Parks, Arts & Recreation Commission
Regular MeetingMonticello, MN · March 25, 2021
Minutes
PARKS, ARTS & RECREATION COMMISSION MINUTES MAR 25, 2021
MINUTES
PARKS, ARTS & RECREATION COMMISSION MEETING
THURSDAY
MARCH 25, 2021 - 8:00 A.M.
“To enhance community pride through developing and maintaining City parks with a high standard of quality.”
Members Present: Lynn Anderson, Julie Jelen, Adam Leiferman, Nancy McCaffrey,
Sam Murdoff, Brian Stoll, Mercedes Turner
Members Absent: Janine Kopff
Staff Present: Sara Cahill, Beth Green, Tricia Handorff, Tom Pawelk,
Others Present: Sue Seeger
1. Call to Order.
Tom Pawelk called the meeting to order due to lack of a chair or vice-chair. Pawelk
informed the commission that with Jack Gregor resigning, there is a vice-chair vacancy
that needs to be filled. Pawelk opened of the floor for nominations for vice-chair.
NANCY MCCAFFREY MOVED TO NOMINATE LYNN ANDERSON AS VICE
CHAIR. MOTION SECONDED BYJULIE JELEN. MOTION CARRIED
UNANIMOUSLY, 5-0.
2. Approve Minutes of Regular PARC Meeting from January 28, 2021.
NANCY MCCAFFREY MOVED TO APPROVE THE REGULAR PARC MEETING
MINUTES FROM JANUARY 28, 2021. MOTION SECONDED BY ADAM
LEIFERMAN. MOTION CARRIED UNANIMOUSLY, 5-0.
3. Approve Minutes of Special PARC Meeting from February 4, 2021.
JULIE JELEN MOVED TO APPROVE THE SPECIAL PARC MEETING MINUTES
FROM FEBRUARY 4, 2021. MOTION SECONDED BY NANCY MCCAFFREY.
MOTION CARRIED UNANIMOUSLY, 5-0.
4. Consideration of adding to or removing items from the agenda.
None.
Page 1 of 4
PARKS, ARTS & RECREATION COMMISSION MINUTES MAR 25, 2021
5. Citizens requests and comments.
a. Pickle Ball Court Request: Vicki Michaelis sent an email to Sara Cahill at the
MCC regarding pickle ball. Julie Jelen noted that when she was in Arizona there
were a lot of people in the community that would use the pickle ball courts.
Pawelk talked about tennis courts at Pinewood and potentially designing
pickleball courts on the interior of the tennis court, the play area is ½ of the tennis
courts; however, there are no nets at this time. Pawelk said they set up two
pickleball courts last summer at 4th Street Park inside the hockey rink and they do
get used, but maybe we can do a better job letting the public know they exist
down there. With the 4th Street Park renovations this year, Pawelk said maybe we
will look at how we can incorporate something else down there. Adam Leiferman
noted that Prairie Park in Otsego just installed pickleball courts constructed out of
asphalt. This is a growing sports trend and people really use the courts.
b. 4th Street Park Skating Rink: Looking at removing the small ball diamond and
making some adjustments and the plan for the design and that will be brought to
the next meeting. Pawelk said it’s necessary to keep the maintenance to just a few
locations with the warming house facilities.
6. Update on Haven Ridge 2nd Addition.
Written update provided in agenda packet posted online. Tom had questions about the
existing trail on Fallon Avenue from Farmstead to 87th Street. One comment to
Engineering is a possible crosswalk at 87th & Fallon for people to cross Fallon.
Eventually there will be a trail connection on the east side, but it could be a while
depending on the phasing according to Matt Leonard. At this time, it is not warranted to
install a marked crosswalk d there but it may be something the city will look at in the
future. It is unknown at this time when Phase 3 of the development will happen to include
the piece of the trail to make the connection from 87th through Hunters Crossing Park.
7. Motion to approve Ellison Park restroom building design.
Tom Pawelk shared the modular building restroom design. It will mirror the building at
Bertram, and the Lions Den. Horizontal ship lap siding with the bottom being the field
stone. Added hot water to the structure and the auto flush vales. Increased price by
$3,500 but over time is worth it. The next step is to get the final paperwork done to go
out for bids for plumbing, footings, electrical and sidewalk work. The sidewalk design
was shared and discussed ADA compliance for trails to get to the restroom. Jelen said the
ADA requires a path to get to the playground and to the shelter and she said she will take
a walk down there to look it over and see what would be compliant. Pawelk said he
would like a motion on the building, but the sidewalk can be brought back to the next
meeting. Sam Murdoff asked about whether or not they had looked at a different area for
the restroom building within the park. Pawelk said they had considered the Lions Den
location but that is listed in the flood plain so any buildings within that zone must be
open to allow water to run through and cannot be fully enclosed. The existing location is
a good spot next to the parking lot and out of the way so not as to block the river view.
Page 2 of 4
PARKS, ARTS & RECREATION COMMISSION MINUTES MAR 25, 2021
NANCY MCCAFFREY MOVED TO APPROVE ELLISON PARK RESTROOM
BUILDING DESIGN AT THE EXISTING LOCATION. MOTION SECONDED BY
ADAM LEIFERMAN. MOTION CARRIED UNANIMOUSLY, 5-0.
8. MontiArts Update.
Update given by Sue Seeger and provided via email.
9. MCC Update.
Updated provided by Sara Cahill and provided via email.
10. General Park Updates.
a. Parks, Arts & Recreation Department. Council has given ideas for moving
forward for the next year for the collaboration between the Parks Department and
the Community Center, forming a Parks, Arts & Recreation Department.
b. Park Vandalism. Pawelk said he has been tracking since the first of the year and
the first vandalism incident was on 1/18/21, and there have been 15 events since
then which have added up to nearly $10,000 in damage to Monticello parks. West
Bridge Park was just hit over the weekend and again two days ago! Cameras are
in place and working but there have been some timing issues where the motion
sensors and the cameras have needed to be adjusted to capture more frequently to
taking photos every 10 seconds rather than every minute as they move in and out
and do the damage pretty quickly. Authorities are working on apprehending the
individuals who appear to be a group of four youths. The most problems have
been taking place at Montiview and West Bridge Parks. The typical time hit has
been between 10 p.m. and 2 a.m. It is local youths as they are seeing a pattern and
the same cars have been at Bertram too.
c. Additional Ellison Park Projects: One of the projects is consolidating the power
lines internally into the building and eliminating some of the overhead power.
They are eliminating the permanent picnic tables as the concrete slabs have
caused tripping hazards. Pawelk said that he met with Julie Jelen last fall and
went over other ADA stuff and will add additional handicap picnic tables to the
park per code.
d. Bertram: Gearing up for sports events, will start lining fields next week. Secured
soccer and lacrosse for BCOL. Asked WSB to layout permanent field corners for
athletic fields and then they will be creating a map for the athletic park. The goal
is to have that completed in advance of the state soccer tournament in July so it
can be distributed to the teams. City staff is also working with Wright County in
changing out the signs on CR 39 and Briarwood to get users to the athletic facility
and to the larger park.
e. Other Items: Looking into launching “Adopt a Planter”. Pawelk said they would
work with East Bridge Gardeners to do the planting that will be sponsored by
local businesses.
Page 3 of 4
PARKS, ARTS & RECREATION COMMISSION MINUTES MAR 25, 2021
11. Next regular meeting scheduled for May 27, 2021.
The next regular PARC meeting is scheduled for May 27, 2021, at 8 a.m.
12. Motion to Adjourn.
NANCY MCCAFFREY MOVED TO ADJOURN AT 9:14 A.M. MOTION
SECONDED BY JULIE JELEN. MOTION CARRIED UNANIMOULSY, 5-0.
RECORDED BY: Beth
___________________________________
Green
DATE APPROVED: ______________May 27, 2021__________
ATTEST: ___________________________________________
Page 4 of 4
Agenda
AGENDA
REGULAR PARKS, ARTS & RECREATION COMMISSION MEETING
March 25, 2021 – 8:00 A.M.
Please join meeting from your computer, tablet or smartphone
https://global.gotomeeting.com/join/946823989
Access Code: 946-823-989
You can also dial in using your phone (312) 757-3121
If you are new to GoToMeeting get the app now at: https://global.gotomeeting.com/install/946823989
1. Call to Order.
2. Approve Minutes of Regular PARC Meeting from January 28, 2021.
3. Approve Minutes of Special PARC Meeting from February 4, 2021.
4. Consideration of adding to or removing items from the agenda.
5. Citizen request and comments.
6. Update on Haven Ridge 2nd Addition.
7. Motion to approve Ellison Park restroom building design.
8. MontiArts Update. (SS)
9. MCC Update. (SC/TM)
10. General Park Updates.
A. Parks, Arts & Recreation Department.
B. Park Vandalism.
C. Additional Ellison Park Projects.
D. Other Items.
11. Next regular meeting scheduled for May 27, 2021.
12. Motion to adjourn.
PARKS, ARTS & RECREATION COMMISSION MINUTES JAN 28, 2021
MINUTES
PARKS, ARTS & RECREATION COMMISSION MEETING
Special joint meeting with Planning Commission
THURSDAY
JANUARY 28, 2021 - 8:00 A.M.
“To enhance community pride through developing and maintaining City parks with a high standard of quality.”
Members Present: Lynn Anderson, Julie Jelen,
Adam Leiferman, Nancy McCaffrey, Brian Stoll
Members Absent: Jack Gregor, Sam Murdoff
Staff Present: Sara Cahill, Beth Green, Tom Pawelk,
Ron Hackenmueller, Jennifer Schreiber, Angela Schumann, Jacob
Thunander
Others Present: Planning Commissioners Eric Hager, Paul Konsor, Sue Seeger,
Andrew Tapper, Alison Zimpfer, Steve Grittman, Charlotte Gabler
1. Call to Order.
Chair Brian Stoll called the meeting to order at 8:00 a.m. and declared a quorum.
Members of the Planning Commission were in attendance for the Special Joint Meeting.
Jennifer Schreiber administered the Oath of Office to Commissioner Eric Hager.
2. Approve Minutes of Regular PARC Meeting from December 3, 2020.
NANCY MCCAFFREY MOVED TO APPROVE THE REGULAR PARC MEETING
MINUTES FROM DECEMBER 3, 2020. MOTION SECONDED BY JULIE JELEN.
MOTION CARRIED UNANIMOUSLY, 5-0.
3. Consideration of adding to or removing items from the agenda.
None.
4. Joint discussion with Planning Commission on Chelsea Commons Small Area
Plan.
a. Site and project context. City Council has taken the next step toward
implementation of a mixed-use development concept proposed for the area known
as “Chelsea Commons” by authorizing a Small Area Plan process. The land area
is located south of Chelsea Road, north of School Boulevard, and between Cedar
Street and Edmonson Avenue.
Page 1 of 8
PARKS, ARTS & RECREATION COMMISSION MINUTES JAN 28, 2021
The mixed-use concept for Chelsea Commons was initially suggested in 2019 in
response to proposals the city was receiving throughout the community for
conversion of land guided or zoned for commercial uses to mid to high-density
residential. Due to its location and size of approximately 100 acres, the Chelsea
Commons area was viewed as an ideal opportunity to create a centrally located
complete neighborhood which blends commercial, residential, and public spaces.
The main feature of the site will be a central pond and pathway system amenity.
The pond will be structured like Bertram to be a water reuse pond to keep the
water levels up. These features will anchor and advance the development of
residential uses. With the small area planning effort there will be a lot of attention
on how the pond is laid out. It will be important for the water to be visible for it to
be a true amenity. The vision is for the trail to provide areas to connect residential
to commercial. This is something that will be totally unique to the area and offer a
way for people to interact with the water with paddle boarding, canoeing,
kayaking, etc.
Schumann introduced the City Planner Steve Grittman. She said the purpose of
the meeting today is for the commissioners to really give this a lot of thought and
to provide input on the area planning. McCaffrey noted that she would like to see
this area put on the spring park tour to get a better understanding of the size and
layout of the development and area.
Steve Grittman shared a PowerPoint presentation with the group. He noted that the
project is envisioned with the stormwater pond being used as a lake amenity, along
with part economic development to spur residential and commercial growth, and
part open space to create a unique public experience in Monticello.
The concept relies on the basic requirement for stormwater management incumbent
on all development, and the park/trail dedication components of residential
development, and public street or utility dedications required of most private
development. The concept plan principles include:
• Introduce multi-family into current commercial.
• Require adherence to a common pond/amenity with extensive trails and
open space.
• Include variety of multi-family product types.
• Be flexible as to specific boundaries and unit styles.
• Require commercial uses fronting Chelsea & Cedar.
• Consider potential additional commercial along School Blvd.
• Enhance Edmonson and Dundas to emphasize parkway/open space.
• Incorporate gateway plaza element at corner of Chelsea & Cedar.
• Enhance architectural and building materials – high end objectives.
Page 2 of 8
PARKS, ARTS & RECREATION COMMISSION MINUTES JAN 28, 2021
Grittman said the planning process will go into mid-summer before we get to a final
decision. Everything is illustrative at this point and nothing is etched in stone. As
we move further through the project planning, we will get a firm depiction of the
area, as it is currently in the very beginning concept stages.
Grittman said that he wants to use this meeting time to brainstorm ideas for
potential elements to be included in the public sphere. It will be important to
identify private development opportunities that take advantage of the common
spaces, and to identify public amenities and infrastructure that facilitate improved
marketability of private land.
Comments fell into two broad categories. The first related to specific project
opportunities and expectations, while the second related to potential project
challenges, and whether the project scope should include additional areas of
research. These are each summarized below (in no particular order):
Project Opportunities/Expectations:
• Ability to fit this project on largely undeveloped land makes it realistic,
rather than trying to wedge it in to existing patterns or redevelopment.
• Water feature is the key element – make it visually attractive, accessible,
useful
• Consider use of water for recreation – fishing, canoeing, paddle boats,
kayaks, etc.
• Focus on common public elements between the Chelsea Commons area and
the Downtown for consistency in cross-messaging.
• But remember distinctions and what makes each area unique.
• Focus on extensive internal pathway development, as well as connections
to external pathway system – consider opportunities for multi-modal access.
• Focus on uniqueness of the Chelsea Commons area – what roles can it play
in the city’s open space system, and what roles should it not play, given
roles played by other facilities, including Downtown and Bertram Chain of
Lakes, as well as others?
• What opportunities might be gained by terminating – or retaining - Dundas
Road in terms of internal accessibility, visual impacts, etc.?
• Focus on four seasons of activity and benefit for the Commons – plan for
improvements that will provide benefit, or be adaptable, to year-round use.
• Take advantage of, and incorporate in the design, an extensive use of
grading and grade changes to emphasize and separate plantings and
different use areas.
• Opportunities should include spectrum of users from full community, not
just abutting development in the Commons.
• Consider water-based amenities, including fountains and other water
movement.
• Consider provision of public improvements up front, in order to
demonstrate amenities and benefits to prospective development/tenants.
Page 3 of 8
PARKS, ARTS & RECREATION COMMISSION MINUTES JAN 28, 2021
• How might the development – public and private – serve as a template or
model for development in other areas?
• Private development could be benefitted and must be integrated into city
planning efforts to ensure positive outcomes. Do not lose focus on attention
to partnership.
• Build in public parking areas, assuming many residents may travel by
private automobile to visit the Commons, in addition to those walking or
biking to the area.
• Development efforts should take advantage of the opportunity to
hide/minimize parking areas, including focus on underground to minimize
land cover with parking and asphalt.
• City will have as an objective an effort to make the project as cost-neutral
as possible.
• Several example projects were recommended, including projects in Edina,
St. Louis Park, Blaine, Arden Hills, St. Anthony.
Project Challenges:
• Can the city design for the sustainability of water feature – levels, plantings,
etc.
• Will the city be able to plan not just for construction, but long-term
operation and maintenance?
• How will be able to avoid eyesore potential for water and edge plantings.
• How can we be confident that there is a market for the uses included in the
study, at the densities proposed – assuming these densities and uses will be
a factor in cost allocation?
• What is the city’s planned phasing of construction, and how might this
impact private development interests?
• Over-planning of the Chelsea Commons area beyond its reasonable role,
and beyond the ability of the project to serve as a benefit to the immediate
land uses.
• What are the likely impacts of traffic generated by the development in the
area, and does the city have an understanding of those impacts, required on-
or off-site traffic improvements, etc.?
• What will be the environmental challenges posed by the project, and
how/when should this be subject to additional study?
• How will the boundaries between private and public spaces be managed
and/or integrated into the use and design of the project?
• Will the project planning include attention to lighting, street furniture, street
improvements, signage, and other details?
• How will the city make plans for implementation – will there be separate
follow-up efforts defining both public and private implementation projects?
• Will the city maintain a flexible approach to site development, or does it
expect to define and specify development design details?
• How/when will the city be able to provide information on cost contributions
from private development, and how will those contributions be estimated?
Page 4 of 8
PARKS, ARTS & RECREATION COMMISSION MINUTES JAN 28, 2021
• How might changes to Dundas Road, and/or the connections along and
across that road, be impacted by utility services?
• How is the plan impacted by recent Comp Plan 2040 development
directives, including density, floor area ratios, height, other factors? Might
this be an issue, depending on the balance between market reality and
private development contributions?
• Challenge will be to plan around what we don’t know – environmental,
market
Next chance for update or to provide more input. Steve said developing a couple of
schemes and within a couple of months, early spring a couple of schemes fleshed
out. Do more engineering analysis of the schemes. Then will be back in front of
everyone to understand what the differences are between the options. Early Spring.
Will send calendar so that we keep corresponding, so we know where at. If you
want to participate, happy to have that participation. Encourages everyone to reach
out to Steve if you have other thoughts, ideas, insights, after the meeting thinking.
If you are pondering. Welcome follow-up input.
Now a chance to think about it, do you envision this space to be a more naturalized
space or a more cultured landscape? How do you think about this, what kind of a
space are you walking through when you envision this. Very much a built landscape
but mature enough with elements like large rocks and well-designed enough that it
feels like a natural landscape. Like some bigger resort properties out west as an
example. This will be different than Bertram where there’s more natural, more of a
structured purposefully developed area. Make sure that it’s accessible to everyone
on the trail that should be relatively flat. Picturing surrounded by elevated
landscaping areas but trail flat. See as a combo area where they may be quiet areas
or more active areas and well blended. More relaxing near the residential and more
active near the retail space. The opportunity to experience both.
Grittman said that the comments will be incorporated, to a various extent, into
concept planning for the project and/or follow-up study as appropriate. He
welcomes follow-up input and for commissioners to reach out to him with any other
thoughts, ideas and/or insights. There will also be continuing opportunities to
participate. After more engineering review and analysis, a couple different schemes
will be developed and brought forward for review in the spring.
5. Citizens requests and comments.
a. River Mill Park skating rink request: Tom Pawelk said that residents in the River
Mill neighborhood have approached the city and they are very eager for an
outdoor ice rink at river Mill Park. In the past, he has also received similar
requests from other residential neighborhoods. Logistically, it is not feasible to
put a rink there at this time as there are infrastructure problems and groundwater
Page 5 of 8
PARKS, ARTS & RECREATION COMMISSION MINUTES JAN 28, 2021
issues, so the hydrant is pumped down for the season. It would also require
different equipment as it’s not possible to bring in 500’ of hose either.
To give some history, Pawelk said that 20 years ago there were4 eight community
rinks throughout Monticello in neighborhoods and those rinks were next to
hydrants.
Stalpes noted that 4th Street Park rinks are being very heavily used this year and
maybe more skating areas are needed. Also discussed the idea of looking at
flooding West Bridge Park again next year for general skating as there is public
parking available there.
Pawelk said he would like to make improvements at 4th Street Park and regrade
the open space of the ballfield area and increase the ice sheet for general skating
next year. It could be divided into two different rinks so there would be four
sheets of ice.
Other ideas included promoting a skating trail at Bertram. Lieferman also
suggested a skating trail at Sunse4t Ponds Park.
At this point it is too late in the season to do anything this year. However, it
should be looked at next year to make improvements, expand rink hours, skate
guards and ice sheets. Pawelk said this item can be revisited mid-summer before
budget prep to decide what to propose to city council for skating rinks for the
2021-22 season.
6. Review and select PARC applicants to interview for position openings.
Item tabled.
7. Ellison Park restroom design review.
Item tabled.
8. MontiArts Update.
Update given by Sue Seeger as follows:
• For practical reasons MontiArts has expanded its use of the corner building formerly
known as WTF on a temporary basis. We’d given Allison Hunsley, currently working
on a CMAB public art grant project, a 12 x 12 space in MontiArts, but her project
involves a dozen 8 x 4’ panels that all need to be primed and painted. She has been
relocated to the corner building, so she’d have more space to work, and because there
is ample room inside the building and we are already utilizing the windows, decided to
expand our residency program a bit and move several other artists in there to create
projects with a community benefit.
Page 6 of 8
PARKS, ARTS & RECREATION COMMISSION MINUTES JAN 28, 2021
• We received a $1000 virtual capacity building grant from the CMAB, and have
applied for a similar $10,000 grant from the state arts board that will be reviewed in
March. The second grant (if we are awarded it) will determine how we use the first
grant. Meanwhile Sue is attending training workshops in this area through mid-March.
• In mid-March we are applying for 2 project grants for $5000 each. One involves an
individual artist creating a large interactive temp outdoor installation downtown. The
other involves working with the Rotary as a fiscal partner for a project managed by
MontiArts that pairs local artists with local downtown business owners to create public
art on or in their building. The Rotary will be considering this proposal at their next
meeting but leadership sounds positive on the idea so far.
• With MontiArts being eligible for fewer grants in 2021, we’ve had to be creative and
look for other sources. Sue looked through awarded Artist Initiative projects from the
state arts board and found 2 artists whose work seemed like a good fit and has invited
them to Monticello to do demonstrations/give artist talks/ exhibit their work. This
would be at no cost to us. The CMAB also has a program for artists to apply for their
own grants to do workshops and we are working with 4 of them to create workshops to
run through MontiArts that are more in depth than what is available through
Community Ed.
• Monthly Open Mic nights, facilitated by Ben Lundquist, are continuing to operate
remotely. When restrictions lift, we’d like to expand that format into more of an all
encompassing arts experience for attendees, including artists talks and exhibits in
addition to the music and spoken word sets. We think this will give the public and
enhanced experience and something else fun to do downtown.
9. MCC Update.
Updated provided by Sara Cahill as follows:
• MCC continues to be open by reservation and with limited capacity. Reservations are
filling up and people are eager to use the facility. An attached spreadsheet shows
some tracking we have been watching.
• The Farmers Market will begin Thursday, May 27 and run through September
30. The market will be open on Thursdays, 3:30-7:00p.m. in the library parking
lot. We are working to link the Arts Market with the Farmers’ Market this season.
• The Community Center Egg Dive event will take place at the end of March. Kids
love this annual egg hunt event in the pool. We will have precautions in place to
make this a safe event.
Page 7 of 8
PARKS, ARTS & RECREATION COMMISSION MINUTES JAN 28, 2021
Planning is underway for Music on the Mississippi and Movies in the Park. Sponsors,
Liberty Bank and TDS, have committed to these events. We will keep an eye on the
pandemic situation and adjust plans if needed.
10. General Park Updates.
Item tabled.
11. Schedule special meeting to interview PARC applicants.
NANCY MCCAFFREY MOVED TO HOLD A SPECIAL MEETING ON FEBRUARY
4, 2021 AT 8 A.M. TO INTERVIEW THE PARC APPLICANTS, AND TO ALSO
REVIEW THE ELLISON RESTROOM DESIGN. MOTION SECONDED BY LYNN
ANDERSON. MOTION CARRIED UNANIMOUSLY, 5-0.
12. Next regular meeting scheduled for March 25, 2021.
The next regular PARC meeting is scheduled for March 25, 2021, at 8 a.m. This will be an
online GoTo meeting.
15. Motion to Adjourn.
JULIE JELEN MOVED TO ADJOURN AT 9:35 A.M. MOTION SECONDED BY
NANCY MCCAFFREY. MOTION CARRIED UNANIMOULSY, 5-0.
RECORDED BY: ___________________________________
DATE APPROVED: ___________________________________
ATTEST: ___________________________________________
Page 8 of 8
SPECIAL PARKS, ARTS & RECREATION COMMISSION MINUTES FEB 4, 2021
MINUTES
SPECIAL PARKS, ARTS & RECREATION COMMISSION MEETING
FEBRUARY 4, 2021 – 8:00 A.M
Via GoTo Meeting
“To enhance community pride through developing and
maintaining city parks with a high standard of quality.”
Members Present: Julie Jelen, Nancy McCaffrey, Brian Stoll, Adam Leiferman
Members Absent: Lynn Anderson, Jack Gregor
Staff Present: Beth Green, Matt Leonard, Tom Pawelk, Sue Seeger
1. Call to Order.
Brian Stoll called the meeting to order at 8 a.m.
2. PARC Applicant Interviews.
• 8:00 a.m. Stuardt Boydston Interview
• 8:15 a.m. Janine Kopff Interview
• 8:30 a.m. Mercedes Turner (pre-recorded)
• 9:00 Teri Willenbring Interview
Following the interviews, discussed who would be the best two candidates to fill
the open seats left by Mariah Peterson and Jack Gregor. Following discussions,
the PARC was unanimous in their selections.
NANCY MCCAFFREY MOVED TO RECOMMEND THE APPOINTMENT
OF JANINE KOPFF TO FILL THE VACANT SEAT THRU 2021, AND
MERCEDES TURNER TO FILL THE VACANT SEAT THROUGH 2022.
MOTION SECONDED BY JULIE JELEN. MOTION CARRIED
UNANIMOUSLY, 4-0.
3. Ellison Park Precast Restroom Design Approval.
Tom Pawelk shared the proposed design being planned for the new Ellison Park
restroom. The approval needed at this time is for the color and style of siding as
the design itself has not yet been finalized. The consensus is to move forward
with the lap siding to match the Lions Den shelter with the Mississippi Bronze
corners, soffit and facia, along with the fieldstone on the bottom third of the
1
SPECIAL PARKS, ARTS & RECREATION COMMISSION MINUTES FEB 4, 2021
building. Pawelk said that when the design is complete, he will bring it back for
review and final recommended approval for the City Council.
4. Adjourn.
Meeting adjourned at 9:30 a.m.
RECORDED BY: ___________________________________
DATE APPROVED: ___________________________________
ATTEST: ___________________________________________
2
Consideration to review an update on park dedication requirements for the proposed
Haven Ridge 2nd Addition. (AS)
REFERENCE AND BACKGROUND
The PARC previously made a formal recommendation on park dedication for Haven Ridge, a
residential plat approved in January of 2020. City Council approved the Haven Ridge
preliminary plat and 1st Addition final plat consistent with PARC’s recommendation for parkland
dedication requirements.
Haven Ridge is located south of 85th Street and west of Fallon Avenue. The approved
preliminary plat illustrates a 335-unit residential neighborhood, which will be final platted in a
series of phases. As each final plat for Haven Ridge is considered, park dedication specific to
that phased area will be evaluated and required based on the prior recommendation of the PARC.
The staff report for the June 2019 PARC recommendation has been included with this report for
reference.
At this time, the developer is proposing to move forward with a final plat for Haven Ridge 2nd
Addition, consisting of 47 units. The final plat is consistent in lot count, layout and size to the
approved preliminary plat.
With the 2nd Addition, the developer will construct the 10’ bituminous pathway along the east
side of Fallon Avenue as recommended with the preliminary plat. Collector routes in Monticello
are required to include pathway on both sides of the street.
Per the June 2019 PARC recommendation and development agreement approved by the City
Council, the developer will receive construction cost credit for this section of Fallon Avenue
pathway. The credits for trail construction are applied with each phase at the time of final plat
and are calculated against the 11% dedication requirement based on the value of raw land at the
time of plat.
To maximize efficiency of construction within the road corridor, the developer will be
constructing the full stretch of pathway along the east side of Fallon Avenue from the north
extent of Fallon in the 1st Addition to the south extent of Fallon in the 2nd Addition.
The developer received the 1st Addition pathway construction credit with the 1st Addition.
Accordingly, the developer will only receive the attributable 2nd Addition pathway credit with
this plat, although as noted, pathway construction will be along both phases.
No other park dedication was planned or anticipated with this portion of the plat.
As the final plat and dedication proposed is consistent with the preliminary plat, staff
recommends proceeding with park dedication requirements as originally recommended by the
PARC in June of 2019 and no formal action is required of the PARC.
1
Should the developer or city propose changes to the original configuration of park, pathway or
associated dedication credit, staff will prepare an evaluation for revised formal recommendation
of the PARC.
ALTERNATIVE ACTIONS
None required as dedication is consistent with the prior recommendation of the PARC.
STAFF RECOMMENDATION
Not applicable.
SUPPORTING DATA
A. Aerial Site Image
B. Have Ridge 2nd Addition Final Plat
C. Haven Ridge Preliminary Plat
D. June 2019 Haven Ridge PARC report
E. Monticello Subdivision Ordinance, Excerpt
2
Marc D. Schulte - Request for Comp Plan Amendt, Rezoning, Planned Unit Dvlpmt, and Preliminary Plat
Lengthy Legals – See City Hall | PID: 213-100-234101, 213-100-242200, 213-100-261200, 213-100-234102
Created by: City of Monticello
1,056 ft
HAVEN RIDGE 2ND ADDITION
FARMSTEAD
87TH
AVENUE
ET
RE
ST
NE
NE
FARMSTEAD
CIRCLE NE
Haven Ridge
Monticello, Minnesota
SITE
VICINITY MAP
R
Know what's below.
Callbefore you dig.
3890 Pheasant Ridge Drive NE, Revisions:
Suite 100 I hereby certify that this plan, specification Print Name: Brian J. Krystofiak, P.E. Drawn: MONTICELLO PROPERTIES 1
· environmental Blaine, MN 55449 or report was prepared by me or under my
1.
HAVEN RIDGE
· engineering Phone: (763) 489-7900 direct supervision and that I am a duly
Licensed Professional Engineer under
Signature: Designed: BJK 7308 Aspen Lane, Suite 114
Monticello, Minnesota COVER of
· surveying Fax: (763) 489-7959
www.carlsonmccain.com
the laws of the State of Minnesota Date: 4/5/19 License #: 25063 Date: 4/5/19 Brooklyn Park, MN 55428 38
Save Date: 04/08/19 f:\jobs\7041 - 7060\7056 - monticello properties\cad c3d\engineering\prelim_plans\7056_cover.dwg
Consideration to review for recommendation park dedication requirements for the
proposed Haven Ridge residential subdivision. (AS)
REFERENCE AND BACKGROUND
The Parks Commission is asked to consider a formal recommendation related to park dedication
requirements for Haven Ridge, a proposed 335-unit residential plat.
Under State Statute 462.358, with platting or replatting, the City has the option of either
requiring a land dedication for park, or the City can collect park dedication fees for purchase of
park land at another location – referred to as “cash in lieu”. The Park & Recreation
Commission’s consideration is related to a recommendation for this allocation, which is
currently set at a dedication of 11% of the land or cash-in-lieu equivalent.
Under Minnesota statutes, the City may set this fee to be equal to the value of raw land no later
than at the time of final plat – this is the value of raw land that is immediately developable, but is
not yet actually developed.
Haven Ridge is a proposed subdivision plat and as such, the Parks & Recreation Commission is
asked to review the plat and make a recommendation to the City Council on dedication
requirements.
Developer Marc Schulte is seeking approval of a comprehensive plan amendment, rezoning,
preliminary plat and planned unit development for development of 260 single-family residential
units and 75 townhome units. The subject site is located south of 85th Street, and west of Fallon
Avenue. The property requires annexation to the City and a petition for annexation from the
property owners has been received and acknowledged by the City Council. Final annexation of
the property will not occur until the time of final plat.
The proposed Haven Ridge plat is intended as a multi-phased plat and planned unit development.
The developer proposes approximately 8 phases, the timing for which will be determined by
market circumstances.
The plat is located in an area guided under the Comprehensive Plan as “Places to Live” and
“Urban Reserve” (a designation intended for re-guiding as the city grows). The development is
proposed to be zoned R-1, R-A and R-3. The 260 single-family units will provide for low to
moderate density single-family dwellings and directly related complementary uses. The
townhome area provides for medium density housing in multiple family structures.
The proposed plat of Haven Ridge is 213.92 acres. An 11% land dedication requirement would
require a total land dedication area of 23.53 acres. The cash dedication would be based upon the
value of the raw land at the time of final plat. As this is a multi-phased project, the calculation
on value of the raw land will be made at each final plat for the development.
1
The preliminary plat presented proposes the dedication of additional park land to the Hunters
Crossing park. This additional parkland is supported by the proposed development of a
roundabout intersection at Fallon/Eisele and 85th Street. The area in the north quadrant of the
roundabout is proposed to be added to the Hunters Crossing Park. In addition, the roundabout
alignment for Fallon Avenue would impact the existing 5.0 acre park on the southwest edge,
creating a parkland loss of approximately .11 acres.
The proposed road configuration will also result in a future vacation of the current 85th Street
upon construction of the roundabout and realignment of 85th Street NE. The vacated road right
of way is proposed to be dedicated as park land. That area is approximately .62 acres.
The developer has proposed a land dedication of 1.89 acres based on the proposed roundabout
configuration. The area includes stormwater ponding.
The City’s park dedication ordinance (part of the Subdivision Ordinance), indicates that the City
shall not accept park dedication credit for land within a drainage and utility easement for
stormwater management. As such, the applicable park dedication land area credit is 1.04 acres.
In addition, the City zoning ordinance requires that all utilities within or serving new
development [e.g. cable television, electrical (excluding transformers), gas, sewer, telephone,
and water lines] shall be placed underground. Staff has recommended that the developer work
with the utility provider to determine whether the existing lines can be buried. If they are able to
be buried, the .62 acres may be added to the park dedication land area credit, for a total of .1.66
acres. If they cannot be buried, the .62 acres will not be considered as eligible for parkland.
In addition to the Hunters Crossing park land area dedication, the developer is proposing to
construct two pathway trails within the development, both located in the southwest portion of the
plat. These trails will meander along the stormwater and wetland facilities in Outlots N, M and
O. The developer will receive land area credit for these corridors, at 2.77 acres in total. This is
based on a 30’ easement width, plus land adjacent to the trail in the area of the southerly wetland.
It is important to note as it relates to Outlot O, the trail along the wetland and the preservation
and buffering of the wetland is consistent with the city’s Natural Resources Inventory and
Assessment (NRI/A). The NRI/A identifies a greenway corridor along the string of wetland
extending south from this area. The addition of the wetland, which is a public water wetland,
supports public views and enjoyment of this area, while protecting the resource. The wetland
buffer will require specific planting requirements.
City staff have recommended an additional trail following the southerly edge of the wetland in
Outlot G. A 30’ trail easement will be required, for which the developer will receive park
dedication land credit. Staff have further recommended a trail continuing along the east side of
Edmonson Avenue as it veers southwesterly. This trail provides another internal neighborhood
connection to the wetland trail and creates a loop system. Land area dedication is proposed to be
2
provided for this trail easement area. Calculations for these two trail areas will be added to the
total land area dedication as shown below.
Location Land Area (AC)
Parkland – Outlot J 1.04
Vacated ROW/Utility .62
Easement
Outlot N, M and O Trails 2.77
Outlot G Trail To be provided
Edmonson – Wetland To be provided
Connection Trail
TOTAL 4.43 + acres
In addition to park land area, the developer is asked to construct 10’ bituminous trails along
Fallon, Edmonson, 85th Street NE, and Eisele Avenue, including the roundabout portion. If the
city requires construction of these pathways within the existing unreconstructed right of way, it
is staff’s understanding that the city is required to credit the developer for the trail construction.
The credits for trail construction are proposed to be applied with each phase at the time of final
plat and will be calculated against the 11% requirement based on the value of raw land at the
time of plat, as well as any land dedication provided with that phase.
It should be noted that the Parks Superintendent has recommended that a connection pathway be
provided between the northwest leg of the roundabout trail into the playground area at Hunters
Crossing. In addition, the developer is responsible for tree protection within the plat. The loss of
trees in the roundabout area will require the replacement of trees within the project. The Parks
Superintendent recommends the tree replacement occur within the Hunters Crossing park area at
locations to be determined.
In summary, the development proposed includes a combination of land dedication, as well as
application of credit for construction costs. Any differential between the amount of land and
construction costs in total and the 11% requirement will be applied either as a credit to the
developer (if the amount is in excess of the requirement), or as required to be paid as cash-in-
lieu.
ALTERNATIVE ACTIONS
1. Motion to recommend park dedication in a combination of park land area adjacent to the
Hunters Crossing Park, trail easement, and trail construction costs as detailed in the staff
report and exhibits of June 27th, 2019.
2. Motion of other recommendation.
3
STAFF RECOMMENDATION
Staff recommends alternative 1 above. Staff’s recommendation is based on the following
considerations:
1. The proposed plan for trails and parks as detailed in the exhibits is consistent with the
City’s Parks & Pathways Plan and the city’s NRI/A. The City’s Parks & Pathways Plan
relies on park service areas which cover a ½ mile radius. The vast majority of the
proposed Haven Ridge development is within the service area for Hunters Crossing Park,
with the exception of the far southern portion of the site. Expansion of the Hunters
Crossing Park to serve this development is supportable given its location and access.
2. The addition of trails along the major wetland complexes, including loop systems,
provides an amenity to the development.
3. The completion of bituminous trails along major collector routes within the development
provides both a recreational and transportation benefit.
SUPPORTING DATA
A. Aerial Site Image
B. Park & Pathway Plans, including
a. Proposed Preliminary Plat and Existing Conditions
b. Park Exhibit
c. Trail Corridor Exhibit
d. Trail Corridor Exhibit – prepared by staff
e. Outlot Ownership Exhibit – prepared by staff
C. Park & Pathway Plan Service Areas
D. Park & Pathway Plan System Map
E. Natural Resource Inventory and Assessment Greenways Map
F. Monticello Subdivision Ordinance, Park Dedication
4
CHAPTER 6
PARKS, OPEN SPACE AND PUBLIC USE
SECTION:
11-6-1: Dedication Requirement
11-6-2: Cash Contribution
11-6-3: Delayed Dedication Payment
11-6-4: Purchase or Condemnation of Lands
11-6-5: Location and Configuration of Dedication
11-6-1: DEDICATION REQUIREMENT:
(A) Pursuant to Minnesota Statutes 462.358, Subdivision 2b, the City Council
of Monticello shall require all developers requesting platting or replatting
of land in the City of Monticello to contribute an amount of land for public
park and trail purposes. The location of said land shall be at the discretion
of the City Council. The amount of said land shall be reasonably
commensurate with demand that the platting or replatting places on the
City park system, as described in the Comprehensive Plan. For purposes
of this section, an amount of land equal to eleven percent (11%) of the
total gross land area of the plat shall be presumptively defined as
“reasonably commensurate.” In the event that the subdivider objects to
the eleven percent (11%) standard, the City shall, at the developer’s
request and expense, conduct a specific dedication study of the park
system and the demand placed on the system by the proposed plat. Prior
to conducting the study, the City shall obtain a waiver of statutory time
lines for plat approval during the conduct of the study. No approval of
final plats, nor construction of any improvements, shall occur until the
park dedication study is completed. In lieu of land dedication, the City
Council may require a cash contribution in accordance with Minnesota
Statutes, or a combination of both. The City Council’s decision on land
and/or cash shall be made following recommendations from the City’s
Park Commission and staff, in accordance with the Comprehensive Plan.
(#412 8/23/04; #501 6/22/09)
(B) In accordance with Minnesota Statutes, where the City Council determines
that the park dedication requirements shall be paid in a cash contribution,
the amount of said contribution shall be based on the market value of the
raw land not later than at the time of final plat. The City may require that
the subdivider provide an appraisal to determine the market value. In the
alternative, the city may, by Ordinance, establish a fee per residential unit
that will meet the cash dedication requirement. The determination of the
appropriate fee calculation shall be made by the City Council.
(#412 8/23/04; #501 6/22/09)
MONTICELLO SUBDIVISION ORDINANCE Title XI/Chapter 6/Page 1
(C) The City Council shall not accept for credit against a subdivider’s park
dedication requirement any of the following:
1. Delineated wetlands.
2. Land within a designated flood plain.
3. Land encumbered by a utility easement such as a petroleum or
electric power transmission line (except where such easement is a
standard platting requirement of the City of Monticello pursuant to
Section 11-5-4 of this Chapter, and where the City determines that
the land within the easement will be usable for park, trail or open
space purposes).
4. Land within a drainage easement or other land required for
stormwater treatment.
The City may, at its discretion, accept lands in the above categories for
park dedication purposes if it deems the dedication to be of public benefit.
No credit shall be given against the subdivider’s park dedication
requirement, however, unless the City determines that the land will be
used for a specific public park, trail or open space purpose.
(#412, 8/23/04)
(D) Land dedicated for park purposes shall be transferred to the City of
Monticello by warranty deed. The transfer of said land shall occur at the
time of recording of the final plat. For multiple-phased developments, all
of the park dedication land shown on the approved Preliminary Plat shall
be transferred to the City upon recording of the first final plat, in the form
of Outlot(s) and shall not be shown as “Park” on the plat. The
Development Agreement may permit the phasing of said land transfer. In
addition, the Development Agreement shall grant the subdivider a license
to enter the park dedication land for the purposes of required grading,
seeding or other work approved by the City Council.
(#412, 8/23/04)
(E) In addition to the park dedication requirements listed above, each newly
subdivided lot shall pay a surcharge for park and trail development
purposes. The surcharge will be at a prevailing rate as determined by the
City Council.
(#412, 8/23/04)
11-6-2: CASH CONTRIBUTION: All monies collected from cash contributions shall be
placed in a special fund from which only those public uses as listed in (1) above
may be constructed or improved or land for those same uses may be acquired.
11-6-3: DELAYED DEDICATION PAYMENT: Upon petition by the developer, the
Council may approve a delay in the actual dedication of the cash required in lieu
MONTICELLO SUBDIVISION ORDINANCE Title XI/Chapter 6/Page 2
of land until such time as development occurs on the property being platted
provided that a proper legal agreement is executed guaranteeing such dedication.
Delayed dedication payment shall include eight percent (8%) interest per year.
11-6-4: PURCHASE OR CONDEMNATION OF LANDS: Where a proposed park,
playground or other recreational area, proposed school site, or other public ground
that has been indicated in the official map and/or master plan is located in whole
or in part within a proposed subdivision, such proposed public site shall be
designated as such and should be dedicated to the City, School District, or other
proper governmental unit. If the subdivider chooses not to dedicate an area in
excess of the land required under this section hereof for such proposed public site,
the Council shall be required to act to approve or disapprove the plat of the
subdivision for a period of ninety (90) days after the subdivider meets all the
provisions of the subdivision title in order to permit the Council, School Board, or
other appropriate governmental unit to consider the proposed plat and to take the
necessary steps to acquire, through purchase or condemnation, all or part of the
public site proposed under the official map or master plan.
11-6-5: LOCATION AND CONFIGURATION OF DEDICATION: In such cases where
the developer is required to dedicate land area, the City Council of the City of
Monticello shall have the right to determine the geographic location and
configuration of said dedication.
MONTICELLO SUBDIVISION ORDINANCE Title XI/Chapter 6/Page 3