Floodplain Permit Committee Meeting
Regular MeetingNorman, OK · April 5, 2021
Minutes
FLOODPLAIN PERMIT COMMITTEE MEETING
201 West Gray, Building A, Conference Room D
Monday, April 5, 2021
3:30 p.m.
Minutes
PRESENT: Shawn O’Leary, Director of Public Works
Scott Sturtz, City Engineer
Ken Danner, Subdivision Development Manager
Jane Hudson, Director of Planning and Community Development
Lora Hoggatt, Planning Services Manager
Bill Scanlon, Citizen Member
Sherri Stansel, Citizen Member
OTHERS PRESENT: Carrie Evenson, Stormwater Program Manager
Todd McLellan, Development Engineer
Amy Shepard, Staff
Douglas Hartwig, Crafton Tull & Associates
Hannah Ables, Meshek & Associates, LLC
Harris Wilson, Meshek & Associates, LLC
Barbara Schindler, Resident
Scott Heiple, Resident
The meeting was called to order by Mr. Shawn O’Leary at 3:31 p.m.
Item No. 1, Approval of Minutes:
All seven members of the committee were present, and Amy Shepard called roll. Mr. O’Leary
called for a motion to approve the minutes from the meeting of March 15, 2021. A motion was
made to approve the minutes by Mr. Scott Sturtz. The motion was seconded by Mr. Bill
Scanlon. Mrs. Shepard called roll for approval, and the minutes were approved 6-0, with Ms.
Sherri Stansel abstaining.
Item No. 2, Floodplain Permit Application No. 627:
Mr. O’Leary stated this application is for the installation of a section of public waterline on the
south side of West Franklin Road and west side of North Interstate Drive, which is to be located
Floodplain Permit Committee Meeting
April 5, 2021
Page 2
in the Little River floodplain. Dr. Carrie Evenson gave the staff report for Floodplain Permit
Application No. 627. Dr. Evenson said the Applicant is Battison Properties, LLC and the
Engineer is Douglas Hartwig with Crafton Tull & Associates. Dr. Evenson said Mr. Hartwig
was in attendance via Zoom and will be representing the applicant. Dr. Evenson said this project
will install approximately 800 linear feet of new 12 inch waterlines generally located on the
south side of Franklin Road and the west side of North Interstate Drive near Ruby Grant Park.
Dr. Evenson said the installation of the new waterlines will be primarily through open cut
methods where the contractor will dig a trench, install the waterline, test and disinfect, and then
restore the area to a condition as good as or better than prior to the project. Dr. Evenson noted
that where necessary to minimize damage to other infrastructure or to reduce traffic impacts,
such as the section of waterline to be installed under Franklin Road, the waterline will be
installed using boring methods. Dr. Evenson said the floodplain will be returned to the original
lines and grades and any excess spoils will be removed and disposed of outside the floodplain.
Dr. Evenson reviewed aerial photographs of the area, the site plan, and the floodplain on the
property. Dr. Evenson reviewed the applicable floodplain ordinances and confirmed all
ordinance requirements have been met. Dr. Evenson said staff recommended approval of
Floodplain Permit Application No. 627. Mr. O’Leary asked if there were any comments from
the applicant or representatives; hearing none, he asked for questions or comments from the
public. Mr. O’Leary asked for questions from the committee or a motion. Mr. Ken Danner
recommended approval of Floodplain Permit Application No. 627. Ms. Lora Hoggatt seconded
the motion. Mr. Sturtz asked if the channel would be open cut to install the waterline. Mr.
Hartwig said that during the last meeting with staff, the waterline location had been altered to
Floodplain Permit Committee Meeting
April 5, 2021
Page 3
be closer to the street. Mrs. Shepard called roll, and the committee voted to approve the
application 7-0.
Item No. 3, Floodplain Permit Application No. 628:
Mr. O’Leary said this application is for a restoration project on Merkle Creek immediately north
of Iowa Street and a tributary on the north side of Cleveland Elementary School in the Merkle
Creek floodplain/floodway. Mr. Todd McLellan gave the staff report for Floodplain Permit
Application No. 628. Mr. McLellan said this application is for resoration of Merkle Creek and
reviewed an aerial photograph of the project location. Mr. McLellan said the Applicant was
City of Norman Public Works Stormwater Division represented by Dr. Evenson and the
Engineer was Hannah Ables with Meshek & Associates, LLC. Mr. McLellan noted all parties
were present. Mr. McLellan said Merkle Creek just north of Iowa Street has experienced severe
erosion of the east bank over time and the tributary north of Cleveland Elementary School has
become overgrown with brush, debris, and silt, and the banks are very steep and severely
eroded. Mr. McLellan said both areas are in need of rehabilitation to address these issues and
make these areas easier to maintain on a regular basis. Mr. McLellan said the proposed
improvements to Merkle Creek include bank stabilization and placement of fill for
approximately 280 feet along the east bank of the creek. Mr. McLellan said the stabilization
measures include filling and grading the bank to a 3:1 slope and placing turf reinforcement mat
on the graded area. Mr. McLellan said the tributary channel modifications include removing
debris and brush and constructing a trapezoidal grass-lined channel from the outfall structure
to the confluence with Merkle Creek. Mr. McLellan said the contractor for the project has not
been selected yet and engineer’s estimate for the project is $773,773.00 with an estimated
completion date of August 2021. Mr. McLellan said the work is scheduled for completion this
Floodplain Permit Committee Meeting
April 5, 2021
Page 4
summer while school is out of session. Mr. McLellan presented an aerial photograph of the
project location and the floodplain and floodway footprint of that property. Mr. McLellan said
the project engineer has performed a hydraulic analysis that has determined there will no rise
in the Base Flood Elevation due to this project. Mr. McLellan reviewed the site plans and
current photographs of the site location. Mr. McLellan noted the erosion reflected in the
photographs of the stream banks. Mr. McLellan verified the application meets all applicable
ordinance requirements and said that staff recommends approval of Floodplain Permit
Application No. 628.
Mr. O’Leary asked if there were any comments from the Applicant or representatives. Mr.
Harris Wilson and Ms. Hannah Ables with Meshek & Associates, LLC, said the staff report
was thorough and did not have anything additional to add. Mr. O’Leary asked if there were
questions or comments from the public. Mrs. Barbara Schindler said her property backs up to
the creek and she is thankful for the project. Mrs. Schindler asked what material would be used
to stabilize the banks. Dr. Evenson said the product identified for bank stabilization is called
Flexamat, which is a concrete grid product that allows grass to grow up between the panels.
Mr. Sturtz asked if the U.S. Army Corps of Engineers (USACE) is requiring a 404 permit on
the tributary. Dr. Evenson said the entire project was presented to the USACE for approval, and
that Meshek & Associates, LLC, were in the process of responding to comments from USACE.
Dr. Evenson said that the permit was anticipated to be issued within 30-45 days. Mr. Sturtz
noted that he grew up near the stream and has fond memories of jumping in the creek. Mr.
Sturtz said he is excited to see the project coming forward and the restoration of Merkle Creek.
Mr. Sturz complimented the project, the products chosen, and he recommended approval of
Floodplain Permit Application No. 628. Mr. Scanlon seconded the motion and asked for some
Floodplain Permit Committee Meeting
April 5, 2021
Page 5
additional education on how streambank projects are prioritized and selected. Dr. Evenson
agreed to review that process with Mr. Scanlon. Mr. O’Leary said this project, due to its
proximity to Cleveland Elementary, was most likely requested by Norman Public Schools and
has been in progress for 10 years. Mrs. Shepard called the roll, and the committee voted to
approve the application 7-0.
Item No. 4, Miscellaneous Discussion:
a) Mr. O’Leary stated that there are two pending applications for the April 19, 2021
meeting.
b) Mr. O’Leary said the May 3, 2021 meeting has no pending applications and the deadline
for submittals is April 14, 2021.
c) Mrs. Stansel asked about the status of Floodplain Application No. 615, for the
replacement of utility transmission poles. Dr. Evenson said she had not received an
update but would follow up with the applicant. Mr. Danner asked if there had been any
consideration of a fee increase for submitting a Floodplain Permit Application. Mr.
O’Leary said he had not heard about any discussion of fees and would begin discussion
and report back to the committee.
Item No. 5, Adjournment:
Mr. O’Leary called for a motion to adjourn. Mr. Sturtz motioned to adjourn and was seconded
by Mr. Scanlon. Mrs. Shepard called roll, and the motion was approved 7-0. Meeting adjourned
at 3:58 p.m.
Agenda
FLOODPLAIN PERMIT COMMITTEE
AGENDA
Monday, April 5, 2021
MEETING TIME: 3:30 p.m.
MEETING PLACE: 201 West Gray, Building A, Conference Room D
Virtual meeting with Committee Members Shawn O’Leary, Scott Sturtz, Ken Danner, Bill Scanlon,
and Sherri Stansel appearing in-person and Jane Hudson and Lora Hoggatt appearing via video
conference.
https://zoom.us/j/94566271136?pwd=VDhpQzhRU2dYZy95Wk1BTGhiTzhNdz09
Meeting ID: 945 6627 1136
Passcode: 767010
1. Approval of Minutes from the March 15, 2021, meeting.
2. Floodplain Permit No. 627: This application is for the installation of a section of waterline on the
south side of West Franklin Road and west side of North Interstate Drive, which is to be located in the
Little River floodplain.
3. Floodplain Permit No. 628: This application is for a restoration project on Merkle Creek immediately
north of Iowa Street and a tributary on the north side of Cleveland Elementary School in the Merkle
Creek floodplain/floodway.
4. Miscellaneous Discussion:
a. The filing deadline for application submittals for the April 19, 2021 meeting is Wednesday, March
31, 2021. Currently, there is one (1) pending application.
b. The filing deadline for application submittals for the May 3, 2021 meeting is Wednesday, April
14, 2021. Currently, there are no pending applications.
5. Adjournment.
It is the policy of the City of Norman that no person or groups of persons shall on the grounds of
race, color, religion, ancestry, national origin, age, place of birth, sex, sexual orientation, gender
identity or expression, familial status, marital status, including marriage to a person of the same
sex, disability, retaliation, or genetic information, be excluded from participation in, be denied the
benefits of, or otherwise subjected to discrimination in employment activities or in all programs,
services, or activities administered by the City, its recipients, sub-recipients, and contractors. In
the event of any comments, complaints, modifications, accommodations, alternative formats,
and auxiliary aids and services regarding accessibility or inclusion, please contact the ADA
Technician at 405-366-5424, Relay Service: 711. To better serve you, five (5) business days’
advance notice is preferred.
Get email alerts for Norman
A daily email when new agendas and minutes are posted.