Utility Advisory Committee
Regular MeetingOlympia, WA · June 6, 2013
Minutes
City Hall
City of Olympia 601 4th Avenue E
Olympia, WA 98501
Contact: Liz Hoenig
Meeting Minutes - Final (360) 753-8152
Utility Advisory Committee
Thursday, June 6, 2013 5:40 PM City Hall, Room 207
1. CALL TO ORDER
Chair Curtz called the meeting to order.
2. ROLL CALL
Present: 7- Chair Thad Curtz, Vice Chair Barbara Day, Committee Member Kim
Andresen, Committee Member Richard Doenges, Committee Member
David Dunn, Committee Member Carol Law, and Committee Member
Jennifer Sievert
Absent: 3- Committee Member Margaret Drennan, Committee Member Loralei
Walker, and Committee Member Chris Ward
3. APPROVAL OF AGENDA
The agenda was approved.
3.A 13-0440 Approval of May 2, 2013 UAC Meeting Minutes
LOTT Community and Environmental Policy Director Karla Fowler contacted the City to say
Bob Jacobs is not a member of the advisory committee for the LOTT groundwater scientific
study. He has been coming to the meetings and offering public comment.
Chair Curtz would like staff to go back and write the answers to the bulleted questions from
UAC members that occurred during the discussion under the business items of the evening.
Liz stated that staff would do this before posting the minutes.
The minutes were approved as amended.
5. PUBLIC COMMENT - None
6. ANNOUNCEMENTS
Chair Curtz noted a book he is reading that he would like to share with the UAC called
“Fostering Sustainable Behavior - Community-Based Social Marketing” (third edition) by
authors Doug McKenzie-Mohr and William Smith. He suggested that UAC members and staff
read the book and discuss it at a future meeting.
City of Olympia Page 1
Utility Advisory Committee Meeting Minutes - Final June 6, 2013
Chair Curtz also shared a draft letter for the Comprehensive Plan to send to the City Council
related to the policy/goal that was removed from the Plan. UAC members made and
approved a motion to send the letter to City Council.
Liz Hoenig noted that a letter was sent to the Council General Government Committee and
approval was received from them to officially change the 2013-2014 UAC work plan for the
September meeting. The new agenda item will include a panel of experts who will attend
the September UAC meeting to discuss aquatic habitat improvement priorities related to the
Storm and Surface Water Utility.
Clark Halvorson announced that Doug Floyd retired from the City of Olympia recently. He
had a long history with the City, and was especially knowledgeable of McAllister Springs and
the operations of the City’s pump stations. We are currently recruiting to fill his vacated
Supervisor position in Pump Stations and hope to have a replacement by early July.
6.A PLANNING COMMISSION UPDATE
Kim updated UAC members on the comprehensive planning process. She noted that the new
members had received a briefing on the plan and a briefing on reclaimed water and solid
waste enclosures. The Planning Commission also recently forwarded a code change
recommendation on parking lots and frontage issues with large buildings to the City Council.
They also approved a proposed work plan for the Planning Commission to City Council. The
Planning Commission would like to review the idea of neighborhood centers, and they plan
to conduct research on this topic. They are going to do a walking/driving tour of 17 areas to
review local neighborhood centers (for example, the area near the San Francisco Street
Bakery).
7. BUSINESS OF THE EVENING
7.A 13-0438 LOTT Clean Water Alliance Capital Improvements Plan Development
LOTT staff Tyle Zuchowski and Karla Fowler gave an update on the LOTT capital planning
process. They started with an overview of the long-range planning process. LOTT conducts
continuous capital planning and updates population projections every year to determine the
needs for future capacity. They calculate the needs for facilities using flow modeling
throughout the service area. They also coordinate this with their asset management
program, to look at the needs for rehabilitation, maintenance and replacement of assets.
With population projections this year, the LOTT partnership took a more in-depth approach
to looking at how septic systems could be hooked up to the sewer system over time. The
partnership looked at different scenarios for hook-ups, assuming only a portion of septic
systems would eventually connect to the regional sewer system.
Mr. Zuchowski discussed different project categories that are funded through the LOTT CIP.
He then discussed some of the project highlights for this year’s CIP (A full draft CIP is not
available yet). Ms. Fowler gave an update on the groundwater scientific study and discussed
how this study will help guide local public policy and future permitting on infiltration of
City of Olympia Page 2
Utility Advisory Committee Meeting Minutes - Final June 6, 2013
reclaimed water in local soils. The anticipated completion date of the study is 2017.
Questions/Comments from UAC Members:
· Is the equivalent residential unit (ERU) based on actual use patterns in households
and businesses and does it automatically assume a reduction in water use? We do
monitor flows in households by looking at drinking water consumption results, billing
records, census data, and flow monitoring results in different cities, but do not
automatically assume an ongoing reduction in water use.
· What are assumptions about water conservation and how have these changes been
incorporated into the planning period? Ms. Fowler noted over 1 million gallons per
day of capacity have been realized since indoor conservation efforts started in 1997,
which has allowed new treatment capacity projects to be pushed out in time. Water
use is accounted for by updating the per capita wastewater generation rates (gallons
per capita per day) which is done annually based on drinking water consumption
results, billing records, census data, and flow monitoring results.
· How have the reductions in water use impacted ERUs and projections for future
capacity projects? Water use reduction provides more flexibility in long-range
planning for capacity. Reductions in water use are reflected in the updated per
capita wastewater generation rates, which are used to estimate future wastewater
flows. Thus, capacity development projects can be postponed in proportion to
reduced water usage. The ERU is strictly a unit measure to count the number of
connections.
· What are benefits of the primary sedimentation basin? Better control over large
storm events, replacing a 60 year old structure. Another basin will be added in 2027.
Odor control will continue to be a big component of operations at this treatment
facility.
· Is there anything in the plan so far that might affect the Tumwater reclaimed water
storage facility? Is it possible that moving ahead with the facility might undermine
community trust before the scientific study is completed? The storage facility will
provide Tumwater with reclaimed water for irrigation, and has been in the planning
process for many years. LOTT has not moved ahead with any future projects related
to groundwater infiltration; the earliest project for those efforts is scheduled for
2017.
· Has LOTT looked at alternate capital improvement paths in order not to infiltrate
reclaimed water - so we understand what the costs might be to not infiltrate into
groundwater? The issue will be more focused on the level of treatment of reclaimed
water and the costs associated with that. There are significant discharge limitations
to Puget Sound.
· Any other bonding to finance capital projects? LOTT did issue a bond for the primary
sedimentation projects. There is the potential for future bonding to keep costs
down.
· Is LOTT addressing sea level rise impacts? LOTT has hired a consultant to do an
assessment of the vulnerability of the downtown facilities to overland flow. LOTT
has also used the work done by the City of Olympia staff to evaluate sea level rise
downtown.
City of Olympia Page 3
Utility Advisory Committee Meeting Minutes - Final June 6, 2013
The report was received.
7.B 13-0439 Draft Capital Facilities Plan
Clark Halvorson, Water Resources Director, and Andy Haub, Engineering and Planning
Manager, gave a review of the CFP for the Water, Wastewater and Storm and Surface Water
utilities and of the annual process of review. Clark gave an overview of the planning process
and how utility master plans, budgets and rates feed into the capital planning process. Clark
discussed the process for evaluating capital projects, and also discussed taking a more
strategic and long-term approach to pursuing grants and loans to fund capital projects.
Water projects will be mostly focused on transmission and distribution projects in coming
years. Wastewater is transitioning from the older master plan to the newer plan. This CFP
includes policies and projects from the new Wastewater Plan, which has been reviewed by
the UAC.
Questions/Comments from UAC Members:
· All utilities have asphalt overlay - what is the reason for not dividing up the overlay
funding equally - why does storm water pay more? Council made the decision three
years ago to provide stormwater funding for sidewalk projects that incur high
stormwater management costs.
· Can reclaimed water be used for fire suppression? Our current reclaimed water
system is not reliable enough - would need a duplicate system (along with drinking
water) with storage and pumps to provide this.
· Does the new Community Renewal Act have any funding available for utility
projects? Federal funds may be available through new legislation.
· Is fiber optic cable being put into projects when the road is being torn up? Staff will
follow-up with this, our current understanding is that it is only put in in areas where
city facilities are being connected.
· What does staff consider modest rate increases for Wastewater? 4-5 percent.
· We are proposing investing in getting people off septic - but also letting people put
in new septic systems. Can we rationalize that the cost of getting people off septic
systems are beneficial enough? If we let people on new septic systems - aren’t we
just creating a new problem for ourselves in the future? Staff feel we should allow
installation of septics in areas where this is the only feasible way to develop - when
there is no cost effective way to hook up to sewer. We prioritize septic to sewer
connections in areas where there are environmental risks with a failed septic
system.
· Are stormwater retrofits included in the water quality section of the CFP? What
about LID (low impact development) demonstrations? Yes, most of the retrofits have
an LID component, both neighborhood projects and larger arterial projects.
· Will the different LID approaches that DOE is requiring impact Olympia? Yes,
however we have lots of discretion on the types of projects we build for stormwater,
except for grant funded type projects. The land development implications will be
significant for public and private development. LID techniques will need to be
inherent to the design of new development, not just laid on top of new
development. We are considered progressive in this area so we are poised to deal
with it. We will adopt as much LID as feasible from a risk management perspective.
City of Olympia Page 4
Utility Advisory Committee Meeting Minutes - Final June 6, 2013
· Ken Lake project conveyance; is the rezoning being considered? Would that impact
this project? Ken Lake conveyance needs to be upgraded independent of zoning
changes - this system is currently undersized.
The Committee moved and approved to draft a letter to the Planning Commission
supporting the proposed CFP and provide specific comments. Staff will draft a
letter for the Chair’s review and signature.
8. ADJOURNMENT
Chair Curtz adjourned the meeting at 7:52 p.m.