Architectural Review Board
Regular MeetingMount Vernon, NY · January 25, 2023
Minutes
Architectural Review Board
Department of Planning & Community Development
City Hall - Roosevelt Square
Mount Vernon, New York 10550-2060
(914) 699-7230
Shawyn Patterson-Howard Robin Myers
Mayor Acting Chair
ARCHITECTURAL REVIEW BOARD
MEETING MINUTES
FOR JANUARY 25, 2023, 2022
A regular meeting of the Architectural Review Board was held on Wednesday, January 25,
2023 at 6:30 PM in the Mayor’s Conference Room on the 1st Floor in Mount
Vernon City Hall.
ITEM #1 - ROLL CALL - The Acting Chair, Ms. Robin Myers, called the roll: in addition to the
Acting Chair, the following Commissioners were present: Sylvia Woods and Linda Sanchez.
Also attending were Maria Pace, Secretary to the ARB, Deputy Commissioner Marlon Molina,
William Hyland, Robert Galvin, Plan Administrator (via Zoom), and U. Nkechi Nwachukwu,
land use counsel.
With a quorum present, the Acting Chair opened the meeting at 6:30 PM.
Meeting was live streamed on CMVNY Facebook.
ITEM #2 - APPROVAL OF MINUTES
The December 21, 2022 minutes were approved. Commissioner Woods made a motion to
approve the minutes, seconded by Commissioner Sanchez and approved by a vote of 3-0.
Continued Public Hearing
3.1 Case # 40- 2022 31 South 14th Avenue (Section 164.84, Block 3015, Lot 29) in the RMF-
6.75 District.
This application was adjourned to the February 22, 2023 meeting because it was not noticed
properly.
City of Mount Vernon Meeting Date
Architectural Review Board Meeting Minutes January 25, 2023
Continued Public Hearing
3.2 Case # 41-2022 (ARB Application #197301) 210 West Lincoln Avenue (Section 165.61,
Block 1076, Lot 14) in the Neighborhood Business (NB) District.
The Acting Chair read into the record how the legal notice for this matter was published.
The Applicant is West Side Party Rental. Applicant is being represented by Mr. Shahin Badaly,
PE, and is seeking a certificate of appropriateness to allow the following improvements in this
existing brick, one-story warehouse, and sales office. Proposed improvements include the
installation of a new overhead garage door and enlargement and installation of two existing
adjacent garage doors. Windows on the exterior elevation between the garage doors and
existing entrance door will be reconfigured from three windws to two windows. All of the garage
doors access West Lincoln Avenue and the interior loading dock. Applicant is also proposing to
expand the existing loading dock. The subject property is 34,486 sf with the building being
29,883 sf in the NB zone. There is an approximately 4,000 sf open yard at the rear of the building.
Applicant provided set of plans showing the building elevation with dimensions. Applicant will
be working with the City Tree Surgeon in planting new street trees of at least 8” caliper in the
city r-o-w fronting adjacent properties along West Lincoln Avenue.
SEQRA Determination – The Proposed Action is a Type II action based on 617.5(c)(9)
“construction or expansion of a primary or accessory/appurtenant, non-residential structure or
facility involving less than 4,000 square feet of gross floor area and not involving a change in zoning
or a use variance and consistent with local land use controls,” therefore, ending the SEQRA
process.
Mr. Shahin Badaly explained that this application has received Planning Board approval. There
will be no landscaping because there is no room; however, he is working with the DPW to put in
a tree. There will be no rolling gates and the three garage doors will be the same height although
adjustment for the slope needs to be made.
As a result of discussion and suggested conditions made at the December 21 meeting, a draft
Certificate of Appropriateness was sent to the ARB members for their preliminary review before
the January meeting. The conditions included:
1. Make a donation to tree fund and plant street trees along W. Lincoln Ave (per Planning
Board condition)
2. Coping on top & garage door warm grey color (to coordinate w/ windows & doors)
3. Streamline LED down-facing, anodized bronze finished lighting
4. Paint mullions on windows
5. Provide cut sheet for fixtures
2
City of Mount Vernon Meeting Date
Architectural Review Board Meeting Minutes January 25, 2023
The ARB commissioners agreed that the Certificate of Appropriateness included all the
conditions requested.
The Acting Chair asked for a motion to approve the application with the conditions.
Commissioner Sanchez made the motion, seconded by Commissioner Woods and carried by a
vote of 3-0.
New Public Hearing
3.3 Case #1- 2023 39 Parkway East (Section 165.24, Block 2247, Lot 25) in the R1-4.5 Zone.
The Architectural Review Board received an Affidavit of Sign Posting stating that on January
11, 2023 a sign was posted at the site giving notice of the Architectural Review Board’s January
25, 2022 meeting. The Board also received photographs showing that the sign posting on the
property has been provided with notice of today’s meeting.
The owner is Mr. Thomas Moore. He is represented by his architect, Joseph Fernandez. The
0.25-acre subject property is located on the east side of Parkway East approximately 470’ north
of its intersection with Devona Avenue. The property is generally located in the northwestern
portion of the city, above the Cross County Parkway. The subject property is occupied by 2 ½
story single family resident in the R1-4.5 single family zone.
Applicant is seeking a certificate of appropriateness for renovation and alteration of existing
single-family residence. The scope of work includes:
• interior renovation,
• new garage
• replacement of exterior doors & windows in existing openings w/style matching
original
• new shingles on existing roof
• renovation of existing porch
• cosmetic repair of existing siding
• new terraces
• new retaining wall, driveway and walkway
Applicant provided a set of plans with color elevations, locations of trees and site improvements,
landscape plan, photographs of existing residence from various views, including view of the
existing asphalt shingles roof, Survey. The new retaining wall appears to be 5’. 6” at its highest
point close to the driveway for the new garage, extending in front of the existing porch down to
1’ at the south of the porch.
Applicant provided catalogs of materials as well as samples to the ARB meeting. The
photographs of the existing roof show the need for repair and replacement of shingles. Likewise,
the siding shows need for cosmetic repairs. The plans do not show any lighting for the garage
or the front door of the residence.
3
City of Mount Vernon Meeting Date
Architectural Review Board Meeting Minutes January 25, 2023
SEQRA Determination – The proposed action is a “Type II” action under SEQRA based on
DEC 617.5 (c) (11) "construction or expansion of a single family, a two-family or a three-family
residence on an approved lot ......” therefore, ending the SEQRA process.
Joseph Fernandez explained that the home is a farmhouse colonial that is tired looking, and the
new owners want to refresh it with new paint and upgrades. The garage will be a new addition
to the house, there will be an open section along the enclosed porch and the railings will be
similar to what is there currently. Brand new shutters will be added and will mirror what had
been there previously. The existing original siding will be painted, not replaced. The kitchen
will also be opened up.
The Acting Chair asked about the windows.
Mr. Fernandez said new 6/1 Andersen windows would be installed to match the style of the
house. He also said that the foundation would remain the same but refreshed.
The Acting Chair inquired about lighting.
Mr. Fernandez said that light fixtures will be added on the garage and main door entrance.
The Acting Chair also inquired about plantings.
Mr. Fernandez said that small plants, possibly boxwoods would be planted and that trees that
had been taken down would be replaced.
Mr. Galvin recommended that a landscape schedule be submitted and that this should be a
condition of approval along with a cut sheet for the lighting.
The Acting Chair asked for a motion to approve the application with conditions.
Commissioner Woods made a motion to approve the application with conditions, including a
planting schedule and cut sheet for garage and main door lighting, seconded by Commissioner
Sanchez and carried by a vote of 3-0.
New Public Hearing
3.4 Case # 02 - 2023 357 Bedford Avenue (Section 169.25, Block 4052, Lot 12 & 13) in the R2-
4.5 Residence District
The Architectural Review Board has also received an Affidavit of Sign Posting stating that on
January 12, 2023 a sign was posted at the site giving notice of the Architectural Review Board’s
4
City of Mount Vernon Meeting Date
Architectural Review Board Meeting Minutes January 25, 2023
January 25, 2023 meeting. The Board also received photographs showing that the sign posting
on the property has been provided with notice of today’s meeting.
The owner, Ena Mae Properties, is represented by Mr. Tom Abillama, the architect. The
Applicant received subdivision and site plan approval from the Planning Board at their
December 7, 2022 meeting. Staff is currently waiting for the Chair to sign the resolution. The
ZBA approved the area variances required for the subdivision on September 20, 2022. Still
waiting on the Findings of Fact for the application.
The subject property which was subdivided into two lots (12.101 and 12,102) is located at the
intersection of Bedford Avneu and East Fifth Street. This property (lot 12) consists of 7,500 sf
in the R2.4-5 zone. The property is situated across from Graham Elementary School (which
extends the entire length of the west side of Bedford Avenue). Each lot is 3,750 sf. (50' x 75').
The Applicant is requesting a certificate of appropriateness for the construction of new two-
family residences on each of the two lots.
Applicant proposes Tudor style subdivision with two 2-family houses and garages. Applicant
will also demolish a 3-car garage on lot 12.101. Lot 12.1.A and 12.2.B will provide parking in a
garage under each unit. The proposed two-family houses will be two stories and 25' in height.
On Lot 12.101, parking will be in tha garage under the 2-family residence. On Lot 12.102, there
will be a seperate grage built behind the 2-family residence with a pergola on top of the garage.
The pergola would provide open space for each family in the building. Direct access will be
available from the basement of the units. The units will have direct accesss to the basement.
Lighting will be provided by 2 sconces (downlite to mitigate light spill) over each garage and
additional ground level path lighting. Granite curbing and new sidewalks will be installed.
The Applicant provided elevations, photographs of the property and surrounding area,
rendering of the proposed two-family residences and site plans. Landscape plan has been
provided. Applicant has also provided spec sheet with catalog cuts and colors for the proposed
materials including outdoor lighting.
SEQRA Determination – The proposed action is a “Type II” action under SEQRA based on
DEC 617.5 (c) (11) "construction or expansion of a single family, a two-family or a three-family
residence on an approved lot ......” therefore, ending the SEQRA process.
Mr. Tom Abillama explained that the windows would be black, and lighting would be added
under the porch. He also provided a landscape schedule for plantings, including birch.
The Acting Chair asked if there would be a pathway to the back of the subdivision.
Mr. Abillama said he could include stone pavers (hardscape surface).
5
City of Mount Vernon Meeting Date
Architectural Review Board Meeting Minutes January 25, 2023
The Acting Chair suggested that a condition of approval would be to show the hardscape
material on the site plans.
The Acting Chair asked if there were any comments from the public; there were none.
The Acting Chair then asked for a motion to approve the application. Commissioner Sanchez
made the motion with the condition that hardscape materials with pavers be included on the
final site plans, seconded by Commissioner Woods and carried by a vote of 3-0.
New Public Hearing
3.5 Case # 03 - 2023 333 South Fifth Avenue (Section 169.30, Block 3090, Lot 25) in the RMF-
6.75 District.
The Architectural Review Board has also received an Affidavit of Sign Posting stating that on
January 12, 2023, a sign was posted at the site giving notice of the Architectural Review Board’s
January 25, 2023 meeting. The Board also received photographs showing that the sign posting
on the property has been provided with notice of today’s meeting.
The owner, Ms. Caryl Blackwood, is represented by Mr. Thomas Curro, Architect. The
Applicant is requesting a certificate of appropriateness for the construction of new one story,
rear addition to an existing single-family residence with new asphalt roof shingles and vinyl
siding to match existing materials.
The subject property is on a 4,500-sf lot located on the east side of 5th Avenue, approximately
360’ to the south of West 4th Street. The property has 60’ frontage with 75’ depth and is in the
RMF-6.75 zone. Property is occupied by an existing 2 ½ story frame dwelling. Applicant is
located between two existing residences and there is an existing residence at the rear. The rear
yard is 36’ from the proposed one-story addition. Photographs of the residence and
surroundings were provided. There is an existing flagstone patio at the rear. Applicant has
provided catalog cuts and colors for siding, shingles and trim as well as details for double-hung
window and picture window.
SEQRA Determination – The proposed action is a “Type II” action under SEQRA based on
DEC 617.5 (c) (11) "construction or expansion of a single family, a two-family or a three-family
residence on an approved lot ......” therefore, ending the SEQRA process.
Mr. Thomas Curro explained that an additional 120 sq. ft would be added to the house to
enlarge the bathroom and reconfigure the kitchen. The roofing will also be replaced. The
siding color will be similar to the existing linen color and new windows will be Anderson
double-hung, 6/0.
Commissioner Woods asked about the flagstone patio.
6
City of Mount Vernon Meeting Date
Architectural Review Board Meeting Minutes January 25, 2023
Mr. Curro said he would try to save what he can, but it might need to be removed.
The Acting Chair inquired about the style of lighting fixture in the front of the house and
recommended that conditions be added specifying that a cut sheet for the fixture be provided;
that the black wrought iron railing be coordinated in the back and front; and to specify the
color and material for the asphalt roof.
The Acting Chair then asked for a motion to approve the application with the recommended
conditions. Commissioner Sanchez made the motion to approve with the conditions, seconded
by Commissioner Woods and carried by a vote of 3-0.
New Public Hearing
3.6 Case # 04 - 2023 140 West 2nd Street (Section 165.77, Block 3024, Lot 3) in the RMF- 6.75
District.
The Architectural Review Board has also received an Affidavit of Sign Posting stating that on
January 12, 2023, a sign was posted at the site giving notice of the Architectural Review Board’s
January 25, 2023 meeting. The Board also received photographs showing that the sign posting
on the property has been provided with notice of today’s meeting.
The owner, Julian & Marvalyn Waters, are being reporesented by Mr. Tom Abillama, architect.
The Applicant received subdivision and site plan approval from the Planning Board at their
December 7, 2022 meeting. Staff is currently waiting for the Chair to sign the resolution. The
ZBA approved the area variances required for the subdivision. Still waiting on the Findings of
Fact for the application.
The Applicant is requesting a certificate of appropriateness for the construction of a new two-
family residence on the newly created vacant lot (3.102). There will be parking provided for two
vehicles in the garage under the house. The proposed new lot is 5,000 sf with a width of 50’ and
a depth. The property is at the northeast intersection at South Tenth Avenue, across the street
from the Grimes elementary school. The proposed new two-family residence will include
downward LED lighting in the front and rear. Granite curbing will be installed. New sidewalk
and new driveways will be concrete with concrete curbs. A landscape plan has been provided.
The Applicant provided elevations, photographs of the property and surrounding area,
rendering of the proposed two-family residence and site plans. A landscape plan was provided.
Applicant also provided spec sheet with catalog cuts and colors for the proposed materials
including outdoor lighting.
7
City of Mount Vernon Meeting Date
Architectural Review Board Meeting Minutes January 25, 2023
SEQRA Determination – The proposed action is a “Type II” action under SEQRA based on
DEC 617.5 (c) (11) "construction or expansion of a single family, a two-family or a three-family
residence on an approved lot ......” therefore, ending the SEQRA process
Mr. Abillama explained that there will be downward facing light by the garage door in the back.
Windows will be white, and the handrails will be black. The front door color will match to the
gables (in the brown family) and there will be asphalt shingles over the French doors on the
deck. There will be a door and light included under the porch. There will be no tree removal.
The Acting Chair asked about hardscape materials/pavers and added it as a condition.
Mr. Bob Galvin mentioned that the tree in the backyard is under tree protection due to its
maturity, that it is healthy and significant, and it’s the only tree on the property.
The Acting Chair asked for a motion to approve the application with the condition that a cut
sheet for the pavers be provided. Commissioner Woods made the motion to approve with the
condition, seconded by Commissioners Sanchez, and carried by a vote of 3-0
Meeting Adjournment
There being no other business, the Chair asked for a motion to adjourn the meeting.
Commissioner Woods made a motion to adjourn the meeting, seconded by Commissioner
Sanchez and carried by a vote of 3-0.
The meeting was adjourned at 7:34 PM.
Maria Pace
Land Use Secretary
Bob Galvin, AICP
Planning Administrator
8
Agenda
Architectural Review Board
Department of Planning & Community Development
City Hall - Roosevelt Square
Mount Vernon, New York 10550-2060
(914) 699-7230
Shawyn Patterson-Howard Robin Myers
Mayor Acting Chair
MEETING AGENDA
ARCHITECTURAL REVIEW BOARD
PUBLIC MEETING
JANUARY 25, 2023
A work session of the Architectural Review Board will be held on Wednesday,
January 25, 2023 at 6:00 PM in the Mayor’s Conference Room, Room 107A on the 1st floor
in Mount Vernon City Hall. The regular meeting of the Architectural Review Board will be
continued at 6:30 PM on January 25, 2023. Applicants and members of the public will be
permitted to attend and make public comment via in person attendance.
ITEM #1 - ROLL CALL
ITEM #2 - APPROVAL OF MINUTES
• December 21, 2022 Minutes
ITEM #3 - PUBLIC MEETINGS
Continued Public Hearing
3.1 Case # 40- 2022 31 South 14th Avenue (Section 164.84, Block 3015, Lot 29) in the RMF-6.75
District.
Adjourned – The Board did not receive an Affidavit of Sign Posting or photographs
confirming that this application was noticed properly.
Continued Public Hearing
3.2 Case # 41-2022 (ARB Application #197301) 210 West Lincoln Avenue (Section 165.61,
Block 1076, Lot 14) in the Neighborhood Business (NB) District.
The Architectural Review Board has also received an Affidavit of Sign Posting stating that on
City of Mount Vernon Meeting Date
Architectural Review Board Agenda January 25, 2023
January 10, 2023, a sign was posted at the site giving notice of the Architectural Review
Board’s January 25, 2022 meeting. The Board also received photographs showing that the sign
posting on the property has been provided with notice of today’s meeting.
The Applicant is West Side Party Rental. Applicant is being represented by Mr. Shahin
Badaly, PE. The Applicant is seeking a certificate of appropriateness to allow the following
improvements in this existing brick, one-story warehouse, and sales office. Proposed
improvements include the installation of a new overhead garage door and enlargement and
installation of two existing adjacent garage doors. Windows on the exterior elevation between
the garage doors and existing entrance door will be reconfigured from three windws to two
windows. All of the garage doors access West Lincoln Avenue and the interior loading dock.
Applicant is also proposing to expand the existing loading dock. The subject property is
34,486 sf with the building being 29,883 sf in the NB zone. There is an approximately 4,000 sf
open yard at the rear of the building.
Applicant has provided set of plans showing the building elevation with dimensions. Applicant
will be working with the City Tree Surgeon in planting new street trees of at least 8” caliper in
the city r-o-w fronting adjacent properties along West Lincoln Avenue.
The ARB is reviewing the Certificate of Appropriateness for formal approval at this meeting.
SEQRA Determination – The ARB confirmed that this was a Type II action at its December 21,
2022 meeting.
New Public Hearing
3.3 Case No. 1- 2023 39 Parkway East (Section 165.24, Block 2247, Lot 25) in the R1-4.5 Zone.
The Architectural Review Board has also received an Affidavit of Sign Posting stating that on
January 11, 2023 a sign was posted at the site giving notice of the Architectural Review Board’s
January 25, 2022 meeting. The Board also received photographs showing that the sign posting
on the property has been provided with notice of today’s meeting.
The owner is Mr. Thomas Moore. He is represented by his architect, Joseph Fernandez. The
0.25-acre subject property is located on the east side of Parkway East approximately 470’ north
of its intersection with Devona Avenue. The property is generally located in the northwestern
portion of the city, above the Cross County Parkway. The subject property is occupied by 2 ½
story single family resident in the R1-4.5 single family zone.
Applicant is seeking a certificate of appropriateness for renovation and alteration of existing
single-family residence. The scope of work includes:
• interior renovation,
• new garage
2
City of Mount Vernon Meeting Date
Architectural Review Board Agenda January 25, 2023
• replacement of exterior doors & windows in existing openings w/style matching
original
• new shingles on existing roof
• renovation of existing porch
• cosmetic repair of existing siding
• new terraces
• new retaining wall, driveway and walkway
Applicant has provided set of plans with color elevations, locations of trees and site
improvements, landscape plan, photographs of existing residence from various views, including
view of the existing asphalt shingles roof, Survey. The new retaining wall appears to be 5’. 6” at
its highest point close to the driveway for the new garage, extending in front of the existing
porch down to 1’ at the south of the porch.
Applicant needs to provide catalogs of materials and bring actual samples to the ARB meeting.
The existing roof appears to be in which show samples of materials. The photographs of the
existing roof show the need for repair and replacement of shingles. Likewise, the siding shows
need for cosmetic repairs. The plans do not show any lighting for the garage or the front door
of the residence.
SEQRA Determination – The proposed action is a “Type II” action under SEQRA based on
DEC 617.5 (c) (11) "construction or expansion of a single family, a two-family or a three-family
residence on an approved lot ......” therefore, ending the SEQRA process.
New Public Hearing
3.4 Case # 02 - 2023 357 Bedford Avenue (Section 169.25, Block 4052, Lot 12 & 13) in the R2-
4.5 Residence District
The Architectural Review Board has also received an Affidavit of Sign Posting stating that on
January 12, 2023 a sign was posted at the site giving notice of the Architectural Review Board’s
January 25, 2023 meeting. The Board also received photographs showing that the sign posting
on the property has been provided with notice of today’s meeting.
The Owner, Ena Mae Properties, is represented by Mr. Tom Abillama, the architect. The
Applicant received subdivision and site plan approval from the Planning Board at their
December 7, 2022 meeting. Staff is currently waiting for the Chair to sign the resolution. The
ZBA approved the area variances required for the subdivision on September 20, 2022. Still
waiting on the Findings of Fact for the application.
The subject property which was subdivided into two lots (12.101 and 12,102) is located at the
intersection of Bedford Avneu and East Fifth Street. This property (lot 12) consists of 7,500 sf
in the R2.4-5 zone. The property is situated across from Graham Elementary School (which
3
City of Mount Vernon Meeting Date
Architectural Review Board Agenda January 25, 2023
extends the entire length of the west side of Bedford Avenue). Each lot is 3,750 sf. (50' x 75').
The Applicant is requesting a certificate of appropriateness for the construction of new two-
family residences on each of the two lots.
Applicant proposes Tudor style subdivision with two 2-family houses and garages. Applicant
will also demolish a 3-car garage on lot 12.101. Lot 12.1.A and 12.2.B will provide parking in a
garage under each unit. The proposed two-family houses will be two stories and 25' in height.
On Lot 12.101, parking will be in tha garage under the 2-family residence. On Lot 12.102,
there will be a seperate grage built behind the 2-family residence with a pergola on top of the
garage. The pergola would provide open space for each family in the building. Direct access
will be available from the basement of the units. The units will have direct accesss to the
basement. Lighting will be provided by 2 sconces (downlite to mitigate light spill) over each
garage and additional ground level path lighting. Granite curbing and new sidewalks will be
installed.
The Applicant has provided elevations, photographs of the property and surrounding area,
rendering of the proposed two-family residences and site plans. Landscape plan has been
provided. Applicant has provided spec sheet with catalog cuts and colors for the proposed
materials including outdoor lighting.
SEQRA Determination – The proposed action is a “Type II” action under SEQRA based on
DEC 617.5 (c) (11) "construction or expansion of a single family, a two-family or a three-family
residence on an approved lot ......” therefore, ending the SEQRA process
New Public Hearing
3.5 Case # 03 - 2023 333 South Fifth Avenue (Section 169.30, Block 3090, Lot 25) in the RMF-
6.75 District.
The Architectural Review Board has also received an Affidavit of Sign Posting stating that on
January 12, 2023, a sign was posted at the site giving notice of the Architectural Review
Board’s January 25, 2023 meeting. The Board also received photographs showing that the sign
posting on the property has been provided with notice of today’s meeting.
The owner, Ms. Caryl Blackwood, is being reporesented by Mr. Thomas Curro, Architect.
The Applicant is requesting a certificate of appropriateness for the construction of new one
story, rear addition to an existing single-family residence with new asphalt roof shingles and
vinyl siding to match existing materials.
The subject property is on a 4,500-sf lot located on the east side of 5th Avenue, approximately
4
City of Mount Vernon Meeting Date
Architectural Review Board Agenda January 25, 2023
360’ to the south of West 4th Street. The property has 60’ frontage with 75’ depth and is in the
RMF-6.75 zone. Property is occupied by an existing 2 ½ story frame dwelling Applicant is
located between two existing residences and there is an existing residence at the rear. The rear
yard is 36’ from the proposed one-story addition. Photographs of the residence and
surroundings have been provided. There is an existing flagstone patio at the rear. Applicant
has provided catalog cuts and colors for siding, shingles and trim as well as details for double-
hung window and picture window.
SEQRA Determination – The proposed action is a “Type II” action under SEQRA based on
DEC 617.5 (c) (11) "construction or expansion of a single family, a two-family or a three-family
residence on an approved lot ......” therefore, ending the SEQRA process.
New Public Hearing
3.6 Case # 04 - 2023 140 West 2nd Street (Section 165.77, Block 3024, Lot 3) in the RMF- 6.75
District.
The Architectural Review Board has also received an Affidavit of Sign Posting stating that on
January 12, 2023, a sign was posted at the site giving notice of the Architectural Review
Board’s January 25, 2023 meeting. The Board also received photographs showing that the sign
posting on the property has been provided with notice of today’s meeting.
The owner, Julian & Marvalyn Waters, are being reporesented by Mr. Tom Abillma,
architect. The Applicant received subdivision and site plan approval from the Planning Board
at their December 7, 2022 meeting. Staff is currently waiting for the Chair to sign the
resolution. The ZBA approved the area variances required for the subdivision. Still waiting on
the Findings of Fact for the application.
The Applicant is requesting a certificate of appropriateness for the construction of new two-
family residence on the newly created vacant lot (3.102). There will be parking provided for
two vehicles in the garage under the house. The proposed new lot is 5,000 sf with a width of
50’ and a depth. The property is at the northeast intersection at South Tenth Avenue, across
the street from the Grimes elementary school. The proposed new two-family residence will
include downward LED lighting in the front and rear. Granite curbing will be installed. New
sidewalk and new driveways will be concrete with concrete curbs. A landscape plan has been
provided.
The Applicant has provided elevations, photographs of the property and surrounding area,
rendering of the proposed two-family residence and site plans. Landscape plan has been
provided. Applicant has provided spec sheet with catalog cuts and colors for the proposed
materials including outdoor lighting.
5
City of Mount Vernon Meeting Date
Architectural Review Board Agenda January 25, 2023
SEQRA Determination – The proposed action is a “Type II” action under SEQRA based on
DEC 617.5 (c) (11) "construction or expansion of a single family, a two-family or a three-family
residence on an approved lot ......” therefore, ending the SEQRA process
Bob Galvin, AICP
Planning Administrator
Maria Pace
Land Use Secretary
cc: Mayor
Planning Commissioner
Corporation Counsel
Deputy Planning Commissioner
City Clerk
Building Department
Lobby
6
Get email alerts for Mount Vernon
A daily email when new agendas and minutes are posted.