Muyni
← Back to High Point

HPMPO Transportation Advisory Committee (TAC)

Regular Meeting

High Point, NC · August 23, 2022

Agenda

Agenda

HIGH POINT URBAN AREA MPO TRANSPORTATION ADVISORY COMMITTEE (TAC) Agenda for the August 23, 2022 TAC Meeting 10:00 AM High Point Museum – Lecture Gallery 1859 E. Lexington Ave, High Point Ethics Statement In accordance with the State Government Ethics Act, it is the duty of every TAC member to avoid conflicts of interest. Does any TAC member have any known conflict of interest with respect to any matters coming before the TAC today? If so, please identify the conflict and refrain from any participation in the particular matter involved. Public Comment Period Action Items 1. Consideration of the June 28th TAC meeting minutes (Martha Wolfe) Page 1 2. Consideration of amendments to the 2020-2029 MTIP (John Hanes) Page 6 Information Items 3. STIP Format and P7.0 Schedule Update (Greg Venable) Page 9 Agency Reports 4. NC Board of Transportation Report (Mike Fox) 5. Division Engineer’s Reports • Division 7 (Wright Archer) Page 11 • Division 8 (Patrick Norman) Page 16 • Division 9 (Pat Ivey) Page 17 6. Federal Highway Administration Report (Suzette Morales) 7. NCDOT Transportation Planning Branch Report (Michael Abuya) 8. NCDOT Integrated Mobility Division (Alex Rotenberry) 9. Public Transportation Reports High Point Transit System (Angela Wynes) Davidson County Transportation (Richard Jones) RCATS (Tawanna Williams) PART (Scott Rhine) Page 19 Next TAC Meeting September 27, 2022 TAC Meeting Meeting Date 8/23/2022 Agenda Item No. 1 Action Requested Approve Section Tab Consideration of the June 28th TAC meeting minutes. (Martha Wolfe) Information Summary Attachments Yes No The complete meeting minutes are in your packet as Attachment 1. TAC Vote: Motion Second By:__________________ By:_______________________ Vote: For_______________________ Against________________________ 1 MINUTES TRANSPORTATION ADVISORY COMMITTEE June 28, 2022 TAC MEMBERS PRESENT: Martha Wolfe, Larry Warlick, Doug Hunt, Lynn Reece, Jame Upchurch, Darrell Frye, Lisa Mathis, Suzette Morales TCC MEMBERS PRESENT: Greg Venable, Bryan Kluchar, Michael Abuya, Jason Miller, Roger Jones, Chuck George, Stevie Cox, Wright Archer, Pat Ivey, Scott Rhine MPO Staff: John Hanes, Gwen Ford, Andrew Edmonds, Tabatha J’Arrante OTHERS PRESENT: Mike Horney, Jim Myers, Phillip Craver, Richard Jones, Kathy Vollert, Tawana Williams, Dawn Vallieres RECORDING STAFF: Microsoft Teams Reading of the Ethics Statement: Martha Wolfe read the Ethics Statement. Public Comment Period: No comments. Action Items Item 1: Consideration of the April 26th TAC meeting minutes. Motion by: Darrell Frye Seconded: Larry Warlick Vote: For: Unanimous Against: None Item 2: Consideration of amendments to the 2020-2029 MTIP. John Hanes reported that there was two additions to the 2020-2029 MTIP; HE-0008 (US 64 in Davidson County) and HL-0060 (High Point signal system retiming study). There were also several modifications to statewide projects in the 2020-2029 MTIP. Motion by: Doug Hunt Seconded: Larry Warlick Vote: For: Unanimous Against: None 2 Item 3: Consideration of Section 5307 funding allocation. Andrew Edmonds reported that a request to the NCDOT Integrated Mobility Division had been sent to allocate FFY22 Section 5307 to the following recipients: Guilford County - $100,000 Davidson County - $300,000 PART – $900,000 High Point - $2,884,618 Motion by: Larry Warlick Seconded: Darrell Frye Vote: For: Unanimous Against: None Information Items Item 4: STIP Format and P7.0 Schedule Update Greg gave an update on the STIP and P7.0 schedule. TAC and TCC members were emailed a spreadsheet from Van Argabright that updated the P7.0 schedule as well as project list and funding. Division offices will hold public drop in sessions for STIP review throughout July and August. Item 5: Bus and Bus Facilities Letter of Support Andrew reported that FTA announced that there would be $372 million available for transit agencies for FY22. High Point Transit System had requested letters of support (included in packet) for four project applications submitted on May 31st: 1) Five Points Transfer Hub, 2) an operator training facility, 3) an addition to the maintenance facility, and 4) a new vehicle to replace aging fleet. Item 6: Bipartisan Infrastructure Law Opportunities & Safe Streets for All Andrew gave a presentation of the BIL and Safe Streets for All program. Included in the presentation was an overview of the BIL legislation, key programs for roads, bridges, and transit for area stakeholders, detailed for information about the Safe Streets for All program, and review of key planning provisions and programs. 3 Agency Reports Item 7. NCDOT Board of Transportation Report Lisa Mathis reported on the IIJA’s significance of infrastructure invest. The was written with several things in mind such as health, safety, climate, environmental, and resilience. She emphasized considering grants that covered multiple categories to have improve chances of a successful grant. We are entering into the “100 deadliest days”, between Memorial Day and Labor Day which see teen fatality deaths rise. Item 8. NCDOT Division Reports Division 7 Wright Archer gave the Division 7 report. Updates were given on the Jamestown Bypass, South Main Street/Business 85 interchange, and NC 68 projects. Nothing else to add beside what is in the packet other that the Business 85/South Main Street project in High Point is now underway. Division 8 Bryan Kluchar gave the Division 8 report and highlighted projects in the draft STIP. Division 9 Pat Ivey gave an updates on the US 27-70/Old Greensboro Road (R-5737), I-85/NC 109 (47796), Gumtree Road (WSSB RR) (B-5765), and NC 8 (U-5757) projects. Item 9. Federal Highway Administration Report. Suzette Morales shared additional information on the BIL. She mentioned the Bridge Investment Program grant and the funding available for it. The federal registry updated the definition of “urban area” and the final definition was adopted in March. This fall the urban area boundaries should be completed. Item 10. NCDOT Transportation Planning Branch Report. Michael Abuya had no updates. Item 11. Public Transportation Reports High Point Transit Andrew Edmonds had nothing to report. 4 Davidson County Transportation Richard Jones reported that Davidson County Transportation are still working on their submittal to become a direct recipient for FTA funding. RCATS No report given. PART Scott Rhine discussed the TDM updates. PART continues to expand mobile faring and will share more information at future meetings. Freight model will be moving forward and be used for project prioritization/SPOT process. The household survey is kicking off and will moving continuing through the new fiscal year. August 1st there will be service expansion of Route 10 in Randolph County. North Carolina is in consideration to host the 2027 World University Games and PART will be working on the mobility aspect with other agencies should North Carolina be awarded these games. 5 TAC Meeting Meeting Date 8/23/2022 Agenda Item No. 2 Action Requested Approve Section Tab Consideration of approval of amendments to the 2020-2029 MTIP. (John Hanes) Information Summary Attachments Yes No The proposed amendments to the 2020-2029 MTIP for the High Point MPO are included in you packet. Staff is recommending approval of the MTIP amendments. TAC Vote: Motion Second By:__________________ By:_______________________ Vote: For_______________________ Against________________________ 6 High Point RESOLUTION Archdale AMENDING THE 2020-2029 HIGH POINT METROPOLITAN TRANSPORTATION IMPROVEMENT PROGRAM WHEREAS, the Transportation Advisory Committee has reviewed the 2020-2029 Denton Metropolitan Transportation Improvement Program and found an amendment is necessary; and Jamestown WHEREAS, the following amendments have been proposed: Lexington Thomasville Trinity Wallburg Davidson County Forsyth County Guilford County Randolph County 7 High Point Archdale Denton Jamestown Lexington Thomasville Trinity Wallburg Davidson County NOW THEREFORE, be it resolved by the Transportation Advisory Committee for the High Point Metropolitan Planning Organization that the 2020-2029 Metropolitan Forsyth Transportation Improvement Program be amended as listed above on this the 23rd day of County August 2022. A motion was made by TAC Member ______________and seconded by TAC Guilford member _______________ and approved this the 23rd day of August 2022. County _________________________ Martha Wolfe, Randolph Chair, Transportation Advisory Committee County Subscribed and sworn to me this the 23rd day of August 2022. ______________________________________ Notary Public My commission expires ______________________ 8 TAC Meeting Meeting Date 8/23/2022 Agenda Item No. 3 Action Requested Information Section Tab STIP Format and P7.0 Schedule Update (Greg Venable) Information Summary Attachments Yes No Update on STIP format and P7.0 process. Below are following key items: • All project swaps must be agreed to by NCDOT and the MPO(s)/RPO(s), with documentation of the agreement provided to the appropriate STIP Manager by Friday, March 17th, 2023. • NCDOT Divisions will hold public drop-in sessions this fall. The specific dates have not yet been determined but are anticipated in the September/October timeframe. • The Final 2024-2033 STIP is anticipated to be presented to the Board of Transportation for approval in May 2023. TAC Vote: Motion Second By:__________________ By:_______________________ Vote: For_______________________ Against________________________ 9 TAC Meeting Meeting Date 8/23/2022 Agenda Item No. 4-9 Action Requested Information Section Tab MPO Reports Information Summary Attachments Yes No Agenda Item 4 NCDOT Board of Transportation Report Agenda Item 5 Division Reports Agenda Item 6 FHWA Report Agenda Item 7 NCDOT Transportation Planning Division Report Agenda Item 8 NCDOT Integrated Mobility Division Report Agenda Item 9 Public Transportation Reports TAC Vote: Motion Second By:__________________ By:_______________________ Vote: For_______________________ Against________________________ 10 NCDOT DIV 7 PROJECTS LOCATED IN HPMPO - UNDER DEVELOPMENT Estimated TIP/WBS # Description Let/Start Date Completion Cost Status Project Lead Date EB-5519 Lydia greenway trail from Jamestown municipal building to Jul. 2019 8/31/22 $1,198,415 LAP, Under Construction, Contract Donnie Huffines 50035.3.1 York Leigh Road (Non-System) in Jamestown Administered by Town of Jamestown - Punchlist Items Underway SS-4907CN Install All-Way Stop with flasher and radius improvements on Dec. 2019 8/31/22 $90,000 Radius improvements completed, Dawn McPherson 48759.1.2 SR 1113 (Kivett Drive) at SR 1145 (Riverdale Drive) east of Traffic materials pending acquisition - Derek Dixon 48759.2.1 High Point Materials have been ordered - 48759.3.1 Construction underway - Pavement markings and sign installation scheduled for 6/30/22 SS-4907CF Install traffic signal with pedestrian count down heads at the Mar. 2022 Sep-22 $120,000 Signal plans not complete, MA w/City of Dawn McPherson 48252.1.1 intersection of SR 1278 (University Parkway) and Davis High Point executed. Poles arrived 48252.2.1 Avenue (non-system) in High Point. Traffic signal to be 8/23/2021. Construction underway - 48252.3.1 supported by metal strain poles. Poles have been installed and pavement markings and final signs remain to be completed. SS-6607AC Installation of 2 lines of trailing approach bridge guardrail at Jul. 2022 Sep. 2022 $33,000 Planning and design activities Bobby Norris 49824.1.1 Bridge #400196 on SR 1193 (Baker Road) over US 29-70 in underway 49824.2.1 High Point. 49824.3.1 SS-6007P Bridge #57 on SR 1113 (Kivett Drive) over Reddick's Creek - 9/1/22 12/31/22 $36,000 Planning and design activities Bobby Norris 49423.1.1 Install bridge approach guardrail with MASH compliant end 7/1/22 10/31/22 underway 49423.3.1 units HS-2007D I-74 at I-74 and US 29-70 (I-85 Business) Interchange. 3/16/23 10/31/23 $500,000 Planning and design activities Dawn McPherson 49317.1.5 Upgrade traffic signals, signing, and pavement markings at underway 49317.2.5 intersections within the interchange. 49317.3.5 HS-2007E Installation of life-long pavement markings on NC 62 3/16/23 10/31/23 $715,000 Planning and design activities Dawn McPherson 49317.1.6 underway 49317.2.6 49317.3.6 11 Page 1 HPMPO Aug. 2022 NCDOT DIV 7 PROJECTS LOCATED IN HPMPO - UNDER DEVELOPMENT Estimated TIP/WBS # Description Let/Start Date Completion Cost Status Project Lead Date U-6018 Improve interchange at NC 62 and I-85 and realign 4/18/23 FY2026 $12,300,000 Planning and design activities Rob Weisz 47163.1.1 intersections along NC62 at SR 1154 (Kersey Valley Road) underway, ROW acquisition underway 47163.2.1 and SR 1162 (Weant Road) in Archdale 47163.3.1 U-4015A Widen SR 1556 (Gallimore Dairy Road) to multilanes from NC 5/16/23 FY2025 $6,600,000 Planning and design activities Brian Ketner 35013.1.4 68 to Airpark East in Greensboro underway, coordinate with U-5974, 35013.2.4 ROW acquisition underway 35013.3.4 U-4758 Improvements to Johnson Street/Sandy Ridge Road from 12/19/23 FY2026 $45,700,000 Planning and Design activities Laura Sutton 40251.2.1 Skeet Club Road to I-40 underway, Public meeting 8/14/18 - 40251.3.1 ROW underway B-5723 Replace Bridge 54 over Richland Creek on SR 1158 (Jackson 11/19/24 FY2026 $3,237,000 Planning and design activities Rob Weisz 45679.1.1 Lake Road) underway 45679.1.2 45679 2 1 I-5712 Interchange improvements at I-40/US 421 and SR 1850 12/15/26 FY2029 $14,500,000 Planning and Design activities Laura Sutton 50126.1.FS1 (Sandy Ridge Road) in Greensboro. Sandy Ridge Road underway, Coordinate with U-4758 & U- 50126.2.1 widening to Cider Road 6045 50126.3.1 U-5974 Upgrade NC 68 to Superstreet from SR 1523 (Hickswood 7/18/28 FY2030 $48,100,000 Planning and design activities Brian Ketner 45962.1.1 Road) to SR 1556 (Gallimore Dairy Road) in High Point underway, coordinate with U-4015A 45962.2.1 45962.3.1 U-6121 Widen SR 1541 (Wendover Avenue) from NC 68 (Eastchester 11/21/28 FY 2031 $27,300,000 Planning and design activities Brian Ketner 48605.1.1 Drive) in High Point to SR 1541 (Guilford College Road) in underway 48605.2.1 Greensboro. 48605.3.1 12 Page 2 HPMPO Aug. 2022 North Carolina Department of Transportation 8/2/2022 Active Projects Under Construction - Guilford Co. Contract TIP Number Location Description Contractor Name Resident Contract Bid Availability Completion Work Start Estimated Progress Completion Number Engineer Amount Date Date Date Completion Schedule Percent Date Percent C203256 U-3615B SR-1820 (SKEET CLUB RD) FROM EAST OF SR-1818 APAC - ATLANTIC INC Hayes, PE, $30,898,017.15 3/2/2015 3/29/2019 5/20/2015 8/31/2022 99.9 99.9 (JOHNSON ST) TO WEST OF NC-68 (EASTCHESTER DR) IN THOMPSON ARTHUR Meredith HIGH POINT. DIVISION C204071 U-5169 I-74/US-311 AND NC-68 (EASTCHESTER DR) BRANCH CIVIL INC Snell, PE, $22,481,354.65 7/30/2018 1/28/2021 9/14/2018 9/30/2022 100 91.7 INTERCHANGE IMPROVEMENTS. William H C204096 U-2525C GREENSBORO EASTERN LOOP FROM US-29 NORTH OF ES WAGNER COMPANY Julian, Jason $120,471,182.82 4/30/2018 11/20/2022 5/7/2018 7/21/2023 82.24 96.75 GREENSBORO TO SR-2303 (LAWNDALE DR). LLC/SMITH-ROWE LL R C204103 U-2412A SR-1486/SR-4121 (GREENSBORO/HIGH POINT RD) FROM BRANCH CIVIL INC Lorenz, PE, $55,963,119.69 7/30/2018 12/28/2021 9/12/2018 10/20/2023 92.9 87.08 US-311 BYPASS TO WEST OF SR-1480 (VICKREY CHAPEL Kris RD). C204150 U-5896 US-29/US-70/I-85 BUSINESS, SR 1009 (S. MAIN ST.) IN HIGH BOGGS CONTRACTING, Lorenz, PE, $25,325,396.73 3/28/2022 2/28/2025 4/23/2022 3/1/2025 11.5 5.13 POINT AND BRIDGE #147 OVER US-311 ON US-29/US-70/I- INC Kris 85 BUSINESS C204371 U-2581BA US-70 (BURLINGTON RD) FROM WEST OF SR-3045 (MT APAC - ATLANTIC INC Snell, PE, $11,125,538.10 7/1/2020 4/30/2022 7/1/2020 10/31/2022 100 90.6 HOPE CHURCH RD) /SR-2819 (MCLEANSVILLE RD) TO THOMPSON ARTHUR William H EAST OF SR-2826 (BIRCH CREEK RD) DIVISION C204499 R-4707 INTERCHANGE OF US 29 AND SR 4771 (REEDY FORK APAC - ATLANTIC INC Hayes, PE, $46,382,713.04 6/2/2021 10/28/2024 6/7/2021 10/28/2024 32.9 23.36 PARKWAY) THOMPSON ARTHUR Meredith DIVISION C204626 RESURFACE 1 SECTION OF NC 87, 1 SECTION OF NC 49 FSC II LLC DBA FRED Lorenz, PE, $4,639,570.37 6/3/2021 11/1/2022 6/28/2021 11/1/2022 76.4 41.08 AND 21 SECTIONS OF SECONDARY ROADS SMITH COMPANY Kris C204665 U-5754 US-29/US-70/US-220 (O'HENRY BLVD.) FROM I-40/I-85 BUS. BRANCH CIVIL INC Lorenz, PE, $5,144,885.00 3/15/2022 3/14/2023 4/25/2022 3/14/2023 47 18.86 TO SOUTH OF FLORIDA ST. IN GREENSBORO. Kris C204700 RESURFACE 1 SECTION OF US-158 AND 49 SECTIONS OF VECELLIO & GROGAN INC. Hayes, PE, $5,303,911.30 4/25/2022 7/15/2023 6/30/2022 SECONDARY ROADS DBA SHARPE BROTHERS Meredith DG00490 AST TREATMENT OF 26 SECONDARY ROADS IN CAROLINA ROAD Lorenz, PE, $832.311.02 4/1/2021 10/30/2021 4/8/2021 8/31/2022 100 97.46 GUILFORD COUNTY SOLUTIONS LLC Kris Page 1 of 3 13 North Carolina Department of Transportation 8/2/2022 Active Projects Under Construction - Guilford Co. Contract TIP Number Location Description Contractor Name Resident Contract Bid Availability Completion Work Start Estimated Progress Completion Number Engineer Amount Date Date Date Completion Schedule Percent Date Percent DG00512 RESURFACE 43 VARIOUS STATE ROUTES VECELLIO & GROGAN INC. Hayes, PE, $2,562,749.29 7/1/2021 11/1/2022 7/1/2022 11/1/2022 58 75.7 DBA SHARPE BROTHERS Meredith DG00513 REPLACE BRIDGE #235 OVER BIG ALAMANCE CREEK ON SMITH-ROWE, LLC Hayes, PE, $1,675,367.75 6/21/2021 10/25/2022 SR 1005 (ALAMANCE CHURCH ROAD) Meredith DG00515 AST TREATMENT OF 34 SECONDARY ROADS IN WHITEHURST PAVING CO. Lorenz, PE, $749,755.28 7/1/2021 6/30/2021 4/25/2022 8/31/2022 100 85.46 GUILFORD COUNTY INC. Kris DG00524 R-5787-G INSTALLATION OF ADA COMPLIANT CURB RAMPS AT ATLANTIC CONTRACTING Lorenz, PE, $717,704.25 6/1/2021 4/14/2023 7/26/2021 4/14/2023 93.5 88.65 R-5787-H VARIOUS ROUTES COMPANY, INC. Kris DG00527 HS-2007C INSTALLATION OF THERMOPLASTIC PAVEMENT MARKING TMI SERVICES INC. Cvijetic, PE, $1,358,289.72 8/16/2021 11/19/2021 5/18/2022 8/31/2022 1.35 1.35 LINES ON VARIOUS SECONDARY ROUTES Bojan DG00531 RESURFACE SR 1001 (CHURCH STREET) - 3 SECTIONS, VECELLIO & GROGAN INC. Hayes, PE, $2,780,006.94 7/8/2021 7/7/2022 8/12/2021 8/31/2022 60 96.13 SR 2714 (RED CEDAR ROAD) AND SR 2748 (SPRINGWOOD DBA SHARPE BROTHERS Meredith CHURCH ROAD) DG00533 MILLING, RESURFACING AND PAVEMENT MARKINGS ON I- BLYTHE CONSTRUCTION Lorenz, PE, $2,989,292.45 7/8/2021 7/7/2022 9/20/2021 7/7/2022 91.3 71.09 85 BUS/US 29/US 70, NC 150 AND VARIOUS SECONDARY INC. Kris ROADS DG00545 REPLACE PIPE #40 ON SR 2930 (BETHEL CHURCH ROAD) BOGGS CONTRACTING, Cvijetic, PE, $346,396.50 6/16/2022 2/15/2023 6/20/2022 IN GUILFORD COUNTY INC Bojan DG00551 R-2413A(L) LANDSCAPE PLANTING ALONG I-73 FROM BRYAN BLVD. COUNTRY BOY Lorenz, PE, $593,953.15 12/20/2021 6/19/2023 3/21/2022 6/19/2023 91.1 52.78 TO US 220 LANDSCAPING INC. Kris DG00552 R-2413C(L) LANDSCAPE PLANTING ALONG US 220 FROM I-840 TO NC GOLDSTAR PROJECT Lorenz, PE, $119,464.76 12/20/2021 6/19/2023 3/4/2022 6/19/2023 96 80.66 65 GROUP LLC Kris DG00555 REPLACE PIPE #402221 ON SR 3426 (SHERATON PARK C2 CIVIL LLC Cvijetic, PE, $529,396.00 3/7/2022 12/1/2022 3/7/2022 8/31/2022 100 93.98 ROAD) IN GUILFORD COUNTY Bojan Page 2 of 3 14 North Carolina Department of Transportation 8/2/2022 Active Projects Under Construction - Guilford Co. Contract TIP Number Location Description Contractor Name Resident Contract Bid Availability Completion Work Start Estimated Progress Completion Number Engineer Amount Date Date Date Completion Schedule Percent Date Percent DG00564 MILLING, RESURFACING AND PAVEMENT MARKINGS ON APAC - ATLANTIC INC Hayes, PE, $3,519,513.72 4/1/2022 6/30/2023 59 SECONDARY ROADS IN GUILFORD COUNTY THOMPSON ARTHUR Meredith DIVISION DG00570 REPLACE BRIDGE #85 OVER REEDY FORK ON SR 1858 RE BURNS & SONS CO. Hayes, PE, $1,052,260.20 7/7/2022 4/29/2023 8/1/2022 (BEESON ROAD) INC. Meredith DG00572 REPLACE BRIDGE #25 OVER POLE CAT CREEK ON SR RE BURNS & SONS CO. Lorenz, PE, $1,285,359.02 1105 (EAST STEEPLE CHASE ROAD) INC. Kris DG00573 RESURFACE SR 2335 (TROSPER RD.) AND 25 ADDITIONAL APAC - ATLANTIC INC Hayes, PE, $2,009,092.07 6/1/2022 8/31/2023 7/6/2022 SECONDARY ROADS THOMPSON ARTHUR Meredith DIVISION DG00576 AST RETREATMENT ON 50 SECONDARY ROADS IN WAUGH ASPHALT INC. Lorenz, PE, $811,504.54 5/9/2022 6/30/2023 GUILFORD COUNTY Kris Page 3 of 3 15 Randolph County - High Point MPO - Active Projects - Division 8--August 2022 Contract # or Completion Route Description Let Date Contractor Project Admin. Project Cost Notes WBS # or TIP # Date HI-0002 I-85 Randolph Co. Pavement Rehab - from I-85/NC 109 in 4/19/2022 10/15/2023 Blythe Michael Ricketts $13,384,387 Project just starting Thomasville to SR 1009 (South Main St) in Construction Inc. (910) 773-8033 Archdale 17BP.8.R.136 SR 1557 (Morris Rd) Replace Bridge No. 54 over unnamed 3/23/2021 9/27/2022 APAC Cary Fine $910,339 Project 91% complete DH00325 tributary of the Uwharrie River (336) 318-4020 Now open to Traffic Randolph County - High Point MPO - Upcoming Projects - Planning & Design, R/W, or not started - Division 8- August 2022 Revised Draft STIP in RED Contract # or Completion Route Description Let Date Contractor Project Admin. Funds Needed Notes WBS # or TIP # Date U-3400 SR 1577 / SR 1004 Widening from SR 1567 (Robbins Country 11/18/2025 TBD TBD Jeff Stroder $38,626,000 Right of Way 1/2023 FY 2023 (Archdale Road) Rd) to US 311 (Main Street) in Archdale FY 2026 (910) 773-8034 Public Meeting held 2/27/18 U-5308 SR 1547 (Finch Farm Rd) Widening from south of SR 3106 Kennedy 6/17/2025 TBD TBD Greg Davis $35,462,000 Right of Way in progress Rd to NC 62 FY 2025 (910) 773-8022 Public Meeting held 3/29/2018 2nd Public Meeting 11/29/18 U-5770 I-85 / SR 1993 Interchange Improvements - construct 4/15/2025 TBD TBD Jeff Stroder $21,034,000 Right of Way in progress A= resurface (South Main Street) Diverging Diamond Interchange and RCI's FY 2025 (910) 773-8034 Public Meeting 11/30/17 B= DDI Newsletter Mailed 6/8/18 U-5864 SR 1595 (Surrett Drive) 3-lane widening from I-85 to SR 1300 (W. 8/15/2028 TBD TBD Greg Davis $33,864,000 Right of Way 6/2024 FY 2026 Fairfield Rd. /Guilford Co.) in Trinity, FY 2029 (910) 773-8022 Public Meeting held 6/13/19 Archdale, and High Point U-6191 NC 62 Modernize roadway between SR 3252 10/17/2028 TBD TBD Greg Davis $22,800,000 Right of Way 10/2026 FY 2027 (Surrett Dr) in Trinity to SR 1009 (N. Main FY 2029 (910) 773-8022 St) in Archdale 16 High Point MPO Transportation Update August 4, 2022 T.I.P. No. Description Let Date Completion Date Status Construction Cost Contractor Project Administrator Comments PROJECTS UNDER CONSTRUCTION High Impact Low Cost Project - Construction began in late April Construct additional left turn lane on I-85 South April 6, 2022 Kevin Hedrick, PE with the removal of existing traffic island, grading of curb and the 47796 TBA Under Construction $358,000 State Forces Bound Exit Ramp at NC 109 in Thomasville (State Forces) (336) 224-3200 grading for the pavement widening. The initial phase of work is progressing. Handy Road was closed at Cabin Creek on June 13, 2022. The new culvert has been installed and backfilled. Work at this Replace Culvert #564 on Unnamed Creek and location is scheduled to be completed by the end of July. After 17BP.9.C.14 Chatham Civil Larry Shaver replace Culvert #504 on Branch of Cabin Creek at SR September 27, 2021 December 16, 2022 2% Complete $920,485 Handy Road is reopened at Cabin Creek, the crews will move 17BP.9.C.13 Contracting, LLC (336) 249-6255 2522 (Handy Rd) in Davidson County. down and close Handy Road at Cabin Creek Tributary. This closure is anticipated to last for 5 weeks. Once the project is completed, Handy Road will be reopened to the public. Welcome-Arcadia Rd at the bridge over Reedy Creek was closed on April 4, 2022. The bridge construction has been completed Replace Bridge #63 on SR 1472 (Welcome Arcadia Larry Shaver 17BP.9.R.57 March 28, 2022 January 25, 2023 33% Complete $858,581 Smith-Rowe, LLC and the focus has turned to grading, paving, and guardrail Rd) over Reedy Creek in Davidson County. (336) 249-6255 installation. The project is scheduled to be complete and Welcome-Arcadia Road reopened by July 29, 2022. The project has experienced a delay due to shortages of ductile Replace Bridge #230 on SR 2250 (Becks Church Rd) Eastern Structures, Jeb Smith, PE iron pipe needed to relocate a 6” water main away from our 17BP.9.R.79 June 6, 2022 March 29, 2023 0% Complete $1,234,179 over Pounder Fork Creek in Davidson County. LLC (704) 630-3220 proposed bridge substructure. An updated schedule will be provided ASAP. Milling, Resurfacing, and Shoulder grading of (18) 2021CPT.09.02.20291 Jeb Smith, PE sections of Secondary routes in Davidson County, May 3, 2021 October 28, 2022 TBA $4,158,575 Blythe Construction, Inc Contractor plans to begin work in mid-June. (C204604) (704) 630-3220 totaling 28.6 miles 2021CPT.09.26.20292 Polyurea Pavement Markings on I-285/US 52 from SR JP Couch, PE Project was awarded on March 22, 2021. Project is 90% February 10, 2021 TBA 90% Complete $228,300 TMI Services, Inc. (DI00245) 1147 (Old Salisbury Rd) to NC 8, North of Lexington (336) 747-7800 complete. Whitehurst is completed AST on 7/18/2022 and Whitehurst works 2022CPT.09.11.20292 Asphalt Surface Treatment (AST) in Davidson County Jeb Smith, PE April 11, 2022 October 14, 2022 90% Complete $1,740,522 Whitehurst Paving Co. on the preliminary punchlist. Whitehurst is anticipated to be (DI00253) - Various Secondary Routes – 78 Sections (704) 630-3220 completed by end of July 2022. Smith-Rowe began work in January 2022. Project has been cleared and contractor is currently working on grading operations for the new portion of Old Greensboro Road (located across US 29/70 from DDCC). The contractor has also constructed median crossovers for future traffic patterns. By the end of July, R-5737 motorists on northbound US 29/70 wishing to access Old Convert at grade intersection to Interchange on US Larry Shaver 50195.3.1 January 10, 2022 February 28, 2026 10% Complete $25,893,075 Smith-Rowe Greensboro Road and DDCC will use a new exit location and 29/70/I-85 Bus at SR 1798 (Old Greensboro Rd) (336) 249-6255 (C204399) Caldcleugh Road. Motorists on southbound US 29/70 wishing to access Old Greensboro Road and DDCC will use a signed detour of Evans Road. Once these detours are in place, the existing exit locations from Old Greensboro Road to US 29/70 at DDCC will be closed. The closure will allow for construction of an onsite detour for US 29/70 traffic in order to allow for new bridge construction. PROJECTS UNDER DEVELOPMENT Raleigh Let - Final Plans received. There will likely be a delay in B-5765 Replace Bridge #115 on SR 1711 (Gumtree Rd) over ROW Acquisition Kevin Fischer, PE availability for the contractor to begin work; this will allow time for 45721.3.1 October 31, 2022 TBA $3,850,000 TBA WSSB RR in progress (919) 707-6514 railroad coordination and acquiring materials for the project. Let (C204385) date has been delayed due to a property issue with the Railroad. Raleigh Let - Approved to move forward with PE. Re-initiation meeting held March 2022. Working on scope and fee for B-5773 Replace Bridge #25 on SR 3346 (S. Main St) over ROW Acquisition Ryan Newcomb, PE January 20, 2026 TBA $3,250,000 TBA additional PE work. SMU has completed structure design. 45729.3.1 WSSB RR in Lexington (Combine let with BR-0015) Jan. 15, 2025 (336) 747-7800 Moving forward with additional PE work for environmental document and roadway design. B-5777 ROW Acquisition Ryan Newcomb, PE Raleigh Let - Approved to move forward with PE. Working on Replace Bridge #58 on NC 109 over US 64 June 30, 2025 TBA $1,850,000 TBA 45733.3.1 Jan. 31, 2024 (336) 747-7800 scope and fee for PE. PE work has started. 17 The schedules listed are based on the adjusted 2020-2029 STIP. Page 1 of 2 All schedules will be updated once the DRAFT 2024-2033 STIP is officially released in December 2022. High Point MPO Transportation Update August 4, 2022 T.I.P. No. Description Let Date Completion Date Status Construction Cost Contractor Project Administrator Comments PROJECTS UNDER DEVELOPMENT *Schedule based on Approved 2020-2029 STIP - Raleigh Let - B-5779 Replace Bridge #118 on US 29NB/64EB/70EB over ROW Acquisition Ryan Newcomb, PE Coordinate with B-5785. Division is currently working on a April 15, 2025 TBA $4,061,000 TBA 45735.3.1 SR 3346 (N Main St) in Lexington April 19, 2024 (336) 747-7800 feasibility study for this bridge replacement and how this will work with the overall interchange. PE work has started. *Schedule based on Approved 2020-2029 STIP - DDRL Let - B-5783 Replace Bridge #164 and Bridge #168 on US 29/70/I- Planning/Design in Ryan Newcomb, PE May 16, 2023 TBA $5,778,000 TBA Approved to move forward with PE. 75% plans under review. 45738.3.1 85 Bus over NSRR Progress (336) 747-7800 Railroad coordination is ongoing. B-5785 Replace Bridge #121 and Bridge #122 on US 29/70/I- ROW Acquisition Daniel Dagenhart Raleigh Let - Coordinate with B-5779. Approved to move February 17, 2026 TBA $4,000,000 TBA 45740.3.1 85 Bus over Leonard Creek Feb. 16, 2025 (336) 747-7800 forward with PE. B-5787 ROW Acquisition Daniel Dagenhart Replace Bridge #29 on NC 49 over NC 109 August 19, 2025 TBA $2,000,000 TBA Raleigh Let. - Approved to move forward with PE. 45741.3.1 Aug. 30, 2024 (336) 747-7800 BP9-R001 Replace Bridge #469 on SR 2183 (Fisher Ferry Rd) ROW Acquisition Daniel Dagenhart BP9.R001.3 May 24, 2024 TBA $1,300,000 TBA Division Let - Approved to move forward with PE. over North Hamby's Creek in Davidson County Oct. 1, 2022 (336) 747-7800 formerly 17BP.9.R.16) BP9-R003 Replace Bridge #286 on SR 2545 (Slate Mine Rd) ROW Acquisition Daniel Dagenhart BP9.R004.3 June 14, 2023 TBA $1,400,000 TBA Division Let - Approved to move forward with PE. over Beaverdam Creek in Davidson County. in progress (336) 747-7800 (formerly 17BP.9.R.74) BP9-R006 Replace Bridge #246 on SR 2351 (Flat Swamp Rd) ROW Acquisition Daniel Dagenhart BP9.R006.3 February 14, 2024 TBA $900,000 TBA Division Let - *Approved to move forward with PE. over Lick Creek in Davidson County Sept. 14, 2022 (336) 747-7800 (formerly 17BP.9.R.92) Replace Bridges #67 and #68 over SR 1192 (W. 5th BR-0015 ROW Acquisition Kevin Fischer, PE Ave) on US 29/70/ I-85 Business in Lexington December 31, 2024 TBA $6,200,000 TBA Raleigh Let - Approved to move forward with PE. 67015.3.1 Nov. 3, 2023 (919) 707-6514 (Combine let with B-5773) BR-0016 Replace Bridge #150 over SR 2123 (Kanoy Rd) WB ROW Acquisition Ryan Newcomb, PE January 20, 2026 TBA $5,175,000 TBA Raleigh Let - PE work has started. 67016.3.1 on I-85 Bus in Thomasville Jan. 19, 2025 (336) 747-7800 BR-0140 Replace Bridges #87 and #89 0n US 29/70/I-85 Bus ROW Acquisition Sept. Ryan Newcomb, PE September 16, 2025 TBA $6,800,000 TBA Raleigh Let - PE work has started. 67140.3.1 over WSSB Railroad 23, 2024 (336) 747-7800 Extend Left Turn Lane and Construct Right Turn Lane at Proposed New Access and RR Crossing Planning/Design in Jeremy Keaton HE-0008 April 28, 2023 TBD $800,000 TBD Economic Development project. PE work has started. Improvements US 64 from SR 2112 (Decker Road) to Progress (336) 747-7800 Rail Crossing 836515Y *Schedule based on Adjusted 2020-2029 STIP - DDRL - Pavement Rehabilitation on I-85 from US 29/52/70/I- I-5950 Planning/Design in Matt Jones, PE Combine I-5950 and I-5951 - This project will include bridge 85 Bus to N of SR 2205 (Old US 64) and from NC 109 September 20, 2022 TBA $14,740,000 TBA 45897.3.1 Progress (336) 747-7800 preservation in this corridor, STIP description will be updated to to Randolph County Line (Includes I-5951) reflect this. Construction estimate will be updated once adjusted. *Schedule based on Adjusted 2020-2029 STIP - DDRL - The R-4734 Widen NC 109 to multilanes from NC 109 in Denton Post Year ROW Acquisition Ryan Newcomb, PE TBA $132,096,000 TBA PE work for this project has been suspended. Express design 38954.3.1 to I-85 in Thomasville Jan., 2040 Jan. 21, 2028 (336) 747-7800 update in progress to revise project estimate. U-5757 Widen NC 8 (Winston Rd) to multi-lanes from 9th St ROW Acquisition Ryan Newcomb, PE June 18, 2024 TBA $8,800,000 TBA *Schedule based on Adjusted 2020-2029 STIP - DDRL - 54035.3.1 to SR 1408 (Biesecker Rd) in Lexington in progress (336) 747-7800 STATE FORCES CONSTRUCTED PROJECTS Re-align intersection of SR 2184 (Cedar Lodge Rd) ROW Acquisition Matt Jones, PE 47795 April 24, 2023 TBA $372,000 State Forces High Impact Low Cost Project - Project released to move forward. and Liberty Drive (NS) in Thomasville in progress (336) 747-7800 COMPLETED PROJECTS Replace Bridge #459 on SR 2160 (Smith Ave) over Triangle Grading & Jeb Smith, PE The project is substantially complete ICT No. 1 on May 5, 2022 17BP.9.R.33 July 26, 2021 May 27, 2022 98% Complete $927,670 Charles creek in Davidson County. Paving, Inc (704) 630-3220 and waiting on vegetation establishment. W-5809A Install Rumble Strips on NC 109 from SR 2067 TRP Construction Kelly Seitz, PE March 15, 2022 June 30, 2022 99% Complete $2,095,141 Crews are currently finishing up punch list items. 48954.3.2 (Lambeth Rd) to the Northern Denton Municipal Limits Group, LLC (704) 630-3200 R-5789F 44919.3.7 ADA Ramps at Various Locations in Davidson, Davie, Little Mountain Builders Kelly Seitz, P.E. R-5789G March 1, 2021 July 31, 2022 100% Complete $2,524,367 Project completed and accepted 7/6/22. Forsyth and Rowan Counties of Catawba County, Inc (704) 630-3200 44919.3.8 (DI00235) 18 The schedules listed are based on the adjusted 2020-2029 STIP. Page 2 of 2 All schedules will be updated once the DRAFT 2024-2033 STIP is officially released in December 2022. PARTiculars Piedmont Authority for Regional Transportation August 2022 Explore With Express We stay close to ‘home’ with Route 20, which covers the NW Pleasant Ridge area. This PART route is specifically designed to get riders to and from work. And while this route stays close to ‘home,’ it covers a lot of ground. It runs every 30 minutes throughout the day, Monday-Friday 6:15am-9:15pm; it stops at two Camco facilities, FedEx Freight, PBM Graphics, Coco-Cola, RSVP, and has several other stops along the way. It also operates an on-demand service on Saturdays. On-demand means riders can contact our call center and schedule a pick-up at any of our Route 20 stops, and we will pick them up and drop them off. Saturday hours of operation for this heavy work run are 6:45am-9:45pm. This route utilizes a PART Shuttle Bus, but don’t be fooled by its size; we pack a lot of rider comfort in these vehicles. Our MPOs Are At It Again! Regional planning departments, staffed by your neighbors and fellow residents, known as MPOs (Metropolitan Planning Organizations), are working hard to launch an important survey this fall called Triad Travel Counts. The survey will ask a random selection of Triad residents about how they get around the region. Responses will be used to understand where people are trying to go in their daily lives, how they get there, and how much time and effort it takes them. The survey results create a snapshot of how the transportation system in the region is used. Planners use that snapshot to plan and develop system improvements. How can residents help? By participating in the survey if they receive an invitation in the mail. Each household invited to the survey represents thousands of other households with similar demands and needs in nearby neighborhoods that were not selected! A prompt response to the invitation ensures that each household’s experiences are reflected in the results and is the best way to help the survey succeed. In addition, all participants will receive compensation for their time and effort. If you are a community leader, let your constituents know that this important survey is happening and encourage them to participate if they receive an invitation! 19 Route 10 Randolph County Express Is Going To The Zoo! PART met with our North Carolina Zoo partners a few weeks ago to solidify our service going into the North Carolina Zoo. As a result, we agreed on a front-of-the-Zoo drop-off right at the North American entrance, and we are sending riders in! Both Zoo and PART representatives see the vast potential in this partnership. And while the Zoo is an excellent addition to this route, we service an entire array of stops along the way. For example, UNCG and Randolph Community College, Four Seasons Town Centre and Koury Convention Center, two Park & Ride lots, and Randolph Health are all on this route. In addition, we added time points running from 6:27am through 6:41pm. With PART’s nine-county reach we can make a significant impact. Starting with the Greensboro Depot at the head of this route and the North Carolina Zoo at the tail of the route, it opens a lot of potential for community members to utilize this service for greater mobility. College Days Are Here Again It is time for students to buckle down and get back to class, and PART is gearing up for student riders to hop on board. With the Greensboro Depot hosting PART, Amtrak, Greyhound, and Greensboro Transit Authority, students are much more mobile than they may realize. And it is safe, fun, and affordable transportation! PART offers 1/2 price fare to all students. PART has been invited to attend UNCG’s Fall 2022 Open House for incoming first-year students. With two PART services, Route 9 Davidson County Express and Route 10 Randolph County Express, making stops at UNCG, it is essential for us to communicate to incoming students the wide range of mobility options available in our region. We have connections to our nine member counties and students in every corner of the region. Public Transportation is an essential tool for this population, and we aim to please. We are excited to talk about our Route 10 connection going to the North Carolina Zoo. We feel this will create an avenue for all students to enjoy this rich treasure unique to our region. 20

Get email alerts for High Point

A daily email when new agendas and minutes are posted.

Report an issue with this meeting