Historic District Commission Regular Meeting
Regular MeetingHillsborough, NC · March 6, 2024
Minutes
Minutes
HISTORIC DISTRICT COMMISSION
Regular meeting
6:30 p.m. March 6, 2024
Board Meeting Room of Town Hall Annex, 105 E. Corbin St.
Present: Chair Will Senner, Vice Chair Mathew Palmer, and members
Elizabeth Dicker, G. Miller, Hannah Peele, Sara Riek and Bruce
Spencer
Staff: Planner Joseph Hoffheimer and Town Attorney Bob Hornik
1. Call to order, roll call, and confirmation of quorum
Chair Will Senner called the meeting to order at 6:30 p.m. He called the roll and confirmed the presence of a
quorum.
2. Commission’s mission statement
Senner read the statement.
3. Agenda changes
There were no changes to the agenda.
Planner Joseph Hoffheimer informed the commission that the owners of 202 W. King St. have withdrawn their
application.
4. Minutes review and approval
Minutes from regular meeting on Feb. 7, 2024.
Motion: Member G. Miller moved approval of the Feb. 7, 2024, minutes with a correction. Senner
seconded.
Vote: 7-0.
Correction: Item 6A: after the vote to approve the application add: “Miller explained that he had voted to
approve the finding of fact but voted against the motion to approve the application because it
didn’t include the proposed condition, which he considered to be necessary.”
5. Written decisions review and approval
Written decisions from regular meeting on Feb. 7, 2024.
Motion: Member Sara Riek moved approval of the written decisions from the regular meeting on Feb. 7,
2024, as submitted. Senner seconded.
Vote: 7-0.
6. Old business
A. Certificate of Appropriateness Application: 114 W. Queen St.
101 E. Orange St., PO Box 429, Hillsborough, NC 27278
919-732-1270 | www.hillsboroughnc.gov | @HillsboroughGov
HISTORIC DISTRICT COMMISSION MINUTES | 1 of 11
HISTORIC DISTRICT COMMISSION MINUTES | 2 of 11
Applicant is proposing to add porches to the main house, add an accessory dwelling unit to the brick
kitchen structure in the backyard, and construct two sheds in the northeast corner of the property (PIN
9874071780).
Hoffheimer informed the commissioners that the applicant had requested to continue the application at
the April meeting.
Motion: Miller moved to continue the application at the April 3, 2024, meeting. Senner seconded.
Vote: 7-0.
7. New business
A. Certificate of Appropriateness Application: 102 W. Queen St.
Applicant is requesting to install 15 roof-mounted solar panels (PIN 9874073693).
Senner opened the public hearing and asked whether there were any conflicts of interest or bias among
the commissioners. Member Hannah Peele disclosed that she has personal bias toward solar energy and
her personal opinions would prevent her from hearing the application in the context of the design
standards and congruity with the Historic District.
Motion: Senner moved to recuse Peele from consideration of the 102 W. Queen St. application.
Miller seconded.
Vote: 6-0.
All commissioners disclosed that they had visited the site in preparation for reviewing the application. No
other conflicts of interest were disclosed.
Hoffheimer was sworn in. Donnis Whitfield from Top Tier solar solutions and Susan Shipp, the property
owner, were sworn in to speak on behalf of the application.
Hoffheimer introduced the application by presenting the staff report. He noted that the inventory
information, application materials, and applicable design standards would be entered into the record as
evidence. He provided the staff comments:
The solar panels on the ell face North Churton Street so require commission approval. The other
panels do not face a street and would meet the minor works requirements. Staff recommend
treating this proposal as one application, approving the panels that are not visible from North
Churton Street, and deliberating about the panels that face North Churton Street.
The east-facing solar panels three buildings away at 116 W. Queen St. are visible from North
Churton Street.
Staff did not receive any objections or comments from the public related to this application.
Whitfield provided some background information about the proposal. He explained that the initial goal
was for the solar panels to not be visible from the street. The house requires 15 panels to provide enough
solar-generated electricity to offset current electric needs. 11 of the panels will be located out of street
view, but due to fire code setback requirements, shade trees, and the orientation of the roof, the only
appropriate spot for the remaining four panels is in view of North Churton Street.
There was discussion of the optimal orientation for solar panels and where from the street the solar
panels can be seen.
HISTORIC DISTRICT COMMISSION MINUTES | 3 of 11
There was discussion of whether it would be feasible to install only 11 of the 15 panels. There was
discussion of how to address solar panels within the context of the design standards. Town Attorney Bob
Hornik reminded the commissioners that in addition to considering congruity with the district, North
Carolina General Statues do not allow the town to adopt rules of regulation that prevent solar panels
from being installed.
There was discussion of the elevation of the roof in relation to the road. Shipp gave an estimated
elevation, saying the bottom of the house sits at about eight to ten feet above the road because of the
terrain. The house is one story, and the gable is moderately sloped, neither steep nor flat. There was
discussion of the roof being naturally obscured by trees and the change in topography.
There was discussion of the visibility of the equipment on the north side of the house, which would
include a utility meter and a main service panel. Whitfield showed a photograph of a main service panel
as an example. Whitfield and Shipp described the low visibility of the equipment, explaining that it will
face a small retaining wall, a tall 12- to 14-foot Ligustrum hedge, and the neighbor’s privacy fence behind
the hedge. Hoffheimer noted that the equipment will be located on the rear elevation, which is not
character defining or visible.
Whitfield said the system would be considered a small, low-profile system.
Senner summarized the commissioners’ discussion: the consensus was that there was not concern that
the installation of the solar panels would be incongruous with the district. He noted that effort had been
made to exhaust all opportunities for placing the solar panels on alternate elevations, and that the
proposal was based on the only viable arrangement. He mentioned that the commissioners had also
considered the fact that the panels are at least partially blocked from public view along North Churton
Street because of grade changes and existing trees; the panels would not be placed on a character
defining elevation; and the pitch of the back roof is relatively shallow.
Senner closed the public hearing.
Motion: Miller moved to find as fact that the 102 W. Queen St. application is not incongruous with
the overall character of the Historic District and complies with all relevant standards of
evaluation based on the commission’s discussion of the application and the standards of
evaluation in Section 3.12.3 of the Unified Development Ordinance because the plans are
consistent with the Historic District Design Standards: Roofs; Sustainability and Energy
Retrofit; and Site Features and Plantings. Member Elizabeth Dicker seconded.
Vote: 6-0.
Motion: Miller moved to approve the application as submitted. Vice Chair Mathew Palmer
seconded.
Vote: 6-0.
B. Certificate of Appropriateness Application: 124 E. Union St.
Applicant is requesting to add rear and side additions to the existing house and a new accessory dwelling
unit/garage behind the existing house (9874171925).
HISTORIC DISTRICT COMMISSION MINUTES | 4 of 11
Senner opened the public hearing and asked whether there were any conflicts of interest or bias among
the commissioners. All commissioners disclosed that they had visited the site in preparation for reviewing
the application. No other conflicts of interest were disclosed.
David Cates, the draftsperson and presenter for the applicant, and Kimberly Touzeau, the applicant, were
sworn in to speak on behalf of the application.
Hoffheimer introduced the application by presenting the staff report. He noted that the inventory
information, application materials, and applicable design standards would be entered into the record as
evidence.
He provided the staff comments:
Staff find that the proposed shutters meet the design standards.
Because the proposed outbuilding would function as both an accessory dwelling unit and a
garage, staff recommend applying both the New Construction of Outbuildings and Garages and
New Construction of Accessory Dwelling Units standards referenced in the applicable design
standards section.
Staff had questions about New Construction of Outbuildings and Garages 2 and 3 and New
Construction of Accessory Dwelling Units 1, 5, 6, and 8. The applicant has provided several photo
examples of garage/accessory structures within two blocks of the subject property.
Staff have verified that the accessory dwelling unit portion of the outbuilding will include 416
heated square feet, which should comply with current zoning requirements. However, the
commission is still allowed to discuss the size of the entire structure.
Staff find the rear addition to be typical of other additions that the commission has recently
approved. There was discussion in a recent meeting about Additions to Residential Buildings 6
that may be worth revisiting if this addition is proposed along with another structure.
The partially enclosed side porch and the added door to it would be visible from the street.
The windows on the proposed addition are not listed in the material list but are noted as
aluminum-clad in the elevations.
Hoffheimer mentioned that staff did not receive any objections to this proposal from the public.
Cates introduced the proposal and provided additional examples of dwelling units over garages and
massing examples that are either historic to the area or recently approved by the commission. The
examples included the properties at 108 E. Orange St. and 121 W. Corbin St.
Cates confirmed that the windows would be aluminum-clad wood.
Senner expressed appreciation for the effort that went into locating the additions to minimize visible
impact from the street and dropping the ridgeline to minimize impact relative to the rest of the house, as
is congruent with the design standards.
Cates added that attempts were made to have the porch continue to be identifiable as a porch.
There was discussion about whether the example properties were approved by the commission. Cates
clarified that the examples are meant to show that accessory dwelling units fit with the character of the
neighborhood, not whether the commission had approved them.
HISTORIC DISTRICT COMMISSION MINUTES | 5 of 11
There was discussion of the east side door, which Cates clarified will no longer exist because it will be
absorbed by the addition. The existing door is tucked around a chimney and hardly visible from the street.
In the remodel it will become interior space and will not be closed up in the same plane as it currently is.
Cates showed the commissioners the site plan. The commissioners expressed appreciation for the shrubs
added along the west side of the driveway extension to provide screening to adjacent properties. Cates
mentioned that the plans have been discussed with the adjacent neighbors.
Cates confirmed that the driveway will be extended and will be the same composition as the existing
driveway. He explained that this will improve the current parking situation on the street by providing
more space for off-street parking.
Commissioners expressed concern over the extent to which the proposed project expands the footprint of
the property. There was discussion that the size of the addition itself is not out of the ordinary, but that
the addition of a large accessory building seemed disproportionate to the size of the existing house. There
was discussion of whether the proposal would be approved if the accessory building proposal were
submitted at a later time.
Cates said that the size might appear more reasonable if volume were considered instead of area. He had
calculated the volume of the existing house plus the new addition to be 29,388 cubic feet, and the garage
as 18,660 cubic feet, which is 63% of the volume of the proposed main house. He added that the
accessory building would be distant from the road and would look smaller because of diminishing
perspective.
Senner said that the new structure does appear to be massed in a way that is subordinate to the main
structure, though that this proposal might be at the limit of that threshold. He agreed that massing is a
concern, but that the commission also needed to consider the overall built area on the site. He noted the
relatively large size of the site and said that even though the project would add a lot of built space, there
is still much green space on the site, allowing for a congruous balance of developed to undeveloped
space.
There was discussion of what the accessory building would look like from the street. Most commissioners
agreed that since the accessory building would be located behind the house, far from the street, the
massing could feel comfortable because of distance and perspective.
There was discussion of whether the additions would be visible from Cameron Street. Cates and the
commissioners viewed the property using Google Maps, finding that there is a line of trees that would
provide screening for the view from North Cameron Street.
Cates confirmed that tree protection would be provided for the existing tree on the property.
There was further discussion of the proportion of the proposed footprint relative to the footprint of the
existing structure and its distribution across the site. There was discussion of how to assess the ratio of
built to unbuilt area and its congruity with the Historic District. There was also discussion of the
consistency of the commission’s evaluation of applications.
Cates said that he had designed the project to be congruous with the rest of the historic district and had
provided photos of similar properties as evidence.
HISTORIC DISTRICT COMMISSION MINUTES | 6 of 11
The commissioners noted that there are examples of properties with similar massing and standalone
garage structures that exist on the same block as the applicant property.
There was discussion of the 50-foot setback from the street to the house and 30-foot distance between
the addition and the garage. Cates said the garage will be sited 165 feet from East Union Street. It was
noted that the house across the street, which has similar massing, is located closer to the street than the
applicant property.
A few commissioners expressed concern about the blank wall of the accessory building, noting that the
large spaces without windows make the building feel more massive and solid. It was also noted that the
wall will not necessarily be seen from the street.
The commissioners discussed the front elevation for the proposed addition. Cates confirmed that the
previous owners removed the shutters, and that they are proposed to be replaced in a more appropriate
manner. The new double shutters will be made of wood, will be operable, and will be sized to cover the
window.
There was discussion of the change to the porch. It was noted that this is a character defining elevation
and that the porch used to be open so trees could be seen behind it. The proposed project turns that view
into a wall and a door.
Cates said that the applicant’s desire was to make the porch an office space, and that he had
recommended leaving as much of the porch as possible. He explained that the porch still exists but is
shallower and that a door onto a porch is not incongruous with the district. Senner clarified that the
proposal is not a change to the front plane of the house; the modification is set back behind the front
plane. Cates further explained that the addition begins behind the existing chimney, and that most of the
porch will remain as-is.
Cates added that some of the metal work on the porch will be maintained. There was discussion of the
railing and metal work being character defining features.
The commissioners discussed the left elevation. Cates confirmed that the porch railing will be cut and will
terminate at the new wall. The commissioners asked if a vertical metalwork piece could be added at the
intersection so the railing terminates in vertical metalwork. Cates assented.
There was discussion of the bottom of the addition sitting lower than the elevation of the porch floor.
Cates explained that the existing porch is a concrete slab, and the floor of the addition will have to be
lower to install a standard floor system. He chose to continue the siding at that point instead of adding a
notch of brick into the siding. He confirmed that the brick will not be expanded.
There was discussion of the gable of the porch and the side of the new addition. Peele asked whether the
two would be coplanar, with the vinyl siding adjacent to the Hardieplank. Cates suggested that a trim
board at the junction could create visual separation. He explained that he tried not to introduce more
gables in order to keep the roof not visible from the front. There was discussion of replacing the vinyl with
Hardieplank. Both Cates and Touzeau agreed to that solution. The commissioners decided to add the
siding material as a condition if the application were approved.
There was discussion of the shape and proportion of the windows on the addition. Cates explained that
the windows are taller than they are wide and that they are sliding windows to match a three-season
HISTORIC DISTRICT COMMISSION MINUTES | 7 of 11
room in the applicant’s current residence. Touzeau expressed flexibility regarding muntins and divided
lites but that they were not included in the proposal because she wanted the room to have the feel of a
three-season room.
Senner referenced the design standards, which say that windows should be harmonious, but not that they
must be identical. There was discussion of whether the windows without muntins would be incongruous
with the district. It was noted that the office windows are more visible from the street than the rear
windows. The commissioners agreed that muntins and simulated divided lites would be less incongruous
with the district, and Touzeau agreed to include muntins in the windows, including in the window in the
rear on the right elevation.
Cates clarified that the stairs on the site plan that are located on the south side of the existing building are
existing basement steps.
Cates confirmed that metalwork would be used for the railings of the front stoop and porch, and that the
handrails for all other exterior stairs would be wood. He also noted that the stairs will not be visible from
the street and that there are numerous examples of wood railings and pickets on many houses in the
Historic District. He added that these additions of exterior stairs could be considered new construction,
and that the different materials set them apart from the existing historic elements.
Cates confirmed that the lap of the Hardieplank siding on the east elevation will match the current siding.
The commissioners discussed the option of including muntins on the door to the office in the rear
elevation.
Cates confirmed that the existing brick on the façade underneath where the existing roof will be removed
will be exposed and cleaned up.
Cates confirmed that all vinyl siding will be replaced with Hardieplank, as discussed earlier in the meeting.
The commissioners moved on to discussing the accessory building.
There was discussion of whether adding gables to the dormer of the accessory dwelling unit would be
more compatible with the existing house than a shed dormer. Cates said that if a gabled dormer were
added it would increase the volume of the structure. Miller suggested that a gabled dormer might give
the structure a more congruous look from the street.
There was discussion of the roof form of the left elevation. Commissioners noted that it seemed visually
busy with many different planes, in part because the lean-to straddles the roof elevation. Cates said he
had originally had the roof of the left elevation extend all the way over, which ended up seeming visually
imposing, so he introduced the roof break. He said it also helped to make the dormer look more centered.
There was discussion of the location of the lean-to. Cates said it could be shifted farther to the south. He
also noted that introducing gables would add more complexity to the roof line. Some commissioners
agreed that a shed roof is the simplest roof form for this structure.
The commissioners expressed appreciation for the consideration that went into dropping the roof to
decrease the massing.
HISTORIC DISTRICT COMMISSION MINUTES | 8 of 11
Cates described the complexity of designing the roof forms on the rear elevation and mentioned the
challenge involved in designing the lean-to, which was in essence an ancillary structure to an accessory
structure. Touzeau explained that the purpose of the lean-to was to provide a protected and non-visible
parking spot for an Airstream trailer.
There was discussion of the option of moving the lean-to roof farther south to be flush with the edge of
the building, and how that adjustment might add symmetry and reduce visual conflict with the dormer.
The commissioners decided to allow that adjustment as an option but to not require it since the proposed
design did not seem to be incongruous with the district.
There was discussion of the windowless wall on the studio portion of the accessory building. Cates
explained that the applicant would be using the space as a recording studio and that introducing windows
would make the acoustics more challenging. There was discussion of adding landscaping to break up the
large wall space.
Cates confirmed that the shadow elevation on pg. 93 should read “View . . . from E. Union Street” instead
of E. Queen Street.
Cates confirmed that the horizontal line on the left side of the dormer on the exterior elevation back was
a software glitch. He also confirmed that the metalwork on that elevation was for massing only, and not a
proposed part of the project.
There was discussion of adding muntins on the front door of the new office that leads to the porch.
Senner summarized the commissioners’ discussion:
There was no concern beyond the proposed conditions about anything in the proposal being incongruous
with the Historic District. The additions and accessory building were deemed to be sited in the rear of the
property, consistent with rest of district; they maintained a similar developed-to-undeveloped ratio; and
they were designed to be subordinate to the primary structure based on height, scale, and orientation.
Senner summarized the proposed conditions:
Include tree protection for the large existing tree adjacent to the accessory building.
Existing vinyl siding will be replaced with Hardieplank in all locations.
Existing metal ornate column that is removed from the porch shall be repurposed at the termination
of the porch to the new addition.
Windows and doors on the porch addition on the left elevation will be simulated divided lite with
muntins to align with existing windows on the house.
The applicant has the option, which is encouraged by the commission, to adjust the lean-to on the
accessory building. It may be shifted south to align with the proposed south end of the structure so it
is not straddling the dormer.
The applicant shall add screening in front of the right elevation of the accessory building in the
location where there are no windows, to mitigate massing concerns and in consideration of the view
from the adjacent property. This screening may be either landscaping or trellis to support vegetation,
made of materials deemed appropriate within the compatibility matrix.
Touzeau confirmed that she was amenable to the proposed conditions.
Touzeau raised a question about shifting the accessory building south 15-20 feet to increase space for
parking and allow for additional landscaping under the front windows of the accessory building.
HISTORIC DISTRICT COMMISSION MINUTES | 9 of 11
The commissioners agreed that this change was appropriate and that it further mitigated concerns about
the massing of the accessory structure.
The commissioners added a condition: The outbuilding may be sited up to 20 feet further south. The
driveway shall be extended accordingly and the parking turn-in to that additional space shall be increased.
With extension of the driveway, there would also be extension of the screening landscaping to the west.
Senner closed the public hearing.
Motion: Miller moved to find as fact that the 124 E. Union St. application is not incongruous with
the overall character of the Historic District and complies with all relevant standards of
evaluation based on the commission’s discussion of the application and the standards of
evaluation in Section 3.12.3 of the Unified Development Ordinance because the plans are
consistent with the Historic District Design Standards: New Construction of Outbuildings
and Garages; New Construction of Accessory Dwelling Units; Additions to Residential
Buildings; Walkways, Driveways, and Off-Street Parking; Exterior Lighting; Architectural
Metals; Doors; Porches, Entrances, and Balconies; and Sustainability and Energy Retrofit.
Riek seconded.
Vote: 7-0.
Motion: Miller moved to approve the application as submitted with the proposed conditions.
Member Bruce Spencer seconded.
Vote: 7-0
Conditions:
Tree protection shall be provided for the large existing tree adjacent to the accessory building.
Existing vinyl siding will be replaced with Hardieplank in all locations.
Existing metal ornate column that is removed from porch shall be repurposed at the termination
of the porch to the new addition.
Windows and doors on the porch addition on the left elevation will be simulated divided lite with
muntins to align with existing windows on the house.
The applicant has the option, which is encouraged by the commission, to adjust the lean-to on the
accessory building. It may be shifted south to align with the proposed south end of the structure
so it is not straddling the dormer.
Screening shall be added in front of the right elevation of the accessory building in the location
where there are no windows, to mitigate massing concerns and in consideration of the view from
the adjacent property. This screening may be either landscaping or trellis to support vegetation,
made of materials deemed appropriate within the compatibility matrix.
The outbuilding may be sited up to 20 feet further south. The driveway shall be extended
accordingly and the parking turn-in to that additional space shall be increased. With extension of
the driveway, there would also be extension of the screening landscaping to the west.
8. Fee schedule updates
Hoffheimer presented the proposed fee schedule. He explained that fees for planning are not coded
specifically enough to determine precisely how Historic District Commission application fees offset the
program’s operating expenses. He said the fees do offset operation costs but do not come near to covering
them all.
HISTORIC DISTRICT COMMISSION MINUTES | 10 of 11
The commissioners supported the fee increases and expressed that they would support even further
increases, especially within a progressive rate system and sliding scale fees. They specifically suggested
increasing the demolition fees and significantly increasing the after-the-fact application fees.
Commissioners were generally interested in the idea of having minor and major tiers for Certificates of
Appropriateness applications, based on the extent of the proposed project.
The commissioners expressed surprise at Hillsborough’s low fees compared to similar historic districts. There
was discussion of how higher fees may reflect a more professional process.
Hornik added that the town’s planning and utilities departments have started to be much less lenient about
enforcing rules due to the costs of non-enforcement that have accrued in recent years.
Hoffheimer said the town received 25 or 26 Certificate of Appropriateness applications last fiscal year, and
that there are typically 80-100 minor works approvals per year.
There was continued discussion of educating residents about the Historic District Commission’s parameters
and why the commission exists.
Hoffheimer said he would take the commission’s recommendations to staff and to the Board of
Commissioners. Commissioners expressed interest in drafting a letter in support of fee schedule changes and
attending a Board of Commissioners meeting to speak in support of further increases to certain fees.
9. General updates
There was discussion of adding an additional certification to the Certificate of Appropriateness application for
applicants to certify that the estimated project cost is accurate and that work will be conducted according to
the approved plans. There was also discussion of adding language to the application guidelines encouraging
professional drawings for larger projects, potentially including additions and new construction projects that
would require a building permit or would meet the requirements for a proposed major Certificate of
Appropriateness tier.
The commissioners discussed creating a fillable application template from examples of thorough applications
to provide a model with clarity and guidance.
There was discussion of the rules of procedures around tabled applications and public notice.
10. Adjournment
Senner adjourned the meeting at 9:16 p.m. without a vote.
Respectfully submitted,
Joseph Hoffheimer
Planner
Staff support to the Historic District Commission
HISTORIC DISTRICT COMMISSION MINUTES | 11 of 11
Approved: April 3, 2024
Agenda
Agenda
HISTORIC DISTRICT COMMISSION
Regular meeting
6:30 p.m. March 6, 2024
Board Meeting Room of Town Hall Annex, 105 E. Corbin St.
Public charge: The Hillsborough Historic District Commission pledges to the
community of Hillsborough its respect. The commission asks members of
the public to conduct themselves in a respectful, courteous manner with
the commission members and with fellow community members. At any
time should any member of the commission or community fail to observe this public charge, the chair or
the chair’s designee will ask the offending person to leave the meeting until that individual regains
personal control. Should decorum fail to be restored, the chair or the chair’s designee will recess the
meeting until such time that a genuine commitment to this public charge can be observed.
Public comment guidelines: All meetings shall be open to the public. The public may attend, but public
comment shall be limited to those members of the public who have expert testimony or factual evidence
directly related to an application on the agenda. Other public comments are permissible at the discretion
of the Chair but shall not be used to render the Commission’s decision on an agenda item. At the discretion
of the Chair, a time limit may be placed on speakers other than the applicant to afford each citizen an
equitable opportunity to speak in favor of, or in opposition to, an application.
1. Call to order, roll call, and confirmation of quorum
2. Commission’s mission statement
To identify, protect, and preserve Hillsborough’s architectural resources and to educate the public
about those resources and preservation in general. The Hillsborough Historic District presents a visual
history of Hillsborough’s development from the 1700s to the 1960s. In 1973, the town chose to respect
that history through the passage of the preservation ordinance creating the historic district.
3. Agenda changes
4. Minutes review and approval
Approve minutes from regular meeting on February 7, 2024
5. Written decisions review and approval
Approve written decisions from regular meeting on February 7, 2024
6. Old business
A. Certificate of Appropriateness Application: 114 W. Queen Street – Applicant is proposing to add
porches to the main house, add an accessory dwelling unit to the brick kitchen structure in the
backyard, and construct two sheds in the northeast corner of the property (PIN 9874071780)
101 E. Orange St., PO Box 429, Hillsborough, NC 27278
919-732-1270 | www.hillsboroughnc.gov | @HillsboroughGov
HISTORIC DISTRICT COMMISSION AGENDA | 1 of 2
HISTORIC DISTRICT COMMISSION AGENDA | 2 of 2
7. New business
A. Certificate of Appropriateness Application: 102 W. Queen Street – Applicant is requesting to install
15 roof-mounted solar panels (PIN 9874073693)
B. Certificate of Appropriateness Application: 124 E. Union Street – Applicant is requesting to add
rear and side additions to the existing house and a new accessory dwelling unit/garage behind the
existing house (9874171925)
8. Fee schedule updates
9. General updates
10. Adjournment
Interpreter services or special sound equipment for compliance with the American with Disabilities Act is
available on request. If you are disabled and need assistance with reasonable accommodations, call the
Town Clerk’s Office at 919-296-9443 a minimum of one business day in advance of the meeting.