Site Plan & Architectural Review Committee
Regular MeetingLodi, NJ · May 22, 2024
Agenda
LODI SITE PLAN AND AGENDA – Regular Meeting
Date: May 22, 2024
ARCHITECTURAL REVIEW Time: 5:15 p.m.
COMMITTEE
Carnegie Forum
305 West Pine Street, Lodi
For information regarding this Agenda please contact:
Lorie Waters
Administrative Assistant
Telephone: (209) 333-6711
Notice Regarding Public Comments
Public Comment may be submitted in the following ways:
• In-person – The Carnegie Forum is open to the public.
• Email – sparccomments@lodi.gov
➢ Received no later than two hours prior to the meeting
• Mail – Community Development Department, P.O. Box 3006, Lodi, CA 95241
• Hand delivered to: Community Development Department, 221 W. Pine Street, Lodi, CA 95240
➢ Received no later than two hours prior to the meeting
1. ROLL CALL
2. MINUTES
“May 8, 2024”
3. COMMENTS BY THE PUBLIC (NON-AGENDA ITEMS)
If you wish to address the Committee, please refer to the Notice at the beginning of this agenda. Individuals are
limited to one appearance during this section of the Agenda.
4. REVIEW ITEMS
a. Request of Site Plan and Architecture Review Committee (“SPARC”) for approval of the
construction of a two-story triplex at 425 East Lodi Avenue (Applicant: Octavio Gonzalez; File
Number: PL2024-004 SP; CEQA Determination: Exempt Per CEQA Guidelines Section 15332)
NOTE: The above item is a quasi-judicial hearing and requires disclosure of ex parte communications as set forth
in Resolution No. 2006-31
5. REGULAR BUSINESS
6. COMMENTS BY THE COMMITTEE MEMBERS AND STAFF ON NON-AGENDA ITEMS
7. ADJOURNMENT
Pursuant to Section 54954.2(a) of the Government Code of the State of California, this agenda was posted at least
72 hours in advance of the scheduled meeting at a public place freely accessible to the public 24 hours a day.
______________________________
Lorie Waters
Administrative Assistant
Revised 10/2021 5/16/2024 11:54
AM
SITE PLAN AND ARCHITECTURAL REVIEW
MAY 22, 2024
PAGE TWO
**Notice: Pursuant to Government Code §54954.3(a), public comments may be directed to the legislative body
concerning any item contained on the agenda for this meeting before (in the cast of Closed Session items) or during
consideration of the item.
All staff reports or other written documentation relating to each item of business referred to on the agenda are on file in the Office of the
Community Development Department, located at 221 W. Pine Street, Lodi, and are available for public inspection. Agendas and staff
reports are also posted on the City’s website at www.lodi.gov. If requested, the agenda shall be made available in appropriate alternative
formats to persons with a disability, as required by Section 202 of the Americans with Disabilities Act of 1990 (42 U.S.C. Sec. 12132),
and the federal rules and regulations adopted in implementation thereof. To make a request for disability-related modification or
accommodation contact the Community Development Office as soon as possible and at least 72 hours prior to the meeting date.
Language interpreter requests must be received at least 72 hours in advance of the meeting to help ensure availability. Contact Lorie
Waters at (209) 333-6711. Solicitudes de interpretación de idiomas deben ser recibidas por lo menos con 72 horas de anticipación a la
reunión para ayudar a asegurar la disponibilidad. Llame a Lorie Waters (209) 333-6711.
Members of the public may view and listen to the open session of this teleconference meeting at www.facebook.com/CityofLodi/.
Right of Appeal:
If you disagree with the decision of the committee, you have a right of appeal. Only persons who participated in the review process by submitting written
or oral testimony, or by attending the public hearing may appeal.
Pursuant to Lodi Municipal Code Section 17.70.050, actions of the Site Plan and Architectural Review Committee may be appealed to the Planning
Commission and then to the City Council by filing, within ten (10) business days, a written appeal with the City Clerk and payment of $300.00 appeal fee.
The appeal shall be processed in accordance with Chapter 17.70, Appeals, of the Lodi Municipal Code. Contact: City Clerk, City Hall 2nd Floor, 221
West Pine Street, Lodi, California 95240 – Phone: (209) 333-6702.
SITE PLAN AND ARCHITECTURAL
REVIEW COMMITTEE MEETING
CARNEGIE FORUM, 305 WEST PINE STREET
WEDNESDAY, MAY 8, 2024 MINUTES
1. CALL TO ORDER / ROLL CALL
The Regular Site Plan and Architectural Review Committee meeting of Wednesday, May 8,
2024, was called to order by Chair Slater at 5:15 p.m.
Present: Committee Members Donaldson, Hamilton, Vice Chair Rosado, and Chair
Slater
Absent: Committee Members Diehl
Also Present: Community Development Director John R. Della Monica, Jr., Deputy City Attorney
Brian Gabriel, City Planner Cynthia Marsh, and Administrative Assistant Lorie
Waters
2. MINUTES
“February 28, 2024”
MOTION / VOTE:
The Site Plan and Architecture Review Committee on motion of SPARC Member Diehl, Vice
Chair Rosado second, approved the minutes of February 28, 2024, 4-0.
3. COMMENTS BY THE PUBLIC
Member Donaldson disclosed that he participated in preliminary land planning in the early
stages of the project being heard at this meeting. He stated that the site plan now differs from
the plans that he prepared, and he has no further interest or participation in the project moving
forward, nor will he have any interest in the future. He also stated that he has discussed this
matter with Director Della Monica and his staff, and it has been determined that there is no
conflict of interest.
Member Donaldson stated that his participation was nearly 18 months ago.
Director Della Monica introduced the new Deputy City Attorney, Brian Gabriel.
4. PUBLIC HEARINGS
a) Notice thereof having been published according to law, an affidavit of which publication is
on file in the Community Development Department, Chair Slater called for the public
hearing to consider the request of Site Plan and Architecture Review Committee
(SPARC) for approval of a new 210 apartment complex (“12 West Apartments”) at 2925
Gala Drive (Applicant: NJA Architecture, File Number: PL2024-005 SP, CEQA
Determination: Exempt Per CEQA Guidelines Section 15183)
City Planner Marsh gave a presentation based on the staff report and the design package.
Chair Slater asked for clarification that the property to the east of the project site is City
property and will be used for a switching station in the future. Director Della Monica
clarified that the property will hold a substation and will include a water tank.
Vice Chair Rosado asked if all of the driveways and pedestrian access points for the
project are gated. City Planner Marsh confirmed that all are gated.
May 8, 2024 SPARC Meeting Minutes
Page 2 of 4
Member Hamilton asked if there were any plans for any additional stop signs or
crosswalks for the existing street. City Planner Marsh stated that all of were considered in
the 2017-2018 EIR, and no additional stop signs or crosswalks are planned. She added
that a higher capacity was taken into consideration in the EIR, and no changes to the
existing street was warranted.
Chair Slater asked how would tenants of the site get safely to the park across the street.
Director Della Monica stated that Staff would have to speak with Public Works to see if
there were any plans for a crosswalk in the area.
Hearing Opened to the Public
• The Applicant, Nick Seward of NJ Architects & Associates of 212 W. Pine Street, St. 1,
came up to the podium to answer questions. He stated that this project was previously
approved in 2021, and briefly described the changes from the prior approval.
• Chair Slater asked about the location of the bicycle racks. Mr. Seward stated that the
racks will be located in the breezeways of each building.
• Chair Slater asked where HVAC equipment would be located. Mr. Seward stated that
they’ve changed the design to include mini-split systems on the ground.
• Chair Slater asked about roof material. Mr. Seward stated that they are now hoping
that a metal roof will fit into the budget, but it may change to composite.
• Chair Slater asked if there would be piping for solar and EV chargers. Mr. Seward
stated that solar will be considered in the next phase of Building permits, and EV
requirements are shown on the site plan.
• Chair Slater asked if there would be designated parking spots for tenants and visitors.
Mr. Seward confirmed that all spots will be marked.
• Chair Slater also asked Mr. Seward if he had met with his neighbors. Mr. Seward
stated that he did not reach out to neighbors.
• Vice Chair Rosado asked about the fence line and materials. Mr. Seward stated that
three sides are CMU and the south side would consist of wrought iron. He also stated
that the gates would have key-card access.
• Chair Slater asked for trash enclosure locations. Mr. Seward stated that he worked
with Waste Management on trash enclosure locations and they are located throughout
the site.
• Member Hamilton stated concerns about food waste smells from the trash enclosures.
Mr. Seward stated the they have attempted to place most enclosures around the
perimeter of the site. Member Hamilton asked if the enclosures were set up for
different kinds of waste. Mr. Seward stated that he is now talking the Waste
Management on how to accommodate the different types of waste.
• Vice Chair Rosado and Mr. Seward discussed relocating the enclosures that were
located closer to buildings.
• Vice Chair Rosado asked for the height of the carport along Kettleman Lane. Mr.
Seward stated that it is either 8.8 or 9 ft. Vice Chair Rosado requested that the height
of the carport not exceed the wall to eliminate any light glare beyond the wall.
J:\Community Development\Planning\MINUTES\2022 SPARC Minutes
2
May 8, 2024 SPARC Meeting Minutes
Page 3 of 4
• Chair Slater asked Mr. Seward if he had spoken with CalTrans concerning the lighting.
Mr. Seward stated that CalTrans has approved the design.
• Vice Chair Rosado asked about the screening of the HVAC units. Mr. Seward stated
that the units will be grouped and surrounded by landscaping.
• Vice Chair Rosado asked if there would be any exterior lighting. Mr. Seward confirmed
that lighting will be on the entry ways and more lighting will be on the pathways than
the buildings to avoid glare for residents.
• Vice Chair Rosado asked for clarification on the materials for the balconies. Mr.
Seward stated that the material would be a perforated metal.
• Vice Chair Rosado asked Staff if there were any regulations on the storage of items on
balconies. Mr. Seward clarified that each unit will have a storage unit in the
breezeway.
• Member Hamilton asked about lighting in the parking areas. Mr. Seward stated the
canopies will have lighting.
• Member Donaldson asked if there would be an exhaust hood for the preparation
kitchen. Mr. Seward stated that the kitchen has a prep area only and is not a
commercial kitchen.
• Member Donaldson stated that the elevations show a fireplace element that is not
showing in the renderings. Mr. Seward stated that there were last minute updates to
the floor plan, but anticipates that there will be a chimney and a gas fireplace.
• Member Donaldson expressed concerns over using a silver corrugated metal and the
material creating a significant glare for the neighborhood. Mr. Seward stated that they
will likely use a material that is darker.
• Member Donaldson asked Mr. Seward to consider removing some walkways to make
the site more pleasant for first-floor tenants.
• Chair Slater asked about signage. Mr. Seward stated that there will be monument
signage along Gala Drive.
• Chair Slater asked Mr. Seward to consider noise remedies for the HVAC units. Mr.
Seward stated that the units are small and very efficient, so there haven’t been any
considerations for noise reduction.
• Vice Chair Rosado asked if there were plans to screen the roof top equipment on the
clubhouse. Mr. Seward stated that there will not be any roof equipment.
• Vice Chair Rosado asked about the plans for roof vents. Mr. Seward stated that he is
currently looking at the options to cluster or go out the side walls, and the goal is
keeping a clean roof.
• Diana Moffitt of 1515 Marigold, came up to the podium to express concerns about
crosswalk safety. Additionally, she expressed concerns over having enough personnel
to house an influx of people in the area.
J:\Community Development\Planning\MINUTES\2022 SPARC Minutes
3
May 8, 2024 SPARC Meeting Minutes
Page 4 of 4
• Vice Chair Rosado asked if the park would be utilized for storm water management.
Mr. Seward came back up to the podium to answer the question and stated that there
is no storm water management required for the site.
Public Portion of Hearing Closed
MOTION / VOTE:
The Site Plan and Architectural Review Committee on motion of Member Donaldson,
second by Member Hamilton, finds that the project is exempt from the California
Environmental Quality Act (CEQA) pursuant to Section 15332, and adopt a resolution
approving the proposed project for a new apartment complex at 2925 Gala Drive, subject
to the Conditions of Approval in the draft resolution. The motion carried by the following
vote:
Ayes: Members - Donaldson, Hamilton, Vice Chair Rosado, and Chair Slater
Noes: Members -
Absent: Members - Diehl
5. REGULAR BUSINESS
Director Della Monica advised the Committee that there will be a regular meeting on May 22,
2024.
Chair Slater asked for any updates on the Lakehouse Project. Director Della Monica gave a
brief update regarding the traffic concerns on the project.
6. COMMENTS BY SPARC MEMBERS AND STAFF
Chair Slater stated that he will be traveling to Germany, likely in late July and August.
7. ADJOURNMENT
There being no further business to come before the Site Plan and Architectural Review
Committee, the meeting was adjourned at 6:16 p.m.
ATTEST:
Lorie Waters
Administrative Assistant
J:\Community Development\Planning\MINUTES\2022 SPARC Minutes
4
Item 4a.
CITY OF LODI
SITE PLAN AND ARCHITECTURAL REVIEW
COMMITTEE
Staff Report
MEETING DATE: May 22, 2024
APPLICATION NO: PL2024-004
REQUEST: Request of Site Plan and Architecture Review Committee (“SPARC”) for
approval of the construction of a two-story triplex at 425 East Lodi Avenue
(Applicant: Octavio Gonzalez; File Number: PL2024-004 SP; CEQA
Determination: Exempt Per CEQA Guidelines Section 15332)
LOCATION: 425 East Lodi Avenue
Lodi, CA 95240
APN: 043-130-25
APPLICANT: Octavio Gonzalez
124 Chestnut Street
Lodi, CA 95240
PROPERTY OWNER: Same as Applicant
RECOMMENDATION
Staff recommends the Site Plan and Architectural Review Committee approve SPARC Review PL2024-
004, subject to the proposed conditions of approval, included in Attachment A hereto.
PROJECT / AREA DESCRIPTION
General Plan Designation: Mixed Use Corridor
Zoning: Mixed Use Corridor (MCO)
Property Size: 0.13 acres (5,525 square feet)
SUMMARY
The applicant, Octavio Gonzalez (“Applicant”), proposes to construct a new two-story triplex (“Project”)
that will replace an existing single-family residence at 425 East Lodi Avenue, Lodi, California, 95240
(“Site”). The Project will have a residential unit and covered parking spaces on the first floor and two
residential units on the second floor. In the rear of the Site there will be a driveway, landscaping and
parking.
Per the Lodi Municipal Code (“LMC”) Zoning regulations, the Project requires approval of a site plan and
architectural review by the Site Plan and Architectural Review Committee.
1
357890.1
Gonzalez Triplex
May 22, 2024
Page 2 of 18
BACKGROUND
The following sections describe the Site and its setting:
• Site Location Map
• General Plan and Zoning
• Existing Conditions
Figure 1: Site Location Map
General Plan and Zoning
The General Plan designation for the Site is Mixed Use Corridor and the zoning district is Mixed Use
Corridor (MCO). In the MCO zoning district, triplexes are allowed by right.
357890.1
Gonzalez Triplex
May 22, 2024
Page 3 of 18
Table A: Adjacent General Plan, Zoning Designations and Land Uses (1)
General Zoning Classification Existing Land
Plan Use
North Medium Residential Medium Density (RMD) Single-Family
Density Residential
Residential
South Mixed Use Mixed Use Corridor (MCO) Single-Family
Corridor Residential
East Mixed Use Mixed Use Corridor (MCO) Single-Family
Corridor Residential
West Mixed Use Mixed Use Corridor (MCO) Single-Family
Corridor Residential
Project Mixed Use Mixed Use Corridor (MCO) Single-Family
Site Corridor Residential
Figure 2: Lodi General Plan Designation – Mixed Use Corridor
MEDIUM DENSITY
RESIDENTIAL
MIXED USE
CORRIDOR
357890.1
Gonzalez Triplex
May 22, 2024
Page 4 of 18
The Mixed Use Corridor General Plan land use designation is described as follows:
Mixed Use Corridor: The Mixed-Use Corridor classification includes a variety of office and general
commercial uses, as well as low-, medium-, and high-density residential along the city’s major
corridors: Kettleman and Cherokee Lanes and Lodi Avenue. This category allows for somewhat more
intensive development along these corridors to take advantage of vacant and underutilized sites and
provide shopping and services to residents in highly accessible corridors. The maximum FAR for this
designation is 1.2.
Figure 3: Zoning – Mixed Use Corridor (MCO)
RESIDENTIAL MEDIUM
DENSITY (RMD)
MIXED USE
CORRIDOR (MCO)
The Mixed Use Corridor zoning district is described as follows:
The MCO zoning district is applied along the city's major corridors: Kettleman and Cherokee
lanes and Lodi Avenue. This category provides for a variety of office and general commercial
uses, as well a low-, medium-, and high-density residential. The maximum FAR is 1.2. The MCO
zoning district is consistent with the mixed use corridor land use designation of the general plan.
Existing Conditions
The Site is currently developed with a single-family residence and accessory structures behind the
residence. One can access the Site from East Lodi Avenue and an alleyway adjacent to the Site’s rear
property line. The Site is in a predominantly single-family residential area with small businesses
interspersed among residences.
357890.1
Gonzalez Triplex
May 22, 2024
Page 5 of 18
Aerial photos and street views of the Site are shown below.
Figure 4: Existing Site and Vicinity Aerial View
South Central Ave.
South Garfield St.
357890.1
Gonzalez Triplex
May 22, 2024
Page 6 of 18
Figure 5a: View of Project Site from the South (Across East Lodi Ave.)
Figure 5b: View to the South from Project Site
357890.1
Gonzalez Triplex
May 22, 2024
Page 7 of 18
Figure 5c: View to the East from Project Site
Figure 5d: View to the West from Project Site
PROPOSED PROJECT
The Applicant proposes to construct a new two-story triplex on a 5,525 square foot parcel. The Project
will have a residential unit and three parking spaces on the first floor and two residential units on the
second floor. In the rear of the Site there will be a driveway and two additional parking spaces.
357890.1
Gonzalez Triplex
May 22, 2024
Page 8 of 18
Site Plan
The site plan below shows the Project layout. The triplex’s façade will be oriented toward East Lodi
Avenue and will have a front yard setback of 10 feet. This building will cover approximately 45 percent of
the parcel. To the rear of the triplex will be a driveway that will connect the parking spaces within the
main building with an alleyway. There will also be two parking spaces adjacent to the driveway with one
space at the northwest corner of the parcel and another space at the northeast corner. There will be no
vehicular access into the Site from East Lodi Avenue but there will be pedestrian access.
Figure 6: Proposed Site Plan
357890.1
Gonzalez Triplex
May 22, 2024
Page 9 of 18
Floor Plans and Roof Layout
Figures 7a, 7b and 7c below show the Project floor plans and roof layout. The Project will have two stories
with a 909 square foot residential unit and three parking spaces on the first floor and two 1,017 square
foot residential units on the second floor. Each of the residential units will have a kitchen, two bedrooms,
a bathroom, a living room, and a dining room. The roof layout includes HVAC screening consisting of
solid walls.
Figure 7a: Floor Plan – Ground Floor
357890.1
Gonzalez Triplex
May 22, 2024
Page 10 of 18
Figure 7b: Floor Plan – Upper Floor
Figure 7c: Roof Layout
357890.1
Gonzalez Triplex
May 22, 2024
Page 11 of 18
Building Elevations
The exterior façade of the Project facing East Lodi Avenue will be articulated with a number of elements.
There will be three pitched roofs facing the street – the main roof, one roof over one of the windows on
the first floor, and the roof over the porch area. The building entrance will be accented with a roof and
columns that will comprise an entry porch area. There will be variation in building materials and siding
orientation with the use of ledgestone for the foundation, exterior vertical siding for the first floor and
horizontal siding for the second floor. There will also be variation in colors with light green used for the
first floor and beige for the second floor. The dark brown frames around the door and windows will
contribute to color variety.
Like the front elevation, the rear elevation will differentiate the floors by using different colors and the
windows will have dark brown frames. The wall facing the alleyway will be setback behind the covered
parking spaces. Within this wall, there will be two doors providing access to stairwells that lead up to the
residential units on the second floor. The parking spaces will be open carports (no garage doors). The
east elevation will be articulated with windows, a door, and an opening to the carports. The west elevation
will have windows and an opening to the carports.
Elements that will be used for all four sides of the triplex include the ledgestone foundation, windows with
dark brown frames, and a dark brown horizontal board (“belly wrap”) that adds further delineation between
the first and second floors.
Figure 8a: South Elevation (Front of Triplex), View from East Lodi Avenue
357890.1
Gonzalez Triplex
May 22, 2024
Page 12 of 18
Figure 8b: North Elevation (Rear of Triplex, View from Alleyway
Figure 8c: East Elevation
357890.1
Gonzalez Triplex
May 22, 2024
Page 13 of 18
Figure 8d: West Elevation
Figure 8e: Finishes
357890.1
Gonzalez Triplex
May 22, 2024
Page 14 of 18
Landscaping
The Project includes landscaping within the front yard setback and adjacent to the parking lot in the rear
of the Site (See Figure 6 – Proposed Site Plan). Within the front yard, there will be two street trees
(maple) and foundation shrubbery. Within the rear of the Site there will be landscape strips adjacent to
the side property lines. There will also be two shade trees and four galvanized horse troughs with mixed
perennials within the landscape strips.
ANALYSIS
The following sections address several topics associated with the Project:
• Compliance with Zoning District Development Standards
• Architecture and Landscape Design
• Landscaping and Site Improvements
• Parking
Staff’s analysis of these issues is provided below.
Compliance with Development Standards
Table B below shows the Project’s compliance with the development standards of the MCO zoning
district.
Table B: Compliance with LMC Development Standards
for MCO Zoning District
LMC Proposed Compliance
Standard Project
Setbacks
Front 10 feet 10 feet Yes
Side 5 feet 5 feet Yes
Rear 10 feet 45 feet Yes
Side Street NA NA NA
Site Coverage 1.20 0.50 Yes
Height Limit Max 4 Stories 25.5 feet Yes
or 60 feet
Min 15 feet
Parking 2 Spaces Per 5 Spaces Yes with
Unit (3 Covered) Administrative
(1 Covered) Deviation
Architectural and Landscape Design
The mixed-use corridor design guidelines for development within MCO zoning district cover a variety of
topics, including:
• Site Planning
• Building Placement
357890.1
Gonzalez Triplex
May 22, 2024
Page 15 of 18
• Building Orientation
• Building Design and Architecture
• Articulation and Detail
• Roofs
• Building Materials and Colors
• Windows
• Plazas
• Parking and Circulation
• Landscaping
• Lightning
• Signage and Gateways
• Walls
• Equipment, Service Area, and Refuse Screening
In Staff’s opinion, the Project meets the intent of the mixed use corridor design guidelines listed in LMC
Section 17.22.070 and is a well-designed project.
The Project building has a variety of colors and materials with all sides well-articulated with windows,
contrasting materials and colors.
Parking and Vehicle and Pedestrian Access
According to Table 3-1 of LMC Section 17.32.040, two-bedroom multifamily units require two parking
spaces (one covered, one uncovered). Because the Project will have three residential units, at least three
covered spaces and three uncovered spaces are required. The Project proposes five parking spaces with
three covered parking spaces and two uncovered. Thus, there is a shortage of one uncovered parking
space. However, the Community Development Director will grant an administrative deviation to allow the
Project to have five spaces instead of the required six spaces. LMC Section 17.40.050 allows an
administrative deviation of up to 25 percent (up to two parking spaces) from parking standards.
Vehicular access will be via an alleyway adjacent to the rear property line of the Site. There will be
pedestrian access into the Site from East Lodi Avenue (See Figure 6 – Proposed Site Plan).
FINDINGS
The LMC Section 17.40.020 E requires that the SPARC make the following findings in order to approve
a site plan and architectural review application:
1. The design and layout of the proposed project would:
a. Be consistent with the development and design standards/guidelines of the applicable zoning
district;
b. Not interfere with the use and enjoyment of neighboring existing or future developments, and not
create traffic or pedestrian hazards;
c. Maintain and enhance the attractive, harmonious, and orderly development contemplated by this
development code; and
357890.1
Gonzalez Triplex
May 22, 2024
Page 16 of 18
d. Provide a desirable environment for its occupants, neighbors, and visiting public through good
aesthetic use of durable materials, texture, and color.
2. The proposed development:
a. Would not be detrimental to the public health, safety, or welfare or materially injurious to the
properties or improvements in the vicinity; and
b. Has been reviewed in compliance with the California Environmental Quality Act (CEQA) and the
Lodi Environmental Review Guidelines.
Staff believes that SPARC can make the required findings and determination as described below:
1a. The design and layout of the proposed project would be consistent with the development and design
standards/guidelines of the applicable zoning district;
Analysis: The Project complies with the LMC development standards of the MCO zoning district,
including setbacks, minimum and maximum height, site coverage, and parking (with an administrative
deviation).
1b. The design and layout of the proposed project would not interfere with the use and enjoyment of
neighboring existing or future developments, and not create traffic or pedestrian hazards; and
Analysis: The Project will not create any known impediments to surrounding developments.
1c. The design and layout of the proposed project would maintain and enhance the attractive,
harmonious, and orderly development contemplated by this development code; and
Analysis: The Project’s design, colors, and materials are appropriate for the type of building, and meet
or exceed the City’s design expectations as listed in LMC Section 17.22.070. The materials and colors
reflect a high level of design and quality.
1d. The design and layout of the proposed project would provide a desirable environment for its
occupants, neighbors, and visiting public through good aesthetic use of durable materials, texture,
and color.
Analysis: The Project includes colors consistent with the type of building used for the proposed use,
and would be constructed with durable materials and finishes.
2a. The proposed development would not be detrimental to the public health, safety, or welfare or
materially injurious to the properties or improvements in the vicinity; and
Analysis: There is no evidence in the record to suggest that the Project buildings would result in any
detriments to public health, safety, or welfare. The Project has been designed to be consistent with
the design guidelines of the LMC and will be reviewed for compliance with building and other codes
and requirements.
2b. Has been reviewed in compliance with the California Environmental Quality Act (CEQA) and the Lodi
Environmental Review Guidelines.
357890.1
Gonzalez Triplex
May 22, 2024
Page 17 of 18
Analysis: The Project is exempt from environmental review per CEQA Guidelines Section 15332, as
discussed below.
ENVIRONMENTAL REVIEW
The proposed Project meets the criteria for a Class 32 exemption per CEQA Guidelines section 15332.
CEQA defines projects in Class 32 as follows:
“Class 32 consists of projects characterized as in-fill development meeting the conditions described in
this section.
(a) The project is consistent with the applicable General Plan designation and all applicable General Plan
policies as well as with applicable zoning designation and regulations.
(b) The proposed development occurs within City limits on a project site of no more than five acres
substantially surrounded by urban uses.
(c) The project site has no value as habitat for endangered, rare, or threatened species.
(d) Approval of the project would not result in any significant effects relating to traffic, noise, air quality,
or water quality.
(e) The site can be adequately served by all required utilities and public services.”
The Project meets all the conditions listed for a Class 32 exemption:
a) The Project is consistent with the Lodi General Plan as Mixed Use Corridor is a land use category
that provides for triplexes. The MCO zoning district permits the Project’s proposed use by right.
b) The Site is within the City, surrounded by existing development, and less than five acres in size.
c) The Site is a developed parcel surrounded by development, and contains no known habitat for wildlife
species.
d) The Project is not expected to result in any traffic, noise, air quality, or water quality impacts. The
types of uses expected to occur at the proposed Project are typical of buildings in the Mixed Use
Corridor zoning district, and would not generate significant levels of traffic, noise, or other impacts.
e) The Site is served with all needed utilities by the City and other agencies.
CONDITIONS OF APPROVAL
Staff’s recommended conditions of approval for the Project are included in Attachment A of this report.
STRATEGIC PRIORITY ADDRESSED:
5.A. Infrastructure: Community Development: Examine both public and private underutilized or vacant
property City wide and consider approaches for achieving highest and best use, including policy or
zoning modifications, for Council’s consideration.
357890.1
Gonzalez Triplex
May 22, 2024
Page 18 of 18
PUBLIC HEARING NOTICE
Legal Notice for this item was published in the Lodi News Sentinel on Saturday, May 11, 2024. Fifty-five
(55) Public Hearing Notices were sent to all property owners of record within a 300-foot radius of the
Project Site as required by California Govt Code §65091(a)(4) and LMC Section 17.74.020.
Public notice also was mailed to interested parties who expressed their interest of the Project.
RECOMMENDED MOTION
Staff recommends that the SPARC approve Site Plan and Architectural Review PL2024-004, subject to
the attached Conditions of Approval.
Should the Committee agree with Staff’s recommendation, the following motion is suggested:
“I move that the Site Plan and Architectural Review Committee find that the proposed Project is exempt
from CEQA per CEQA Guidelines Section 15332, and approve site plan and architectural review for a
triplex located at 425 East Lodi Avenue, File Number PL2024-004, subject to the Conditions of Approval.”
ALTERNATIVE SPARC ACTIONS
• Approve the request with attached or alternate conditions
• Approve the Project with revisions
• Deny the Project
• Continue the item to a future SPARC meeting
Respectfully submitted,
Tim Kohaya John R. Della Monica Jr.
Associate Contract Planner Community Development Director
ATTACHMENTS:
A. Detailed Site Plans and Design Elements
B. Proposed Conditions of Approval
357890.1
ATTACHMENT A
FLOOR PLAN
FLOOR PLAN
GONZALEZ
FRONT ELEVATION
ROOF LAYOUT
SITE
REAR ELEVATION
GONZALEZ
RIGHT ELEVATION
LEFT ELEVATION
GONZALEZ
GONZALEZ
ATTACHMENT B
CONDITIONS OF APPROVAL
PROJECT NO. PL2024-004 SP
Site Plan and Architectural Review for the Development
of a Triplex at 425 East Lodi Avenue
APN: 043-130-25
Project No. PL2024-004 SP– Site Plan and Architectural Review for the development of a new
triplex (“Project”) at 425 East Lodi Avenue, Lodi, California, 95240 (“Site”). The Project applicant
is Octavio Gonzalez, at 124 Chestnut Street, Lodi, California, 94240 (“Applicant”).
PLANNING DIVISION
General Conditions
1. The Applicant shall sign below verifying the “Acceptance of the Conditions of Approval” and
return the signed page to the Lodi Planning Division. Project approval is not final until a signed
copy of these conditions is on file with the City.
By signing my name electronically in the space provided, I intend to authenticate my receipt
and acknowledgment of the Conditions of Approval for Project No. PL2024-004 SP and agree
that my electronic signature has the same force and effect as a manual handwritten signature
for purposes of validity, enforceability, and admissibility.
Applicant Signature Print Name Date
2. The Applicant, Property Owner, and/or any successor(s) in interest shall, jointly and severally,
indemnify, protect, defend, and hold harmless the City, and/or any of its officials, officers,
employees, agents, departments, agencies, and instrumentalities thereof, from any and all
claims, demands, law suits, writs of mandamus, and other actions and proceedings (whether
legal, equitable, declaratory, administrative, or adjudicatory in nature), and alternative dispute
resolutions procedures (including but not limited to arbitrations, mediations, and other such
procedures) (collectively “Actions”), brought against the City, and/or any of its officials,
officers, employees, agents, departments, agencies, and instrumentalities thereof, that
challenge, attack, or seek to modify, set aside, void, or annul any action of, or any permit or
approval issued by, the City and/or any of its officials, officers, employees, agents,
departments, agencies, and instrumentalities thereof (including actions approved by the
voters of the City), for or concerning the Project, whether such Actions are brought under the
California Environmental Quality Act (CEQA), the Planning and Zoning Law, the Subdivisions
Map Act, Code of Civil Procedure Section 1085 or 1094.5, or any other state, federal, or local
statute, law, ordinance, rule, regulation, or any decision of a court of competent jurisdiction. It
is expressly agreed that the City shall have the right to approve, which approval will not be
unreasonably withheld, the legal counsel providing the City’s defense, and that Applicant,
Property Owner, and/or any successor(s) in interest shall reimburse City for any costs and
expenses directly and necessarily incurred by the City in the course of the defense. City shall
promptly notify the Applicant, Property Owner, and/or any successor(s) in interest Applicant,
Property Owner, and/or any successor(s) in interest of any Action brought and City shall
cooperate with Applicant in the defense of the Action.
357891.1 1
3. The Project shall be developed in accordance with the Site Plan and Architectural Review
approved by SPARC on May 22, 2024, including the approved Site plan, architectural
elevations, etc. The Applicant may only request modifications or revisions to the approved
Project as outlined in the Lodi Municipal Code (“LMC”) Title 17, Articles 2 and 3.
4. This Project approval does not include signage. All Project signs shall be subject to separate
review and approval by the Lodi Planning Department to ensure compliance with the sign
regulations in the LMC Title 17.
5. The Project plans shall ensure that any rooftop mechanical equipment is screened by the
parapet as visible from the street.
Prior to Issuance of Building Permit
6. The Applicant shall submit landscape plans which are in substantial conformance with the
Project plans as approved by the SPARC, and shall be submitted to, and approved by, the
Community Development Department Director.
a. A landscape architect licensed by the State of California shall prepare the Project plans
(the “Project Landscape Architect”).
b. All Project landscape and irrigation plans shall be consistent with the requirements of
LMC Chapter 17.30, Landscaping, and any other applicable codes and requirements.
7. The Project landscape plan submittal shall include the following:
a. Complete Project title and address.
b. Square footage of on-site landscape (and off-site where applicable).
c. Plan preparation date.
d. City of Lodi Project number PL2024-004 SP shall be shown on all plans.
e. Match lines, limit lines, property lines, and Project limit lines.
f. The following items need to be located on the landscape plan and a detail identifying
them: walls, fences, easements, right-of-way, street names, and building footprint(s).
g. Dimensioned setbacks for all buildings and parking areas.
h. All existing trees and major shrubs, indicating whether they are to remain or be
removed.
i. Owner/developer name, address, telephone number, facsimile number, Project
manager's name, email.
j. Planting Plans and Irrigation Design Plans shall be prepared by the Project Landscape
Architect licensed by the State of California. The licensed Project Landscape Architect
shall sign the plans verifying that the plans comply with this City of Lodi Water Efficient
Regulations. Include Project Landscape Architect’s name, registration number,
address, telephone number, and email.
357891.1 2
k. Provide intended irrigation approach/written statement of the type of irrigation design
approach and equipment intended to be utilized for the subsequent construction plans.
l. Plant legend, including the following:
• Botanical Name
• Common Name
• Container Size
• On-center spacing (not required for trees)
• WUCOLS rating (very low, low, moderate, high)
m. A note that all exposed surfaces of non-turf areas (soil area) within the landscape area
shall be identified to receive a minimum of 3-inch layer of mulch.
n. Notes, details, and specifications shall be included.
o. Landscape plans shall be drawn at a scale of 20 feet equal to 1 foot or larger.
p. Trees shall be installed at a minimum 24-inch box size.
Prior to Issuance of Final Certificate of Occupancy
8. All required landscaping and irrigation systems shall be installed in accordance with the plans
approved by SPARC. If the Project Landscape Architect has inspected the landscaping, the
Project Landscape Architect shall provide the City with a Certificate of Compliance stating that
the landscaping was installed per the approved Project plans. The City will review the approved
plans, and Certificate of Compliance, if applicable, and conduct inspections to ensure that the
installation is in compliance with the approved plans.
BUILDING DIVISION
1. The construction of the new buildings and related Site improvements shall require building
permits. All plan submittals shall be based on the City of Lodi Building Regulations and
currently adopted 2022 California Building Code (“2022 CBC”). Please review our policy
handouts for specific submittal procedures.
2. All buildings and structures shall have the required fire separation distance separation to the
property lines and other structures as specified by the 2022 CBC, Table 705.5 or shall provide
the required fire rated protection of walls, limitations of protected and unprotected openings for
each structure, as per 2022 CBC, Sections 705.3, 705.5, 705.8, 705.11, 716, Tables 601, 705.5,
705.8 and 716.1(2).
3. Fire rated separation may be required between different occupancies in the building as per 2022
CBC, Section 508.4 and Table 508.4
4. Plans shall show fire rated separation between sleeping units in accordance with 2022 CBC,
Section 708 and fire rated horizontal assemblies between the floors separating residences in
accordance with Section 711. 2022 CBC, Section 420
357891.1 3
5. Plans shall provide occupancy load calculations for each area of each building based on square
footage and the applicable occupant load factor from Table 1004.5. 2022 CBC, Section 1004.5
6. Site Plan to show all building entrances and ground level exits shall be connected on an
accessible route to other buildings on the Site, public transportation stops, accessible parking
and passenger loading zones and to public streets and sidewalks. 2022 CBC, Sections 11B-
206.4.1, 11B-404, 11B-Division 4
7. Plans to specify walkways and sidewalks along accessible routes of travel (1) are continuously
accessible, (2) have maximum 1/2" changes in elevation, (3) are minimum 48" in width, (4) have
a maximum 2% cross slope, and (5) where necessary to change elevation at a slope exceeding
5% (i.e., 1:20) shall have ramps complying with 2022 CBC, Section 11B-405 or 11B-406 as
appropriate. (6) Circulation paths contiguous to vehicular traffic shall be physically separated
from vehicular traffic. Vehicular traffic includes travel through parking facilities, into and out of
parking spaces, into and out of electrical vehicle charging spaces, and along roadways,
driveways and drive aisles. Physical separation shall be provided with circulation paths raised
4” minimum above the area where vehicular traffic occurs.
8. Plans to specify and show accessible parking spaces in compliance with 2022 CBC, Sections
11B-208.2, 11B-502 and Table 11B-208.2. At least one space shall be van accessible as per
2022 CBC, Section 11B-208.2.4.
Provide complete and adequate accessible parking details to specify and show:
a. A 9’ wide x 18’ deep accessible parking space(s) with 5’ wide striped access aisle.
“Van accessible” parking spaces shall be a minimum 12’ wide x 18’ deep with a 5’
wide access aisle or 9’ wide with an 8’ wide access aisle. 2022 CBC, Section 11B-
502.2
b. The access aisle(s) may be located on either side of the accessible parking space(s),
except “van accessible” parking spaces shall have the access aisle located on the
passenger side of the accessible parking space. Two accessible parking spaces
shall be permitted to share a common access aisle. 2022 CBC, Sections 11B-
502.3.4, 11B-502.3
c. The access aisles shall be marked with a blue painted borderline around their
perimeter. The area within the blue borderlines shall be marked with hatched lines a
maximum of 36” on center in a color contrasting with the aisle surface, preferable
blue or white. The words “NO PARKING” shall be painted in 12” high white letters in
each access aisle. 2022 CBC, Section 502.3.3
d. The accessible parking spaces and the access aisles shall not exceed 2% cross
slope in any direction. 2022 CBC, Section 11B-502.4
9. Plans to specify location and provide complete and adequate details of the following required
parking signage:
a. "Unauthorized vehicles..." signs at all driveway entrances, or located adjacent to and
visible from each accessible parking space. Indicate on the plans that the sign shall be
filled out with the correct appropriate information to become a permanent part of the sign
(Lodi Police Department, 209-333-6725). 2022 CBC, Section 11B-502.8
357891.1 4
b. Specify permanently posted reflectorized parking space identification sign at each
accessible parking space, 70-sq. inches in area, and mounted a minimum of 60" (80”
when located in the path of travel) from bottom of sign to paving. Provide a "van
accessible" sign at appropriate parking spaces. The sign may also be posted on a wall
at the interior end of the parking space at a height of 36" above the finished walk or grade.
An additional sign below the symbol of accessibility shall state “Minimum Fine $250”.
2022 CBC, Section 11B-502.6
c. Specify pavement-marking symbols at each accessible parking space. 2022 CBC,
Section 11B-502.6.4
10. Provide long and short-term bicycle parking as required by 2022 CGBS, Section 5.106.4.1.1.
11. The Fire Sprinkler system shall be submitted under a separate permit and cover to the Building
Department by a C-16 licensed contractor.
12. A manual fire alarm and a smoke detection system is required by 2022 CFC, Sections
907.2.9.1 & 907.2.9.2. The Fire Alarm and Smoke Detection System shall be submitted under
a separate permit and cover to the Building Department by a C-10 licensed fire alarm
contractor.
13. All automatic sprinkler systems shall require a fire department connection (FDC) in a
location approved by the Fire Chief. On Site FDC’s shall be within 50 feet on a fire hydrant
unless placed along a public street within 20 feet of the property line. FDC’s shall be placed
on the same side of fire access roads as the fire hydrant. Plans to show the location of the
Fire Department Connection within the required distance to a hydrant.
14. Buildings that are to be protected by an automatic fire extinguishing system shall have an
approved fire control room. [LMC 15.20.180 & Lodi Fire Standard D-01] Plans shall include
a fire control room with the following:
a. Fire control rooms shall contain all fire sprinkler system control valves, fire alarm
control panels, extra fire sprinkler heads, and other fire equipment required by the
Chief.
b. Fire control rooms shall be located within the building at a location approved by the
Chief, and shall be provided with a means to access the room directly from the
exterior with an approved door of minimum dimensions of 36” x 80”.
c. Durable signage shall be provided on the exterior side of the access door to identify
the fire control room. The sign shall indicate “FIRE CONTROL ROOM” with 3” tall
letters that contrast with their background.
d. Keys shall be located within an approved Knox® Company key box located adjacent
to the main entrance door on the exterior of the building at 6’ above finished floor.
Keys shall include keys for manual pull stations, fire alarm control panel, breakaway
locks for PIV, locks for OS &Y chains and exterior doors and essential rooms as
determined by the Chief.
e. Fire control rooms for commercial buildings shall be a minimum dimension of 5’ x 7’
not less than 35 square feet.
357891.1 5
f. The fire sprinkler riser shall be located at least 12” from any wall. Fire riser SHALL
NOT block doorway.
g. The fire equipment room may contain other building service equipment. This other
equipment shall not be within 3’ in front of any fire equipment in the room. Rooms
may be enlarged to share with other equipment such as electrical. However, rooms
may not be used as storage areas.
PUBLIC WORKS DEPARTMENT
1. Project design and construction shall be in compliance with applicable terms and conditions
of the City’s Stormwater Management Plan (SMP), and shall employ the Best Management
Practices (BMPs) identified in the SMP and the City’s Stormwater Development Standards
Plan. Some notable requirements include the following:
a. All roof drains shall be directed to a permeable area or an infiltration trench before
the stormwater enters the City of Lodi’s municipal stormwater system.
b. State-mandated, year-round construction site inspections to assure compliance with
the City of Lodi Storm Discharge Permit are required. The fee for the inspections is
the responsibility of the Applicant or Project developer.
2. Submit Project Stormwater Plan(s) for the Project in compliance with the Multi-Agency Post-
Construction Stormwater Standards Manual as adopted by City Council on November 4,
2015, if adding or removing and replacing at least 2,500 square feet of impervious surface.
3. The developer shall dedicate all PUEs required by the various utility companies and the City
of Lodi. All property dedicated to the City of Lodi shall be free and clear of all liens and
encumbrances and without cost to the City of Lodi and free and clear of environmental
hazards, hazardous materials or hazardous waste.
4. All property lines and proposed Public Utility Easements (PUEs) shall be shown and clearly
identified on Project plans. No structures shall cross property lines or be located inside City
Right-of-Way (ROW) or PUEs.
5. Per City of Lodi Design Standards Section 2.4 and 4.4 the City allows one water and
wastewater service per parcel. Existing water, wastewater, and storm water services to the
parcel(s) shall be utilized for this Project, if possible. Otherwise the developer is responsible
to abandon any excess/unused connections and install new service connections to the
public facilities at the developer’s expense.
6. If fire service is needed it shall be installed according to the City of Lodi Design Standards §
4.403.
7. All backflow preventers installed with this Project (Reduced Pressure Backflow Device
Assemblies per City of Lodi Standard Plan 413) shall be certified by the property owner prior
to final inspection. Test reports will only be accepted from a tester on the City’s approved
list.
8. Project onsite parking shall be designed in conformance with City of Lodi Standard Plan
134.
357891.1 6
9. All walls, fences, buildings, landscaping shall be installed in conformance with the site
distance requirements specified in Section 1.303 of the City of Lodi Public Improvement
Design Standards.
10. Project irrigation plans and plantings shall conform to the Model Water Efficient Landscaping
Ordinance (MWELO) per the Governor’s Executive Order B-29-12 adopted on December 31,
2015, if the proposed landscape area is larger than 500 square feet.
11. Any private trees proposed within 5 feet of public sidewalk shall be selected from the City’s
approved street tree list and be planted per City of Lodi Standard Plan 140.
12. As required by the California Green Building Code, the Project shall participate in the
Construction and Demolition Recycling Program.
13. Remove and replace all damaged or non ADA-conforming curb, gutter, and sidewalk
fronting the parcel in conformance with City of Lodi Standard Plans, if applicable.
14. The Applicant/Project developer is responsible for ensuring that all Project design and
construction complies with the Americans with Disabilities Act (ADA).
15. Prior to any work within City ROW, PUEs, or on existing public water, wastewater, and storm
drain infrastructure, the Applicant shall obtain an encroachment permit issued by the City of
Lodi Public Works Department.
16. The Applicant and/or Project developer must obtain the following permits:
a. Building permit issued by the City of Lodi Building Department.
b. Encroachment Permit issued from the City of Lodi Public Works Department for any
work within City ROW, PUEs, or on existing public water, wastewater, and storm drain
infrastructure.
17. The Applicant and/or Project developer must pay the following fees prior to building permit
issuance unless noted otherwise:
a. Filing and processing fees and charges for services performed by City forces per the
Public Works Fee and Service Charge Schedule.
b. Installation of water and wastewater services by City Forces if property does not
have existing services or current services shall be upsized.
c. Abandonment of existing water and wastewater services by City Forces, if
applicable.
d. Water meter installation fees, if applicable.
e. Regional Transportation Impact Fee (RTIF).
f. Encroachment permit fees, if applicable.
g. PUE dedication fee, if applicable.
357891.1 7
h. County Facilities fees, if applicable.
i. Stormwater Compliance Inspection Fee prior to building permit issuance or
commencement of construction operations, whichever occurs first.
j. Post Construction Storm Water Plan Check fee.
k. MWELO Compliance Plan Check fee, if applicable.
18. The Applicant and/or Project developer must also pay the following fee prior to temporary
occupancy or occupancy of the building unless noted otherwise:
a. Development Impact Mitigation Fees per the Public Works Fee and Service Charge
Schedule.
(The fees referenced above are subject to periodic adjustment as provided by the
implementing ordinance/resolution. The fee charged will be that in effect at the time
of collection indicated above.)
19. Additional comments and conditions will be provided during the building permit review
process when more detailed plans are available.
357891.1 8
Get email alerts for Lodi
A daily email when new agendas and minutes are posted.