CALL TO ORDER A meeting of the Lake Quality Commission (LQC) was held on February 16, 2022 in
the Mayor’s Conference at the Maple Grove Government Center, 12800 Arbor
Lakes Parkway, Maple Grove
Becky Fahrenbruch called the meeting to order at 6:32 p.m.
Commissioners Present:
Becky Fahrenbruch – Chair - Eagle Lake
George Schneider – Rice Lake
Brennon O’Callaghan – Fish Lake
Nancy Bergstrand – Weaver Lake
Steve Lane – Cedar Island
Sharon Martin-Kotula – Edward Lake
Joe Ruegsegger – At Large
Commissioners Absent:
Ben Zaker – At Large
Others Present:
City Council Member LQC Liaison Karen Jaeger
Derek Asche, City of Maple Grove
Mark Lahtinen, City of Maple Grove
Ben Olson – Teal Lake
Diane Spector - Stantec
OATHS OF OFFICE Councilmember Jaeger gave oaths of office to Steve Lane and Sharon Martin-Kotula.
AREA REPORTS Rice Lake, George Schneider – Aerator may not be working as planned. Recent DO
readings have indicated low dissolved oxygen levels.
Eagle Lake, Becky Fahrenbruch – Winter activity is less than last year although there
are some ice rinks and fish houses. The Winter Festival will be on February 26, 2022
in the Balsam Lane Channel.
Fish Lake, Brennon O’Callaghan – FLARA is considering restocking bluegills this year.
TRPD will have kids activities going on the 19th-20th of February. A DNR permit has
been secured to remove cattails in the channel between Fish and Rice lakes. One
boat was detected with zebra mussels in 2021 and it seems the launch inspections
are having a positive effect. There is no indication of northern pike spearing this
winter.
Cedar Island, Steve Lane – The aerator has been on since January 1st, 2022.
Edward Lake, Sharon Martin-Kotula – The aerator is running and there are some
hockey rinks on the lake.
Weaver Lake, Nancy Bergstrand – Winter activities are down compared to last year.
The white stem pondweed appears thick.
At Large, Joe Ruegsegger – There was recently a polar plunge on Fish Lake but the
hole was left open and not well marked.
APPROVAL OF Minutes of the November 17, 2021 and January 19, 2022 LQC meetings were
MINUTES approved with one correction to the November 17, 2021 minutes. Nancy Bergstrand
was present at the November meeting.
MOTION TO APPROVE made by Schneider, second by Bergstrand. With all in favor
the motion was APPROVED.
ELECTION OF Becky Fahrenbruch was nominated to serve as Chair. Joe Ruegsegger was
OFFICERS nominated to serve as Vice-Chair.
MOTION TO APPROVE made by O’Callaghan, second by Schneider. With all in
favor the motion was APPROVED.
SHINGLE CREEK Diane Spector presented information on the Shingle Creek/West Mississippi
4TH GENERATION process for updating their watershed management plan. Spector noted a number
PLAN of watershed successes over the years including securing over $3,000,000 in grant
funding to support community projects, restoration of 3.2 miles of Shingle Creek,
and the delisting of three lakes from the State impaired waters list. Spector also
explained that this current update is required every 10 years and will include
updating policies/goals, addressing emerging issues, promoting inclusivity, and
enhancing education. Spector will be back to the LQC later in the Spring with more
information.
2022 WORK PLAN Asche presented the 2022 Work Plan as discussed at the January LQC meeting.
February – Work Plan, Shingle Creek 4th Generation Pan and LIP Process
March – LIP review and approval
April –Steve McComas Lake Monitoring Report
May – Shingle Creek 4th Generation Plan & Shingle Creek TMDL Updates
June – Edward Lake Tour if weeds are not too thick
July – Maple Grove Days
August – Fish Lake Tour
September – Eagle Lake Tour
October - NPDES MS4 Annual Meeting & Fish Lake Alum presentation
November – Fish/Rice Lake Carp Report and Presentation
December – Winter/Holiday Gathering
MOTION TO APPROVE made by Lane, second by Schneider. With all in favor the
motion was APPROVED.
INFORMATIONAL The Chair will not be at the March LQC meeting. The Vice-Chair will serve in her
ITEMS place. The Rice Lake drawdown will end in late March by closing the dam.
FUTURE March 16, 2022
MEETING:
ADJOURNMENT Meeting adjourned at 7:46pm.
Agenda
Lake Quality Commission Agenda
February 16, 2022
The Lake Quality Commission (LQC) meeting will commence at 6:30 pm at the Maple Grove
Government Center, 12800 Arbor Lakes Parkway, Maple Grove, MN, 55369.
ITEM ACTION REQUIRED
CALL TO ORDER Call to order by Chairperson Fahrenbruch at 6:30 p.m.
BUSINESS ITEMS
1. Introductions Introduce commissioners and students; 5 minutes for public
comment
2. Oaths of Office Councilmember Jaeger will give oaths of office to Steve Lane
and Sharon Martin-Kotula
3. Area Reports
4. Approval of Minutes 1) Approve minutes from the November 17, 2021 LQC meeting
2) Approve minutes from the January 19, 2022 LQC meeting
5. Election of Officers Nominations of Commissioners and action will be taken on the
positions of Chair and Vice Chair of the Lake Quality
Commission for 2022.
6. Shingle Creek Watershed Representative(s) from the Shingle Creek Watershed/Stantec
4th Generation Plan Consulting will discuss their upcoming watershed management
plan update process.
7. 2022 Work Plan Approve the 2022 LQC Work Plan.
8. Lake Improvement Update on the Lake Improvement Program process and due
Program dates for funding requests.
INFORMATIONAL ITEMS
FUTURE MEETINGS: March 16, 2022
ADJOURNMENT
MAPLE GROVE
LAKE QUALITY COMMISSION
DRAFT MINUTES
November 17, 2021
CALL TO ORDER A meeting of the Lake Quality Commission was held on November 17, 2021 via
Webex. Becky Fahrenbruch called the meeting to order at 6:30 p.m.
Commissioners Present:
Becky Fahrenbruch – Chair - Eagle Lake
George Schneider – Rice Lake
Joe Randall – Fish Lake
Joe Ruegsegger – At Large
Sharon Martin-Kotula – Edward Lake
Steve Lane – Cedar Island Lake
Commissioners Absent:
Ben Zaker – At Large
Guarav Uppal – At Large
Nancy Bergstrand – Weaver Lake
Others Present:
City Council Member LQC Liaison Karen Jaeger
Derek Asche, City of Maple Grove
Mark Lahtinen, City of Maple Grove
APPROVAL OF Minutes of the October 20, 2021 meeting of the Lake Quality Commission was
MINUTES reviewed for accuracy.
MOTION TO APPROVE made by Schneider, second by Lane. With all in favor the
motion was APPROVED.
AREA REPORTS Rice Lake, George Schneider – The drawdown has Rice about 5.5 feet down. Lots of
seagulls. Implanted carp tracking devices have died. New decoys have been set in
place.
Eagle Lake, Becky Fahrenbruch – Mainly quiet on Eagle lake. A couple of fishermen.
Fish Lake, Joe Randall – Still people water skiing.
At-Large - Joe Ruegsegger – Daughter had a strong performance in a recent wake
boarding competition and won an event.
Edward Lake – Sharon Martin-Kotula – Lots of ducks and geese still present on the
water.
Cedar Island Lake, Steve Lane – Water levels remain low.
Derek Asche, Maple Grove staff – Reminded LQC members to submit
reimbursement requests by December 31.
Karen Jaeger, City Council – Noted eagles and seagulls still present on Rice.
LQC STATEMENT The revised LQC Statement of Goals and Purpose was reviewed based on
OF GOALS & comments in October.
PURPOSE
MOTION TO APPROVE made by Randall, second by Ruegsegger. With all in favor
the motion was APPROVED.
Wetland Systems Asche reviewed the Wetland Systems District and its purpose to protect wetlands
District in compliance with State law. Asche noted that the Wetland Systems District pre-
dates State Wetland Conservation Act law and requires updates to remain
consistent with State law and watershed requirements. Proposed revisions
include referencing existing State law as well updated buffer standards for
conformance with watershed requirements. No comments were received from
LQC.
MOTION TO APPROVE made by Schneider, second by Martin-Kotula. With all in
favor the motion was APPROVED.
INFORMATION Asche noted that beginning in 2022 meetings are likely to be in-person.
ITEMS
Joe Randall indicated he will not seek reappointment after his term expires in
December, 2021.
FUTURE December 14, 2022
MEETING:
ADJOURNMENT MOTION TO ADJOURN by Randall, second by Martin-Kotula. With all in favor the
motion was APPROVED. 7:57 p.m.
MAPLE GROVE
LAKE QUALITY COMMISSION
DRAFT MINUTES
January 19, 2022
CALL TO ORDER A meeting of the Lake Quality Commission (LQC) was held on January 19, 2022 in
the Mayor’s Conference at the Maple Grove Government Center, 12800 Arbor
Lakes Parkway, Maple Grove
Becky Fahrenbruch called the meeting to order at 6:34 p.m.
Commissioners Present:
Becky Fahrenbruch – Chair - Eagle Lake
George Schneider – Rice Lake
Brennon O’Callaghan – Fish Lake
Commissioners Absent:
Ben Zaker – At Large
Nancy Bergstrand – Weaver Lake
Joe Ruegsegger – At Large
Sharon Martin-Kotula – Edward Lake
Steve Lane – Cedar Island Lake
Others Present:
City Council Member LQC Liaison Karen Jaeger
Derek Asche, City of Maple Grove
Mark Lahtinen, City of Maple Grove
APPROVAL OF Minutes of the November 17, 2021 LQC meeting were not approved as there was
MINUTES no quorum for this meeting.
AREA REPORTS Rice Lake, George Schneider – The aerator is on and working.
Eagle Lake, Becky Fahrenbruch – Has seen the first vehicle on the lake. There are
many ice fisherman and hockey rinks. The annual winter festival is scheduled for
February 26, 2022.
Fish Lake, Brennon O’Callaghan – A trail has been plowed around Fish Lake.
OATHS OF OFFICE Derek Asche gave the oaths of office to Becky Fahrenbruch and new LQC member
Brennon O’Callaghan
2022 WORK PLAN Asche reminded the LQC of the need for the annual work plan. A draft work plan
was provided in the LQC packet. The following work was drafted based on
discussion and will be brought back to the LQC in February for approval.
February Lake Improvement Program & Steve McComas Monitoring Report
March Lake Improvement Program review and approval
April Shingle Creek 4th Generation Plan & Shingle Creek TMDL Updates
May Shingle Creek 4th Generation Plan & Elm Creek TMDL Updates
June Edward Lake Tour (or walking tour)
July No Meeting – Maple Grove Days
August Fish Lake Tour
September Eagle Lake Tour
October NPDES MS4 Annual Meeting & Fish Lake Alum Presentation
November Fish/Rice Carp Removal Project
December Winter/Holiday Gathering
INFORMATION Becky Fahrenbruch requested an opportunity to write lake and or water quality
ITEMS articles for the Maple Grove quarterly newsletter.
Brennon O’Callaghan requested information on the dredging of the Fish Lake
channel on the west side of the lake. Lahtinen indicated he would reach out to
Public Works for the status.
FUTURE February 16, 2022
MEETING:
ADJOURNMENT Meeting adjourned at 7:22pm.
LAKE QUALITY COMMISSION
STAFF REPORT
TO: Lake Quality Commission (LQC)
FROM: Derek Asche, Water Resources Engineer
DATE: February 9, 2022
SUBJECT: Shingle Creek/West Mississippi 4th Generation Plan Update
The Shingle Creek and West Mississippi Watershed are beginning the projects of updating their
watershed plans. These plans are updated every 10 years and as a part of the public engagement
process, representative(s) from the watershed will be in attendance to explain the process and
take feed back from the LQC. This will be the first of two meetings with representatives from the
watersheds.
RECOMMENDATION: None.
LAKE QUALITY COMMISSION
STAFF REPORT
TO: Lake Quality Commission (LQC)
FROM: Derek Asche, Water Resources Engineer
DATE: February 1, 2022
SUBJECT: 2022 WORK PLAN
In January of each year, the LQC prepares a work plan outlining the topics and subjects for
consideration over the course of the year. Historically, the LQC has included Lake Improvement
Program (LIP) applications, the required Maple Grove Municipal Separate Storm Sewer (MS4)
Annual Meeting, and lake tours in the work program. Additionally, topics of interest, projects,
guest speakers, and/or environmentally relevant issues have been included as well. The 2022
work plan is provided as Table 1 based on discussion from the January 2022 meeting.
Table 1. DRAFT 2022 LAKE QUALITY COMMISSION WORK PLAN
February Work Plan, Shingle Creek 4th Generation Plan & LIP Process
March LIP Review and Approval
April Steve McComas Lake Monitoring Report
May Shingle Creek 4th Generation Plan & Shingle/Elm Creek TMDL Updates
June Edward Lake Tour
July No Meeting – Maple Grove Days
August Fish Lake Tour
September Eagle Lake Tour
October NPDES MS4 Annual Meeting & Fish Lake Alum presentations
November Fish/Rice Carp Removal Report and Presentation
December Winter/Holiday Gathering
RECOMMENDATION: I recommend the LQC approve 2022 Work Plan.
LAKE QUALITY COMMISSION
STAFF REPORT
TO: Lake Quality Commission (LQC)
FROM: Derek Asche, Water Resources Engineer
DATE: February 7, 2022
SUBJECT: Lake Improvement Program (LIP) Process
The LQC annually reviews, and makes recommendations to the City Council, funding for projects
that improve the water quality in our local lakes. Project proposers should consider existing data
and studies, such as sub-watershed assessments as the basis for funding requests. At a minimum,
these projects are typically a partnership between lake associations and the city, but can also
include other partners such as watershed management organizations, Hennepin County, the
Three Rivers Park District, and possibly others.
Funding for water quality monitoring and individual water quality improvement projects (<$750)
is included with the LIP but does not require partnerships or a funding match from lake
associations. Staff has developed guidance for funding amounts (attached).
RECOMMENDATION: None.
Attachment: Staff Guidance on Funding
Lake Improvement Application Form
Individual Water Quality Improvement Project Application Form
LAKE QUALITY COMMISSION
STAFF REPORT
Staff Guidance on Funding
Lake Association
Category of Project Investment City LOC Investment
Internal Phosphorus Sequestering
Alum/Phoslock treatments or similar 20.00 80.00
Aquatic Vegetation Management
Invasive species Management - Curlyleaf/EMW 30.00 70.00
Native Plantings (shoreline restorations, etc…) 30.00 70.00
Algae Reduction Control 30.00 70.00
Boat Launch Inspections/Cleaning Stations (CD3) 30.00 70.00
Dye Treatments 30.00 70.00
Fish Management
Carp Removal 40.00 60.00
Fish Stocking 40.00 60.00
Miscellaneous Activities
Boat Launch Upgrades 50.00 50.00
Consulting/Monitoring Services 50.00 50.00
Aeration 50.00 50.00
Adopt-a-Drain 0.00 100.00
Individual Water Quality Improvement Projects Case by case Case by Case
MAPLE GROVE LAKE IMPROVEMENT PROGRAM
APPLICATION FORM
DUE FEBRUARY 28th, 2022
PROJECT NAME
DATE
Lake
Organization
Contact Person Telephone (H)
Address: (W)
Contractor/Applicator
Address
Telephone
Project Description
Scope of Work (including description of lake area, size of area and expected longevity of project
enhancements)
Meets Objective of
Management Plan?
Yes No
1. Shoreline Buffer
2. Watershed Clean-Up
3. Aquatic Plant Control
4. Water Quality
5. Public Education
6. Fisheries
7. Recreational
8. Algae Control
9. Other
Lake Improvement Program Application – Page 2
For Copper Sulfate treatments, secchi disc readings for water quality, must be taken for one week prior to
and after treatment.
Readings Before Readings After
Date Date
Date Date
Project Cost
Project Cost $
(Attach copy of invoices and permits)
Association Funding $
Other Funding $
Amount of City Funding Requested $
Description of Association in-kind labor and materials:
I declare the stated costs are an accurate reflection of estimated costs to be incurred.
Organization Representative Date
Maple Grove Lake Improvement Project Grant
DUE FEBRUARY 28th, 2022
Maple Grove Lake Improvement Project Application (Funding is limited and based on
approval from the Lake Quality Commission. Is based on a first come basis, so please get in
your application ASAP)
Name:_____________________________________________
Address:___________________________________________________________________________
Phone:____________________________Email:___________________________________________
Project (check project(s) below):
___ Native shoreline restoration ___ Rain garden (design approved)
___ Bioengineered shoreline ___Native buffer (at least 15 feet wide)
___ Bioengineered slopes greater than 4:1 (H:V) near shore ___
___Consulting services for training for those projects listed above (Note: only covered if a project was
implemented)
___Other (please explain in detail) _______________________________________________________
**Note that lake weed removal will not be covered by this grant
Explain in detail how your project will improve lake quality (include before and/or after pictures if
available) Use back of form if needed.
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
Estimated Cost of Project (Home owner pays 100% of cost up front, and is then reimbursed up to 50%
of the total cost and $750 maximum). Please save ALL Receipts. You will need to turn them in for
reimbursement.
_______________________
Please send completed form to your Lake Quality Commission Representative.
LQC Use Only:
_____Approved ____ Not Approved
Get email alerts for Maple Grove
A daily email when new agendas and minutes are posted.