Design Review Board
Regular MeetingOlympia, WA · September 25, 2014
Minutes
City Hall
City of Olympia 601 4th Avenue E
Olympia, WA 98501
Contact: Catherine McCoy
Meeting Minutes 360.570.3776
Design Review Board
Thursday, September 25, 2014 6:30 PM Room 207
1063 Capitol Way Building - Information Only
1. CALL TO ORDER
Chair Carver called the meeting to order at 6:30 p.m.
1.A ROLL CALL
Present: 6 - Chair Thomas Carver, Boardmember Jami Heinricher, Boardmember
Angela Rush, Boardmember Robert Findlay, Boardmember Joseph
S LaValle, and Boardmember Darrell Hoppe
Excused: 3 - Vice Chair Jane Laclergue, Boardmember David Goularte, and
Boardmember Duane Edwards
OTHERS PRESENT
City Staff:
Keith Stahley, Director, Community Planning and Development Department
Presenters:
Rick Browning, State of Washington, Department of Enterprise Services
Allyn Stellmacher, ZGF Architecture
Eddie Kung, ZGF Architecture
Jim Keller, Site Workshop
2. APPROVAL OF AGENDA
The agenda was approved.
3. BUSINESS ITEMS
3.A 14-0919 1063 BLOCK REPLACEMENT INFORMATION & DISCUSSION
Presentation:
Mr. Browning introduced the project team to the Design Review Board members.
Mr. Stellmacher presented a PowerPoint Presentation providing a project overview.
Mr. Keller explained the site landscaping and its connection with the Olmstead plan.
He noted the State left out the understory planting when they installed the
City of Olympia Page 1
Design Review Board Meeting Minutes September 25, 2014
landscaping. He highlighted the bike parking near the front door of the building.
Public Comments and Responses:
Following the design team’s presentation Mr. Carver asked for questions or comments
from the public.
Jim Lazar referred to his letter submitted to the DRB regarding their jurisdiction over
the project. He did not agree with the staff 's and state’s perspectives that the site
and the project are not subject to the City’s design review process. He noted the site
abuts three “pedestrian A streets”; awnings are required along pedestrian A streets,
and must be at a pedestrian scale; and the awning at the south side of building
doesn’t provide protection because it’s 30 feet in the air. He urged the design team to
consider rain protection improvements around the perimeter of the building.
Walt Jorgenson referred to an article and his letter previously submitted to the State in
March. He expressed concerns about little opportunity for public comment, and asked
what public participation opportunities would be available in the future. He
encouraged the DRB to take advantage of opportunities to weigh in on the project. He
asked the design team what changes to the building reflect public input.
Rich Browning responded that canopies do not provide continuous protection from the
rain but there is protection around much of the building. He said DES and the design
team will take these comments under consideration. He noted DES is planning an
October workshop for public comments about the project. This meeting will focus on
the public realm. He noted the Capitol Campus Design Advisory Committee and the
State Capitol Committee have also held public meetings and have taken feedback.
Mr. Stellmacher will continue to work on the weather protection issue. Mr. Browning
noted weather protection may also be provided through a link through the building.
Mr. Browning added that the property is included in the Capital Campus Master Plan.
He will provide a legal opinion to the City from the State Attorneys General Office
regarding the status of the property relative to the City’s design and zoning
requirements.
Ms. Heinricher asked if the Beall Mosaic is being moved to another location. Mr.
Browning responded that incorporation of the mural has not been authorized as of yet.
The legislation authorizing the design of the building also stipulates that the GA
building will be demolished at some point in the future. Mr. Kung added that the
design team is continuing to work on finding an appropriate location for the mosaic in
the building.
City of Olympia Page 2
Design Review Board Meeting Minutes September 25, 2014
Mr. Hoppe asked what the occupancy count of the building will be. Mr. Brown
responded about 800. Mr. Hoppe asked about the parking plan and transportation.
Mr. Browning responded that the two buildings will demolished. This project improves
parking capacity on campus, at least on paper. A campus-wide parking and
transportation study is available on the DES, 1063 Building web page. A parking
report was prepared that includes very detailed occupancy counts and gives a
detailed picture of parking utilization both during and outside of legislative session.
When not in session, there is plenty of parking capacity. Things get tight during
session and may exceed practical capacity. The State will need to more aggressively
manage parking by managing how spaces are allocated, cost of parking, restriping,
satellite parking and shuttles, and shifting away from the drive-alone rate currently at
75%. Mr. Browning noted the Governor has set a target of 65%. DES has included a
request for funding to implement parking management in its budget request. DES is
hoping not to build new parking for this project.
Mr. La Valle stated encouraging alternative means of commuting will gain the project
LEED points.
Ms. Heinricher noted the interior pass-through could be very important for improving
the pedestrian experience and said it would be tragic if the whole building was closed
off due to security issues. She asked if there will there be a coffee bar. Mr. Browning
said all food provided will be through the Commission for the Blind.
Mr. Findlay asked about the height of the building compared to the mixed use building
at the northeast corner of Union and Capitol Way. Mr. Kung explained the building
will be no more than 59 feet.
Ms. Rush asked if the wall along Capitol Way can be softened. Mr. Stellmacher said
the details have not been resolved for that wall and corner. Mr. Kung explained the
wall also serves as a retaining wall. Ms. Heinricher asked about use of art. Mr.
Browning added DES is looking at alternatives to break-up that wall. This building is
not specifically a “State Patrol Building”.
Mr. La Valle complimented the project. Capitol Way is an important street for the City;
Union is less important. Need to think about wrapping the corner and the importance
of covered walkways. The pass-through idea within the building is great. Extend the
Union entrance treatment up Capitol Way or move the entrance to Capitol Way. Ms.
Rush added that the bit of setback helps create some space and keeps the building
from overwhelming the street. Rain protection might actually impinge on the
spaciousness of the streetscape.
City of Olympia Page 3
Design Review Board Meeting Minutes September 25, 2014
Mr. Stellmacher stated a canopy wrapping the corner and utilizing some wood on the
corner helps soften and make the Capitol Way side of the building more appealing
from a pedestrian perspective.
Ms. Rush noted this building will make a great impact on the approach to the campus
coming up Capitol Way from downtown and appreciate the focus on the corner. The
break in building materials helps. She noted the extra five feet gives the opportunity
to install large trees along Capitol Way.
Ms. Heinricker said she appreciates the connection to the campus group, and
suggested there could be a sculpture at the southeast corner of the building. Mr.
Browning said there will be .5% for public art, however, no decision to employ an artist
has yet been made.
Mr. Carver thanked the design team for presenting and explaining the project.
The information was provided.
4. ADJOURNMENT
The meeting adjourned at 8:16 p.m.
City of Olympia Page 4
Agenda
City Hall
City of Olympia 601 4th Avenue E
Olympia, WA 98501
Contact: Catherine McCoy
Meeting Agenda - Final 360.570.3776
Design Review Board
Thursday, September 25, 2014 6:30 PM Room 207
1063 Capitol Way Building - Information Only
1. CALL TO ORDER
1.A ROLL CALL
2. APPROVAL OF AGENDA
3. BUSINESS ITEMS
3.A 14-0919 1063 BLOCK REPLACEMENT INFORMATION & DISCUSSION
Attachments: Capitol Campus map excerpt and aerial perspective
Capital Park Building historic photos and narrative
Memo to the OPC 100113
Architects Plan Set Submittal
4. ADJOURNMENT
Accommodations
The City of Olympia is committed to the non-discriminatory treatment of all persons in employment and
the delivery of services and resources. If you require accommodation for your attendance at the City
Advisory Committee meeting, please contact the Advisory Committee staff liaison (contact number in
the upper right corner of the agenda) at least 48 hours in advance of the meeting. For hearing impaired,
please contact us by dialing the Washington State Relay Service at 7-1-1 or 1.800.833.6384.
City of Olympia Page 1 Printed on 9/17/2014