School Building Committee
Regular MeetingLowell, MA · September 6, 2018
Minutes
Office of the City Manager
City Hall ● 375 Merrimack Street ● Lowell, MA 01852
P: 978.674.4000 ● F: 978.970.4007
www.LowellMA.gov
Eileen Donoghue
City Manager
Kara Keefe Mullin
Assistant City Manager
School Building Committee MSBA Meeting
Meeting Minutes
Date: September 6, 2018
Time: 6:30 PM
Location: City Council Chambers
City Manager E. Donoghue called the meeting to order at 6:35 PM.
I. Attendance
Present: Eileen Donoghue, William Samaras, Edward Kennedy, Rodney Elliott, Connie Martin,
Conor Baldwin, Marianne Busteed, James Cook, David Cunningham, Jeannine Durkin, Jay
Mason, Maria Sheehy, Diane Tradd, Michael Vaughn, Richard Underwood (late arrival)
Also in attendance:
Skanska: Mary Ann Williams, Jim Dowd
Perkins Eastman: Joe Drown, Bob Bell, Dawn Guariello, Alicia Caritano
City: Kara Keefe Mullin, Elliott Veloso, Heather Varney, & Alex Magee
II. Updates Since last SBC Meeting 8/2/2018
A. Caritano began the discussion with the agenda and material related to existing conditions.
Current existing conditions assessment includes laser scanning of entire building to build a 3
dimensional model. The architectural team and cultural consultants are currently looking over
existing conditions, verifying how they compare to assumptions. The team noted that there have
also been numerous meetings with local stakeholders.
Preliminary massing and materials were presented by D. Guariello. The team have begun
massing and materials studies on a preliminary basis, to determine what the building could look
like. D. Guariello mentioned that while nothing is final, the team is interested in investigating the
scale of building and materials appearances. At end of schematic design, the team will be
utilizing design palette to help inform the City on budgetary decisions.
The presentation illustrates the images produced thus far, including the existing site shown with
new building overlay. D. Guariello stated that Perkins Eastman is focusing on the envelope
improvements to existing structures. The slides serve inspirational purposes, to assist with
forming an idea of how the building may appear. One illustration focusing on the Freshman
Academy from the street has a depiction of the communal space for students on the first floor. J.
Mason questioned the vertical bar on outside of building; D. Guariello stated that is a stairwell
that will be featured with lighting from outside. Light wells allow natural light to permeate
spaces, especially communal spaces like the gym. A look at the green space is given from
perspective of Freshman Academy, as well as the front entry, were also provided. While the
physical appearance of the school is still being designed, the team noted that there may be a
desire to tie in the existing building to new building with the use of certain materials.
W. Samaras inquired to the gymnasium being a temporary structure, and if this would have the
same quality. D. Guariello stated that the gym was depicted as a prefabricated structure, which
only notes how the building is constructed; it does not take away from any quality or useful life.
She continued, noting that the gymnasium will be designed to last for over 50 years, and will not
sacrifice durability. B. Bell noted that the structure would be built to last, but could be assembled
quicker. Custom buildings can become extremely expensive; while many modern construction
projects are completed this way. W Samaras stated that he has not seen high level of quality in
prefabricated work. E. Kennedy noted his concerns, primarily the durability of prefabricated
structures vs. other traditional buildings. D. Guariello noted that there are potential limiting
issues aside from cost differences between the types of structures. J. Drown mentioned cost and
construction issues. The team will be investigating determining if the system is appropriate for
this application and if it is the best solution for the project. E. Kennedy clarified his question of
space vs. life of building; asking which last longer and what the cost differences are. J. Drown
noted that a hybrid may be the best solution for duration and durability standpoint. D. Guariello
stated that this decision is important and may need to be made relatively quickly. A. Caritano
mentioned upcoming meetings that will include other system introductions and decisions that
may include some more information on the fieldhouse. Examples of similar buildings with some
prefabricated designs include Rhode Island and Chelsea. J. Mason commented about design, cost
and prefabricated cost and benefits.
D. Guariello noted that the team’s design incorporates an extremely durable base, which is
needed in all schools in New England. This will help with wear and tear of snow removal, which
can be solved with brick and stone. D. Guariello mentioned that softer materials will be used on
higher exterior elevations. D. Tradd inquired to the costs of materials. D. Guariello noted that
most are within a $45-65 per sq. foot range. D. Guariello stated that the team is looking to find a
Office of the City Manager
City Hall ● 375 Merrimack Street ● Lowell, MA 01852
P: 978.674.4000 ● F: 978.970.4007
www.LowellMA.gov
Eileen Donoghue
City Manager
Kara Keefe Mullin
Assistant City Manager
way to blend a modern and historical appearance while reflecting the era in which it is built. She
also mentioned that the design will attempt to utilize 24% glass exterior for sustainability
reasons. E. Donoghue asked if the sketches can be modified to include different materials on the
different buildings to achieve a better understanding of appearance. D. Guariello will showcase
some materials on buildings later in presentation.
D. Guariello brought sample materials with different combinations of colors available. Materials
include brick, fiber cement, wall panels, stone, metallic panels, glass, etc. W. Samaras asked
about the cost and durability of each. D. Guariello stated that the durability of materials would
depend on what is selected for the top portion of building as well. D. Guariello replied to prices,
noting that all materials shown are in a $45-65 range, which can be adjust slightly based on
design. D. Guariello noted the importance of the space behind the bricks. She noted that
materials have come a long way and are more durable and better quality than they used to be. E.
Kennedy noted that he did not like corrugated metal, mentioning how it deteriorates, and will
eventually look tired for the second half of its useful life. D. Guariello stated that the design
does not call for corrugated metal, that the plan can include brick or stone facade. E. Kennedy
asked for the price difference between the two and would want a compelling price difference in
order to go with corrugated metal.
III. Eminent Domain Updates by the City
E. Donoghue began the discussion on the eminent domain update. This process has been
progressing as required. The appraisers and relocation experts will be finishing work soon, which
includes giving proper notice to owners. E. Veloso noted that the City Council will vote on
notice of taking, in early October. He mentioned that there will be more of an update at the next
SBC meeting and they want the process to conclude by the time of the MSBA Board Meeting in
April of 2019.
IV. Next steps in preparation for SBC Meeting 10/4
A. Caritano noted next steps including meetings on 9/11/18 Sustainability priorities meeting
regroup, 9/18/18 and 9/20/18 focus group meetings with departments at the high school detailing
various spaces. On 9/25/18 the working group will meet to receive updates on information
discussed today as well as building systems. On 10/3/18 there will be a student forum to engage
students and faculty. The next SBC meeting will take place on 10/4/18.
D. Cunningham inquired to the back wall along canal, possibly creating a movie theater. He
asked if the team is working with different groups in city to use Lucy Larcom park. R. Bell stated
that yes, they are. He continued that the team is looking for the entire campus to be used as a
teaching tool/asset. D. Guarianello noted that the team met today with DPD staff and National
Parks Services to discuss the canal greenspace. E. Kennedy noted that he liked the idea for all
types of performances that many people can use, a small performance spaces will be great for
community. J. Mason inquired the systems and costs related to energy systems and their
associated costs. A. Caritano noted that they are still working on this, the plans are certainly not
final and are subject to budget and change. J. Cook commented on including DPD office. R.
Elliott asked if there will be air conditioning in the new buildings, which Perkins Eastman
answer is yes.
Motion to adjourn by E. Kennedy, second by D. Cunningham. Meeting adjourns at 7:37.
Notes taken by Alex Magee and certified by:
Agenda
Office of the City Manager
City Hall ● 375 Merrimack Street ● Lowell, MA 01852
P: 978.674.4000 ● F: 978.970.4007
www.LowellMA.gov
Eileen Donoghue
City Manager
Kara Keefe Mullin
Assistant City Manager
School Building Committee Meeting
Meeting Agenda
Date: September 6, 2018
Time: 6:30 PM
Location: City Council Chambers
I. Updates Since last SBC Meeting 8/02/18
• Additional Existing Conditions Investigations:
• Laser Scanning/ Existing Condition Computer Model
• Site visits Architecture and Structure
• Informational meetings with Lowell Planning & Development/
Historic and National Historic Parks
II. Preliminary Massing and Exterior Materials
III. Eminent Domain Updates by the City
IV. Next Steps in Preparation for SBC Meeting 10/1
• 9/11 Sustainability Priorities
• 9/18 & 9/20 LHS Focus Groups
• 9/25 Working Group: Updates Massing and Plans/ Building Systems/
Interior Materials
• 10/3 Student Forum