Architectural Review Board
Regular MeetingMount Vernon, NY · September 27, 2023
Minutes
Architectural Review Board
Department of Planning & Community Development
City Hall - Roosevelt Square
Mount Vernon, New York 10550-2060
(914) 699-7230
Shawyn Patterson-Howard Robin Myers
Mayor Chair
ARCHITECTURAL REVIEW BOARD
MEETING MINUTES
FOR SEPTEMBER 27, 2023
A regular meeting of the Architectural Review Board was held on Wednesday, September
27, 2023 at 6:30 PM in the Memorial Room on the 2 n d Floor in Mount Vernon City
Hall.
ITEM #1 - ROLL CALL - Chair Robin Myers called the roll; in addition to the Chair,
Commissioners Sylvia Woods, Lynda Sanchez and Buzz Riley were present.
Also attending were William Hyland, Senior Planner, Maria Pace, Land Use Boards secretary,
and U. Nkechi Nwachukwu, land use counsel.
With a quorum present, the Chair opened the meeting at 6:30 PM.
The meeting was live streamed on CMVNY Facebook.
ITEM #2 - APPROVAL OF MINUTES
A grammar correction on page 4 of the August 23, 2023 minutes was discussed and made
during the work session. At the meeting, Commissioner Riley made a motion to approve the
minutes with the edit, seconded by Commissioner Woods, and approved by a vote of 4-0.
ITEM #3 - PUBLIC MEETINGS
Continued Public Hearing
3.1 – ARB-23-53: 114 North 8th Avenue (Section 165.61, Block 1108, Lot 10) in the RMF- 6.75
District.
The Architectural Review Board received an Affidavit of Sign Posting stating that on
September 13, 2023, a sign was posted at the site giving notice of the Architectural Review
City of Mount Vernon Meeting Date
Architectural Review Board Meeting Minutes September 27, 2023
Board’s September 27 meeting. The Board also received photographs showing that the sign
posting on the property has been provided with notice of today’s meeting.
The owner, Wen Ming Xie, is represented by Mr. Tom Abillama, Architect. The subject property
is a 5,000 sf lot on the west side of North 8th Avenue, approximatly 150’ to the north of West
Sidney Avenue in the RMF-10 zone. The lot has a 50’ width on North 8th Avenue with
approximately 100’ depth. The property is occupied by a 2 ½ story frame two-family residence.
Applicant requested a certificate of appropriateness for the renovation of a new enclosed front
porch. The work will entail the relocation of the existing canopy at the front porch and the front
door to the side of the residence and relocate the window from the side of the house to replace
the door in the front. The plans are shown on the submitted drawing A.01. The Applicant’s
architect provided catalog cuts for the materials including the door and window to be used in
the project. There are no exterior lights shown on the front porch. There is an existing driveway
on the south side of the residence.
SEQRA Determination – The proposed action is a “Type II” action under SEQRA based on DEC
617.5 (c) (11) " construction or expansion of a single-family, a two-family or a three-family
residence on an approved lot including provision of necessary utility connections as provided in
617.5(c)(13).....” therefore, ending the SEQRA process.
Ms. Carla Tannous, an architect who works with Mr. Abillama, provided revised plans including
the staircase in the front, moving the door to the side of the house, wall-mounted black light over
the door, stone veneer to cover the bottom area and loose stone to replace the pavers.
Commissioner Riley suggested that the owner rethink the door and perhaps opt for something
different.
The Chair asked if any landscaping would be added to the front.
Mr. Abillama confirmed that bushes would be added in the front but the owner will not be
undertaking any major landscaping.
Land Use Counsel requested that Mr. Abillama submit an updated sheet showing the suggested
changes to the current set of plans.
Commissioner Woods then made a motion to approve the application with the suggested
changes, seconded by Commissioner Sanchez, and approved by a vote of 4-0.
2
City of Mount Vernon Meeting Date
Architectural Review Board Meeting Minutes September 27, 2023
New Public Hearing
3.2 – ARB-23-62: 32 Birch Street (Section 165.23, Block 1013, Lot 7) in the R2-4.5 District.
The Architectural Review Board received an Affidavit of Sign Posting stating that on
September 13, 2023, a sign was posted at the site giving notice of the Architectural Review
Board’s September 27 meeting. The Board also received photographs showing that the sign
posting on the property has been provided with notice of today’s meeting.
The owner, Ms. Colleen Duffy, was represented by Mr. Vincent Zaccardo (the contractor,
Honey Do Men Gutters Inc.) and Mr. Scavelli, the architect. The subject property is a 15,015 sf
lot with a depth of 143’ and 70’ frontage along East Birch Street in the R2-4.5 zone. The
property is occupied by a single-family residence on the south side of East Birch Street. The
property is approximately 210' to the west of Westchester Avenue. It is in the Fleetwood section
north of the Cross-County Parkway.
The Applicant requested a certificate of appropriateness for a one-story addition and
alterations of the existing single-family house. The latest edition of the Materials Reference
Standards shall be used. In looking at the plans, it appears that the Applicant will be replacing
the exterior siding which will match existing siding with like kind and color. There will be a
new exterior stairwell at the rear with a new patio at the back of the house. There will also be a
new screened-in porch at the rear of the house on the left side. There will be a new asphalt
shingle roof which will match the existing color. Exterior windows will be replaced as seen on
the elevations provided. Existing trees and shrubs on site will be protected during construction.
The Applicant provided photos of the residence and street façade. A survey was provided
together with Plan Examiner Report, Checklist and separate color photographs of the residence
from various views. A site plan was submitted consisting of 9 sheets.
SEQRA Determination – The proposed action is a “Type II” action under SEQRA based on
DEC 617.5 (c) (11) "construction or expansion of a single-family, a two-family or a three-family
residence on an approved lot including provision of necessary utility connections”......” therefore,
ending the SEQRA process.
Ms. Colleen Duffy, the owner of the home, explained that a new kitchen, pantry and bathroom
will be added on the first floor. She has a big back yard allowing her to expand so she can also
add a screened-in porch and patio in the back. She confirmed that siding will be added to match
what is currently on the house; the siding will be in Linen. A new roof will match the expansion
in Fox Hollow Grey.
Ms. Duffy confirmed that the front of the house will remain unchanged. She also said that new
double-hung windows will be installed and will match uniformly to the house.
Commissioner Riley asked whether the side renovation is stucco.
3
City of Mount Vernon Meeting Date
Architectural Review Board Meeting Minutes September 27, 2023
Ms. Duffy said that the front of the house will be stucco but the side of the house will retain the
siding; the new addition will also have siding but in a different color as the previous color has
been discontinued.
Commissioner Riley asked how the transition would be made from the old siding to the new
siding.
Mr. Zaccardo, the contractor, said he would use a piece of PVC pipe to separate the two areas
and make the transition. He also said he will attempt to match the frieze board of the windows
as a separation.
Commissioner Woods then made a motion to approve the application, seconded by
Commissioner Riley, and approved by a vote of 4-0.
New Public Hearing
3.3 – ARB-23-83: 602 S. Third Ave. (Section 169.47, Block 3105, Lot 1) in the Landscaped
Industrial (LI) 7.5 District.
The Architectural Review Board received an Affidavit of Sign Posting stating that on
September 13, 2023, a sign was posted at the site giving notice of the Architectural Review
Board’s September 27 meeting. The Board also received photographs showing that the sign
posting on the property has been provided with notice of today’s meeting.
The owner is Kovar Hill Associates, LLC represented by Mr. Tom Abillama, Architect.
The subject property is in the Landscaped Industrial (LI) 7.5 Zone and is 1.20 acres. The
facility is occupied by Commodore Construction Corp. Their business hours are M-F 7am-
4pm, and the company also works two Saturdays a month from 7am-2pm.
The Applicant requested a certificate of appropriateness for an addition to a two-story
manufacturing facility at the rear of an existing two-story office and 1 story warehouse in
the zoning District 6-7.5. The building is designed using two different colors of stucco in
addition to custom black glass windows and doors. The existing Main Entrance elevation
will be renovated using granite, stucco, custom black glass door, with a metal and glass
canopy. A standing seam roof will be provided, and a new escape stair will be built with a
combination of masonry and stucco structure. New landscaping is provided in the front of
the building with lighting and safety cameras. Applicant has provided the site plan,
renderings and elevation for the Project.
SEQRA Determination – The Planning Board was the lead agency for the proposed unlisted
action and after review, issued a Negative Declaration for the application on August 2, 2023,
which closed out the SEQRA review.
4
City of Mount Vernon Meeting Date
Architectural Review Board Meeting Minutes September 27, 2023
Ms. Carla Tannous confirmed that the application is for the addition of a two-story
manufacturing facility at the rear of an existing office and warehouse.
Commissioner Riley asked whether the face of the retaining wall can be seen from the building
side.
Ms. Tannous confirmed that it can.
The Chair inquired about the color of the roof.
Ms. Tannous confirmed that it is grey. She also said that grey granite will be used around the
entrance, with a mix of dark and light stucco in between. There will also be a canopy added
made of glass.
Commissioner Riley asked about an elevator that is higher than the peak of the roof but was
not given an overview on the plans. He said he was concerned that it will be an aesthetic eyesore
as it will stick out from the rest of the building and suggested that the applicant find a way to
make it blend better with the rest of the roof.
Commissioner Riley then asked if there would be black fencing at the sidewalk and if the
sidewalk would be properly landscaped.
Commissioner Riley recommended that more maple trees be added to the site if possible, and to
add more native plants in keeping with the maple and hemlock trees already included in the
plans, instead of boxwoods.
Commissioner Riley then made a motion to approve the application with conditions, seconded
by Commissioner Sanchez, and approved by a vote of 4-0.
New Public Hearing
3.4 – ARB-23-56: 383 Packman Ave. (Section 159.78, Block 1005, Lot 19) in the R2-4.5
District.
The Architectural Review Board received an Affidavit of Sign Posting stating that on
September 7, 2023, a sign was posted at the site giving notice of the Architectural Review
Board’s September 27 meeting. The Board also received photographs showing that the sign
posting on the property has been provided with notice of today’s meeting.
The owner, Ms. Olivia Kraus, was represented by SunBlue Energy for the installation of a 7.2
KW rooftop PV Solar System with 18 modules at 383 Packman Avenue. The 5,000 sf subject
5
City of Mount Vernon Meeting Date
Architectural Review Board Meeting Minutes September 27, 2023
property is located on the east side of Packman Avenue approximately 150’ south of the Bronx
River. The property is occupied by a 2-story, colonial single family residence with a new
addition at the north side of the residence in the R2-4.5 zone.
The Applicant requested a certificate of appropriateness for the installation of the PV solar
system which will include 18 solar modules. There will be 10 modules on the front of the roof
including on the addition facing Packman Avenue and the remaining 8 modules will be installed
on the rear roof with no visibility to the street. There is a driveway on the north side of the
residence.
SEQRA Determination – The proposed action is a Type II action based on 617.5(c)(15)
“installation of solar energy arrays on an existing structure, provided the structure is not: (i) listed
on the National or State Register of Historic Places; (ii) located within a district listed in the
National or State Register of Historic Places; (iii) been determined by the Commissioner of the
Office of Parks, Recreation and Historic Preservation to be eligible for listing on the State
Register of Historic Places pursuant to sections 14.07 or 14.09 of the Parks, Recreation and
Historic Preservation Law.”
Mr. Jermaine Pedro of Sun Blue Energy reviewed the solar panel application and said that
there would be 10 panels on the front and eight on the back, for a total of 18 modules.
Commissioner Riley asked about an existing vent pipe and then asked about the percentage of
utilization and how much power would be delivered to the home.
Mr. Pedro confirmed the vent pipe is existing and the power is 7.2 KW.
The Chair asked if Mr. Pedro had any data based on the usage that could justify the need for
18 panels and what amount of power is currently being used. She then confirmed that the
front of the house faces west and the back faces east.
Commissioner Riley then made a motion to approve the application, seconded by
Commissioner Woods, and approved by a vote of 4-0.
There being no other business, Commissioner Riley made a motion to adjourn the meeting,
seconded by Commissioner Woods, and approved by a vote of 4-0.
The meeting was adjourned at 7:23 pm.
Maria Pace
Land Use Secretary
Bob Galvin
AICP, Planning Administrator
6
Agenda
Architectural Review Board
Department of Planning & Community Development
City Hall - Roosevelt Square
Mount Vernon, New York 10550-2060
(914) 699-7230
Shawyn Patterson-Howard Robin Myers
Mayor Chair
MEETING AGENDA
ARCHITECTURAL REVIEW BOARD
PUBLIC MEETING
SEPTEMBER 27, 2023
A work session of the Architectural Review Board will be held on Wednesday, September 27,
2023 at 6:00 PM in the Memorial Room on the 2nd floor of Mount Vernon City Hall. The
regular meeting of the Architectural Review Board will be continued at 6:30 PM on September
27, 2023. Applicants and members of the public will be permitted to attend and make public
comment via in person attendance.
ITEM #1 ROLL CALL
ITEM #2 APPROVAL OF MINUTES
• August 23, 2023 Minutes
ITEM #3 PUBLIC MEETINGS
Continued Public Hearing
3.1 – ARB-23-53: 114 North 8th Avenue (Section 165.61, Block 1108, Lot 10) in the RMF- 6.75
District.
The Architectural Review Board has received an Affidavit of Sign Posting stating that on
September 13, 2023, a sign was posted at the site giving notice of the Architectural Review
Board’s September 27 meeting. The Board also received photographs showing that the sign
posting on the property has been provided with notice of today’s meeting.
The owner, Wen Ming Xie, is represented by Mr. Tom Abillama, Architect. The subject property
is a 5,000 sf lot on the west side of North 8th Avenue, approximatly 150’ to the north of West
City of Mount Vernon Meeting Date
Architectural Review Board Agenda September 27, 2023
Sidney Avenue in the RMF-10 zone. The lot has a 50’ width on North 8th Avenue with
approximately 100’ depth. The property is occupied by a 2 ½ story frame two-family residence.
Applicant is requesting a certificate of appropriateness for the renovation of a new enclosed front
porch. The work will entail the relocation of the existing canopy at the front porch and the front
door to the side of the residence and relocate the window from the side of the house to replace the
door in the front. The plans are shown on the submitted drawing A.01. Applicant’s architect has
provided catalog cuts for the materials including the door and window to be used in the project.
There are no exterior lights shown on the front porch. There is an existing driveway on the south
side of the residence.
SEQRA Determination – The proposed action is a “Type II” action under SEQRA based on DEC
617.5 (c) (11) " construction or expansion of a single-family, a two-family or a three-family residence
on an approved lot including provision of necessary utility connections as provided in
617.5(c)(13).....” therefore, ending the SEQRA process.
New Public Hearing
3.2 – ARB-23-62: 32 Birch Street (Section 165.23, Block 1013, Lot 7) in the R2-4.5 District.
The Architectural Review Board has received an Affidavit of Sign Posting stating that on
September 13, 2023, a sign was posted at the site giving notice of the Architectural Review
Board’s September 27 meeting. The Board also received photographs showing that the sign
posting on the property has been provided with notice of today’s meeting.
The owner, Ms. Colleen Duffy, is being represented by Mr. Vincent Zaccardo (the contractor,
Honey Do Men Gutters Inc.) and Mr. Scavelli, the architect. The subject property is a 15,015 sf
lot with a depth of 143’ and 70’ frontage along East Birch Street in the R2-4.5 zone. The
property is occupied by a single-family residence on the south side of East Birch Street. The
property is approximately 210' to the west of Westchester Avenue. It is in the Fleetwood section
north of the Cross-County Parkway.
The Applicant is requesting a certificate of appropriateness for a one-story addition and
alterations of the existing single-family house. The latest edition of the Materials Reference
Standards shall be used. In looking at the plans, it appears that the Applicant will be replacing
the exterior siding which will match existing siding with like kind and color. There will be a new
exterior stairwell at the rear with a new patio at the back of the house. There will also be a new
screened-in porch at the rear of the house on the left side. There will be a new asphalt shingle
roof which will match the existing color. Exterior windows will be replaced as seen on the
elevations provided. Existing trees and shrubs on site will be protected during construction.
2
City of Mount Vernon Meeting Date
Architectural Review Board Agenda September 27, 2023
Applicant has provided photos of the residence and street façade. Survey has been provided
together with Plan Examiner Report, Checklist and separate color photographs of the residence
from various views. Site Plan submitted consisting of 9 sheets.
SEQRA Determination – The proposed action is a “Type II” action under SEQRA based on
DEC 617.5 (c) (11) "construction or expansion of a single-family, a two-family or a three-family
residence on an approved lot including provision of necessary utility connections”......” therefore,
ending the SEQRA process.
New Public Hearing
3.3 – ARB-23-83: 602 S. Third Ave. (Section 169.47, Block 3105, Lot 1) in the Landscaped
Industrial (LI) 7.5 District.
The Architectural Review Board has received an Affidavit of Sign Posting stating that on
September 13, 2023, a sign was posted at the site giving notice of the Architectural Review
Board’s September 27 meeting. The Board also received photographs showing that the sign
posting on the property has been provided with notice of today’s meeting.
The owner is Kovar Hill Associates, LLC represented by Mr. Tom Abillama, Architect. The
subject property is in the Landscaped Industrial (LI) 7.5 Zone and is 1.20 acres. The facility
is occupied by Commodore Construction Corp. Their business hours are M-F 7am-4pm, and
the company also works two Saturdays a month from 7am-2pm.
The Applicant is requesting a certificate of appropriateness for an addition of two-story
manufacturing facility at the rear of an existing two-story office and 1 story warehouse in the
zoning District 6-7.5. The building is designed using two different colors of stucco in addition
to custom black glass windows and doors. The existing Main Entrance elevation will be
renovated using granite, stucco, custom black glass door, with a metal and glass canopy. A
standing seam roof will be provided, and a new escape stair will be built with a combination
of masonry and stucco structure. New landscaping is provided in the front of the building
with lighting and safety cameras. Applicant has provided the site plan, renderings and
elevation for the Project.
SEQRA Determination – The Planning Board was the lead agency for the proposed unlisted
action and after review, issued a Negative Declaration for the application on August 2, 2023,
which closed out the SEQRA review.
3
City of Mount Vernon Meeting Date
Architectural Review Board Agenda September 27, 2023
New Public Hearing
3.4 – ARB-23-56: 383 Packman Ave. (Section 159.78, Block 1005, Lot 19) in the R2-4.5 District.
The Architectural Review Board has received an Affidavit of Sign Posting stating that on
September 7, 2023, a sign was posted at the site giving notice of the Architectural Review
Board’s September 27 meeting. The Board also received photographs showing that the sign
posting on the property has been provided with notice of today’s meeting.
The owner, Ms. Olivia Kraus, is being represented by SunBlue Energy for the installation of a 7.2
KW rooftop PV Solar System with 18 modules at 383 Packman Avenue. The 5,000 sf subject
property is located on the east side of Packman Avenue approximately 150’ south of the Bronx
River. The property is occupied by a 2-story, colonial single family residence with a new addition
at the north side of the residence in the R2-4.5 zone.
The Applicant is requesting a certificate of appropriateness for the installation of the PV solar
system which will include 18 solar modules. There will be 10 modules on the front of the roof
including on the addition facing Packman Avenue and the remaining 8 modules will be installed
on the rear roof with no visibility to the street. There is a driveway on the north side of the
residence.
SEQRA Determination – The proposed action is a Type II action based on 617.5(c)(15)
“installation of solar energy arrays on an existing structure, provided the structure is not: (i) listed
on the National or State Register of Historic Places; (ii) located within a district listed in the
National or State Register of Historic Places; (iii) been determined by the Commissioner of the
Office of Parks, Recreation and Historic Preservation to be eligible for listing on the State Register
of Historic Places pursuant to sections 14.07 or 14.09 of the Parks, Recreation and Historic
Preservation Law.”
Bob Galvin, AICP
Planning Administrator
Maria Pace
Land Use Secretary
cc: Mayor
Planning Commissioner
Corporation Counsel
Deputy Planning Commissioner
City Clerk
Building Department
Lobby
4
Get email alerts for Mount Vernon
A daily email when new agendas and minutes are posted.