Planning Board
Regular MeetingLaconia, NH · September 3, 2024
Minutes
CITY OF LACONIA PLANNING BOARD
6:30 PM City Hall - Armand A. Bolduc Council Chamber
Draft Minutes
9/3/2024 - Minutes
1. CALL TO ORDER
C. St Clair called the meeting to order at 6:31pm.
2. ROLL CALL
The following members were in attendance; Brian Wolf, Gail Ober, Rich MacNeill, Councilor Bruce Cheney,
Mike DellaVecchia, Chairman Charlie St. Clair, and Amy Lovisek.
3. RECORDING SECRETARY
Savanna Brunelle, Admin Assistant
4. STAFF IN ATTENDANCE
Rob Mora, Planning Director
Tyler Carmichael, Assistant Planner
5. ACCEPTANCE OF MINUTES FROM PREVIOUS MEETING
G. Ober motions to accept the minutes from the previous meeting, A. Lovisek seconds. All in favor, passed
unanimously.
5.I. Planning Board August 6, 2024 Minutes
6. CONTINUED PUBLIC HEARINGS, CONSIDERATION, AND POSSIBLE VOTE
6.I. PL2024-0070; 1921 Parade Rd (290-155-9)
A. Lovisek motions to accept application PL2024-0070, seconded by G. Ober. All in favor. S. Whearty
from Dubois & King and Louis Tomasello were present to summarize the application. There was
discussion about the Snowmobile trail that is on the property. The public hearing started at 6:56pm.
Mary & Jim Labonty came to speak as a testimonial abutter and expressed concerns about drainage
issues. the snowmobile trail easement and the fence proposed. The public hearing was closed at
7:06pm. S. Whearty came back up to propose ways to help with the concerns from neighbors. T.
Carmichael and R. Mora explained that the applicant has met the requirements for the site plan and
subdivision regulations for storm water management. T. Carmichael read the following staff-
recommended conditions of approval:
PRECONSTRUCTION REQUIREMENTS
All conditions in this section must be completed at least two weeks prior to commencing any work on-
site.
1.1. Plan Revisions. Plans must be revised and submitted to the Planning Department in accordance
with the following:
1.1.1. All leading zeros must be removed from all lot numbers.
1.1.2. Details of the fence to be constructed along Parade Road must be provided and include the
1.1. Plan Revisions. Plans must be revised and submitted to the Planning Department in accordance
with the following:
1.1.1. All leading zeros must be removed from all lot numbers.
1.1.2. Details of the fence to be constructed along Parade Road must be provided and include the
height, style, and materials to be used.
1.1.3. All notes on the details sheet must reflect a minimum bury depth of six feet for all water pipes.
1.1.4. One paper and one digital plan set must be submitted.
1.2. Sewer Inspection. The existing sewer service must be inspected via camera from the house to
as far downstream as possible. During the inspection, the sewer line must be marked out on the
ground. If the camera cannot reach the sewer main, then the service must be inspected from the sewer
main to as far as possible upstream.
1.3. Sewer Service Disconnect. The Applicant must disconnect the existing sewer service as close
to the sewer main as possible. The Department of Public Works must approve the service
disconnection plan prior to disconnection.
1.4. Water Service Disconnect. The Applicant must disconnect the existing water service at the
water main. The Water Department must approve the service disconnection plan prior to disconnection.
1.5. Erosion Controls. Erosion controls must be in place and inspected and approved by the
Planning Department. The Planning Department will perform regular inspections to ensure erosion
controls are installed and maintained correctly.
1.6. Site Security. The Applicant must submit a performance guarantee for site improvement and
restoration security in an amount equal to 11% of the total estimated cost for all sitework. This
guarantee must be submitted to and approved by the Planning Department. This performance
guarantee will be returned to the Applicant once the project is complete. Bonds will not be accepted to
satisfy this requirement.
1.7. Landscape Security. The Applicant must submit a performance guarantee for site landscaping
and restoration security in an amount equal to 11% of the total estimated cost for all landscaping or a
minimum of $500, whichever is greater. This guarantee must be submitted to and approved by the
Planning Department. This performance guarantee will be returned to the Applicant after two growing
seasons following the completion of the project. Bonds will not be accepted to satisfy this requirement.
1.8. Permits and Approvals. The Applicant must possess all required permits and approvals granted
by other municipal, state, and federal boards or agencies. All permits and approvals must be in place
prior to the signing and recording of the final plans and mylar. Should any permit or approval be revoked
at any time during the project, all work must cease until a new permit or approval is obtained. Copies
of all permits and approvals must be provided by the Applicant to the Planning Department upon
request.
1.9. Final Plans and Mylar. Four final plan sets and a mylar plan must be submitted to, reviewed,
and approved by the Planning Department. The mylar plan must be recorded at the Belknap County
Register of Deeds in accordance with RSA 478:1-a at the Applicant’s expense
CONSTRUCTION REQUIREMENTS
All conditions in this section must be met during the construction of the project.
Register of Deeds in accordance with RSA 478:1-a at the Applicant’s expense
CONSTRUCTION REQUIREMENTS
All conditions in this section must be met during the construction of the project.
2.1. Parade Road Setback. No structure may be built within 100 feet of Parade Road.
2.2. Lot Access. No lot may be accessed from Parade Road. All lots must be accessed from Clover
Lane.
2.3. Water Specifications. All specifications for municipal water service required by the Water
Department apply to all construction.
POST-CONSTRUCTION REQUIREMENTS
All conditions in this section must be met prior to the issuance of any Certificate of Occupancy.
3.1. Private Sewer Agreement. A private sewer agreement must be in place between each
development and those serviced by the sewer downstream. Evidence of the in-force agreement must
be presented to the Department of Public Works.
3.2. Road Ownership. Clover Lane will remain a private road to be owned and maintained by the
South Down Recreation Association.
3.3. HOA Membership. Each house must be included in the existing HOA. HOA documents for
each house must be provided to the Planning Department.
3.4. Impact Fees. Impact Fees in the amount of $3,814.80 per new single-family dwelling unit must
be paid to the Planning Department. In accordance with RSA 674:39, the Applicant is exempt from any
changes to impact fee rates for 5 years from the approval date. Should the project not be completed
during the exemption period, the Applicant must pay any and all increases to impact fees regardless of
vestment status.
3.5. Monumentation. A statement from a licensed land surveyor must be submitted to the Planning
Department confirming the proposed monumentation was installed according to the approved plan.
3.6. As-Built Design. An as-built design, application, and fee for each dwelling unit must be
submitted to the Planning Department for review and approval.
COMPLETION DATE
The project and all associated conditions must be completed by no later than August 6, 2026. If all
conditions are not met, nor any extension application filed with the Laconia Planning Department, by
the completion date, this approval is null and void.
G. Ober motions to approve application PL2024-0070 for 1921 Parade with the conditions of approval
and waivers as presented in the Staff Report. M. DellaVecchia seconds. All in favor, none opposed.
7. NEW PUBLIC HEARINGS, POSSIBLE CONSIDERATION, AND VOTE
G. Ober motions to approve application PL2024-0070 for 1921 Parade with the conditions of approval
and waivers as presented in the Staff Report. M. DellaVecchia seconds. All in favor, none opposed.
7. NEW PUBLIC HEARINGS, POSSIBLE CONSIDERATION, AND VOTE
7.I. PB2025-010; 17 Bay St (450-13-43)
Sal Hubbard from Lakes Region Community Developers was present to summarize the application. G.
Ober motions to accept the application. R. MacNeill seconds. All in favor, none opposed. C. St. Clair
asked with the private trash removal if there was going to be recycling as well. There was further
discussion about how to financially proceed with trash and recycling. The applicant is going to do more
research for the recycling aspect of removal. The public hearing was opened at 7:30pm. No abutters
were present, the public hearing was closed at 7:31pm. T. Carmichael read the following staff
recommended conditions of approval Amend prior approval to require private solid waste collection
method preferred by the private solid waste collection service. All solid waste receptacles must be
screened and all other conditions from the November 6, 2023, approval apply. M. DellaVecchia
motioned to approve application PB2025-010 for 17 Bay St. with the conditions of approval presented in
the Staff Report. R. MacNeill seconds. 5 in favor and 1 in opposition. The motion passed.
7.II. PB2025-007; 92 Pine St (443-184-75)
B. Cheney motioned to accept application PB2025-006 for 92 Pine St. as complete with the findings of
fact as presented in the Staff Report. G. Ober seconds. All in favor. Tom LaBree was present to
summarize the application. There was discussion about it being a two-family but it to be constructed
later and be a mulit-family. The public hearing was opened at 7:36pm due to no one speaking up the
public hearing was closed at 7:37pm. T. Carmichael summarized the staff report and read the following
conditions of approval:
PRECONSTRUCTION REQUIREMENTS
All conditions in this section must be completed at least two weeks prior to commencing any work on-
site.
1.10. Permits and Approvals. The Applicant must possess all required permits and approvals granted
by other municipal, state, and federal boards or agencies. All permits and approvals must be in place
prior to the signing and recording of the final plans and mylar. Should any permit or approval be revoked
at any time during the project, all work must cease until a new permit or approval is obtained. Copies
of all permits and approvals must be provided by the Applicant to the Planning Department upon
request.
1.11. Final Plans. Four final plan sets must be submitted to, reviewed, and approved by the Planning
Department. The final plan sets must include a floor plan for each unit.
CONSTRUCTION REQUIREMENTS
All conditions in this section must be met during the construction of the project.
2.4. Knox Box. A Knox Box must be installed to prevent damage in the event an emergency
entrance is needed.
2.5. Smoke/CO Detectors. All smoke and carbon monoxide detectors must be installed and
interconnected in accordance with the current fire code.
2.5. Smoke/CO Detectors. All smoke and carbon monoxide detectors must be installed and
interconnected in accordance with the current fire code.
2.6. Fire Separation. All dwelling units must be separated from each other by walls and floors
constructed as fire barriers with a minimum of one-hour fire resistance rating.
2.7. Sewer Service. The sewer service must be cleaned and inspected via CCTV. A certified
inspection report must be submitted to the Department of Public Works for review and approval.
2.8. Water Meter and Meter Horn. A meter horn with a double check valve can be used in lieu of a
testable backflow device. The Laconia Water Department must reinstall the water meter once the
meter horn is installed. Both the meter horn and the water meter must be in a heated and accessible
location.
2.9. Water Specifications. All specifications for municipal water service required by the Water
Department apply to all construction.
POST-CONSTRUCTION REQUIREMENTS
All conditions in this section must be met prior to the issuance of any Certificate of Occupancy.
3.7. Construction and Maintenance Assessment Fees. All Construction and Maintenance
Assessment fees must be paid to the Water Department.
3.8. Water Department Inspection. The Laconia Water Department must inspect and approve all
plumbing work.
3.9. Impact Fees. Impact Fees in the amount of $3,481.37 per new multifamily dwelling unit must be
paid to the Planning Department. In accordance with RSA 674:39, the Applicant is exempt from any
changes to impact fee rates for 5 years from the approval date. Should the project not be completed
during the exemption period, the Applicant must pay any and all increases to impact fees regardless of
vestment status.
3.10. As-Built Design. An as-built design, application, and fee for each dwelling unit must be
submitted to the Planning Department for review and approval.
COMPLETION DATE
The project and all associated conditions must be completed by no later than September 3, 2029. If all
conditions are not met, nor any extension application filed with the Laconia Planning Department, by
the completion date, this approval is null and void.
G. Ober motions to approve application PB2025-006 for 92 Pine St. with the conditions of approval
presented in the Staff Report. A. Lovisek seconds. All in favor, the motion passed unanimously.
7.III. PB2025-008; 30 Winter St (426-246-44)
A. Lovisek motions to accept application PB2025-008 for 30 Winter Street as complete with the
findings of fact as presented in the Staff Report. R. MacNeill seconds. All in favor. Nick King and De
7.III. PB2025-008; 30 Winter St (426-246-44)
A. Lovisek motions to accept application PB2025-008 for 30 Winter Street as complete with the
findings of fact as presented in the Staff Report. R. MacNeill seconds. All in favor. Nick King and De
Hsieh were present to summarize the application for 30 Winter St. There was discussion about the
parkin ordinance and the requirements for this property. The public hearing was opened at 7:47pm and
closed 7:48pm due to no abutters being present. T. Carmichael summarized the staff report and read
the conditions of approval:
PRECONSTRUCTION REQUIREMENTS
All conditions in this section must be completed at least two weeks prior to commencing any work on-
site.
1.12. Permits and Approvals. The Applicant must possess all required permits and approvals granted
by other municipal, state, and federal boards or agencies. All permits and approvals must be in place
prior to the signing and recording of the final plans and mylar. Should any permit or approval be revoked
at any time during the project, all work must cease until a new permit or approval is obtained. Copies
of all permits and approvals must be provided by the Applicant to the Planning Department upon
request.
1.13. Water Deposit. The Applicant must provide the Laconia Water Department with the required
deposit amount for inspection services.
1.14. Final Plans. Four final plan sets must be submitted to, reviewed, and approved by the Planning
Department. The final plan sets must include a floor plan for each unit.
CONSTRUCTION REQUIREMENTS
All conditions in this section must be met during the construction of the project.
2.10. Knox Box. A Knox Box must be installed to prevent damage in the event an emergency
entrance is needed.
2.11. Smoke/CO Detectors. All smoke and carbon monoxide detectors must be installed and
interconnected in accordance with the current fire code.
2.12. Fire Separation. All dwelling units must be separated from each other by walls and floors
constructed as fire barriers with a minimum of one-hour fire resistance rating.
2.13. Sewer Service. The sewer service must be cleaned and inspected via CCTV. A certified
inspection report must be submitted to the Department of Public Works for review and approval.
2.14. Water Service Box. The water service box and curb stop must be repaired or replaced.
2.15. Water Meter and Meter Horn. A meter horn must be installed. The Laconia Water Department
must reinstall the water meter once the meter horn is installed. Both the meter horn and the water
meter must be in a heated and accessible location.
2.16. Water Specifications. All specifications for municipal water service required by the Water
Department apply to all construction.
must reinstall the water meter once the meter horn is installed. Both the meter horn and the water
meter must be in a heated and accessible location.
2.16. Water Specifications. All specifications for municipal water service required by the Water
Department apply to all construction.
POST-CONSTRUCTION REQUIREMENTS
All conditions in this section must be met prior to the issuance of any Certificate of Occupancy.
3.11. Construction and Maintenance Assessment Fees. All Construction and Maintenance
Assessment fees must be paid to the Water Department.
3.12. Water Department Inspection. The Laconia Water Department must inspect and approve all
plumbing work.
3.13. Impact Fees. Impact Fees in the amount of $3,481.37 per new multifamily dwelling unit must
be paid to the Planning Department. In accordance with RSA 674:39, the Applicant is exempt from any
changes to impact fee rates for 5 years from the approval date. Should the project not be completed
during the exemption period, the Applicant must pay any and all increases to impact fees regardless of
vestment status.
3.14. As-Built Design. An as-built design, application, and fee for each dwelling unit must be
submitted to the Planning Department for review and approval.
COMPLETION DATE
The project and all associated conditions must be completed by no later than September 3, 2029. If all
conditions are not met, nor any extension application filed with the Laconia Planning Department, by
the completion date, this approval is null and void.
There was further discussion about the variances that were previously approved by the Zoning Board. R.
Mora added that there was a state law that passed regarding parking spots and there was discussion
about that. M. DellaVecchia motioned to approve application PB2025-008 for 30 Winter Street with the
conditions of approval presented in the Staff Report. G. Ober seconded. All in favor, passed
unanimously.
7.IV. Zoning Ordinance Amendment; Article XIII, § 235-81
R. Mora summarized the rewrite of the Zoning Ordinance. There was discussion about prior approvals
and moving forward with the new wording. The public comment was opened at 8:01pm. The public
comment was closed at 8:02pm. G. Ober motions to recommend the proposed language of the
Ordinance to City Council. R. MacNeill seconds. 5 in favor and 1 abstention. Motion passed.
8. PRESENTATIONS
9. PLANNING DEPARTMENT REPORT
9.I. Planning Department Monthly Report
R. Mora summarized the Planning Dept monthly report. There was discussion about getting members
for the Master Plan committee. The board discussed grants that the Planning Board had applied for.
The Planning Board approval was needed for the HOP Grant. B. Cheney motioned to approve; A.
Lovisek seconded. All in favor. T. Carmichael spoke about the Housing Champion program.
R. Mora summarized the Planning Dept monthly report. There was discussion about getting members
for the Master Plan committee. The board discussed grants that the Planning Board had applied for.
The Planning Board approval was needed for the HOP Grant. B. Cheney motioned to approve; A.
Lovisek seconded. All in favor. T. Carmichael spoke about the Housing Champion program.
10. LIAISON REPORTS
11. CITY COUNCIL
B. Cheney encouraged the Planning Dept to investigate Performance Zoning. The council also reacted
positively to the Monthly report being provided as well as the TRC agendas.
12. LAKES REGION PLANNING COMMISSION
Meetings will start up again this fall.
13. CONSERVATION COMMISSION
G. Ober summarized what has been going on at the Conservation Commission.
14. HISTORIC DISTRICT COMMISSION
No updates yet.
15. OTHER BUSINESS
15.I. Appointment of Capital Improvements Committee Members
Charlie St. Clair, Brian Wolf, and Rich MacNeill volunteered to be on the Capital Improvements
Committee. The meetings should start in October. Staff will get that distributed.
16. ADJOURNMENT
Meeting was adjourned at 8:24pm.
Get email alerts for Laconia
A daily email when new agendas and minutes are posted.