Architectural Review Board
Regular MeetingMount Vernon, NY · April 24, 2024
Minutes
Architectural Review Board
Department of Planning & Community Development
City Hall - Roosevelt Square
Mount Vernon, New York 10550-2060
(914) 699-7230
Shawyn Patterson-Howard Robin Myers
Mayor Chair
ARCHITECTURAL REVIEW BOARD
MEETING MINUTES
FOR APRIL 24, 2024
A regular meeting of the Architectural Review Board was held on Wednesday, April 24, at
6:30 PM in the Memorial Room on the 2 n d Floor in Mount Vernon City Hall.
ITEM #1 - ROLL CALL - Chair Robin Myers called the roll; in addition to the Chair,
Commissioners Sylvia Woods, Linda Sanchez, and Buzz Riley were present.
Also attending were Marlon Molina, Deputy Commissioner, William Hyland, Senior Planner,
Maria Pace, Land Use Boards Secretary, and U. Nkechi Nwachukwu, Land Use Counsel.
With a quorum present, the Chair opened the meeting at 6:30 PM.
The meeting was live streamed on CMVNY Facebook.
ITEM #2 - APPROVAL OF MINUTES
The minutes of March 20, 2024 were approved. Commissioner Riley made a motion to approve
the minutes, seconded by Commissioner Woods, and approved by a vote of 4-0.
ITEM #3 ADMINISTRATIVE ITEM
3.1 Q West Towers – Expedited Review Process, 25 & 29 North Macquesten Parkway (Section
164.68, Block 1073, Lot 24) and 1 & 7-11 North Macquesten Parkway (Section 164.68, Block
1073, Lot 24) in the CB Zoning District (MVW-H Transit Oriented Development Zone)
This project was previously reviewed by both the Architectural Review Board and the
Expedited Review Committee in 2021 and was referred to The Board again due to architectural
changes in the project upon its recent resubmission. The Board was provided with renderings
and other materials specific to the Board’s review process.
City of Mount Vernon Meeting Date
Architectural Review Board Meeting Minutes April 24, 2024
Mr. Robert Tredger presented the redesign based on comments from the previous ARB review.
He explained that Building A at 25 N. MacQuesten Parkway will generally stay the same, with
the exception of an increase in building height from 140 ft to 148 ft., still below the 150 ft.
maximum height. He also reviewed other architectural modifications, including breaking up
the solid pass of the previous design with glazing, using light and gray brick and stucco instead
of the prior gray tones, accenting the framework around the perimeter of the windows with
slightly darker grey to enhance the architectural elements of the building, adding the illusion of
windows to the side wall with various color stucco patterns and lines to provide a nicer element
to the side elevation.
The Chair asked if the iron work constitutes active gates.
Mr. Tredger confirmed it was the garage door.
Commissioner Riley suggested that native trees be used as they will work against drought prone
conditions and disease.
Commissioner Riley asked what drove the color change.
Mr. Tredger said it was driven by earlier suggestions from the ARB at a prior review.
Commissioner Riley then asked if there were trees on the roof terrace.
Mr. Tredger said there were green spaces and pervious pavers.
Land Use Counsel noted that this is a Type II action based on 6 NYCRR 617.5(c)(26) “routine
or continuing agency administration and management, not including new programs or major
reordering of priorities that may affect the environment”, therefore ending the SEQRA process.
Commissioner Sanchez then made a motion to approve the revised application, seconded by
Commissioner Woods and approved by a vote of 4-0.
ITEM #4 PUBLIC MEETINGS
New Public Hearing
4.1 – ARB-24-5: 356 South Tenth Avenue (Section 169.37, Block 2254, Lot 6) in the RMF-6.75
District.
The Architectural Review Board received an Affidavit of Sign Posting stating that on April 1,
2024, a sign was posted at the site giving notice of the Architectural Review Board’s April 24,
2
City of Mount Vernon Meeting Date
Architectural Review Board Meeting Minutes April 24, 2024
2024 meeting. The Board also received photographs showing that the sign posting on the
property has been provided with notice of today’s meeting.
The owner is the Wiin LLC, represented by Tom Abillama, their lead design professional.
The subject property is located on South Tenth Avenue, just north of West Fifth Street, in
the RMF-6.75 Multifamily Residence District. The property is just east of the border of the
City of Mount Vernon and the Bronx.
The Applicant is requesting a certificate of appropriateness to reconstruct a fire-damaged
property from the ground up, with the proposed work including new siding, a new roof, new
windows and doors and new lighting. The application was recently approved for an extension of
time on previously approved area variances by the Zoning Board of Appeals.
SEQRA – The proposed action is a Type II action based on 6 NYCRR 617.5(c)(11) “construction
or expansion of a single-family, a two-family or a three-family residence on an approved lot
including provision of necessary utility connections”, therefore ending the SEQRA process.
Mr. Tom Abillama, the architect, and his associate, Ms. Carla Tannous, reviewed the
reconstruction of the three-family house. They have already received an extension of time twice
from the ZBA. For this application, an exterior staircase was added as a fire escape as well as a
landscaping plan, including bushes. The roof, which will be charcoal, will also be reconstructed
and four chambers for stormwater will be added. While the elevations are the same, they are
removing the overhang. There will be recessed lighting under the porch and the windows are
double-hung.
Commissioner Woods asked if any thought was given to providing another entrance considering
it is a three-family house with only one entrance for three apartments.
The Chair asked what the condition of the sidewalk/walkway was.
Ms. Tannous said it was concrete but will be repaired.
Commissioner Woods then made a motion to approve the application with the condition that the
sidewalk in the front be replaced, seconded by Commissioner Sanchez, and approved 4-0.
New Public Hearing
4.2 – ARB-24-19: 260 South Second Avenue (Section 169.23, Block 3114, Lot 16) in the RMF-
6.75 District.
The Architectural Review Board received an Affidavit of Sign Posting stating that on March 29,
2024, a sign was posted at the site giving notice of the Architectural Review Board’s April 24,
3
City of Mount Vernon Meeting Date
Architectural Review Board Meeting Minutes April 24, 2024
2024 meeting. The Board also received photographs showing that the sign posting on the
property has been provided with notice of today’s meeting.
The owner is 260 South Second LLC, represented by Salvatore Aprile, as well as Shahin
Badaly, their lead design professional. The subject property is located on South Second
Avenue, just north of the intersection with East Fourth Street, in the RMF-6.75 Multifamily
Residence District. The property is additionally just east of the commercial corridors on
South Third and South Fourth Avenue.
The Applicant is requesting a certificate of appropriateness to construct a minor addition to an
existing multifamily apartment building residence, including a new stair access to the basement
with a proposed handrail attached at the side yard of the property. There will additionally be a
wrought iron guardrail and the reconstruction of a former retaining wall at the side yard in the
same location.
SEQRA – The proposed action is a Type II action based on 6 NYCRR 617.5(c)(12) “construction,
expansion or placement of minor accessory/appurtenant residential structures, including garages,
carports, patios, decks, swimming pools, tennis courts, satellite dishes, fences, barns, storage sheds
or other buildings not changing land use or density”, therefore ending the SEQRA process.
Kevin Munene, a construction engineer with Badaly Engineering, and Mr. Salvatore Aprile,
explained that the current stairs and retaining wall are damaged and that the owner wants to
reconstruct the stairs to the basement. The railing on the retaining wall and stairs will be
repainted, and he asked the ARB for input on the color.
Commissioner Riley asked about the two chain link fences and their relation to the railing.
Mr. Aprile said one chain link fence will be removed and replaced with a new railing, as the
fence is falling apart. The other chain link fence will stay as a property line barrier.
Commissioner Riley then suggested that, since the fences run parallel to each other, the removal
of the chain link fence will prohibit trash from being thrown between them. He suggested using
ground cover to offer separation from the property next door.
The Chair noted that there were open violations on the property that should be resolved as a
condition of approval.
A motion was made by Commissioner Riley to approve the application with the following
conditions: replace the chain link fence with ground cover; close out the open violations with the
Building Department; and the metal railing shall coordinate with the dark bronze color of the
windows. The motion was seconded by Commissioner Woods and approved by a vote of 4-0.
4
City of Mount Vernon Meeting Date
Architectural Review Board Meeting Minutes April 24, 2024
New Public Hearing
4.3 – ARB-24-20: 464 Highland Avenue (Section 169.34, Block 4074, Lot 15) in the R2-4.5
District.
The Architectural Review Board received an Affidavit of Sign Posting stating that on April 10,
2024, a sign was posted at the site giving notice of the Architectural Review Board’s April 24,
2024 meeting. The Board also received photographs showing that the sign posting on the
property has been provided with notice of today’s meeting.
The owner is Sean Trowers, represented by Seth Rosenberger, as well as Christopher Teeter,
the lead design professional. The subject property is located near the intersection of
Highland Avenue and Sandford Boulevard, adjacent to Memorial Field, in the R2-4.5 Two
Family Residence District. The property is just west of the border of the City of Mount
Vernon and the Village of Pelham.
The Applicant is requesting a certificate of appropriateness to reconstruct a single-family
residence previously destroyed by a fire on the existing foundation, with a new wood frame house
with vinyl siding and hardwood floors.
SEQRA Determination – The proposed action is a “Type II” action under SEQRA based on 6
NYCRR 617.5 (c) (2) “replacement, rehabilitation or reconstruction of a structure or facility, in kind,
on the same site, including upgrading buildings to meet building, energy, or fire codes”, therefore
ending the SEQRA process.
Mr. Seth Rosenberger, the applicant, represented Sean Trowers, the owner. Mr. Rosenberger
explained that they want to rebuild a home that was destroyed by fire. There are no changes to
the impervious surfaces, the walkway and stairs are in good condition but they have plans to
renovate and reconstruct.
The Chair asked if the front door would be in kind with the previous version and suggested that
color be used for the door but keep the wood white.
Commissioner Riley recommended that the front area above the door be gabled with a window
or an insert.
The Chair asked about the gutters.
Commissioner Riley suggested a Yankee gutter that takes water to the front, and that moving
water away from the house is something that should be addressed.
The Chair asked about the base.
Mr. Rosenberger said it would be stucco.
5
City of Mount Vernon Meeting Date
Architectural Review Board Meeting Minutes April 24, 2024
Commissioner Sanchez asked if anything could be done to enhance the windows to give them
more character.
Commissioner Riley asked whether the owner had considered adding a porch to expand the full
front of the house.
Mr. Rosenberger said that a porch is a good idea but there are budgetary constraints.
The Chair asked about the front elevation.
Mr. Rosenberger said they can run white trim to break the plane, which isn’t represented in the
photos. He also said they can insert foam in the rafters for temperature control.
The Chair then offered the following conditions:
• Post, railing, landing, and tread shall be white in color.
• The front door shall be craftsman style in a color of owner’s choosing.
• Add fascia trim between the first and second floors and between the second floor and
attic.
• Siding on the garage shall coordinate with the house.
• Add decorative louver at the front gable.
Commissioner Riley then made a motion to approve the application with the above conditions,
seconded by Commissioner Sanchez, and approved by a vote of 4-0.
New Public Hearing
4.4 – ARB-24-21: 55 Bradley Avenue (Section 165.42, Block 2160, Lot 1) in the R1-7 District
(RMF-SC Senior Citizen Housing Floating Overlay Zone).
The Architectural Review Board received an Affidavit of Sign Posting stating that on
April 2, 2024, a sign was posted at the site giving notice of the Architectural Review Board’s
April 24, 2024 meeting. The Board also received photographs showing that the sign posting on
the property has been provided with notice of today’s meeting.
The owner is the Wartburg Resident Community, represented by their legal team, Cuddy &
Feder LLP, with Aufgang serving as the lead design professional. The subject property is the
Wartburg, an integrated, comprehensive senior care and living campus located just south of
the Cross County Parkway, near the eastern border of Mount Vernon, on Bradley Avenue in
the R1-7 Single Family Residence Zone, in the RMF-SC Senior Citizen Housing Floating
Overlay Zone.
The Applicant is requesting a certificate of appropriateness with respect to an adaptive re-use of,
and internal renovations to the Waltemade Residence building, enabling it to be occupied for
senior affordable housing.
6
City of Mount Vernon Meeting Date
Architectural Review Board Meeting Minutes April 24, 2024
SEQRA Determination – The proposed action is a “Type II” action under SEQRA based on 6
NYCRR 617.5 (c) (18) " reuse of a residential or commercial structure, or of a structure containing
mixed residential and commercial uses, where the residential or commercial use is a permitted use
under the applicable zoning law or ordinance, including permitted by special use permit”, therefore
ending the SEQRA process.
Mr. David Gentner, CEO of The Wartburg, and Alison Fausner, an attorney with Cuddy &
Feder, represented the applicant. Mr. Gentner explained that the Waltemade building was a
residential healthcare facility for 29 and they would like to convert it to affordable housing with
some façade changes.
Mr. Bonano said that they explored the materials being used on The Wartburg campus and
reconsidered them to see how best and most effectively they could also be used for the adaptive
reuse of the building design. He stated that the building didn’t need a drastic modification but
should be linked to the design of some of the older buildings along with new construction.
Commissioner Riley asked about the stage-set roof as it doesn’t continue sloping up.
Mr. Bonano explained that it is faux and ornamental.
Commissioner Woods asked if there is ample parking.
Mr. Bonano confirmed that there is, but they are anticipating fewer vehicles as well.
Commissioner Riley asked about the green areas on the roof as well as solar capability.
Mr. Gentner stated that they want the roof to have some level of green space/sustainability, but
they have to be careful about it from a safety perspective.
Commissioner Sanchez asked how many units were in the building.
Mr. Bonano confirmed there were 103 units.
Mr. Gentner clarified there were 160 beds but not units, as the building had been used as
institutional housing.
Commissioner Riley asked about the lamp posts on the front walk.
Mr. Bonano stated the intention is to keep the lighting as is.
Commissioner Woods suggested that a walking path from the parking lot to the front entrance
would be helpful.
Mr. Bonano concurred.
7
City of Mount Vernon Meeting Date
Architectural Review Board Meeting Minutes April 24, 2024
Commissioner Sanchez then made a motion to approve the application with the condition that a
walking path be added from the parking lot to the front entrance, seconded by Commissioner
Riley, and approved by a vote of 4-0.
Commissioner Woods then made a motion to adjourn the meeting, seconded by Commissioner
Sanchez, and approved by a vote of 4-0.
The meeting was adjourned at 7:53 PM.
Maria Pace
Land Use Secretary
Bob Galvin
AICP, Planning Administrator
8
Agenda
Architectural Review Board
Department of Planning & Community Development
City Hall - Roosevelt Square
Mount Vernon, New York 10550-2060
(914) 699-7230
Shawyn Patterson-Howard Robin Myers
Mayor Chair
MEETING AGENDA
ARCHITECTURAL REVIEW BOARD
PUBLIC MEETING
April 24, 2024
A work session of the Architectural Review Board will be held on Wednesday, April 24, 2024 at
6:00 PM in the Memorial Room on the 2nd floor of Mount Vernon City Hall. The regular
meeting of the Architectural Review Board will be continued at 6:30 PM on April 24, 2024.
Applicants and members of the public will be permitted to attend and make public comments via
in person attendance.
ITEM #1 ROLL CALL
ITEM #2 APPROVAL OF MINUTES
• March 20, 2024 Minutes
ITEM #3 ADMINISTRATIVE ITEM
3.1 Q West Towers – Expedited Review Process, 25 & 29 North Macquesten Parkway (Section
164.68, Block 1073, Lot 24) and 1 & 7-11 North Macquesten Parkway (Section 164.68, Block
1073, Lot 24) in the CB Zoning District (MVW-H Transit Oriented Development Zone)
This project was previously reviewed by both the Architectural Review Board and the Expedited
Review Committee in 2021 and has now been referred to The Board again due to architectural
changes in the project upon its recent resubmission. The Board has been provided with
renderings and other materials specific to the Board’s review process.
City of Mount Vernon Meeting Date
Architectural Review Board Agenda April 24, 2024
ITEM #4 PUBLIC MEETINGS
New Public Hearing
4.1 – ARB-24-5: 356 South Tenth Avenue (Section 169.37, Block 2254, Lot 6) in the RMF-6.75
District.
The Architectural Review Board has received an Affidavit of Sign Posting stating that on April
1, 2024, a sign was posted at the site giving notice of the Architectural Review Board’s April 24,
2024 meeting. The Board also received photographs showing that the sign posting on the
property has been provided with notice of today’s meeting.
The owner is the Wiin LLC, represented by Tom Abillama, their lead design professional.
The subject property is located on South Tenth Avenue, just north of West Fifth Street, in
the RMF-6.75 Multifamily Residence District. The property is just east of the border of the
City of Mount Vernon and the Bronx.
The Applicant is requesting a certificate of appropriateness to reconstruct a fire-damaged
property from the ground up, with the proposed work including new siding, a new roof, new
windows and doors and new lighting. The application was recently approved for an extension of
time on previously approved area variances by the Zoning Board of Appeals.
SEQRA – The proposed action is a Type II action based on 6 NYCRR 617.5(c)(11) “construction
or expansion of a single-family, a two-family or a three-family residence on an approved lot
including provision of necessary utility connections”, therefore ending the SEQRA process.
New Public Hearing
4.2 – ARB-24-19: 260 South Second Avenue (Section 169.23, Block 3114, Lot 16) in the RMF-
6.75 District.
The Architectural Review Board has received an Affidavit of Sign Posting stating that on March
29, 2024, a sign was posted at the site giving notice of the Architectural Review Board’s April
24, 2024 meeting. The Board also received photographs showing that the sign posting on the
property has been provided with notice of today’s meeting.
The owner is 260 South Second LLC, represented by Salvatore Aprile, as well as Shahin
Badaly, their lead design professional. The subject property is located on South Second
Avenue, just north of the intersection with East Fourth Street, in the RMF-6.75 Multifamily
Residence District. The property is additionally just east of the commercial corridors on
South Third and South Fourth Avenue.
2
City of Mount Vernon Meeting Date
Architectural Review Board Agenda April 24, 2024
The Applicant is requesting a certificate of appropriateness to construct a minor addition to an
existing multifamily apartment building residence, including a new stair access to the basement
with a proposed handrail attached at the side yard of the property. There will additionally be a
wrought iron guardrail and the reconstruction of a former retaining wall at the side yard in the
same location.
SEQRA – The proposed action is a Type II action based on 6 NYCRR 617.5(c)(12) “construction,
expansion or placement of minor accessory/appurtenant residential structures, including garages,
carports, patios, decks, swimming pools, tennis courts, satellite dishes, fences, barns, storage sheds
or other buildings not changing land use or density”, therefore ending the SEQRA process.
New Public Hearing
4.3 – ARB-24-20: 464 Highland Avenue (Section 169.34, Block 4074, Lot 15) in the R2-4.5
District.
The Architectural Review Board has received an Affidavit of Sign Posting stating that on April
10, 2024, a sign was posted at the site giving notice of the Architectural Review Board’s April
24, 2024 meeting. The Board also received photographs showing that the sign posting on the
property has been provided with notice of today’s meeting.
The owner is Sean Trowers, represented by Seth Rosenberger, as well as Christopher Teeter,
the lead design professional. The subject property is located near the intersection of
Highland Avenue and Sandford Boulevard, adjacent to Memorial Field, in the R2-4.5 Two
Family Residence District. The property is just west of the border of the City of Mount
Vernon and the Village of Pelham.
The Applicant is requesting a certificate of appropriateness to reconstruct a single-family
residence previously destroyed by a fire on the existing foundation, with a new wood frame house
with vinyl siding and hardwood floors.
SEQRA Determination – The proposed action is a “Type II” action under SEQRA based on 6
NYCRR 617.5 (c) (2) “replacement, rehabilitation or reconstruction of a structure or facility, in kind,
on the same site, including upgrading buildings to meet building, energy, or fire codes”, therefore
ending the SEQRA process.
New Public Hearing
4.4 – ARB-24-21: 55 Bradley Avenue (Section 165.42, Block 2160, Lot 1) in the R1-7 District
(RMF-SC Senior Citizen Housing Floating Overlay Zone).
The Architectural Review Board has received an Affidavit of Sign Posting stating that on
3
City of Mount Vernon Meeting Date
Architectural Review Board Agenda April 24, 2024
April 2, 2024, a sign was posted at the site giving notice of the Architectural Review Board’s
April 24, 2024 meeting. The Board also received photographs showing that the sign posting on
the property has been provided with notice of today’s meeting.
The owner is the Wartburg Resident Community, represented by their legal team, Cuddy &
Feder LLP, with Aufgang serving as the lead design professional. The subject property is the
Wartburg, an integrated, comprehensive senior care and living campus located just south of
the Cross County Parkway, near the eastern border of Mount Vernon, on Bradley Avenue in
the R1-7 Single Family Residence Zone, in the RMF-SC Senior Citizen Housing Floating
Overlay Zone.
The Applicant is requesting a certificate of appropriateness with respect to an adaptive re-use of,
and internal renovations to the Waltemade Residence building, enabling it to be occupied for
senior affordable housing.
SEQRA Determination – The proposed action is a “Type II” action under SEQRA based on 6
NYCRR 617.5 (c) (18) " reuse of a residential or commercial structure, or of a structure containing
mixed residential and commercial uses, where the residential or commercial use is a permitted use
under the applicable zoning law or ordinance, including permitted by special use permit”, therefore
ending the SEQRA process.
Bob Galvin, AICP
Planning Administrator
Will Hyland
Senior Planner
Maria Pace
Land Use Secretary
cc: Mayor
Planning Commissioner
Corporation Counsel
Deputy Planning Commissioner
City Clerk
Building Department
Lobby
4
Get email alerts for Mount Vernon
A daily email when new agendas and minutes are posted.