Parks and Recreation Board
Regular MeetingMaple Grove, MN · October 17, 2024
Minutes
Maple Grove Parks and Recreation Board
Regular meeting
October 17, 2024
Regular meeting The regular meeting was called to order by Chair, Bill Lewis at
7:00 p.m.
Board members present Present in the Chambers were Chair Bill Lewis, Vice Chair John
Ferm, Board Members Ken Helvey, Kelly Cunningham, Andy
Mielke, Krista Kuhnly.
Board members Board Members absent was: Board Member Deb Syhre
absent
Also present Also present in the Chambers were: Council Representative
Hanson, Chuck Stifter, Director; Ben Jaszewski, Parks and
Planning Superintendent; Aimee Peterson, Assistant Parks and
Recreation Director; and Angie Dehn, Community Center
Manager.
Approval of agenda Chair Lewis called for any changes to the agenda. Director
Stifter replied there are none.
Motion made by Vice Chair Ferm, seconded by Board
Member Kuhnly to approve the agenda for the October 17,
2024 meeting as presented.
Upon call for the question, on a voice vote, there were six ayes
and no nays. Motion carried.
Public comments No requests were received.
Special business No items present.
Board Member reports Board Member Kuhnly stated she greatly enjoyed attending
the Park Board tour.
Staff reports Director’s report: Director Stifter thanked the Park Board
members for attending the park tour. He explained this was a
great way for staff to showcase the work that has been done
over the past year.
Park Board Meeting
October 17, 2024
Page 2
Director Stifter stated he was in Atlanta last week at an NRPA
conference with Assistant Parks and Recreation Director
Peterson and Community Center Manager Dehn.
Assistant Parks and Recreation Director’s report: Aimee
Peterson reported she enjoyed attending the park tour with
the board.
Ms. Peterson commented on internal events that have been
expanded. She stated Oktoberfest was held on Saturday,
September 28 and there were over 3,000 attendees this year.
She indicated the Water Lantern Festival was held at Town
Green on September 28 as well.
Ms. Peterson explained Maria’s Voice held their tribute to
domestic violence last week at Central Park.
Ms. Peterson discussed the staff outreach event that was held
at the University of Minnesota, noting staff was able to speak
with students about career opportunities.
Ms. Peterson reported Maple Grove was recently recognized as
the number one Learn to Skate program in the State of
Minnesota and twenty sixth in the nation.
Ms. Peterson stated Minnesota Parent recently announced the
2024 awards for family favorites and Central Park was awarded
third place in the best destination playground category.
Parks and Planning Superintendent’s report: Ben Jaszewski
updated the Board on Village Park. He noted the play
equipment would be finished up early next week along with
the landscaping. He indicated the arbor would be installed
around November 4.
Mr. Jaszewski reported the playground equipment at
Nottingham and Donahue North parks was now installed. He
stated work continues at Village Park and Polaris.
Mr. Jaszewski stated the Kerber tennis courts were paved in
early October and would be painted next spring and noted the
fencing and nets would be installed yet this fall.
Park Board Meeting
October 17, 2024
Page 3
Mr. Jaszewski thanked the Rotary Club for donating $10,000 to
assist with the planting of trees.
Mr. Jaszewski indicated the splash pad would be closing after
this weekend, noting staff would begin preparing for the
winter program at Central Park. He explained due to the
amount of maintenance required the Crokicurl would not be
built this year.
Community Center Manager’s report: Angie Dehn discussed
how the facility maintenance coordinator was working to find a
balance with the gym use at the Community Center and noted
open volleyball has become very popular.
Ms. Dehn reported Trinity Church has been a great partner
with the Community Center and was holding church services
on a weekly basis.
Ms. Dehn provided the board with construction updates and
displayed photos for the Community Center expansion project.
She commented further on the proposed construction
timeline. She reported all of this information was available on
the city’s website.
Ms. Dehn reviewed upcoming events that would be held at the
Community Center which included an Endeavor Schools
professional development conference, an Anambra Association
of MN Gala, the Lions Waffle Breakfast, North Central College
Health Association Annual Conference, a Halloween Gift and
Craft Show, a Minnesota Law Enforcement Wellness Summit, a
Holiday Craft Boutique hosted by the Maple Grove Lions and
Maple Grove Seniors, an American Red Cross Blood Drive and
the Maple Grove Home Show.
Chair Lewis commended staff for keeping operations going at
the Community Center during the expansion project.
Council Liaison’s Report: Council Member Hanson provided
the board with an update from the City Council. She
commented on the recent ribbon cutting ceremonies the City
Council had attended, which were for Axis Precision, Mama’s
Happy and noted Grackle would hold a ribbon cutting
Park Board Meeting
October 17, 2024
Page 4
tomorrow. She explained she attended the domestic violence
event that was held at Central Park, noting this event was very
well done.
CONSENT BUSINESS
Consent business Chair Lewis requested Item C be presented by staff. Parks and
Planning Superintendent Jaszewski introduced Parkkeeper Jack
Denzer to the Park Board.
Parkkeeper Jack Denzer stated he was thankful to have the
opportunity to work for the City of Maple Grove and explained
he looked forward to beginning his work with the city
tomorrow.
Motion made by Board Member Helvey, seconded by Board
Member Cunningham to approve the Consent Items as
presented.
A. Minutes – September 19, 2024 regular meeting
B. Approve claims
C. Appointment - Parkkeeper
D. Appointment - Community Center food services
coordinator
E. Special use permit – Maple Grove Community
Organization – Halloween Family Fun Event
F. Special use permit – Experience Maple Grove – Turkey
Trot Fun Run event
G. Grant application – Community Center play equipment
– Resolution No. 24-130 PB
H. Grant application – 2025 play equipment replacement
– Resolution No. 24-131 PB
Upon call for the question, on a voice vote, there were six ayes
and no nays. Motion carried.
OLD BUSINESS
Old Business, Item A Parks and Planning Superintendent Jaszewski stated staff is
Pickleball court use and requesting board discussion and direction on the management
maintenance of pickleball facilities within the park system. Staff conducted a
study of pickleball court locations and their proximity to
Park Board Meeting
October 17, 2024
Page 5
residential areas to address recent resident concerns about
nuisance noise levels. Pickleball has a distinctive sound, and in
certain conditions, can carry into nearby properties and in
some cases be a nuisance. The study focuses on identifying
which courts have potential to create nuisance noise levels and
exploring effective solutions, such as sound barriers and
fencing upgrades, to balance recreational use with the quality
of life for the immediate neighborhood. The goal is to maintain
access to this popular recreational game while respecting the
quality of life for those that live in close proximity to the
courts.
Mr. Jaszewski reported there are currently 17 locations within
the city that have tennis courts painted with pickleball lines,
and eight of these sites have courts that are located within 200
feet of residential areas. All locations feature dual-use courts,
where at least one court has lines for tennis and pickleball. This
shared-use approach has been a practical solution for meeting
the growing demand for pickleball facilities at neighborhood
parks without the need to build new courts. However, the
proximity of these courts to residential homes has raised
concerns about noise impact, particularly at the eight sites
closest to residential properties. This has led to a more focused
examination of noise control measures, such as sound barriers
and fencing upgrades, to minimize disruption while preserving
access to recreational facilities.
Ms. Jaszewski explained to mitigate sound concerns at courts
near residential areas, two primary options could be
considered. The first option involves installing sound
abatement materials on fences within 200’ of residences along
with strategic landscaping to help absorb and deflect noise
from pickleball play. These barriers, combined with trees and
shrubs, could provide an effective buffer between the courts
and nearby homes, helping to reduce the impact of the sport's
distinctive noise. The second option is to remove pickleball
lines from these dual-use courts and return them to tennis-
only facilities. This option completely eliminates structured
pickleball play and the associated noise issues at these
locations while still maintaining recreational use of the space
for tennis, which is typically less disruptive to nearby residents.
Park Board Meeting
October 17, 2024
Page 6
Both options have the potential to reduce noise impacts and as
a result improve the quality of life for nearby residences.
Mr. Jaszewski indicated based on the provided data, the
average cost of installing sound barriers and fencing for
pickleball courts near residential areas varies depending on the
length of the fence and the direction of the homes. At some
sites it may be necessary to upgrade the fencing and footings
to handle the additional load of the sound barriers, which can
contribute to the overall costs. The cost for sound mitigation
material is estimated at $30 per linear foot (installed by park
staff), while the cost of fencing is $110 per linear foot (installed
by contractor). On average, sound barrier installations would
range from $3,180 to $6,780, and fencing costs range from
$11,660 to $24,860. The total cost for both sound barriers and
fencing at individual sites typically falls between $14,840 and
$31,640, depending on the distance of the fence and the
proximity of the courts to residential areas. Based on the data,
the total cost for implementing sound barriers and fencing at
all identified sites would be approximately $198,440. This
reflects the significant investment required to effectively
mitigate noise at courts that are located closest to homes.
Landscaping modifications would vary by site and are not
included in the above estimates but could be funded through
the parks' annual tree planting allocation from the general
fund.
Mr. Jaszewski indicated staff recommends that the board
consider using Fish Lake Woods Park as a test site for
implementing sound barriers and landscaping to mitigate noise
from pickleball courts. Given its proximity to residential homes
(only 92 feet away) Fish Lake Woods is an ideal location to
assess the effectiveness of these measures. Additionally, staff
believe the courts at Fish Lake Woods are naturally protected
from high winds due to surrounding terrain and vegetation,
which means that the existing fence likely would not need an
upgrade, further reducing costs. The combination of sound
barriers and natural landscaping could help absorb and reduce
noise, while maintaining the site’s aesthetics. By using Fish
Lake Woods as a test site, the board can evaluate whether
sound mitigation techniques can be a feasible, long-term
solution before expanding efforts to other locations. If
Park Board Meeting
October 17, 2024
Page 7
successful, this approach could be applied to other high-
priority courts near residential areas.
Vice Chair Ferm indicated the reasoning for replacing the fence
would be to assist with covering the weight of the sound
barrier. Mr. Jaszewski explained the fencing material would
need to have footings to carry the added wind load on and
weight of the sound barrier material. He stated the footings
would only be required on one or two sides of the fence being
discussed for sound mitigation efforts.
Vice Chair Ferm questioned if the sound would be pushed from
one side of the park to the other with the proposed sound
barrier. Mr. Jaszewski stated this was not his understanding
through the research he has read. Rather, the sound barrier
would muffle or mute the sound.
Chair Lewis asked if the sound barrier for Fish Lake Woods
would be for two sides of the court. Mr. Jaszewski reported
this was the recommendation.
Board Member Cunningham stated she understood the city
had received one complaint for noise at Fish Lake Woods which
was why staff was recommending the noise barrier be tested
at this park. However, she also understood these pickleball
courts were not the closest to homes. She believed it would be
more fair to test the sound barrier material at a different park
where the pickleball courts were closer to neighboring homes.
Chair Lewis asked if the city had received complaints from
residents for other parks. Mr. Jaszewski stated he was not
aware of any other complaints. He indicated at Donahue
North, the nearest neighbor was 50 feet away, but it was to the
side. He commented on how the direction of play impacts how
sound travels.
Board Member Helvey requested further information on how
the new courts at Kerber Park would be painted. Mr. Jaszewski
stated Kerber would have two tennis courts and one pickleball
court painted.
Park Board Meeting
October 17, 2024
Page 8
Board Member Helvey indicated he would like to see this
revisited given the fact there used to be four pickleball courts
at Kerber Park.
Board Member Helvey suggested a test on the sound material
be done at Fish Lake Park due to the direction of the sound.
Board Member Mielke supported this recommendation.
Board Member Cunningham thanked staff for pointing out how
the placement or position of the pickleball courts impacts how
the noise travels. She stated she could support the sound
barrier being installed at Fish Lake Park for testing purposes.
Board Member Kuhnly commented if the sound barrier was
used and it was ineffective, could this be repurposed at
another park. Mr. Jaszewski reported this would be the case.
Chair Lewis indicated he visited Fish Lake Park recently, and
discussed the investments the city has made in this park. He
wanted to see the city bringing purposeful programming to the
community in a meaningful manner without overly impacting
the neighbors. He stated he supported testing the sound
barrier material at Fish Lake Park on two sides (south and east)
of the fencing.
Board Member Helvey questioned if the sound barrier could be
installed yet this fall. Mr. Jaszewski indicated he did not have
this project in the budget for 2024. He explained his plan was
to purchase and install the sound barrier material in the spring
of 2025.
Board Member Cunningham asked that signs be posted
regarding pickleball rules and hours at Fish Lake Park. Mr.
Jaszewski stated signs had been printed and would be posted.
Vice Chair Ferm indicated he was pleased the city had only
received one complaint to date and he appreciated the fact the
city would be testing the sound barrier material for the one
park of concern.
Park Board Meeting
October 17, 2024
Page 9
Old Business, Item B Director Stifter stated the Park Board last reviewed design and
Lions pavilion costing for the Lions pavilion at the April 1, 2024, joint work
replacement session with council. Generally, the board and council
supported the direction of the pavilion design but asked staff
to find some cost reductions where possible. Additionally, the
funding strategy previously proposed needs final approval from
council. Staff is recommending the Park Board review and
recommend a design and funding strategy for council
consideration. For this meeting staff is proposing a discussion
to reaffirm the desires of the board. A motion to advance a
recommendation to council is appropriate if the board so
desires. With the advancement of the Community Center
project the loss of the Lions pavilion and playground along with
the skate park were unfortunate but necessary to capture
usable space on the west side for needed parking to serve the
arena expansion. During the planning it became apparent
these amenities would need to be relocated to maximize
efficient parking lot design. The proposed location creates a
greater separation between the proposed pavilion/playground
and the arena front doors but does provide some purpose to
the lake shore side of the large parking lot and will provide a
prominent overlook of West Arbor Lake and Town Green. The
pavilion will be available for various events and programs and
rentable for private use. The added restrooms are a much-
needed improvement to the campus.
Director Stifter reported since April, staff has worked with the
consultant to confirm four design options for the pavilion along
with associated cost projections. Options consider a spectrum
of designs to replace the pavilion on the MGCC campus near a
planned new Lions playground. As a reminder, the funds to pay
for these two amenities come from several sources, namely,
the playground replacement fund, building replacement fund,
Lions contribution and the park dedication fund. Total cost for
the two amenities is estimated at $1.5M. These costs were
shared at the last joint work session as part of the overall
community center renovation and expansion project “sources
and uses” breakdown.
Playground replacement $300,000
Building replacement $165,000
Lions’ contribution $140,000
Park Board Meeting
October 17, 2024
Page 10
Park dedication $895,000
Total estimate $1,500,000
Director Stifter commented the first four options are
architecturally designed incorporating components of the new
Community Center architecture in both look and materials.
option 2 was most preferred at previous showings so options 3
and 4 are iterations that simplify the design to reduce costs.
Director Stifter explained a fifth option to consider would be to
purchase a catalog pavilion of the likes of the new Lakeview
Knolls Park pavilion near the pickleball courts. That, in
combination with a standalone toilet building, could be a cost-
effective approach to the project. The Lakeview pavilion and
toilet building cost about $385K but are about half the size of
the proposed Lions pavilion. A budget estimate for a more
cost-effective Lions pavilion and toilet building design would
likely be in the range of $750-$950K. Further cost saving may
be achievable if the project is separated from the Community
Center improvements and bid separate. Staff would need to
evaluate the potential savings if this option is the preference of
the board. This fifth concept has not been reviewed with the
Lions nor the City Council. Staff is seeking discussion and
direction from the board and if appropriate a motion to
recommend the council proceed with a specific option.
Adam Barnett, JLG, commented further on the design
modifications for the Lions Pavilion Park replacement and
displayed images for the pavilion options. He explained option
1 would have a flat roof with storage in the pavilion along with
bathrooms. He stated option 2 would provide a shelter with a
strong gabled roof with storage and bathrooms. He reported
option 3 would square up the footprint and would still have
storage and bathrooms. He indicated option 4 would be the
simplest as it would have a “masonry box” for storage and
bathrooms with no canopy. He commented option 5 would
provide an off-the-shelf option and would be the most cost
effective.
Phil Leith, President of the Maple Grove Lions, explained he
met with staff several times to discuss this project. He
commented this pavilion is used for the Lions Corn Feed and
Park Board Meeting
October 17, 2024
Page 11
several other events. He questioned if the old pavilion was
similar in size to options 1 and 2. Director Stifter stated options
1 and 2 were similar in size to the old pavilion.
Mr. Leith asked that the new pavilion not be smaller in size. He
indicated he would also like to be involved in the water and
electricity plans. He thanked the city for working together with
the Lions on this project.
Board Member Cunningham thanked Mr. Leith for his input.
She agreed the pavilion should not be smaller than the original
pavilion. She recommended the board not make a decision on
the pavilion until further information was available on the out
of the box option (option 5). She stated this may provide cost
savings for the city and then the inside of the building could be
more customized.
Board Member Mielke inquired if option 5 would lead to a
great deal of savings for the city. Director Stifter stated he
hasn’t looked into this option too closely.
Board Member Helvey commented this was one of the first
things people see when the drive into the Community Center
lot. He explained the city has not typically done things on the
cheap when it comes to its park amenities. He supported the
city moving forward with a well-planned and consistently
designed park pavilion. He stated he supported option 1 at this
time, noting this option would nicely compliment that adjacent
ice arena.
Board Member Kuhnly questioned if the roof pitch in option 2
had to be this high. She indicated she was not a fan of the flat
roof in option 1 either. She suggested the roof pitch in option 2
be reduced slightly. She stated there were a lot of great ideas
within each option, but noted she was not a fan of the
numerous brown posts either and stated she would like to see
more white on the pavilion. She asked if option 2 would be
taller than the Community Center building. Mr. Barnett stated
this would be the case.
Vice Chair Ferm stated it would be worthwhile to learn more
about option 5. He explained of the other four options
Park Board Meeting
October 17, 2024
Page 12
available to the board, he supported option 1 because the look
would tie in nicely with the Community Center and entire civic
campus.
Board Member Cunningham commented she typically supports
a gable end, but in this case she supported option 1 moving
forward with a slightly higher pitch on the roof. She noted she
would still like further information on option 5.
Board Member Kuhnly suggested skylights be considered if
option 1 were to move forward in order to add dimension and
light into the pavilion.
Director Stifter indicated another option to consider would be
to explore reorienting the pavilion in order to open the pavilion
to the Community Center. He stated he would take the
direction and feedback from the board and noted this item
would come back to the board for further consideration in
November.
Chair Lewis thanked the board for their feedback and stated he
wanted to ensure the Lions pavilion was done right because
this was an important amenity to the entire campus.
NEW BUSINESS
New Business, Item A Parks and Planning Superintendent Jaszewski stated this PUD is
Subdivision – Rush Hollow located north of Highway 81, along Territorial Road bordered
5th Addition by Maple Grove Parkway and lies within the city’s Park Service
Area (PSA) 4. A neighborhood park is planned for this PSA.
Pedestrian access to the planned regional trail system and
neighborhood park are essential in connecting new residents
to the many nearby park amenities.
Mr. Jaszewski explained the applicant previously satisfied a
portion of the park dedication obligation with a land dedication
of 1.09 acres which equates to 9% of the required obligation
for the entire Rush Hollow PUD. The dedicated land, outlots U,
V, W, X, Y, and Z, are for future local and regional trail
corridors. The 9% reduction in the park dedication obligation
will carry forward to all future subdivisions within the Rush
Hollow PUD.
Park Board Meeting
October 17, 2024
Page 13
Mr. Jaszewski reported the balance of the park dedication
obligation will be paid in cash. The Rush Hollow 5th Addition
subdivision consists of 4 single-family residential units and 76
multi-dwelling units. The current single-family rate is $4,092
per unit or lot. The land dedication (9%) reduces the single-
family rate to $3,782 per unit and the multi-dwelling rate to
$2,980. Cash dedication for Rush Hollow 5th Addition
calculates as follows:
PUD 583 units
1st Addition 221 single family units
2nd Addition 33 single family units
3rd Addition 186 single family units
4th Addition 12 single family units
5th Addition 80 (76 multi & 4 single family) units
Remaining 51 units
The cash dedication for the Rush Hollow 5th Addition
calculates as follows:
4 single family units x $3,724 per unit = $14,896
76 multi-dwelling units x $2,980 per unit = $226,480
Total Cash Dedication = $241,376
Staff recommends the Park Board approve the Rush Hollow 5th
Addition plat and accept the cash dedication.
Motion made by Vice Chair Ferm, seconded by Board
Member Cunningham to approve the park dedication
requirements on the Rush Hollow 5th Addition plat pursuant
to Maple Grove Subdivision Ordinance, Chapter 30:18,
Provision of Land for Public Use:
• Applicant shall fulfil the park dedication requirements
on the plat with a cash dedication minus any credit for
a previous land dedication and based upon residential
rate in effect at the time the plat is released by the city
for recording.
Park Board Meeting
October 17, 2024
Page 14
• Applicant may pay the fee at any time after the final
plat has been approved by the City Council, but it must
be paid before the plat is released for filing with the
county. The final cash dedication is based on the rate
at the time the dedication is paid. Rates are reviewed
annually by the City Council at their first meeting in
February. This may affect the final cash dedication
requirements.
Upon call for the question, on a voice vote, there were six ayes
and no nays. Motion carried.
Adjournment Motion made by Board Member Cunningham, seconded by
Board Member Kuhnly to adjourn.
Upon call for the question, on a voice vote, there were six ayes
and no nays. Motion carried.
The meeting adjourned at 8:20 p.m.
Respectfully submitted,
Chuck Stifter, Director
Parks and Recreation Board
City of Maple Grove