Muyni
← Back to New Ulm

Heritage Preservation Commission

Regular Meeting

New Ulm, MN · October 21, 2024

Agenda

Agenda

AGENDA Heritage Preservation Commission Meeting 4:45 PM - Monday, October 21, 2024 City Hall Council Chambers Page 1. CALL TO ORDER 2. APPROVAL OF MINUTES 2.1. September 16, 2024 Meeting 2-4 HPC Meeting Minutes 9-16-24 3. DESIGN REVIEWS 3.1. True Real Estate - Sign and Awning - 127 North Minnesota Street 5 - 11 True Real Estate Design Review 4. REPORTS FROM CITY AND CHAIR 5. ADJOURNMENT Page 1 of 11 MINUTES NEW ULM HERITAGE PRESERVATION COMMISSION Monday, September 16, 2024 at 4:45 P.M. City Hall Council Chambers Present: Chair Deb Zahn, Councilor David Christian, Al Stabenow, Jeannie Leighty, Peter Baganz, Ron Brutlag and Building Official Ellwood Zabel Absent: Cara Knauf 1. CALL TO ORDER The meeting was called to order by Chair, Deb Zahn at 4:45 P.M. 2. APPROVE MINUTES 2.1) August 19, 2024 Meeting Mr. Brutlag made a nomination to approve the minutes of the August 19, 2024, meeting. The motion was seconded by Mr. Baganz and all voted aye. 3. DESIGN REVIEW 3.1) Kaiserhoff Restaurant and K Bar – Sign – 221 North Minnesota Street Mr. Zabel presented details of the request, including: The new K Bar Sign, the placement of the existing Veigel’s Kaiserhoff lettering, the addition of the blue paint to the K Bar, the addition of the 70’s style Kaiserhoff sign, and the effort to distinguish the two different entities. He added that both applicants were unable to attend this meeting, so there is still a question of if they currently possess the classic 70’s style Kaiserhoff sign or if they will be using a replica. Ms. Zahn asked if there was prior approval for the blue paint that was used at the K Bar. Mr. Zabel stated that it wasn’t approved, and isn’t in the color palette, however, it is in the Bavarian flag. More discussion took place about the signage, approval of the blue color, the possibility of extending the color palette and other downtown locations with the color blue. Mr. Brutlag motioned to accept the design review as presented. Mr. Stabenow seconded the motion, and all voted aye. The motion carried. Page 2 of 11 3.2) River Bend Business Products – Stairs – 14 South Minnesota Street Mr. Zabel provided details of the request, including the frontage on Center Street as well as South Minnesota Street. The proposal includes building a stairway on the corner off of Minnesota Street in order to access the second floor apartments. Kyle Esser of Esser Brothers Construction explained that there is currently a back entrance which shouldn’t be used, and these stairs would provide a main entrance to the second floor apartment. More discussion took place regarding the fenced in area, the patio, materials to be used, the railing and landings and colors to be used. This stairway will be unique since the location is at the front of the building as opposed to the rear. The stairs and decking will be cedar with the cable wire railings. Mr. Baganz motioned to accept this design. Mr. Brutlag seconded the motion. All voted aye and the motion carried. 4. HERMANN MONUMENT UPDATE Mr. Zabel stated there was information received from SHPO on the letter that was sent from the architect regarding deconstruction of Hermann monument, which they have accepted. The next step will be to reach out to the architect and get pricing on what deconstruction documents will cost. There will be many people involved in this project, including architects, engineers, archaeologists, and subcontractors. The goal is to have information on pricing by the end of the year. The City Council has established a Hermann sinking fund for this type of occasion. There is also some funding carryover that can be used instead of applying for a grant. It would be possible to make the 2025 grant cycle, however, that would delay the creation of construction documents to 2026. Deconstruction documents will go out for bids to get a cost. While deconstruction is taking place, construction documents will be made to rebuild the monument and do moisture mitigation. 5. REPORTS FROM CITY AND CHAIR 5.1) City Report Mr. Zabel had nothing else to report. 5.2) Chair Report Ms. Zahn stated that she and Jeannie Leighty will be leaving for the HPC convention on Wednesday in Red Wing. They will give a report at the next meeting. Page 3 of 11 5.3) Addendum to the Agenda – Community Collage Mural Mr. Christian made a motion to suspend the rules and make an addendum on the agenda for the Community Collage Murial. Mr. Baganz seconded the motion and all voted aye. The motion carried. City Manager, Dalton presented a request from the New Ulm Chamber Downtown Action Team to put up a mural that was created through the community collage project. The mural is composed of photographs of community members from a public photo shoot this summer. The ideal location of the mural would be at the Thimble Box on Center Street and Minnesota Street where there is high traffic and a large blank wall to act as a canvas. The mural would be on a vinyl wrap adhered to the building so it can be easily removed. The Chamber is working with the owner of the Thimble Box to make a service agreement. The goal is to keep the mural up for a minimum of five years and then potentially renewing it if there is no significant damage. Vinyl wrap can be easily repaired if sections are damaged. The Thimble Box will have the option to take it down if needed during that time. Mr. Dalton shared a picture of the mural and the space where it will be hung on the Center Street side of the Thimble Box between the store windows and the door to the right. The mural will be in black and white with minimal color. If anything changes with the mural, it will come before the HPC. The unveiling will be just before or during Oktoberfest. Ms. Leighty made a motion to accept the proposal of the Community Collage Mural. Mr. Christian seconded the motion, and all voted aye. 6. ADJOURN There being no further business to come before the Commission, the meeting was adjourned at 5:26 P.M. Respectfully submitted, Secretary Heritage Preservation Commission Page 4 of 11 City OfNew Ulm Project Number: ' Planning Department Heritage Preservation Design Review Form , I 06%amp QMeJV WSW/Ad Applicant’s Name Owner ’sName s“ V‘ , l . é? /V 4 / E Street Street a, . , Maui/fag W” fé?é/ . City State Zip City State Zip ' Phone Home Work Phone Home Phone WorkPhone I ‘ Email Email Historic Property: IE Downtown District [:1 South Broadway District [3 IndividualProperty E Contributing DNon-Contributing Type of Work E] Minor FaCe Lift :I Major Face Lift IX?Signage/Awning (signpermit must also be?led) [:1 Restoration :I New Construction E] Demolition Address of the Project: ' Please attach the following documents that apply to project (* required items): ShortDescription of Work * X] Current Photograph* I: Scale Elevation Drawing E] Material Samples Short CU6% $009M aa,c, 2-»$le Description:_J/4w(/\Mj Bot/é?wrugf (3A,? . ' WWgM/x (‘AQMA{ (ho/«1"»- l/ Architect/Engineer/DesignFirm Name: Architect/Engineer/De’sign Firm Address: Authority to file application: :] Ownership E] Tenant C] Other I hereby certify that the above information and accompanying documents are true and accurate to thebest of my knowledge arid acknowledge that the process of this application may require additional fees and expenses for the preparation of necessary environmentaldocumentationand planning studies. Applicant’sSignature Date Page 5 of 11 Of?ce Use"Only ' Staff Review Date: Commission Review Date: ' ' liillltll'ill fiilléilll lilillliVll l/l;Kill? 'il i Front Entrance - Recover existing awning frame in orange - Paint areas above awning and door gray - Add a logo panel above awning ° Add vinyl logo, phone and url and address to door ' ”Genuine Service. True Results." in frosted vinyl on windows Side Street - Recover existing awning frame in orange Page 6 of 11 - Paint areas above awning and door gray - Add a logo panel above awning ?i?l'l?éiilkll/A?l‘éi liillE—E?lll/ Mill/Al ‘il3} - Recover existing awning frame in orange - Cover existing corrugated metal with a smooth metal panel and add the True Real Estate logo - Vinyllogo, phone, url and locationaddress to door - "Genuine Service. True Results." in frosted vinyl on windows ‘ Cover green tile with cement board to compliment Sim ' Page 7 of 11 Recover existing awning frame in orange - Cover existing corrugated metal with a smooth /. ’ "_I ”-15:71: Front Entrance - New open-sided awing that goes over the corrugated material ‘ Paint areas under awning and above the door gray - Add vinyl logo, phone and url and address to door - "Genuine Service. True Results.” in frosted vinyl on windows Side Street - New open-sided awing that goes over the corrugated material Page 8 of 11 - Paint areas under awning Wllilll‘l/ lUll §§§liélllll/sl?xil?' Ié’ri LllVll Front Entrance - New open-sided awing that goes over the corrugated material - Paint areas under awning to match the corbeling on the building - Paint area above the door dark gray to ' match awning . Add vinyl logo, phone and url and address to door - ”Genuine Service. True Results.” in frosted vinyl on windows Page 9 of 11 Side Street . New open-sided awing that goes over the UlllliVll‘allmlill/‘\(Qul,' \VlV/ } lliilj? £53 L ;_ Mining? ~ 1652 Logos: = -.24 92 sf: ‘ each Front Entrance - New open-sided awing that goes over the corrugated material - Paint areas under awning to match the corbeling on the building - Paint area above the door dark gray to match awning ~ Add vinyl logo, phone and url and address to door - “Genuine Service. True Results.” in frosted vinyl on windows Page 10 of 11 idem - New open-sided awing that goes over the Page 11 of 11

Get email alerts for New Ulm

A daily email when new agendas and minutes are posted.

Report an issue with this meeting