Arbor Committee
Regular MeetingMaple Grove, MN · September 9, 2021
Minutes
MAPLE GROVE ARBOR COMMITTEE
REGULAR MEETING MINUTES
SEPTEMBER 9, 2021
VIRTUAL ONLINE MEETING
7:00 PM
Call to Order The regular meeting of the Arbor Committee was called to
order by Chair Parenteau at 7:00 p.m.
Members Present Chair Mary Parenteau, Vice-Chair Frank Kampel, Sarah
Piket, Steve Courtney, Julie Gamber, Don Varney, Marilyn
Arnlund, Bob Henke, Cody Lensing and Mike Aasen.
Members Absent Ed Reichow
Also Present Jesse Corrow, Staff Liaison
Approval of Agenda Henke requested the addition of 3D T-shirt Discussion.
Motion Kampel, second Arnlund to approve the amended
agenda. Vote all ayes. Motion passed.
Approval of Minutes Kampel requested a grammatical error.
Motion Varney, second Henke to approve the minutes from
August 12, 2021. Vote all ayes. Motion passed.
Old Business
3A - Forest Management Corrow summarized the discussion from the previous
Plan Review meeting. The city has the GPS equipment to locate and map
the trail system, this should be done during leaf off. Kampel
and Henke volunteered to help locate the trails in the forest
preserve when the time comes. Corrow is working with a sign
company in order to install signage where the Forest
Preservation Area borders residential neighborhoods. Sign
locations were discussed and staff will try to begin installing
the signs this fall. The Committee would like to have a single
person or department to oversee and manage The Forest
Management Plan in the future. Kampel offered to revise the
shortened version of the Forest Management Plan document
ahead of the next committee meeting.
3B - Conservation Partners Corrow contacted the DNR grant coordinator and she thought
Legacy Grant the Forest Preservation Area would be a great candidate and
encouraged us to apply. Applications would be received
through May of 2022. The grant coordinator also
recommended applying for the $50,000 maximum amount
and the city would be reimbursed on the actual amount it
spends. The grant also requires a 10 percent match by the city
and Corrow mentioned that there is money available for this
type of activity. Arnlund, Aasen and Kampel will work on
writing the application. Corrow will forward example
applications that were provided by the DNR. A number of
possible grant activities were discussed that could be applied
to Forest Preservation Area.
3C – Fall Tree Festival Corrow reviewed the event planning that was covered during
the previous meeting and mentioned that a lot of the ground
work was already in place from last year’s event. Arnlund
and Council Member Hanson recently toured the Arboretum
and provided a list of 16 new trees for the tree tour and
Corrow will work on updating the map. Since some of the
selected trees did not have a plaque beneath it, a
corresponding number will be placed near each tree.
Scavenger hunt photos were provided by Piket and the
committee discussed tree identification. Piket and Lensing
will add information for each tree slide so they will be ready
for the website. Corrow will prepare the website and
Facebook page. Parenteau, Kampel and Henke will hang the
laminated signs on the scavenger hunt trees. Gift cards to
local nurseries will be awarded to the top three scavenger
hunt participants and the tree seedlings that were planted in
the gravel bed last spring will be available to all participants
on a first come, first served basis. Henke and Lensing
volunteered to hand out the tree seedlings on Saturday
October 9th between 9:00 – 11:00 A.M. Arnlund expressed
disappointment that approximately 75 tree seedlings had died
because of the poorly maintained irrigation system at the
gravel bed. Chair Parenteau will contact Joe Bennett about
the concern.
3D – T-shirt Discussion Henke has been in contact with a couple of t-shirt vendors
and was requesting additional input from the committee on
material, colors and design. The committee decided that one
shirt with a high visibility color could be used for the
buckthorn event and street cleanup, while a second shirt with
a more neutral color could be used other public events.
Committee members will send their shirt size and color
preference to Henke.
Area Reports Henke expressed disappointment that an article in the City
Focus magazine did not mention that T-zone can be easily
identified on the new city website resources.
Parenteau asked if there was any additional information from
staff pertaining to what Hennepin County Parks can do for the
city in the Forest Preservation Area. This information was
requested by the Mayor at the conservation easement
worksession. Staff will be responding to Parenteau.
Adjournment Motion Kampel, second Henke to adjourn the meeting at 8:11
p.m. Vote all ayes. Motion carried.
Respectfully submitted,
Jesse Corrow, Staff Representative
City of Maple Grove Arbor Committee
Agenda
CITY OF MAPLE GROVE
ARBOR COMMITTEE AGENDA
SEPTEMBER 9, 2021
7:00 P.M.
MAYOR’S CONFERENCE ROOM
1. OPENING BUSINESS
A. Call to Order
2. A. Approval of Agenda
B. Approval of Minutes – August 12, 2021 Regular Meeting
3. OLD BUSINESS
A. Forest Management Plan Review
B. Conservation Partners Legacy Grant
C. Fall Tree Festival Planning
4. NEW BUSINESS
5. AREA REPORTS
6. ADJOURNMENT
REQUEST FOR ARBOR COMMITTEE ACTION
September 9, 2021 2A and B
DATE AGENDA ITEM NUMBER
Approval of Agenda and
Minutes
ORIGINATING DEPT. AGENDA ITEM AGENDA HEADING
Community and Economic Approval of Agenda and Minutes
Development
PREVIOUS ACTIONS:
None
RECOMMENDED COMMITTEE ACTION:
Call by Chair ________________ for any additions or revisions to the agenda.
Motion by Committee member ________________, seconded by Committee member
__________________ to approve as proposed or approve as amended the agenda for the September 9,
2021 regular meeting.
Motion by Committee member __________________, seconded by Committee member
______________ to approve the minutes of the August 12, 2021 regular meeting as presented or as
amended.
COMMENTS:
COMMITTEE COMMENTS
MAPLE GROVE ARBOR COMMITTEE
REGULAR MEETING MINUTES
AUGUST 12, 2021
VIRTUAL ONLINE MEETING
7:00 PM
Call to Order The regular meeting of the Arbor Committee was called to
order by Vice-Chair Kampel at 7:02 p.m.
Members Present Vice-Chair Frank Kampel, Sarah Piket, Steve Courtney, Julie
Gamber, Don Varney, Marilyn Arnlund, Bob Henke and Ed
Reichow
Members Absent Cody Lensing, Mike Aasen, Mary Parenteau
Also Present Jesse Corrow, Staff Liaison
Judy Hanson, City Council Liaison
Approval of Agenda Frank Kampel requested the addition of 4E Vicksburg Lane
cleaning.
Motion Julie Gamber, second Sarah Picket to approve the
amended agenda. Vote all ayes. Motion passed.
Approval of Minutes No change.
Motion Don Varney, second Sarah Piket to approve the
minutes from June 10, 2021. Vote all ayes. Motion passed.
Old Business
3A - Forest Management Corrow discussed this item was reviewed at the June arbor
Plan Review committee meeting. Chair Parenteau provided a 2002
working draft prepared by Westwood, staff will provide a
scanned copy to the committee for review. The city is
considering getting a GPS system to better define the trail
system. Kampel volunteered to assist with this project to have
a working map for the designated trails. Discussed signage
for this area to inform the public this is a forest management
area but a public area. The Committee discussed what has
been completed on the management list. The draft will
continue to be reviewed at future Arbor Committee meetings.
3B - Maple Grove Parade Corrow discussed with Parenteau to order arbor committee t-
Recap shirts. Color and design were discussed at the meeting. Henke
and Arnlund volunteered to work on the project.
The Smokey Bear costume was great quality and would like
the same costume next year with the blower attachment.
Picking up and returning the costume was disorganized when
arriving at the DNR location in St. Paul.
Kampel volunteered to store the parade supplies until they are
needed next year. Additional supplies for the parade was
discussed. The eight bags of candy purchased was adequate.
New Business
4A - Addison Dahmer – Addison Dahmer did not attend the meeting as scheduled.
Gold Award Project Corrow asked if there are a couple volunteers to meet with
Addison. Kampel and Parenteau will meet with Addison to
collect her ideas. Corrow will coordinate with Addison to
meet with Parenteau and Kampel.
4B - Conservation Partners Corrow discussed this item was provided by Arnlund.
Legacy Grant Kampel reported he researched and found the grant money is
available for C.P.L. grant and mentioned Park and Recreation
or Public Works should apply for the grant. Arnlund said the
10% grant match could be in-kind match and doesn’t have to
be cash. Councilmember Hanson stated council would have
to approve any matching of the grant. Corrow will check with
the Finance Department if any funds are available? Initial
deadline for the first grant deadline of September 20, 2021
through May of 2022 for available money.
4C - Fall Tree Festival The Arbor Committee discussed the plans for the Fall Tree
Planning Festival which was scheduled for September 25 through
October 10, 2021. Similar to the 2020 event, it will include a
Parade of Trees at the arboretum, a Tree Scavenger Hunt
within various city parks and a visit to the Forest Preservation
Area.
Tree seedlings will be given away for prizes. Arnlund and
Hanson volunteered to work together for the trees in the
arboretum. Piket volunteered to locate other trees in city
parks and schools and to update the tree festival flyer. Corrow
will prepare information for Facebook and the city website.
Tree prizes can be handed out at Public Works on Saturday,
October 9 in the morning. Resident will need to show Maple
Grove ID. Corrow will inventory the tree seedlings that were
planted in the gravel bed.
4D - Landscape Review The committee discussed to review the landscape plans at
Discussion meetings like done in the past. Members like discussing the
plans during the meetings. Discussed keeping a timeline on
each set of plans and review plans at home prior to the
upcoming meeting. Corrow presented the items the planner
reviews on each landscape plan for a project. Committee
discussed receiving an email to include the combined
comments from the landscape plan reviews.
4E – Vicksburg Lane The Committee scheduled the adopt a street cleanup on
Cleaning Vicksburg Lane for Wednesday, August 25 at 5:00 p.m.
Kampel will send out an email of the event.
Area Reports Corrow updated the committee about the Rotary Club. They
would like the Arbor Committee to give a presentation at
their next Rotary meeting. Parenteau will be presenting the
committee mission on September 21.
Courtney mentioned several dead trees on Weaver Lake Road
that are located in front of Applebee’s. Arnlund asked if
Public Works watering the trees on the boulevards? Corrow
will follow up.
Hanson updated the committee that residents were asking
about emerald ash borer treatment. Trees need to be treated
for the life of the tree.
Arnlund praised the EAB information provided on the city
website. Kampel asked if EAB banners should remain up in
the community that were placed on public property. Ok to
leave banners up.
Adjournment
Motion Arnlund, second Henke to adjourn the meeting at
9:00 p.m. Vote all ayes. Motion carried.
Respectfully submitted,
Jesse Corrow, Staff Representative
City of Maple Grove Arbor Committee
REQUEST FOR ARBOR COMMITTEE ACTION
September 9, 2021 3A
DATE AGENDA ITEM
NUMBER
Old Business
ORIGINATING DEPT. AGENDA ITEM AGENDA HEADING
Community and Economic Forest Management Plan Review
Development
PREVIOUS ACTIONS:
At their meeting of Thursday, August 12, 2021, the Arbor Committee had further discussion on what
items should be reviewed that are listed on the plan based on the 2040 plan. A number of objectives in
the management plan were identified that have not been pursued or implemented.
RECOMMENDED COMMITTEE ACTION:
COMMENTS:
IT staff has GPS equipment capable of mapping the trails within the Forest Preservation Area. It is
highly recommended that the coordinates are gathered in the late fall/early spring during leaf off for
better readings and more accurate results.
Signs are being developed to identify the boundaries of the Forest Preservation Area. Staff has contacted
the vendor to begin production of the signs that will be installed behind residential lots that border the
FPA. The Parks Department may be able to assist in the installation of the 4”x4” treated posts that will
hold the signs. The city may also provide a “private property” sign on the opposite side of the post
indicating the boundaries of the residential lots.
Also, a copy of the draft management plan was emailed to committee members for review.
COMMITTEE COMMENTS
ATTACHMENTS
REQUEST FOR ARBOR COMMITTEE ACTION
September 9, 2021 3B
DATE AGENDA ITEM
NUMBER
New Business
ORIGINATING DEPT. AGENDA ITEM AGENDA HEADING
Community and Economic Conservation Partners
Development Legacy Grant
PREVIOUS ACTIONS:
At their meeting of Thursday, August 12, 2021, the Arbor Committee discussed the CPL grant funds and
what the grant could be used for.
RECOMMENDED COMMITTEE ACTION:
The Arbor Committee is encouraged to review and discuss what specifically the CPL grant funds could
be used for in the Forest Preservation Area preservation efforts. An activity list is provided for review.
COMMENTS:
In speaking with the DNR grant coordinator, she thought that enhancements to the Forest Preservation
Area would be a great use of the grant money and encouraged the City of Maple Grove to apply for the
Expedited Conservation Project (ECP) activities. She expects funding to be available into May of 2022
and it would be fine to apply up until that point. She will also be providing some example applications
from metro cities for staff review.
It appears there is forest preservation money available for the necessary 10% match, expenditure will
require City Council approval. This is a reimbursement style grant in that invoices would be submitted to
the DNR and the qualifying amount would be reimbursed or paid to a contractor.
COMMITTEE COMMENTS
ATTACHMENTS:
Expedited Conservation Project Activities List
Conservation Partners Legacy Grant Program
Expedited Conservation Projects (ECP) Activity List
# Forest habitat:
1 Winter (thermal) cover
2 Tree planting
3 Promotion of natural regeneration
4 Bud capping
5 Rx burning within BMP prescription, including aerial support
# Prairie habitat:
1 Establish new prairie/grassland
2 Seed purchase of native species
3 Rx burning within BMP prescription
4 Mowing/herbicide for invasives control in recently established grassland/prairie
5 Tree removal/woody encroachment management
6 Interseeding of monoculture/low biodiversity sites
# Wetland/water habitat:
1 Water level control structures
2 Fish Barriers
3 Upland vegetation enhancement
4 Tile breaks/ditch blocks
# Fish Game and Wildlife habitat:
1 Brushland shearing
2 Dam removal/modification
3 In-stream habitat modification
4 Trout stream restoration/habitat improvement
5 Site prep for habitat enhancement
6 All ECP activities from forest, prairie, wetland habitats
Conservation Partners Legacy Grant Program Page 1 of 5
Expedited Conservation Projects Activity List ver. 1.2 082714
FOREST Habitat ECP Activity List Definitions and Details
# Activity Definitions Requirements Included treatments/costs Excluded costs
Planting woody vegetation
(native trees, bushes, shrubs) for Planting tree/woody Non-native species,
the purpose of providing vegetation, herbicide, equipment purchase
overwinter cover for native mowing, tree mats/stake, (including mowers, chainsaws,
1 Winter (thermal) cover animal species seedlings/bare root stock heavy equipment)
Planting and purchase of native Equipment purchase
tree species for reasons other trees, seedlings, contractor (including hand tools, saws,
than replanting of clear cut costs, equipment rental, attachments for heavy
2 Tree planting/seeding purchase timber harvest herbicide, tree mats/stakes equipment), PPE
Activities that promote natural Mowing, shearing, herbicide,
regeneration within native stand hand/mechanical release, Equipment purchase
types with defined fish and/or thinning, contractor costs, (including mowers, chainsaws,
3 Promotion of natural regeneration wildlife habitat benefit equipment rental heavy equipment)
Protecting young conifer buds
overwinter from deer browse
with defined fish and/or wildlife Papers, clips, contractor costs,
4 Bud capping habitat benefit equipment rental Equipment purchase
Burning of understory to remove Burn break installation,
heavy fuels, improve stand contractor costs, burn fuel Agency staff time, equipment
health and promote regeneration (minimal cost), pre-burn site purchase, PPE, burn
Rx burning within BMP of young successional forest prep, equipment rental, non- equipment (sprayers, drip
prescription, including aerial species with defined fish and/or state aerial contractor for torches, slip-on units),
5 support wildlife habitat benefit current planned burn herbicide, chainsaws, vehicles
Conservation Partners Legacy Grant Program Page 2 of 5
Expedited Conservation Projects Activity List ver. 1.2 082714
PRAIRIE Habitat ECP Activity List Definitions and Details
# Activity Definitions Requirements Included treatments/costs Excluded costs
DNR lands require
approved and
Restoring native grassland adopted Restoration
Establish new prairie/grassland species (including forbs) in a Plan; must be Mowing, herbicide, seed Burn costs, equipment
by planting seeding of native suitable area currently void of or submitted with purchase, equipment rental, (seeder, packer, tractor, ATV,
1 species within BMP prescription covered in non-native vegetation application contractor costs for seeding sprayer, etc.)
Purchase of native, local ecotype
grassland seed and forbs from a Purchase of seed to provide
local contractor to be planted by current agencies/staff
land manager before end of opportunity to complete a Non-native vegetation, woody
2 Seed purchase of native species grant period restoration or enhancement vegetation, trees
PPE, burn equipment
Burning to restore native Mowing burn breaks, (sprayers, drip torches, slip-on
Rx burning within BMP grassland/prairie species as contractor costs, burn fuel units), herbicide, chainsaws,
3 prescription prescribed by current BMP (minimal cost) vehicles
Invasive control within newly Equipment purchase
planted or newly established (including mower
grassland/prairie sites (within 3 attachments, replacement
Mowing/herbicide for invasives years), including both cutting and Herbicide, equipment rental, parts for existing equipment,
control in recently established spraying to eliminate invasive contractor costs for mowing units, sprayers,
4 grassland/prairie species spraying/mowing sprayer parts, etc.), PPE
Removal of individual trees or
Tree removal/woody woody encroachment within Herbicide, equipment rental, Chainsaws, pruner, brush saw,
5 encroachment management grassland/prairie sites contractor costs for removal sprayer, PPE, seed/seedlings
Increasing the biodiversity of an Equipment purchase (seeder,
existing grassland site by adding Contractor costs for seeding, packer, ATV, tractor, etc.),
Interseeding of monoculture/low additional grassland species and seed purchase, equipment management activities
6 biodiversity sites forbs rental (mowing, herbicide, etc.)
Conservation Partners Legacy Grant Program Page 3 of 5
Expedited Conservation Projects Activity List ver. 1.2 082714
WETLAND/WATER Habitat ECP Activity List Definitions and Details
# Activity Definitions Requirements Included treatments/costs Excluded costs
Engineering, survey
and design and
Installation of a structure to construction Fixed crest, variable crest
control the level of water, estimates must be structures, contractor costs, Access or conservation
necessary due to altered complete and equipment rental, materials, easement acquisition,
hydrology of a shallow lake or submitted with site clean-up, associated engineering and design,
1 Water control structures wetland system application upland or lowland restoration survey work
Engineering, survey
and design and
construction Fish removal (commercial or
Barriers places on larger or estimates must be Contractor costs, equipment chemical), access or
shallow lake systems to prevent complete and rental, materials, site clean- conservation easement
the spread of aquatic invasive submitted with up, associated upland or acquisition, engineering and
2 Fish Barriers species application lowland restoration design, survey work
PPE, burn equipment
(sprayers, drip torches, slip-on
units), chainsaws, vehicles,
pruner, brush saw, Rip-rap,
Enhancement or restoration of Invasives control, Rx burning, access or conservation
uplands associated with existing herbicide, tree removal, easement acquisition,
wetlands or water systems that seeding, equipment rental, engineering and design,
3 Upland vegetation enhancement have been degraded contractor costs survey work
Tile system improvements,
access or conservation
Decommissioning installed water equipment rental, contractor easement acquisition,
drainage systems by tile break or costs, re-meandering of ditch engineering and design,
4 Tile breaks/ditch blocks removal channels survey work
Conservation Partners Legacy Grant Program Page 4 of 5
Expedited Conservation Projects Activity List ver. 1.2 082714
FISH GAME and WILDLIFE Habitat ECP Activity List Definitions and
Details
# Activity Definitions Requirements Included treatments/costs Excluded costs
Use of heavy equipment during
ground stable conditions to
remove over mature trees and Shearing, mowing, chopping,
Brushland shearing/mowing/ brush at ground level to allow for hydro-ax, follow-up site burning,
1 chopping regeneration contractor costs Equipment purchase
Engineering, Dam removal and weir Equipment purchase,
The removal of an existing dam survey and design placement, nature-like fishway, barrier/structure replacement
within a public waterway, or and construction rock arch rapids, rapids or maintenance, fish ladders,
installation of a dam modification estimates must be construction, contractor costs, fish elevators, engineering and
or nature-like fishway to allow complete and equipment rental, materials, site design, survey work, access or
for fish and other aquatic species submitted with cleanup, river/stream channel conservation easement
2 Dam removal/modification to pass the current barrier application modification or re-meandering acquisition
Engineering,
survey and design
Restoring or enhancing degraded and construction Structure placement, spawning
or missing in-stream habitat or estimates must be area restoration, natural bank Rip-rap, access or
access to habitat to provide complete and stabilization, log jam removal, conservation easement
spawning, resting, feeding areas submitted with equipment rental, contractor acquisition, engineering and
3 In-stream habitat modification for aquatic species application costs design, survey work,
Engineering,
Restoring or enhancing degraded survey and design
or missing in-stream habitat or and construction Beaver dam removal, equipment
enhancements to estimates must be rental, contractor costs, Rip-rap, access or
upland/lowlands to provide complete and structure placement, spawning conservation easement
Trout stream restoration/habitat spawning, resting, feeding areas submitted with area restoration, upland acquisition, engineering and
4 improvement and for trout species application restoration design, survey work,
Use of heavy equipment to Equipment purchase
remove current site vegetation, (including mowers, chainsaws,
including grasses, brush and/or Shearing, mowing, chopping, heavy equipment and
trees, to allow for future hydro-ax, burning, contractor attachments for heavy
enhancement work on the costs, equipment rental, equipment), non-native
5 Site prep for habitat enhancement landscape invasives control, herbicide species
All ECP activities from forest, prairie, wetland habitats
Conservation Partners Legacy Grant Program Page 5 of 5
Expedited Conservation Projects Activity List ver. 1.2 082714
REQUEST FOR ARBOR COMMITTEE ACTION
September 9, 2021 3C
DATE AGENDA ITEM
NUMBER
New Business
ORIGINATING DEPT. AGENDA ITEM AGENDA HEADING
Community and Economic Fall Tree Festival Planning
Development
PREVIOUS ACTIONS:
At their meeting of Thursday, August 12, 2021, the Arbor Committee discussed the plans for the Fall
Tree Festival which is scheduled for September 25 through October 10 with the same theme as 2020.
The event will include the Parade of Trees at the arboretum, a Tree Scavenger Hunt within various city
parks and a visit to the Forest Preservation Area.
RECOMMENDED COMMITTEE ACTION:
COMMENTS:
Below is an update on what has been planned and an update on progress:
• The event will run from September 25th through October 10th.
• Prizes will include the tree seedlings that were planted in the gravel bed (more details below).
• The tree seedlings will be given out on Saturday, October 9 at the public works facility
- Establish time for pick up and volunteers to hand out trees
• Arboretum Trees have been identified – Judy and Marilyn
• Park Scavenger Hunt - Sarah
• Staff will promote the event on the city website and social media
• Scavenger Hunt slides and Arboretum maps will be available online. Paper copies of the
Arboretum maps will be onsite as well.
• Other event promotions? Flyers?
• Other suggestions…
Below is an inventory of the Gravel Bed Tree Seedlings available for the prize giveaway.
• 25 White Oak
• 15 Pin Oak
• 10 Maple
• 20 Downy Serviceberry
• Crabapple and White Pines did not survive
ATTACHMENTS: Tree Seedling Pictures
REQUEST FOR ARBOR COMMITTEE ACTION
September 9, 2021 5
DATE AGENDA ITEM
NUMBER
Area Reports
ORIGINATING DEPT. AGENDA ITEM AGENDA HEADING
Community and Economic Area Reports
Development
PREVIOUS ACTIONS:
None
RECOMMENDED COMMITTEE ACTION:
The area reports section of the agenda provides an opportunity for any Committee member to report any
item in the city that needs staff attention. Arbor related items will be forwarded to the appropriate staff
member with a response provided at the next meeting.
COMMENTS:
COMMITTEE COMMENTS
ATTACHMENTS:
Get email alerts for Maple Grove
A daily email when new agendas and minutes are posted.