Work Session
Regular MeetingOssining, NY · June 12, 2024
Agenda
Village of Ossining
Work Session Agenda
Wednesday, June 12, 2024 @ 7:30 PM
16 Croton Ave. Board Room
OSSINING, NEW YORK
and VIA ZOOM
Members of the public can view the meeting via
computer or mobile app:
https://us06web.zoom.us/j/83519013039
Members of the public can listen to the meeting
by dialing in via phone: +1 929 205 6099
Webinar ID: 835 1901 3039
**Please note that by dialing in, your phone
number will be visible to the host, participants,
and attendees of the meeting.**
Topic: Sustainable Westchester Update on CCA
Contact: Karen D'Attore, Village Manager
SW - Village of Ossining - WP Renewal 2024
Topic: 12 inch transmission main, 9A water main replacement
Contact: Stuart Kahan, Corporation Counsel, Andrew Tiess, Superintendent of
Water/Sewer & Tom Pasquale
6.10.24 Manganaro Proposal
Topic: Driveway Paving Fees
Contact: Stuart Kahan, Corporation Counsel & Joseph Agostinelli, Building Inspector
Topic: Rental Registry Fees
Contact: Stuart Kahan, Corporation Counsel & Joseph Agostinelli, Building Inspector
Topic: Vacant Storefront Fees
Contact: Stuart Kahan, Corporation Counsel & Joseph Agostinelli, Building Inspector
Topic: Special Events Fees
Contact: Karen D'Attore, Village Manager
Topic: License/site agreements for Project Mover
Contact: Stuart Kahan, Corporation Counsel
Topic: Proposed Local Law -2024: A local law amending chapter 91, section 91-23
Contact: Stuart Kahan, Corporation Counsel
Work Session June 12, 2024 Page 1 of 51
Chapter 91- Escrow
ADJOURNMENT - WORK SESSION
Work Session June 12, 2024 Page 2 of 51
Westchester Power
6/12/2024 Village of Ossining
Page 3 of 51
A SHARED CHALLENGE
Page 4 of 51
CLIMATE CHANGE IS HERE, NOW
TEMP
RAIN
Page 5 of 51
OUR COMMUNITIES ARE IMPACTED
White Plains Yorktown Tarrytown
Page 6 of 51
9/23/2023 9/23/2023 10/21/2023
4
AMBITIOUS GOALS FOR NYS
Climate Leadership and Community Protection Act - CLCPA
70% renewable energy by 2030
Zero emissions by 2040
Page 7 of 51
SHARED SERVICES:
DOING MORE TOGETHER
Page 8 of 51
SUSTAINABLE WESTCHESTER
CREATED BY AND FOR WESTCHESTER’S MUNICIPALITIES
Page 9 of 51
and Westchester County itself
GRID
SW IS SHARED SERVICE PROGRAMS EFFICIENCY
COMMUNITY ELECTRIFICATION
ENERGY SOLUTIONS
WESTCHESTER POWER ENERGYSMART HOMES GRID REWARDS
ZERO
WASTE
RECYCLE RIGHT APP
BUILDING
DECARBONIZATION
Page 10 of 51
COMMUNITY SOLAR SUNSHINE TO EV
OPPORTUNITY, COMMUNITY & EQUITY
GREEN WORKFORCE
ENVIRONMENTAL JUSTICE
MUNICIPAL ENGAGEMENT LMI Utility Savings
Empower
SERVICE PROVIDER HELP
Climate Justice Fellows
Public Housing Support
Page 11 of 51
WESTCHESTER POWER
IS A CORNERSTONE OF
REGIONAL CLIMATE ACTION
Page 12 of 51
WESTCHESTER POWER CCA
First and Largest CCA in New York State
29
Municipalities
145,000
Page 13 of 51
Residents and
Small Businesses
Provide Clean Energy
Expand Consumer Choice
Cap Electricity Costs
Page 14 of 51
PROVIDE CLEAN ENERGY
2023
310,860
Metric Tons
of Carbon
Page 15 of 51
PROVIDE CLEAN ENERGY
Page 16 of 51
Cars off the road 73,985
Based on EPA Calculator
PROVIDE CLEAN ENERGY
310,860 Tons of Carbon . . .
Westchester
Power
>
Page 17 of 51
More impactful than all other municipal actions combined.
PROVIDE CLEAN ENERGY
310,860 Tons of Carbon . . .
Page 18 of 51
$40,411,800 social costs averted.
NYSDEC calculation for 2025, based on 2% discount rate
Expand Consumer Choice
Westchester Power DEFAULT
DEFAULT Utility Utility
ESCOs ESCOs
Page 19 of 51
Traditional CCA
CAP ELECTRICITY COSTS
UTILITY RATES HAVE VARIED from 4
cents to 22 cents since program launch.
WP PREDICTABLE FIXED-RATE never
exceeds the contract level.
Page 20 of 51
STATE GRANTS
STATE GRANTS can be accessed by municipalities that participate in CCA. NYSERDA’s Clean
Energy Communities program recognizes CCA as a high-impact action.
Page 21 of 51
STATE GRANTS
Page 22 of 51
CUSTOMER SUPPORT & EDUCATION
CUSTOMER HELP by phone or email BILINGUAL SUPPORT & OUTREACH
COMMUNITY ENGAGEMENT
LINKS TO OTHER PROGRAMS with
guaranteed savings
EASILY ACCESSIBLE INFO through our
website
ASSISTANCE FOR MUNI STAFF is
Page 23 of 51
always available
IMPROVING COMMUNICATION
CUSTOMIZED PLAN based on community
collaboration.
POSSIBLE APPROACHES
● Enhanced messaging for opt-out period
● Monthly email updates
● Video guide to online information
● Robocalls/texts as needed
● In-person community workshops
● Community leader engagement
Page 24 of 51
● Additional mailings and/or inserts
LOW & MODERATE INCOME PROTECTION/ASSISTANCE
Not Enrolled in CCA Guaranteed
Savings
Community Solar
HEAP
Home Energy Assistance Program
GridRewards
UAP
Utility Assistance Program
Page 25 of 51
EmPower+
EMPOWERMENT
Page 26 of 51
CONSUMERS CAN ALWAYS OPT-OUT, AND IT’S EASY
OPTING OUT IS SIMPLE, customers can:
1. Mail (Before Enrollment)
2. Online at sustainablewestchester.org/wp/con-ed-area-choosesupply
3. Email westchesterpower@sustainablewestchester.org
4. Phone at (914) 242-4725 ext.111
NEVER ANY FEES OR PENALTIES
COME AND GO AS OFTEN AS YOU LIKE
Page 27 of 51
ONCE & DONE: You remain out of the program unless you choose to opt
back in.
WHY IS OPT-OUT NECESSARY?
VIABILITY
The only practical model
IMPACT
Clean energy uptake at scale
THERE IS ALWAYS A DEFAULT
!!! Not whether, but what
Page 28 of 51
WE ARE ALL EMPOWERED
Residents & Businesses Municipalities
Make the best choices for Advance community-wide values and
ourselves from a broader priorities through intentional decision-
menu of options. making.
Page 29 of 51
Price Enhanced Competition & Options
Predictability Clean, Renewable Power
Environmental Action Consumer Protection
CURRENT CONTRACT
Page 30 of 51
CURRENT CONTRACT: CON ED TERRITORY
Supplier: Constellation New Energy
Rates for Residential & Small Commercial:
• Renewable – 15.449¢/kWh
• Standard – 13.685¢/kWh
Term: November 1st 2022 through October 31st 2024 (24 months)
*Con Ed 12-month trailing average for the period 04/2023-03/2024: 9.378¢/kWh
Page 31 of 51
WHY? UNIQUE CHALLENGES IN 2022
WAR IN UKRAINE roils energy markets
ENERGY PRICES FORECAST TO RISE
ACTUAL PRICES DECLINE post-contract,
leaving fixed-rate higher than utility
Page 32 of 51
BUT LONG-TERM PRICING IS COMPETITIVE . . .
Year Con Ed Avg WP Renewable WP Standard
2016 8.01 7.68 7.38
2017 8.41 7.68 7.38
2018 8.55 7.68 7.38
2019 6.46 7.96 7.71
2020 5.64 7.96 7.71
2021 7.23 7.41 6.75
2022 10.38 9.34 8.40
2023 9.36 15.13 13.36
2024 11.39 15.44 13.68
ABOVE BELOW Since 2016 7.98 9.03 8.41
Utility Utility
Price Price
Page 33 of 51
WP RENEWABLE ENERGY IS A GOOD DEAL
Monthly ranges of comparable ESCO
offerings
(12-24 month contracts, 100% renewable)
WP RENEWABLE ENERGY has typically
come in below market costs, even in the most
recent contract, comparing favorably with
similar renewable offerings from ESCOs.
Page 34 of 51
NEW CONTRACT OPPORTUNITIES
Page 35 of 51
MARKET CONTEXT: ADVANTAGES FOR FIXED RATES
CAPACITY CONCERNS: NYISO projects a shortage in 2025
with the confluence of peaker plants coming offline,
acceleration of electrification and new emissions rules coming
into effect.
PRESSURE ON NATURAL GAS PRICES: Natural gas is the
electricity market price setter. Exports to higher priced market
are again becoming a factor as port facility capacity increases.
HOT SUMMER PREDICTED: 2-4 degrees higher than
Page 36 of 51
average. New York City will likely see twice as many 90-
degree days as in 2023, when there were 12.
MARKET CONTEXT: REC LIMITS & OPTIONS
RECs 101
Tier 2
LIMITED SUPPLY ● New York renewable market system
Primarily hydropower
based on “renewable energy
certificates” - RECs
● For generation constructed prior to Jan 1, 2015
● Maintaining and optimizing legacy facility output, ● 1 REC = 1 megawatt-hour of power
and keeping it in-State
put out on the grid
● NYS has designed distinct “tiers” of
Tier 1 RECs for different policy purposes,
NOW AVAILABLE
Primarily wind but all to grow renewables and meet
Page 37 of 51
and solar
● Started operation after Jan 1, 2015
clean energy goals
● Considered higher “additionality” - deeper green.
RENEWABLE ENERGY MIX TO DATE & GOING FORWARD
Paths to 100% Default
Current & A possible T2 If availability can If availability can
past contracts shortage means be met, possibility be met, munis
2024 base for 100% T2 can add T1
contract would be
Tier 1
100% 50% 100% +
Tier 2 Tier 2 Tier 2
Tier 2
100% Blend
Page 38 of 51
Greener Green Greener Greenest
CURRENT INDICATIVES
Based on energy
markets today.
Apples-to-apples
reduction of roughly
20% in rates.
Page 39 of 51
GETTING TO 100
Challenge: NYSERDA price for Tier 1 RECs known by July, and sale in
August, with Tier 2 availability unknown until that time frame as well, but
we are looking to sign the main contract in June
June: Award & sign contract for 50% Tier 2
July: REC opportunities are identified in July for Tier 1 & Tier 2
July-August: RECs are secured and contract amendments that allow
Page 40 of 51
for 100% Renewable default are executed
Two MOU Options
1. Tier 2 50% Default and 100% Customer Opt Up
The product structure we initially go to bid with and contract for in June will be the
structure for the upcoming contract, regardless of Tier 1 & Tier 2 REC availability
2. 100% Renewable Default if Possible
Allows for final decision by the municipality once Tier 1 & Tier 2 product prices are
settled the possibility for a default 100% Renewable product is known
Page 41 of 51
REQUESTED ACTIONS & TIMETABLE
Municipalities Sustainable Westchester (Pre-Contract)
Approve/Sign MOU: Throughout June RFP Release: Mid-June
Sign Contract Post-Award: Late June Bid Award: Mid/Late June
Sustainable Westchester (Post-Contract)
Tier 1 Price Determined: July
Tier 1 Auction: Aug 1-15
Final Pricing: Aug 15-17
Public Meetings: End of Aug
Page 42 of 51
Opt-out Period: Early Sept - Early Oct
Customer Enrollments: Starting Nov 1
THANK YOU!
Contact Us
Nick Tedrow, Deputy Program Director
nick@sustainablewestchester.org
914-242-4725 ext 118
Westchester Power General
westchesterpower@sustainablewestchester.org
More Program Information at:
Page 43 of 51
sustainablewestchester.org/wp/conedterritory
303 South Broadway, Suite 223
m a n g a n 3 r0 Tarrytown, NY I 0591
T: 914. 769.0000, F: 914. 769.1976
June 10, 2024
Mr. Andrew W. Tiess, Superintendent of Water & Sewer
J ohn-Paul Rodrigues
Ossining Operations Center
101 Route 9A, PO. Box 1166
Ossining, NY 10562-1993
RE: Professional Engineering Services Proposal
—
Installation of a New Water Main Whitetail Circle, Hawkes
Avenue & Route 9A NYSDOT Entrance/Exist Ramp
o
Pa 1
5f CAMCE No. P—2049
ge
Dear Mr. Tiess:
Charles A. Manganaro Consulting Engineers, P.C. (CAMCE) is pleased to offer this proposal to
provide requisite Of?ce Services and Construction Administration services towards the existing
design for installation of the new 8 & 12-inch diameter water mains within the Town/Village water
distribution system.
The work involves the installation of approximately 960 linear feet of new 8 & 12-inch diameter
Class 54, ductile iron water mains on Whitetail Circle, Hawkes Avenue & a portion of Route 9A
NYSDOT Entrance/Exist Ramp. The scope also includes the installation of in-line gate valves
and the installation of new ?re hydrant assemblies.
The areas identi?ed as requiring new water mains are summarized in the following table and are
the basis of the limits of this work:
Whitetail
the 9A
Entrance/Exist
Route
Avenue,
Whitetail Avenue
Circle
Circle,
and NYSDOT
Location & Hawkes
Ramp.
Hawkes
a portion of Service
Connections
No. of No.
62 of In-
Gate
Valves/Size
line12-
Diameter
8-inch
inch
Page 44 of 51
Page 45 of 51
80-088 80 8a 80m$5539
mg?om 2: 985582 6 8m 8:358:86 hammooo: o? 238m
.9830 um 30 $809on 3030M
.888qu :88me >328“:9888300 85 $8on
moEo?tmmom
m> countomwnm?l 39m #8? 302 2: canA ODD v
.8 EoEtonQ b 00 “88:33 05 m3£5253 0859000
.mm?a?w 90%$305 w 325%
.95 com888qu
t??EBE a$80: > 03>on 8 .258qu 22m HEB3958800
0%:
882 z“ @632: mange 5833:0929 a 8:980 c Escoaom
ucot< .o
got/w
. 3283850 win—5mo?tom 35¢
Samoa .9 gotoq 38on 3 8:02 a 25mmw 23on
05 5 H333 8 ESP 2: Sm 0030: E08835
bcoo2: 8m bm?u?aoo go.“ 3:08:08
mmmmaoc Eon w mo :55 2: 325% on“;
33
232m 038383
douosbmqoo
4.
macaw
2: 9 0322
8: 8,“Sm mandooQ
aco?aoom mEcEm
88:80 mo38 Bow v
3 55388 Sm mEo?sooQ 88:50 2: momoEoo g Sow 23on
025$ .s
gated EmB< wo8:0 Z 2: 03mmc
232m
magi .Hease 683m 8% 228286
2: 38on «in 60382 mums >632 “mammomo Ba. 2:
n mm
cBmoE—oc
.8358 meteo?08 032 canmagma29-89 2:
m 98 a303.3% .6
2: :o wommm
.: gash.
mC mmu
C mE
303 South Broadway, Suite 223
Tarrytown, NY 10591
m a n ga n a r0
E N G' N E E R 5 T: 914.769.0000, F: 914.769.1976
Responsibilities of the Clien
t:
a. All data deemed relev to, the
not
project
but
limited
including,
existing
plans Task III. Field Services during Construction: As per WCDOH requirements,provide a full-
ant
and/or record as-built orstreet
and
construction
other
details,
utilities, time Resident Representative to monitor the Contractor’s work during construction.
information shall be pr tothe
Engineer. It is anticipated that the ?eld services for the project will require approximately 13
o
b. Provide access to all vi
si weeks. The details of Field Services to be provided under this task are as follows:
dte
c. from
the
representa
Provide the name of aes. to
Ossining
Town/Village a.
of During the period of construction, observation of work quality and progress by a
d tive
serve as a contact duri coattend
who
and
meetings.
project
will resident representative(s) skilled in ?eld resident services.
ng ns
tr b. Observe required testing by the Contractor.
uc
P53
of ti c. Interact with all parties to provide interpretation of the documents.
a o
g (1. Prepare daily work reports and review Contractor monthly payment estimate.
n
e
e. Assist in identifying any change orders.
1'. Coordinate with the Town/Village of Ossining.
g. Attend project meetings with the Contractor.
h. Prepare a ?nal punch list of outstanding work for the Contract upon substantial
completion of the project and provide ?eld veri?cation of completed or corrected
items.
Additional Engineering Services: CAMCE will provide any additional services required
for this project and not delineated in this proposal. Our fee for “additional engineering
services” will be based on the attached Schedule of Hourly Rates and will not be billed without
prior approval from the Town/Village of Ossining. These services may include attending
meetings not identi?ed with this proposal such as with WCDOH and NYSDOT, negotiating
Page 46 of 51
Page 47 of 51
3.9“in Hm
oodvanmmm
oodomnmmm
oodooao;
£338 2% View 52
.880 20x83
$53 #2230805
a a 5:53 93
.2882: ?qomzwcxx mmmaEmmmO
mmo
.8 03:5 :— v—m?h
.Bmwouwwm some 3* 5585
8m 338 N 8:0 80 38:06
m“6 v ow?
A 8anwish.
cotosbmcoo mEEQ5.3qu
.8 moom?om28:82?
2 2m 8388 .8 8289
5582 53 833 62888 soon0%.: £8: wag/0:8 u? 5. 3:23
u
nocosbmnoo wEEQmo?tom 850
gush.
Emomoim.H.8 tag 38238 on:55 $83980 8850 @2888 2?
322%
6832
ooammcm 2: 9 8:359:00 2t dws?o 38% 358283.. >882:on
omoa
aist 2:2: $83
.3 .0“: 80$”.on 2: E 828205 8: 3338 38:83 8% SE
::me 3
:00 dw?u?
826%Sma"moo
doom 038308 333:8 uBEoomm< 88.3.8.5
mmm m _02 Z w .25: E:
33 m
0L Cm
2: m mE mam—8x83
2885C c 83% 53> 8:03:80 8: ~33
82:80 a 8 3me 08 E xmmh88 303.3% 32m 2? A
"$82
-P-ZOOO
lo
2099\P—2049
Ossinmg
Gordon
of
Mums
Water
Replacement
M \ -L
9AInden\Final
Route
Circle,
Proposals_02242017\Poposal
Whitetail
Route
Avenue
and
Hawkes A BY: Shailesh R. Naik 303
Suite
South
Broadway,
223
9AP 06
rAMP\2024
IO
Entrance
Proposal
docx ————————
m a n an a r0
R eXlST C 1059]
NY
Tarrytown,
O President , g
E N GI N E E R S
P C 914.769.0000,
O L 2. T:
F:
914.769.1976
S EP
A Attachment J
L T
S L Please feel free to call me if you hav aor
dditional
quest
Your
require
E information.
D
V
Village
Engineer
cc: Mr. Paul Fra P.E. e nions
constitute
Agreement
authorized signature on a copy of thi sawill
between
yatisfactory
ioli s
, us for the performance of these servi
ces.
Very truly yours,
CHARLES A. MANGANARO
CONSULTING ENGINEERS, P.C.
«(a/L
P 5of
ag
e
Page 48 of 51
Page 49 of 51
Proposed Local Law -2024
A local law amending chapter 91, section 91-23 (Building Construction, Payment of review costs) and
section 91-24 (Failure to pay review costs).
BE IT ENACTED by the Board of Trustees of the Village of Ossining as follows:
Section 1. Chapter 91, section 91-23 (Building Construction, Payment of review costs) is amended
with new matter underlined and deleted matter in [brackets].
§ 91-23 Payment of review costs.
A. Consultants and Village staff members providing professional services will submit monthly
statements to the [Director of Planning] Planning Department for their professional services,
setting forth the services provided and the cost of those services. The cost of professional services
provided by a consultant will be as provided in the consultant's agreement with the Village,
consistent with the usual charges for such services in Westchester County. The cost of professional
services provided by the Village's professional staff will be at hourly rates based upon the actual
salary and benefits paid by the Village, as determined by the Treasurer.
B. Within 15 days of the receipt of a monthly statement from a consultant or the Village's
professional staff, the [Director of Planning] Planning Department will provide a copy of the
statement to the applicant by regular mail to the address specified by the applicant or by
electronic mail if the applicant specifies an electronic mail address. The applicant may dispute any
charge by notifying the [Village Manager] Planning Department in writing of the basis for the
dispute [in writing] within [15] 5 days [of] from the date [on which] that the [Director of Planning]
Planning Department gives the applicant notice of the statement.
C. If the applicant does not dispute any charge, the [Director of Planning] Planning Department will
[direct] notify the Treasurer to pay the charges out of the escrow account. If the applicant disputes
any charge, the Village Manager will determine within 15 days of receipt of the dispute by the
Planning Department, [based upon the applicant's statement,] whether to pay the disputed
charge and will [direct] notify the Treasurer to pay the charges the [Village Manager] [determines]
determined to be reasonable and consistent with the provisions of this article.
D. All payments for review costs shall be in addition to any application, inspection or other fees as
may be required by any other laws of the Village and shall not be used to offset the Village's
general expenses of engineering, legal and planning services for the reviewing boards nor to offset
the Village's general expenses.
Section 2. Chapter 91, section 91-24 (Failure to pay review costs) is amended with new matter
underlined and deleted matter in [brackets].
§ 91-24 Failure to pay review costs.
A. The Building Inspector shall not grant a building permit, certificate of occupancy or certificate of
compliance until all fees and costs required herein have been paid in full.
B. If, after final action is taken on the land use application and the [Director of Planning] Planning
Department has received and approved all statements for professional services with respect to the
application, the escrow amount held by the Treasurer is less than the charges for the approved
Page 50 of 51
professional services, the applicant must pay the remaining balance within 30 days. If the applicant
fails to do so, the Treasurer will cause the unpaid amount to be added to the next Village tax bill
for the property that is the subject of the application.
C. If, after final action is taken on the land use application and the [Director of Planning] Planning
Department has received and approved all statements for professional services with respect to the
application, the escrow amount held by the Treasurer is greater than the charges for the approved
professional services, the Treasurer will refund the balance to the applicant within 30 days.
D. Withdrawal of a land use application before action is taken does not relieve the applicant of the
applicant's obligation to pay the cost of professional services incurred in connection with the
review of the application prior to its withdrawal.
Section 3. Effective date.
This local law shall become upon filing with the Secretary of State pursuant to section 27 of the
Municipal Home Law.
Page 51 of 51
Get email alerts for Ossining