Transportation Committee
Regular MeetingMount Pleasant, SC · October 2, 2017
Minutes
TOWN OF MOUNT PLEASANT, SOUTH CAROLINA
TRANSPORTATION COMMITTEE
Monday, October 2, 2017
Municipal Complex, Committee Meeting Room, 3rd Floor
100 Ann Edwards Lane
Mount Pleasant, SC 29464
MINUTES
Members Present: Mayor Linda Page, Chair; Paul Gawrych, Will Haynie
Staff Present: Eric DeMoura, Brad Morrison, Paul Lykins
Mayor Page called the meeting to order at 12:36 p.m.
1. Approval of Minutes from the September 5, 2017 meeting
Mr. Haynie moved for approval of the minutes; motion seconded by Mr.
Gawrych. Motion carried unanimously.
2. Public Comments
None
3. Update on Town-wide transportation projects
Mr. Lykins stated that the Transportation Department currently has two (2)
Capital Improvement Projects (CIP) underway and six (6) CIP projects
scheduled to begin in 2018.
The SC 41/Joe Rouse Road intersection improvements are open to traffic and
traffic signals have been modified. Updated traffic counts will need to be
performed to adjust the timing of the signals for efficient traffic flow.
Mayor Page inquired if there has there been any discussion related to traffic
congestion where traffic merges into one lane.
Mr. Morrison replied that the issue has been discussed and explained that the
intersection improvements have provided more capacity and that timing
adjustments should ease congestion. Staff is also reviewing operations to
ensure that signal timing US 17 and Hamlin Road does not impede traffic flow
Transportation Committee Minutes
October 2, 2017
Page 2 of 10
on SC 41. The intersections are being monitored so that adjustments can be
made if necessary.
Mayor Page asked for comments or questions from Committee.
None.
Mr. Lykins continued that Blythe Development began construction on the
Coleman Boulevard Revitalization project September 17, 2017, and
construction is estimated to last for approximately two (2) years.
Construction will be performed in four (4) stages, with the current stage
implementing a traffic shift for the west bound lanes of Coleman Boulevard
that will allow crews to work safely. Initial work will be confined to Simmons
Street between Coleman Boulevard and the Shem Creek Boat Landing and will
involve relocating a sewer force main, a water line and installation a water
quality device that will direct stormwater runoff to the Shem Creek
watershed. Stage one is expected to be completed in April, 2018. During
stage two, traffic control will shift to the eastbound lanes of Coleman
Boulevard and curb and gutter, drainage and sidewalks will be installed with
an estimated completion date of December, 2018. Stage three encompasses
the construction of the center median. All work for Stage three will be
performed at night with an estimated completion date of May, 2019. Stage
four completes the project with final paving and pavement markings. Staff is
being proactive in assisting business owners and residents throughout
construction with Ed Barbee, the Town of Mount Pleasant Construction
Liaison, actively engaging business owners, residents and Blythe
Development. Staff hosted a drop-in meeting for businesses owners at
Moultrie Middle School with an attendance of approximately twenty-five (25)
business owners and residents. Information was provided relating to the
phasing, timelines, storm drain plans and general project information. Now
that a detailed schedule has been established, a project website is being
developed to update the public with accurate information.
Mr. Morrison stated that staff meets with the Blythe Development each week
for a two (2) week outlook and the website will be updated accordingly in
Transportation Committee Minutes
October 2, 2017
Page 3 of 10
addition to Mr. Barbee continually meeting with property owners throughout
construction.
Mayor Page thanked Mr. Barbee and for being responsive to issues and
concerns among business owners and residents and Amy Livingston, Town of
Mount Pleasant Business and Tourism Manager, for her assistance with the
project. Directional signage will be installed above traffic cones to indicate
where breaks are for business entrances. The stacking lane to turn left into
Brookgreen has been increased due to it not being noticed by all drivers. The
Town and Blythe Development will remain adaptive throughout the project.
Mr. Haynie commented that a long time business owner expressed concern
that Coleman Boulevard has been converted to two (2) lanes with no
designated left turn lane. If a driver makes a left turn into a business, only
one (1) lane of traffic is moving. The business owner has requested that the
center turn lane be restored with one lane of traffic traveling in each
direction.
Mr. Morrison agreed with Mayor Page and stated that Ms. Livingston has
been very valuable acting as an additional liaison between the Town, business
owners and residents. The business owners meeting was held to hear and
address concerns. The Town is designing signage to be placed above traffic
barrels directing local traffic to business accesses.
Regarding traffic control, elimination of the center turn lane is necessary to
maintain minimum lane widths for a facility type like Coleman Boulevard. As
such, a left turn lane is not possible without a complete change in the means
and the methods assumed by the contractor in their bid. The contract was
bid with the contractor utilizing a safe work area because easements would
be difficult to obtain on the private side of the road and including the turn
lane would eliminate the work area. There was discussion at the beginning
of the project of forcing left-turns to be come U-turns at the signals, but staff
did not feel that option would be well received by the business community
because it would eliminate direct access to businesses. Staff will continue to
listen to concerns expressed by business owners and residents and make
Transportation Committee Minutes
October 2, 2017
Page 4 of 10
adjustments as needed. Council and the public are encouraged to contact
Staff with any feedback or concerns.
Mr. Lykins stated that the vision for the Coleman Boulevard Revitalization
project has always been a Main Street atmosphere where people gather, live,
work and play. Project benefits include enhanced mobility for pedestrians
and cyclists as well as motorists and greatly improved drainage facilities that
decreases stormwater discharge to adjacent neighborhoods with an
estimated twenty-four point thirty-two (24.32) acres of water cleaned before
entering the Shem Creek watershed. Other benefits include improved
lighting and landscaping for safety and beautification and additional transit
facilities with pull-outs and shelters.
Mr. Lykins stated that design for the Long Point Road Realignment and
Extension project was recently started by Johnson, Mirmiran and Thompson,
Inc. (JMT). The design will be complete in approximately September, 2019
and construction is expected to be complete in September, 2022. There is
extensive coordination with the Billy Swails Boulevard Phase IV project and
the Rifle Range Road Park master plan. The intent with this facility is to have
a connection with Rifle Range Road to include a roundabout constructed by
the Liberty Hill developer. Currently, the project is in the National
Environmental Policy Act (NEPA) process in the event federal funding
becomes available.
Mayor Page applauded the project and the roundabout improvements by the
developer. She questioned if there will be any bridging over the creek on Long
Point Road through the Charleston Area Transportation Study (CHATS)
program. Discussions have occurred relating to the loss of economy and the
challenges during flood events on that road section.
Mr. Morrison stated currently there is a culvert at Boone Hall Creek as well as
a nearby flat slab bridge. SCDOT plans have identified these crossings for
replacement, but they are not funded.
Mayor Page thanked Mr. Morrison stating that it is important to continue to
advocate at the state and federal level for the infrastructure. The Town
competes for CHATS funding. A bridge needs to be discussed during this
Transportation Committee Minutes
October 2, 2017
Page 5 of 10
process due to climate change. She asked Mr. DeMoura if approximately
twenty-four thousand (24,000) commuters are affected during a flood event.
Mr. DeMoura responded that he could not recall, however, approximately
twenty-four thousand (24,000) sounded accurate. During the first Strategic
Plan, the overriding theme was self-reliance and not waiting for other levels
of government assistance. The issue of self-reliance should be revisited
during the annual Council Retreat when capital projects are discussed
whether it is prudent for projects to be delayed just for the chance to be
eligible for federal funds. It is nice to have projects funded by an outside
agency, but the cost to the public of waiting for years must be considered.
Council may not agree, but with longer delays seen on SC-41, the question
becomes is it worth having an extra funding source available or should Council
explore alternative funding.
Mayor Page stated that there may be policy changes with regard to regulatory
changes from Washington and the Council Retreat in January would be a good
time to begin the conversation.
Mr. Gawrych asked for clarification that item being discussed is the full design
and permitting of the Long Point Road Extension from US-17 to Rifle Range
Road.
Mr. DeMoura replied in the affirmative.
Mr. Gawrych asked for confirmation that theexisting portion of Long Point
Road, west of US-17, is designed and permitted.
Mr. Morrison answered in the affirmative.
Mr. Gawrych asked what the cost is of the project.
Mr. Morrison responded that the combined cost is sixteen million, eight
hundred thousand dollars ($16,800,000) for both projects. The cost for the
realignment portion of the project is approximately, five to six million dollars
($5,000,000 - $6,000,000).
Mr. Gawrych inquired if it is possible to construct the re-alignment portion
before the extension portion begins.
Transportation Committee Minutes
October 2, 2017
Page 6 of 10
Mr. Morrison stated that the projects could be mutually exclusive and the first
phase could be completed if approved by Council.
Mr. Gawrych commented that the project has been discussed since 1998 and
is much needed and expressed hope that future Council will explore
alternative funding during the Council Retreat. If the project moves forward,
it could motivate other things to take place.
Mr. Lykins stated that the Coleman Boulevard/Patriot’s Point Road/Magrath
Darby intersection improvements project will adding a right turn lane on
Patriot’s Point Road, a dual left turn from Coleman Boulevard onto to Patriot’s
Point Road and additional turn lanes on Magrath Darby Boulevard. The
project will include bike lanes on Coleman Boulevard that partially complete
the bike network. A key feature of this project will include a bike box for
cyclist to facilitate left turns and other maneuvers. The basis of the design
came from the Waterfront Gateway Sector plan and the improvement is
based on the build-out of Patriot’s Point. The design should be complete in
February, 2019 and construction should begin in 2020.
Mr. Haynie asked if the project coincides with the timing of the development
at Patriots Point.
Mr. DeMoura replied that the schedule for the development has not been
established. However, it is likely that the project will be ahead of the
development. It is the intention that the project be properly designed and
funded so that the Town portion can be completed.
Mr. Haynie asked Mr. Gawrych, for clarification, if the project is being
designed to accommodate complete build out at Patriot’s Point.
Mr. Gawrych responded that the project would be for both of Mr. Bennett’s
projects.
Mr. Morrison agreed, stating that the Waterfront Gateway Sector plan was
discussed in January and has not changed regarding the build-out
assumptions for Ferry Wharf and the remainder of the development along
Harry Hallman Boulevard.
Transportation Committee Minutes
October 2, 2017
Page 7 of 10
Mr. Lykins stated that the project being discussed is the final phase of the
corridor and is estimated to be completed in August, 2020, based on the
South Carolina Department of Transportation’s (SCDOT) NEPA process
currently underway. There will be extensive coordination with the Rifle Range
Road Park Master plan and the Long Point Road extension project.
Mr. Gawrych inquired if the project was fully funded.
Mr. Lykins answered in the affirmative.
Mr. Lykins continued that the Shem Creek Bridge Bike Lane project is in
addition to the future pedestrian bridge and is federally funded through a
Transportation Alternative Program (TAP) grant. The project will involve re-
marking the bridge to accommodate a five (5) foot bike lane on each side, to
include curb and sidewalk work. The design is estimated to be complete in
January, 2017 and construction in December, 2018. The transition of the bike
lanes will be coordinated with the bike lanes included in the Coleman
Boulevard Revitalization project.
Mr. Gawrych inquired if the bike lanes will be on the roadway.
Mr. Lykins answered in the affirmative.
Mr. Gawrych asked what the schedule is for the pedestrian walkway.
Mr. DeMoura responded that the project will begin once the permit from the
regulatory agency is received.
Mr. Lykins stated that permits were submitted in September.
Mr. Gawrych asked if issues had been resolved with the property owners and
lessees.
Mr. DeMoura answered in the affirmative.
Mr. Lykins stated that the Park West Boulevard Widening project is relatively
simple. Referring to a graphic, Mr. Lykins explained that phase one involves
improvements from Grey Marsh Road to the four-lane section near the
entrance to the Town of Mount Pleasant Recreation Department. The project
is in design and the first public informational meeting is scheduled for October
26, 2017, at the Park West Recreation facility. The purpose of the meeting is
Transportation Committee Minutes
October 2, 2017
Page 8 of 10
to receive public input on the need for the widening as well as options for on-
street bike lanes or improvements to the existing multi-use path. The project
is expected to be complete in December, 2018.
Mayor Page stated that the length of time it takes to go through the
environmental process in anticipation that a project will become eligible for
federal funds is significant and asked what type of federal aid the Town has
received during the past ten (10) years.
Mr. DeMoura replied that Billy Swails Boulevard, Coleman Boulevard and the
I-526 Interchange projects have received some federal funds. Residents are
looking for relief and it is frustrating to inform them that a project will take
five (5) years to complete with federal funds when a project can be designed
and completed in twenty-four (24) months or less.
Mayor Page stated that the Town goes through the regulatory process for
safety reasons which should not be eliminated and the process can create the
dilemma of additional time. It is important for residents to understand that
Council and Staff would like projects to already be complete. During an initial
meeting with the consultant on the SC 41 project, she was stunned to learn
the timeline and the steps involved in the process. The County was
encouraged to explore all options and alternatives to help with interim
improvements. Drivers will be diverted through Park West and as Council
moves forward, all of the Gregory Ferry Road Connector and other
improvements need to be prioritized to alleviate any pressure on SC 41.
During the January Council Retreat and prioritization of plans, Council should
discuss the issues that will help the residents in that corridor.
4. Update on McCants Drive radar speed feedback signs
Mr. Morrison explained that forty-four (44) days ago the radar feedback signs
located on McCants were activated explaining that a graphic shows pre and
post eighty-fifth percentile (85%-ile) bi-directional speeds, which combines
speeds for both directions. Typically, results would not be analyzed until
approximately six (6) months had passed, but staff wanted to provide the
Committee with some preliminary results. Referring to the graphic, Mr.
Morrison indicated where count stations were located before and after the
Transportation Committee Minutes
October 2, 2017
Page 9 of 10
radar feedback signs and data indicated a slight increase in speed from thirty
(30) miles per hour (mph) to thirty-one (31) mph near the intersection of
McCants Drive and Simmons Street. At the radar signs located near the
intersection of McCants Drive and Jackson Street, data indicates a decrease
of one (1) mph with a slight increase between the two (2) sets of radar
feedback signs near the intersection of McCants Drive and Pocahontas Street,
which is intuitive for the first set feedback signs coming from Ben Sawyer. The
largest decrease in speed detected was at the location of feedback signs near
the intersection of McCants Drive and Barbara Street, where the pre-speed of
thirty-eight (38) mph dropped to thirty (30) mph and that may be attributed
to traffic entering the neighborhood from a higher speed facility. This is a
significant decrease in speed between Ben Sawyer Boulevard and the first set
of radar feedback signs on McCants Drive. Current results indicate benefits
near the sign, however, more data will need to be collected and analyzed.
Mayor Page asked if the radar feedback signs are capable of collecting traffic
counts to monitor any increases in volume due to resident concerns that cut-
through traffic will increase as the Coleman Boulevard Revitalization project
progresses. Ideally, the signs would be able to issue traffic citations and often
the offenders are residents that live within the neighborhood.
Mr. Morrison replied that state legislation does not allow ticketing from a
radar feedback device.
Mayor Page commented that it is not possible to have police presence in
every part of the Town running radar and that helping to reduce speed is
important.
Mr. Morrison stated regarding monitoring the traffic as it relates to the Old
Village, data has been collected for many years and now that construction is
underway on Coleman Boulevard, traffic will continue to be monitored.
Mayor Page commented that residents do not want any excessive cut through
traffic.
5. Adjourn
There being no further business, the meeting was adjourned at 1:07 p.m.
Transportation Committee Minutes
October 2, 2017
Page 10 of 10
Respectfully submitted by,
Cathy Godsey
October 5, 2017
Transportation CIP
Project Updates
OCTOBER, 2017
Ongoing CIP Projects
SC 41 and Joe Rouse Intersection Improvements
Coleman Boulevard Revitalization
New 2018 CIP Projects
Long Point Road Realignment and Extension
Coleman Boulevard and Patriot’s Point Intersection Improvements
Billy Swails Boulevard Phase 4B
Shem Creek Bridge Bike Lanes
Park West Boulevard Widening
All American Boulevard Extension
SC 41 & Joe Rouse Intersection Improvements
CONSTRUCTION COST ESTIMATE (YTD BUDGETED): $1,013,000 ($1,013,000)
CONTRACTOR: Gulf Stream Construction
COMPLETION DATE: October 24, 2017
STATUS: New traffic lanes, signals and other improvements open to traffic. Clean-up and punch list
items to complete.
Coleman Boulevard Revitalization
CONTRACTOR: Blythe Development
START DATE: September 11, 2017
COMPLETE DATE: August 31, 2019
STATUS: TC Stage 1 – Westbound
Meeting with Business Owners.
Construction community liaison visiting
businesses.
Develop project website.
“What We Get”
• Main Street atmosphere where people gather, live, work and play.
• Enhanced mobility for pedestrians and cyclists as well as motorists.
• Greatly improved drainage facilities that decreases stormwater discharge to adjacent neighborhoods.
• 24.32 acres of runoff cleaned before entering Shem Creek watershed.
• Improved lighting and landscaping for safety and beautification.
• Additional transit facilities with pull-outs and shelters.
Long Point Road Realignment and Extension
CONSTRUCTION COST ESTIMATE (YTD BUDGETED): $16,810,000 ($4,982,249)
DESIGNER: JMT
COMPLETION DATE: Design: September 2019 – Construction: September 2022
STATUS: Design and NEPA process starts October.
Coleman Boulevard and Patriot’s Point Road Intersection Improvements
CONSTRUCTION COST ESTIMATE (YTD BUDGETED): $5,100,000 ($5,100,000)
CONSULTANT: STV Incorporated
COMPLETION DATE: Design and Permitting: February 2019 – Construction: December 2020
STATUS: Surveying and preliminary engineering began August 2017.
Billy Swails Boulevard 4B
CONSTRUCTION COST ESTIMATE (YTD BUDGETED): $11,923,000 ($1,923,000 TOMP and
$10,000,000 Federal)
DESIGNER: Stantec Consulting Services, Inc.
COMPLETION DATE: Design: August 2020 – Construction: August 2022
STATUS: Preliminary engineering began in August 2017
Shem Creek Bridge Bike Lanes
CONSTRUCTION COST ESTIMATE (YTD BUDGETED): $791,000 ($158,000 TOMP and $633,000 Federal)
CONSULTANT: CDM Smith
COMPLETION DATE: Design: January 2018 – Construction: December 2019
STATUS: Preliminary design began in August 2017
Park West Boulevard Widening
CONSTRUCTION COST ESTIMATE (YTD BUDGETED): $6,571,250 ($1,100,000)
CONSULTANT: Meade and Hunt
COMPLETION DATE: Design – December 2018
STATUS: Design contract awarded and notice to proceed issued in August 2017.
• Public Meeting on October 26
• Bike Lanes vs. MUP
Pre and Post Radar Sign Installation
Pre- 85th = 30 mph Pre- 85th = 34 mph Pre- 85th = 38 mph
Pre- 85th = 32 mph
Pre- 85th = 31 mph Post- 85th =30 mph
Post- 85th = 30 mph In - bound
Pre- 85th = 29 mph
McCants Drive Pre- 85th = 32 mph Out - bound
Post- 85th =28 mph Post- 85th =30 mph
Post- 85th = 31 mph Post- 85th = 36 mph Post- 85th = 30 mph
Sign location
Post implementation = 44 day study