Board of Works
Regular MeetingLafayette, IN · September 21, 2021
Minutes
BOARD OF PUBLIC WORKS AND SAFETY
MINUTES
September 21, 2021
Regular Session:
The Board of Public Works and Safety met in regular session on Tuesday, September 21, 2021 at 9:00 a.m. in the
Common Council Chambers. Members present were: Cindy Murray, Ron Shriner, Amy Moulton and Norm
Childress. Absent: Gary Henriott
Jacque Chosnek, City Attorney, was also present.
Mrs. Murray called the meeting to order.
The Pledge of Allegiance was given to the flag of our Country.
MINUTES
Mrs. Moulton moved for approval of the minutes from the September 14, 2021 regular meeting. Mr. Childress
seconded. Passed.
NEW BUSINESS
Engineering
Change Order #1-Highland Park Curb Replacement Project
Jeromy Grenard, Public Works Director, presented to the Board and recommended approval of Change Order #1
for Highland Park Curb Replacement Project with Dixon Construction. The change order is an increase in the
amount of $2,735.00 which brings that revised contract amount to $142,175.00. The change order includes
replacing concrete pads between sidewalk and curb, replacing 4 concrete panels, and installing 2 concrete panels.
Mr. Shriner moved for approval. Mr. Childress seconded. Passed.
Acceptance for Maintenance-West Baker Industrial Subdivision
Mr. Grenard presented to the Board and recommended approval of an Acceptance for Maintenance for West
Baker Industrial Subdivision which is located at the top of the Wabash Avenue hill on the east side of Beck Lane.
The as-built drawings have been approved and a 3-year maintenance bond has been submitted. Mr. Childress
moved for approval. Mrs. Moulton seconded. Passed.
Acceptance for Maintenance-Barrington Lakes, Section 1, Phase 2
Mr. Grenard presented to the Board and recommended approval of an Acceptance for Maintenance for Barrington
Lakes Section 1 Phase 2 which is located northwest of the CR E 50 S and McCarty Lane intersection and consists
of 70 lots. The as-built drawings have been approved and a 3-year maintenance bond has been submitted. Mr.
Shiner moved for approval. Mrs. Moulton seconded. Passed.
Board of Public Works and Safety
September 21, 2021
Page 2
Lafayette Renew
Significant Industrial User Permit-DANA Dba Fairfield
Josh Terry, Renew, presented to the Board and recommended approval of a Significant Industrial User Permit for
DANA Dba Fairfield. Mr. Terry stated that DANA is permitted through the pre-treatment program with a 4-year
permit renewal. Discussion ensued regarding past and current quantities. Mrs. Moulton moved for approval. Mr.
Childress seconded. Passed.
Purchasing
Declaration of Surplus Property-Purchasing Department
Dave Payne, Purchasing Manager, presented to the Board and recommended approval of a Declaration of
Surplus Property for the Purchasing Department that includes 18 iPhones and 1 iPad. Mr. Payne stated that these
items have been replaced with newer equipment and will be sold. Mrs. Moulton moved for approval. Mr.
Shriner seconded. Passed.
CLAIMS
Jeremy Diehl, Controller, presented for Board approval, Claims in the amount of $1,061,216.16. Mr. Childress
asked a question on Page 8 regarding the status of the Complete Restoration invoices for cleaning/painting
Haggerty Water Tower. Mr. Diehl stated that the project is complete. Mr. Childress moved for approval. Mrs.
Moulton seconded. Passed.
Time: 9:07 a.m.
BOARD OF PUBLIC WORKS AND SAFETY
Cindy Murray s/s
President Pro-Tem
ATTEST: Mindy Miller Riehle s/s
Mindy Miller Riehle, 1st Deputy Clerk
Minutes written by Mindy Miller Riehle, 1st Deputy Clerk
*A digital audio recording of this meeting is available in the Lafayette City Clerk’s Office or online at
http://www.lafayette.in.gov/agendacenter.
**A list of all permits issued for the preceding week is available at
http://www.lafayette.in.gov/DocumentCenter/Index/375
Get email alerts for Lafayette
A daily email when new agendas and minutes are posted.