School Building Committee Meeting
Meeting Minutes
Date: December 9, 2021
Time: 5:00 PM
Location: Virtual Meeting – Zoom
School Building Committee Members Present: Eileen Donoghue, Mike Vaughn, Bill Samaras, Conor
Baldwin, Ed Kennedy, MaryAnn Manzi, Mike Fiato, Benjamin Opara, Christine Clancy, Joel Boyd, John
Leahy
City/School Staff Present: Kara Keefe Mullin, Phillip Geoffroy, Roxane Howe, Jill Rothschild, Hannah
Hession
Elected Officials Present: John Drinkwater
Perkins Eastman Staff Present: Joe Drown, Robin Greenberg
Skanska Staff Present: Maryann Williams, Jim Dowd
Suffolk Construction Staff Present: Rex Radloff, Pannha San Chung
Called to order 5:03 PM by E. Donoghue. Roll call showed 10 members. Mayor Leahy joined after roll
call to make a total of 11 members and 23 total present. Motion to accept previous meeting minutes
accepted by Kennedy and Samaras.
E. Donoghue: Asked R. Radloff for his presentation on construction progress and procurement.
R. Radloff: Reviewed the previous construction timeline of Phase 1: “Building the New Gymnasium”
from the demolition of 75 Arcand Drive, building the foundation, steel erection, and roofing from October
2020 to November 2021. Façade work, overhead mechanical, electrical, and plumbing (OH MEP), and
masonry work have all begun and are on-going. Finishes, gym equipment, and flooring will begin after
the new year with an expected building start-up and occupancy date of Summer 2022. He also presented
a photo “walk-through” of the gymnasium in its current condition. The procurement update included a
list of remaining subcontractor procurements for Phases 2-4. Suffolk is currently putting out to bid Phase
2-4 structural steel, curtainwall, metal panels, stage rigging and curtains, auditorium seating, fireproofing,
acoustical panels, and final cleaning. For the subcontractors on-site currently, Suffolk is meeting its
minority and women business enterprise (MBEs and WBEs) goals and workforce diversity goals. They
have awarded $13,021,408 total MBE/WBE contracts so far. 17,517 hours of work have been done by
107 people of color, 17 women, and 33 Lowell residents. This means that 25.4% of workers are POC,
4.1% are women, and 10.3 % of workers are Lowell residents.
Office of the City Manager
City Hall • 375 Merrimack Street • Lowell, MA 01852
P: 978.970.4000 • F: 978.970.4007
www.LowellMA.gov
Eileen M. Donoghue
City Manager
Kara Keefe Mullin
Assistant City Manager
E. Kennedy: If the gym is set to be finished next summer, will the high schoolers be able to use the gym
in the next school year?
R. Radloff: Yes. In the Fall of 2022, students will be able to use the gym.
E. Kennedy: Is the statistic of 25% of minorities and 10% of Lowell residents meeting the thresholds for
subcontractors?
R. Radloff: The minority workforce goal was 15.3% and there was no Lowell resident goal, but we are
always looking for ways to promote Lowell residents working on the job.
E. Kennedy: So with the minority workforce goal, we’re doing a lot better than the threshold?
R. Radloff: Yes, that’s correct.
W. Samaras: We have a lot of projects in the City that may need to be held back for periods of time due
to difficulties in obtaining steel right now. When discussing procurement, are you being more aggressive
in terms of procuring materials so we can ensure that the construction continues as planned?
R. Radloff: That is precisely what we are doing. Steel lead times have increased recently, so one of our
responsibilities is to work with Skanska and Perkins Eastman to monitor that and ensure that we are
procuring the next packages with ample time. We are in good shape with procurement and materials.
W. Samaras: What about the price?
R. Radloff: We have seen escalation in price of materials, but we are able to competitively bid these
packages and maintain the best value for the project.
E. Donoghue: You kept using the term CMU in your presentation. Can you explain what that is?
R. Radloff: CMU stands for Concrete Masonry Unit. It is a concrete block that is bigger than a regular
brick.
E. Donoghue: What is the demolition schedule of the field house? When is that expected to start?
R. Radloff: Right after the students are dismissed for summer break, we are looking to gain access to the
space and begin those efforts. The building won’t begin to come down for about a month after that.
E. Donoghue: Will it be down before the students are back in school?
R. Radloff: It will be on-going, but in a manner where we will be completely separated from the students.
We have no concern about taking down the building next to what will be the newly occupied gym.
E. Donoghue: It was nice to see a photo “walk-through” of what is going on behind the walls.
Office of the City Manager
City Hall • 375 Merrimack Street • Lowell, MA 01852
P: 978.970.4000 • F: 978.970.4007
www.LowellMA.gov
Eileen M. Donoghue
City Manager
Kara Keefe Mullin
Assistant City Manager
E. Kennedy: Looking at the photos is nice, but you can’t really get a sense of scope or size. Would it be
appropriate for this building committee to do a tour of the gym area? What would be a good time to do
that?
R. Radloff: We can certainly accommodate a walk-through for this committee at any time and would be
eager to do that. The springtime, when we are in the middle of our finishes, might be the best time
because the site will be mainly free of heavy equipment and you would have a better idea of the end
product. I will work with everyone here and set up a date.
E. Donoghue: Closing remarks, wished everyone a happy and healthy holiday. Meeting adjourned 5:36
PM. Moved by Kennedy and seconded by Samaras.
Agenda
City of Lowell – Office of the City Manager
375 Merrimack Street, Room 43 – Lowell, MA 01852
P: 978.674.4400 – F: 978.970.4044
www.LowellMA.gov
Eileen Donoghue
City Manager
Kara Keefe Mullin
Assistant City Manager
School Building Committee Meeting
Meeting Agenda
Date: December 9, 2021
Time: 5:00 PM
Location: Public Meeting Via Zoom
I. Accept Minutes of February 04, 2021 Meeting
II. Construction Progress Update
III. Procurement Update
IV. MBE/WBE and Workforce Plan
V. Next Steps