BOARD OF PUBLIC WORKS AND SAFETY
MINUTES
February 11, 2020
Regular Session:
The Board of Public Works and Safety met in regular session on Tuesday, February 11, 2020 at 9:00 a.m. in the
Common Council Chambers. Members present were: Gary Henriott, Amy Moulton, and Norm Childress. Absent:
Cindy Murray, Ron Shriner
Jacque Chosnek, 1st Deputy City Attorney, was also present.
President Henriott called the meeting to order.
The Pledge of Allegiance was given to the flag of our Country.
MINUTES
Mr. Childress moved for approval of the minutes from the February 4, 2020 regular meeting. Mrs. Moulton
seconded. Passed.
BID OPENING
Teal Road Water Main Relocation
This being the time set to open bids for the Teal Road Water Main Relocation and the following bids were
received and opened:
Miller Pipeline
Indianapolis, Indiana
Base Bid: $189,567.50
Atlas Excavating
West Lafayette, Indiana
Base Bid: $316,000.00
Yardberry Landscape and Excavating
Anderson, Indiana
Base Bid: $240,457.00
Mr. Childress moved to take the bids under advisement for further review. Mrs. Moulton seconded. Passed
36th Street Roadway Improvements, Phase 1
This being the time set to open bids for the 36th Street Roadway Improvement, Phase 1 and the following bids
were received and opened:
Milestone Contractors
Lafayette, Indiana
Base Bid: $894,345.50
Board of Public Works and Safety
February 11, 2020
Page 2
Morphey Construction Inc.
Indianapolis, Indiana
Base Bid: $1,196,000.00
Rieth-Riley
Lafayette, Indiana
Base Bid: $986,495.07
Midwest Paving
Noblesville, Indiana
Base Bid: $1, 039,212.40
Mr. Childress moved to take the bids under advisement for further review. Mrs. Moulton seconded. Passed
N. 19th Street, Underwood Street and Old US 231 Resurface Project
This being the time set to open bids for the N. 19th Street, Underwood Street and Old US 231 Resurface Project
and the following bids were received and opened:
Milestone Contractors
Lafayette, Indiana
Base Bid: $932,960.76
Rieth-Riley Construction
Lafayette, Indiana
Base Bid: $897,124.90
Midwest Paving
Noblesville, Indiana
Base Bid: $1,061,642.89
Mr. Childress moved to take the bids under advisement for further review. Mrs. Moulton seconded. Passed
NEW BUSINESS
Engineering
Change Order #1-Underwood Street Concrete Replacement Project
Jeromy Grenard, Public Works Director, presented to the Board and recommended approval of Change Order #1
for the Underwood Street Concrete Replacement Project. The change order #1 is the final change order. The
changes included more sidewalks and curbs at the request of the owners. The change order amount is $31,784.85
bringing the final total cost of the project to $278,047.75. Mr. Childress moved for approval. Mrs. Moulton
seconded. Passed
Board of Public Works and Safety
February 11, 2020
Page 3
Lafayette Renew
2020 Operator Training Contract with Wastewater Solutions, Inc.
Brad Talley, Renew Superintendent, presented to the Board and recommended approval of the 2020 Operator
Training Contract with Wastewater Solutions, Inc. This is an annual training to help keep staff certified. The
contract amount is $19,600.00. Mr. Childress moved for passage. Mrs. Moulton seconded. Passed
Proposal-Patriot Engineering for Geotechnical Engineering Investigation
Mr. Talley presented to the Board and recommended approval of a Proposal from Patriot Engineering for a
Geotechnical Investigation. This contract is for the 40 &8 Lift Station & Forcemain Replacement Project. The
contract amount is not to exceed $7,000.00. Mr. Childress moved for approval. Mrs. Moulton seconded. Passed
Professional Services Contract with American Structurepoint for Rainey Brook and Waterstone Lift Stations
Mr. Talley presented to the Board and recommended approval of a Professional Services Contract with American
Structurepoint for the Rainey Brook and Waterstone Lift Stations. This is to prepare a preliminary basis of design
report on those existing lift stations. The contract amount is not to exceed $93,900.00. Mr. Childress moved for
approval. Mrs. Moulton seconded. Passed
Engineering Services Contract with VS Engineering for Brady Lane and Concord Road
Mr. Talley presented to the Board and recommended approval of an Engineering Services Contract with VS
Engineering for Brady Lane and Concord Lane to address drainage issues in that area. The contract amount is not
to exceed $45, 900.00. Mr. Childress moved for approval. Mrs. Moulton seconded. Passed
Engineering Services Contract with VS Engineering for Mulberry Drive
Mr. Talley presented to the Board and recommended approval of an Engineering Services Contract with VS
Engineering for Mulberry Drive this contract is to address drainage issues in this area. The contract amount is not
to exceed $9,500.00. Mr. Childress moved for approval. Mrs. Moulton seconded. Passed
CLAIMS
Tim Clary, Controller, presented for Board approval, Claims in the amount of $394,946.40. President Henriott
asked if there were any further questions and there were none. Mr. Childress moved for approval. Mrs. Moulton
seconded. Passed.
MISCELLANEOUS
Banner Request-Stars and Stripes 2020
Board of Public Works and Safety
February 11, 2020
Page 4
President Henriott presented to the Board and recommended approval of a Banner Request for Stars and Stripes
2020 to be hung on Columbia Street from June 30-July 6, 2020. Mr. Childress moved for approval. Mrs. Moulton
seconded. Passed.
Time: 9:16 a.m.
BOARD OF PUBLIC WORKS AND SAFETY
Gary Henriott s/s
President
ATTEST: Sue Scott s/s
Sue Scott, Deputy Clerk
Minutes written by Sue Scott, Deputy Clerk
*A digital audio recording of this meeting is available in the Lafayette City Clerk’s Office or online at
http://www.lafayette.in.gov/agendacenter.
**A list of all permits issued for the preceding week is available at