Architectural & Historic Board of Review
Regular MeetingHudson, OH · December 11, 2024
Minutes
City of Hudson, Ohio
Meeting Minutes - Final
Architectural & Historic Board of Review
John Caputo, Chair
Allyn Marzulla, Vice Chair
John Workley, Secretary
Françoise Massardier-Kenney
William Ray
Jamie Sredinski
Nicholas Sugar, City Planner
Amanda Krickovich, Associate Planner
Wednesday, December 11, 2024 7:30 PM Town Hall
27 East Main Street
I. Call To Order
Chair Caputo called to order the regularly scheduled meeting of the Architectural & Historic
Board of Review of the City of Hudson at 7:30 p.m., in accordance with the Sunshine Laws of
the State of Ohio, O.R.C. Section 121.22.
II. Roll Call
Present: 6 - Mr. Caputo, Ms. Kenney, Ms. Marzulla, Mr. Ray, Mr. Workley and Ms. Sredinski
III. Public Comment
Chair Caputo opened the meeting to public comments for anyone wanting to address the
Board. There were no comments.
IV. Consent Applications
A motion was made by Ms. Kenney, seconded by Mr. Workley, to approve the Consent
Agenda. The motion carried by the following vote:
Aye: 6 - Mr. Caputo, Ms. Kenney, Ms. Marzulla, Mr. Ray, Mr. Workley and Ms.
Sredinski
A. AHBR 24-129041 Ambrose Drive
Accessory Structure (Pavillion)
Attachments: 41 Ambrose Drive AHBR Packet
This AHBR application was approved on the Consent Agenda.
V. Old Business
City of Hudson, Ohio Page 1
Architectural & Historic Board of Review Meeting Minutes - Final December 11, 2024
A. AHBR 24-426 13 N. Oviatt (Historic District)
Demolition (One-Story, Single-Family House)
Attachments: 13 N. Oviatt New Documents for 12.11 Meeting
13 N. Oviatt AHBR Packet 11.13 Meeting
Perspectus Consultant Report
13 N. Oviatt AHBR Packet
Ms. Krickovich introduced the application by noting a site visit was conducted on November
19, 2024.
Mr. Clayton Braham and Ms. Megan Braham, homeowners, reviewed the site visit and the
recommendation to examine information from Summit County Soil and Water (SCSW). The
Brahams found no conclusive photographs of the area of their house in SCSW information .
Mr. Braham also displayed a photographs from 1951 and 1959, which he believes shows no
house. However, by 1970, a photograph shows a structure on the property. Mr. Braham then
expressed his opinion that the pertinent question is, 'Is the house worth saving?', noting that it
is made of particle board and other lesser materials.
The Board, applicant, and staff discussed: When and why this house was added to the Historic
District, the Public Comments at the last meeting stating the 1950s supposed building date is
incorrect, that the photographs are not conclusive evidence there was or was not a house in
the location, that the nature of the structure conveys to AHBR members that the house was not
there in the 1950s, and that the National Registry states the house has no historical
significance. The applicant also stated they were not able to discover when the house was
built before the 1970 photo.
The Board requested staff write out the motion to clarify why demolition will be permitted.
A motion was made by Mr. Workley, seconded by Ms. Kenney, that this AHBR
Application be Continued to the January meeting to allow staff to submit a
recommended motion to the AHBR. The motion carried by the following vote:
Aye: 6 - Mr. Caputo, Ms. Kenney, Ms. Marzulla, Mr. Ray, Mr. Workley and Ms.
Sredinski
VI. New Business
A. AHBR 24-1296190 N. Main Street (Historic District)
Sign (Building Sign)
Attachments: 190 N. Main AHBR Packet
Ms. Krickovich introduced the application by describing the sign and reviewing the staff
comments.
Ms. Soyson described and displayed the proposed lettering and stated the thickness of the
lettering is approximately one-inch, with no lighting.
The Board, applicant, and staff discussed: The mounting board is plywood and suitable for
hanging the letters and the flower is the same material as the letters.
A motion was made by Mr. Workley, seconded by Ms. Kenney, that this AHBR
Application be approved as amended by the submitted redesign. The motion carried by
the following vote:
City of Hudson, Ohio Page 2
Architectural & Historic Board of Review Meeting Minutes - Final December 11, 2024
Aye: 6 - Mr. Caputo, Ms. Kenney, Ms. Marzulla, Mr. Ray, Mr. Workley and Ms.
Sredinski
B. AHBR 24-128148 College Street (Historic District)
Alterations (Windows & Doors)
Attachments: 48 College St. 12.11 Meeting AHBR Packet
48 College St. Consultant Report
48 College St. AHBR Packet 11.13 Meeting
48 N. Oviatt AHBR Packet
Ms. Krickovich introduced the application by noting the application has been reviewed in
numerous AHBR meeting, described the various iterations of the design, and reviewing the
staff comments.
Mr. Joe Matava, and Ms. Elizabeth Nicklas, Peninsula Architects, noted ongoing demolition
is taking place, the framing is not supporting the second floor, that the framing and plumbing -
done throughout the years - is causing problems, that the homeowner is willing to invest in the
house for its preservation, that the structure was built in three different time periods and was
not done well, that the entire second floor structure is being rebuilt, and that Peninsula
Architects is trying to make the house useful for today. Mr. Matava noted none of elements of
the house are in alignment, therefore it does not make sense to require the proposed windows
to align.
The Board noted: It appreciates the elevation changes in this proposal, expressed concern that
the first floor is not sufficiently holding up the second floor, stated the ganged windows are
still not a good solution, that the ganged windows are out of the general public view, that the
proposal is in keeping with the general character of the house in its time period, that structural
issues should be taken into account by the Board, that all the LDC requirements are not being
met with the redesign, and that Pella Reserve windows will be used.
A motion was made by Mr. Ray, seconded by Mr. Workley, that this AHBR Application
be approved. The motion carried by the following vote:
Aye: 4 - Mr. Caputo, Mr. Ray, Mr. Workley and Ms. Sredinski
Nay: 2 - Ms. Kenney and Ms. Marzulla
C. AHBR 24-11737181 Huntington Road
Alterations (Siding)
Attachments: 7181 Huntington Rd AHBR Packet
Ms. Krickovich introduced the application by explaining this review is for the siding
replacement only and reviewed the staff comments.
Mr. Brando Campo, and Mr. Chuck Conway, WeatherSeal Home Services, Inc., were present
for the meeting.
The Board. applicant, and staff, discussed why and where board and batten is being used, and
that the LDC demands material changes take place on inside corners and be consistent around
the entire mass.
A motion was made by Mr. Workley, seconded by Ms. Kenney, that this AHBR
Application be denied. The motion carried by the following vote:
City of Hudson, Ohio Page 3
Architectural & Historic Board of Review Meeting Minutes - Final December 11, 2024
Aye: 6 - Mr. Caputo, Ms. Kenney, Ms. Marzulla, Mr. Ray, Mr. Workley and Ms.
Sredinski
D. AHBR 24-119661 Sussex Road
Addition (Attached Garage)
Attachments: 61 Sussex 12.11 AHBR Meeting Packet
61 Sussex 10.9 AHBR Meeting Packet
Ms. Krickovich introduced the application by noting an informal review was conducted on
October 9, 2024, a variance was granted by BZBA on November 21 , 2024, and reviewing the
Architectural Design Standards and staff comments.
Mr. Steve Hanna, representing the owners, and Mr. Eric Long, property owner, described:
Mr. Long's child's disability and need for this ADA equipped suite on the first floor, the
research behind the submitted design, how the existing garage can be adapted for the ADA
needs at a cost effective price, and that a new garage will be required for loading and
unloading their child. Mr. Hanna noted the new garage, as submitted, does not meet the LDC,
the alternative garage designs which are not as suitable and come at a higher cost,
necessitating a variance and these ADA exemptions.
The Board, applicant, and staff, discussed the type of garage door to use, that BZBA granted
a variance for the front facing garage, and AHBR will permit an exception because of the
homeowners demonstrated need.
A motion was made by Mr. Workley, seconded by Ms. Kenney, that this AHBR
Application be approved based on Section 2 1, subcategory 2 (exceptional and unique
conditions) which create a practical difficulty in complying with the standards, and that
staff approve the garage door. The motion carried by the following vote:
Aye: 6 - Mr. Caputo, Ms. Kenney, Ms. Marzulla, Mr. Ray, Mr. Workley and Ms.
Sredinski
City of Hudson, Ohio Page 4
Architectural & Historic Board of Review Meeting Minutes - Final December 11, 2024
E. AHBR 24-126548 Wellgate Drive
Addition (Mudroom & Garage)
Attachments: 48 Wellgate AHBR Packet
Ms. Krickovich introduced the application by describing and displaying the addition, and
reviewing the staff comments and recommendations.
Mr. Nate Bailey, Hara Architects, displayed the neighborhood of the house which is 11
houses on a round-about private drive, that every house in the development is a unique style,
and that the subject house has a mansard roof type with a traditional shingles . Mr. Bailey then
described the project with an owner's suite and addition in the back, replacement of the
vertical wood cedar shake siding which has dry rot, and described the project as a design
solution which complements the owner's house and neighborhood .
The Board, applicant, and staff discussed: Blending in the new siding, that the addition steps
forward approximately five-feet in front of the house, how the addition will be seen from the
street and driveway, the siding type which will be a different material but will match the
existing in appearance, and that the material transitions will be wood to match at inside
corners.
Mr. Workley made a motion, seconded by Ms. Kenney, based on Section 211 1, sub
section 2, noting the unique construction of the mansard roof which will not be reflected
in the new portion of the more modern construction of the addition, that the new siding
will be feathered in with the existing T 1 11 wood siding, and new fiber siding be used .
The motion passed by the following vote:
Aye: 6 - Mr. Caputo, Ms. Kenney, Ms. Marzulla, Mr. Ray, Mr. Workley and Ms.
Sredinski
City of Hudson, Ohio Page 5
Architectural & Historic Board of Review Meeting Minutes - Final December 11, 2024
F. AHBR 24-12802 Bradley Drive
New House (Single-Family Detached)
Attachments: 2 Bradley Drive AHBR Packet - 1.8.25 Meeting
2 Bradley Drive AHBR Packet
Ms. Krickovich introduced the application by displaying renderings, elevations, the site plan,
and reviewing the staff comments and recommendations.
Mr. Nate Bailey, Hara Architects, stated this is a two-story wing type proposed house and
described how the house fits the description of a wing type house, displayed other locations
where the two-story wing type house may be found in Hudson, explained how the proposed
house captures the charm and look of village houses, and discussed revisions of the house
after discussions with staff.
The Board, applicant, and staff, discussed: The LDC allowing certain types of houses in
certain zones, explained what a 'main body' type of house is as opposed to an intersecting
wing type of house, the Boards feeling the proposed house is not compatible with other
houses in the neighborhood, what would need to take place to make the house compliant,
changes to the design while keeping the porch - which would make the house design
allowable, and that the lack of trim, the window types and overhangs are problematic .
Mr. Bailey and the Board discussed the 16-feet of windows and a 14-foot wall without
fenestration.
Mr. Bailey requested the application be continued.
A motion was made by Ms. Kenney, seconded by Mr. Ray, that this AHBR Application
be continued. The motion carried by the following vote:
Aye: 6 - Mr. Caputo, Ms. Kenney, Ms. Marzulla, Mr. Ray, Mr. Workley and Ms.
Sredinski
City of Hudson, Ohio Page 6
Architectural & Historic Board of Review Meeting Minutes - Final December 11, 2024
G. AHBR 24-1049734 Barlow Road
New House (Single-Family Detached)
Attachments: 734 Barlow Rd. AHBR Packet - 1.8.25 Meeting
734 Barlow Rd. AHBR Packet
Ms. Krickovich introduced the application by: Displaying the site plan, describing the project
and reviewing the staff comments and recommendations.
Mr. John Russell, Prestige, Builder Group, and Mr. Chris Brown, Prestige Builder Group,
agreed to the modify the windows, discussed the different types of roofs, the use of stone on
the walls which is required to terminate at an inside corner, that the lot is not perpendicular to
the roadway making it difficult to make the house parallel to the road, and the use of the
standing seam on the shed.
The Board, applicants, and staff, discussed: The roof types, that the orientation of the house
will need to match the neighboring houses, that AHBR cannot approve the proposed
orientation since it is a LDC requirement, that the septic system is causing the house to be in
the proposed location, that moving the house on the lot will cause setback problems, that the
adjoining houses are more parallel to Barlow Road than the proposed house, that if the
proposed house is as parallel as the neighboring houses AHBR may be able to approve, if the
house can be turned as in the drawing Mr. Brown submitted - the AHBR will approve
according to the ten-percent rule, that grids will be placed in all the windows, that AHBR
approves of the roof styles, and that a metal piece combined with shingles may be
problematic.
A motion was made by Mr. Workley, seconded by Ms. Kenney, that this AHBR
Application be continued. The motion carried by the following vote:
Aye: 6 - Mr. Caputo, Ms. Kenney, Ms. Marzulla, Mr. Ray, Mr. Workley and Ms.
Sredinski
VII. Other Business
A. AHBR 7675 Minutes of Previous Architectural & Historic Board of Review Meeting:
November 13, 2024.
Attachments: November 13, 2024 AHBR Minutes - Draft
A motion was made by Ms. Kenney, seconded by Ms. Marzulla, that the November 13,
2024, minutes be approved as amended. The motion carried by the following vote:
Aye: 6 - Mr. Caputo, Ms. Kenney, Ms. Marzulla, Mr. Ray, Mr. Workley and Ms.
Sredinski
VIII. Staff Update
Staff thanked the Board members for attending the workshop.
Mr. Sugar informed the Board that the development across from Stony Hill on Darrow Road
was approved by PC and will return to the AHBR.
City of Hudson, Ohio Page 7
Architectural & Historic Board of Review Meeting Minutes - Final December 11, 2024
A. AHBR 7674 Discussion on the 2025 Council check-in
Attachments: City Council Memo - 2025
2025 Council Check-in Staff Memo
Ms. Krickovich discussed the five objective the AHBR developed at the workshop and that on
February 11, 2025, AHBR will appear before council. The Board and staff discussed
finalizing the council report at the January meeting.
IX. Adjournment
A motion was made by Ms. Marzulla, seconded by Mr. Workley, that the meeting be
adjourned at 9:44 p.m.. The motion carried by the following vote:
Aye: 6 - Mr. Caputo, Ms. Kenney, Ms. Marzulla, Mr. Ray, Mr. Workley and Ms.
Sredinski
___________________________________________
John Caputo, Chair
___________________________________________
John Workley, Secretary
___________________________________________
Joe Campbell, Executive Assistant
Upon approval by the Architectural & Historic Board of Review, this official written
summary of the meeting minutes shall become a permanent record, and the official minutes
shall also consist of a permanent audio and video recording, excluding executive sessions, in
accordance with Codified Ordinances, Section 252.04, Minutes of Architectural and Historic
Board of Review, Board of Zoning and Building Appeals, and Planning Commission .
* * *
City of Hudson, Ohio Page 8
Agenda
City of Hudson, Ohio
CD Meeting Agenda - Final
Architectural & Historic Board of Review
John Caputo, Chair
Allyn Marzulla, Vice Chair
John Workley, Secretary
Françoise Massardier-Kenney
William Ray
Jamie Sredinski
Karl Wetzel
Nicholas Sugar, City Planner
Amanda Krickovich, Associate Planner
Wednesday, December 11, 2024 7:30 PM Town Hall
27 East Main Street
I. Call To Order
II. Roll Call
III. Public Comment
IV. Consent Applications
A. AHBR 41 Ambrose Drive
24-1290 Accessory Structure (Pavillion)
Submitted by Jeff Rak
a) Staff recommends approval as submitted.
Attachments: 41 Ambrose Drive AHBR Packet
V. Old Business
City of Hudson, Ohio Page 1 Printed on 12/6/2024
Architectural & Historic Board of Review CD Meeting Agenda - Final December 11, 2024
A. AHBR 24-426 13 N. Oviatt (Historic District)
Demolition (One Story, Single-Family House)
Submitted by Clayton Braham
a) Staff notes this proposal was reviewed at the May 8, 2024 AHBR meeting.
The Board requested the assistance from the Consultant. The Consultant
report concluded the existing house falls within the Period of Significance
of the Historic District (1806-1963) and therefore, demolition would not be
appropriate. The Consultant report cited the 2022 Historic District
Boundary Increase, which added the building as a contributing resource,
along with 38 other buildings built between 1940 and 1963.
b) Staff notes the application was further reviewed at the November 13, 2024
AHBR meeting. The Board requested a site visit which was conducted on
November 19th, 2024.
c) The applicant has submitted additional documentation for the AHBR to
consider.
Attachments: 13 N. Oviatt New Documents for 12.11 Meeting
13 N. Oviatt AHBR Packet 11.13 Meeting
Perspectus Consultant Report
13 N. Oviatt AHBR Packet
Legislative History
5/8/24 Architectural & Historic Board continued
of Review
11/13/24 Architectural & Historic Board continued
of Review
VI. New Business
A. AHBR 190 N. Main Street (Historic District)
24-1296 Sign (Building Sign)
Submitted by Robert Riegle
a) Question the thickness of the letters and how they will be mounted to the
wall.
b) Verify if the holes from the previous sign will need to be patched.
Attachments: 190 N. Main AHBR Packet
City of Hudson, Ohio Page 2 Printed on 12/6/2024
Architectural & Historic Board of Review CD Meeting Agenda - Final December 11, 2024
B. AHBR 48 College Street (Historic District)
24-1281 Alterations (Windows & Doors)
Submitted by Elizabeth Nicklas, Peninsula Architects
a) Staff notes this project was reviewed at the October 23, 2024 & the
November 13, 2024 AHBR meetings. At the 11/13 meeting the Board
approved the addition, but allowed the applicant to re-submit plans that
would depict a design that is more aligned with the Consultant report.
b) Staff notes the consultant report recommended removing the flanking
window and replacing with a double hung, retaining the historic door
opening and the farthest right (south) window. The applicant has submitted
revised plans that depict removing the flanking window and replace with
ganged double hung windows, retain the historic door opening, widening it
and replacing with double doors and removing the right window and
replacing with ganged double hung. However, staff notes the windows and
doors would not align with the second-floor windows, which conflicts with
the Consultant’s recommendation.
Attachments: 48 College St. 12.11 Meeting AHBR Packet
48 College St. Consultant Report
48 College St. AHBR Packet 11.13 Meeting
48 N. Oviatt AHBR Packet
C. AHBR 7181 Huntington Road
24-1173 Alterations (Siding)
Submitted by WeatherSeal Home Services, Inc.
a) The proposal is for siding replacement only. The applicant will apply
separately for the roofed porch.
b) The Architectural Design Standards state as per Section IV-1(d)(2) - The
materials used in the main body must be applied consistently on that mass
on all sides of the structure. Staff notes the applicant is proposing board
and batten siding that does not wrap around the entire mass. Revise plans
to depict a more consistent material on all sides of the mass.
Attachments: 7181 Huntington Rd AHBR Packet
City of Hudson, Ohio Page 3 Printed on 12/6/2024
Architectural & Historic Board of Review CD Meeting Agenda - Final December 11, 2024
D. AHBR 61 Sussex Road
24-1196 Addition (Attached Garage)
Submitted by Steve Hanna
a) Staff notes this project was reviewed by the AHBR informally at the
October 9, 2024 meeting. Additionally, the project was granted a BZBA
variance for a forward-facing garage door on November 21, 2024.
b) Section III-1(a)(4) of the Architectural Design Standards states - Attached
garages shall not face the street except for new development with a front
yard depth of 130 feet or more.
c) Section IV-3(a) of the Architectural Design Standards states - The main
body is a single story and centrally located in the structure and the front
door is located in the main body. Staff notes the addition would create a
main body that is not centrally located.
d) During the informal review the Board members generally accepted the
plans but suggested a garage door that had a higher degree of
architectural features. The new garage door elevation is attached in the
packet.
e) Staff notes Section II-1 - Approval and discretion of the AHBR:
c. The AHBR may waive any requirement of these standards in order to
approve a proposed project, if the AHBR finds that the project fulfills the
five principals enumerated in Section I-2, and meets one of the following
conditions:
(1) The project is an exceptional design, meaning that it is either
especially creative or it is designed in response to unique situation,
such as a very difficult site or an unusual program requirement.
Or
(2) Exceptional and unique conditions exist that create a practical
difficulty in complying with the requirements of these Standards. The
AHBR should consider the factors enumerated in as defined in the
Land Development Code in determining "practical difficulty"
Attachments: 61 Sussex 12.11 AHBR Meeting Packet
61 Sussex 10.9 AHBR Meeting Packet
City of Hudson, Ohio Page 4 Printed on 12/6/2024
Architectural & Historic Board of Review CD Meeting Agenda - Final December 11, 2024
E. AHBR 48 Wellgate Drive
24-1265 Addition (Mudroom & Garage)
Submitted by Nate Bailey, Hara Architects
a) Section IV-4(c) of the Architectural Design Standards state - All roofs in
all the wings must be of the same shape as the main body, but they may
have a different pitch or orientation. Roofs shall not intersect a wall so as
to cause a valley. Staff notes the existing house has a mansard roof and the
proposed addition is depicted to have a flat roof. Revise plans to depict the
addition to have the same type of roof shape as the main body.
b) Section III-1(g)(11) of the Architectural Design Standards states -
Replacement wall and roof materials should be blended across a facade
(rather than small patch areas) to ensure compatibility with existing
materials. Confirm how the siding will be blended in at the rear and east
elevations and at the window replacement infills.
c) Submit a roof plan to verify massing.
Attachments: 48 Wellgate AHBR Packet
F. AHBR 2 Bradley Drive
24-1280 New House (Single-Family Detached)
Submitted by Nate Bailey, Hara Architects
a) Staff notes the overall design of the house would not comply with the
permitted building types within District 4 per Section II-2. Revise the plans
to depict a more traditional two-story wing type by removing the overhang
and creating a pitched roof off of the main mass.
b) Section I-2(e) of the Architectural Design Standards state - New buildings
and alterations shall respect the existing context and framework. The
design of any building shall be judged in reference to its site and the
character of its surroundings, not as an independent object. Suggest
revising the plans to depict more traditional overhangs, eaves, siding and
window openings that would be more compatible with neighboring
properties.
c) Section III-1(g)(8) of the Architectural Design Standards state - Large
expanses of blank wall are to be avoided. Fenestration placement should
be at a maximum of approximately every 12 feet. Adjust window
placements to meet this requirement.
d) Section III-1(d)(5) of the Architectural Design Standards state - All
facades (including the rear) over twelve (12) feet long shall have at least
one window or door opening. Fenestration placement on the accessory
structure shall be proportional to the house. Revise accessory structure
plans to show fenestration on the rear elevation to meet this requirement.
Attachments: 2 Bradley Drive AHBR Packet
City of Hudson, Ohio Page 5 Printed on 12/6/2024
Architectural & Historic Board of Review CD Meeting Agenda - Final December 11, 2024
G. AHBR 734 Barlow Rd
24-1049 New Residential Construction (Two-story single-family house)
Submitted by Robyn Jones
a) Section 1205.05(d)(7)(2) of the Land Development Code states - The front
wall of the principal structure shall be parallel to the street or
perpendicular to a radius of the curve of the street extended through the
approximate center of the main mass, if the street is curved.” Revise the
orientation of the house to meet this requirement.
b) Section 1205.05(d)(5)(C)(2) of the Land Development Code states - The
front setback shall not differ by more than ten percent from the average of
the front yard setbacks existing on the two properties immediately
adjoining the subject property, unless approved by the Architectural and
Historic Board of Review. Staff notes the proposed setback is greater than
ten percent of the adjacent properties 86 ft average.
c) Section IV-1(e)(3) of the Architectural Design Standards state - The
building shall have a typical window used for most windows. Utilize a
more consistent window design to meet this requirement.
d) Section III-1 (g)(8) of the Architectural Design Standards state - Large
expanses of blank wall are to be avoided. Fenestration placement should
be at a maximum of approximately every 12 feet. Add additional
fenestration on the right elevation to meet this requirement.
e) Section IV-2(g)(1) of the Architectural Design Standards state - Roofs on
projections should match the roof material of the building, and to the
extent possible, shall be same kind of roof. Natural finish metals such as
copper, terne coated steel, or lead may be substituted for any roofing
material. Staff notes the house is a hip roof and the porch projections are
gable roofs.
f) Question if the stone applied to the rear elevation wall would terminate at
an inside corner.
g) Question the mix of standing seam and shingles at the front porch.
Attachments: 734 Barlow Rd. AHBR Packet
VII. Other Business
A. AHBR 7675 Minutes of Previous Architectural & Historic Board of Review Meeting:
November 13, 2024.
Attachments: November 13, 2024 AHBR Minutes - Draft
VIII. Staff Update
A. AHBR 7674 Discussion on the 2025 Council check-in
Attachments: 2025 Council Check-in Staff Memo
IX. Adjournment
City of Hudson, Ohio Page 6 Printed on 12/6/2024
Architectural & Historic Board of Review CD Meeting Agenda - Final December 11, 2024
* * *
The mission of the Hudson City Government is to serve, promote and support, in a fiscally responsible manner,
an outstanding community that values quality of life, a well-balanced tax base, historic preservation, with a
vision to the future, and professionalism in volunteer and public service.
City of Hudson, Ohio Page 7 Printed on 12/6/2024
Get email alerts for Hudson
A daily email when new agendas and minutes are posted.