attachment 1 will give the overall total ranking for our priority list for SPOT 4.0. The DOT voting will take place at the March 22 TAC meeting. The ranking criteria along with the DOT vote will be released on March 23rd for public review and comment period. The State already has this list and is looking it over and we are not anticipating any major changes. Each member gets 10 dots for each mode with a maximum of 5 dots that can be placed on one project. Item 6: Davidson County airport Project Information. L.G. Cashion and Karel Van Der Linden gave a presentation. AGENCY REPORTS Item 7: NCDOT Board of Transportation Report. No one was present. Item 8: Division Engineer’s Reports. Division 7 Ed Lewis reported that the bids on the Lexington Ave. Bridge Project were rejected. The project will be re-let next month. The Pavement Rehabilitation Project on I-74/US-311 came in 12% under the engineer’s estimate. The date of availability for this project will be in April. Ed was asked if there has been any movement on the public meeting for the bridge project over NC 68 and I-74. Ed reported that this project is going to be a combination of updating everyone that lives in this area about the project and along with that there is going to be a noise wall presentation. They hope to combine the public involvement process for the noise wall with the public meeting. Division 8 Jen Britt reported that Prospect St. bridge replacement project is about 34% complete. There are two SPOT safety projects where they are upgrading the traffic signal to flashing yellow. There is also an I-73 pavement rehabilitation project underway. Division 9 Diane Hampton reported that the interchange project in Lexington over US 29 – I-85 Business has been let and utility work is underway. The milling and resurfacing of US 64 will start next month. The interchange project at Davidson County Community College will be let in FY 21. The bid opening for the turn lane project on Hickory Tree Rd. is tomorrow. The Winston Rd. Project is will let in FY 19. The rest of the projects are bridge and resurfacing projects. Item 9: Triad Air Awareness. No one was present Item 10: NCDOT Transportation Planning Branch Report. No one was present. . 3 Attachment 1 Item 11: Hi tran Report Angela Wynes reported that staff is continuing to work on service changes and expansion for the short range transit plan. Hi tran has 14 new busses ordered and are hoping for delivery in late Fall. The fare boxes will no longer take the magnetic strip cards. Only smart cards and cash will be able to be used. Item 15: PART Report Mark Kirstner reported that Business 40 through Winston Salem will be closed in about 1.5 years for a period of about 2 years. This year’s MPO Conference will take place in Greensboro. Registration for the conference is open. Item 16: Other Business The next meeting will be Tuesday, March 22, 2016 at 9:00 am. There was no other business. The meeting was adjourned. 4

Agenda

HIGH POINT URBAN AREA MPO TRANSPORTATION ADVISORY COMMITTEE (TAC) Agenda for the February 23, 2016 TAC Meeting 10:00 AM High Point Parks and Recreation Department Administration Building 136 Northpoint Avenue, High Point Ethics Statement In accordance with the State Government Ethics Act, it is the duty of every TAC member to avoid conflicts of interest. Does any TAC member have any known conflict of interest with respect to any matters coming before the TAC today? If so, please identify the conflict and refrain from any participation in the particular matter involved. Public Comment Period Action Items 1. Consideration of the January 26th TAC meeting minutes. (Neal Grimes) Pages 1-6 2. Consideration of amendments to the 2016-2025 Metropolitan Transportation Improvement Program. (Greg Venable) Pages 7-14 Information Items 3. SPOT 4.0 update. (Greg Venable) Page 15 4. Davidson County Airport Project Information (L.G. Cashion) Page 16 Agency Reports 5. NCDOT Board of Transportation Report (Cheryl McQueary – NCDOT Division 7 Board Member) 6. Division Engineer’s Reports a. Division 7 Pages 18-22 b. Division 8 Page 23 c. Division 9 Pages 24-26 7. Triad Air Awareness Report (Lorelei Elkins) Pages 27-28 8. NCDOT Transportation Planning Branch Report (Wayne Davis) 9. Hi tran Report (Angela Wynes) 10. PART Report (Scott Rhine) Pages 29-30 11. Other Business TAC Meeting Meeting Date 2/23/2016 Agenda Item No. 1 Action Requested Approve Section Tab Consideration of the January 26th TAC meeting minutes. (Neal Grimes) Information Summary Attachments Yes No The complete meeting minutes are in your packet as Attachment 1. TAC Vote: Motion Second By:__________________ By:_______________________ Vote: For_______________________ Against________________________ 1 MINUTES TRANSPORTATION ADVISORY COMMITTEE January 26, 2016 TAC MEMBERS PRESENT: Jim Myers –Lexington Neal Grimes – Thomasville Keith Volz – Jamestown Cheryl McQueary – NCDOT Board Bill Bencini – High Point Larry Ward – Denton Joe Geigle – FHWA Larry Warlick - Archdale TCC MEMBERS PRESENT: Greg Venable, Guy Cornman, Bryan Fulbright, Ed Lewis, Heidi Galanti, Chuck George, Mark McDonald, Pat Ivey, Jason Miller, Mark Kirstner, Darius Sturdivant, John Gray, Wayne Davis, Kelly Larkins, Chuck Smith, Mike Mills, Brandon Jones, and Carrie Spencer. OTHERS PRESENT: John Hanes (Transportation Planning), Vickie Embry(COHP Transportation), Gwen Ford (COHP), Randy McCaslin (COHP), Gary Kennedy (Citizen, Wallburg), Beth Kennedy (Citizen, Wallburg), Lee Gill (Citizen, Wallburg) RECORDING SECRETARY: Marianne Janiszewski, City of High Point Item 1: Reading of the Ethics Statement. Neal Grimes read the Ethics Awareness and Conflict of Interest Reminder. No one had any conflicts. Item 2: Public Comment Period Neal opened up the public comment period. Lee Gill spoke in opposition to the NC 109 project and its financial impact on the homeowners in the area. Neal closed the public comment period. Item 3: Report from the Nominating Committee and Election of TAC Chair and Vice Chair. Neal Grimes was nominated as Chair and Keith Volz was nominated as Vice-Chair. They were voted in with no opposition. Motion by: Jim Myers 2 Seconded: Cheryl McQueary Vote: For: Unanimous Against: None ACTION ITEMS Item 4: Consideration of the November 17, 2015 TAC meeting minutes. There were no corrections to the minutes. Motion by: Jim Myers Seconded: Keith Volz Vote: For: Unanimous Against: None Cheryl McQueary abstained from the vote since she was not present at the November meeting. Item 5: Consideration to release the 2016-1017 Unified Planning Work Program for public review and comment. The Draft 2016-2017 UPWP is the work plan for the MPO for the upcoming fiscal year. As part of the Public Participation Policy for the MPO the Draft UPWP must be available for a minimum 30 day public review and comment period. The draft document will be released to for public review and comment on February 8 and close on March 11. It will come back to the TAC for approval at the March meeting. NCDOT put out a new format this year. The draft document will be sent out to all TAC and TCC members this afternoon. A public notice will go out stated that the document will be available for public review at all jurisdictions. Greg handed out the local match which is based on population from the 2010 census numbers. The budget this year is $580,000 which is an increase over last year’s budget. Money will be taken out of the new budget for a new position that will be opening up. Some additional funding has also been included for special studies. There is a bike plan the MPO would like to do and there has been some requests for some small feasibility studies to be done. Motion by: Cheryl McQueary Seconded: Jim Myers 3 Vote: For: Unanimous Against: None Item 6: Consideration to amend the 2016-2025 Metropolitan Transportation Improvement Program. These amendments are due to additional funding of approximately $1.6 million from the State for a ten year period. The Jamestown bypass has been moved up from 2025 to 2019 for construction with completion expected in 2022. ROW plans on this project are complete and funding is available to start purchasing ROW. Motion by: Keith Volz Seconded: Cheryl McQueary Vote: For: Unanimous Against: None INFORMATION ITEMS Item 7: SPOT 4.0 Update. Greg reported that NCDOT has to approve all prioritization processes throughout the State. Greg handed out a draft version that will be submitted to NCDOT. The ranking criteria along with the DOT vote will be released on March 23rd for public review and comment period. The regional impact/local input points window opens on April 1 and runs until May 31. Review of public comments and final ranking criteria will take place at the April TAC meeting. The division needs window opens August 1st and runs through September 30. Unlike last year this year we will know ahead of time which projects will be funded regionally and what projects will fall to the division level. The dates of the public information sessions will be released at the March meeting. Greg will send an email with the dates as soon as he gets them. Staff has considered changing the number of DOT votes from 12 to 10. Members can vote on as many projects as they want but the maximum number of votes that can be put on one project is five. This change is up for discussion. This year bike and ped projects will be included in the ranking. A project spreadsheet was handed out dividing projects into highway, bicycle and ped, rail, aviation and transit. In the past a maximum of 100 points was given to the highest ranking projects. This is how it is written currently but there will be a discussion before it is sent to NCDOT as to if it is going to be kept like this. Greg also presented a map of the SPOT projects. 4 AGENCY REPORTS Item 8: NCDOT Board of Transportation Report. Cheryl McQueary gave a presentation on division 7 projects and showed a slide show on the Honda Aircraft Type Certification Event. Item 10: Division Engineer’s Reports. Division 7 Mike Mills reported that they are working with the COHP on some pedestrian projects. The High Point Rd. Project has a let date of 2019. The ROW plans are complete. The Johnson St./Sandy Ridge Rd. project has a let date of July 2019. Planning and Design is underway and the ROW plans will be complete in 2017. There will be a public workshop sometime in early spring for the I-74/US 311 and NC 68 interchange improvement project. The let date for this project is June, 2018. There are a couple of bridge projects currently in progress. There are three pavement rehab projects. The pavement project on I-74 to the Guilford/Forsyth County Line has a let date of February, 16, 2016 with a completion date of Summer 2017. The project on I-85 from I-85 Business past the Randolph County Line has a let date of April 19, 2016 with a completion date of Summer 2017. The project on I-40 from Gallimore Dairy Rd. to the Forsyth County Line has a let date of March 15, 2016 with a completion date of Summer 2017. Division 8 Darius Sturdivant reported that the Pedestrian Crosswalk project at the Main St./Balfour Dr. intersection in Archdale is complete. The asphalt project is expected to resume in April, 2016 with a completion Spring, 2016. The Prospect St. Bridge Project is 33% complete with an estimated completion date of March, 2017. There are two SPOT Safety Projects, one is the upgrade of traffic signals at the intersections of NC 62 and Finch Farm Rd., and at Trinity Rd. and Archdale Rd. A flashing yellow arrow will be added. Plans have been completed and the materials have been ordered for the upgrade. There are some pavement rehab and bridge resurfacing projects coming up. Division 9 Pat Ivey reported that new bridge project on Winston Rd. over 2970. Utility relocation is underway and will be available to start construction on April 1, 2016. The 2970/ Bus 85 rehabilitation project on the southern end has a revised completion date of February 1, 2016. There is currently traffic on both new bridges. All lanes are anticipated to be open on February 1. Division 9 has a consultant onboard for the new interchange project on 2970 at DCCC. The planning, environmental work and design are anticipated to start later this year. Item 10: Triad Air Awareness. Lorelei Elkins was not present. Greg stated that there will be a lunch and learn tomorrow, January 27. 5 Item 13: NCDOT Transportation Planning Branch Report. No one was present. Hemal Shah was promoted and is now with the Fayetteville MPO. Item 14: Hi tran Report Angela Wynes was not present. Item 15: PART Report Mark Kirstner referred to the report in the TAC packet. Item 16: Other Business The next meeting will be Tuesday, February 23, 2016. There was no other business. The meeting was adjourned. 6 TAC Meeting Meeting Date 2/23/2016 Agenda Item No. 2 Action Requested Approve Section Tab Consideration of amendments to the 2016-2025 MTIP. (Greg Venable) Information Summary Attachments Yes No The proposed amendments to the 2016-2025 MTIP for the High Point MPO are included in you packet. Staff is requesting approval of the amendments to the 2016-2025 MTIP. TCC Vote: Motion Second By:__________________ By:_______________________ Vote: For_______________________ Against________________________ 7 High Point RESOLUTION AMENDING THE 2016-2025 HIGH POINT METROPOLITAN TRANSPORTATION IMPROVEMENT PROGRAM Archdale WHEREAS, the Transportation Advisory Committee has reviewed the current 2016-2025 Metropolitan Transportation Improvement Program and found an amendment is necessary; and Denton WHEREAS, the following amendments have been proposed: Jamestown Lexington Thomasville Trinity Wallburg Davidson County Forsyth County Guilford County Randolph County 8 NOW THEREFORE, be it resolved by the Transportation Advisory Committee for the High Point Metropolitan Planning Organization that the 2016-2025 Metropolitan Transportation Improvement Program be amended as listed above on this the 23rd day of February 2016. A motion was made by TAC Member ______________and seconded by TAC member _______________ and approved this the 23rd day of February 2016. _________________________ Neil Grimes Chairman, Transportation Advisory Committee Subscribed and sworn to me this the 23rd day of February 2016. ______________________________________ Notary Public My commission expires ______________________ 9 ADDITIONS to the Transit 2016-2025 MTIP/STIP FY16 FY17 FY18 FY19 FY20 FY21 FY22 STIP # Transit Partner DESCRIPTION match FUND (000) (000) (000) (000) (000) (000) (000) Piedmont Authority for Regional Purchase One Replacement TA-5194 Transportation Vehicle FUZ 5307 400 Local L 100 Piedmont Authority for Regional Purchase One Replacement TA-5196 Transportation Vehicle JARC 5316 400 Local L 100 NOTES: TA-5194 – Project funding originated from FTA Section 5339 funding administered by NCDOT. PART applied under a competitive grant and received funding award. These funds will be transferred to FTA Section 5307 for FTA grant purposes. MTIP action is to have vehicle included in local MPO TIP so funding can be identified in an upcoming FTA Capital grant. STIP action has already been approved by NCDOT-BOT. TA-5196 – Project funding originated from FTA Section 5316 funding administered by NCDOT. PART applied under a competitive grant and received funding award. These funds will be administred under a grant between NCDOT and FTA. MTIP action is to have vehicle included in local MPO TIP so funding can be identified in an upcoming FTA Capital grant. STIP action has already been approved by NCDOT-BOT. ADDITIONS to the Transit 2016-2025 MTIP/STIP FY16 FY17 FY18 FY19 FY20 FY21 FY22 STIP # Transit Partner DESCRIPTION match FUND (000) (000) (000) (000) (000) (000) (000) Piedmont Authority for Regional Transportation – High Point Urban TO-5212 Area Operating 5307 CMAQ 459 Local L 115 Piedmont Authority for Regional Transportation – High Point TA-5197A Urban Area Bus Replacement 5307 CMAQ 380 Local L 95 NOTES: TO-5212 – Project funding originated from HP MPO “Call for Projects.” Project funding was approved by HP MPO, and also received funding award from NCDOT. These funds will be transferred to FTA Section 5307 for FTA grant purposes. MTIP action is to have operating funds included in local MPO TIP so funding can be programmed in the STIP. Funding is established to impement a new Palladium Circulator in North High Point beginning in FY2017, and will be utilized for a three year period at an eligible 80/20 operating ratio for new service in Air Quality maintenance area. TA-5197A – Project funding originated from HP MPO “Call for Projects.” Project funding was approved by HP MPO, and also received funding award from NCDOT. These funds will be transferred to FTA Section 5307 for FTA grant purposes. MTIP action is to have capital funds included in local MPO TIP so funding can be programmed in the STIP. Funding is established for replacement bus in the PART fleet that is operated in North High Point. 10 High Point RESOLUTION Archdale AMENDING THE 2016-2025 HIGH POINT METROPOLITAN TRANSPORTATION IMPROVEMENT PROGRAM WHEREAS, the Transportation Advisory Committee has reviewed the current Denton 2016-2025 Metropolitan Transportation Improvement Program and found an amendment is necessary; and Jamestown WHEREAS, the following amendments have been proposed: ADDITIONS to the Transit 2016-2025 MTIP/STIP Lexington FY16 FY17 FY18 FY19 FY20 FY21 FY22 STIP # Transit Partner DESCRIPTION match FUND (000) (000) (000) (000) (000) (000) (000) Piedmont Authority for Regional Purchase One Replacement Thomasville TA-5194 Transportation Vehicle FUZ 5307 400 Local L 100 Piedmont Trinity Authority for Regional Purchase One Replacement TA-5196 Transportation Vehicle JARC 5316 400 Local L 100 Wallburg ADDITIONS to the Transit 2016-2025 MTIP/STIP Davidson matc FY16 FY17 FY18 FY19 FY20 FY21 FY22 STIP # Transit Partner DESCRIPTION h FUND (000) (000) (000) (000) (000) (000) (000) County Piedmont Authority for Regional Forsyth Transportation – County High Point TO-5212 Urban Area Operating 5307 CMAQ 459 Local L 115 Piedmont Guilford Authority for County Regional Transportation – TA- High Point 5197A Urban Area Bus Replacement 5307 CMAQ 380 Local L 95 Randolph County 11 NOW THEREFORE, be it resolved by the Transportation Advisory Committee for the High Point Metropolitan Planning Organization that the 2016-2025 Metropolitan Transportation Improvement Program be amended as listed above on this the 23rd day of February 2016. A motion was made by TAC Member ______________and seconded by TAC member _______________ and approved this the 23rd day of February 2016. _________________________ Neil Grimes Chairman, Transportation Advisory Committee Subscribed and sworn to me this the 23rd day of February 2016. ______________________________________ Notary Public My commission expires ______________________ 12 CITY OF HIGH POINT NORTH CAROLINA DEPARTMENT OF TRANSPORTATION PUBLIC TRANSPORTATION DIVISION To: Greg Venable, Transportation Planning Administrator From: Angela W. Wynes, Transit Manager Date: February 16, 2016 Subject: FY2016 - 2025 MTIP Amendment High Point Transit System would like to request the attached amendment to project TA-5170 in the FY2016 – FY2025 MTIP for the purchase of one (1) 35 foot low floor. We are requesting TCC/TAC approval of the amendment as soon as possible to allow the MTIP and STIP reflect these projects in order to secure Federal Transit Administration funding. If you need more information, please advise. c: Cassandre’ Haynesworth, NCDOT Public Transportation Division Tamra Shaw, NCDOT Public Transportation Division 13 High Point RESOLUTION AMENDING THE 2016-2025 HIGH POINT METROPOLITAN TRANSPORTATION IMPROVEMENT PROGRAM Archdale WHEREAS, the Transportation Advisory Committee has reviewed the current 2016-2025 Metropolitan Transportation Improvement Program and found an amendment is necessary; and Denton WHEREAS, the following amendments have been proposed: Jamestown Lexington Thomasville Trinity NOW THEREFORE, be it resolved by the Transportation Advisory Committee for the High Point Metropolitan Planning Organization that the 2016-2025 Wallburg Metropolitan Transportation Improvement Program be amended as listed above on this the 23rd day of February 2016. A motion was made by TAC Member ______________and seconded by TAC Davidson member _______________ and approved this the 23rd day of February 2016. County _________________________ Neil Grimes Forsyth Chairman, Transportation Advisory Committee County Subscribed and sworn to me this the 23rd day of February 2016. Guilford County ______________________________________ Notary Public Randolph My commission expires ______________________ County 14 TAC Meeting Meeting Date 2/23/2016 Agenda Item No. 3 Action Requested Information Section Tab Update of NCDOT Project Prioritization 4.0 (SPOT 4.0). (Greg Venable) Information Summary Attachments Yes No Update on SPOT 4.0 projects. TAC Vote: Motion Second By:__________________ By:_______________________ Vote: For_______________________ Against________________________ 15 TAC Meeting Meeting Date 2/23/2016 Agenda Item No. 4 Action Requested Information Section Tab Davidson County Airport Projects. (L.G. Cashion) Information Summary Attachments Yes No Update on projects at the Davidson County Airport. TAC Vote: Motion Second By:__________________ By:_______________________ Vote: For_______________________ Against________________________ 16 TAC Meeting Meeting Date 2/23/2015 Agenda Item No. 5-10 Action Requested Information Section Tab Agency Reports Information Items Attachments Yes No Agenda Item 5 NCDOT Board of Transportation Report (Cheryl McQueary – NCDOT Division 7 Board Member) Agenda Item 6 Division 7 – (Mike Mills) Division 8 – (Darius Sturdivant) Division 9 – (Pat Ivey) Agenda Item 7 Triad Air Awareness (Lorelei Elkins) Agenda Item 8 Transportation Planning Branch Report (Wayne Davis) Agenda Item 9 Hitran (Angela Wynes) Agenda Item 10 PART Report (Scott Rhine) TAC Vote: Motion Second By:__________________ By:_______________________ Vote: For_______________________ Against________________________ 17 NCDOT DIV 7 PROJECTS LOCATED IN HPMPO TIP/WBS # Description Let Date Completion Date Status Cost Comments Design and bid Small Construction. document Install pedestrian improvements on SR 1009 (N. Main Street) at M.A. w/ City, Signal preparation in 43250 Lexington Avenue (WCR, pedestrian signal heads, traffic Mar. 2016 Spring 2016 $140,000 plans submitted for progress by City, islands) Division Traffic City addressing review and approval. signal comments Planning and I-5712 Design activiities Interchange improvements at I-40/US 421 and SR 1850 (Sandy 50126.2.1 1/19/21 FY 2023 underway, R/W $7,800,000 STIP, P3.0 Ridge Road) 50126.3.1 plans complete 1/18/19 R/W plans being U-2412A SR 1486 (Greensboro Road) / SR 4121 (High Point Road), revised - Fall 34802.2.2 STIP, Programmed Widening (part on new location) from SR 4228 (Vickrey Chapel FY 2019 FY 2022 2016 completion, $51,900,000 34802.2.6 due to HB97 Road) to I-74/US 311 Bypass R/W Acquisition - 34802.3.3 10% complete Planning and U-4758 Design activities Improvements to Johnson Street/Sandy Ridge Road from Skeet 40251.2.1 7/16/19 FY2022 underway, R/W $18,300,000 STIP Club Road to I-40 40251.3.1 plans complete 7/21/2017 Central Design in progress, Public U-5169 I-74/US 311 and NC 68 (Eastchester Drive) interchange workshop early 45220.2.1 6/19/18 FY 2020 $15,775,000 STIP improvements 2016, R/W 45220.3.1 plans complete 6/17/16 R/W Certified, System 17BP.7.R.22 Bridge #895 on SR 1486 (Lexington Ave.) over Bouldin Branch 2/18/16 Summer 2016 Project let $577,000 Preservation, M.A. pending executed 18 NCDOT DIV 7 PROJECTS LOCATED IN HPMPO TIP/WBS # Description Let Date Completion Date Status Cost Comments Design in B-5358 progress, R/W 46072.1.1 STP funds, LAP, Replace Bridge #428 on Model Farm Rd over Richland Creek 9/30/16 Summer 2017 plans complete; $1,050,000 46072.2.FD1 City match City acquiring 46072.3.FD1 R/W I-5767 Pavement Rehabilitation: I-74/US-311 from 0.7 miles East of I- 53010.3.1/ Project let NHPP - Interstate 40 to the Guilford /Forsyth County Line to SR1300 (E. Green 2/16/16 Summer 2017 $20,600,000 I-5736 pending Maintenance Drive) 52018.3.1 I-5821 Design and bid 50464.3.1 package I-5789 Pavement Rehabilitation: I-85 from 0.4 miles South of I-85 NHPP - Interstate 4/19/16 Summer 2017 submittal to $9,900,000 53029.3.1 Business to South of SR 1009 (S. Main St.) in Archdale Maintenance Raleigh-75% I-5738 Complete 52020.3.1 Design and bid I-5734 package 52010.3.1 Pavement Rehabilitation: I-40 from 1.1 miles East of SR 1556 NHPP - Interstate 5/17/16 Summer 2017 submitted to $9,664,000 I-5762 Gallimore Dairy Rd to Forsyth County Line Maintenance Raleigh - 100% 53005.3.1 complete 19 Contract Number: C202881 Route: SR-4121 Division: 7 County: Guilford TIP Number: U-2412B, U-2524AE Length: 4.836 miles Federal Aid Number: NHS-124-1(17) NCDOT Contact: J. Paul Ingram, PE NCDOT Contact No: (336)487-0150 Location Description: SR-4228 (VICKERY CHAPEL RD) TO SR-1424 (HILLTOP RD); GREENSBORO WESTERN LOOP INTERCHANGE AT HIGH POINT RD. Contractor Name: APAC - ATLANTIC, INC. THOMPSON ARTHUR DIVISION Contract Amount: $40,094,959.99 Cost Overrun/Underrun: 0% Work Began: 10/05/2012 Letting Date: 08/21/2012 Original Completion Date: 05/13/2016 Revised Completion Date: 08/03/2016 Scheduled Progress: 99.6% Actual Progress: 83.79% Contract Number: C203237 Route: US-70 Division: 7 County: Guilford Length: 0 miles Federal Aid Number: NCDOT Contact: Kris Lorenz, PE NCDOT Contact No: (336)487-7080 Location Description: REHAB BRIDGE #217, 259 & 274 ON US-220 AND #1, 136 & 470 ON SR-2254 (WENDOVER AVE). Contractor Name: ASTRON GENERAL CONTRACTING COMPANY INC Contract Amount: $1,274,112.00 Cost Overrun/Underrun: 0% Work Began: 06/14/2013 Letting Date: 02/19/2013 Original Completion Date: 09/28/2013 Scheduled Progress: 100% Actual Progress: 82.31% Contract Number: C203256 Route: SR-1820 Division: 7 County: Guilford TIP Number: U-3615B Length: 3.388 miles Federal Aid Number: STP-1820(5) NCDOT Contact: J. Paul Ingram, PE NCDOT Contact No: (336)487-0150 Location Description: SR-1820 (SKEET CLUB RD) FROM EAST OF SR-1818 (JOHNSON ST) TO WEST OF NC- 68 (EASTCHESTER DR) IN HIGH POINT. Contractor Name: APAC - ATLANTIC, INC. THOMPSON ARTHUR DIVISION Contract Amount: $30,898,017.15 Cost Overrun/Underrun: 0% Work Began: 05/20/2015 Letting Date: 01/20/2015 Original Completion Date: 03/29/2019 Revised Completion Date: 03/28/2020 Scheduled Progress: 0% Actual Progress: 0.33% Contract Number: C203433 Route: I-73 Division: 7 County: Guilford TIP Number: I-5110, I-5110A, R-2413A R-2413B Length: 9.4 miles Federal Aid Number: NCDOT Contact: Brian V. Smith NCDOT Contact No: (336)375-1774 Location Description: FUTURE I-73 FROM EXISTING SR-2085 (JOSEPH M BRYAN BLVD) / AIRPORT PKWY INTERCHANGE TO SOUTH OF US-220 NEAR HAW RIVER. Contractor Name: FLATIRON CONSTRUCTORS, INC. BLYTHE DEVELOPMENT CO JOINT VENT Contract Amount: $176,550,000.00 Cost Overrun/Underrun: 0% Work Began: 05/07/2014 Letting Date: 04/03/2014 Original Completion Date: 04/25/2017 Revised Completion Date: 10/18/2017 Scheduled Progress: 45.86% Actual Progress: 47.38% 20 Contract Number: C203627 Route: - Division: 7 County: Guilford TIP Number: C-5558 Length: 80 miles Federal Aid Number: CMS-0710(29) NCDOT Contact: Kris Lorenz, PE NCDOT Contact No: (336)487-7080 Location Description: CITY OF HIGH POINT SIGNAL SYSTEM Contractor Name: HAYNES ELECTRIC UTILITY CORP. Contract Amount: $0.00 Cost Overrun/Underrun: 0% Work Began: Letting Date: 10/20/2015 Original Completion Date: 02/15/2019 Scheduled Progress: 0% Actual Progress: No work at this time Contract Number: C203640 Route: - Division: 7 County: Guilford Length: 0.431 miles Federal Aid Number: NCDOT Contact: Kris Lorenz, PE NCDOT Contact No: (336)487-7080 Location Description: REPLACE 4 BRIDGES IN GUILFORD COUNTY AND 3 BRIDGES IN ORANGE COUNTY. Contractor Name: HAYMES BROTHERS, INC. Contract Amount: $0.00 Cost Overrun/Underrun: 0% Work Began: Letting Date: 04/21/2015 Original Completion Date: 11/01/2017 Scheduled Progress: 0% Actual Progress: No work at this time Contract Number: C203641 Route: SR-2719 Division: 7 County: Guilford Length: 0.685 miles Federal Aid Number: NCDOT Contact: Christopher D. Kirkman, PE NCDOT Contact No: (336)570-6830 Location Description: REPLACE 5 BRIDGES IN GUILFORD COUNTY AND 5 BRIDGES IN ORANGE COUNTY. Contractor Name: R.E. BURNS & SONS CO., INC. Contract Amount: $5,940,323.00 Cost Overrun/Underrun: 0% Work Began: 06/01/2015 Letting Date: 04/21/2015 Original Completion Date: 11/01/2018 Scheduled Progress: 5.5% Actual Progress: 15.89% Contract Number: DG00219 Route: SR-2509 Division: 7 County: Guilford Length: 10.993 miles Federal Aid Number: NCDOT Contact: J. Paul Ingram, PE NCDOT Contact No: (336)487-0150 Location Description: RESURFACE SR 3093, SR 3029, SR 2826, SR 2732 AND SR 2509 Contractor Name: BLYTHE CONSTRUCTION, INC. Contract Amount: $1,065,598.39 Cost Overrun/Underrun: 0% Work Began: 07/20/2015 Letting Date: 10/16/2014 Original Completion Date: 11/20/2015 Scheduled Progress: 0% Actual Progress: 80.37% 21 Contract Number: DG00260 Route: NC-22 Division: 7 County: Guilford Length: 12.856 miles Federal Aid Number: NCDOT Contact: Kris Lorenz, PE NCDOT Contact No: (336)487-7080 Location Description: RESURFACE NC 22 FROM THE RANDOLPH COUNTY LINE TO NC 62 TO JOINT NORTH OF SR 1486 (LEXINGTON AVENUE) Contractor Name: SHARPE BROTHERS A DIV OF VECELLIO & GROGAN, INC. Contract Amount: $0.00 Cost Overrun/Underrun: 0% Work Began: Letting Date: 07/16/2015 Original Completion Date: 11/15/2016 Scheduled Progress: 0% Actual Progress: No work at this time Contract Number: DG00261 Route: NC-22 Division: 7 County: Guilford Length: 5.217 miles Federal Aid Number: NCDOT Contact: J. Paul Ingram, PE NCDOT Contact No: (336)487-0150 Location Description: RESURFACE A PORTION OF SR 1001, SR 1008, SR 3163 AND SR 2851 Contractor Name: APAC - ATLANTIC, INC. THOMPSON ARTHUR DIVISION Contract Amount: $0.00 Cost Overrun/Underrun: 0% Work Began: Letting Date: 07/16/2015 Original Completion Date: 11/15/2016 Scheduled Progress: 0% Actual Progress: No work at this time Contract Number: DG00262 Route: - Division: 7 County: Guilford Length: 0.098 miles Federal Aid Number: NCDOT Contact: Kris Lorenz, PE NCDOT Contact No: (336)487-7080 Location Description: REPLACE BRIDGE NUMBER 338 ON SR 1859 (BOYLSTON ROAD) OVER WEST FORK OF DEEP RIVER (TRIBUTARY 1) Contractor Name: SMITH-ROWE, LLC Contract Amount: $0.00 Cost Overrun/Underrun: 0% Work Began: 02/01/2016 Letting Date: 08/06/2015 Original Completion Date: 03/01/2017 Scheduled Progress: 0% Actual Progress: No estimate at this time Contract Number: DG00265 Route: - Division: 7 County: Guilford Length: 31.1 miles Federal Aid Number: NCDOT Contact: Jason Ryan Julian NCDOT Contact No: (336)634-5635 Location Description: RESURFACE 39 SECONDARY ROADS IN GUILFORD COUNTY AND ONE SECONDARY ROAD IN ROCKINGHAM COUNTY Contractor Name: WHITEHURST PAVING CO INC Contract Amount: $0.00 Cost Overrun/Underrun: 0% Work Began: Letting Date: 10/15/2015 Original Completion Date: 08/31/2016 Scheduled Progress: 0% Actual Progress: No work at this time 22 23 High Point Urban Area MPO NCDOT Transportation Update (Davidson County) Tuesday, February 16, 2016 Construction T.I.P. No. Description Let Date Completion Date Status Contractor Comments Cost Projects under Construction Replace Bridge #27 on US 52/NC 8 over US 29/64/70/I- May 1, 2019 Availability date B-3159 Oct. 20, 2015 (perm. vegetation established $10,164,621 J.T. Russell & Sons, Inc. Utility relocation work is underway 85 Bus. Loop in Lexington October 28, 2019) April 1, 2016 June 15, 2016 Work start date April 6, 2015. Traffic is now on new structure in Replace Bridge #38 on SR 1493 (Frye Bridge Rd) over (Perm. vegetation 88% Complete B-4741 Dec. 16, 2014 $2,333,794 Dane Construction, Inc. final traffic pattern. Road to remain open during Muddy Creek in Davidson County established (20% ahead of schedule) Dec. 12, 2016) construction,with new bridge being built next to existing. June 15, 2016 (Perm. vegetation 99% Complete Work is ongoing on new bridge - roadway to stay open. C-4901A NCRR/NS Mainline Bowers to Lake Railroad Roadbed June, 2013 $15,738,016 Blythe Construction, Inc. established (10% ahead of schedule) Minimal to no impact to vehicular traffic. Oct. 28, 2016) Contract Landscaping on I-85 from (SR 1224) Approx. 20% Contractor began work on Nov. 3, 2015. Currently planting I-2304AC/AD (L) Hardgrave Rd in Davidson Co. to (SR2120) Long Ferry Sept. 23, 2015 May 6, 2018 $1,281,336 Staniel Key Landscaping Complete trees. Rd in Rowan Co. Pavement Rehabilitation, Bridge Preservation, and March 15, 2016 DDRL Project - Contractor will be paving SB lanes and Marco Upgrade to Interstate Standards - US 29/52/70/I-85 Bus. (revised) 92.2% Complete St first week of February. Traffic shift on Feb. 1 on SB side R-4750 From I-85 to south of SR 1147 (Salisbury Rd) and September, 2013 (Perm. vegetation (schedule has been $7,571,155 J. T. Russell & Sons, Inc. from outside lane to inside lane. All work except some Bridges #43 & #225 over Swearing Creek on US established revised) pavement markings and rumble strips should be complete by 29/52/70. June 4, 2016) mid-March. 110 days Work not yet begun, scheduled to start Feb. 15, 2016. Replace Bridge #361 on SR 1837 (Bud Sink Rd) over Leonard (perm. vegetation Availability date Completion of project to be 110 calendar days (May 8 - June BD-5109L Creek in Davidson County. Includes Grading, Drainage, Dec. 9, 2015 $378,498 TCB Builders, LLC established by Jan. 25, 2016 18, 2016) from established availability date (Jan. 19 - Feb. 29, Widening, Structure, Paving, and Pavement Markings. Dec. 31, 2016) 2016). June 23, 2016 Replace Bridge #40 on SR 1298 / I-85 Service Rd (perm. vegetation 15.1% Complete Work began December 7, 2015. Road is closed with off-site 17.BP.9.R.3 October 28, 2015 $830,623 Smith-Rowe LLC (Grimes Blvd) over Swearing Creek in Davidson County. established (on schedule) detour. Dec. 9, 2016) Design Build Project - (Dvdsn Co) Bridge #235 (Hedrick Mill) Rehabilitation and bridge beam painting of (4) bridges in complete; #303 (Ball Rd) complete; #431 (Old 64) complete; 17BP.9.R.34 Davidson Co., (1) in Forsyth Co., (3) in Rowan Co., and April, 2012 Oct. 20, 2016 97.1% Complete $12,585,775 Crowder Construction Co. #424 (E Center St) work to start on Oct. 24, 2015 and (1) in Stokes Co. projected to complete Oct. 20, 2016. Permitting and Express Design Build Contract - Br. #258 over Swearing DESIGN BUILD - Replace two (2) Bridges in Davidson design work begun Creek on SR 1272, and Br. #410 over Leonard Creek on SR 17BP.9.R.61 Co., one (1) Bridge in Davie Co., three (3) Bridges in May 19, 2015 June 30, 2019 $10,642,621 Smith-Rowe, LLC (Anticipate construction work 1844 in Davidson; (1) bridge in Davie; (2) bridges in Rowan; Rowan Co., and four (4) Bridges in Stokes Co. to begin Summer, 2016) and (4) bridges in Stokes Co. Permitting and Express Design Build Contract - Br. #86 over First Potts Creek Mountain Creek DESIGN BUILD - Replace three (3) Bridges in Davidson design work begun on SR 1158, Br. #95 over Leonard Creek on SR 1838, and Br. 17BP.9.R.62 May 19, 2015 September 1, 2018 $4,740,000 Contractors/SEPI Co. and seven (7) Bridges in Rowan Co. with Culverts (Anticipate construction work #471 over Unnamed Creek on SR 2416 in Davidson Co. and to begin Spring, 2016) Engineering (7) bridges in Rowan Co. Milling and resurfacing of 3.8 miles of US 64 from RR 2016CP.09.01. Availability date Division Let contract. Continuation of previous resurfacing crossing near Decker Rd. to the end of concrete island Aug. 12, 2015 May 20, 2016 $1,035,588 J.T. Russel & Sons, Inc. 10291.1 Sept. 21, 2015 map. Work scheduled to begin after March 15, 2016. near Linda Pl., just W. of I-85. Contract Resurfacing of 2 sections of NC 8, 1 section of 9CR.10291.160, May 25, 2016 Work began August 3, 2015. Work over the next few months US 64, 1 section of NC 68 and 8 sections of Secondary May 19, 2015 26% Complete $3,755,440 J.T. Russell & Sons, Inc. 9CR.20291.160 (revised) will be limited by temperatures. routes (20.54 miles) in Davidson County. Davidson County Asphalt Surface Treatment (AST) Preconstruction meeting held Aug. 19, 2015. Work began 9SP.20295.4 Retreatment (58.79 miles) of various Secondary routes June 10, 2015 May 25, 2016 50% Complete $1,455,996 Blythe Construction, Inc. Sept. 22, 2015. Seasonal limitations in force currently, plan to in Davidson Co. start back in April, 2016. 24 Construction T.I.P. No. Description Let Date Completion Date Status Contractor Comments Cost Projects under Development Bridge Preservation project - Plans are currently being Bridge Preservation – Bridge #31 on NC 8, Bridges #55 revised. Bridge #55 will be dropped from this contract and 41665.6A TBD TBD $1,600,000 TBD & 82 on NC 47 in Davidson County completed under another project at a later date. Finalizing structure plans. Replace Bridge #42 on SR 1485 (Hampton Rd) over ROW B-5165 FY 2017 TBD $1,800,000 TBD *Schedule based on Approved 2016-2025 STIP Muddy Creek FY 2016 Replace Bridge #115 on SR 1711 (Gumtree Rd) over ROW B-5765 FY 2021 TBD $1,700,000 TBD *Schedule based on Approved 2016-2025 STIP WSSB RR FY 2019 Replace Bridge #25 on SR 3346 (S. Main St) over ROW B-5773 FY 2025 TBD $3,250,000 TBD *Schedule based on Approved 2016-2025 STIP WSSB RR in Lexington FY 2023 Replace Bridge #99 on SR 1810 (Clodfelter Rd) over ROW *Schedule based on Approved 2016-2025 STIP - Project B-5774 FY 2020 TBD $1,200,000 TBD Brushy Creek FY 2019 accelerated due to additional revenue (HB 97) Replace Bridge #100 on SR 1810 (Clodfelter Rd) over ROW *Schedule based on Approved 2016-2025 STIP - Project B-5776 FY 2020 TBD $1,800,000 TBD Abbott's Creek FY 2019 accelerated due to additional revenue (HB 97) ROW B-5777 Replace Bridge #58 on NC 109 over US 64 FY 2022 TBD $1,850,000 TBD *Schedule based on Approved 2016-2025 STIP FY 2021 Replace Bridge #118 on US 29NB/64EB/70EB/I-85 Bus ROW *Schedule based on Approved 2016-2025 STIP - Coordinate B-5779 FY 2025 TBD $4,061,000 TBD NB over SR 3346 (N Main St) in Lexington FY 2024 with B-5785 ROW Acquisition in B-5780 Replace Bridge #17 on NC 47 over Swearing Creek FY 2017 TBD $1,400,000 TBD Hydraulic Study complete. progress Replace Bridge #164 and Bridge #168 on US 29/70/I-85 ROW B-5783 FY 2025 TBD $5,778,000 TBD *Schedule based on Approved 2016-2025 STIP Bus over NSRR FY 2024 Replace Bridge #121 and Bridge #122 on US 29/70/I-85 ROW *Schedule based on Approved 2016-2025 STIP - Coordinate B-5785 FY 2025 TBD $4,000,000 TBD Bus over Leonard Creek FY 2024 with B-5779 ROW B-5787 Replace Bridge #29 on NC 49 over NC 109 FY 2024 TBD $2,000,000 TBD *Schedule based on Approved 2016-2025 STIP FY 2023 Extend Sidewalks on SR 3346 (S Main St) and provide Planning/Design/ Construction by City of C-5216 wide paved shoulders on Anna Lewis Dr and Emergency FY 2016 TBD Right of Way in $601,000 *Schedule based on Approved 2016-2025 STIP Lexington Dr. in Lexington progress Provide wide paved shoulders and construct sidewalks Planning/Design/ Construction by City of C-5217 on Cornelia St and Hillsdie Dr. Bike and Pedestrian FY 2016 TBD Right of Way in $190,000 *Schedule based on Approved 2016-2025 STIP Lexington Improvements on Mize and Biesecker Rds. progress Pavement Rehabilitation of I-85 from SR 2025 (Squire Planning and Design I-5793 FY 2018 TBD $6,386,000 TBD *Schedule based on Approved 2016-2025 STIP Bowers Rd) to 0.3 mi N. of NC 109 in Thomasville in Progress Pavement Rehabilitation of I-85 from 1.7 mi N of SR Availability date *Schedule based on Approved 2016-2025 STIP I-5740 Feb. 24, 2016 August 31, 2016 $200,000 TBD 2205 (Old US 64) to 0.3 mi N of US 64 April 4, 2016 Currently advertised for bid NC 109 from SR 1756 (Old Greensboro Rd) in Davidson R-2568C *Post Year TBD Planning and Design $129,000,000 TBD Currently being re-evaluated in STIP - UNFUNDED County to I-40/US 311 in Forsyth County. Convert at grade intersection to Interchange on US ROW R-5737 FY 2021 TBD $15,000,000 TBD *Schedule based on Approved 2016-2025 STIP) 29/70/I-85 Bus at SR 1798 (Old Greensboro Rd) FY 2019 SS-4909AH Install left turn lane on Hickory Tree Rd (SR 1508) near Availability date Feb. 24, 2016 September 30, 2016 $660,000 TBD Currently advertised for bid U-4742NC Mendenhall Road in Davidson County. April 4, 2016 Widen NC 8 (Winston Rd) to multi-lanes from 9th St to Planning and Design U-5757 FY 2019 TBD $1,254,000 TBD *Schedule based on Approved 2016-2025 STIP SR 1408 (Biesecker Rd) in Lexington in Progress Widen SR 1508 (Hickory Tree Rd) from US 52/NC ROW U-5786 FY 2023 TBD $13,794,000 TBD *Schedule based on Approved 2016-2025 STIP 8/Future I-285 to NC 150 FY 2021 Widen NC 150 to multilanes from US 64 (SR 1493, Frye ROW & Utilities *Schedule based on Approved 2016-2025 STIP - New U-5902B Post Year TBD $33,150,000 TBD Bridge Rd) to Forsyth County Line FY 2024 project programmed due to additional revenue (HB 97) Safety Improvements to median crossovers, etc., on I-85 ROW Division Let. Public meeting scheduled for Jan. 14, 2016 at W-5601CF Business from SR1797 (Evans Rd) to SR 1963 (Moose January , 2017 TBD $600,000 TBD June 2016 Davidson County Community College. Lodge Rd) in Davidson Co. 25 Construction T.I.P. No. Description Let Date Completion Date Status Contractor Comments Cost Projects Under Development Bridge Painting on Bridges #136, 150 in Davidson;#'s Funding issues. There will be plan revisions and a new letting 17BP.9.P.3 29,32,85,86 in Davie; #'s 53,54,55,78,115,185,297,322 TBD TBD $5,000,000 TBD date - to be determined. in Forsyth; and #94 in Rowan County. Letting date delayed due to funding and other priorities. Replace Bridge #271 on SR 2501 (S. Main St. Ext./ Lick ROW Acquisition 17.BP.9.R.10 June, 2016 TBD $1,000,000 TBD Coordinating with ALCOA to begin construction. Utility Creek Ch. Rd) over Lick Creek in Davidson County. in progress. relocation in progress Replace Bridge #221 on SR 2324 (Harris Rd) over Lick Plan Preparation 75% Complete; Let date is funding 17.BP.9.R.15 TBD TBD $525,000 TBD Creek in Davidson County. dependent Replace Bridge #459 on SR 2160 (Smith Rd) over an 17BP.9.R.33 Nov., 2016 TBD $250,000 TBD Letting date delayed due to funding and other priorities. unnamed creek in Davidson County. Replace Bridge #63 on SR 1481 (Welcome-Arcadia Rd) This project will not be pursued at this time. Will be deleted 17BP.9.R.57 TBD TBD $443,000 TBD over Reedy Creek in Davidson County. from program due to funding rules and bridge condition. 9CR.10291.161 Contract Resurfacing of various sections of Primary and April, 2016 TBD $3,100,000 TBD Centrally let 9CR.20291.161 Secondary routes in Davidson County Completed Projects Davidson County Asphalt Surface Treatment (Chip Seal) 9SP.20295.3 April 8, 2015 August 28, 2015 100% Complete $1,555,785 APAC Atlantic, Inc. One year warranty in effect. Contract March 15, 2015 Landscaping at Bridge #39 on US 64 over US 29/70/I-85 (Perm. Vegetation Country Boy Landscaping B-4497L Dec. 10, 2014 100% Complete $14,999 Bus in Davidson Co. established Inc. Nov. 20, 2015) Aug. 15, 2015 Replace Bridge #11 on SR 1155 (Swicegood Rd) over (perm. vegetation BD-5109V Mar. 11, 2015 100% Complete $572,994 Dane Construction, Inc. First Potts Creek in Davidson County. established Dec. 30, 2015) April 30, 2015 Grade separation on SR 2024 (Upper Lake Rd) over (perm. vegetation DH Griffin Construction C-4901B March, 2013 100% Complete $4,203,035 ARRA Rail Project - Complete and accepted Hamby Creek / NCRR established Co., LLC Nov. 11, 2015) 26 Triad Air Awareness January, 2016  Air Quality Notes:  Clean Fuels Advanced Technologies Grant (CFAT) o The CFAT grant request for proposals is open until March 1st. The CFAT project is funded by the N.C. DOT and administered by the NC Clean Energy Technology Center. o More information can be found here: https://nccleantech.ncsu.edu/clean- transportation/clean-transportation-projects/clean-fuel-advanced-technology- project/  Interim I/M Study Bill report o State legislature did not act on House bill; expect legislature to pick up bill in 2016 short session. o DAQ will be preparing a final I/M study report for the NC General Assembly by the end of March 2016 now that the EPA has finalized revisions to the 2015 8-hour ozone  FHWA Webinar Series: Advancing a Sustainable Highway System o The Sustainable Transport and Climate Change Team within FHWA’s Office of Natural Environment recently posted webinar recordings related to the FHWA report Advancing a Sustainable Highway System: Highlights of FHWA Sustainability Activities. o Report illustrates how sustainability has been incorporated into a wide variety of FHWA programs, projects, policies, processes, and partnerships. o Webinar recordings and transcripts are available at: https://www.sustainablehighways.dot.gov/FHWA_Sustainability_Activities_We binars.aspx o If you have any questions regarding the webinar series or the report, please contact Connie Hill: Connie.Hill@dot.gov or (804) 775-3378.  Registration for the NC Breathe Conference is now open. o April 8, 2016 Bridging Research on Economics and Air Quality for the Health of Everyone o http://ncbreatheconference.org/ 27  Air Quality Report:  Historic AQI results AQI Results (Ozone and PM2.5) ORANGE or GREEN YELLOW higher 2005 181 175 9 2006 186 171 8 2007 201 156 8 2008 217 133 16 2009 270 94 1 2010 230 123 12 2011 247 110 8 2012 273 85 7 2013 252 112 1 2014 222 143 0 2015 271 93 1 Air quality outreach & education programs available for school, civic group and businesses. Contact Triad Air Awareness at (336) 703-2449 or ElkinsLT@forsyth.cc, Lorelei Elkins 28 Piedmont Authority for Regional Transportation Updates for the High Point MPO TCC/TAC February 2016 PART Express Updates Amtrak Thruway Tickets: On January 1, 2016 PART Express started accepting the Amtrak Thruway Tickets. The Amtrak Thruway ticket will be a convenient and seamless transaction for Amtrak passengers to ride Route 5. Route Adjustment Implemented 1/11/16: Route 9 Business 85 Express was adjusted 1/11/16 providing more service & frequency between Davidson County and High Point. The route is picking up more Shown Above: PART Express ridership was 37,778 for December passengers and growing every day. Route 3 High 2015 with an annual projection of 489,780 for FY 2016. Point Express is now serving the Palladium Shopping Center with more access for passengers. Planning Department Updates Route Analysis • Route 10 Evaluation Underway • Working with NCDOT Modeling group to use Piedmont Triad as pilot project for the evaluation of TBEST Ridership Forecast Model • Developed draft bus transit mitigation plan for Business 40 closure Regional Travel Demand Model • Selected Contractor and prepared contract for Freight Model Work Regional Activities To learn more about PART’s programs and projects, please • Working on Joint Bus Advertising Contract with visit www.partnc.org partner transit agencies • Regional Smart Card & Pay by phone Fare Collection Stay Connected with PART on Social Media! being studied Page 1 of 2 29 Page 2 of 2 PART Board Officers for 2016 New Vanpool Fares Chairperson: Dan Besse, Winston-Salem City Council Now is a great time to join a Vanpool! New Vice Chairperson: Leonard Williams, Burlington- Vanpool Fares have been posted on the PART Graham TAC Website. Treasurer: Carolyn Coleman, Guilford County Board of Commissioners Secretary: Ronda Jones, Stokes County Board of Commissioners Piedmont Transit Resources Call Center Celebrates 6 Months of Operation On August 2, 2015 the Piedmont Authority for Regional Transportation (PART) launched the Piedmont Transit Resources Call Center. This Call Center is a regional transportation information center representing the public transit services offered by Hi tran, Davidson County Transportation, and PART. Staff is available to answer questions regarding: Bus route schedules & fares, Real-time bus status, Transit trip planning, Carpool & Vanpool information, Airport Area Shuttle Request, Pass sales, Emergency Ride Home, and More! The Piedmont Transit Resources Call Center employs 5 staff members and is open Monday-Friday 6:00AM – 7:00PM. You can reach the call center at 1-800-588-7787. 30

Get email alerts for High Point

A daily email when new agendas and minutes are posted.

Report an issue with this meeting