City Council Workshop
Regular MeetingOakdale, MN · May 24, 2022
Minutes
WORKSHOP
OAKDALE CITY COUNCIL
May 24, 2022
The City Council held a workshop on Tuesday, May 24, 2022 at Oakdale City Hall, 1584 Hadley
Avenue North, Oakdale, Minnesota. The meeting began at 5:00 PM.
Present: Mayor Paul Reinke
Council Members: Jake Ingebrigtson
Colleen Swedberg
Kevin Zabel
Susan Olson
Also Present: Christina Volkers, City Administrator
Katie Robinson, Deputy City Clerk
Nick Newton, Police Chief
Jason Zimmerman, Finance Director
Jim Romanik, Public Works Manager
Andrew Gitzlaff, Community Development Director
Lori Pulkrabek, Communications Manager
Nick Newton, Chief of Police
Jim Thompson, City Attorney
Ryan Stuart, Police Officer
Kevin Wold, Fire Chief
Julie Williams, Recreation Superintendent
Luke McClanahan, City Planner
Brian Bachmeier – Interim Engineer
Public Attendees: Glen Bearth, Interview Candidate for Parks and Recreation Commission
Allen Dale, Dale Properties
PARKS AND RECREATION COMMISSION APPOINTMENT INTERVIEW
Mayor Reinke and all Council Members welcomed Mr. Glen Bearth and gave him the opportunity to
share information about himself and why he is interested in the appointment to the Parks and
Recreation Commission.
Mr. Bearth is a long-time resident of Oakdale that had retired from 3M Company and Ameriprise, is
currently the President of the Maplewood Oakdale Lions Club, a past Commission member of the
Washington County Parks and Open Spaces, Oakdale Wellness 50+ team member and Oakdale
Discovery Center volunteer.
Mr. Bearth is very familiar with our parks system and has participated in recreation programs for
the following parks; Tanners, Walton, Eberle, Eastside and the Oakdale Nature Preserve to name a
few. His passion is not only to help others, but also wanting to ensure parks and trails are safe for
our current residents and future residents.
He expressed that he would love the opportunity to continue the legacy of his father, Mr. Ted Bearth
with public service.
WORKSHOP MINUTES
MAY 24, 2022
PAGE TWO
At the conclusion of the interview (after Mr. Bearth left), there was a brief discussion amongst the
Council in regards to Mr. Bearth’s qualifications for the position. All members agreed he would be
a great addition to the Parks and Recreation Commission. A final decision will be made at the next
City Council meeting.
COMPREHENSIVE PLAN ECONOMIC DEVEOPMENT CHAPTERS, CONTINUED DISCUSSION
Community Development Director, Andy Gitzlaff, began his presentation on Charter 7, Economic
Development, Goal 2,
There was much discussion in regard to the language of the policies in this goal. The second policy
states, “provide business financing options to support the maintenance and upgrading of existing
commercial and industrial buildings and increase the sustainability of business operations.”
Mr. Gitzlaff recognized that the wording may lead to open interpretation so he provided additional
background on some of the things the City has done in the past for financing such as; the Covid
loans, building rehabilitation loans as well as Open to Business which is a program ran by
Washington County and DEED also has a program that covers expansions of businesses.
Mr. Gitzlaff paused for any feedback from Council. Council Member Zabel stated the challenge in
that policy is the word ‘provide’. There have been conversations about what that looks like for
Oakdale going forward. The question is, does the City want to be in the business of financial lending.
Council Member Zabel feels that wording for the policy needs to be reexamined. Mayor Reinke
agreed with Council Member Zabel in regard to not being in the business of being a lender, however,
to be a conduit of financing options to the provider of other funding sources, makes sense. The City
would not be putting up the funding, but directing individuals to other resources.
Council Member Olson asked if we can change the policy to state that we are no longer giving out
direct loans, Ms. Volkers replied we put a hold on it when we were short staffed and there still is a
hold as we are not fully staffed yet and at some point, the Council will have to make that decision
whether to offer funding or not. Mayor Reinke confirmed a formal decision has not been made to
change that policy, but we will continue to take a pause and concentrate on current projects.
Mr. Gitzlaff moved on to Policy 3 which states the city partners with DEED (MN Department of
Employment and Economic Development) and the Washington County Workforce Center to respond
to firm closures or contractions to assist dislocated workers transition to new employment
opportunities.
Council Member Zabel asked for clarification on how the city assists with relocating private
employees. Mr. Gitzlaff, referred to the Washington County Workforce center resource as they
provide types of services and classes.
WORKSHOP MINUTES
MAY 24, 2022
PAGE THREE
Ms. Volkers mentioned that this is a common policy in comp plans and gave the example of Sam’s
Club. When they closed, they provided that city a whole list of all the employees that were laid off,
the city then reached out and gave each of them the resources such as DEED and the local county
workforce to assist them in finding new employment. The city was the “conduit” and was there to
support those living in the community that were searching for new employment.
Mr. Gitzlaff went on to the Policy 4 which is a plan for the development and integration of transit
service, affordable daycare, and housing options that reflect the wages paid by Oakdale businesses
and other supports required to ensure the success of business and labor.
Council Member Ingebrigtson said he thinks it’s a great idea, however is unsure of how realistic that
idea is. Council Member Swedberg agreed and shared that she believes the language should be
changed regarding affordable daycare because it is not something the City can control.
Mayor Reinke agreed the language needs to be changed. Mr. Gitzlaff will review it and come back
to Council.
Goal 3 states; The local economy and employment base shall be diverse so as to ensure the
continued employment for all residents.
Mayor Reinke supports this goal and the policies under it.
Goal 4 states; The number of Oakdale residents who struggle the most in securing employment that
provides a minimum standard of living shall be reduced.
The two policies that align this goal are;
To work in partnership with other public and private stake holders to ensure employment
opportunities for those with the greatest challenges to securing living wage employment to include,
but no limited to unemployment, disabled and those moving toward greater self-sufficiency.
Continue the administration of the Oakdale First policy that requires businesses receiving City
financial assistance to give priority to Oakdale residents when hiring especially those who are
unemployed moving toward greater self-sufficiency, disabled or those who are otherwise looking for
work.
Council Member Zabel explained his belief as to why he believes the second policy is not needed.
He stated that given the position employers are currently at with the struggles of attracting and
retaining talent is already tough and then having the city ‘handcuff’ them saying they have to hire a
resident even if they are not the most qualified is not in the best interest of the City.
Mayor Reinke clarified for Council Member Zabel that is not what the policy states (as far as not the
most qualified). Mr. Gitzlaff had the documentation of the policy and it states that it requires the
business to use the Washington County Workforce Center service when filling the new positions and
giving priority to hiring first qualified Oakdale residents, then secondarily to qualified Washington
County residents. The Council supported taking a closer look at the Oakdale First policy.
WORKSHOP MINUTES
MAY 24, 2022
PAGE FOUR
SUMMERFEST UPDATE
Several members of the Summerfest Committee were present to give an update on respective
activities. There was brief discussion as to how/if the pony vendor was paid by the City in the past,
however, Recreation Superintendent, Julie Williams stated we have no confirmed documentation
whether or not the vendor was paid or just collected money per ride. Therefore, council has decided
to pay for pony rides this year at the rate of $195.00/hr.
The parade participant number has increased to 47 from 39 signed up by the last workshop
discussion, a car has been confirmed for our Grand Marshal to ride in per Council Member Zabel
and the OACC Pancake Breakfast is confirmed to be held on Saturday at Guardian Angels church.
Council Member Zabel will provide Communications Manager, Lori Pulkrabek with a contact to Hy-
Vee to obtain donations. The breakfast cost for the public will be $5.00. Any money raised beyond
their (OACC) cost will be donated to Christian Cupboards.
There is a Summerfest meeting scheduled on May 26, 2022 at which time it will be determined if
Bingo will be an available activity. Mayor Reinke mentioned the Maplewood Rotary Club wanted to
participate in Summerfest this year, so he will reach out to them to see if they want to host Bingo.
Currently the vendor count is 28, (18 food / 10 non-food).
Council Member Olson will use her truck for Council to participate in the parade.
CR14 SANITORY SEWER CAPACITY STUDY
Interim Engineer, Brian Bachmeier began by sharing the background information on a sewer
capacity study that was initiated in March to evaluate impacts due to several high-density
developments being considered simultaneously in the Oakdale Station, Oakdale Market Place (east
of I-694 and south of CSAH 14), and 4Front Development (east of I-694 & north of CSAH 14) areas.
South of CSAH 14
The study evaluated both pipe size and lift station capacity as the area is served by the lift station
at the corner of Ideal and Stillwater Blvd. Currently the pipe size is sufficient, however the additional
density uses up more than half of the reserve capacity of lift station which raises the question of
cost recovery as the lift station reconstruction project was more expensive than budgeted. Lake
Elmo’s share of the lift station is $450,000 for 300ga/min capacity or $1500/gal.min capacity.
The high-density developments increase the flow to the lift station by 128al/min which results in
$192,000 equivalent charge for 637 residential units or $300/unit service availability Charge
surcharge per resident unit. This would recover about 1/2 of the local cost increase associated
w/the bid award to reconstruct the lift station ($410,000).
WORKSHOP MINUTES
MAY 24, 2022
PAGE FIVE
North of CSAH 14
This part of the study evaluated the capacity of the sanitary sewer pipe that runs from High Point
Blvd. to Hadley Avenue. The capacity of the pipes currently matches the projected flow from the
area based on the land uses identified in the current comprehensive plan. Any residential
development that is not offset by an equivalent reduction will exceed the pip capacity that serves
the area. If such development is pursued that is not offset, the 8” diameter pipe would have to be
replaced with 10” diameter pipe. The estimated cost to replace the pipe could exceed $1,000,000.
Dividing the costs to replace the pipe with the total number of residential units results in a
$1600/unit SAC Charge.
The development schedule in the 4Front area is still evolving. This increased the level of uncertainty
for the city to recover the costs to install a larger sanitary server pipe through a SAC surcharge.
Due to the study information it was recommended that Council advise staff if they support allowing
high-density developments in either of these areas.
Council Member Olson asked if the SAC charge would be a one-time charge, and indeed it would
be.
Council Member Zabel brought up other financial options such as developers paying upfront, SAC
and possible special assessments on streets (10 years) / utilities (20 years).
Mayor Reinke stated that he is not comfortable with the planning process of multi-family areas nor
is he in favor of increasing multi-family development in either of the areas (North and South of CSAH
14) and if it does happen, the City should not be at risk for the costs.
Overall, the Council would like to see an overall plan for additional / multi-use development plans
for the 4Front development before further considering multi-family housing there.
BODY WORN CAMERAS
Sergeant Ryan Stuart gave a summary of a field test study of four different body worn camera
systems. The study was 6 – 8 months long and included 8 officers. The police department has
narrowed the considerations down to two systems; Axon and Motorola (WatchGuard), favoring on
the side of Motorola.
The Motorola system not only meets the needs for our police department but has a few enhanced
features such as; rechargeable batteries, holds 2 – 3 days of video, information can be stored on
the cloud and the cost for a 5-year agreement would cost $279,331 vs Axon’s 5-Year agreement at
$447,841. This total would include 14 squad cameras and 36 body worn cameras along with the
administration / software fees.
The next steps would be to communicate directly w/our residents it may be an open house or an
invite to a City Council meeting, conduct a survey and then a policy would have to be crafted for the
public to review. After the public’s review, the police department would bring this back to Council
WORKSHOP MINUTES
MAY 24, 2022
PAGE SIX
with findings and financial considerations. A couple financial options for funding would be State
grants, 2-year forfeiture funds or internal funding through property tax.
Council Member Zabel believes that having an open house for the public would be a great way for
the residents to be able to engagement directly with officers and see the equipment. This way
officers can answer questions and / or concerns immediately.
Although the 2-year forfeiture financial option was not an ideal method, Mayor Reinke along with
Council Members Olson, Swedberg and Ingebrigtson would support it.
The police departments goal is to development a policy that follows LMC recommendation,
implements vendor specific protocol, complete a formal review and present a funding plan to
Council in September, 2022.
The police department’s desired implementation date of the body worn cameras is the first quarter
of 2023.
IDEAL AVENUE FINANCING OPTIONS
Finance Director, Jason Zimmerman began by reviewing the memo which states that three street
projects that were approved in 12/2014 were identified as requiring the use of debt to facilitate
the reconstruction as outlined in the CIP. The projects involved are 2022 Street Reconstruction
and Overlay, 40th Street Reconstruction and Ideal Avenue Reconstruction.
Each of these projects has a least a portion of the cost assessed to the benefiting property owner,
per City policy, and will be charged an interest rate of 2 percent (rounded to the nearest ¼ percent)
above the city’s interest rate established at the time of the bond sale.
The primary risk with a bond that has an assessment tied to it is that it may be prepaid by the
property owner to the city at any time while the city has a fixed term that is required to make principal
and interest payments. For example; if a parcel that is to be assessed with a repayment term of
eight years pays off the principal obligation in three years, the city would need to find external
resources to fulfill the interest obligation associated w/the debt for the remaining five years.
Currently the Ideal Avenue project poses the most exposure in regards to interest expense obligation
under a traditional bonding structure as it is proposed to be financed 100 percent by assessments.
An alternative option to finance the Ideal Avenue project is internally with use of the Special Project
Fund.
Mr. Zimmerman handed out a document that broke down the General Obligation Improvement
Bonds, Series 2022A for Ideal Avenue Reconstruction Project over 8 years along with a City of
Oakdale Special Project Fund (530) Summary as of May 24, 2022.
As it stands, there is currently $2,444,530.79 remaining unallocated in the Special Project Fund.
The question for Council is the comfort with the risk that exists w/this project in regards to financing.
WORKSHOP MINUTES
MAY 24, 2022
PAGE SEVEN
If the city finances internally, we are potentially compromising up to $600,000 of city cash for a
duration up to 8 years. It will be prepaid in portions and the money will be freed up over time if the
prepayments are made. The city would realize all the interest and the 2% interest additional as
revenue for using our cash up front.
Mayor Reinke is in favor of bond financing, even if early payoff is putting the City at risk for the
interest payments. He also brought up the possibility of taking monies out of Special Project Fund
and putting it in escrow in case we need it.
Council Member Swedberg asked if it’s common that debts are paid off early, and City Administrator
Volkers confirmed that it is.
Council Member Olson asked, would raising the percent to 2.25 or 2.5 minimize the risk, Mr.
Zimmerman replied yes it would help but current policy states 2% above bond interest rate.
ADJOURNMENT
The workshop was adjourned for the Regular City Council meeting at 6:55p.m.
RECONVENE
The workshop reconvened at 7:25pm to continue discussion on the Comprehensive Plan and
Council Topics.
Council Member Zabel asked if the 2021 audit has been finalized and Mr. Zimmerman informed
him that we are awaiting the formalized financials.
Mayor Reinke voted for moving forward on typical bond sale rather than set aside a portion of
special project fund. All Council Members agree.
COUNCIL TOPICS
Council Member Olson – Asked the Council if they would agree to place signs on the trails / sidewalk
of Hadley and Helmo Avenues to warn people about asphalt temperatures for pets. City
Administrator Volkers is working with Public Works to obtain pricing and will bring it back to council.
All Council members agreed this is a great idea to research and consider.
Council Member Swedberg asked for an update on pricing on the maintenance of the Eder School
house. Ms. Volkers stated staff is still gathering the pricing and will bring back to Council when
complete.
WORKSHOP MINUTES
MAY 24, 2022
PAGE EIGHT
Council Member Zabel brought up a few different topics to Council. His first being a confirmation
on the Commissions Annual meeting (where all Commissions are together). This typically takes
place in April, however it has not been scheduled as of yet. After a brief discussion, City
Administrator Volkers will work with Council and coordinate a good date/time for all, possibly in
September.
Council Member Zabel also brought up the topic of City employees maintaining private property
such as maintaining the lawn at Transfiguration Church. Council Members Zabel’s last topic was
the issue of paying for Sanitation on school property. It was determined that this all needs to
researched to see if any agreements are in place in regards to these tasks. His last ask was for an
update from City Administrator Volkers on the Abelight meeting. Ms. Volkers shared that
Washington County, the City of Oakdale and the State met w/Abelite last week and Abelite has
decided that they will not proceed w/the project as the primary due to the market rate apartments
included in this project which complicates their ability to get financing. They have also had a lot of
change w/their mission as to where they want to go as an organization and didn’t want to take the
risk of the market rate component. They have however committed to look out for other nonprofits
or socially conscious for-profit developers that do this kind of work and to help see if there is
someone who is willing to jump in and help.
ADJOURNMENT
The workshop was adjourned at 8:00pm.
Respectfully submitted,
Katie Robinson
Deputy City Clerk
Agenda
AGENDA
City Council Workshop
Workshop
May 24, 2022
Council Chambers
5:00 PM Advisory Body Appointment – Parks and Recreation
5:10 PM Council Discussion re: Appointment
5:15 PM Comp Plan Discussion – Economic Development Chapter, Continued
5:45 PM Summerfest Update
5:55 PM CR14 Sanitary Sewer Capacity Study
6:15 PM Body Worn Cameras
6:35 PM Ideal Avenue Financing Options
6:40 PM Council Topics
6:55 PM Adjourn for Regular Meeting
COUNCIL MEMORANDUM
To: Honorable Mayor and City Council
From: Christina M. Volkers, City Administrator
Date: May 24, 2022
Subject: Interview to Appoint – Parks and Recreation Commission
BACKGROUND
Per City Policy MIS-013 Section 6.0 Boards and Commissions Appointment, Reappointment, and
Service:
6.0 Application Process
6.1 All persons interested in being appointed to an Oakdale advisory board or commission
shall complete an application provided by the City of Oakdale.
6.4 Upon reviewing the application, the staff liaison shall determine whether the applicant
meets the preliminary criteria for the respective board or commission.
6.9 Applicants selected for appointment to boards and commissions by the City Council shall
be those persons who, in the judgement of the City Council, are representative of the
community and are qualified by training, experience, and interest, useful for the
fulfillment of the board or commission’s responsibility.
At this work session, the City Council will interview an individual seeking to be appointed to the Parks
and Recreation Commission. Application is being sent under separate cover.
5:00 PM Parks and Recreation Commission
Glen Bearth
COUNCIL MEMORANDUM
To: Honorable Mayor and City Council
From: Andrew Gitzlaff, Community Development Director
Date: May 24, 2022
Subject: Comprehensive Plan Economic Development Chapters, Continued Discussion
BACKGROUND
Through a series of Council workshops staff has been providing a chapter-by-chapter overview of the
Comprehensive Plan and facilitating a discussion with Council on the following:
Are the policies identifying the appropriate course of action to achieve the goal?
Is anything missing, inaccurate or in need of further evaluation?
Are there some policies that should be prioritized?
Chapters are sent out with the agenda packet for review in advance. Staff is tracking language changes
that will likely need to be made as part of a future Comprehensive Plan amendment. See attached
comment tracker form for reference.
The Introduction and the Land Use Chapters were discussed at the February 8, 2022 and February 22,
2022 Council workshops. The Housing and Neighborhoods Chapters were discussed at the April 29,
2022 Special Council workshop. The Transportation Chapter was discussed at the April 26, 2022
meeting. At this meeting, the discussion began on the Economic Development Chapter but was tabled
after discussion Goal 1 due to meeting time constraints.
At the May 24, 2022 Council workshop, staff will continue the facilitated discussion with Council on the
Economic Development Chapter of the Comprehensive Plan starting on Goal 2.
Future Council workshops will focus on the remaining chapters of the Comprehensive Plan.
(4) Water resources
(5) Parks and Trails
(8) Resilience
(10) Implementation
Attachments
Comment Tracker
Economic Development Chapter of the 2040 Comprehensive Plan
Comprehensive Plan City Council Comment Tracker
Date Received Chapter Comment Recommended Action
2-8-22 Chapter 2 – Concerned about the preciseness of some of the Revise statement to say
Workshop Land Use policy statements in the Comprehensive Plan “consider an annual
including Goal 2 Policy 4 establishing an annual EDA levy along with the
EDA levy to fund predevelopment and other funding
rehabilitation activities. mechanisms”.
2-8-22 Chapter 2 – Council emphasized that the words that are used Noted.
Workshop Land Use are important.
2-8-22 Chapter 2 – Council wanted more information on the specific Consider updated the
Workshop Land Use parcels listed under Goal 1 Policy 1 and more list of sites based on
clarity on the Council’s role in preparing needs / interest from
redevelopment plans considering many of these landowners, add more
properties are privately owned. clarity to the City’s role
in preparing
redevelopment plans.
2-8-22 Chapter 2 – Council expressed a concern about references to Add more clarity in
Workshop Land Use public financing and how it creates a perception Comprehensive Plan to
that the City will provide public financing for where, when, how and
every project without additional evaluation of the why public financing
merits. Staff noted that the Comprehensive Plan would and would not be
is not the last word. It provides overall guidance considered.
but the City Council can direct staff to conduct
additional study and craft more specific policies
and programs to better define and interpret the
current Council’s position.
2-22-22 Chapter 2 – Our current TIF policy doesn’t separate Review the Baker Tilly
Workshop Land Use residential and commercial and is outdated. TIF Summary and
Council would like to see a comparison and update the City’s TIF
contrast of how it is now and recommendations Policy as a separate
from staff for how it could be improved. effort and reference the
updated TIF Policy in
the Comprehensive
Plan.
3-29-22 Chapter 6 - There are a lot of other subsidies such as Consider noting other
Workshop Housing Section 8 vouchers and mortgage assistance programs in the
programs that are not captured as publicly Housing Chapter and
subsided housing units in the existing local their contribution
condition chart. towards meeting the
City’s affordable
housing goals.
3-29-22 Chapter 6 - The Comprehensive Plan Area Median Income Reference current AMI
Workshop Housing (AMI) numbers listed in the plan are outdated. but do not include a
specific number
because it does not
change every year.
3-29-22 Chapter 6 - Desire to take a closer look at the Neighborhood Staff will review the
Workshop Housing Preservation and Enhancement Initiative’s NPEI, the process for
Housing Rehabilitation Strategic Framework approval and discuss
(NPEI). with Council if changes
should be made to
better reflect the Comp
Plan and the current
Council’s thinking.
3-29-22 Chapter 6 - What does it mean to develop plans under Goal Consider adding clarity
Workshop Housing 1 Policy 2? to the type of plans
referenced (finance
plan, management
plan).
3-29-22 Chapter 6 - What happens if you do not meet the Ensure the
Workshop Housing Metropolitan Council requirements? Ultimately it Comprehensive Plan
could end up in legal challenges or the City may remains legally
become ineligible to receive future grants under defensible, not in
the Livable Communities Act. conflict with regional
plan and fulfills our
requirements to be
eligible for funding.
3-29-22 Chapter 6 - How was the 791 units of affordable housing No change since the
Workshop Housing established? Staff clarified these numbers number is established
came directly from Metropolitan Council based by the Metropolitan
on a regional allocation formula. The Council.
Metropolitan Council does not require a City to
meet this number. The Metropolitan Council
does require (through review of the land use
plan conformity) that there is sufficient land use
and allowable densities programmed within the
City so that these units can feasibly be built. The
Metropolitan Council also will make sure that the
City has identified tools (within the housing
chapter) that could be used to accomplish the
goal.
3-29-22 Chapter 9 - There are multiple references to the City’s Remove references to
Workshop Neighborhoods emergency home rehabilitation loan program. this particular program
if discontinued by the
City and references
other active program
partnerships
3-29-22 Chapter 9 - City Council provided direction to consider Staff will work on
Workshop Neighborhoods adopting MN State Statutes 65A.50 Trust or adopting as a separate
Escrow Accounts: Insured Real Estate Property effort from the
Fire or Explosion Loss Proceeds into the City Comprehensive Plan
Code
3-29-22 Chapter 9 - How will our progress be tracked to meeting the Additional detail is
Workshop Neighborhoods adopted goals? provided in the
implementation chapter
which will be discussed
at a future workshop.
4-26-22 Chapter 3 - Goal 2 – Some of the policies seem outside the For additional clarity,
Workshop Transportation City’s ability to control such as burying suggest using words
powerlines along Highway 120 such as coordinating
with, advocating or
supporting the work of
others.
4-26-22 Chapter 3 - Goal 3 - Policy 5 states support for jurisdictional Consider removing
Workshop Transportation roadway transfers, Council discussed whether entirely or adding
we really wanted to support future jurisdictional additional explanation
transfers. It is unclear what the benefit would be that the transfer must
to the City for taking on the additional roadway be in the financial
responsibilities. interests of the City and
to the benefits of
residents
4-26-22 Chapter 3 - Goal 4. Consider adding a policy to support the Consider adding this
Workshop Transportation addition of a pedestrian walkway adjacent to the policy to the
40th Street bridge over I-694 improving access Comprehensive Plan.
from existing neighborhoods on the west side to Having this policy in
the Willowbrooke neighborhood on the east side place will help support
future funding requests
at the state and federal
level
4-26-22 Chapter 3 - Goal 5. Question about the City’s role in Policy Statement 3
Workshop Transportation collaborating with Metro Transit. Clarification could better specify
was provided that Metro Transit operates the that Metro Transit is the
regional system but the City can provide input on service provider
where routes can go
4-26-22 Chapter 7 – Goal 2. Question about whether this should be Unless causing harm
Workshop Economic two separate Goals, one focused on jobs and suggest leaving as one
Development other on quality of life Goal recognizing that
these Goals were the
result of a public
engagement process,
the policies under the
Goal could be better
aligned.
4-26-22 Chapter 7 – Goal 1 – Concern about the term Living Wage Consider adjusting the
Workshop Economic and how it might be misinterpreted as the city Goal to remove the
Development supporting a mandatory minimum wage word shall and replace
with encourage or use
an alternative term
other than living wage.
4-26-22 Chapter 7 – Policy 3 – ensuring adequate supply of land for Consider updating to
Workshop Economic new and expanding commercial and industrial reflect current realities
Development development may be out dated with the limited
amount of land remaining in the City
4-26-22 Chapter 7 - Policy 1 – Question about if the City really want Consider updating to
Workshop Economic to be spending a lot of resources attracting reflect current priorities
Development specific businesses?
CHAPTER 7 Local economic development is achieved when a
community’s standard of living can be preserved
ECONOMIC and increased through a process of human and
physical development that is based on principles
DEVELOPMENT ofAll broadly shared prosperity and sustainability.
Oakdale residents of any age, race, ethnicity,
physical or mental ability should have the
opportunity for a good quality of life and personal
wellbeing. A good quality of life includes access to
living-wage jobs, which are jobs that pay enough
to support a basic needs budget for food, housing,
child care, health care, transportation, personal
necessities, retirement, and higher education
needs. Furthermore, a good quality of life includes
the availability, accessibility, and affordability of
high quality public goods and services such as
public safety, parks and recreation, education,
transportation options, neighborhoods, and health
and human services. Pursuing this vision of
economic development requires the sustainable use
and preservation of the City’s natural resources and
quality of life.
Economic Development 61
GOAL 1
Living wage jobs shall be maintained and increased to provide
employment opportunities and a continually improving quality of
life for all residents.
POLICIES:
1. Administer a 2. Administer a 3. Ensure an adequate 4. In partnership with
program to attract new program to retain and supply of land for public and private
businesses to Oakdale. assist in the expansion new and expanding stakeholders, support
of existing Oakdale commercial and those wishing to start
businesses. industrial development. a new business in
Oakdale.
GOAL 2
The local economic environment shall provide business and
labor with the supports necessary to be successful and ensure
continued employment opportunities for all residents.
POLICIES:
1. Support the success 2. Provide business 3. Partner with the 4. Plan for the
of business and financing options MN Department development and
labor by connecting to support the of Employment integration of transit
them to resources at maintenance and and Economic service, affordable
the MN Department upgrading of existing Development (DEED) daycare, housing
of Employment commercial and and the Washington options that reflect the
and Economic industrial buildings County Workforce wages paid by Oakdale
Development (DEED) and increase the Center to respond businesses and other
and other State, sustainability of to firm closures supports required to
County, and Federal business operations. or contractions to ensure the success of
agencies. assist dislocated business and labor.
workers transition
to new employment
opportunities.
62 Economic Development
GOAL 3 GOAL 4
The local economy and The number of Oakdale
employment base shall be residents who struggle the
diverse so as to ensure the most in securing employment
continued employment for all that provides a minimum
residents. standard of living shall be
POLICIES:
reduced.
1. Market the City to attract and retain POLICIES:
businesses that complement and diversify the
economic base. 1. Work in partnership with other public
and private stakeholders to ensure
2. Promote the expansion of business-to- employment opportunities for those with the
business sales in the local economy to increase greatest challenges to securing living wage
job opportunities for residents. employment to include, but not limited to
unemployed, disabled, and those moving
toward greater self-sufficiency.
2. Continue the administration of the Oakdale
First policy that requires businesses receiving
City financial assistance to give priority to
Oakdale residents when hiring, especially
those who are unemployed, moving toward
greater self-sufficiency, disabled, or those who
are otherwise looking for work.
Economic Development 63
COUNCIL MEMORANDUM
To: Honorable Mayor and City Council
From: Kathy Laur, City Clerk
Date: May 24, 2022
Subject: Summerfest Update
BACKGROUND
At the March 22, 2022 Workshop, the council was given an update on plans for the city’s annual
Summerfest event. Since that date, there have been updates to the following:
Parade – The application deadline to participate in the parade is May 24. Thirty-nine units have applied
so far. Staff is secure that having enough parade participants will not be a problem.
Reminder: Our parade will be “competing” with two other parades that day: South St. Paul Kaposia Days
and Columbia Heights Jamboree.
OACC Pancake Breakfast – Will be held Saturday morning from 9–11:30 am at Guardian Angels
Church.
BINGO – Jeff Koesling is still working on finding an organization to run it.
Beer Tent – The Lions Club applied for a liquor license so they are set.
K9 Demonstration – Saturday from 2-2:30 PM.
Food Vendors – Food vendor applications were mailed out and there are 11 confirmed so far. There are
three non-food vendors we are waiting to hear back from. The deadline is May 24.
Pony Rides –Lea Neamy, who conducted the pony rides in the past, contacted staff and asked to be
added to Summerfest again. The ponies will be on Saturday afternoon and will cost $5.00 a ride.
Skateboard Contest – Saturday, 11 AM registration and 12 PM start.
5k Run/Walk – People have already begun to sign up.
ITS Truck – Will provide jumbo yard games, a gaming system, wearable bumper balls and more.
Basketball at the Courts – The Tartan basketball team will hold a skills/drills event for kids and will hold
a game between the Tartan Boys team vs Tartan alumni. More details to follow.
Fireworks – The contract has been signed. Fireworks begins at 10 PM Saturday night.
Music – The performance agreements have been signed for The Jolly Pops, Stuck in the Middle and the
Rockin’ Hollywoods.
OACC Medallion Hunt - $500 prize
Emergency Action Plan – Nick is on top of that.
Grand Marshal –Retired Fire Chief Jeff Anderson and his wife Kay will be our Grand Marshals this year.
We are working on a vehicle for them to ride in.
Additional Information – Staff will have more updates at the Council workshop as the Summerfest
Committee met today.
FINANCIAL CONSIDERATIONS
The following expenses are what we know for sure at this time.
Beginning Budget $33,000
Fireworks - 11,000
Music - 6,500
Children’s Entertainment - 1,300
Parade Units - 3,600
ITS Truck staff - 600
TOTAL AFTER EXPENSES $10,000
Projected expenses to come
5k $ 2,150
Skateboard Contest - 500
Candy - 430
TOTAL AFTER EXPENSES $ 6,890
Parade Unites that paid us to participate $ + 675
Skateboard Contest Sponsorship + 500
REMAINING FUNDS $ 8,065
The next Summerfest Committee meeting will be held on Thursday, May 26, from 2-3:30 PM.
COUNCIL MEMORANDUM
To: Honorable Mayor and City Council
From: Brian Bachmeier, Interim City Engineer
Date: May 24, 2022
Subject: Sanitary Sewer Capacity Study
BACKGROUND
In early March a sewer capacity study was initiated to evaluate impacts due to several high-density
developments being considered simultaneously in the Oakdale Station, Oakdale Market Place (east of I-694
and south of CSAH 14), and 4Front Development (east of I-694 & north of CSAH 14) areas.
SOUTH OF CSAH 14
The study area south of CSAH 14 evaluated both pipe size and lift station capacity as the area is served by
the lift station at the corner of Ideal & Stillwater Boulevard. The study concluded there is sufficient pipe size,
however the additional density uses up more than half of the reserve capacity of the lift station. Since they
are using up available capacity, it raises the question “should they have to pay for that capacity similar to the
City of Lake Elmo”? Lake Elmo’s share of the lift station is $450,000 for 300 gal/min capacity or
$1,500/gal/min capacity. The high-density developments increase the flow to the lift station by 128 gal/min
which results in a $192,000 equivalent charge for 637 residential units or $300/unit Sewer Availability
Charge (SAC) surcharge per residential unit. This would recover a little under ½ of the local cost increase
associated with the bid award to reconstruct the lift station ($410,000).
NORTH OF CSAH 14
The study area north of CSAH 14 evaluated the capacity of the sanitary sewer pipe that runs from High
Pointe Boulevard to Hadley Avenue. The study concludes the capacity of the pipe matches the projected
flows from the area based on the land uses identified in the current comprehensive plan. Any residential
development that is not offset by an equivalent reduction in office/commercial land uses will exceed the pipe
capacity that serves the area. If residential development is pursued that is not offset the 8” diameter pipe
would have to be replaced with a 10” diameter pipe. The estimated cost to replace the pipe could exceed
$1,000,000. A 10” sewer pipe has the capacity to serve 625 residential units. Dividing the cost to replace the
pipe with the total number of residential units results in a $1,600/unit SAC surcharge.
The ultimate development schedule and density in the 4Front area is still evolving. This increases the level of
uncertainty for the city to recover the costs to install a larger sanitary sewer pipe through a SAC surcharge.
To reduce the City’s level of risk another option would be for the developer to either install the pipe or
petition the City and have the total cost assessed to their property.
COUNCIL DIRECTION REQUESTED
It is recommended the council advise staff if they support allowing high-density developments in either of
these areas due to this information.
It is recommended the council advise staff if the SAC surcharge should be established to recover sewer
capacity funds used to accommodate the increased land-use density for the Oakdale Market Place and Station
area south of CSAH 14.
It is recommended the council advise staff if the developer should be required to install a larger sewer pipe or
if the SAC surcharge or special assessments should be used to recover the city’s funds to accommodate the
increased land-use density for the 4Front area north of CSAH 14.
Attachment
SEH Memorandum - CR 14 Area Sanitary Sewer System Capacity Study
MEMORANDUM
TO: Christina Volkers, Oakdale City Administrator
Andrew Gitzlaff, Oakdale Community Development Director
Brian Bachmeier, Oakdale City Engineer
FROM: Todd M. Blank, PE, Principal
DATE: May 2, 2022
RE: CR 14 Area Sanitary Sewer System Capacity Study
SEH No. OAKDA 166968 14.00
In response to proposed development requests, the City of Oakdale requested a review and capacity
analysis of the sanitary sewer system adjacent to County Road 14 (34th Street North) and east of I-
694. This includes the 4Front, Oakdale Station and Oakdale Marketplace developments.
Requests have been made for high density residential housing development which will significantly
increase sanitary sewer flows beyond what was planned for in the Sewer Plan within the City’s 2040
Comprehensive Plan. This memorandum addresses the impacts to the City’s downstream sanitary sewer
system, including lift station 6, from requested increased flows from this proposed change in
development.
The area south of 34th Street North includes the Oakdale Station and Oakdale Marketplace existing and
proposed development and is identified as City Sewer District 8. This area is shown on the attached
Figure 1.
The area north of 34th Street North includes the 4Front proposed development and is identified as City
Sewer District 10. This area is shown on the attached Figure 2.
The Flow Path Diagram from the Oakdale 2040 Sanitary Service Comprehensive Plan is shown on the
attached Figure 3, and the City sanitary sewer system map is shown on the attached Figure 4.
The City’s existing and proposed sanitary flows from the City’s 2040 Sanitary Service Comprehensive
Plan were reviewed, and then projected flows were calculated based on the proposed development
information and on recent City water use records. The existing downstream sanitary sewer system was
then reviewed to determine if there is adequate capacity for these proposed land use changes.
CONCLUSIONS AND RECOMMENDATIONS
CONCLUSIONS
• The undeveloped parcels in Sewer Districts 8 and 10 are currently planned for non-residential
use.
• Changing the proposed use to residential development significantly affects the sewage flow as
there would be more water use and the peak sewer flow would be greater.
Engineers | Architects | Planners | Scientists
Short Elliott Hendrickson Inc., 3535 Vadnais Center Drive, St. Paul, MN 55110-3507
SEH is 100% employee-owned | sehinc.com | 651.490.2000 | 800.325.2055 | 888.908.8166 fax
Memorandum
Sanitary Sewer System Capacity Study
Page 2
• There is adequate capacity in Sewer District 8 south of 34th Street N to serve the potential
changes to residential use.
• There is not adequate capacity in Sewer District 10 north of 34th Street N to serve any of the
potential changes to residential use. To provide adequate capacity, the existing 8-inch diameter
sewer pipe must be replaced with a 10-inch diameter pipe all the way west to Hadley Avenue
including the portion under I-694.
• If Sewer District 8 (south of 34th Street N) develops with four parcels changed to residential use
with 637 units, then the projected sewer flows will be 128 GPM more than planned. This is a 67%
increase.
• The existing sewer system in District 8 will handle this flow. The proposed improved lift station 6
will also handle this flow, although it will use up 64% of the station’s 200 GPM reserve capacity.
• Lift Station 6 currently has a peak flow capacity reserve of 200 Gallons per Minute (GPM).
• If Sewer District 10 (north of 34th Street N) develops with four parcels changed to residential use
with 625 units, then the projected sewer flows will be 204 GPM more than planned. This is a 74%
increase.
• The existing sewer system in District 10 will be significantly over the full pipe flow capacity. It is
possible to operate the sewer with some peak flows at a point slightly over the top of this 8-inch
diameter sewer pipe, but to handle the projected increased residential flow, the peak flow would
be several feet above the top of pipe and would reach ground surface.
• Replacing this 8-inch sewer line with a 10-inch line will provide adequate capacity for the potential
increased residential use. This pipe replacement would likely cost approximately $1,000,000.
• This pipe replacement cost could vary significantly and this should be reviewed further with
MnDOT prior to any replacement plan preparation. Record plans show the pipe is within a steel
casing pipe under I-694, a horizontal alignment problem occurred, two additional larger diameter
casings and a small 12-inch casing encased in concrete were used, and it is not clear if a new 10-
inch pipe can be installed. A new casing pipe may need to be installed.
• The proposed additional flows show that the furthest downstream gravity sewer areas at the
south end of the City (District 15 and 17) may be at or would be slightly over capacity. The
original flow peaking factors appears they may be overly conservative. Using different peaking
factors based on standard flow diagrams, and peaking only residential flow, does not show
significant flow concerns.
RECOMMENDATIONS
• The City of Oakdale staff should review this memo, the proposed land use changes, and the
effect on the existing sanitary sewer system to determine which land use changes are
acceptable.
• Potential cost recovery procedures should be reviewed if lift station 6 reserve capacity is
allocated to Sewer District 8.
• Further review should be done on potentially replacing the existing 8-inch diameter sewer pipe
serving District 10 with a 10-inch diameter pipe. This should be done by the Developer and
include a detailed cost estimate and potential cost recovery procedures for consideration by the
City.
SEWER DISTRICT 8 FLOWS & CAPACITY
Background
Sewer District 8 is located south of 34th Street North, and is partially developed and includes
undeveloped Oakdale Station and Oakdale Marketplace parcels that were planned for commercial/office
use. The developers have requested that some of these parcels be developed with high density
residential development. Currently this has been requested for two parcels, but for this analysis four
parcels were considered high density residential to determine the impact to the worst-case impact to the
existing sewer system.
Memorandum
Sanitary Sewer System Capacity Study
Page 3
This area flows southerly through a 10-inch diameter pipe to lift station 6 located at Helmo Avenue and
Stillwater Boulevard. This pumping station is currently proposed for reconstruction this year to increase
capacity and replace equipment at the end of its useful life. This then flows westerly to the same larger
pipe system on Hadley Avenue.
Projected Flows
The sewer study assumes 310 residential units on parcel A and150 units on parcel B.. For analysis
purposes, additional residential development of 27 units on parcel C and 150 units on parcel D were also
considered for a total of 637 residential units.
The City’s 2040 Comprehensive Sewer Plan flows were also used as a basis, existing recent water use
records were used for the developed parcels E-N, and the project flows were calculated. The total
Comprehensive Plan peak projected flow from this area north of the railroad tracks is 146 GPM. The
existing 10-inch sewer pipe serving this area has a capacity flowing full of 450 GPM so there is adequate
pipe capacity if developed in accordance with the Comprehensive Plan.
The increased flow from this potential residential development over the current proposed
commercial/office use planned is significant due to the increased water use and the higher peak flows for
residential use. If all four parcels were developed as indicated above, with 637 residential units, the total
peak projected flow is 319 GPM which is 70% of the full pipe capacity. This is 173 GPM over the
projected Comprehensive Sewer Plan flows. Recent water use records for the developed parcels show
that there is 45 GPM less peak flow than the Comprehensive Plan flow. If this flow is subtracted then the
projected peak flow is 128 GPM over the Comprehensive Plan projected peak flow from this area.
Lift Station 6 serving Sewer District 8 currently has a capacity of 898 GPM according to the City’s 2040
Sanitary Service Comprehensive Plan. It is planned to be reconstructed this year to an increased
capacity of 1200 GPM. The existing planned flow to this lift station is 688 GPM plus 300 GPM allocated
to the City of Lake Elmo for a total planned flow of 988 GPM. After reconstruction, there will be
approximately 200 GPM of reserve capacity. The potential increased residential flow would use up to
64% of lift station 6’s reserve capacity.
SEWER DISTRICT 10 FLOWS & CAPACITY
Background
Sewer District 10 is located north of 34th Avenue North and includes the partially developed 4Front office
complex and undeveloped parcels that were planned for Business Campus use (commercial/office). The
developer has requested that some of these parcels be developed with high density residential
development. Currently this has been requested for one parcel and the owner has indicated that future
parcels may also include residential. For this analysis up to four parcels were considered high density
residential to determine the impact to the existing sewer system.
This area flows westerly under I-694 through an 8-inch diameter pipe to a larger 12-inch sewer system on
Hadley Avenue. Potentially diverting this flow to the north would create the need for it to be pumped
through an additional lift station and is not recommended for operational purposes. The existing sewer
plans are shown on the attached Figures 5-7.
Projected Flows
The 4Front developer has requested 175 residential units in addition to commercial development on
parcel C. A potential request for 150 residential units on parcel D may also be made. For analysis
purposes, additional residential development of 150 units on parcel B and 150 units on parcel G were
also considered for a total of 625 residential units.
Memorandum
Sanitary Sewer System Capacity Study
Page 4
The City’s 2040 Comprehensive Sewer Plan flows were used as a basis, existing recent water use
records were used for the developed parcels H, I and J, and the project flows were calculated. The total
Comprehensive Plan peak projected flow from this area is 287 Gallons per Minute (GPM). The existing 8-
inch sewer pipe serving this area has a capacity flowing full of 282 GPM so the area would be at full pipe
capacity if developed in accordance with the Comprehensive Plan. Additional flows will cause the pipe to
back up and sewage levels to rise in the system manholes.
The increased flow of this residential development over the current proposed commercial/office use
planned is significant due to the increased water use and the higher peak flows for residential use. There
is not adequate capacity to handle even one parcel of this proposed residential flow. If all four parcels
were developed as indicated above, with 625 residential units, the total peak projected flow is 479 GPM,
or 170% of the full pipe capacity. This is 192 GPM over the projected Comprehensive Sewer Plan flows.
Recent water use records for the developed parcels show that there is 15 GPM more peak flow. If this
flow is added then the projected peak flow is 207 GPM over the projected peak flow from this area.
Sewer Pipe Replacement
The existing 8-inch diameter sewer pipe serving District 10 is at full capacity with existing projected flows.
It is possible to operate the sewer with some peak flows at a point slightly over the top of this 8-inch
diameter sewer pipe, but to handle the projected increased residential flow, the peak flow would be
several feet above the top of pipe and would reach ground surface which is not acceptable.
If the existing 8-inch pipe is replaced with a 10-inch pipe, then there would be capacity to support the
additional residential flows in this area. By just replacing the portion from I-694 to Hadley, there is not
enough capacity to prevent the pipe from surcharging to ground surface.
Hydraulic modeling was performed for this sewer line with various flows. Summary results of this are
shown in the attached Figures 11-14.
The 8-inch sewer pipe from Hadley Avenue to the proposed 4Front sewer connection is approximately
2700 lineal feet. Using general costs per foot for typical sanitary sewer improvements, it would likely cost
about $1,000,000 to replace this with a 10-inch sewer. There is significant risk in replacing this pipe due
to unknow conditions under I-694. The record plans show that under the west edge of the bridge there
are two additional larger pipe casings installed at angles and encased in concrete. It is not clear why this
was done, or if it is even possible to reuse the existing casing pipes.
DOWNSTREAM SEWER CAPACITY
As shown in Figure 1, Sewer Districts 8 and 10 flow downstream to Districts 11, 7, 12, 15 and 17 where
flows leave the City and enter the Met Council sewer system. Districts 8 and 12 are pumped downstream
through lift stations and the rest of the downstream system flows by gravity.
Without any proposed residential flow from Districts 8 and 10, and using the City’s 2040 Sanitary Service
Comprehensive Plan peak flows, the sewer system will be slightly over capacity in District 15 (by 4%) and
at capacity in district 17.
With proposed residential flow from Districts 8 and 10, the sewer system will be over capacity in District
15 (by 13%) and over capacity in District 17 (by 8%).
In District 15, the peaking factor used in the Comprehensive Plan calculations is 3.0 which is a
conservative figure. The Ten States Standards peaking factor based on this district is 2.6. Using a 2.6
peaking factor, the peak flow for this district with the proposed residential flow is then under capacity.
In District 17, the peaking factor appears correct based on flows, but was applied conservatively to all
flows upstream. The flows to this location represent most of the City which includes 0.48MGD of non-
residential flow that had a peaking factor applied. It is common to not apply a peaking factor for non-
Memorandum
Sanitary Sewer System Capacity Study
Page 5
residential flows as there is not a morning and evening peak flow time due to domestic activities. If
conservatively half of the non-residential flow is assumed to be in this district, and no peaking factor is
applied to it, then the total flow is slightly over capacity (by 4%) with the proposed residential flow which is
not significant.
tmb
Attachments:
Figure 1 – City Sewer Flow Diagram
Figure 2 – Sewer District 8 Map
Figure 3 – Sewer District 10 Map
Figure 4 – City of Oakdale Sanitary Sewer System Map
Figures 5-7 – Existing District 10 sewer plans.
Figures 8-10 – Projected Sewage Flow Calculations
Figures 11-14 – Hydraulic Modeling Results
x:\ko\o\oakda\166968\4-prelim-dsgn-rpts\memo\oakdale sanitary sewer capacity study 5-11-22.doc
Oakdale Sanitary Service District flow path diagram
Figure 1
WASTEWATER
Water Resources Wastewater
1
3 18
2
4
19
5
6 Sanitary Sewer Flow
11 10 Sanitary Sewer Districts
City & Private Sanitary Sewer
Force Main
MCES Interceptor Sewer
Lift Station
Lake Elmo Service Area
7
North St. Paul Service Area
New Growth Connection Points
NOTES
8 1. Sanitary districts are numbered 1 through 20.
9 2. A number of existing sanitary sewers outflow into
neighboring communities. These areas are labeled with
20
a letter designating the community that receives the
outflow. The letter designations are as follows:
12 (M) Maplewood
(LE) Lake Elmo
3. The city’s sanitary sewer system also receives inflow
from neighboring communities. These areas are
designated with an on the map. The letter designations
(M) 20 detailed above have been used to identify areas that are
generating the inflow.
14
15
(M)
13
17
16
(LE)
(M)
Water
CITY OF OAKDALE
FIGURE 4
41
FIGURE 5
PROPOSED 4FRONT SAN. SEWER
FIGURE 6
FIGURE 7
Sewer Flow Calculations‐Comp Plan with Water Use Records
Available Available Available Available
Comp Plan Comp Plan Water Water Use Water Use
Proposed Comp Plan Proposed Avg. Peak Records Avg. Peak
Plat Current/Comp Comm/Ind/O Proposed Avg. Flow Avg. Flow Capacity Capacity Avg. Flow Capacity Capacity
Property ID PIN No. Property Address Property Owner GIS Area (Ac.) Area(Ac.) Plan Land Use ff Acres Res units (Gal/Day) (Gal/Day) (Gal/Day) (Gal/Min) (Gal/Day) (Gal/Day) (Gal/Min)
District 8
A 1702921340040 0 DPS‐OAKDALE LLC 16.02 Commercial 16.02 20826 20826 0 43.4 20826 43.4
B 1702921420013 0 OAKDALE MARKETPLACE OVA LLC 4.39 Commercial 4.39 5707 5707 0 11.9 5707 11.9
C 1702921430051 0 OAKDALE MARKETPLACE OVA LLC 1.46 Commercial 1.46 1898 1898 0 4.0 1898 4.0
D 1702921410011 0 OAKDALE MARKETPLACE OVA LLC 7.54 Commercial 7.54 9802 9802 0 0.0 9802 0.0
E 1702921310011 7360 33rd St. N 55128 Oakdale, MN COLE LA OAKDALE MN LLC 4.59 Commercial 5967 5967 0 0 4550 1417 3.0
F 1702921310012 7400 33rd St. N. 55128 Oakdale, MN MSP/OAKDALE STATION LLC 1.64 Commercial 2132 2132 0 0 55 2077 4.3
G 1702921420008 7520 32nd St. N 55128 Oakdale, MN SCF RC FUNDING IV LLC 4.49 Commercial 5837 5837 0 0 1365 4472 9.3
H 1702921420012 7560 33rd St. N 55128 Oakdale, MN AUTOZONE PARTS INC 2.26 Commercial 2938 2938 0 0 50 2888 6.0
I 1702921420010 7560 33rd St. N 55128 Oakdale, MN LCN NTI MULTI (MN) LLC 1.65 Commercial 2145 2145 0 0 11320 ‐9175 ‐19.1
J 1702921410010 7830 33rd St. N 55128 Oakdale, MN MCDONALD'S USA LLC 1.03 Commercial 1339 1339 0 0 1055 284 0.6
K 1702921410009 7860 33rd St N 55128 Oakdale, MN TRUSTONE FINANCIAL FED CREDIT UNION 1.22 Commercial 1586 1586 0 0 1586 0 0.0
L 1702921410007 7900 32nd St. N. 55128 Oakdale, MN TARGET CORPORATION 14.84 Commercial 19292 19292 0 0 6140 13152 27.4 3.8 Ac outlots undeveloped
M 1702921440046 3240 Ideal Ave N 55128 Oakdale, MN IDEAL LOCATIONS LLC 4.38 Res/Commercial 5694 5694 0 0 5694 0 0
N 1702921430053 7511 32nd St. N 55128 Oakdale, MN RALEIGH PATRICK A & MICHELLE 4.93 Industrial 6409 6409 0 0 50 6359 13.2
70.4 0 91572 91572 0 59 59707 104
Proposed peak flow based on water
use & proposed development
(Gal/Min) = 146
Existing 10" Sanitary Sewer at 0.22% = 450 Gal/Min capacity
Lift Station 6 peak capacity =1200 Gal/Min‐688 comp plan‐300 Lake Elmo = 200 Gal/Min reserve capacity
(Flows based on Comp Plan peak factor of 3.0 for non‐res and 4.0 for res)
District 10
A 1702921240011 0 LARSON FAMILY REAL ESTATE LLLP 25.82 23.6 Comm/Ind 25.82 33566 33566 0 0.0 0.0 Prop flow from sewer permit
B 1702921310007 0 LARSON FAMILY REAL ESTATE LLLP 9.2 8.3 Comm/Ind 9.2 11960 11960 0 0.0 0.0
C 1702921420003 0 LARSON FAMILY REAL ESTATE LLLP 8.61 8.4 Comm/Ind 8.61 11193 11193 0 0.0 0.0
D 1702921130006 0 LARSON FAMILY REAL ESTATE LLLP 9.89 9.8 Comm/Ind 9.89 12857 12857 0 0.0 0.0
E 1702921310008 0 LARSON FAMILY REAL ESTATE LLLP 0.56 Comm/Ind 0.56 728 728 0 0.0 0.0
F 1702921410004 0 LARSON FAMILY REAL ESTATE LLLP 10.93 Comm/Ind 10.93 14209 14209 0 0.0 0.0
G 1702921140004 0 LARSON FAMILY REAL ESTATE LLLP 6.7 Comm/Ind 6.7 8710 8710 0 0.0 0.0
H 1702921130004 3503 Highpoint Dr. N 55128 Oakdale, MN LARSON FAMILY REAL ESTATE LLLP 18.87 Office 24531 24531 0 0.0 27119 ‐2588 ‐5.4 Jan 21‐Feb 22 records
I 1702921130005 3503 Highpoint Dr. N 55128 Oakdale, MN LARSON FAMILY REAL ESTATE LLLP 8.26 Office 10738 10738 0 0.0 11871 ‐1133 ‐2.4 Jan 21‐Feb 22 records
J 1702921140005 3510 Hopkins PL. N 55128 Oakdale, MN LARSON FAMILY REAL ESTATE LLLP 22.81 Office 29653 29653 0 0.0 32781 ‐3128 ‐6.5 Jan 21‐Feb 22 records
121.7 50.1 0 158145 158145 0 0.0 ‐6848 ‐14
Proposed peak flow based on water
use & proposed development
(Gal/Min) = 286.4
Existing 8" Sanitary Sewer at 0.27% = 282 Gal/Min capacity
(Flows based on Comp Plan peak factor of 2.5 for non‐res and 4.0 for res)
FIGURE 8
Sewer Flow Calculations‐with Full Residential Development
Available Available Available Available
Comp Plan Comp Plan Water Water Use Water Use
Proposed Comp Plan Proposed Avg. Peak Records Avg. Peak
Plat Current/Comp Comm/Ind/O Proposed Avg. Flow Avg. Flow Capacity Capacity Avg. Flow Capacity Capacity
Property ID PIN No. Property Address Property Owner GIS Area (Ac.) Area(Ac.) Plan Land Use ff Acres Res units (Gal/Day) (Gal/Day) (Gal/Day) (Gal/Min) (Gal/Day) (Gal/Day) (Gal/Min)
District 8
A 1702921340040 0 DPS‐OAKDALE LLC 16.02 Commercial 310 20826 43013 ‐22187 ‐76.1 20826 ‐76.1
B 1702921420013 0 OAKDALE MARKETPLACE OVA LLC 4.39 Commercial 150 5707 20813 ‐15106 ‐45.9 5707 ‐45.9
C 1702921430051 0 OAKDALE MARKETPLACE OVA LLC 1.46 Commercial 27 1898 3746 ‐1848 ‐6.5 1898 ‐6.5
D 1702921410011 0 OAKDALE MARKETPLACE OVA LLC 7.54 Commercial 2.5 150 9802 24063 ‐14261 ‐44.2 9802 ‐44.2
E 1702921310011 7360 33rd St. N 55128 Oakdale, MN COLE LA OAKDALE MN LLC 4.59 Commercial 5967 5967 0 0 4550 1417 3.0
F 1702921310012 7400 33rd St. N. 55128 Oakdale, MN MSP/OAKDALE STATION LLC 1.64 Commercial 2132 2132 0 0 55 2077 4.3
G 1702921420008 7520 32nd St. N 55128 Oakdale, MN SCF RC FUNDING IV LLC 4.49 Commercial 5837 5837 0 0 1365 4472 9.3
H 1702921420012 7560 33rd St. N 55128 Oakdale, MN AUTOZONE PARTS INC 2.26 Commercial 2938 2938 0 0 50 2888 6.0
I 1702921420010 7560 33rd St. N 55128 Oakdale, MN LCN NTI MULTI (MN) LLC 1.65 Commercial 2145 2145 0 0 11320 ‐9175 ‐19.1
J 1702921410010 7830 33rd St. N 55128 Oakdale, MN MCDONALD'S USA LLC 1.03 Commercial 1339 1339 0 0 1055 284 0.6
K 1702921410009 7860 33rd St N 55128 Oakdale, MN TRUSTONE FINANCIAL FED CREDIT UNION 1.22 Commercial 1586 1586 0 0 1586 0 0.0
L 1702921410007 7900 32nd St. N. 55128 Oakdale, MN TARGET CORPORATION 14.84 Commercial 19292 19292 0 0 6140 13152 27.4 3.8 Ac outlots undeveloped
M 1702921440046 3240 Ideal Ave N 55128 Oakdale, MN IDEAL LOCATIONS LLC 4.38 Res/Commercial 5694 5694 0 0 5694 0 0
N 1702921430053 7511 32nd St. N 55128 Oakdale, MN RALEIGH PATRICK A & MICHELLE 4.93 Industrial 6409 6409 0 0 50 6359 13.2
70.4 637 91572 144973 ‐53401 ‐173 59707 ‐128
Proposed peak flow based on water
use & proposed development
(Gal/Min) = 319
Existing 10" Sanitary Sewer at 0.22% = 450 Gal/Min capacity
Lift Station 6 peak capacity =1200 Gal/Min‐688 comp plan‐300 Lake Elmo = 200 Gal/Min reserve capacity
(Flows based on Comp Plan peak factor of 3.0 for non‐res and 4.0 for res)
District 10
A 1702921240011 0 LARSON FAMILY REAL ESTATE LLLP 25.82 23.6 Comm/Ind 23.6 33566 30680 2886 5.0 5.0 Prop flow from sewer permit
B 1702921310007 0 LARSON FAMILY REAL ESTATE LLLP 9.2 8.3 Comm/Ind 4 150 11960 26013 ‐14053 ‐46.1 ‐46.1
C 1702921420003 0 LARSON FAMILY REAL ESTATE LLLP 8.61 8.4 Comm/Ind 8.4 175 11193 35201 ‐24008 ‐67.0 ‐67.0
D 1702921130006 0 LARSON FAMILY REAL ESTATE LLLP 9.89 9.8 Comm/Ind 150 12857 20813 ‐7956 ‐35.5 ‐35.5
E 1702921310008 0 LARSON FAMILY REAL ESTATE LLLP 0.56 Comm/Ind 0.56 728 728 0 0.0 0.0
F 1702921410004 0 LARSON FAMILY REAL ESTATE LLLP 10.93 Comm/Ind 10.93 14209 14209 0 0.0 0.0
G 1702921140004 0 LARSON FAMILY REAL ESTATE LLLP 6.7 Comm/Ind 2.7 150 8710 24323 ‐15613 ‐48.8 ‐48.8
H 1702921130004 3503 Highpoint Dr. N 55128 Oakdale, MN LARSON FAMILY REAL ESTATE LLLP 18.87 Office 24531 24531 0 0.0 27119 ‐2588 ‐5.4 Jan 21‐Feb 22 records
I 1702921130005 3503 Highpoint Dr. N 55128 Oakdale, MN LARSON FAMILY REAL ESTATE LLLP 8.26 Office 10738 10738 0 0.0 11871 ‐1133 ‐2.4 Jan 21‐Feb 22 records
J 1702921140005 3510 Hopkins PL. N 55128 Oakdale, MN LARSON FAMILY REAL ESTATE LLLP 22.81 Office 29653 29653 0 0.0 32781 ‐3128 ‐6.5 Jan 21‐Feb 22 records
121.7 50.1 625 158145 216888 ‐58743 ‐192.3 ‐6848 ‐207
Proposed peak flow based on water
use & proposed development
(Gal/Min) = 478.8
Existing 8" Sanitary Sewer at 0.27% = 282 Gal/Min capacity
(Flows based on Comp Plan peak factor of 2.5 for non‐res and 4.0 for res)
FIGURE 9
Comprehensive Sewer Plan Flows with Proposed Residential in 8 & 10
Exist. Peak LS or Pipe Existing + Prop Res Proposed Proposed
Ultimate 2040 Sewer Ultimate Cumulative Ultimate Cumulative Peaking Flow Capacity Capacity Peak Flow Peak Flow Capacity
Sewer District** Flows (MGD) Flow Thru District (MGD) Flow Thur District (CFS) Factor CFS CFS CFS CFS CFS CFS Notes
Sewer District 7 0.060 2.074 3.209 2.5 8.72 13.20 4.48 9.15 4.05
Sewer District 8 0.330 0.330 0.511 3.0 2.23 2.64 0.41 0.281 2.514 0.13 300 GPM from Lake Elmo included, res peak = 4
Sewer District 9 0.141 0.472 0.730 3.0 3.17 3.78 0.61 3.451 0.33
Sewer District 10 0.084 0.084 0.130 2.5 1.06 0.62 -0.44 0.455 1.514 -0.89 Res peak = 4
Sewer District 11 0.161 0.717 1.109 3.0 4.03 4.08 0.05 4.54 -0.46 18"@0.15%=4.1cfs, about 11% over cap. OK if slight surcharge.
Sewer District 12 0.188 2.263 3.501 3.0 11.20 13.2 2.00 11.72 1.48
Sewer District 15 0.596 3.136 4.852 3.0 15.26 14.00 -1.26 15.77 -1.77 About 13% over cap. Ok if slight surcharge
30"@0.11%=14.0 cfs
15 with diff. PF 2.6 13.32 14.00 0.68 13.76 0.24 OK with 10-States Peaking Factor
Sewer District 17 0.244 3.612 5.588 2.5 14.67 14.00 -0.67 15.10 -1.10 About 8% over cap. OK if slight surcharge
17 with diff. PF 2.4 14.09 14.00 -0.09 14.50 -0.50 About 4% over cap if non res flow not peaked
FIGURE 10
HGL Profile for Scenario 1
(Existing Projected Flows)
Assumptions:
Fixed outlet - 1 foot above downstream invert
Manning's N: 0.013 Approximate width of 694 highway and
Flow: 286 gpm (0.412 MGD) road ramps
Existing Development Flow
Existing 8" alignment
FIGURE 11
HGL Profile for Scenario 2
(+175 Res Unit Projected Flows)
Assumptions:
Fixed outlet - 1 foot above downstream invert
Manning's N: 0.013 Approximate width of 694 highway and
Flow: 353 gpm (0.508 MGD) road ramps
Existing Development Flow
+ 1 Residential parcel
Existing 8" Alignment
FIGURE 12
HGL Profile for Scenario 3
(+625 Res Unit Project Flows-10" West End Only)
Assumptions:
Fixed outlet - 1 foot above downstream invert
Manning's N: 0.013 Approximate width of 694 highway and
Flow: 480 gpm (0.691 MGD) road ramps
Full Development
Existing 8" Alignment Upsize to 10"
FIGURE 13
HGL Profile for Scenario 4
(+625 Res Unit Project Flows-10" Entire Run)
Assumptions:
Fixed outlet - 1 foot above downstream invert
Manning's N: 0.013 Approximate width of 694 highway and
Flow: 480 gpm (0.691 MGD) road ramps
Full Development
Upsize entire alignment to 10"
FIGURE 14
COUNCIL MEMORANDUM
To: Honorable Mayor and City Council
From: Christina M. Volkers, City Administrator
Date: May 24, 2022
Subject: Body Worn Camera Update
BACKGROUND
The Police Department recently completed field-testing of four different body worn camera systems.
The testing process included a committee of several officers who deployed the four different body worn
camera systems in the field. The committee narrowed down the selection to two different vendors that
could provide the body worn camera system that would meet the needs and expectations of our
community and police department.
Sergeant Ryan Stuart headed the body worn camera committee and he will be providing a short
presentation on the findings. Chief Nick Newton will discuss the next steps for the body worn camera
process, to include: legal steps, policy development, and funding options.
FINANCIAL CONSIDERATIONS
The Axon body worn camera system would cost approximately $89,000 annually, or $445,000 for the
five-year agreement. The WatchGuard system would cost approximately $56,000 annually, or
$280,000 for the five-year agreement. The police department will seek a state grant to assist with
funding for the first year, and potentially the second year. However, if the state grant is not secured, the
police department intends to use forfeiture funds to cover the first two years of the agreement. In
either scenario, the police department would have the remaining agreement years adopted into our
operations budget starting in 2025.
STAFF RECOMMENDATION
Continue to next steps of following legal guidelines and identifying the funding source prior to seeking
council approval.
COUNCIL DIRECTION REQUESTED
Staff would like to solicit feedback from the council to help guide the direction of the remaining steps in
the process. The Police Department’s desired body worn camera implementation date is the first
quarter of 2023.
Attachment
Presentation - Overview of Body Worn Cameras
Body Worn Cameras
May 2022
Body Worn Camera
• Presentation by Sergeant Ryan Stuart
• Overview of four body worn camera (BWC) systems tested by staff.
• Selection of two BWC for consideration.
Legal Steps
Implementation of BWC
(MN 626.8473 Subd. 2)
1. Public comment
• Local law enforcement agency must provide opportunity for
public comment before it purchases or implements portable
recording system.
• At minimum, agency must accept public comments submitted
electronically or by mail and governing body with
jurisdiction over budget of agency must provide opportunity
for public comment at regularly scheduled meeting.
Legal Steps
2. Written & Procedure Mandated
• Chief officer of every state and local law enforcement
agency that uses or proposes to use portable recording system
must establish and enforce written policy governing use.
• In developing and adopting policy agency must provide for
public comment and input as provided in statute.
• Use of portable recording system without adoption of written
policy meeting requirements of this section is prohibited.
• written policy must be posted on agency’s (City) Web site.
Funding Considerations
Funding Plan
WatchGuard BWC
Year Amount Source
2023 $56,000 State grant funding, or forfeiture
2024 $56,000 State grant funding, or forfeiture
2025 $56,000 Adopt into police department operation budget
2026 $56,000 Operations budget
2027 $56,000 Operations budget
Considerations
• After selecting vendor, need to work out details of the five-year
agreement, final on price, and have legal review.
• Policy development to follow LMC recommendations,
implementing vendor specific protocol, and formal review.
• Goal is to complete necessary steps and be back to council for
formal approval by September, 2022.
COUNCIL MEMORANDUM
To: Honorable Mayor and City Council
From: Jason Zimmerman, Finance Director
Date: May 24, 2022
Subject: Ideal Avenue Financing
BACKGROUND
At the December 14, 2022 City Council Meeting, several road construction projects were approved in
the 2022-2026 Capital Improvement Plan (CIP). As part of the planning process, three street projects
were identified as requiring the use of debt to facilitate the reconstruction as outlined in the CIP.
R2022-01; 2022 Street Reconstruction and Overlay Project
R2022-02; 40th Street Reconstruction Project
R2022-03; Ideal Avenue Reconstruction Project
Each reconstruction project has at least a portion of the cost assessed to the benefiting property
owners, which, per city policy, will be charged an interest rate 2 percent (rounded to the nearest 1/4
percent) above the city’s interest rate established at the time of the bond sale. The proposed bond
duration for the three project areas are as follows:
2022 Street Reconstruction and Overlay Project – Ten years per City Policy
40th Street Reconstruction Project – Eight years per Willowbrooke development agreement
Ideal Avenue Reconstruction Project – Eight years per Willowbrooke development agreement
The primary risk with any bond that has an assessment tied to it is that it may be prepaid by the
property owner to the City at any time, while the City has a fixed term that it is required to make
principal and interest payments. Hence, if a parcel that is to be assessed with a repayment term of
eight years pays off the principal obligation in three years, the City would need to find external resources
to fulfill the interest obligation associated with the debt for the remaining five years. This typically hasn’t
been an issue for projects assessed as part of the city’s regular road reconstruction program, but given
these assessments are for residential development projects, they pose an accelerated interest risk
Council should be aware of.
The most significant exposure the City faces in regards to interest expense obligations under a
traditional bonding structure is on Ideal Avenue, which is proposed to be financed 100 percent by
assessments. It’s important to keep in mind that although there is elevated risk under this financing
scenario, the developer does have the option to wait to make payments throughout the entire duration
of the bond term.
With this in mind, staff would like to provide Council with an alternative to finance the Ideal Avenue
project internally, with the use of funds from the Special Project Fund. If Council would like to proceed
internally, the following would be proposed:
Appropriate resources needed to cover the construction costs would be transferred from the
Special Project Fund to a new Capital Project Fund (“Ideal Avenue/CSAH 13 Reconstruction).
o This new fund would be used to accumulate expenses and collect assessment payments.
o Assessments would be at a rate of 2 percent (rounded to the nearest 1/4 percent) above
the city’s interest rate established at the time of the bond sale, as noted above.
As assessments are repaid, Council direction would be required to use the funds for other
purposes (these resources can’t be transferred without formal Council action).
In addition to minimizing interest expense risk by internally financing, the interest generated on the
assessments would be fully realized by the City. The primary downside of this option is committing
current city cash resources for a period up to eight years.
COUNCIL DIRECTION REQUESTED
It is requested that Council determine if they are comfortable with the interest expense risk associated
with a traditional bond issuance to facilitate the financing of Ideal Avenue, or if they would like staff to
pursue financing internally.
If Council would prefer to finance the Ideal Avenue Reconstruction Project internally and continue the
debt issuance process for the 2022 Street Reconstruction and Overlay Project and the 40th Street
Reconstruction project, no modifications need to be made to the parameter’s resolution related to the
G.O. Bonds Series 2022A which is on the consensus motion for this evening, as the parameters
resolution sets the cap for the par amount the bonds can be issued.