Village Board
Regular MeetingLittle Chute, WI · November 11, 2020
Agenda
AMENDED AGENDA
LITTLE CHUTE VILLAGE BOARD
COMMITTEE OF THE WHOLE MEETING
PLACE: Little Chute Village Hall
DATE: Wednesday, November 11, 2020
TIME: 6:00 p.m.
Virtually attend the November 11th Committee of the Whole meeting at 6 PM by following the link here:
- https://www.gotomeet.me/JamesFenlon/november-11th-regular-board-meeting
- Call-in Information: + 1 (571) 317-3122 Access Code: 951-903-829
- For further details please refer to additional information immediately following agenda.
REGULAR ORDER OF BUSINESS
A. Invocation
B. Roll call of Trustees
C. Roll call of Officers and Department Heads
D. Public Appearance for Items Not on the Agenda
E. Minutes of Committee of the Whole Meeting of October 14, 2020 and
Regular Board Meeting of October 21, 2020
F. Presentation - TDS Project
G. Action—Award Bid for 2020 Storm Sewer Extension
H. Discussion—COVID 19 Updates
I. Call for Unfinished Business
J. Items for Future Agenda
K. Adjournment
Requests from persons with disabilities who need assistance to participate in this meeting or hearing should be made with as much advance notice as possible to the
Clerk’s Office at 108 West Main Street, (920) 423-3852, email: Laurie@littlechutewi.org Prepared: November 9, 2020
Information for the Committee of the Whole Meeting – November 11th, 2020 – 6:00 PM
The Village of Little Chute is taking precautions related COVID-19 as it relates to Village Board meetings.
On March 16th, 2020, the Wisconsin Attorney General released guidance for local communities related
to Open Meetings and the use of technology while still complying with Wisconsin’s Open Meeting laws.
You can find Wisconsin Department of Justice guidance here: DOJ Guidance on Open Meetings.
Until further notice, the Village of Little Chute will be providing the following means for residents to interact, engage,
and participate in Village Board proceedings. The proceedings of all Village of Little Chute public meetings are
recorded and available for review.
1. Virtually attend the November 11th Committee of the Whole Meeting at 6:00 PM by following the link here:
https://www.gotomeet.me/JamesFenlon/november-11h-regular-board-meeting
2. Call-in Information: United States: +1 (571) 317-3122 Access Code: 951-903-829
3. If you are experiencing connectivity issues or have questions on the options above, please contact James Fenlon
at james@littlechutewi.org
4. The Board Room at Village Hall will be open, but board members and staff have the option to attend virtually.
We urge residents to participate in our meetings by utilizing the virtual options above.
5. New to GoToMeeting? Get the app now and be ready when your first meeting starts:
https://global.gotomeeting.com/install/951903829
6. If you have questions or comments regarding the agenda or potential items on the agenda, we urge you to
contact Board or staff members regarding your concerns. You can find Board Member contact information here:
http://www.littlechutewi.org/59/Meet-the-Village-Board
7. If you have questions or comments regarding the agenda, you can also contact the Village Administrator, James
Fenlon, at james@littlechutewi.org or 920-423-3850.
8. If you have questions or comments regarding the agenda and want to contact a Village of Little Chute
Department Head, you can find a complete staff directory here: http://www.littlechutewi.org/directory.aspx
MINUTES OF THE COMMITTEE OF THE WHOLE MEETING OCTOBER 14, 2020
Call to Order
President Vanden Berg called the Committee of the Whole meeting to order at 6:00 p.m.
Roll Call
PRESENT: Michael Vanden Berg, President
Larry Van Lankvelt, Trustee
Skip Smith, Trustee
Bill Peerenboom, Trustee
Brian Van Lankveldt, Trustee
Don Van Deurzen, Trustee
James Hietpas, Trustee
Roll call of Department Heads
PRESENT: James Fenlon, Village Administrator
Dan Meister, Fox Valley Metro Police Chief
Lisa Remiker-DeWall, Finance Director
Kent Taylor, Director of Public Works
Chris Murawski, Village Engineer
Jeremy Slotke, Fox Valley Metro Police Department
Kelly Vanden Heuvel, Fox Valley Metro Police Department
Mark Jansen, Little Chute Fire Department Chief
Duane Nechodom, Little Chute Fire Department
Scott Van Deurzen, Little Chute Fire Department
Public Appearance for Items not on the Agenda
None
Approval of Minutes
Minutes of Regular Board Meeting of October 7, 2020
Moved by Trustee L. Van Lankvelt, seconded by Trustee Van Deurzen to Approve Minutes of the
Regular Board Meeting of October 7, 2020
Ayes 7, Nays 0 – Motion Carried
Presentation—Emergency Response
This presentation was postponed
Presentation—Fire Study
Administrator Fenlon advised the board that the Fire Department has been working with Mr. Tim Franz and
Mr. Jim Austad from Public Administration Associates, LLC on recommendations on a survey done to
improve services. Administrator Fenlon complimented the Fire Department for opening up their department
to this survey.
Discussion—Public Safety Budgets – 2021
Administrator Fenlon went over the documents in the agenda for the 2021 Public Safety Budget. Chief
Meister then went over the Fox Valley Metro 2021 Budget requests.
Action—Ebben Storm Sewer Bids
Engineer Murawski advised the Board of the bids received for the Ebben Trail and Storm Sewer. The
recommendation is to award the project to Superior Sewer & Water Inc. of Luxemburg, WI and an amount of
$906,540.29 base bid, contract number L0001-9-18-00487 (2020005).
Moved by Trustee Peerenboom, seconded by Trustee L. Van Lankvelt to Award the bid for Ebben
Storm Sewer to Superior Sewer & Water in the amount of $906,540.29 base bid.
Ayes 7, Nays 0 – Motion Carried
Discussion/Action—CARES ACT Funding
Administrator Fenlon went over the balance of the Cares Act funding donation.
Moved by Trustee L. Van Lankvelt, seconded by Trustee Smith that we share the $40,000.00 with the
three school districts
Ayes 7, Nays 0 – Motion Carried
Discussion—Covid-19 Updates
No updates
Unfinished Business
None
Items for Future Agendas
None
Adjournment
Moved by Trustee Smith, seconded by Trustee Van Deurzen to Adjourn the Committee of the Whole
Meeting at 7:28 p.m.
Ayes 7, Nays 0 – Motion Carried
VILLAGE OF LITTLE CHUTE
By: Michael R. Vanden Berg, Village President
Attest: Laurie Decker, Village Clerk
MINUTES OF THE REGULAR BOARD MEETING OF OCTOBER 21, 2020
Call to Order: President Vanden Berg called the Regular Board Meeting to Order at 6:00 p.m.
Roll call of Trustees
PRESENT: Michael Vanden Berg, President
James Hietpas, Trustee
Larry Van Lankvelt, Trustee
Skip Smith, Trustee
Bill Peerenboom, Trustee
Brian Van Lankveldt, Trustee
Don Van Deurzen, Trustee (Arrived 6:09)
Roll call of Officers and Department Heads
PRESENT: James Fenlon, Village Administrator
Dan Meister, Fox Valley Metro Police Chief
Dave Kittel, Community Development Director
Adam Breest, Director of Parks, Recreation and Forestry
Lisa Remiker-DeWall, Finance Director
Kent Taylor, Director of Public Works
Chris Murawski, Village Engineer
EXCUSED: Steve Thiry, Library Director
Tyler Claringbole, Village Attorney
Laurie Decker, Village Clerk
Public Appearance for Items Not on the Agenda
Mr. Bruce Jansen, 951 Florida Avenue addressed issues with the Outagamie County Landfill. Mr. Jansen is
noting that the smell is much worse and has contacted DNR after not receiving any replies from the Outagamie
County Landfill and is hoping the board could address this issue.
Consent Agenda
Items on the Consent Agenda are routine in nature and require one motion to approve all items listed. Prior to
voting on the Consent Agenda, items may be removed at the request of any Board Member or member of the
public. Any removed items will be considered immediately following the motion to approve the other items.
1. Disbursement List
2. Jaycees Christmas Tree Sale
3. Special Event Permit-Veterans Day Ceremony-November 11
Moved by Trustee Smith, seconded by Trustee B. Van Lankveldt to Approve Consent Agenda as presented
Ayes 6, Nays 0 – Motion Carried
Other Informational Items—September Fire Monthly Report and September Monthly Report
Discussion/Possible Action—Johnson Street Parking
Director Taylor went over the parking situation on Johnson Avenue and Johnson Court and advised the board
that the plow trucks cannot get through to plow snow if cars are parked on both sides of the street. Director
Taylor advised staff recommendation is to put signs on the Northside of the road for no parking in the winter
months, December 1st to April 1st. Mr. Tim Schepp, 607 Johnson Court would like to see no parking year-
round on one side. Trustee L. Van Lankvelt asked if all the residence have been notified and Director Taylor
advised that yes, letters were sent out and has not received any opposition. Ms. Alison Wallace, 414 Johnson
Avenue, is also in favor of no parking on one side all year long due to the change in the exit for the school and
events at the baseball diamond causing congestion. Trustee Smith asked if the parking ban could be changed to
year-round, President Vanden Berg suggested putting the no parking signs up now and consider again in March
or April to see if it should be year-round. Trustee B. Van Lankveldt asked if it became permanent, would you
need new signs; and yes that would be the case. Administrator Fenlon suggested installing no parking signs on
the North side without the signage for winter only and then if it is a permanent move, signs would not have to
be changed.
Moved by Trustee Smith, seconded by Trustee L. Van Lankvelt to Install the no parking signs on the North
side of Johnson Avenue and Johnson Court on December 1, 2020 and will bring back to the board in
March to decide if it is permanent once residence have been notified of temporary or permanent.
Ayes 7, Nays 0 – Motion Carried
Discussion—2021 Proposed Budget
Administrator Fenlon went over a few minor changes to the proposed budget that was presented in the earlier
board meeting. Trustee Peerenboom stated and various board members felt they have enough information to
adopt this 2021 budget on November 4th.
Discussion—Covid-19 Updates
Administrator Fenlon thanked the board for the action on the Cares Act to purchase various equipment for the 3
school districts in our area.
Department and Officers Progress Reports
Departments and Officers provided progress reports to the Board
Call for Unfinished Business
None
Items for Future Agenda
None
Adjournment
Moved by Trustee Van Deurzen, seconded by Trustee B. Van Lankveldt to Adjourn the Regular Board
Meeting at 6:51 p.m.
Ayes 7, Nays 0 – Motion Carried
VILLAGE OF LITTLE CHUTE
By: ___________________________________
Michael R. Vanden Berg, Village President
Attest:
Laurie Decker, Village Clerk
Village of Little Chute
Engineering Department
REQUEST FOR BOARD'S CONSIDERATION
ITEM DESCRIPTION: Award of 2020 Downtown Storm Sewer Extension
REPORT PREPARED BY: Christopher L. Murawski, P.E.
REPORT DATE: November 6, 2020
ADMINISTRATOR'S REVIEW / COMMENTS:
No additional comments to this report ___________________
See additional comments attached ________________________
EXPLANATION:
On November 5, 2020 bids were opened for the 2020 Downtown Storm Sewer Extension Project.
This storm sewer will serve additional properties in the downtown area and more specifically for the
private hotel site currently under construction.
Seven bids were received for this project ranging in cost from $321,463.20 to $483,776.98. The low
bid was submitted by Advance Construction, Inc. from Green Bay, WI in the amount of
$321,463.20 for the contract base bid. The estimated cost for this project was $524,000 for
construction and $78,600 for design, inspection and construction administration.
Alternate bids were received for Lyle Street Storm Sewer Improvements. This project was initiated
to replace storm pipe that has been identified to be causing backup issues for residents. The
alternate bids for this work ranged from $212,990.60 to $288,832.05. Advanced Construction, Inc,
from Green Bay, WI submitted the second lowest bid for this work in the amount of $232,847.20.
The estimated amount for this work by the Village Engineering Department was $300,000 but is not
included in the Village’s CIP or borrowed debt amount. An additional $24,000 is expected to be
required for design, inspection and construction administration.
Contractor Selection is based on the low base bid (Downtown Storm) and if the alternate bid is
selected, the combined low bid (Downtown Storm and Lyle Street) will be awarded for this contract.
Advanced Construction, Inc. has submitted the low base bid and the combined low bid in the
amount of $321,463.20 and $554,310.40 (combined) respectively. This contractor appears to be a
responsible and qualified contractor to perform the specified work.
If selecting only the downtown storm sewer project with a 10% construction contingency the
construction amount of $353,609.52 is below the budgeted amount in the CIP of 524,000 by
$170,390.48.
When considering both projects the additional debt for the Lyle Street Storm Sewer Project
including inspection and project management with a 10 percent construction contingency is
approximately $109,800.
RECOMMENDATION:
CONTRACT AWARD AND BUDGET ADJUSTMENT
Lyle Street Storm Sewer Improvements – Alternate Bid
Given that the bids were favorable when considering costs and that the Lyle Street Storm Sewer
Improvements are being provided to alleviate storm sewer overflow issues. It is recommended by
the Village Engineer that the additional funding of $109,800 be provided for this contract. We are
not likely to experience this type of competitive market in the near future and we should take
advantage of the prices that are being provided.
Stormwater Utility
Lyle Street Project +$109,800
Cash Balances -$109,800
2020 Downtown Storm Sewer Extension
Approve the contract price for the submitted bid for the 2020 Downtown Storm Sewer Extension
Improvements (within budget) with allowing for an additional approximate 10 percent contingency
for construction. The finance construction budget is $500,000.
Bid Form
2020 Downtown Storm Sewer Extension – Project Number: 2020005
Village of Little Chute, Wisconsin
November 5, 2020 at 2:00 P.M.
DOWNTOWN STORM - BASE CONTRACT BID FORM
STORM SEWER – DOWNTN STORM SEWER EXT. Advance Construction Inc. Dorner Inc. Degroot Inc. David Tenor Corp. Kruczek Construction Inc. Donald Hietpas & Sons P.T.S. Contractors Inc.
Bid Item Description Unit Quantity Unit Cost Bid Amount Unit Cost Bid Amount Unit Cost Bid Amount Unit Cost Bid Amount Unit Cost Bid Amount Unit Cost Bid Amount Unit Cost Bid Amount
1 12" Class III Reinforced Concrete Storm Sewer LF 30 $150.00 $4,500.00 $69.00 $2,070.00 $72.83 $2,184.90 $90.00 $2,700.00 $117.00 $3,510.00 $125.00 $3,750.00 $110.00 $3,300.00
2 24" Class III Reinforced Concrete Storm Sewer LF 85 $155.00 $13,175.00 $104.00 $8,840.00 $108.36 $9,210.60 $99.00 $8,415.00 $135.00 $11,475.00 $182.00 $15,470.00 $130.00 $11,050.00
3 30" Class III Reinforced Concrete Storm Sewer LF 430 $128.00 $55,040.00 $116.00 $49,880.00 $154.69 $66,516.70 $166.00 $71,380.00 $205.00 $88,150.00 $170.00 $73,100.00 $150.00 $64,500.00
4 36" Class III Reinforced Concrete Storm Sewer LF 160 $150.00 $24,000.00 $277.00 $44,320.00 $223.36 $35,737.60 $256.00 $40,960.00 $300.00 $48,000.00 $366.00 $58,560.00 $330.00 $52,800.00
5 42" Class III Reinforced Concrete Storm Sewer LF 167 $163.00 $27,221.00 $321.00 $53,607.00 $247.59 $41,347.53 $306.00 $51,102.00 $395.00 $65,965.00 $370.00 $61,790.00 $510.00 $85,170.00
6 42" Class III Reinforced Concrete Storm Sewer (Native Backfill) LF 158.2 $125.00 $19,775.00 $161.00 $25,470.20 $130.95 $20,716.29 $180.00 $28,476.00 $210.00 $33,222.00 $230.00 $36,386.00 $214.00 $33,854.80
7 12" PVC Storm Sewer Main LF 60 $122.00 $7,320.00 $63.00 $3,780.00 $61.38 $3,682.80 $85.00 $5,100.00 $90.00 $5,400.00 $110.00 $6,600.00 $118.00 $7,080.00
8 4 Ft Dia Standard Storm Sewer Manhole VF 9 $220.00 $1,980.00 $268.00 $2,412.00 $437.46 $3,937.14 $356.00 $3,204.00 $300.00 $2,700.00 $550.00 $4,950.00 $418.00 $3,762.00
9 5 Ft Dia Standard Storm Sewer Manhole VF 44.8 $285.00 $12,768.00 $290.00 $12,992.00 $379.93 $17,020.86 $425.00 $19,040.00 $325.00 $14,560.00 $575.00 $25,760.00 $445.00 $19,936.00
10 6 Ft Dia Standard Storm Sewer Manhole VF 28.4 $370.00 $10,508.00 $324.00 $9,201.60 $453.68 $12,884.51 $600.00 $17,040.00 $350.00 $9,940.00 $600.00 $17,040.00 $518.00 $14,711.20
11 8 Ft Dia Standard Storm Sewer Manhole VF 42.5 $450.00 $19,125.00 $407.00 $17,297.50 $446.49 $18,975.83 $820.00 $34,850.00 $420.00 $17,850.00 $1,100.00 $46,750.00 $595.00 $25,287.50
12 4 Ft Dia Standard Storm Sewer Inlet Manhole VF 9.5 $260.00 $2,470.00 $288.00 $2,736.00 $524.82 $4,985.79 $440.00 $4,180.00 $330.00 $3,135.00 $575.00 $5,462.50 $472.00 $4,484.00
13 Type "H" Catch Basin Including: Frame (R-3067) & Grate EA 1 $1,940.00 $1,940.00 $1,837.00 $1,837.00 $2,121.00 $2,121.00 $2,025.00 $2,025.00 $2,075.00 $2,075.00 $2,000.00 $2,000.00 $2,000.00 $2,000.00
14 Connect to Existing Storm Sewer Main EA 8 $450.00 $3,600.00 $548.00 $4,384.00 $1,767.50 $14,140.00 $1,800.00 $14,400.00 $900.00 $7,200.00 $1,250.00 $10,000.00 $1,400.00 $11,200.00
15 Abandon Existing 12" and Smaller Storm Sewer Main LF 45 $12.00 $540.00 $10.00 $450.00 $6.06 $272.70 $5.00 $225.00 $53.00 $2,385.00 $15.00 $675.00 $14.00 $630.00
16 Storm Sewer Utility Line Opening (ULO) EA 1 $500.00 $500.00 $656.00 $656.00 $757.50 $757.50 $700.00 $700.00 $730.00 $730.00 $900.00 $900.00 $870.00 $870.00
17 Construction Staking (Storm) LS 1 $894.40 $894.40 $897.00 $897.00 $1,010.00 $1,010.00 $925.00 $925.00 $1,835.00 $1,835.00 $905.00 $905.00 $950.00 $950.00
STORM SEWER SUB-TOTAL $205,356.40 $240,830.30 $255,501.75 $304,722.00 $318,132.00 $370,098.50 $341,585.50
PAVING – DOWNTOWN STORM SEWER EXT. Advance Construction Inc. Dorner Inc. Dorner Inc. David Tenor Corp. Kruczek Construction Inc. Donald Hietpas & Sons P.T.S. Contractors Inc.
Bid Item Description Unit Quantity Unit Cost Bid Amount Unit Cost Bid Amount Unit Cost Bid Amount Unit Cost Bid Amount Unit Cost Bid Amount Unit Cost Bid Amount Unit Cost Bid Amount
18 Stone Tracking Pad EA 1 $1,000.00 $1,000.00 $1,002.00 $1,002.00 $1,212.00 $1,212.00 $1,500.00 $1,500.00 $1,225.00 $1,225.00 $1,200.00 $1,200.00 $2,000.00 $2,000.00
19 4" Concrete Sidewalk & Carriage Walk, Including 3" Aggregate Base SF 754 $7.00 $5,278.00 $6.00 $4,524.00 $8.44 $6,363.76 $7.12 $5,368.48 $7.10 $5,353.40 $6.95 $5,240.30 $7.50 $5,655.00
20 6" Concrete Driveway and Sidewalk, Including 3" Aggregate Base SF 218 $7.80 $1,700.40 $7.00 $1,526.00 $8.84 $1,927.12 $7.79 $1,698.22 $7.75 $1,689.50 $7.60 $1,656.80 $8.00 $1,744.00
21 Drilled Sidewalk Bars (#4x12”) EA 20 $7.00 $140.00 $8.00 $160.00 $7.42 $148.40 $7.50 $150.00 $6.00 $120.00 $6.00 $120.00 $6.40 $128.00
22 No. 4 Reinforcing Rods LF 210 $1.50 $315.00 $2.00 $420.00 $1.60 $336.00 $1.03 $216.30 $1.00 $210.00 $1.00 $210.00 $1.00 $210.00
23 Sawcut Asphalt Pavement LF 325 $3.00 $975.00 $2.00 $650.00 $3.03 $984.75 $2.50 $812.50 $3.00 $975.00 $2.50 $812.50 $2.00 $650.00
24 Sawcut Concrete Pavement LF 260 $4.00 $1,040.00 $3.00 $780.00 $5.05 $1,313.00 $5.00 $1,300.00 $5.00 $1,300.00 $3.50 $910.00 $3.00 $780.00
25 30" Concrete Curb & Gutter - Standard LF 200 $37.50 $7,500.00 $30.00 $6,000.00 $38.18 $7,636.00 $41.00 $8,200.00 $40.00 $8,000.00 $40.00 $8,000.00 $42.00 $8,400.00
26 Remove Concrete Curb and Gutter LF 200 $5.00 $1,000.00 $5.00 $1,000.00 $3.03 $606.00 $5.13 $1,026.00 $5.00 $1,000.00 $5.00 $1,000.00 $5.00 $1,000.00
27 Drilled #6 Tie Bars EA 70 $15.00 $1,050.00 $9.00 $630.00 $15.91 $1,113.70 $8.20 $574.00 $8.00 $560.00 $8.00 $560.00 $8.00 $560.00
28 Common Excavation CY 561 $10.00 $5,610.00 $10.00 $5,610.00 $9.09 $5,099.49 $10.25 $5,750.25 $10.25 $5,750.25 $10.00 $5,610.00 $11.00 $6,171.00
29 Excavation Below Subgrade (Includes 3" Breaker Run Backfill) CY 100 $30.00 $3,000.00 $35.00 $3,500.00 $20.20 $2,020.00 $45.87 $4,587.00 $45.65 $4,565.00 $44.75 $4,475.00 $48.00 $4,800.00
30 4" Topsoil, Seed, Fertilizer, & Mulch SY 688 $5.50 $3,784.00 $8.00 $5,504.00 $8.08 $5,559.04 $8.00 $5,504.00 $6.00 $4,128.00 $7.87 $5,414.56 $8.00 $5,504.00
31 Base Aggregate Dense 1-1/4" CY 230 $25.80 $5,934.00 $20.00 $4,600.00 $30.30 $6,969.00 $11.80 $2,714.00 $11.75 $2,702.50 $11.50 $2,645.00 $24.00 $5,520.00
32 HMA Pavement 3 LT 58-28 S (2¼" Asphalt Binder Course) (19.0 mm) SY 878 $16.00 $14,048.00 $17.00 $14,926.00 $16.97 $14,899.66 $16.40 $14,399.20 $16.35 $14,355.30 $16.16 $14,188.48 $17.00 $14,926.00
33 HMA Pavement 5 LT 58-28 S (1¾" Asphalt Surface Course) (9.5 mm) SY 878 $11.00 $9,658.00 $12.00 $10,536.00 $11.67 $10,246.26 $11.30 $9,921.40 $11.25 $9,877.50 $11.12 $9,763.36 $12.00 $10,536.00
34 Tack Coat GAL 44 $3.00 $132.00 $3.00 $132.00 $3.18 $139.92 $3.09 $135.96 $3.50 $154.00 $3.05 $134.20 $3.00 $132.00
35 8" Concrete Pavement (Doweled) with Integral Curb SY 140 $88.00 $12,320.00 $75.00 $10,500.00 $103.42 $14,478.80 $41.00 $5,740.00 $40.00 $5,600.00 $40.00 $5,600.00 $42.00 $5,880.00
36 8" Concrete Pavement (Doweled) with Integral Curb - HES SY 140 $88.00 $12,320.00 $80.00 $11,200.00 $103.42 $14,478.80 $46.12 $6,456.80 $45.00 $6,300.00 $45.00 $6,300.00 $48.00 $6,720.00
37 Remove Existing Concrete and Asphalt Sidewalks and Driveways SF 972 $0.70 $680.40 $1.00 $972.00 $2.53 $2,459.16 $1.55 $1,506.60 $2.00 $1,944.00 $1.50 $1,458.00 $1.50 $1,458.00
38 Removing Concrete SY 140 $6.50 $910.00 $5.00 $700.00 $10.10 $1,414.00 $10.25 $1,435.00 $11.00 $1,540.00 $10.00 $1,400.00 $10.00 $1,400.00
39 Removing Asphalt SY 878 $4.00 $3,512.00 $3.00 $2,634.00 $3.03 $2,660.34 $3.86 $3,389.08 $1.75 $1,536.50 $3.76 $3,301.28 $4.00 $3,512.00
40 Temporary Asphalt - Cold Patch SY 420 $5.00 $2,100.00 $15.00 $6,300.00 $23.33 $9,798.60 $15.00 $6,300.00 $19.50 $8,190.00 $18.45 $7,749.00 $17.00 $7,140.00
41 Construction Staking` (Paving) LS 1 $700.00 $700.00 $637.00 $637.00 $808.00 $808.00 $660.00 $660.00 $1,835.00 $1,835.00 $650.00 $650.00 $670.00 $670.00
PAVING SUB-TOTAL $94,706.80 $94,443.00 $112,671.80 $89,344.79 $88,910.95 $88,398.48 $95,496.00
MISCELLANEOUS – DOWNTOWN STORM SEWER EXT. Advance Construction Inc. Dorner Inc. Dorner Inc. David Tenor Corp. Kruczek Construction Inc. Donald Hietpas & Sons P.T.S. Contractors Inc.
Bid Item Description Unit Quantity Unit Cost Bid Amount Unit Cost Bid Amount Unit Cost Bid Amount Unit Cost Bid Amount Unit Cost Bid Amount Unit Cost Bid Amount Unit Cost Bid Amount
42 Traffic Control LS 1 $15,000.00 $15,000.00 $5,511.00 $5,511.00 $5,555.00 $5,555.00 $20,725.00 $20,725.00 $20,000.00 $20,000.00 $15,280.00 $15,280.00 $21,000.00 $21,000.00
43 Watering (For Compaction and Dust Control) LS 1 $2,000.00 $2,000.00 $500.00 $500.00 $505.00 $505.00 $525.00 $525.00 $1,000.00 $1,000.00 $750.00 $750.00 $580.00 $580.00
44 Furnish, Install & Maintain - Type D Inlet Protection EA 6 $100.00 $600.00 $145.00 $870.00 $151.50 $909.00 $100.00 $600.00 $100.00 $600.00 $125.00 $750.00 $106.00 $636.00
45 Remove Existing Fence LF 100 $4.00 $400.00 $9.00 $900.00 $15.15 $1,515.00 $8.00 $800.00 $12.25 $1,225.00 $25.00 $2,500.00 $11.60 $1,160.00
46 Remove Existing Building (Garage) LS 1 $3,400.00 $3,400.00 $1,531.00 $1,531.00 $3,535.00 $3,535.00 $3,000.00 $3,000.00 $7,300.00 $7,300.00 $6,000.00 $6,000.00 $8,300.00 $8,300.00
MISCELLANEOUS SUB-TOTAL $21,400.00 $9,312.00 $12,019.00 $25,650.00 $30,125.00 $25,280.00 $31,676.00
DOWNTOWN STORM - BASE BID - TOTAL $321,463.20 $344,585.30 $380,192.55 $419,716.79 $437,167.95 $483,776.98 $468,757.50
Bid Form
2020 Downtown Storm Sewer Extension – Project Number: 2020005
Village of Little Chute, Wisconsin
November 5, 2020 at 2:00 P.M.
ALTERNATE BID FOR LYLE STREET STORM SEWER IMPROVEMENTS W/TOTALS
STORM SEWER – LYLE STREET Advance Construction Inc. Dorner Inc. Degroot Inc. David Tenor Corp. Kruczek Construction Inc. Donald Hietpas & Sons P.T.S. Contractors Inc.
Bid Item Description Unit Quantity Unit Cost Bid Amount Unit Cost Bid Amount Unit Cost Bid Amount Unit Cost Bid Amount Unit Cost Bid Amount Unit Cost Bid Amount Unit Cost Bid Amount
1A 12" PVC Storm Sewer Main LF 17 $120.00 $2,040.00 $56.00 $952.00 $61.59 $1,047.03 $85.00 $1,445.00 $75.00 $1,275.00 $75.00 $1,275.00 $83.00 $1,411.00
2A 36" PVC Storm Sewer LF 357 $100.00 $35,700.00 $92.00 $32,844.00 $93.26 $33,293.82 $117.00 $41,769.00 $220.00 $78,540.00 $128.00 $45,696.00 $170.00 $60,690.00
3A 36" Class III Reinforced Concrete Storm Sewer LF 395 $141.00 $55,695.00 $97.00 $38,315.00 $100.05 $39,519.75 $146.00 $57,670.00 $100.00 $39,500.00 $116.00 $45,820.00 $127.00 $50,165.00
4A 5 Ft Dia Standard Storm Sewer Manhole VF 6.4 $420.00 $2,688.00 $508.00 $3,251.20 $702.62 $4,496.77 $630.00 $4,032.00 $620.00 $3,968.00 $600.00 $3,840.00 $560.00 $3,584.00
5A 6 Ft Dia Standard Storm Sewer Manhole VF 26.9 $484.00 $13,019.60 $576.00 $15,494.40 $717.89 $19,311.24 $600.00 $16,140.00 $625.00 $16,812.50 $650.00 $17,485.00 $700.00 $18,830.00
6A 6 Ft Dia Standard Storm Sewer Inlet Manhole VF 5 $630.00 $3,150.00 $777.00 $3,885.00 $926.10 $4,630.50 $680.00 $3,400.00 $860.00 $4,300.00 $750.00 $3,750.00 $810.00 $4,050.00
7A Type "H" Catch Basin Including: Frame (R-3067) & Grate EA 1 $1,940.00 $1,940.00 $1,837.00 $1,837.00 $2,121.00 $2,121.00 $2,025.00 $2,025.00 $20.75 $20.75 $2,000.00 $2,000.00 $2,000.00 $2,000.00
8A Connect to Existing Storm Sewer Main EA 1 $440.00 $440.00 $784.00 $784.00 $1,515.00 $1,515.00 $1,500.00 $1,500.00 $900.00 $900.00 $1,500.00 $1,500.00 $1,750.00 $1,750.00
9A Connect to Existing Storm Sewer Manhole EA 1 $490.00 $490.00 $875.00 $875.00 $1,515.00 $1,515.00 $1,800.00 $1,800.00 $900.00 $900.00 $2,500.00 $2,500.00 $2,900.00 $2,900.00
10A Connect to Existing Storm Sewer Lateral EA 7 $188.00 $1,316.00 $719.00 $5,033.00 $584.36 $4,090.52 $1,200.00 $8,400.00 $360.00 $2,520.00 $815.00 $5,705.00 $700.00 $4,900.00
11A Remove and Dispose 30" and Smaller Storm Sewer LF 123 $18.00 $2,214.00 $10.00 $1,230.00 $10.10 $1,242.30 $49.00 $6,027.00 $53.00 $6,519.00 $20.00 $2,460.00 $23.00 $2,829.00
12A Abandon Existing 18" Storm Sewer Main LF 285 $13.00 $3,705.00 $12.00 $3,420.00 $9.04 $2,576.40 $10.00 $2,850.00 $36.00 $10,260.00 $12.00 $3,420.00 $10.00 $2,850.00
13A Storm Sewer Utility Line Opening (ULO) EA 1 $550.00 $550.00 $656.00 $656.00 $757.50 $757.50 $800.00 $800.00 $910.00 $910.00 $900.00 $900.00 $350.00 $350.00
14A Furnish and Install Sanitary Sewer External Manhole Chimney Seal EA 1 $680.00 $680.00 $470.00 $470.00 $353.50 $353.50 $375.00 $375.00 $435.00 $435.00 $500.00 $500.00 $1,000.00 $1,000.00
15A Construction Staking (Storm) LS 1 $895.00 $895.00 $700.00 $700.00 $858.50 $858.50 $720.00 $720.00 $1,530.00 $1,530.00 $706.00 $706.00 $750.00 $750.00
STORM SEWER SUB-TOTAL $124,522.60 $109,746.60 $117,328.83 $148,953.00 $168,390.25 $137,557.00 $158,059.00
PAVING – LYLE STREET Advance Construction Inc. Dorner Inc. Degroot Inc. David Tenor Corp. Kruczek Construction Inc. Donald Hietpas & Sons P.T.S. Contractors Inc.
Bid Item Description Unit Quantity Unit Cost Bid Amount Unit Cost Bid Amount Unit Cost Bid Amount Unit Cost Bid Amount Unit Cost Bid Amount Unit Cost Bid Amount Unit Cost Bid Amount
16A Stone Tracking Pad EA 1 $1,000.00 $1,000.00 $1,002.00 $1,002.00 $1,262.50 $1,262.50 $1,500.00 $1,500.00 $1,225.00 $1,225.00 $1,200.00 $1,200.00 $2,000.00 $2,000.00
17A 4" Concrete Sidewalk & Carriage Walk, Including 3" Aggregate Base SF 100 $7.00 $700.00 $6.00 $600.00 $8.68 $868.00 $7.13 $713.00 $7.00 $700.00 $6.95 $695.00 $7.00 $700.00
18A 6" Concrete Driveway and Sidewalk, Including 3" Aggregate Base SF 450 $7.80 $3,510.00 $7.00 $3,150.00 $9.47 $4,261.50 $7.79 $3,505.50 $8.00 $3,600.00 $7.60 $3,420.00 $8.00 $3,600.00
19A Drilled Sidewalk Bars (#4x12”) EA 28 $7.00 $196.00 $8.00 $224.00 $7.42 $207.76 $6.15 $172.20 $6.00 $168.00 $6.00 $168.00 $6.00 $168.00
20A No. 4 Reinforcing Rods LF 45 $1.50 $67.50 $2.00 $90.00 $1.60 $72.00 $1.03 $46.35 $1.10 $49.50 $1.00 $45.00 $1.00 $45.00
21A Sawcut Asphalt Pavement LF 50 $3.00 $150.00 $2.00 $100.00 $3.03 $151.50 $2.50 $125.00 $3.00 $150.00 $2.50 $125.00 $2.00 $100.00
22A Sawcut Concrete Pavement LF 160 $4.00 $640.00 $3.00 $480.00 $5.05 $808.00 $5.00 $800.00 $5.00 $800.00 $4.50 $720.00 $4.00 $640.00
23A 30" Concrete Curb & Gutter - Standard LF 210 $37.50 $7,875.00 $30.00 $6,300.00 $38.18 $8,017.80 $41.00 $8,610.00 $4.00 $840.00 $40.00 $8,400.00 $42.00 $8,820.00
24A Remove Concrete Curb and Gutter LF 20 $8.00 $160.00 $5.00 $100.00 $5.05 $101.00 $10.25 $205.00 $40.00 $800.00 $10.00 $200.00 $11.00 $220.00
25A Drilled #6 Tie Bars EA 36 $15.00 $540.00 $9.00 $324.00 $15.91 $572.76 $8.20 $295.20 $8.50 $306.00 $8.00 $288.00 $8.50 $306.00
26A Common Excavation CY 580 $12.00 $6,960.00 $12.00 $6,960.00 $14.14 $8,201.20 $19.32 $11,205.60 $19.35 $11,223.00 $18.85 $10,933.00 $20.00 $11,600.00
27A Excavation Below Subgrade (Includes 3" Breaker Run Backfill) CY 100 $30.00 $3,000.00 $35.00 $3,500.00 $25.25 $2,525.00 $45.87 $4,587.00 $46.00 $4,600.00 $44.75 $4,475.00 $47.00 $4,700.00
28A 4" Topsoil, Seed, Fertilizer, & Mulch SY 1014 $6.00 $6,084.00 $8.00 $8,112.00 $8.46 $8,578.44 $8.00 $8,112.00 $6.00 $6,084.00 $8.00 $8,112.00 $8.00 $8,112.00
29A Base Aggregate Dense 1-1/4" CY 455 $25.00 $11,375.00 $20.00 $9,100.00 $29.97 $13,636.35 $11.28 $5,132.40 $11.20 $5,096.00 $11.00 $5,005.00 $23.00 $10,465.00
30A HMA Pavement 3 LT 58-28 S (2¼" Asphalt Binder Course) (19.0 mm) SY 1366 $16.00 $21,856.00 $17.00 $23,222.00 $18.30 $24,997.80 $16.40 $22,402.40 $16.35 $22,334.10 $16.16 $22,074.56 $17.00 $23,222.00
31A HMA Pavement 5 LT 58-28 S (1¾" Asphalt Surface Course) (9.5 mm) SY 1366 $11.00 $15,026.00 $12.00 $16,392.00 $11.67 $15,941.22 $11.30 $15,435.80 $11.25 $15,367.50 $11.11 $15,176.26 $11.50 $15,709.00
32A Tack Coat GAL 68 $3.00 $204.00 $3.00 $204.00 $3.18 $216.24 $3.09 $210.12 $3.35 $227.80 $3.05 $207.40 $3.00 $204.00
33A 8" Concrete Pavement (Doweled) with Integral Curb SY 40 $88.00 $3,520.00 $75.00 $3,000.00 $52.52 $2,100.80 $41.00 $1,640.00 $40.00 $1,600.00 $40.00 $1,600.00 $42.00 $1,680.00
34A 8" Concrete Pavement (Doweled) with Integral Curb - HES SY 40 $88.00 $3,520.00 $80.00 $3,200.00 $103.42 $4,136.80 $46.13 $1,845.20 $46.00 $1,840.00 $45.00 $1,800.00 $47.00 $1,880.00
35A Remove Existing Concrete and Asphalt Sidewalks and Driveways SF 491 $0.70 $343.70 $1.00 $491.00 $1.52 $746.32 $1.54 $756.14 $3.00 $1,473.00 $1.50 $736.50 $1.50 $736.50
36A Removing Concrete SY 40 $6.50 $260.00 $5.00 $200.00 $12.12 $484.80 $10.25 $410.00 $10.20 $408.00 $10.00 $400.00 $10.00 $400.00
37A Removing Asphalt SY 1366 $1.40 $1,912.40 $3.00 $4,098.00 $3.03 $4,138.98 $1.03 $1,406.98 $1.50 $2,049.00 $1.00 $1,366.00 $1.00 $1,366.00
38A Temporary Asphalt - Cold Patch SY 300 $5.00 $1,500.00 $15.00 $4,500.00 $12.45 $3,735.00 $15.00 $4,500.00 $20.00 $6,000.00 $18.45 $5,535.00 $17.00 $5,100.00
39A Construction Staking (Paving) LS 1 $525.00 $525.00 $523.00 $523.00 $606.00 $606.00 $540.00 $540.00 $1,530.00 $1,530.00 $530.00 $530.00 $550.00 $550.00
PAVING SUB-TOTAL $90,924.60 $95,872.00 $106,367.77 $94,155.89 $88,470.90 $93,211.72 $102,323.50
MISCELLANEOUS – LYLE STREET Advance Construction Inc. Dorner Inc. Degroot Inc. David Tenor Corp. Kruczek Construction Inc. Donald Hietpas & Sons P.T.S. Contractors Inc.
Bid Item Description Unit Quantity Unit Cost Bid Amount Unit Cost Bid Amount Unit Cost Bid Amount Unit Cost Bid Amount Unit Cost Bid Amount Unit Cost Bid Amount Unit Cost Bid Amount
40A Traffic Control LS 1 $10,500.00 $10,500.00 $1,202.00 $1,202.00 $3,232.00 $3,232.00 $12,375.00 $12,375.00 $25,570.90 $25,570.90 $8,280.00 $8,280.00 $10,750.00 $10,750.00
41A Watering (For Compaction and Dust Control) LS 1 $1,500.00 $1,500.00 $500.00 $500.00 $505.00 $505.00 $550.00 $550.00 $1,000.00 $1,000.00 $750.00 $750.00 $580.00 $580.00
42A Furnish, Install & Maintain - Type D Inlet Protection EA 6 $100.00 $600.00 $145.00 $870.00 $151.50 $909.00 $100.00 $600.00 $100.00 $600.00 $125.00 $750.00 $106.00 $636.00
43A Clear and Grub Existing Tree ID 120 $35.00 $4,200.00 $35.00 $4,200.00 $38.38 $4,605.60 $36.00 $4,320.00 $35.00 $4,200.00 $25.00 $3,000.00 $95.00 $11,400.00
44A Inlet Protection - Type D Install & Maintain EA 6 $100.00 $600.00 $100.00 $600.00 $151.50 $909.00 $100.00 $600.00 $100.00 $600.00 $125.00 $750.00 $100.00 $600.00
MISCELLANEOUS SUB-TOTAL $17,400.00 $7,372.00 $10,160.60 $18,445.00 $31,970.90 $13,530.00 $23,966.00
LYLE STREET STORM SEWER - ALTERNATE BID - TOTAL $232,847.20 $212,990.60 $233,857.20 $261,553.89 $288,832.05 $244,298.72 $284,348.50
Advance Construction Inc. Dorner Inc. Degroot Inc. David Tenor Corp. Kruczek Construction Inc. Donald Hietpas & Sons P.T.S. Contractors Inc.
DOWNTOWN STORM - BASE BID - TOTAL $321,463.20 $344,585.30 $380,192.55 $419,716.79 $437,167.95 $483,776.98 $468,757.50
LYLE STREET STORM SEWER - ALTERNATE BID - TOTAL $232,847.20 $212,990.60 $233,857.20 $261,553.89 $288,832.05 $244,298.72 $284,348.50
BASE BID + ALTERNATE BID = TOTAL $554,310.40 $557,575.90 $614,049.75 $681,270.68 $726,000.00 $728,075.70 $753,106.00