CALL TO ORDER A meeting of the Maple Grove Planning Commission was held at
7:00 p.m. on July 26, 2021 at the Maple Grove City Hall,
Hennepin County, Minnesota. Chair Lamothe called the meeting to
order at 7:00 p.m.
PLEDGE OF
ALLEGIANCE
ROLL CALL Planning Commission members present were Chair Craig
Lamothe, Chris Ayika, Lorie Klein, Susan Lindeman, Chuck
Lenthe, and Michael Ostaffe. Absent was Joe Piket (excused).
Present also were Karen Jaeger, City Council Liaison; Peter
Vickerman, Planning Manager; Jesse Corrow, Associate Planner;
Ben Blauert, Community Development Inspector; and Justin
Templin, City Attorney.
ITEMS TO BE None.
REMOVED FROM
THE AGENDA
CONSENT ITEMS The following Consent Items were presented for the Commission’s
approval:
MINUTES
A. Regular Meeting – June 14, 2021
Motion by Commissioner Ayika, seconded by Commissioner
Lenthe, to approve the Consent Items as presented. Upon call
of the motion by Chair Lamothe, there were six ayes and no
nays. Motion carried.
CONSIDERATION None.
OF ITEMS PULLED
FROM CONSENT
AGENDA
REVIEW OF THE Mr. Vickerman reviewed with the Commission what items the City
CITY COUNCIL Council approved that was given direction at the Planning
Commission level.
MINUTES FROM
Maple Grove Planning Commission
July 26, 2021
Page 2
THEIR REGULAR
MEETING OF JULY
19, 2021
OLD BUSINESS No items to present.
NEW BUSINESS
Mr. Corrow stated the applicant is requesting a concept stage plan
PUBLIC HEARING amendment and development stage plan approval for the purpose
of constructing an 8,650 square foot “Cub Wine & Spirits”
CUB WINE & building on the existing Cub Foods property located at 8150
SPIRITS Wedgewood Lane North. Staff discussed the plans in further
CUB FOODS, LLC detail with the Planning Commission and made the following
recommendation.
8150
WEDGEWOOD STAFF RECOMMENDATION:
LANE NORTH
Motion to recommend that the City Council direct the City
PUD CONCEPT Attorney to draft a Resolution and a Planned Unit Development
STAGE PLAN agreement approving the Cub Wine & Spirits PUD concept stage
AMENDMENT plan amendment development stage plan, subject to:
AND
1. The applicant addressing to the satisfaction of the city
DEVELOPMENT
any remaining applicable comments contained in the
STAGE PLAN TO memorandums from:
CONSTRUCT AN
8,650 SQUARE a. The Community & Economic Development
FOOT STAND- Department dated June 22, 2021
ALONE BUILDING b. The Fire Department dated June 22, 2021
AT THE c. The Water Resources Engineer dated June 16, 2021
NORTHWEST The applicant shall acknowledge that Park Dedication
CORNER OF THE requirements are based on staff review and recommendation to the
PROPERTY Park and Recreation Board and their subsequent board action.
Board meetings are held on the third Thursday of each month.
The applicant was at the meeting to answer questions.
Jim Horacher, Director of Real Estate for Cub Foods, thanked staff
for working with him on this application. He appreciated their
feedback to address internal congestion concerns, while allowing
the branding images on the building intact.
Maple Grove Planning Commission
July 26, 2021
Page 3
Commissioner Ostaffe asked if this was Cub Foods first stand-
alone liquor store. Mr. Hornacker reported Cub Foods had 27
liquor stores at this time. He discussed how this would be the first
free standing Cub Wine & Spirits Store.
Commissioner Lenthe stated he would like to see more variety in
the colors of the brick on the building to provide more contrast. He
requested further comment on the windows along the front of the
building. Darren Johnson, SEH Architecture, reported the windows
along the front of the building would be clear vision glass with UV
protection. He indicated the windows along the back of the
building would be Spandrel. He commented further on how the
architecture of the building was drawing off of the adjacent Cub
Foods store.
Commissioner Ayika reported this corner has food vendors on the
weekends. He asked if this would continue in the future. Mr.
Hornacker stated there was enough room on the site for this to
continue going forward.
Commissioner Ayika questioned when construction would begin,
if Cub Foods receives all the necessary approvals. Mr. Hornacker
anticipated construction would begin late this summer or early this
fall with the building opening next spring.
Commissioner Klein inquired if the ash trees on the site would be
treated for disease. Mr. Hornacker stated he would have to check
on the landscape maintenance plan but noted several of the ash
trees were failing and would be replaced.
Chair Lamothe asked if the fireworks tent would still be
accommodated on this property in the summer months. Mr.
Hormacker commented this would still occur.
Chair Lamothe stated he appreciated how this proposal would
utilize the underutilized space. He supported Commissioner
Lenthe’s suggestions to enhance the building façade because it was
on a main corner. Mr. Hornacker discussed the brand connection
between this building and the main Cub Foods building.
Chair Lamothe opened the public hearing at 7:14 p.m.
The public was asked by Chair Lamothe if they had any comments
Maple Grove Planning Commission
July 26, 2021
Page 4
to make regarding this application.
No one wished to address the Commission.
Motion by Chair Lamothe, seconded by Commissioner Lenthe,
to close the public hearing at 7:15 p.m. Upon call of the
motion by Chair Lamothe, there were six ayes and no nays.
Motion carried.
Motion by Commissioner Lindeman, seconded by
Commissioner Ayika, to recommend that the City Council
direct the City Attorney to draft a Resolution and a Planned
Unit Development agreement approving the Cub Wine &
Spirits PUD concept stage plan amendment development stage
plan, subject to:
1. The applicant addressing to the satisfaction of the city
any remaining applicable comments contained in the
memorandums from:
a. The Community & Economic Development
Department dated June 22, 2021
b. The Fire Department dated June 22, 2021
c. The Water Resources Engineer dated June 16,
2021
The applicant shall acknowledge that Park Dedication
requirements are based on staff review and recommendation
to the Park and Recreation Board and their subsequent board
action. Board meetings are held on the third Thursday of each
month.
Upon call of the motion by Chair Lamothe, there were six ayes
and no nays. Motion carried.
PUBLIC HEARING Commissioner Ayika recused himself from taking action on this
item because he works for Xcel Energy.
XCEL ENERGY
Mr. Blauert stated the Xcel Energy site is currently used as a
10131
substation and is comprised of transformers, among other electrical
FERNBROOK equipment. The substation pad is surrounded by a seven-foot-tall
LANE NORTH chain link fence with one foot of barbed wire on top. Turf grass
CONDITIONAL area containing numerous trees exist south and east of the
substation pad. The west and north sides of the substation
USE PERMIT TO
Maple Grove Planning Commission
July 26, 2021
Page 5
CONSTRUCT A immediately abut wetlands. A paved driveway from Fernbrook
PERMANENT Lane North provides access to the substation. Numerous electric
transmission lines and transmission structures exist on and
STAGING AREA
adjacent to the property. Staff discussed the requested conditional
CONSISTING OF use permits in detail and made the following recommendation.
AN 89,900 SQUARE
FOOT GRADED STAFF RECOMMENDATION:
GRAVEL PAD TO
INCLUDE AN Motion to recommend that the City Council direct the City
Attorney to draft a Resolution approving the Xcel Energy
EXPANDED conditional use permit, subject to:
METAL
PERIMETER 1. The applicant addressing to the satisfaction of the city
SUBSTATION any remaining applicable comments contained in the
FENCE memorandums from:
a. The Community & Economic Development
Department dated July 16, 2021
b. The Water Resources Engineer dated July 7, 2021.
Discussion
Commissioner Lindeman asked why Xcel was requesting to
increase the fence height from seven feet to ten feet. Mr. Blauert
explained Xcel was federally mandated to have the higher fence
for security purposes.
Commissioner Lenthe questioned if the fence would be intertwined
with something to block the view. Mr. Blauert reported this was
the case noting two fences would be in place, the interior fence
would be a woven fence which would greatly assist with blocking
the view.
The applicant was at the meeting to answer questions.
Shawn Lawler, Xcel Energy Representative, thanked staff for the
detailed presentation. He reported the higher fence was needed to
meet federal mandates for security purposes. He indicated the
perimeter lighting would be downcast. He noted the second CUP
request would allow for grading of the staging yard.
Commissioner Ostaffe asked if there was a separate entrance to the
yard. Mr. Lawler discussed how the staging yard and substation
would be accessed off of Fernbrook Lane North.
Maple Grove Planning Commission
July 26, 2021
Page 6
Chair Lamothe opened the public hearing at 7:24 p.m.
The public was asked by Chair Lamothe if they had any comments
to make regarding this application.
No one wished to address the Commission.
Motion by Chair Lamothe, seconded by Commissioner Klein,
to close the public hearing at 7:25 p.m. Upon call of the
motion by Chair Lamothe, there were five ayes and no nays.
Motion carried.
Commissioner Lenthe asked if the Commission should be making
two separate motions for the two different CUP’s. Mr. Vickerman
supported this recommendation.
Motion by Commissioner Lindeman, seconded by
Commissioner Lenthe, to recommend that the City Council
direct the City Attorney to draft a Resolution approving the
Xcel Energy fencing conditional use permit, subject to:
1. The applicant addressing to the satisfaction of the
City any remaining applicable comments contained in
the memorandums from:
a. The Community & Economic Development
Department dated July 16, 2021
b. The Water Resources Engineer dated July 7,
2021.
Upon call of the motion by Chair Lamothe, there were five
ayes and no nays. Motion carried.
Motion by Commissioner Lenthe, seconded by Commissioner
Ostaffe, to recommend that the City Council direct the City
Attorney to draft a Resolution approving the Xcel Energy
staging area grading conditional use permit, subject to:
2. The applicant addressing to the satisfaction of the
City any remaining applicable comments contained in
the memorandums from:
c. The Community & Economic Development
Department dated July 16, 2021
d. The Water Resources Engineer dated July 7,
Maple Grove Planning Commission
July 26, 2021
Page 7
2021.
Upon call of the motion by Chair Lamothe, there were five
ayes and no nays. Motion carried.
PUBLIC HEARING Mr. Vickerman stated the applicant is requesting conditional use
permit (CUP) approval to build a church at 15980 105th Avenue.
NORTHWOOD The applicant has owned this site and the adjacent site for several
CHURCH years with the intent to build a church on the property. A previous
concept plan for this site that was approved in 2019 has now
KINGHORN expired. The total site area is 10.56 acres. Staff discussed the
CONSTRUCTION plans in further detail with the Planning Commission and made the
following recommendation.
15980 105TH
AVENUE NORTH STAFF RECOMMENDATION:
CONDITIONAL Motion to recommend that the City Council direct the City
Attorney to draft a Resolution approving the Northwood Church
USE PERMIT TO conditional use permit, subject to:
CONSTRUCT A
CHURCH 1. The applicant addressing to the satisfaction of the city
any remaining applicable comments contained in the
memorandums from:
a. The Community & Economic Development
Department dated July 14, 2021
b. The Engineering Department dated July 8, 2021
c. The Fire Department dated July 12, 2021
Discussion
Commissioner Lenthe asked if the building was being considered.
Mr. Vickerman reported the use of the site was being considered
and the building itself.
Commissioner Lenthe discussed the stormwater situation on the
site and requested further comment from staff on how the
stormwater would be addressed. Mr. Vickerman stated the
applicant was showing overland travel of stormwater to the north
and then a storm pond around the power line easement.
Commissioner Ostaffe inquired if the property to the north could
be built on in the future. Mr. Vickerman stated if the church
wanted to propose something different, this would require a
Maple Grove Planning Commission
July 26, 2021
Page 8
Planned Unit Development request in the future.
The applicant was at the meeting to answer questions.
Scott Fjellman, 7461 Merrimac Lane, stated he was a Maple Grove
resident and have lived in the City for the past 20 years. He
thanked staff for the detailed presentation. He noted his church
bought this property in 2009 and has since been raising money and
making plans for a church building. He reported the proposed
church would be built in three phases. He appreciated the
Commission’s consideration of his request.
Commissioner Lindeman asked if the applicant was willing to
work with staff to provide more screening along 105th Avenue. Mr.
Fjellman stated this would not be a problem.
Chair Lamothe opened the public hearing at 7:38 p.m.
The public was asked by Chair Lamothe if they had any comments
to make regarding this application.
No one wished to address the Commission.
Motion by Chair Lamothe, seconded by Commissioner
Lindeman, to close the public hearing at 7:39 p.m. Upon call
of the motion by Chair Lamothe, there were six ayes and no
nays. Motion carried.
Motion by Commissioner Ostaffe, seconded by Commissioner
Lenthe, to recommend that the City Council direct the City
Attorney to draft a Resolution approving the Northwood
Church conditional use permit, subject to:
1. The applicant addressing to the satisfaction of the city
any remaining applicable comments contained in the
memorandums from:
a. The Community & Economic Development
Department dated July 14, 2021
b. The Engineering Department dated July 8, 2021
c. The Fire Department dated July 12, 2021
Upon call of the motion by Chair Lamothe, there were six ayes
and no nays. Motion carried.
Maple Grove Planning Commission
July 26, 2021
Page 9
PUBLIC HEARING Mr. Vickerman stated the applicant is requesting PUD concept
plan, development plan, rezoning, preliminary and final plat
NORTHWOOD approval to construct 72 townhomes. The site is 10.9 gross acres
TOWNHOMES in size with 0.4 acres of wetlands for a net acreage of 10.5 acres.
The proposed density is 6.9 units per acre, consistent with the
LENNAR medium density residential guiding of the property which allows 4
to 10 units per acre. Staff discussed the plans in further detail with
16100 105TH the Planning Commission and made the following
AVENUE NORTH recommendation.
PUD CONCEPT
STAGE PLAN, STAFF RECOMMENDATION:
DEVELOPMENT
STAGE PLAN, Motion to recommend that the City Council direct the City
REZONING, Attorney to draft a Resolution and a Planned Unit Development
PRELIMINARY agreement approving the Northwood Townhomes PUD residential
concept stage plan, development stage plan, preliminary and final
AND FINAL PLAT
plat, subject to:
TO CONSTRUCT
72 NEW 1.The applicant addressing to the satisfaction of the city any
TOWNHOMES remaining applicable comments contained in the
memorandums from:
a. The Community & Economic Development
Department dated July 21, 2021
b. The Engineering Department dated July 9, 2021
c. The Fire Department dated July 12, 2021
d. The Parks & Recreation Department dated July 20,
2021
Motion to recommend that the City Council direct the City
Attorney to draft an Ordinance for rezoning from R-A, Single-
Family Agricultural to R-4, Medium Density Residential Planned
Unit Development.
The applicant shall acknowledge that Park Dedication
requirements are based on staff review and recommendation to the
Park and Recreation Board and their subsequent board action.
Board meetings are held on the third Thursday of each month.
Discussion
Maple Grove Planning Commission
July 26, 2021
Page 10
Commissioner Lindeman asked if there would be on-street parking
within the townhome development. Mr. Vickerman stated on-street
parking would be allowed on both sides of the public street. He
noted the private streets would not support on-street parking.
Commissioner Ayika questioned what would happen to the existing
homes on the property. Mr. Vickerman reported both homes would
be demolished as part of this project.
Commissioner Ostaffe anticipated these townhomes, based on their
size would have little to no storage. Mr. Vickerman deferred this
question to the applicant.
Commissioner Ostaffe inquired if there were any attempts to break
up the development and make it look less like barracks. Mr.
Vickerman stated staff worked with the applicant to make
improvements to the plan and had conversations about
alternatives. He noted the applicant may have more to say about
this matter.
Commissioner Lenthe stated he supported a public street being
installed in this townhouse development. Mr. Vickerman reported
the proposed public street would provide access to the property to
the west.
Commissioner Klein discussed the fire department memo and
asked how the required turnaround would be addressed. Mr.
Vickerman reported a temporary turnaround would be installed at
the end of the street, either a hammerhead or small cul-de-sac.
Commissioner Ayika anticipated when the property to the west
develops that the existing townhouse owners would be upset when
the road is pushed through. Mr. Vickerman reported the City could
install signs stating this road would continue in the future.
Commissioner Ayika supported this recommendation as it would
keep the public informed of the future intention for this road to be
pushed through.
Chair Lamothe supported this recommendation as well.
Commissioner Ostaffe asked why there would be no parking on the
private streets. Mr. Vickerman reported City Code does not allow
for parking on either side of the street for roadways that are less
than 28 feet wide. It was noted the proposed private roadways
Maple Grove Planning Commission
July 26, 2021
Page 11
would be 24 feet wide.
Commissioner Lenthe questioned if the City would have an
easement for the proposed sidewalk. Mr. Vickerman explained the
City would need to be granted an easement for the sidewalk and
recommended this be made a condition for approval.
The applicant was at the meeting to answer questions.
Paul Tabone Lennar representative, thanked staff for their
assistance on this project. He indicated this project would have two
different townhome types, back to back and row townhomes. He
noted the row townhomes would have a basement which would
assist with storage concerns. He stated he had great success with
the Rush Creek Townhomes, which led him to propose this
development. He reported he heard the concerns regarding
architecture and visual appeal, and noted he worked on the
landscaping plan with enhancements. He commented the project
would have an open space and play area to the south with another
activity node to the north with a fire pit. He stated he would
appreciate the Commission’s support this evening.
Chair Lamothe explained he appreciated the fact the trees had been
brought to the public street in order to create a boulevard feel with
the meandering trail. He stated this was a nice feature.
Commissioner Ayika requested the applicant address the sidewalk
easement concern. Mr. Tabone reported he would be able to grant
an easement for the sidewalk.
Chair Lamothe opened the public hearing at 7:57 p.m.
The public was asked by Chair Lamothe if they had any comments
to make regarding this application.
LeAnn Blanchard Peterson, 15967 105th Avenue North, stated she
lives directly across from the church property. She noted she has
lived in her home for the past 11 years. She indicated she was
much happier with the proposed plan than the plan that was
submitted in 2019 that consisted of 261 apartment units, several
four-plexes and villas. She explained the newer plan has fewer
units and less density, which she appreciated. She commented
there was no water or sewer along this portion of 105th Avenue.
She noted 105th Avenue was now paved and questioned how water
and sewer would be brought in. She indicated she was concerned
Maple Grove Planning Commission
July 26, 2021
Page 12
about how the additional units would increase the volume and
speed of traffic along 105th Avenue. She reminded the church and
the developer that the surrounding property was zoned agriculture.
Mr. Vickerman discussed where water and sewer lines were
currently and described how water/sewer lines would be brought to
this property.
Commissioner Ayika asked how many units this development
would have. Mr. Vickerman reported there would be 72 units and
not 76.
Commissioner Ayika recommended the City look into the speed of
traffic along this roadway, especially given the fact residents have
to cross this street to get their mail.
Motion by Chair Lamothe, seconded by Commissioner Lenthe,
to close the public hearing at 8:08 p.m. Upon call of the
motion by Chair Lamothe, there were six ayes and no nays.
Motion carried.
Motion by Commissioner Lindeman, seconded by
Commissioner Klein, to recommend that the City Council
direct the City Attorney to draft a Resolution and a Planned
Unit Development agreement approving the Northwood
Townhomes PUD residential concept stage plan, development
stage plan, preliminary and final plat, subject to:
1. The applicant addressing to the satisfaction of the city
any remaining applicable comments contained in the
memorandums from:
a. The Community & Economic Development
Department dated July 21, 2021
b. The Engineering Department dated July 9, 2021
c. The Fire Department dated July 12, 2021
d. The Parks & Recreation Department dated July 20,
2021
e. The City be granted an easement for the sidewalk.
Commissioner Ostaffe questioned if the new residents would be
made aware of the fact, they were moving into townhouses that
were surrounded by farming and agricultural land. Mr. Tabone
reported disclosures would be made within the purchase
Maple Grove Planning Commission
July 26, 2021
Page 13
agreements.
Chair Lamothe supported this recommendation because the
adjacent agricultural uses would not be going away anytime soon.
Commissioner Lindeman stated she could amend her motion to
include another condition that requires the applicant to disclose the
fact that the townhomes were surrounded by agricultural uses.
f. The developer shall disclose to future property
owners the fact that the townhomes are surrounded
by agricultural uses.
Commissioner Ayika asked if this would be a problem for the
developer. Mr. Tabone stated he would have to speak with his land
coordinators, but he did not believe this would be a concern.
Chair Lamothe thanked staff for all of their efforts on this project.
Upon call of the motion by Chair Lamothe, there were six ayes
and no nays. Motion carried.
Motion by Commissioner Lindeman, seconded by
Commissioner Klein, to recommend that the City Council
direct the City Attorney to draft an Ordinance for rezoning
from R-A, Single-Family Agricultural to R-4, Medium Density
Residential Planned Unit Development.
The applicant shall acknowledge that Park Dedication
requirements are based on staff review and recommendation
to the Park and Recreation Board and their subsequent board
action. Board meetings are held on the third Thursday of each
month.
Upon call of the motion by Chair Lamothe, there were six ayes
and no nays. Motion carried.
PUBLIC HEARING Mr. Corrow stated the applicant seeks approval for a rezoning,
short plat (preliminary and final plat) and comprehensive plan
REO PLASTICS amendment for the purpose of combining an adjacent lot to the
existing REO Plastics property. The site is located at the junction
KRAUS of County Road 30 and County Road 81 and borders a residential
ANDERSON neighborhood to the west. The request involves combining an
CONSTRUCTION adjacent residential property and rezoning it to industrial. The
Maple Grove Planning Commission
July 26, 2021
Page 14
COMPANY residential lot was purchased by REO Plastics and is at the south
west corner of its current site. The lot is one acre in size and
11850 93RD currently contains a home and outbuildings with a driveway
AVENUE NORTH leading directly onto County Road 30 (93rd Avenue). Upon
combining the lot, the applicant plans to reconfigure its parking
REZONING, area and shift one of its driveways farther to the west. Based on
the configuration of the residential lot and the less than ideal
SHORT PLAT AND
driveway access directly onto a minor arterial roadway, staff is
COMPREHENSIVE supportive of the request.
PLAN
AMENDMENT FOR Mr. Corrow reported a site plan review was also submitted for the
THE PURPOSE OF 39,000 sq. ft. addition on the north west corner of the existing
building. The building expansion is not subject to Planning
COMBINING AN
Commission approval and is being reviewed administratively per
ADJACENT City Code. Staff will require that all zoning and building code
PROPERTY standards are met as part of the addition. Memos relating to the
site plan review are included for informational purposes only.
Staff discussed the plans in further detail with the Planning
Commission and made the following recommendation.
STAFF RECOMMENDATION:
Motion to recommend that the City Council direct the City
Attorney to draft a Resolution and a Planned Unit Development
agreement approving the REO Plastics Phase 2 comprehensive
plan amendment and short plat, subject to:
1. The applicant addressing to the satisfaction of the city any
remaining applicable comments contained in the
memorandums from:
a. The Community & Economic Development
Department dated July 9, 2021
b. The Parks & Recreation Department, dated July 20,
2021
c. The Fire Department dated July 14, 2021
d. The Water Resources Engineer dated July 20, 2021
e. Hennepin County dated July 7, 2021
Motion to recommend that the City Council direct the City
Attorney to draft an Ordinance approving rezoning from R-2,
Single-Family Residential to I, Industrial for the purpose of
combining an adjacent property.
Maple Grove Planning Commission
July 26, 2021
Page 15
The applicant shall acknowledge that Park Dedication
requirements are based on staff review and recommendation to the
Park and Recreation Board and their subsequent board action.
Board meetings are held on the third Thursday of each month.
Discussion
Commissioner Lindeman asked if the building addition was being
considered by the Commission. Mr. Corrow explained the
Commission was being asked to address the rezoning and
comprehensive plan amendment for the purpose of combining two
properties.
Commissioner Lindeman questioned if there would be screening
along the driveway. Mr. Corrow reviewed the landscaping plan
noting the screening that would be placed along the driveway and
berm.
Commissioner Ayika inquired how long REO Plastics has owned
the residential property. Mr. Corrow indicated REO Plastics
purchased this property in 2019.
Commissioner Lenthe asked what motions staff was seeking from
the Commission. Mr. Vickerman reported staff was seeking
approval of a comprehensive plan amendment and short plat, and
a second motion that would approve the rezoning of the property.
Commissioner Ostaffe discussed the drive that would be created to
enter the property and noted the significant berm that would be
created along the north property line. He asked if this berm would
be landscaped. Mr. Corrow reported the applicant provided quite
a bit of screening at this corner and staff was satisfied with the
proposed plans.
The applicant was at the meeting to answer questions.
Paul Evanson, REO Plastics, explained his company has been in
business since 1960 and at this location in Maple Grove since
1968. He stated he was excited to be able to expand his business
in the community. He indicated he would continue to work to be a
good neighbor in the community.
Commissioner Lindeman thanked Mr. Evanson for reaching out to
his neighbors prior to coming to this meeting.
Maple Grove Planning Commission
July 26, 2021
Page 16
Chair Lamothe concurred.
Chair Lamothe opened the public hearing at 8:24 p.m.
The public was asked by Chair Lamothe if they had any comments
to make regarding this application.
Chris Williamson, 12055 93rd Place North, thanked the
Commission for their time. He explained he lived in the cul-de-sac
that backs up to REO Plastics. He commented his main concern
was having a parking lot installed on the newly rezoned land. He
stated when he purchased his home, this lot was zoned residential
and not industrial. He indicated he met with Mr. Evanson today
and understood the corner on the northwest would not be used as a
parking lot. He appreciated the landscaping that was being
proposed as this would assist with screening the business from the
adjacent residential homes. He requested that a stipulation be
placed on the property that there will not be a parking lot on the
rezoned lot.
Commissioner Ayika questioned where the parking lot was
proposed. Mr. Corrow explained the applicant was proposing to
add warehousing space and did not require additional parking. He
noted the rezoned lot did have space set aside for proof of parking,
but not an actual parking lot.
Chair Lamothe inquired what would happen if REO Plastics were
to sell and a more intense use were to move onto the site that
required more parking. Mr. Corrow reported if the property were
to sell, the new owner would be allowed to install additional
parking but the screening would have to remain in place.
Chair Lamothe asked if the Commission could make a
recommendation to restrict the location of future surface parking.
City Attorney Templin explained the Commission could make this
recommendation but it would be contrary to what City Code
requires.
Commissioner Ayika stated if the current applicant does not
require the parking lot, he believes this suffices. Mr. Vickerman
reported there was space on the east side of the new entrance drive
that could be set aside for proof of parking.
Chair Lamothe believed the applicant was an upstanding member
Maple Grove Planning Commission
July 26, 2021
Page 17
of the community and had no intention to move outside the City of
Maple Grove. However, if the property were to be transferred to
another owner, he wanted to ensure the parking was pushed to the
east side of the entrance and that the screening remain in place so
as to protect the adjacent residential properties. Mr. Vickerman
stated this could be done and noted he would work with the
applicant to make this change.
Ted Schirck, 12074 93rd Place North, reported he has lived in his
home for the past 23 years. He stated REO Plastics has been a
good neighbor this entire time. He questioned if the new drive had
to be pushed further to the west, or could the existing driveway be
used. He reported this would keep the existing tree barrier in place
to buffer the industrial use from the adjacent residential properties.
He inquired if trucks would be coming and going from the new
entrance.
Chair Lamothe requested staff speak to any concerns that have
arisen from the existing driveway and what might be achieved with
the new driveway alignment. Mr. Corrow discussed the comments
staff received from Hennepin County noting the current left turning
truck traffic aligns from County Road 30 into the existing parking
lot aligns with outgoing traffic on Hemlock Lane. He stated
shifting the driveway would reduce this concern.
Chair Lamothe questioned where the request for a new driveway
came from. He asked if this came from the County and this was
addressing an existing problem or was this a request from the
applicant. Mr. Corrow reported this was a preference from
Hennepin County. Mr. Evanson commented the current driveway
approach had grade concerns. He noted the intent would be to have
a clockwise rotation for the trucks to use to get in and out of the
property. He explained he would support moving the proof of
parking to the east side of the new driveway.
Chair Lamothe asked how many trees would be lost due to the new
driveway. Mr. Corrow discussed the tree loss with the
Commission and noted new trees would be planted along the
property line.
Commissioner Lindeman commented if the existing driveway were
regraded and used, additional parking would be lost. She stated
this meant additional parking would have to be added elsewhere on
the lot.
Maple Grove Planning Commission
July 26, 2021
Page 18
Chair Lamothe questioned if there has been any look at preserving
additional trees through a new driveway alignment. Mr. Corrow
stated he was working with the applicant on improving the
landscaping plan. He does not believe preserving any of the larger
trees on the left-hand side of the drive aisle was possible.
However, he could look at potentially installing a retaining wall at
the corner to assist in saving some trees.
Commissioner Lamothe supported staff looking at a new alignment
for the entrance in order to save trees, but indicated Hennepin
County may have something to say about this. He encouraged the
applicant to work on this matter further in order to minimize the
loss of trees. Mr. Corrow stated he would work with the applicant
on this.
Commissioner Ostaffe stated when it comes to realign the
driveway, he understood there was some grading concerns. He
reported he has seen a truck completely stopped and blocking
County Road 30. He questioned if the current option would be a
better option versus the new proposed drive aisle. Mr. Corrow
explained he was not overly familiar with the topography on this
property but stated shifting the drive aisle to the east may be a
possibility. Mr. Evanson agreed, but noted there was a rise that
may have to be knocked down.
Mary Alice Mulloy Fatta, 12035 93rd Avenue North, stated she
supported local businesses and their expansion, but noted she was
concerned with the fact the business was being pushed closer to the
residential neighborhood. She explained her property line abutted
this business and the new driveway would be extremely close to
her home. She expressed concern with how the truck traffic and
noise would impact her property.
Dan Dittes, 12044 93rd Avenue North, explained he lived just west
of the property REO Plastics purchased. He noted he has lived in
his home since 1977. He indicated he met with Mr. Evanson today
and stated the neighbors would like to maintain their privacy. He
suggested staff and the applicant see if the driveway could remain
on the east side of the property.
Julie Duffner, 12086 93rd Place North, stated she lives between
County Road 30 and 81 on the berm line. She reported she shares a
property line with REO Plastics. She reviewed several photos with
the Commission and discussed the history of this property. She
Maple Grove Planning Commission
July 26, 2021
Page 19
understood a minor change was being proposed to the
Comprehensive Plan, but explained the adjacent property owners
would be adversely impacted due to the large number of trees that
would be lost due to the new driveway alignment. She reported the
trees that would be taken out were required when REO Plastics
constructed their first addition. She did not support the City
requiring REO Plastics to remove this landscaping when it was
previously required. She noted the applicant was proposing to
remove 50% of the berm that was in place. This berm was put in
place to screen the business from the neighborhood. She
encouraged the Commission to keep in mind this was a very
significant piece of property and changes to this property would
dramatically impact the adjacent residential neighbors. She
commented further on how the view would be impacted when all
of these trees are removed.
Bill Duffner, 12086 93rd Place North, discussed the poor design
REO Plastics had at the entrance and noted trucks have a difficult
time getting in and out of the site. He suggested the existing
entrance be regraded to address this concern.
Michelle Einstein, 12062 93rd Place North, stated she bordered the
REO Plastics property. She explained she was concerned about the
proposed parking lot or proof of parking and the loss of the
landscaping.
Debra Nelson, 12034 94th Avenue North, discussed the notice she
received from the City and the applicant. She believed the notice
was misleading and questioned why residents could not discuss the
entire addition. She commented on how the proposed addition
would impact her property. She requested the City require the
previous buffer to remain in place and that the driveway be
reconsidered.
Commissioner Lenthe asked if there were any fences along the rear
property lines.
Ms. Nelson stated she does not have a fence in place.
Mr. Duffner discussed how the new driveway would cut into the
existing berm because it is being pushed so far to the west. He
requested the driveway alignment be reconsidered.
Motion by Chair Lamothe, seconded by Commissioner Klein,
to close the public hearing at 9:15 p.m. Upon call of the
Maple Grove Planning Commission
July 26, 2021
Page 20
motion by Chair Lamothe, there were six ayes and no nays.
Motion carried.
Commissioner Lindeman stated she would be in favor of staff and
the applicant reviewing this plan further moving the driveway to
the east in order to save more trees. She suggested the
Commission table action on this item.
Commissioner Ayika explained he would like to hear from the
applicant and questioned when the City had to take action on this
item.
Chair Lamothe stated he had questions regarding this request as
well and noted the Commission has to keep in mind what it has
jurisdiction over and what it does not have jurisdiction over. He
noted he supported the proposed expansion, but has questions
regarding the new driveway. He explained he wanted to learn
more about the previous site and landscaping requirements. He
reported he was struggling with what alternatives the applicant
may have regarding the driveway access. He indicated he could not
support the project as proposed and would support action being
tabled until his questions were answered.
Commissioner Ostaffe commented the applicant was willing to add
a berm or trees in the area of the new driveway. He explained the
new driveway would be 40 to 50 feet from the property line. He
understood the existing driveway was dangerous for trucks and he
believed the new driveway was a better alternative.
Commissioner Ayika asked what the 60-day deadline was for this
project. Mr. Vickerman reported the deadline was August 27,
2021.
Commissioner Lenthe supported this item being tabled to August
9, 2021 in order to allow the applicant and planning staff to
address the concerns that were raised at this meeting. He
understood Hennepin County’s interest in relocating the driveway
entrance but recommended staff further consider the driveway
situation.
Commissioner Ostaffe reported the Commission does not have
jurisdiction over the berms and landscaping plan. Rather, the
Commission can offer feedback to staff. Mr. Corrow stated this
was the case noting staff would be overseeing the site plan review.
Maple Grove Planning Commission
July 26, 2021
Page 21
Commissioner Lindeman reiterated that she would not be able to
support the rezoning without more questions being answered.
Chair Lamothe concurred stating he would need to understand if
the change in access was needed or required and what other
options were considered.
Commissioner Ayika requested comment from the applicant on
how he feels about this item being tabled. Mr. Evanson stated his
desire would be to move this project forward. He explained he was
willing to work with staff to address the questions that have been
raised. He discussed the grade change at the existing entrance and
exit. He indicated it was his intent to make the best-case scenario
with fencing and plantings to screen the new driveway from the
adjacent residential lots. He reported the existing berm was
significant in size and noted he was willing to work through the
issues that had been brought up by the neighbors.
Commissioner Ayika supported the applicant working with the
neighbors, staff and his engineering firm to see what alternatives
could be considered for the driveway entrance. He recommended
action on this item be tabled to allow this to occur and noted the
Commission could consider this item again on August 9th.
Motion by Commissioner Lindeman, seconded by Chair
Lamothe, to table action on this item to the August 9, 2021
Planning Commission meeting to allow the applicant and staff
to address concerns regarding the new driveway alignment.
Upon call of the motion by Chair Lamothe, there were five
ayes and one nay (Commissioner Ostaffe opposed). Motion
carried.
PUBLIC HEARING Motion by Chair Lamothe, seconded by Commissioner
Lindeman, to remove this item from the table. Upon call of
CROCUS GROVE the motion by Chair Lamothe, there were six ayes and no nays.
Motion carried.
PULTE GROUP
Mr. Corrow stated the applicant is requesting Planned Unit
15024 Development (PUD) concept stage plan, development stage plan,
TERRITORIAL preliminary plat, rezoning approval and lot division for a 52 lot,
ROAD single-family detached home neighborhood. The property is
located at the northern end of Maple Grove, just west of Fernbrook
PLANNED UNIT Lane and directly adjacent to The Enclave at Rush Creek
DEVELOPMENT neighborhood that was approved in 2016. Similar to that
Maple Grove Planning Commission
July 26, 2021
Page 22
(PUD) CONCEPT development, there is no direct access to this area from the south
STAGE PLAN, so the site will be accessed from the City of Dayton by way of
Rush Creek Parkway. Staff discussed the plans in further detail and
DEVELOPMENT
made the following recommendation.
STAGE PLAN,
PRELIMINARY STAFF RECOMMENDATION:
PLAT, REZONING
AND Motion to recommend that the City Council direct the City
ADMINISTRATIVE Attorney to draft a Resolution and a Planned Unit Development
LOT DIVISION agreement approving the Crocus Grove PUD residential concept
stage plan, development stage plan, preliminary plat, and
FOR THE administrative lot division, subject to:
PURPOSE OF A
SINGLE-FAMILY 1. The applicant addressing to the satisfaction of the city any
RESIDENTIAL remaining applicable comments contained in the
DEVELOPMENT memorandums from:
CONSISTING OF 52
a. The Fire Department dated April 28, 2021
LOTS b. The Water Resources Engineer dated May 7, 2021
c. The Parks and Recreation Department dated July 21,
2021
d. Three Rivers Park District dated May 10, 2021
e. The City of Dayton dated June 2, 2021
Motion to recommend the City Council direct the City Attorney to
draft an Ordinance rezoning property from R-A, Single-Family
Agricultural to R2 PUD Single-Family Residential (Planned Unit
Development) subject to the approval of the final plat.
The applicant shall acknowledge that Park Dedication
requirements are based on staff review and recommendation to the
Park and Recreation Board and their subsequent board action.
Board meetings are held on the third Thursday of each month.
Discussion
Commissioner Ostaffe discussed the lot size within this
development and noted the vast majority of the lots would be much
smaller than 10,000 square feet. Mr. Corrow indicated the
majority of the lots were around 7,800 square feet in size.
Commissioner Lenthe indicated this plat was proposing 65-foot-
wide lots. He noted he had concerns about a previous development
that made this same request. He stated he was not a big proponent
Maple Grove Planning Commission
July 26, 2021
Page 23
for reducing lot sizes. He questioned if this was to the advantage of
the developer or if this assisted in reducing home prices. He
explained he did not support this development as proposed
because one of the lots would require a retaining wall next to a
wetland. He recommended slightly larger lots be considered. He
asked if the infiltration pond would be maintained by the City. Mr.
Corrow reported this was the case.
Commissioner Lenthe suggested the infiltration pond land be
deeded to the City in order to provide the City with proper access
to this property.
Commissioner Ostaffe supported Commissioner Lenthe’s
comments. He indicated these lots were quite narrow and dense
which were not in keeping with the surrounding neighborhoods.
He recommended the City set itself apart with larger lots that were
10,000 square feet or above.
Commissioner Lindeman asked if the Council supported smaller
lot sizes in the Evanswood development. Mr. Vickerman reported
the Council did not support the 28, 45 and 50-foot-wide lots. He
explained Evanswood came back with a combination of 65 and 80-
foot-wide lots in exchange for open space. He noted the Edgewater
at Cook Lake development had 45-foot-wide lots with shoreland
involved with a different product type.
Commissioner Ayika inquired if Wetland 3 was the responsibility
of the City. Mr. Corrow stated the wetland was not maintained by
the City, but the pond to the south would be maintained by the
City.
Commissioner Klein indicated she was not opposed to smaller lots
such as 65 feet if it increased the amount of housing available in
the community. She explained she did want to understand if the
smaller lot size made the homes more affordable or accessible. She
asked what the price range would be for these homes. Mr. Corrow
deferred this question to the applicant.
Chair Lamothe stated he did not have a concern regarding the lot
width. He indicated he did have a concern with why the lot width
was being requested and how the lot width would impact the future
home values. He discussed the size of his lot, which was smaller
and noted there was a market for narrower lots.
Maple Grove Planning Commission
July 26, 2021
Page 24
The applicant was at the meeting to answer questions.
Paul Hoyer, Pulte Homes, thanked the Commission for their
consideration. He noted he has been working with staff on a
variety of options for this project. He explained what drove the site
plan was dedicating enough land as possible for the future open
space trail through the area and trying to save as many trees as
possible within the T-zone. He stated he made an assumption the
City would rather see more open space as opposed to having large
lots that encroach into the open space. He understood the Rush
Creek trail was important to the City and the region. He indicated
if this was not the direction he should pursue, the plans could be
reconsidered. He apologized about the table and lot averages,
noting he was not trying to hide anything. He reported he was
trying to preserve as much open space as possible, which led to
slightly smaller sized lots. He indicated he would be fine offering
the City an easement or outlot for the wetlands. He stated the
proposed homes would have three car garages and estimated the
home values would be $450,000 to $550,000. He commented the
property was more dense in order to preserve more open space.
Commissioner Ayika stated it was his understanding the developer
needed this number of units in order to make the project feasible.
Mr. Hoyer indicated this was the case, but noted more land was
also preserved than was necessary.
Commissioner Ostaffe asked if there was a pipeline or other
easement running through the property. Mr. Hoyer explained the
property did have a pipeline in place that had to be worked around.
Commissioner Lenthe spoke to the economics of the project and
asked if a variety of lot widths could be considered within this
development. Mr. Hoyer stated this piece of land was part of a
larger piece that was south of the creek. He explained north of the
creek was ready to be developed and south of the creek he would
have a wide variety of housing types and lot widths. He indicated
this project was much smaller and therefore the smaller lot size
was being proposed.
Chair Lamothe questioned if the setbacks were only five feet. Mr.
Hoyer reported the setbacks were five and ten feet.
Chair Lamothe opened the public hearing at 10:15 p.m.
Maple Grove Planning Commission
July 26, 2021
Page 25
The public was asked by Chair Lamothe if they had any comments
to make regarding this application.
Matt Spitzka, 10887 Orchid Lane, reported he lived to the west of
Lot 1, Outlot 1 in Avalon Run. He stated the lot widths may be
trivial but noted the lot size was a concern to him. He explained if
the three largest lots were removed from this plat, the average lot
size was 8,800 square feet and if the five largest lots out the lots
are only 7,800 square feet in size. He indicated Pulte wants the
City to believe that there is either larger lots or open space. He
understood there was a pipeline that ran through this property. he
stated this was not a neighborhood being placed on a busy
roadway, but rather was within existing neighborhoods. He noted
this was not affordable housing just because the lot sizes were
smaller. He recommended this development more closely reflect
the adjacent neighborhoods.
Motion by Chair Lamothe, seconded by Commissioner Ayika,
to close the public hearing at 10:18 p.m. Upon call of the
motion by Chair Lamothe, there were six ayes and no nays.
Motion carried.
Motion by Commissioner Klein, seconded by Commissioner
Ayika, to recommend that the City Council direct the City
Attorney to draft a Resolution and a Planned Unit
Development agreement approving the Crocus Grove PUD
residential concept stage plan, development stage plan,
preliminary plat, and administrative lot division, subject to:
1. The applicant addressing to the satisfaction of the city
any remaining applicable comments contained in the
memorandums from:
a. The Fire Department dated April 28, 2021
b. The Water Resources Engineer dated May 7, 2021
c. The Parks and Recreation Department dated July
21, 2021
d. Three Rivers Park District dated May 10, 2021
e. The City of Dayton dated June 2, 2021
Commissioner Lenthe asked staff to speak about a potential outlot
within this development. Mr. Corrow stated this was a possibility
that has been practiced in other developments and he anticipated an
easement would make this happen.
Maple Grove Planning Commission
July 26, 2021
Page 26
Commissioner Lenthe requested a friendly amendment to the
motion modifying the plat to include an outlot in the areas of the
wetland and infiltration basin.
Motion amendment by Commissioner Lenthe, seconded by
Chair Lamothe, to modify the plat to include an outlot in the
areas of the wetland and infiltration basin.
Commissioner Lindeman stated she was struggling with how small
these lots would be if the outlot was created. She indicated the
small lot size was not making the homes within the development
affordable and for this reason, she would not be supporting this
project.
Commissioner Klein explained she made the motion to support
this project because 13 acres of important open space were being
preserved. She feared that if the project were denied, this land may
not be preserved through a future development proposal.
Commissioner Ostaffe stated he agreed with Commissioner
Lindeman noting he did not support the proposed lot width. He
indicated he would like to see what other proposals the developer
had for this site.
Upon call of the amendment by Chair Lamothe, there were six
ayes and no nays. Motion carried.
Chair Lamothe stated he lived on a 65-foot-wide lot and this was
not a concern to him. He reported his development was dense and
walkable because it was close to the downtown area of Maple
Grove. He explained the context or location of this development
was different. He indicated he was not supportive of the proposed
lot size within this development. He questioned what the City
would get if this development were not approved and how would
the open space be impacted. Mr. Vickerman reported the open
space would be impacted.
Commissioner Ayika stated this development needed 50 units in
order to be accessible. However, he was hearing what the applicant
was saying that the proposed development was protecting a large
portion of open space.
Commissioner Ostaffe questioned if the Commission should table
Maple Grove Planning Commission
July 26, 2021
Page 27
action on this item to have the applicant bring back other options
for this property. He stated he would like to see other options that
make the project economically viable, but with larger lot sizes in
order for the Commission to consider the options.
Commissioner Ayika asked if the Commission could table action
on this item. Mr. Corrow reported this item required action from
the Commission this evening in order to move along to the City
Council for final consideration prior to the 60-day deadline.
Commissioner Lenthe stated he could support this project without
Lot 21. He suggested Lot 4 in Block 2 also be removed.
Commissioner Ayika indicated the Commission cannot take action
to eliminate lots within developments, but rather the Commission
can make a recommendation to the developer.
Chair Lamothe called the question.
Upon call of the amended motion by Chair Lamothe, there
were three ayes and three nays (Commissioner Ostaffe,
Commissioner Lindeman and Chair Lamothe opposed).
Motion failed.
Motion by Commissioner Klein, seconded by Chair Lamothe,
to recommend that the City Council direct the City Attorney to
draft an Ordinance rezoning property from R-A, Single-
Family Agricultural to R2 PUD Single-Family Residential
(Planned Unit Development) subject to the approval of the
final plat.
The applicant shall acknowledge that Park Dedication
requirements are based on staff review and recommendation
to the Park and Recreation Board and their subsequent board
action. Board meetings are held on the third Thursday of each
month.
Upon call of the motion by Chair Lamothe, there were six ayes
and no nays. Motion carried.
DISCUSSION There were no discussion items.
ITEMS
Maple Grove Planning Commission
July 26, 2021
Page 28
ADJOURNMENT Motion by Chair Lamothe, seconded by Commissioner Lenthe,
to adjourn the Planning Commission meeting. Upon call of
the motion by Chair Lamothe, there were six ayes and no nays.
Motion carried.
Chair Lamothe adjourned the meeting at 10:41 p.m. to the next
regularly scheduled meeting of the Planning Commission
scheduled for August 9, 2021.