Planning Commission
Regular MeetingMaple Grove, MN · February 28, 2022
Minutes
MAPLE GROVE
PLANNING COMMISSION
February 28, 2022
CALL TO ORDER A meeting of the Maple Grove Planning Commission was held at
7:00 p.m. on February 28, 2022 at the Maple Grove City Hall,
Hennepin County, Minnesota. Chair Lamothe called the meeting to
order at 7:00 p.m.
PLEDGE OF
ALLEGIANCE
ROLL CALL Planning Commission members present were Chair Craig
Lamothe, Chris Ayika (attending remotely), Susan Lindeman
(attending remotely), Chuck Lenthe, Michael Ostaffe, and Joe
Piket. Absent was Lorie Klein (excused). Present also were Karen
Jaeger, City Council Liaison; Joe Hogeboom, Community and
Economic Development Director; Peter Vickerman, Planning
Manager; Jesse Corrow, Associate Planner; and Scott Landsman,
City Attorney.
ITEMS TO BE Chair Lamothe requested an item be added to the Consent Agenda
REMOVED FROM that would table action for the Westin Commons 2nd Addition
request to the March 14, 2022 Planning Commission meeting.
THE AGENDA
Motion by Chair Lamothe, seconded by Commissioner Lenthe,
to add Item B to the Consent Agenda that would TABLE
action on the Westin Commons 2nd Addition to the March 14,
2022 Planning Commission meeting. Upon call of the motion
by Chair Lamothe, there were six ayes and no nays. Motion
carried.
CONSENT ITEMS The following Consent Items were presented for the Commission’s
approval:
A. Regular Meeting – February 14, 2022
B. Westin Commons 2nd Addition request TABLED to March 14,
2022.
Commissioner Ostaffe requested a change to the February 14
minutes on Page 14 noting the blank line should be filled in with
his name. He requested on Page 15, paragraph 5 changing size to
side.
Maple Grove Planning Commission
February 28, 2022
Page 2
Motion by Chair Lamothe, seconded by Commissioner Ostaffe,
to approve the Consent Items as amended. Upon call of the
motion by Chair Lamothe, there were six ayes and no nays.
Motion carried.
CONSIDERATION None.
OF ITEMS PULLED
FROM CONSENT
AGENDA
REVIEW OF THE Mr. Vickerman reviewed with the Commission what items the City
CITY COUNCIL Council approved that was given direction at the Planning
Commission level.
MINUTES FROM
THEIR REGULAR
MEETING OF
FEBRUARY 22,
2022
OLD BUSINESS No items to present.
NEW BUSINESS
Mr. Vickerman stated Endeavor Development is seeking PUD
ARBOR LAKES development stage plan and final plat approval for building B of
BUSINESS PARK the second phase of Arbor Lakes Business Park. The subject
PHASE 2 property is located at the northeast intersection of Fountains Drive
BUILDING B and Zachary Lane. This project was first brought forward for
approvals by the city in 2017 and received renewed approvals for
ENDEAVOR concept stage plan in 2021. The first building of phase two
DEVELOPMENT received development stage plan approval in 2021 and is currently
under construction. This request for PUD development stage plan
ELM CREEK and final pat approval matches the development concept and
BOULEVARD AND comments that were previously approved. The applicant is
proposing to construct one building, building B, that is a total of
FOUNTAINS 221,549 square feet in size. The proposed development is
DRIVE consistent and mirrors what was developed in the first phase of
Arbor Lakes Business Park, directly adjacent to the east of the
PUD property. Staff discussed the plans in further detail and made the
DEVELOPMENT following recommendation.
STAGE PLAN AND
FINAL PLAT TO STAFF RECOMMENDATION:
CONSTRUCT
Maple Grove Planning Commission
February 28, 2022
Page 3
BUILDING B Motion to recommend that the City Council direct the City
Attorney to draft a Resolution and a Planned Unit Development
agreement approving the Arbor Lakes Business Park Phase 2
Building B Planned Unit Development stage plan and final plat
subject to:
1. The applicant addressing to the satisfaction of the city any
remaining applicable comments contained in the
memorandums from:
a. The Community & Economic Development
Department dated February 4, 2022
b. The Engineering Department dated January 21, 2022
c. The Fire Department dated January 19, 2022
The applicant shall acknowledge that Park Dedication
requirements are based on staff review and recommendation to the
Park and Recreation Board and their subsequent board action.
Board meetings are held on the third Thursday of each month.
Discussion
Commissioner Ostaffe requested further information on the status
of Phase 2 Building A. Mr. Vickerman reported he did not have
this information but noted the applicant may be able to answer this
question.
Commissioner Piket questioned if there was enough room between
the buildings to allow two trucks to pass. Mr. Vickerman indicated
this would be allowed.
The applicant was at the meeting to answer questions.
Joe Bergman, Endeavor Development representative, explained
Phase 2 Building A would be completed in June. He noted he has
had various prospects, but no leases were signed just yet. He
reported the truck court would handle two trucks servicing both
buildings at the same time.
Commissioner Ostaffe asked what percentage of office/warehouse
would push the 246 parking spaces. Mr. Bergman indicated every
tenant has different parking requirements. He noted some of the
trailer spaces in the back could be restriped to provide more
parking.
Maple Grove Planning Commission
February 28, 2022
Page 4
Chair Lamothe questioned if Endeavor had any prospects for the
new building. Mr. Bergman commented it was speculative at this
time. He stated in this market, it was hard to land a tenant without
knowing when the building would be completed.
Chair Lamothe asked if there were any comments from the public.
There were no comments.
Motion by Commissioner Lenthe, seconded by Commissioner
Piket, to recommend that the City Council direct the City
Attorney to draft a Resolution and a Planned Unit
Development agreement approving the Arbor Lakes Business
Park Phase 2 Building B Planned Unit Development stage plan
and final plat subject to:
1. The applicant addressing to the satisfaction of the city
any remaining applicable comments contained in the
memorandums from:
a. The Community & Economic Development
Department dated February 4, 2022
b. The Engineering Department dated January 21,
2022
c. The Fire Department dated January 19, 2022
The applicant shall acknowledge that Park Dedication
requirements are based on staff review and recommendation
to the Park and Recreation Board and their subsequent board
action. Board meetings are held on the third Thursday of each
month.
Upon call of the motion by Chair Lamothe, there were six ayes
and no nays. Motion carried.
PUBLIC HEARING Mr. Corrow stated the applicant is requesting a variance to permit a
recently constructed shed that encroaches into the 5-foot side yard
7479 FERNBROOK setback and is larger and taller than permitted within the shoreland
LANE NORTH setback area. The property located at 7479 Fernbrook Lane N.
abuts Fish Lake and is in the shoreland overlay district. City Code
MICHAEL BALL
allows for a water oriented accessory structure to be placed within
VARIANCE TO the 75-foot shoreland setback when certain conditions are met. The
PERMIT A 10 code specifies the structure shall not be greater than 10 feet in
FOOT-8 INCH height and 100 square feet in area. Additionally, the structure shall
at no point be closer than 25 feet to the ordinary high-water mark
Maple Grove Planning Commission
February 28, 2022
Page 5
TALL AND 124 and shall conform with side yard setbacks for that zoning district.
SQUARE FOOT The lot meets the criteria to place a structure within the shoreland
setback, however, the shed was constructed larger, taller and closer
SHED THAT
to the side yard setback than is permitted by code. Staff discussed
ENCROACHES the plans in further detail and made the following recommendation.
INTO THE 5-FOOT
SIDE YARD STAFF RECOMMENDATION:
SETBACK
Motion to recommend that the City Council direct the City
Attorney to draft a Resolution approving the 7479 Fernbrook Lane
North variance subject to:
1. The applicant addressing to the satisfaction of the city any
remaining applicable comments contained in the
memorandums from:
a. The Community & Economic Development
Department dated February 22, 2022
The applicant shall acknowledge that Park Dedication
requirements are based on staff review and recommendation to the
Park and Recreation Board and their subsequent board action.
Board meetings are held on the third Thursday of each month.
Discussion
Commissioner Piket asked if the applicant came to the City and
requested a building permit. Mr. Vickerman explained the
applicant reached out to the City in April of last year and inquired
about a shed. The City’s requirements were provided via email.
He noted the shed was under construction in October of 2021 and
a complaint was made due to the fact it was too close to the
property line.
Commissioner Ostaffe questioned if a permit was issued. Mr.
Corrow explained for a shed this size, a permit is not required.
He stated sheds 200 square feet or larger require a permit.
Commissioner Piket inquired if the applicant built the shed himself
or was it built by a third party. Mr. Corrow deferred this question
to the applicant.
Commissioner Lenthe noted the shed encroaches into the 100 year
floodplain and asked how staff felt about this matter. Mr. Corrow
Maple Grove Planning Commission
February 28, 2022
Page 6
stated this was not a concern for an accessory structure.
Commissioner Ostaffe questioned if there were other accessory
structures or sheds in the neighborhood that were improperly
placed. Mr. Corrow commented he was uncertain, but understood
sheds were constructed without staff knowledge. He indicated he
was not aware of any sheds in this neighborhood that were a
concern, and he did not recall any other variances being approved
for a shed in the shoreland setback.
Commissioner Ostaffe noted the five foot side yard setback has
been in place for quite some time. Mr. Corrow reported this was
the case.
Commissioner Piket asked how easy it would be to move the shed
2.2 feet if the variance were denied. Mr. Corrow indicated the
shed was sitting on 4” x 4” timbers and he anticipated some
remediation would have to be done.
Commissioner Lenthe stated if the variance was not approved,
would the applicant have to remove the structure. Mr. Corrow
commented the structure would not have to be removed, but rather
the shed would have to meet the City’s conditions and brought
down to an appropriate area of 100 square feet and height of 10
feet. In addition, the shed would have to be moved outside of the
side yard setback.
Commissioner Ayika questioned if the applicant was informed of
the complaint that was made to the City. Mr. Corrow stated he was
uncertain if complaining party reached out to the applicant. He
explained that after the City received the complaint, staff visited
the site and inspected the shed.
Commissioner Ayika inquired what the penalty was for violating
the side yard setback. Mr. Corrow commented the City would give
the opportunity to correct the situation. He indicated this led the
applicant to apply for a variance to the side yard setback.
The applicant was at the meeting to answer questions.
Robert Kouba, representative for Michael Ball, explained his office
helped prepare the variance application. He stated staff appears to
have the old variance narrative that was filed on December 30,
2021. He indicated after discovering impervious surface, a
subsequent narrative was filed on January 16, 2022 which had five
Maple Grove Planning Commission
February 28, 2022
Page 7
variance requests. He reviewed the five variance requests in further
detail with the Commission. He reported his clients property was
quite narrow, being only 40 feet wide. He discussed the boulder
wall that was on the property and commented on the screening that
would be provided, through boulders and perennials. He requested
the shed be allowed to remain gray with white trim. He indicated
it was his understanding there were blue and gray sheds around the
lake. He commented on the height of the shed stating the
machinery that would be stored within the shed was larger in size.
He explained the shed was currently on 4” x 4” beams with packed
gravel. He further discussed how water flowed from the shed
down the hill. He stated his client had the understanding that
because his lot was narrow (40 feet), this created a unique
circumstance and therefore a variance should be considered. He
discussed the purpose of setbacks and noted the current placement
of the shed would allow for the City to access his lot for utility
purposes.
Commissioner Lindeman stated it appears the applicant thought
through many things when building this shed. He questioned why
the applicant did not apply for a variance prior to constructing the
shed if he knew there would be height and setback concerns. Mr.
Kouba commented his client believed that because his lot was
narrow the variance was almost automatic. Obviously, this was
not the case.
Commissioner Ayika reported the applicant was provided with the
City’s requirements for the shed prior to designing and
constructing the shed. In addition, the applicant was informed that
while he was constructing the shed, the City’s requirements were
not being met. He asked why the applicant did not rectify the
situation at that time. Mr. Kouba stated his client mistakenly
believed that the narrowness of his lot and the unique situation of
his parcel, that the variance request would be somewhat automatic.
Chair Lamothe opened the public hearing at 7:40 p.m.
The public was asked by Chair Lamothe if they had any comments
to make regarding this application.
Dave Haas, property owner directly north of the subject property,
stated he has lived in his home for the past 20 years. He questioned
if the Commission would accept the purposeful disregard of City
Code. He indicated he was pleased to see the line of questions the
Maple Grove Planning Commission
February 28, 2022
Page 8
Commission has had for the applicant’s representative. He
discussed how the City would be in chaos if the community did not
adhere to City Code and building requirements. He reported five
variances were being requested by the applicant even after the
applicant requested City requirements and had a visit from City
staff regarding the shed. He indicated the applicant was told the
shed was too close to the property line. He noted the property was
recently surveyed and the property lines were prominently marked.
He stated the property owner did not apply for a permit for the
shed nor did he request a variance until after the City threatened
punitive action. He explained the homeowner violated the
ordinances, knew he was violating the ordinances, but went ahead
and constructed the shed. He stated now the applicant was
requesting a variance because he was in a difficult situation. He
indicated he was opposed to the requested variance.
Timothy Niles, 7469 Fernbrook Lane North, stated he owned the
property adjacent to the applicant. He noted he provided the
Commission with a letter. He indicated he challenged his neighbor
regarding his plans back in March or April of 2021 and he was told
he didn’t care, he was going to build the shed anyways. He did not
believe this kind of behavior should be rewarded or accepted. He
commented the City sewer line runs in the area of the shed.
Motion by Chair Lamothe, seconded by Commissioner Lenthe,
to close the public hearing at 7:49 p.m. Upon call of the
motion by Chair Lamothe, there were six ayes and no nays.
Motion carried.
Commissioner Lindeman asked if the applicant was required to get
a permit for the shed. Mr. Corrow clarified a permit was not
required for a shed of this size.
Chair Lamothe questioned if staff supported the screening as
proposed by Mr. Kouba. Mr. Corrow reported staff was
comfortable with the screening with the brown or green earthen
paint color. He commented further on the impervious surface
requirements.
Chair Lamothe indicated the applicant would like to keep the shed
the color that it was and staff was recommending something
different. He inquired how this would be handled. Mr. Vickerman
stated he has had conversations with the applicant and he had the
understanding the applicant supported the shed remaining the same
Maple Grove Planning Commission
February 28, 2022
Page 9
color with screening being added consisting of boulders and
perennials.
Chair Lamothe clarified that the applicant was requesting four
separate variances from the City for the shed.
Commissioner Lenthe asked if there would be shrubs or flowers to
screen the shed. Mr. Vickerman stated the ordinance gives some
flexibility when it comes to screening. He reported existing
vegetation, new vegetation or the color of the shed should work
together to help it blend in. He stated it was not the City’s intent to
make the sheds invisible but rather the screening should help them
blend in.
Commissioner Ostaffe questioned if there were any ordinances in
place that would preclude a resident from painting their house hot
pink or mustard yellow. Mr. Vickerman stated not that he was
aware of.
Commissioner Ostaffe discussed the sheds that were currently on
the lake that were not an earthen color and asked if these sheds
would have to get a permit to be painted. Mr. Vickerman
explained if there was a complaint the City would have to enforce
based on the complaint.
Commissioner Ostaffe inquired if a fence could be placed within
on the property line. Mr. Vickerman reported this was the case.
Commissioner Lindeman reviewed a picture of the shed noting she
appreciated the gray color noting it worked well with the boulder
walls. Mr. Vickerman stated the guidance that is typically given is
browns or greens. However, in this instance, because the shed has
a boulder wall behind it, gray may be a better color for helping the
shed blend in with its surrounding.
Motion by Commissioner Lindeman, seconded by Chair
Lamothe, to recommend that the City Council direct the City
Attorney to draft a Resolution approving the 7479 Fernbrook
Lane North variance to the screening requirements to permit
the shed color to remain gray.
Commissioner Lenthe explained he was struggling with this
request because the applicant has not made a conscience effort to
comply with City Code. He reported there were a number of areas
where the applicant could have complied with the code and simply
Maple Grove Planning Commission
February 28, 2022
Page 10
did not. He was discouraged by the fact it would not have taken a
great deal of effort to do so, and the applicant still failed to comply.
He noted the building pitch could have been adjusted to fit City
Code. He believed the applicant should have made an effort to
comply with City Code versus just building what he wanted. In
addition, he did not support this shed being located within the 100
year floodplain.
Commissioner Ayika stated in a lot of ways he agreed with
Commissioner Lenthe. He commented in terms of the motion on
the floor, this may be a variance that was low hanging fruit.
However, he believed staff had been very lenient and noted he
would not support a variance to the building color. He explained
staff visited the property and the applicant had not listened to City
staff or the City’s requirements. He supported the building color
being changed as was recommended by staff.
Commissioner Piket indicated he was struggling with this item as
well. He expressed frustration with the fact the applicant
constructed the shed, despite having information from the City on
the proper requirements. He stated his inclination was to not
support this variance or any of the other variances.
Commissioner Ostaffe commented the issue at hand was the intent
of the applicant to flatly ignore the City’s rules. He indicated he
was having a hard time wrapping his head around this. He asked if
the applicant could store the hockey boards and materials outside
under a tarp instead of inside the shed. Mr. Vickerman explained
this was the situation and staff reviewed the site after receiving a
complaint and found the stored materials were not in compliance
with City Code. The applicant was told to put the hockey materials
inside.
Chair Lamothe stated he was struggling with this request as well
and had to bite his tongue when considering the arrogance and
attitude of the applicant when it came to process. He explained
this would be a different situation had the applicant come before
the Planning Commission prior to constructing the shed. He
indicated he was working to put aside his disdain for the applicant
and what he has done and was trying to consider the request as
though it came in before the actions occurred. He reported he
would be able to support all of the variances except the setback
request because there was no justification.
Maple Grove Planning Commission
February 28, 2022
Page 11
Commissioner Lindeman commented after hearing from the
neighbors she was uncertain that she would support the increased
height and size of the shed. However, she believed the screening
would not have been an issue had the applicant done what he was
supposed to at the beginning.
Chair Lamothe reported he struggled with the shed size and height.
He understood the applicant was trying to store hockey materials
and equipment. However, this shed would remain with the
property even if the applicant was no longer living in the home. He
commented he could support the building height and size but could
not support the side yard setback variance.
Commissioner Ayika indicated staff was not being punitive in
terms of the shed color. He reiterated that he would not support
the shed color remaining as is.
Chair Lamothe asked who the Commission was trying to solve for.
He noted the gray shed blended in with the current surroundings
and for this reason, he would be supporting the screening variance.
Commissioner Ostaffe clarified that staff believes adding boulders
and perennials would break up the appearance of the shed and feels
painting the shed green or brown would be appropriate. He
reiterated that staff did not require the shed to be painted but
rather, adding boulders and perennials would screen the shed. Mr.
Vickerman commented staff had believed the applicant had already
agreed to change the shed color, which was why the staff report
was written the way it was. He noted staff supported the addition
of boulders and perennials surrounding the shed.
Chair Lamothe indicated staff had recommended the shed be
painted an earthen color of green or brown and the shed was
currently gray in color, which required a variance to staff’s
recommendation.
Commissioner Piket reported there should be some consequences
for the applicant for not following the rules ahead of the project.
Upon call of the motion by Chair Lamothe, there were four
ayes and two nays (Commissioners Ayika and Lenthe
opposed). Motion carried.
Motion by Commissioner Lenthe, seconded by Chair Lamothe,
Maple Grove Planning Commission
February 28, 2022
Page 12
to recommend that the City Council direct the City Attorney to
draft a Resolution denying the 7479 Fernbrook Lane North
side yard setback variance from 5 feet to 2.8 feet.
Commissioner Piket explained this variance would have been
denied even if requested prior to the construction of the shed.
Commissioner Ayika agreed stating the applicant should be able to
make a small sacrifice by moving the shed, in order to comply with
City Code.
Upon call of the motion by Chair Lamothe, there were six ayes
and no nays. Motion carried.
Commissioner Lenthe stated there were no practical difficulties on
this lot and therefore the size of the shed should comply with City
Code. He indicated he would not support an increased size in the
shed.
Motion by Commissioner Lenthe, seconded by Commissioner
Lindeman, to recommend that the City Council direct the City
Attorney to draft a Resolution denying the 7479 Fernbrook
Lane North variance to the increased area of the shed from 100
square feet to 124 square feet.
Commissioner Ostaffe anticipated that if this request had come
before the Commission prior to construction of the shed, it may
have been approved. He noted he would be supporting this
request.
Commissioner Piket stated increased height and size were tied
together. He assumed that these increases were due to the hockey
lights and boards that were being stored inside the shed. He
commented he would be supporting this request as well.
Chair Lamothe agreed that had this request come in prior to being
constructed he would have supported the request and for this
reason he would not be supporting the motion to deny.
Upon call of the motion by Chair Lamothe, there were three
ayes and three nays (Commissioners Ostaffe, Piket and Chair
Lamothe opposed). Motion failed.
Motion by Commissioner Ostaffe, seconded by Commissioner
Maple Grove Planning Commission
February 28, 2022
Page 13
Piket, to recommend that the City Council direct the City
Attorney to draft a Resolution approving the 7479 Fernbrook
Lane North variance to the shed height from 10 feet to 10 feet 8
inches.
Commissioner Lindeman stated she would not be supporting this
motion.
Commissioner Ayika commented it was difficult to forget all that
has transpired between the City, the neighbors and this applicant.
He noted he was voting based on the concerns he had with the
applicant and his blatant disregard of City Code.
Chair Lamothe stated the height and size variances were not
substantial and for this reason, he would be supporting the
dimensional changes to the shed.
Upon call of the motion by Chair Lamothe, there were three
ayes and three nays (Commissioners Ayika, Lenthe and
Lindeman opposed). Motion failed.
DISCUSSION There were no discussion items.
ITEMS
ADJOURNMENT Motion by Chair Lamothe, seconded by Commissioner Piket,
to adjourn the Planning Commission meeting. Upon call of
the motion by Chair Lamothe, there were six ayes and no nays.
Motion carried.
Chair Lamothe adjourned the meeting at 8:38 p.m. to the next
regularly scheduled meeting of the Planning Commission
scheduled for March 14, 2022.