Village Board
Regular MeetingLittle Chute, WI · January 3, 2018
Agenda
AGENDA
R
PLACE:
EGULAR BOARD MEETING
Little Chute Village Hall
DATE: Wednesday, January 3, 2018
TIME: 6:00 p.m.
REGULAR ORDER OF BUSINESS
A. Invocation
B. Pledge of Allegiance to the Flag
C. Roll call of Trustees
D. Roll call of Officers and Department Heads
E. Public Appearance for Items Not on the Agenda
F. Approval of Minutes
Minutes of the Regular Board Meeting of December 20, 2017
G. Public Informational Meeting—2018 Street Reconstruction Projects
H. Presentation—Habitat for Humanity/Rock the Block
I. Presentation—Fox Cities Chamber of Commerce/Bazaar After Dark
J. Department and Officers Progress Reports
K. Discussion—Outagamie County Landfill Siting Overview
L. Discussion—Downtown Master Plan
M. Call for Unfinished Business
N. Items for Future Agendas
O. Adjournment
Requests from persons with disabilities who need assistance to participate in this meeting or hearing should be made with as much advance notice as
possible to the Clerk’s Office at 108 West Main Street, (920) 423-3852, email: Laurie@littlechutewi.org Prepared: December 28, 2017
MINUTES OF THE REGULAR BOARD MEETING OF DECEMBER 20, 2017
Call to Order: President Vanden Berg called the Regular Board Meeting to Order at 6:00 p.m.
Pledge Allegiance to the Flag
President Vanden Berg led members in the reciting of the Pledge of Allegiance.
Roll call of Trustees
PRESENT: Michael Vanden Berg, President
John Elrick, Trustee
David Peterson, Trustee (arrived 6:45)
Skip Smith, Trustee
Larry Van Lankvelt, Trustee
James Hietpas, Trustee
EXCUSED: Bill Peerenboom, Trustee
Roll call of Officers and Department Heads
PRESENT: James Fenlon, Village Administrator
Tyler Claringbole, Village Attorney
Lieutenant Slotke, Fox Valley Metro Police Department
Laurie Decker, Village Clerk
Teri Matheny, Finance Director
Adam Breest, Director of Parks, Recreation and Forestry
Jim Moes, Community Development Director
Chris Murawski, Engineer
Interested Citizens
EXCUSED: Steve Thiry, Library Director
Public Appearance for Items Not on the Agenda
None
Other Informational Items—November Fire, FVMPD Monthly Reports and November Report
Approval of Minutes
Minutes of the Special Board Meeting of November 16, 2017
Minutes of the Regular Board Meeting of December 6, 2017
Moved by Trustee Smith, seconded by Trustee Elrick to Approve the Minutes of the Special Board
Meeting of November 16, 2017and the Regular Board Meeting of December 6, 2017
Ayes 5, Nays 0 – Motion Carried
Department and Officers Progress Reports
Departments and Officers provided progress reports to the Board
Action—Approve 2018 Meeting Schedule
Moved by Trustee Smith, seconded by Trustee Elrick to Approve 2018 Meeting Schedule
Ayes 5, Nays 0 – Motion Carried
Action—Appoint 2018 Election Inspectors
Moved by Trustee Smith, seconded by Trustee Van Lankvelt to Appoint 2018 Election Inspectors
Ayes 5, Nays 0 – Motion Carried
-1-
Discussion/Action—2018-2022 CIP
Director Matheny presented slides to review the 2018-2022 CIP. Administrator Fenlon advised that Trustee
Peerenboom was concerned on sidewalks in the downtown area and the quiet zone study for 2018. Trustee
Smith questioned the cost on the quiet zone study. Administrator Fenlon advised the cost was for hiring a
consultant that would have to be approved by the Village and also recognized by the Railroad.
Moved by Trustee Smith, seconded by Trustee Van Lankvelt to Approve 2018-2022 CIP
Ayes 5, Nays 0 – Motion Carried
Action—2017 Strategic Plan Review and 2018 Strategic Plan Action Items
Administrator Fenlon went over the attachments for the 2017 Strategic Plan Review and 2018 Strategic Plan
Action Items.
Moved by Trustee Elrick, seconded by Trustee Smith to Approve the 2018 Strategic Plan Action Items as
presented
Ayes 6, Nays 0 – Motion Carried
Action—FVMPD Professional Police Association 2018-2019 Contract
Moved by Trustee Elrick, seconded by Trustee Van Lankvelt to Approve FVMPD Professional Police
Association 2018-2019 Contract
Ayes 6, Nays 0 – Motion Carried
Action—Municipal Services Building Equipment
Director Matheny went over Equipment needed for the Municipal Services Building not to exceed $51,131.00.
Moved by Trustee Elrick, seconded by Trustee Van Lankvelt to Approve Municipal Services Building
Equipment not to exceed $51,131.00
Ayes 6, Nays 0 – Motion Carried
Action—DPW/DPRF Hiring Process
Moved by Trustee Elrick, seconded by Trustee Van Lankvelt to Approve DPW/DPRF Hiring Process
Ayes 6, Nays 0 – Motion Carried
Operator License Approval
Cope, Bradley Seth’s Coffee Menasha
Dolan, Amora Walgreens Appleton
Johnson, Justis Shell Kimberly
Manthey, Eli Walgreens Kimberly
Roovers, Braden Rose Hill Kaukauna
Sandoval, Edgar El Jaripeo Appleton
Selwitschka, Jennifer Down the Hill Little Chute
Streuly, Kathleen Gentleman Jacks Appleton
Tankersley, Ridley Seth’s Coffee Appleton
VandenBloomer, Laura The Ladder House Appleton
Moved by Trustee Smith, seconded by Trustee Elrick to Approve Operator License as presented
Ayes 6, Nays 0 – Motion Carried
-2-
Disbursement List
Moved by Trustee Van Lankvelt, seconded by Trustee Elrick to Approve Disbursement List and
Authorize the Finance Director to pay all vendors
Ayes 6, Nays 0 – Motion Carried
Call for Unfinished Business
Exhibition Center and Hotel/Motel Tax update from Director Matheny
Downtown Lighting Information
Items for Future Agenda
None
Closed Session:
a)19.85(1)(e) Wis. Stats. Deliberations or negotiations on the purchase of public properties, investing of public
funds or conducting other specific public business when competitive or bargaining reasons require a closed
session. Negotiations—Town of Vandenbroek
Moved by Trustee Smith, seconded by Trustee Peterson to Enter into Closed Session at 7:15 p.m.
Ayes 6, Nays 0 – Motion Carried
19.85(1)(c) Consideration of Employment, Promotion, or Performance Evaluation Data of any Public Employee
of the Village of Little Chute. Personnel Matters
Moved by Trustee Smith, seconded by Trustee Peterson to Enter into Closed Session at 7:15p.m.
Ayes 6, Nays 0 – Motion Carried
Return to Open Session
Moved by Trustee Peterson, seconded by Trustee Elrick to Exit Closed Session at 8:18 p.m.
Ayes 6, Nays 0 – Motion Carried
Adjournment
Moved by Trustee Peterson, seconded by Trustee Elrick to Adjourn the Regular Board Meeting
at 8:18 p.m.
Ayes 6, Nays 0 - Motion Carried
VILLAGE OF LITTLE CHUTE
By: _______________________________________
Attest: Michael R. Vanden Berg, Village President
Laurie Decker, Village Clerk
-3-
2018 Utility & Street Reconstruction
Public Information Meeting
January 3, 2018 at 6pm, Village Hall Board Room
Meeting Outline
The Village of Little Chute utilizes Asset Management as a systematic process for maintaining, improving and
operating of our physical facilities in a cost effective manner.
1. Why do we need asset management?
Existing infrastructure is ageing
Increased demand for better roads, bridges, sidewalks, lights and improved sewer & water systems
Higher standards for safety & health
Environmental protection concerns
Regulations
Growth
2. What are the benefits of asset management?
Facilitates the establishment of policy objectives & related measurement of performance
Avoids problems & potential crisis
Provides better & consistent levels of service for public
Reduces life cycle costs
Allows for better decisions regarding resource allocation
Reduces risk to municipality
Allows for more effective financial planning
Leads to more efficient data management
Results in positive institutional change
3. What are the essential components of a good asset management plan?
Asset Value: It must be recognized that all assets have a monetary value. This value is used to determine
the depth of re-investment for each asset. By knowing the “value” the type of rehab strategy and optimum
replacement time will reduce maintenance costs while improving the Village’s infrastructure.
Life Cycle Management: All assets have a finite life expectancy. Engineering staff tries to estimate the rate
of deterioration to provide a decision point when maintenance or reconstruction will be done at any point in
the life cycle for the public facilities while considering the remaining asset life, operational costs and other
related expenses.
Sustainability: “Meeting the needs of the present generation without compromising the ability of future
generations to meet their own needs.” (National Guide to Sustainable Municipal Infrastructure)
Current users pay a fair share for the service they receive so that future users do not have to pay a higher
cost for the same level of service.
Risk Assessment: Acceptable risk tolerance for each asset must be part of the strategy and condition
surveys are used to determine rate and consequences of failure.
Risk Factors include - financial, environmental, regulatory/legal, public health and safety
Performance Measurement: Monitor strategies regularly while making adjustments at the right stage of
the asset’s life cycle to achieve the balance between cost and level of service. Utilize benchmarks to
determine performance of assets.
Meeting Purpose
To provide residents with information regarding the planned utility and street reconstruction project adjacent to
your property. Residents are encouraged to view the exhibits which show the scope of the project and design
details. Please feel free to ask questions or share comments and concerns with the Village staff. Introductions of the
Village staff with roles pertaining to the projects.
Project Information
The utility and street reconstruction are necessary on Daytona, Hayes, and Wilson streets to replace the existing
infrastructure. The proposed work includes pavement structure, sanitary sewer, storm sewer, water main, curb and
gutter, sidewalk, topsoil and grass restoration. The new pavement will be comprised of two 11-foot-wide drive lanes
and one 6-foot-wide parking lane. The Downtown Storm Sewer project is to redirect the storm water to a detention
pond before entering the Fox River also allowing for redevelopment of the downtown area.
Typical Construction Procedure
Note: Procedure may not always occur in the order listed below.
Terrace Trees: Terrace trees located within the reconstruction are evaluated by the Parks and Rec Director.
Trees that are Ash, unsustainable, or conflict with street reconstruction may be trimmed or removed from
the terrace. Smaller trees may be temporarily relocated for the duration of the project.
Sanitary Sewer Installation: Install sanitary sewer mains and structures. Temporary connections are made
between the new main and existing sanitary laterals.
Water Main Installation: Install water mains, fittings and hydrants. Water service is maintained from a
temporary main.
Sanitary Sewer Lateral Installation: Removal of temporary lateral connections. New laterals are installed
by one of the following three options; property owner does the work, owner hires a private contractor, or
owner gives consent to the Village contractor. The Village contractor will make all attempts to perform pipe
bursting
Water Lateral Installation: New services are installed from the main to the curb stop located near the front
of sidewalk. Lead service lines will be required to be replaced to the existing building.
Storm Sewer Installation: Install storm sewer mains and structures.
Storm Sewer Lateral Installation: Install laterals to right-of-way for each property allowing for sump pump
hookups.
Street Excavation: Removal of remaining pavement, sub base, curb and gutter, terrace grass, sidewalk or
any other obstructions.
Sub Base Installation: Install and grade crushed aggregate to function as road base.
Concrete Placement: Installation of street pavement and curb, replacement sidewalk, sidewalk ramps and
driveway aprons. Approximately one week of concrete cure time required between placing adjacent
concrete items.
Terrace Restoration: Shape terrace areas, install topsoil and seed.
Signage and Pavement Marking Installation: Reinstall traffic control, roadway signs and pavement
markings.
Drainage & Sump Pump Water
Engineering staff would like residents with yard drainage concerns to discuss these problems with staff as soon as
possible. Street reconstruction may allow for staff to work with property owners to design and provide solutions for
ongoing drainage problems. In addition to yard drainage concerns, staff can also provide residents information on
sump pump water discharge.
Trash and Recycling Pickup
Residential trash and recycling pickup will not change; however, it may occur very early in the morning.
Business trash and recycling pickup will be coordinated with the contractor to ensure access throughout the project.
Driveway Restrictions
Driveway access will be temporarily restricted throughout the project. Often this will occur when work is being
completed in front of or adjacent to the property. Driveway access will be restored at the end of each construction
day whenever possible.
Driveway access will be restricted for an extended period during the construction of the pavement, driveway
approach and any driveway sidewalk. Notification will be provided to the residents prior to the closure.
Parking During the Project
Parking on project streets is permitted only during non-working hours (8pm-7am). Residents that choose to park on
the project streets are required to move their vehicles prior to the 7am start of construction. Residents are still
required to adhere to existing parking restrictions on all the side streets during construction.
Construction Updates
Construction updates and information will be posted on the Village Little Chute’s website under Road Projects. The
website link is: www.littlechutewi.org
Village of Little Chute
INFORMATION FOR VILLAGE BOARD CONSIDERATION
ITEM DESCRIPTION: Landfill Siting Process
PREPARED BY: James Fenlon, Administrator
REPORT DATE: December 26, 2017
EXPLANATION: On December 15th, the Village received the official notification from Outagamie
County Recycling and Solid Waste that initiates a formal process for a solid waste facility. Since the
facility is in our municipality, we have the requirement to participate in the process and enable/preserve our
right to negotiate. From a very high level, the requirements for the Village of Little Chute are as follows:
1. Reply to official notice within 15 days indicating local approval process
2. Provide a “siting” resolution within 60 days of official notice
3. Appoint 4 members to the local committee within 60 days official notice and provide notice to the
Waste Siting Board within 7 days of appointment (only 2 can be staff or elected officials)
4. 4 appointed members must file economic interest documents within 15 days of appointment
5. Negotiation process
To provide you background, please see the attached:
- Official Notice from Outagamie County Solid Waste with Standard Notice Information
- Village of Little Chute Official Response to Local Approval Inquiry
- DRAFT Siting Resolution
Staff will present the Siting Resolution for your approval on January 17th’s Regular Board meeting. We are
presenting the above information to you ahead of time so that you can be informed, provide input and take
action in the future.
RECOMMENDATION: Provided for information.
December 26, 2017
Mr. Brian Van Straten
Outagamie County Recycling and Solid Waste
1419 Holland Road
Appleton, WI 54911
Mr. Van Straten,
This letter is in response to your memo dated December 15th with regards to the proposed Northwest
Landfill. As requested, this letter will serve as the official response specifying applicable local approvals.
With regards to this project, there are certain uses which, because of their unique characteristics, cannot be
properly classified as unrestricted permitted uses without reviewing each case. Such uses may be necessary
or desirable to be allowed in a particular district provided that due consideration is given to the location,
development and operation. These uses are classified as conditional uses per Little Chute’s Code of
Ordinances. In other words, the applicable local approvals required consist of all of those requirements for
conditional uses specified in Sec. 44-113 through Sec. 44-124 of Article IV of the Village Code of Ordinances,
copies of which are attached to this letter.
The Village of Little Chute’s Zoning Administrator has determined that the proposed use as described in your
memorandum shall be require local approval by the Village for this conditional use. Attached to this letter is
the Village of Little Chute code section regarding conditional uses and the application for a conditional use.
As the applicant, Outagamie County Recycling and Solid Waste will need to supply all relevant information,
including but not limited to design engineering, testing, environmental impact study, etc., along with the
completed application at least thirty days prior to hearing date by the Plan Commission. Since the site is
adjacent to Interstate 41, the Plan Commission or Village Board shall request such review and await the
Department of Transportation’s recommendation for a period not to exceed 20 days before taking final
action.
We offer you the opportunity that prior to submittal, you may consult with Village Engineer Chris Murawski
and Community Development Director Jim Moes regarding standards of information required along with
scheduling a future Public Hearing for the Plan Commission to review the conditional use.
Should you have any concerns, please do not hesitate to contact me.
Sincerely,
James P. Fenlon
Administrator - Village of Little Chute
Attachments: Conditional Use Application and Chapter 44, Article IV Code of Ordinances
Village of Little Chute
INFORMATION FOR VILLAGE BOARD CONSIDERATION
ITEM DESCRIPTION: Downtown Master Plan Implementation Strategy
PREPARED BY: James Fenlon, Administrator
REPORT DATE: December 26, 2017
EXPLANATION: On September 20th, at the Regular Board meeting, you adopted the 2018-2022
Downtown Master Plan. That Mater Plan contained an attachment that outlined the initiatives required for
a successful implementation. That document can be found at the following link:
http://www.littlechutewi.org/DocumentCenter/View/4349
In order to narrow down the tasks ahead, I want to identify the 2018 actions and create an itemized task list
for staff and the board to execute on. Below are the Board required action items or tasks to complete in
2018:
1. Prioritize and Approve Capital Projects for the Downtown – A separately attached memo will
outline the capital projects needing to be discussed and individually approved (Note: Also see
previously distributed Archived Material on past Downtown efforts).
2. Amend the current Façade Program – Staff (primarily the Administrator, Community Development
Director and Finance Director) will be providing recommended changes to the program. Your
inputs now will assist in this effort. Current program application is attached or can also be found
here: http://www.littlechutewi.org/DocumentCenter/View/2355
3. Create a 3-6 month rent incentive program for new businesses – Again, staff will be drafting a
program for the Board of Trustees to consider. Your input into the program at this stage would be
valuable. The program outline will look very similar to the façade program, adjusted for this
specific effort.
4. Create a sign grant incentive program for new businesses (or businesses upgrading to signage to be
in compliance with the Design Review Manual). Again, staff will be drafting a program for the
Board of Trustees to consider. Your input into the program at this stage would be valuable. The
program outline will look very similar to the façade program, adjusted for this specific effort.
5. Create a program to allow businesses to work with a design professional on renderings for the
Façade Program. Again, staff will be drafting a program for the Board of Trustees to consider.
Your input into the program at this stage would be valuable. The program outline will look very
similar to the façade program, adjusted for this specific effort.
There are other items within the Downtown Plan that require efforts, but are more ongoing in nature as the
effort has already commenced in prior years. These are what I would term as more passive efforts, as they
have already been initiated, budgeted for or are in the final planning phase:
1. Village Market and increased plaza programming
2. Bike Share programs
3. Continued effort with Little Chute Business Association and related programming
4. Wayfinding Signage in the Community
While we are not taking action on any of the aforementioned items this evening, we want the Board to have
as much information as you can on the related topics. Also, this gives you a chance to provide comments
or recommendations at the beginning of the process versus the conclusion.
RECOMMENDATION: Provided for information in support of future action.
To: President Vanden Berg and Board of Trustees
From: James Fenlon, Administrator
Date: December 28, 2017
Subject: CIP Outline for Downtown Related Efforts
This memo has been updated from the last time you were provided an overview. The document attempts
to itemize the projects discussed in the downtown master plan. The ultimate goal is to loosely depict a
schedule for the projects along with final decisions for the Board of Trustees as it relates to the Downtown
Plan and the capital projects required improving the downtown.
1. 2018 – Property acquisition (4 potential properties being discussed at the staff level throughout the
five year downtown plan) - Currently allocated $210k in the 2018-2022 CIP.
2. 2018 - Pine Street Vacation (future parking lot and decision point about non-vacated portion of
Pine Street) No formal or updated estimate of cost exists for vacation (there really should be none
other than $5k contribution to partner) or on the parking lot. No property acquisition required,
potential swap of properties exists with St. John’s Nepomucene Church. Upon the property swap
and vacation of Pine Street, the Village needs to be ready to improve the parking lot at the new
property line.
3. 2019 - Civic Center/Library Parking or Pine Street Parking Lot currently allocated $150k in 2018-
2019 CIP–With storm sewer extension slated for the spring of 2018, the earliest this project could
be executed would be in 2019.
4. 2018 - Crosswalk Maintenance – $110k currently allocated within 2018-2022 CIP - Preliminary
estimate of $250k to reconstruct major crosswalks in the Central Business District. Pending what
occurs with the Depot and Vandenbroek realignment, the timing and total schedule of this effort
would be impacted.
5. 2022 - Depot/Vandenbroek Realignment – Allocated in 2018-2022 CIP for $250k. Unofficial
estimate of $250k (this project does NOT require additional property acquisition). 2022 -
Potential Property Acquisition of Riverfront/Canal Property – Informal cost estimate of $231k
(current assessed value). This effort would entail the acquisition and demolition of property to
create additional access to the river. Earliest acquisition would commence would be beyond 2020
at present date.
6. TBD - Lincoln/Vandenbroek Extension – Very preliminary estimate of $250k (this project does
require additional property acquisition). This project would not move forward without the
realignment of Vandenbroek and Depot. Timing and schedule to be determined. Overview will be
presented to Board in early 2018 with the earliest start actually commencing in a time that is
amenable to the five year CIP.
NOTE: Items that are confidential in nature due to negotiations or future legal actions have been removed
from this document.
Contact Information:
James P. Fenlon, Village Administrator
108 W. Main Street, Little Chute, WI 54140
920-423-3850
james@littlechutewi.org
VILLAGE OF LITTLE CHUTE BUSINESS
IMPROVEMENT/FAÇADE RENOVATION
PROGRAM
I. Program Summary
The Little Chute Village Board has adopted a Design Manual primarily
applicable within the Central Business District to create and retain the vision
of a heritage destination in downtown Little Chute with an Old World European
character. The purpose of the manual’s requirements is to preserve, create,
and promote the unique charm, atmosphere, and historical aspects of the
community. Attractive building facades support and encourage local business
and can have a significant effect on the attractiveness and marketability of a
commercial district and the surrounding area.
To encourage business owners to reinvest in downtown Little Chute and other
commercial areas within the Village and to financially assist with implementing
the requirements of the Little Chute Design Manual, the Village of Little Chute
has created a Business Improvement/Façade Renovation Financial Assistance
Program to assist in the exterior renovations of these otherwise sound and vital
properties within the Village. The Village encourages applicants for this
program to obtain price quotes from Little Chute businesses and to
undertake their proposed improvements utilizing Little Chute
contractors whenever possible.
II. Program Goals and Objectives
The Little Chute Business Improvement/Façade Renovation Program has the
following goals and objectives:
1. To renovate existing commercial properties and structures in accordance
with an Old World European theme to harmonize with the authentic Dutch
Windmill Project in the downtown and to reflect the Dutch heritage of the
Village;
2. To attract new businesses and to retain existing businesses currently
located in the Village;
3. To retain existing jobs and bring additional employment opportunities into
the Village;
4. To provide an incentive and financial assistance to business and property
owners to improve their building facades and signage in accordance with an
Old World European design theme;
5. To help make the Village of Little Chute a tourist destination by exhibiting
the appearance of a Village that cares about its built environment, the
residents who live in the Village and the visitors who travel to and through the
Village.
6. To encourage the maintenance, expansion and improvement of the Village’s
Central Business District and improve the viability of the downtown and other
commercial areas as important commercial districts in the Village of Little
Chute and Fox Valley region.
III. Applicant and Property Eligibility Requirements
Property owners of service or commercial/mixed use structures and building
tenants, with leases of more than one year in length located in the areas within
the Village of Little Chute that are zoned Central Business District, Commercial
Shopping District and Commercial Highway District are eligible to apply for
this financial assistance program. Before the Village will approve financial
assistance for a building tenant, the tenant must obtain written approval of
their project from the property owner.
In order to qualify for Village financial assistance, applicants cannot start
on their project until after receiving the necessary Village approvals. If
any work is started on a project before application and approval by the
Village, the Village will not provide financial assistance for the project.
IV. Eligible Costs and Activities
Financial assistance is available to the above noted eligible applicants and
properties within the financial limitations established by the Little Chute
Village Board and based on the parameters outlined in this program document
for the following activities and associated costs:
1. Restoring or substantially beautifying, or enhancing the entire or partial
façades or elevations of an eligible building that is visible to the public from the
public street right- of- way or from a public parking lot adjoining the building.
Funding for improvement of the rear facades of buildings will only be allowed if
the entire building envelope is being addressed for improvement or if the rear
façade is a second phase for a building that has already had its street façade
improved in conformance with the Little Chute Design Manual. Eligible items
include uncovering and restoring historical facades, removing existing façade
materials and replacing them with a new design and materials, and other
detailing which leads to a substantially enhanced appearance in conformance
with the Little Chute Design Manual. Although not eligible for individual
funding, the following may be funded as part of a more comprehensive façade
improvement: windows, doors, exterior cleaning, tuck pointing, painting,
exterior lighting, shutters, gutters, awnings, and historical architectural
elements.
2. Design and/or architectural fees and permit fees up to a maximum of
$2500.00 of the total Village loan per project associated with the proposed
renovation. These fees will only be eligible to be covered if the building
renovation project is undertaken and completed.
3. Landscaping, pedestrian improvements, signage and exterior improvements
related to addressing ADA issues may be included in a project application if
they are directly related to a larger façade improvement project.
4. Roof repair or replacement of a roof structure only where a new roof style is
a critical component associated with a major architectural change in building
design and facades that requires the installation of a totally new and different
roof structure.
V. Ineligible Costs and Activities
The following activities and improvements are not eligible to receive financial
assistance from the Business Improvement/Façade Renovation Program:
1. Any expense incurred prior to written notification from the Village of Little
Chute of approval of financial assistance for the project.
2. The cost of construction where the majority of the project is new
construction unless the new construction involves the replacement or
reconstruction of an existing building and funding shall not exceed $30,000.
3. Work that principally involves minor repairs, painting or maintenance,
billboards, landscaping or paving of patio or parking areas.
4. Re-roofing, repair or replacement of a roof unless it is associated with a
major architectural change to the building design and facades that requires the
installation of a totally new and different roof structure.
5. Internal renovations or improvements to buildings. The Village of Little
Chute has a Revolving Loan Program and Small Business Micro Loan Program
to assist with interior improvements to buildings.
6. Expenditures incurred with regard to acquiring business related inventory.
7. Working capital.
8. Property acquisition.
9. Work on buildings or businesses owned and/or operated by a non-profit
entity.
10. Building or property used for residential purposes unless 50% or more of
the buildings area is used for commercial purposes.
11. Any project determined that is not in compliance with the Village’s Zoning
Ordinance, Building Codes or the adopted Little Chute Design Manual.
VI. Financial Assistance and Terms of the Program
1. The Village of Little Chute has established an initial fund of $150,000 to
support the Business Improvement/Façade Renovation Program.
2. The Program will be operated as a No (0%) Interest long term matching
loan that will not have to be repaid to the Village until the property is sold
and/or changes ownership.
3. The amount of the loan will be established as a matching amount to the
amount of funds the owner/applicant is investing in the project on a cash
basis which shall be documented through reports submitted to the Village
following completion of the work. The Village will provide the loan proceeds as
a reimbursement following completion of the work that was previously
approved for funding by the Village and the filing of the required paperwork.
Reimbursement will occur within 15 business days following submission of the
required documentation to the Village by the owner/applicant.
4. The minimum amount of any loan approved under this program shall be
$1500. The maximum amount of any loan approved under this program shall
be $20,000 for a single façade project and $30,000 for a multiple façade
project such as a building on a corner lot or the renovation of a rear façade as
part of an overall comprehensive building refurbishing.
5. Projects approved for loan funds shall be started within 45 calendar days
of approval and shall be completed within 6 months of the loan approval.
Extensions to the completion date may be granted by the Village for unforeseen
circumstances such as inclement weather or the delayed delivery of special
building materials being used on a project. The applicant must request any
extension in writing documenting the reasons for the request. The Village will
notify the applicant of its approval or denial of the extension request.
6. Loan/project applications will be processed on a first come, first eligible
basis as funding under this program is limited.
7. Village participation in this loan program may be limited or capped based
on the availability of program funds such that the above participation with
matching loan funds may not be possible.
VII. Application Process
Step 1: Application for financial assistance is submitted to the Village
Administrator on the appropriate Village forms. An application from a tenant
must include a copy of the building lease and written approval of the project by
the building owner. Applications must include color photographs of the
facades to be improved, a copy of the proposed façade renovation plans that
have been approved by the Little Chute Design Review Board, and a copy of the
cost estimates to complete all of the work that the applicant is requesting
financial assistance with from the Village.
Step 2: The Village Administrator will work with the applicant to insure
that all of the required application materials are complete. Upon determination
of completeness the Village Administrator will prepare a recommendation on
the application and schedule Review and Approval of the Financial Assistance
Request for Village Board action.
Step 3: The applicant must sign a Financial Assistance/Loan Agreement
with the Village and any other required paperwork including Lien papers
against the property for the amount of the Village’s loan for the project.
Step 4: The applicant must obtain all required State and Village permits
for the required work prior to starting construction. In addition the applicant
must display a sign provided by the Village on the site or building indicating
that “Financing is being provided for the project in part by the Village of
Little Chute Business Improvement/Façade Renovation Program”.
Step 5: The applicant pays for the completed construction work and
submits their payment reimbursement request to the Village Administrator on
the appropriate Village forms along with paid receipts and lien waivers from all
contractors.
Step 6: A final inspection of the building project by the Village
Administrator and Community Development staff shall be scheduled to
determine that all of the required construction work is completed in accordance
with the approved plans and application. Upon determination that the project
meets all of the requirements of the program the Village Administrator shall
authorize payment to the applicant for the approved amount of the financial
assistance that was awarded to the applicant.
Adopted by the Village Board on November 11, 2009