Muyni
← Back to New Richmond

Public Works Committee

Regular Meeting

New Richmond, WI · May 9, 2022

Agenda

Agenda

Public Works Committee Meeting Agenda Monday, May 9, 2022 at 6:00 PM Council Chambers Page 1. CALL TO ORDER 2. ROLL CALL 3. ADOPTION OF AGENDA 4. APPROVAL OF MINUTES a. Minutes from date 2-3 Public Works Committee Minutes - 04 Feb 2022 5. NEW BUSINESS a. Appoint Chairperson for Public Works Committee b. 1652 Sequoia Lane Drainage 4-8 Memo: Sequoia drainage c. Consideration of Competitive Bids: 2022 Street & Utility Projects 9 - 15 Memo: 2022 Street & Utility Project Bids d. Uncontrolled Intersection at E Lincoln and W Lincoln 16 Memo: Stop Sign Request e. Downtown Planters 17 Memo: Downtown Planters 6. COMMUNICATION AND MISCELLANEOUS a. CIP Branch Pickup after Storms b. Meeting requested the week of June 6th 7. ADJOURNMENT Public Works Committee Meeting Minutes 10:00 AM - Friday, February 4, 2022 Council Chambers The Public Works Committee of the City of New Richmond was called to order on Friday, February 4, 2022, at 10:00 AM, in the Council Chambers, with the following members present: PRESENT: Craig Kittel, Kari Kraft, Pete Vrieze, Tim Gjovik ABSENT: OTHERS Erik Evenson, Dave Pufall, Rae Ann Ailts, Lori Brinkman PRESENT: CALL TO ORDER ROLL CALL ADOPTION OF AGENDA Kari Kraft made a motion to adopt the agenda as presented. Pete Vrieze seconded the motion. Carried unanimously. APPROVAL OF MINUTES Pete Vrieze made a motion to approve the minutes from the January 19, 2021, meeting as presented. Craig Kittel seconded the motion. Carried unanimously. PUBLIC WORKS EQUIPMENT LEASES/PURCHASES Discussion continued regarding bids for three pieces of Public Works equipment (compact track loader, wide area mower (WAM) and utility tractor) that were brought to the January 19, 2022, meeting. These items were identified on the 2022 Capital Improvement Plan but the funding was not outlined. At today's meeting, financing details and options were discussed. Staff also presented cost estimates for a flex-wing (pull-behind) mower to be used behind the utility tractor, in lieu of using a WAM as requested by the Committee and the pros and cons of the equipment were outlined. Further discussion included purchasing the compact track loader and wide area mower with a three-year financing option. Rae Ann Ailts explained that the goal is to finance this equipment for three years, and keep it for five years; during years 4 and 5 we would continue to put funds into a capital replacement fund at the annualized payment rate; these funds would be used to purchase equipment in the future for cash. Discussion followed. Public Works Committee Meeting February 4, 2022 Staff recommended purchasing the John Deere 325G track loader in the amount of $64,368 and the John Deere 1600 WAM in the amount of $61,779 (both from Midwest Machinery). Staff also recommend continuing to lease the utility tractor at this time but to reevaluate each year. Kari Kraft made a motion to proceed with purchasing the John Deere 325G track loader from Midwest Machinery in the amount of $64,368 and purchasing the John Deere 1600 WAM from Midwest Machinery in the amount of $61,779, with both pieces being secured by a three-year note, and to continue to lease the utility tractor. Craig Kittel seconded the motion. Carried unanimously. COMMUNICATION AND MISCELLANEOUS • We welcome Tim Gjovik to the Public Works Committee. There is still one opening on the Committee for another community member. ADJOURNMENT Kari Kraft made a motion to adjourn the meeting at 10:30 a.m. Pete Vrieze seconded the motion. Carried unanimously. Public Works Committee Meeting February 4, 2022 City of New Richmond 156 E First Street New Richmond, WI 54017 DATE: May 4, 2022 TO: Public Works Committee FROM: Erik Evenson, Director of Public Works Issue The owner of 1652 Sequoia Lane has contacted Public Works staff regarding potential drainage issues in the swale constructed on the east side of the property. Staff has met with the property owner several times to discuss the issue and possible solutions. Analysis The existing drainage swale was constructed in 2003 with the Evergreen Valley Subdivision. The swale captures stormwater from the east side (rear) of lots 1-22 of the subdivision and also captures stormwater runoff from the undeveloped City owned property to the east. The swale ultimately discharges into the City storm sewer located in Richmond Way. A number of houses have window wells which serve below grade windows to basements. Most of the window wells were constructed to be higher than the adjacent grade, providing a barrier (freeboard) to rain or stormwater entering the basement. The window wells for the property in question were constructed at the same level as the adjacent grade. It was observed that the storm water pipe which the swale discharges into had old silt fence and other material partially obstructing the opening. Swale Looking North Photo shows the swale to the north from the property in question. During winter melt, the runoff from the City owned undeveloped property flows across the trail into the swale. Area Between Buildings Photo shows the area between the building in question and the adjacent building to the north. The window well to the north has been constructed above the adjacent grade while the window well of the building in question has been constructed flush to grade. Swale Looking South Photo shows the swale looking south at the building in question. The swale discharges into the City Storm sewer pipe. Possible Solutions A number of possible solutions have been reviewed with the property owner. Following is a description of possible solutions. 1. The property owner could have the window wells raised to a higher elevation providing more freeboard to prevent stormwater from entering the window wells. Rain gutters could be added to the building to prevent rain water from directly entering the window well area. 2. The property could have some minor regrading to the area between the buildings performed. The area could be lowered so that the elevation is lower than the openings to the window wells, acting as an emergency overflow if the swale were to back up. The water would flow between the buildings and out into Sequoia Lane. 3. City staff will make sure that the storm pipe is cleared of any obstructions. 4. The City could install a small berm along the City trail to prevent water from City property to enter the swale. Conclusions City staff feel that any of the above solutions or a combination of solutions will help with the drainage issue. No solution can be an ultimate guarantee that stormwater will never find its way into the buildings window wells. A fourth solution was suggested to have City Staff re-grade the existing swale at the building location. There are some liability concerns with this suggestion as it appears the swale is outside of the 10-foot drainage easement created with the subdivision. Additional investigation is recommended if the Committee wishes to pursue construction of a berm along the City trail. Currently it is not known what unintended consequences there may be from re-routing the flow of the water. Timing of the construction may have to be later in the year, as the number of projects City staff is scheduled to undertake this coming year is growing large, in addition to not being fully staffed. MEMO Prepared for: Public Works Committee Staff Contact: Erik Evenson Meeting: Public Works Committee - 04 May 2022 Subject: 2022 Street & Utility Project Bid Results BACKGROUND INFORMATION: The City Council directed staff to solicit bids for the 2022 Street & Utility Projects as outlined in the 2022 Capital Improvement Plan. Bids were due Thursday, April 28; three bids were received and are outlined below. Company Haas Sons A-1 Excavating McCabe Constr Bid $1,421,197.20 $1,420,722.50 $1,425,494,45 Alternate Bid $18,700.00 $85,000.00 $17,000.00 Combined Bid & Alternate $1,439,897.20 $1,505,722.50 $1,442,494.45 Bid The bid tabulation along with a breakdown by project are attached for your review. RECOMMENDATION: Staff recommends accepting the low bid from Haas Sons, Inc. Haas has done street and utility work for the City previously and staff are confident they will meet expectations. ATTACHMENTS: Copy of Bid Tab 4.28.2022 (002) Copy of NR 2022 SU Estimate 4.28.22 using Haas Bid TABULATION OF BIDS 2022 Street and Uiltiy Improvements A-1 Excavating LLC Haas Sons Inc McCabe Construction, Inc New Richmond, Wisconsin PO Box 90, 203 E. Birch St, PO Box 1769, SEH No.: NEWRI 165351 Bloomer, WI 54724 Thorp, WI 54771 Eau Claire, WI 54702 Page 2 of 7 Bid Date: 2:00 p.m., Thursday, April 28, 2022 $1,420,722.50 $1,421,197.20 $1,425,494.45 Est. Item No. Item Unit Quantity Unit Price Total Price Unit Price Total Price Unit Price Total Price 01 21 00.1 Contingency Allowance LS 1 $25,000.00 $25,000.00 $25,000.00 $25,000.00 $25,000.00 $25,000.00 01 55 25.1 Maintenance of Traffic LS 1 $17,600.00 17,600.00 $6,800.00 6,800.00 $10,000.00 10,000.00 01 57 19.1 Street Sweeping Hr 14 $165.00 2,310.00 $250.00 3,500.00 $150.00 2,100.00 01 57 33.1 Water for Dust Control MGAL 50 $45.00 2,250.00 $75.00 3,750.00 $35.00 1,750.00 01 57 34.1 Calcium Chloride GAL 2480 $4.00 9,920.00 $5.00 12,400.00 $2.50 6,200.00 01 71 13.1 Mobilization LS 1 $66,450.00 66,450.00 $54,750.00 54,750.00 $80,900.00 80,900.00 02 41 33.1 Remove Asphalt Pavement SY 6300 $1.00 6,300.00 $2.00 12,600.00 $2.50 15,750.00 02 41 33.2 Remove Asphalt or Concrete Driveway SY 1280 $5.00 6,400.00 $5.00 6,400.00 $6.00 7,680.00 02 41 33.3 Remove Concrete Curb and Gutter LF 1935 $4.00 7,740.00 $3.00 5,805.00 $3.00 5,805.00 02 41 33.4 Remove Sidewalk SY 160 $8.00 1,280.00 $5.00 800.00 $12.00 1,920.00 31 11 00.1 Clearing and Grubbing LS 1 $5,000.00 5,000.00 $11,250.00 11,250.00 $5,000.00 5,000.00 31 23 10.1 Common Excavation (EV, P) CY 8492 $12.00 101,904.00 $13.25 112,519.00 $13.00 110,396.00 31 23 10.2 4-inch Nonmetallic Conduit Pipe LF 300 $20.00 6,000.00 $17.00 5,100.00 $8.50 2,550.00 31 23 10.3 Engineered Soil Amendment Area LS 1 $35,000.00 35,000.00 $6,500.00 6,500.00 $4,000.00 4,000.00 31 23 33.1 Crushed Rock for Pipe Foundation Ton 100 $32.00 3,200.00 $25.00 2,500.00 $15.00 1,500.00 31 23 33.2 Exploratory Excavation Each 6 $400.00 2,400.00 $500.00 3,000.00 $350.00 2,100.00 31 23 33.3 Archaeological Monitoring at Cemetery Site LS 1 $2,500.00 2,500.00 $2,000.00 2,000.00 $1,000.00 1,000.00 31 25 10.1 Tracking Pad Each 8 $200.00 1,600.00 $350.00 2,800.00 $1,100.00 8,800.00 31 25 10.2 Inlet Protection Each 19 $150.00 2,850.00 $125.00 2,375.00 $75.00 1,425.00 31 25 10.3 Silt Fence Delivered, Maintained and Installed LF 2200 $1.25 2,750.00 $2.12 4,664.00 $2.15 4,730.00 31 25 10.4 Erosion Mat, Class I, Type B SY 3110 $1.75 5,442.50 $1.12 3,483.20 $1.12 3,483.20 31 25 10.5 Temporary Ditch Check (Bio Roll) LF 600 $6.00 3,600.00 $6.50 3,900.00 $6.50 3,900.00 31 34 15.1 Geotextile Fabric SY 6400 $4.50 28,800.00 $4.00 25,600.00 $3.65 23,360.00 31 37 00.1 Riprap CY 20 $80.00 1,600.00 $60.00 1,200.00 $65.00 1,300.00 32 01 16.1 Pulverizing Asphaltic Pavement SY 14975 $1.00 14,975.00 $0.91 13,627.25 $1.15 17,221.25 32 01 16.2 Salvage, Stockpile, and Replace Pulverized Base (CV) CY 1635 $12.00 19,620.00 $18.00 29,430.00 $26.00 42,510.00 32 11 17.1 Granular Subbase Course (CV) CY 3850 $18.00 69,300.00 $16.37 63,024.50 $18.00 69,300.00 32 11 26.1 Crushed Aggregate Base Course, 1-1/4-inch Ton 9150 $15.00 137,250.00 $17.00 155,550.00 $16.25 148,687.50 32 11 26.2 Crushed Aggregate Base Course, 3/4-inch Ton 300 $18.00 5,400.00 $21.50 6,450.00 $29.00 8,700.00 32 12 28.1 Asphaltic Pavement, Type 5LT Ton 2135 $113.00 241,255.00 $106.00 226,310.00 $106.00 226,310.00 32 12 28.2 Asphaltic Pavement, Type 3LT Ton 1025 $91.00 93,275.00 $84.00 86,100.00 $84.00 86,100.00 32 12 50.1 Saw Cut Pavement LF 1185 $3.00 3,555.00 $2.50 2,962.50 $3.50 4,147.50 32 16 30.1 Concrete Curb and Gutter, 30-inch Type D LF 2985 $15.50 46,267.50 $12.90 38,506.50 $14.15 42,237.75 32 17 23.1 Pavement Marking, Epoxy 4-inch Solid Line, White LF 8100 $1.10 8,910.00 $1.00 8,100.00 $1.00 8,100.00 Short Elliott Hendrickson Inc. Page 1 of 3 TABULATION OF BIDS 2022 Street and Uiltiy Improvements A-1 Excavating LLC Haas Sons Inc McCabe Construction, Inc New Richmond, Wisconsin PO Box 90, 203 E. Birch St, PO Box 1769, SEH No.: NEWRI 165351 Bloomer, WI 54724 Thorp, WI 54771 Eau Claire, WI 54702 Page 3 of 7 Bid Date: 2:00 p.m., Thursday, April 28, 2022 $1,420,722.50 $1,421,197.20 $1,425,494.45 Est. Item No. Item Unit Quantity Unit Price Total Price Unit Price Total Price Unit Price Total Price 32 17 23 2 Pavement Marking, Epoxy 4-inch Solid Line, Yellow LF 7000 $0.70 4,900.00 $0.65 4,550.00 $0.65 4,550.00 32 17 23.3 Pavement Marking, Epoxy 18-inch Solid Line, White LF 102 $12.50 1,275.00 $12.00 1,224.00 $12.00 1,224.00 32 17 23.4 Pavement Marking, Epoxy Curb, Yellow LF 266 $6.25 1,662.50 $6.00 1,596.00 $6.00 1,596.00 32 17 23.5 Pavement Marking, Epoxy, Blue SF 1000 $5.20 5,200.00 $5.00 5,000.00 $5.00 5,000.00 32 17 23.6 Pavement Marking, Symbol, Handicap Symbol, White Each 4 $230.00 920.00 $220.00 880.00 $220.00 880.00 32 18 40.1 Concrete Sidewalk 4-inch SF 2925 $6.00 17,550.00 $5.20 15,210.00 $5.00 14,625.00 32 18 40.2 Concrete Sidewalk or Driveway, 6-inch SF 3600 $7.00 25,200.00 $6.90 24,840.00 $6.00 21,600.00 32 18 40.3 Curb Ramp Detectable Warning Field SF 112 $45.00 5,040.00 $39.25 4,396.00 $40.00 4,480.00 32 92 12.1 Turf Establishment SY 11025 $4.00 44,100.00 $8.25 90,956.25 $7.35 81,033.75 33 01 30.1 Televising Sanitary Sewer LF 450 $2.00 900.00 $3.00 1,350.00 $2.00 900.00 33 11 00.1 8-inch PVC Water Main LF 850 $62.00 52,700.00 $73.75 62,687.50 $60.00 51,000.00 33 11 00.2 6-inch DIP Water Main LF 36 $62.00 2,232.00 $73.00 2,628.00 $93.00 3,348.00 33 11 00.3 8-inch Gate Valve and Box Each 2 $2,550.00 5,100.00 $2,825.00 5,650.00 $2,560.00 5,120.00 33 11 00.4 6-inch Gate Valve and Box Each 3 $1,850.00 5,550.00 $2,225.00 6,675.00 $1,945.00 5,835.00 33 11 00.5 6-inch by 6-inch Wet Tap, with 6-inch Gate Valve and Box Each 1 $3,900.00 3,900.00 $5,550.00 5,550.00 $5,120.00 5,120.00 33 11 00.6 Hydrant (8.5 foot bury) Each 3 $5,300.00 15,900.00 $5,800.00 17,400.00 $5,060.00 15,180.00 33 11 00.7 Connect to Existing Water Main Each 1 $2,200.00 2,200.00 $1,825.00 1,825.00 $1,855.00 1,855.00 33 11 00.8 1-inch Corporation Stop Each 9 $300.00 2,700.00 $300.00 2,700.00 $280.00 2,520.00 33 11 00.9 1-inch Curb Stop and Box Each 9 $410.00 3,690.00 $325.00 2,925.00 $340.00 3,060.00 33 11 00.10 1-inch Copper Water Service LF 230 $45.00 10,350.00 $53.50 12,305.00 $53.00 12,190.00 33 11 00.11 Connect to Existing Water Service Each 7 $300.00 2,100.00 $100.00 700.00 $160.00 1,120.00 33 11 00.12 Insulation SF 200 $4.00 800.00 $4.75 950.00 $3.65 730.00 33 11 00.13 Lower Existing Water Main LS 1 $300.00 300.00 $4,100.00 4,100.00 $3,600.00 3,600.00 33 31 00.1 8-inch PVC Sanitary Sewer LF 431 $51.00 21,981.00 $54.50 23,489.50 $56.50 24,351.50 33 31 00.2 Sanitary Sewer Manhole, 48-inch with Casting VF 29 $695.00 20,155.00 $617.00 17,893.00 $605.00 17,545.00 33 31 00.3 Connect to Existing Sanitary Sewer Each 2 $800.00 1,600.00 $1,075.00 2,150.00 $915.00 1,830.00 33 31 00.4 Connect to Existing Sanitary Sewer MH Each 2 $1,000.00 2,000.00 $1,700.00 3,400.00 $1,665.00 3,330.00 33 31 00.5 8-inch by 4-inch Sanitary Wye Each 10 $350.00 3,500.00 $350.00 3,500.00 $150.00 1,500.00 33 31 00.6 4-inch PVC Sanitary Sewer Service Pipe LF 315 $39.00 12,285.00 $48.25 15,198.75 $54.00 17,010.00 33 31 00.7 Connect to Existing Sanitary Sewer Service Each 10 $150.00 1,500.00 $100.00 1,000.00 $140.00 1,400.00 33 31 00.8 Dye Testing Sanitary Sewer Service Verification Each 2 $300.00 600.00 $350.00 700.00 $195.00 390.00 33 31 00.9 Adjust Existing Manhole Casting Each 15 $600.00 9,000.00 $450.00 6,750.00 $640.00 9,600.00 33 41 00.1 18-inch RCP Storm Sewer LF 117 $88.00 10,296.00 $74.75 8,745.75 $64.00 7,488.00 Short Elliott Hendrickson Inc. Page 2 of 3 TABULATION OF BIDS 2022 Street and Uiltiy Improvements A-1 Excavating LLC Haas Sons Inc McCabe Construction, Inc New Richmond, Wisconsin PO Box 90, 203 E. Birch St, PO Box 1769, SEH No.: NEWRI 165351 Bloomer, WI 54724 Thorp, WI 54771 Eau Claire, WI 54702 Page 4 of 7 Bid Date: 2:00 p.m., Thursday, April 28, 2022 $1,420,722.50 $1,421,197.20 $1,425,494.45 Est. Item No. Item Unit Quantity Unit Price Total Price Unit Price Total Price Unit Price Total Price 33 41 00.2 15-inch RCP Storm Sewer LF 615 $82.00 50,430.00 $71.00 43,665.00 $62.00 38,130.00 33 41 00.3 12-inch RCP Storm Sewer LF 186 $77.00 14,322.00 $67.00 12,462.00 $61.00 11,346.00 33 41 00.4 18-inch RCP Storm Sewer Pipe Aprons Each 1 $1,600.00 1,600.00 $1,500.00 1,500.00 $1,165.00 1,165.00 33 41 00.5 15-inch HDPE Storm Sewer Pipe LF 28 $40.00 1,120.00 $62.00 1,736.00 $53.00 1,484.00 33 41 00.6 12-inch HDPE Storm Sewer Pipe LF 30 $40.00 1,200.00 $58.25 1,747.50 $47.00 1,410.00 33 41 00.7 15-inch CMP Storm Sewer Pipe Aprons Each 2 $500.00 1,000.00 $500.00 1,000.00 $425.00 850.00 33 41 00.8 12-inch CMP Storm Sewer Pipe Aprons Each 2 $450.00 900.00 $435.00 870.00 $375.00 750.00 33 41 00.9 18-inch CMP Storm Sewer LF 10 $90.00 900.00 $100.00 1,000.00 $82.00 820.00 33 41 00.10 Inlet Manhole, Type B-1, with Casting Each 1 $4,800.00 4,800.00 $3,025.00 3,025.00 $3,125.00 3,125.00 33 41 00.11 Storm Sewer Manhole, Type C, with Casting Each 1 $5,500.00 5,500.00 $3,100.00 3,100.00 $5,035.00 5,035.00 33 41 00.12 Storm Sewer Manhole, Type B, with Casting Each 4 $4,300.00 17,200.00 $3,000.00 12,000.00 $3,150.00 12,600.00 33 41 00.13 Inlet, Type 3 with Casting Each 9 $3,100.00 27,900.00 $2,350.00 21,150.00 $2,510.00 22,590.00 33 41 00.14 Connect to Existing Storm Sewer Each 5 $500.00 2,500.00 $950.00 4,750.00 $860.00 4,300.00 33 41 00.15 Connect to Existing Storm Manhole or Inlet Each 1 $500.00 500.00 $1,150.00 1,150.00 $1,715.00 1,715.00 33 41 00.16 Adjust Existing Inlet Casting Each 3 $500.00 1,500.00 $200.00 600.00 $480.00 1,440.00 34 41 40.1 Signs, Type 2 SF 41 $60.00 2,460.00 $60.00 2,460.00 $60.00 2,460.00 34 41 40.2 Street Name Signs Each 4 $500.00 2,000.00 $325.00 1,300.00 $325.00 1,300.00 TOTAL BID PRICE 1,420,722.50 1,421,197.20 1,425,494.45 Alternate 1 33 11 00.1 8-inch DIP Water Main (Additional Cost Over PVC. LF 850 100.00 85,000.00 22.00 18,700.00 20.00 17,000.00 Includes1 BID TOTAL ALTERNATE 12-month time extension for S. Oak Avenue) PRICE 85,000.00 18,700.00 17,000.00 COMBINED TOTAL BID AND ALTERNATE PRICE 1,505,722.50 1,439,897.20 1,442,494.45 Short Elliott Hendrickson Inc. Page 3 of 3 2022 New Richmond Street/Utility Improvements Cost Split Based on Haas Bid 27-Apr-22 Base Bid Project Total Item No. Description Unit Quantity Unit Price Total Price 01 21 00.1 Contingency Allowance LS 1 $25,000.00 $25,000.00 01 55 25.1 Maintenance of Traffic LS 1 $6,800.00 $6,800.00 01 57 19.1 Street Sweeping Hr 14 $250.00 $3,500.00 01 57 33.1 Water for Dust Control MGAL 50 $75.00 $3,750.00 01 57 34.1 Calcium Chloride GAL 2,480 $5.00 $12,400.00 01 71 13.1 Mobilization LS 1 $54,750.00 $54,750.00 02 41 33.1 Remove Asphalt Pavement SY 6,300 $2.00 $12,600.00 02 41 33.2 Remove Asphalt or Concrete Driveway SY 1,280 $5.00 $6,400.00 02 41 33.3 Remove Concrete Curb and Gutter LF 1,935 $3.00 $5,805.00 02 41 33.4 Remove Sidewalk SY 160 $5.00 $800.00 31 11 00.1 Clearing and Grubbing LS 1 $11,250.00 $11,250.00 31 23 10.1 Common Excavation (EV, P) CY 8,492 $13.25 $112,519.00 31 23 10.2 4-inch Nonmetallic Conduit Pipe LF 300 $17.00 $5,100.00 31 23 10.3 Engineered Soil Amendment Area LS 1 $6,500.00 $6,500.00 31 23 33.1 Crushed Rock for Pipe Foundation Ton 100 $25.00 $2,500.00 31 23 33.2 Exploratory Excavation Each 6 $500.00 $3,000.00 31 23 33.3 Archaeological Monitoring at Cemetery Site LS 1 $2,000.00 $2,000.00 31 25 10.1 Tracking Pad Each 8 $350.00 $2,800.00 31 25 10.2 Inlet Protection Each 19 $125.00 $2,375.00 31 25 10.3 Silt Fence Delivered, Maintained and Installed LF 2,200 $2.12 $4,664.00 31 25 10.4 Erosion Mat, Class I, Type B SY 3,110 $1.12 $3,483.20 31 25 10.5 Temporary Ditch Check (Bio Roll) LF 600 $6.50 $3,900.00 31 34 15.1 Geotextile Fabric SY 6,400 $4.00 $25,600.00 31 37 00.1 Riprap CY 20 $60.00 $1,200.00 32 01 16.1 Pulverizing Asphaltic Pavement SY 14,975 $0.91 $13,627.25 Salvage, Stockpile, and Replace Pulverized Base 32 01 16.2 CY 1,635 $18.00 $29,430.00 (CV) 32 11 17.1 Granular Subbase Course (CV) CY 3,850 $16.37 $63,024.50 32 11 26.1 Crushed Aggregate Base Course, 1-1/4-inch Ton 9,150 $17.00 $155,550.00 32 11 26.2 Crushed Aggregate Base Course, 3/4-inch Ton 300 $21.50 $6,450.00 32 12 28.1 Asphaltic Pavement, Type 5LT Ton 2,135 $106.00 $226,310.00 32 12 28.2 Asphaltic Pavement, Type 3LT Ton 1,025 $84.00 $86,100.00 32 12 50.1 Saw Cut Pavement LF 1,185 $2.50 $2,962.50 32 16 30.1 Concrete Curb and Gutter, 30-inch Type D LF 2,985 $12.90 $38,506.50 32 17 23.1 Pavement Marking, Epoxy 4-inch Solid Line, White LF 8,100 $1.00 $8,100.00 32 17 23 2 Pavement Marking, Epoxy 4-inch Solid Line, Yellow LF 7,000 $0.65 $4,550.00 Page 5 of 7 2022 New Richmond Street/Utility Improvements Cost Split Based on Haas Bid 27-Apr-22 Base Bid Project Total Item No. Description Unit Quantity Unit Price Total Price 32 17 23.3 Pavement Marking, Epoxy 18-inch Solid Line, White LF 102 $12.00 $1,224.00 32 17 23.4 Pavement Marking, Epoxy Curb, Yellow LF 266 $6.00 $1,596.00 32 17 23.5 Pavement Marking, Epoxy, Blue SF 1,000 $5.00 $5,000.00 32 17 23.6 Pavement Marking, Epoxy, Handicap Symbol, White Each 4 $220.00 $880.00 32 18 40.1 Concrete Sidewalk 4-inch SF 2,925 $5.20 $15,210.00 32 18 40.2 Concrete Sidewalk or Driveway, 6-inch SF 3,600 $6.90 $24,840.00 32 18 40.3 Curb Ramp Detectable Warning Field SF 112 $39.25 $4,396.00 32 92 12.1 Turf Establishment SY 11,025 $8.25 $90,956.25 33 01 30.1 Televising Sanitary Sewer LF 450 $3.00 $1,350.00 33 11 00.1 8-inch PVC Water Main LF 850 $73.75 $62,687.50 33 11 00.2 6-inch DIP Water Main LF 36 $73.00 $2,628.00 33 11 00.3 8-inch Gate Valve and Box Each 2 $2,825.00 $5,650.00 33 11 00.4 6-inch Gate Valve and Box Each 3 $2,225.00 $6,675.00 33 11 00.5 6-inch x 6-inch Wet Tap, w/ 6-inch GV and Box Each 1 $5,550.00 $5,550.00 33 11 00.6 Hydrant (8.5 foot bury) Each 3 $5,800.00 $17,400.00 33 11 00.7 Connect to Existing Water Main Each 1 $1,825.00 $1,825.00 33 11 00.8 1-inch Corporation Stop Each 9 $300.00 $2,700.00 33 11 00.9 1-inch Curb Stop and Box Each 9 $325.00 $2,925.00 33 11 00.10 1-inch Copper Water Service LF 230 $53.50 $12,305.00 33 11 00.11 Connect to Existing Water Service Each 7 $100.00 $700.00 33 11 00.12 Insulation SF 200 $4.75 $950.00 33 11 00.13 Lower Existing Water Main LS 1 $4,100.00 $4,100.00 33 31 00.1 8-inch PVC Sanitary Sewer LF 431 $54.50 $23,489.50 33 31 00.2 Sanitary Sewer Manhole, 48-inch w/Casting VF 29 $617.00 $17,893.00 33 31 00.3 Connect to Existing Sanitary Sewer Each 2 $1,075.00 $2,150.00 33 31 00.4 Connect to Existing Sanitary Sewer MH Each 2 $1,700.00 $3,400.00 33 31 00.5 8-inch by 4-inch Sanitary Wye Each 10 $350.00 $3,500.00 33 31 00.6 4-inch PVC Sanitary Sewer Service Pipe LF 315 $48.25 $15,198.75 33 31 00.7 Connect to Existing Sanitary Sewer Service Each 10 $100.00 $1,000.00 33 31 00.8 Dye Testing Sanitary Sewer Service Verification Each 2 $350.00 $700.00 33 31 00.9 Adjust Existing Manhole Casting Each 15 $450.00 $6,750.00 33 41 00.1 18-inch RCP Storm Sewer LF 117 $74.75 $8,745.75 33 41 00.2 15-inch RCP Storm Sewer LF 615 $71.00 $43,665.00 33 41 00.3 12-inch RCP Storm Sewer LF 186 $67.00 $12,462.00 33 41 00.4 18-inch RCP Storm Sewer Pipe Aprons Each 1 $1,500.00 $1,500.00 Page 6 of 7 2022 New Richmond Street/Utility Improvements Cost Split Based on Haas Bid 27-Apr-22 Base Bid Project Total Item No. Description Unit Quantity Unit Price Total Price 33 41 00.5 15-inch HDPE Storm Sewer Pipe LF 28 $62.00 $1,736.00 33 41 00.6 12-inch HDPE Storm Sewer Pipe LF 30 $58.25 $1,747.50 33 41 00.7 15-inch CMP Storm Sewer Pipe Aprons Each 2 $500.00 $1,000.00 33 41 00.8 12-inch CMP Storm Sewer Pipe Aprons Each 2 $435.00 $870.00 33 41 00.9 18-inch CMP Storm Sewer LF 10 $100.00 $1,000.00 33 41 00.10 Inlet Manhole, Type B-1, w/Casting Each 1 $3,025.00 $3,025.00 33 41 00.11 Storm Sewer Manhole, Type C, w/Casting Each 1 $3,100.00 $3,100.00 33 41 00.12 Storm Sewer Manhole, Type B, w/Casting Each 4 $3,000.00 $12,000.00 33 41 00.13 Inlet, Type 3 w/Casting Each 9 $2,350.00 $21,150.00 33 41 00.14 Connect to Existing Storm Sewer Each 5 $950.00 $4,750.00 33 41 00.15 Connect to Existing Storm Manhole or Inlet Each 1 $1,150.00 $1,150.00 33 41 00.16 Adjust Existing Inlet Casting Each 3 $200.00 $600.00 34 41 40.1 Signs, Type 2 SF 41 $60.00 $2,460.00 34 41 40.2 Street Name Signs Each 4 $325.00 $1,300.00 BASE BID TOTAL $1,421,197.20 Page 7 of 7 MEMO Prepared for: Public Works Committee Staff Contact: Erik Evenson Meeting: Public Works Committee - 04 May 2022 Subject: Uncontrolled Intersection at E Lincoln and W Lincoln BACKGROUND INFORMATION: A concerned resident reached out to City staff concerned with traffic control at the intersection of East Lincoln Road and West Lincoln Road. With the addition of the Foster Place Development, this intersection sees more traffic out of the development from the east to the west. Staff has reviewed the Wisconsin Manual of Uniform Traffic Control Devices (MUTCD) for guidance. Analysis Staff has reviewed the Wisconsin Manual of Uniform Traffic Control Devices (MUTCD), which offers the following guidance: Intersections with four approaches should have no YIELD or STOP signs unless: 1. The combined vehicular, bicycle, and pedestrian volume entering the intersection from all approaches averages more than 2,000 units per day; 2. The ability to see conflicting traffic on an approach is not sufficient to allow a road user to stop or yield in compliance with the normal right-of-way rule if such stopping or yielding is necessary; and/or 3. Crash records indicate that five or more crashes that involve the failure to yield the right-of-way at the intersection under the normal right-of-way rule have been reported within a 3-year period, or that three or more crashes have been reported within a 2-year period. The MUTCD also notes that YIELD and/or STOP signs should not be used for speed control. Staff does not believe that the intersection in question meets any of the above criteria. Official traffic counts have not been done but it is believed that the average units per day is much less than 2,000. Should the committee wish to still move forward with installing stop signs at this location it would be recommended that signs be installed on the east-west legs rather than make it a 4-way stop condition. RECOMMENDATION: Staff does not recommend installing stop signs at the intersection of E Lincoln and W Lincoln Roads because the intersection does not meet the Wisconsin Manual Uniform Traffic Control Devices criteria for stop signs. MEMO Prepared for: Public Works Committee Staff Contact: Lori Brinkman Meeting: Public Works Committee - 04 May 2022 Subject: Downtown Planters BACKGROUND INFORMATION: Staff have received complaints regarding the condition of the planters in the downtown area. The Committee should direct staff on what they would like to do with the planters.

Get email alerts for New Richmond

A daily email when new agendas and minutes are posted.

Report an issue with this meeting